Loading...
HomeMy WebLinkAbout20191006 Ver 1_I-3819B Iredell July 23 2019_20190723 ,�s�rew ya m h q Z STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER JAMES H.TROGDON,III GOVERNOR SECRETARY July 23, 2019 U. S. Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville,NC 28801-5006 ATTN: Ms.Nicholle Braspennickx NCDOT Coordinator Dear Madam: Subject: Application for an Individual Section 404 and Section 401 Water Quality Certification for the proposed I-40/I-77 interchange improvements including I-40 from west of SR 2003 (Radio Road) to SR 2158 (Old Mocksville Road) and I-77 from south of SR 2321 (East Broad Street)to south of SR 2171 (Jane Sower Road) in Iredell County. Division 12, TIP No. I-3819B. Debit $570.00 from WBS 34192.3.2. The North Carolina Department of Transportation (NCDOT) proposes to improve the I-40/I-77 interchange, beginning on I-40 approximately 3,400 feet west of the SR 2003 (Radio Road) overpass, heading east to the existing interchange with I-77 and ending at the existing interchange with SR 2158 (Old Mocksville Road), for a total length of 4.0 miles. Improvements to I-77 begin approximately 1,200 feet north of SR 2157 (Salisbury Road) and head north to the existing interchange with I-40 and end approximately 1,100 feet south of SR 2171 (Jane Sowers Road) for a total length of 3.63 miles. The current I-40/I-77 interchange is a cloverleaf interchange, which contains loop ramps in three quadrants. A portion of the I-40/I-77 interchange improvements was previously built as part of the I-3819A project between 2012-2017, including removal of a loop ramp in the northeast quadrant and construction of a new directional ramp, which is grade separated under I-77 and I-40, to accommodate northbound I-77 to westbound I-40 traffic. I-3819A also included reconstruction of the northbound I-77 to eastbound I-40 ramp, construction of collector-distributor roadways on I- 40, and interchange improvements on I-40 at US 21 and SR 2158 (Old Mocksville Road). Mailing Address: Telephone:(919)707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Fax:(919)250-4224 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Customer Service:1-877-368-4968 RALEIGH NC 27610 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Website:www.ncdot.gov I-3819B involves the construction of a turbine interchange. The interchange ramps previously constructed as part of the I-3819A project will remain as components of the new turbine interchange. The current interchange will be revised to a two-level turbine interchange replacing the loops in the northwest and southeast quadrants with directional ramps.New bridges will be constructed to accommodate the two-lane directional ramps for eastbound 1-40 to northbound and southbound I-77. A new two-lane bridge will be constructed to accommodate traffic from westbound I-40 to southbound I-77; this new bridge will be constructed above 1-77 and above I-40. The ramp for eastbound I-40 to northbound I-77 will be constructed as a two-lane directional ramp; above I-77, and below I-40. One loop ramp will remain and will be reconstructed in the southwest quadrant to accommodate southbound I-77 to eastbound I-40 traffic. 1-40 and I-77 will be widened from two-to three-thru lanes in each direction in the project area, with additional lanes constructed to accommodate the new interchange ramps. In addition, a new eastbound collector-distributor (C-D) roadway will be constructed along the south side of I- 40 between the existing US 21 interchange and the proposed turbine interchange. The existing 1-40 Diverging Diamond Interchange (DDI) at US 21 will remain in place. Improvements will be made to the existing eastbound 1-40 interchange ramp at SR 2158 (Old Mocksville Road), The interchange with I-77 and SR 2321 (E. Broad Street)will maintain the current general configuration but the ramps from northbound and southbound I-77 will be widened to accommodate one additional lane on each ramp. In addition, the loop ramps from E. Broad Street to I-77 will be slightly realigned. Please see the enclosed ENG 4345, Division of Mitigation Services (DMS)mitigation acceptance letter, updated CP 2A/4A form, permit drawing review minutes from 4B and 4C meetings, State Historic Preservation Office (HPO) concurrence forms, State Stormwater Management Plan (SMP), permit drawings,utility drawings, and design plans for the above referenced project. Purpose and Need: The primary purpose of this project is to improve traffic flow along the I-40 and I-77 corridors; and improve regional connectivity between Iredell County and points east, west, north, and south within North Carolina and across the Interstate System. The I-40/I-77 interchange is currently experiencing traffic capacity deficiencies and the diminished ability to function as a North Carolina Strategic Highway Corridor and United States Interstate System. Capacity analysis was completed using High Capacity Software (HCS) to evaluate the freeway facility operations along these corridors using design year 2040 volumes generated from the new project forecast. The results of the analysis compared the proposed Build design to No- Build conditions within the project study area. The segment results for the Build alternative indicate that the proposed design would provide significant improvement to corridor operations for 1-40 and I-77, in both directions, when compared to No-Build conditions. For the 2040 Build alternative, all freeway segments along I-40 and I-77 would operate at an acceptable Level of Service (LOS) D or better during the AM and PM peak hours throughout the project study area. The intersection capacity analysis results indicate that all ramp intersections in the project study area will have similar or better operations in the Build scenario when compared to the No-Build. In addition to operational improvements, there are several safety benefits associated with the proposed design. The design will replace two of the three existing loop ramps with directional ramps, eliminate two weaving segments between loop ramps, conform to highway design requirements outlined by American Association of State Highway and Transportation Officials (AASHTO), and provide adequate acceleration and deceleration lane lengths throughout the study I-3819B Individual Permit Application Page 2 of 16 area. In conclusion, the design proposed for the system interchange and surrounding area is not expected to adversely impact the traffic operations of the I-40 and I-77 Interstate facilities or the safety of the Interstate System. Summary of Jurisdictional Impacts: This project will result in 2,175 linear feet of permanent stream impacts, 1,019 linear feet of stream bank stabilization, and 0.07 acre (394 linear feet) of temporary stream impacts. There will also be 1.39 acres of permanent wetland impacts and 2.56 acres of hand clearing in wetlands. Summary of Utility Impacts: There will be a total of 0.02 acre of permanent wetland impacts and 0.27 acre of temporary wetland fill impacts associated with the relocation/installation of the gravity sewer line and electric utility tower. Summary of Mitigation: The project has been designed to avoid and minimize impacts to jurisdictional areas throughout the National Environmental Policy Act (NEPA) and design processes. However, project impacts will necessitate compensatory mitigation for the unavoidable impacts. Mitigatable impacts include 2,175 linear feet of permanent stream impacts as required by USACE(1,407 linear feet as required by NCDWR) and 1.41 acres of permanent wetland impacts (0.02 acre from utility impacts). DMS will provide all required mitigation for this project. NEPA DOCUMENT STATUS An Environmental Assessment (EA) was completed in November 2006 for this project A Finding of No Significant Impact (FONSI) was completed in August 2008. NEPA Construction Consultations were approved in January 2011 and May 2019. In compliance with the NEPA/404 Merger Process, Concurrence Point (CP) 4B was reached on March 20,2019. It was determined during the 4B Meeting that CP 2A/4A concurrence,previously achieved in 2008, was required to be re-submitted and signed due to design changes. CP 4C concurrence was reached on June 20, 2019. Minutes of the CP 4B and 4C meetings are attached. All signatures for an updated CP 2A/4A form(attached)were received as of June 12, 2019. PROJECT SCHEDULE The project was let for construction on October 30, 2018. Early works construction in non-permit areas began on May 1,2019. Construction of I-3819B is anticipated to be completed by June 2022. INDEPENDENT UTILITY The subject project is in compliance with 23 CFR Part 771.111(f) which lists the Federal Highway Administration(FHWA) characteristics of independent utility of a project: I-3819B Individual Permit Application Page 3 of 16 (1)The project connects logical termini and is of sufficient length to address environmental matters on a broad scope, (2) The project is usable and a reasonable expenditure, even if no additional transportation improvements are made in the area; (3) The project does not restrict consideration of alternatives for other reasonably foreseeable transportation improvements. RESOURCE STATUS Water resources in the study area are part of the Yadkin-Pee Dee basin [U.S. Geological Survey(USGS) Hydrologic Unit 03040102]. Twenty-three jurisdictional streams were identified within the project area, including Fourth Creek, Morrison Creek, and unnamed tributaries (UTs) of Fourth Creek, Morrison Creek, Gregory Creek, and Beaver Creek. Only Fourth Creek and its UTs are located within the impact footprint of I-3819B (Table 1). There are no designated High- Quality Waters (HQW), Outstanding Resource Waters (ORW), or water supply watersheds (WS- I or WS-II)within or within 1.0 mile downstream of the study area. Waters of the U.S. were delineated in 2005 and verified by the U.S. Army Corps of Engineers (USACE) in 2005 and 2012. In 2018,waters/wetlands within the entire project footprint were re- delineated in order to update everything in advance of the I-3819B let date. The most recent field visit verifying the water resources was conducted on May 10, 2018 with the USACE (Nicholle Braspennickx and Steve Kichefski) and North Carolina Division of Water Resources (NCDWR) (Donna Hood). A Preliminary Jurisdictional Determination (PJD) for I-3819B was issued by the USACE on October 9, 2018. Table 1 —Impacted project area streams NCDWR Best Usage Stream Name Index Description Number Classification Fourth Creek 12-108-20 C Source to South Yadkin River 303(d) Impaired Waters: The 2018 Final 303(d)list of impaired waters identifies a portion of Fourth Creek within the project study area (upstream of the confluence with Morrison Creek) as impaired due to fish. No other 303(d) streams have been identified within or within 1.0 mile downstream of the study area. IMPACTS TO WATERS OF THE U.S. Tables 2 through 4 summarize the impacts to jurisdictional water resources. Site numbers correspond with the permit (hydraulic) drawings included in this application. The stream and wetland IDs correspond to the 2018 NRTR update memo and PJD. The preliminary projected impacts for the overall project will be approximately 1.41 acres of permanent wetland impacts (0.02 acre from utility impacts), 2.56 acres of hand clearing in wetlands, less than 0.01 acre of permanent wetland impacts due to utilities,0.27 acre of temporary wetland impacts due to utilities, 2,175 linear feet of permanent stream impacts requiring mitigation by USACE(1,407 linear feet required by NCDWR), 1,019 linear feet of permanent stream bank stabilization, and 0.07 acre (394 linear feet) of temporary stream impacts. I-3819B Individual Permit Application Page 4 of 16 Table 2-I-3819B Wetland Impacts* Permanent Mechanized Hand Impacts Site Wetland Wetland Fill in Clearing Clearing Requiring Number Size (ac) Wetlands (ac) (ac) Mitigation (ac) (ac) 2 WC 2.94 0.32 0.09 -- 0.41 2 WC/WD 2.94/9.57 0.02 0.02 0.62 0.05 3 WF 0.31 <0.01 0.01 -- 0.02 4 WD 9.57 -- 0.02 -- 0.02 5 WD 9.57 0.03 0.05 1.94 0.09 8 WH 0.08 <0.01 <0.01 -- 0.01 9 WK 1.20 0.40 0.08 -- 0.47 11 WAN 0.21 0.19 0.02 -- 0.21 26 WI 0.13 0.09 0.04 -- 0.13 Total Wetland Impacts 1.061 0.331 2.56 1.391 *All wetlands impacted are riparian 'Values are based on rounding, due to calculating totals with actual numbers to the thousandths Table 3-I-3819B Stream Impacts Stream Permanent Temporary Permit Name/ Status/ Channel USAGE NCDWR Channel Bank Required Required Site NRTR Class Impacts Stabilization Impacts Mitigation Mitigation ID lf(ac) lf(ac) ac (1f) lf lf UT to 2 Fourth Perennial - 42 <0.01 -- -- Creek C (20) SJ UT to Fourth Perennial 206 <0.01 3 Creek C (0.02) -- (10) 206 -- SI UT to 5 Fourth Perennial -- -- <0.01 -- -- Creek C (40) SJ 6 Fourth Perennial -- 12 <0.01 -- -- Creek C (<0.01) (20) 7 Fourth Perennial 12 <0.01 -- -- Creek C (<0.01) (20) UT to Fourth Perennial 747 <0.01 __ 9 Creek C (0.07) (10) 747 747 SL I-3819B Individual Permit Application Page 5 of 16 Table 3—I-3819B Stream Impacts (continued) Stream Permanent Temporary USAGE NCDWR Permit Name/ Status/ Channel Site NRTR Class Channel Bank Impacts Required Required ID Impacts Stabilization ac 1 Mitigation Mitigation lf(ac) lf(ac) ( lf lf UT to 10 Fourth Perennial -- 25 <0.01 -- -- Creek C (<0.01) (20) SK UT to Fourth Perennial 10 0.01 __ 12 10 -- Creek C (<0.01) (54) SK UT to Fourth Perennial 17 44 <0.01 13 17 17 Creek C (<0.01) (<0.01) (10) SL UT to Fourth Intermittent 17 <0.01 _ 14 17 Creek C (<0.01) (10) SX UT to 15 Fourth Intermittent -- 11 <0.01 -- -- Creek C (<0.01) (20) SX UT to 16 Fourth Intermittent 112 <0.01-- 112 -- Creek C (0.01) (10) SX UT to 17 Fourth Perennial 115 <0.01-- 115 -- Creek C (0.02) (14) SX UT to 18 Fourth Perennial 72 _- <0.01 72 -- Creek C (0.01) (10) SW UT to 19 Fourth Perennial 34 __ __ 34 -- Creek C (<0.01) SW UT to Fourth Perennial 61 <0.01 __ 20 61 -- Creek C (0.01) (10) SBA I-3819B Individual Permit Application Page 6 of 16 Table 3—I-3819B Stream Impacts (concluded) Stream Permanent Temporary USAGE NCDWR Permit Name/ Status/ Channel Channel Bank Required Required Site NRTR Class Impacts Stabilization Impacts Mitigation Mitigation ID if(ac) lf(ac) ac (lf) lf lf UT to Fourth Perennial 176 <0.01 21 Creek C (0.06) -- (21) 176 176 ST UT to 22 Fourth Perennial 467 873 <0.01 467 467 Creek C (0.14) (0.23) (10) ST UT to 23 Fourth Perennial -- <0.01-- -- -- Creek C (33) ST UT to Fourth Perennial 49 0.01 -- 2449 -- Creek C (<0.01) (10) SU UT to 25 Fourth Perennial 44 <0.01 -- 44 -- Creek C (<0.01) (32) SU UT to 27 Fourth Perennial 48 <0.01 -- 48 -- Creek C (0.01) (10) SR 2175 1019 0.07* Total Stream Impacts 2175 1407 3194 (394) * Values are based on rounding Permit Site 1: This site has been eliminated. Permit Site 2: Roadway fill slopes resulting from the approach to a new three-lane ramp bridge will result in 0.32 acre of permanent fill and 0.09 acre of mechanized clearing impacts to wetland WC. The construction of bridge columns at two bent locations will result in 0.02 acre of permanent fill and 0.02 acre of mechanized clearing impacts to wetlands WC and WD. There will be 0.62 acre of hand clearing in wetlands WC and WD under and adjacent to the new bridge. In addition, riprap placed on the banks of stream SJ to protect against erosion at a bridge column will result in 42 lf of stream bank stabilization and<0.01 acre (20 10 of temporary stream impact. I-3819B Individual Permit Application Page 7 of 16 Permit Site 3: At this permit site there will be a total of 206 if of permanent stream impacts to stream SI, which includes 184 if of impacts due roadway fill and installation of a new 54" reinforced concrete pipe (RCP) under a new ramp, and 22 lf of impacts from the installation of Class I riprap for streambed stabilization at the outlet of the new pipe. Temporary stream impacts to stream SI will be <0.01 acre (10 10. The roadway fill at this location will also result in <0.01 acre of permanent fill and 0.01 acre of mechanized clearing impacts in wetland WF. Permit Site 4: Construction of the 1.5:1 fill slope and rock plating along a new two-lane ramp in the southwest quadrant of the turbine interchange will result in 0.02 acre of mechanized clearing impacts to wetland WD. Permit Site 5: The construction of bridge columns at four bent locations for a new two-lane ramp bridge will result in 0.03 acre of permanent fill and 0.05 acre of mechanized clearing impacts to wetland WD. There will be 1.94 acres of hand clearing in wetland WD under and adjacent to the new bridge. This hand-cleared area would be utilized for construction access, with the contractor working off of mats. There will also be a temporary pipe installed for construction access that will result in <0.01 acre (40 10 of temporary stream impacts to stream SJ. The pipe will be removed after construction and the stream will be restored to pre-construction contours. Permit Site 6: Class II riprap will be installed at the outfall of a lateral ditch along the right bank of Fourth Creek, which will result in 12 lf of stream bank stabilization impacts and<0.01 acre (20 10 of temporary stream impacts to Fourth Creek. Permit Site 7: Class II riprap will be installed at the outfall of a lateral ditch along the bank of Fourth Creek, which will result in 12 if of stream bank stabilization and <0.01 acre (20 If) of temporary stream impacts to Fourth Creek. Permit Site 8: Roadway fill slopes for a new three-lane ramp will result in<0.01 acre of permanent fill and<0.01 acre of mechanized clearing impacts to wetland WH. Permit Site 9: Roadway fill slopes for a new ramp from westbound I-40 to northbound I-77 in the northeast quadrant will result in 0.40 acre of permanent fill and 0.08 acre of mechanized clearing impacts to wetland WK, and 747 if of permanent stream impacts and <0.01 acre (10 10 of temporary stream impacts to stream SL. To accommodate the new ramp, stream SL will be relocated to the north. The relocated stream will be stabilized with Class II riprap. Permit Site 10: Class II riprap will be installed along the right bank of stream SK at the confluence with the relocated stream SL. This will result in 25 lf of stream bank stabilization impacts and <0.01 acre (20 10 of temporary stream impacts to stream SK. Permit Site 11: Roadway fill slopes resulting from the approach to a new bridge over stream SK will result in 0.19 acre of permanent fill impacts and 0.02 acre of mechanized clearing in wetland WAN. The permanent wetland fill impact at this site includes a Class B riprap apron at the outfall of a new 24" RCP storm water pipe. Permit Site 12: An existing 2 @ 7'X 7' reinforced concrete box culvert(RCBC)will be removed and replaced by a new single span bridge on I-40 with a length of 160' and width of 183'over stream SK. The newly daylighted stream SK will be lined with Class II riprap to stabilize the channel. Impacts at this site total 10 if of permanent stream impacts and <0.01 acre (54 lf) of temporary stream impacts to stream SK. I-3819B Individual Permit Application Page 8 of 16 Permit Site 13: A new 24"corrugated steel pipe(CSP)will direct runoff to stream SL. At the pipe outlet, a new headwall will be installed and Class I riprap will be used to stabilize the streambed and bank. This will result in 17 if of permanent streambed impacts and <0.01 acre (10 10 of temporary stream impacts to stream SL. There will also be 44 lf of stream bank stabilization impacts to stream SL. This permit site is located within an NCDOT mitigation site(see Mitigation Options section below). Permit Site 14: Class I riprap will be installed in stream SX at the pipe outlet of an existing 48" corrugated metal pipe (CMP) to stabilize the streambed. This will result in 17 lf of permanent stream impacts and <0.01 acre (10 10 of temporary stream impacts to the intermittent section of stream SX. Permit Site 15: A new 18"CSP will be installed on the east side of I-77 to carry storm water from the I-77 shoulder to be discharged to stream SX. At the outlet of the CSP, Class II riprap will extend down the left bank of stream SX. This will result in 11 lf of stream bank stabilization impacts and<0.01 acre (20 10 of temporary stream impacts. Permit Site 16: At this permit site, there will be a total of 112 lf of permanent stream impacts to the intermittent section of stream SX,which includes 13 lf of impacts resulting from the extension of an existing 54"RCP, and 99 lf of impacts from riprap in the channel for streambed stabilization. Temporary stream impacts to the intermittent section of stream SX will be <0.01 acre (10 10 at this site. Permit Site 17: At this permit site, there will be a total of 115 lf of permanent stream impacts to the perennial section of stream SX, which includes 17 lf of impacts resulting from the extension of an existing 54" RCP, and 98 lf of impacts from riprap that will be placed at the outlet of the extended pipe for streambed stabilization. Temporary stream impacts to the perennial section of stream SX will be <0.01 acre (14 10 at this site. Permit Site 18: At this permit site, there will be a total of 72 lf of permanent stream impacts to stream SW, which includes 39 lf of impacts resulting from the extension of an existing 54" RCP with a junction box and 33 lf of impacts resulting from the installation of an energy dissipator basin lined with Class II riprap at the outlet of the extended pipe. Temporary stream impacts to stream SW will be<0.01 acre (10 10 at this site. Permit Site 19: At this site, 34 lf of permanent stream impacts to stream SW will result from the installation of a segment of 54"RCP to connect two existing 54"RCPs. Permit Site 20: At this permit site, there will be a total of 61 lf of permanent stream impacts to stream SBA, which includes 48 lf of impacts resulting from new roadway fill and 13 lf of impacts resulting from the relocation of stream SBA to the west and just outside of the new roadway fill slopes. Temporary stream impacts to stream SBA will be<0.01 ac (10 10 at this site. Permit Site 21: At this permit site, there will be a total of 176 lf of permanent stream impacts to stream ST, which includes 39 lf of impacts resulting from the extension of an existing 3 @ 9'Xl l' RCBC beneath I-77 and 137 lf of impacts resulting from streambed stabilization upstream of the extended RCBC. The streambed stabilization will be accomplished using native bed material to fill in scour holes in the channel bottom. Temporary stream impacts to stream ST will be <0.01 acre (21 10 at this site. Permit Site 22: At this permit site,there will be a total of 1,340 If of permanent stream impacts to I-3819B Individual Permit Application Page 9 of 16 stream ST, including 467 if of pipe, fill and streambed impacts, and 873 if of streambank stabilization. The permanent impacts to Stream ST at Site 22 are as follows: • The extension of an existing 3 @ 9'Xl1' RCBC beneath I-77 will result in 45 if of permanent stream impacts. • At the outlet of the extended RCBC, natural bed material will be used for stream bed stabilization, resulting in 1601f of permanent stream impacts. • Beneath the Broad Street bridge, Stream ST will be shifted slightly to the east creating a new channel, which will result in 2251f of permanent stream impacts. • At the most downstream stream segment of stream ST within Site 22, riprap will be added at the outlet of an existing 18" RCP and will result in 37 if of permanent stream impacts and<0.01 acre (10 10 of temporary stream impacts. • Class II riprap will be added to the base of a new retaining wall along I-77 and will extend along the left bank of stream ST, resulting in 873 if of bank stabilization impacts to stream ST. Permit Site 23: The construction of a new retaining wall adjacent to I-77 will result in<0.01 acre (33 10 of temporary stream impacts to stream ST. Permit Site 24: At this permit site, there will be a total of 49 if of permanent stream impacts to stream SU, which includes 37 if of impacts resulting from the extension of an existing 66" RCP and 121f of permanent stream impacts resulting from the installation of Class I riprap for streambed stabilization at the inlet of the extended RCP. Temporary stream impacts to stream SU will be <0.01 ac (10 10. Permit Site 25: There are two jurisdictional sections of stream SU that will be impacted at this permit site with a total of 44 if of permanent stream impacts and<0.01 acre (32 lf) of temporary impacts to stream SU. • At the upstream section, an existing 66" RCP will be extended to accommodate new roadway fill slopes and an existing scour hole will be lined with Class I riprap which will result in 101f of permanent impacts. • The existing 72" CMP that carries stream SU downstream will remain in place and Class I and II riprap will be added for streambed and streambank stabilization, respectively, resulting in 241f of permanent impacts. • A new dry detention basin will be created just south of stream SU with a new 24"RCP-III that will carry water from the new detention basin to stream SU. Where the new 24"RCP- III meets stream SU, a riprap pad with Class I riprap will be installed in stream SU that will result in 10 if of permanent stream impacts. Temporary stream impacts to stream SU will be<0.01 acre (32 10 at this site. Permit Site 26: New roadway fill slopes and a new lateral ditch will result in 0.09 acre of permanent fill and 0.04 acre of mechanized clearing impacts to wetland WI. Permit Site 27: At this permit site, there will be a total of 48 if of permanent stream impacts to stream SR, which includes 29 if of impacts resulting from the extension of an existing 60" RCP and 19 if of permanent stream impacts resulting from the installation of Class I riprap for streambed stabilization at the outlet of the extended 60" RCP. Temporary stream impacts to stream SR will be<0.01 acre (10 10 at this site. Utility Site U-1: There will be 0.02 acre of temporary fill impacts to wetland WJ associated with I-3819B Individual Permit Application Page 10 of 16 the relocation/installation of the gravity sewer line at Utility Site U-1 (see Table 4 and attached utility drawings).No mitigation is required for this utility relocation activity as it is temporary and does not constitute a loss of wetland. Utility Site U-2: There will be 0.25 acre of temporary fill, 0.02 acre or mechanized clearing, and <0.01 acre of permanent fill impacts to wetland WD associated with the relocation of the Duke Energy transmission line and tower at Utility Site U-2. Temporary fill impacts to wetland WD will be due to the use of timber mats for site access and during construction of the footings for the tower. Mechanized clearing will occur in the new location of the tower in a 30'x30' area resulting in 0.02 acre of impacts. Permanent fill impacts will result from the placement of the four 4'x4' tower footings. Table 4— Summary of Utility Wetland Impacts for I-3819B Wetland Temporary Permanent Fill Mechanized Mitigation Site ID Impact Type Impacts ac Clearing Requirement (ac) ( ) (ac) (ac) U-1 WJ Utility 0.02 -- -- -- U-2 WD Utility 0.25 <0.01 0.02 0.02 TOTAL IMPACTS 0.27 <0.01 0.02 0.02 MORATORIUM There are no trout waters or watersheds within the project area. Therefore, no moratoria are required for this project. FEDERALLY PROTECTED SPECIES Plants and animals with Federal classification of Endangered (E) or Threatened (T) are protected under provisions of Section 7 and Section 9 of the Endangered Species Act of 1973 (ESA), as amended. As of June 27, 2018, the United States Fish and Wildlife (USFWS) lists three federally protected species,under the ESA for Iredell County(Table 5). I-3819B Individual Permit Application Page 11 of 16 Table 5. Federally protected species list of Iredell County Scientific Name Common Name Federal Habitat Biological Status Present Conclusion Glyptemys Bog turtle T (S/A) N/A N/A muhlenbergii Myotis septentrionalis Northernbatng-eared T Yes * Hexastylis naniflora Dwarf-flowered T Yes No Effect heartleaf T—Threatened T (S/A)—Threatened due to similarity of appearance *NLEB is consistent with the 4(d) rule The bog turtle is listed by the USFWS as Threatened due to Similarity of Appearance (T (S/A)) and by the state as Threatened. Species designated T (S/A) are listed as threatened due to their similarity of appearance with rare species. According to the USFWS, T (S/A) species are not biologically endangered or threatened and are not subject to Section 7 consultation and biological conclusions are not required. Field reviews conducted for the 2006 NRTR found no occurrences or available habitat for the bog turtle located in the study area. Although suitable habitat for the northern long-eared bat is present,NCDOT has satisfied the 4(d) requirements for this project with regard to this species. Suitable habitat for dwarf-flowered heartleaf occurs throughout the study area. Systematic surveys of suitable habitat within the study area were conducted on April 9, 2018. No individuals of this species were identified. In addition,a review of N.C.Natural Heritage Program(NCNHP)records on July 1, 2019 indicated no known occurrences of this species within 1.0 mile of the study area. Therefore, this project will have No Effect on dwarf-flowered heartleaf. INDIRECT CUMULATIVE IMPACT ANALYSIS Existing rules for the 401 Water Quality Certification Program(15A NCAC 2H.0506(b)(4)require that the NCDWR determine that a project "does not result in cumulative impacts, based on past or reasonably anticipated future impacts, that cause or will cause a violation of downstream water quality standards." Indirect and Cumulative Effects to the Human Environment Land Use/Development While it is apparent that further study area development and eventual build-out is likely, project induced growth in the study area is expected to be minimal due to lack of new access provided by the project.The project is likely to have the greatest impact on location decisions made by industry, specifically warehousing and distribution related industries. Some of these industries may locate within the study area. Commerce Ultimately, the project is likely to facilitate intrastate and interstate commerce by increasing the I-3819B Individual Permit Application Page 12 of 16 efficiency of the I-40/I-77 interchange. Travel Patterns The reconfiguration of the I-40/I-77 interchange will improve traffic flow,reduce congestion, and decrease travel time along the corridor. This will improve operations and traffic flow at this interchange and surrounding access points in and near Statesville. Indirect and Cumulative Effects to the Natural Environment Encroachment-alteration and induced growth effects to natural resources associated with the project are anticipated to be low. Specific impacts to natural resources in the study are discussed below. Water Resources Since the proposed project consists primarily of improvements within existing right of way and development has already occurred in many of the areas adjoining the project; indirect and cumulative impacts are expected to be minimal. The future land use assessment shows continued development in the area with or without the project. Future development impacts to Fourth Creek include water quality degradation as a result of more impervious surfaces that block or redirect discharge and more storm drains that divert precipitation into streams instead of aquifers, which could increase erosion rates over time. Since the ICE in 2005, the Iredell County Land Development Code was put into effect on July 1, 2011 and last amended September 18, 2018. Chapter 9 (Development Plan and Permit Requirements) of the Iredell County Land Development Code requires an Erosion and Sedimentation Control Plan for any proposed activities that will disturb more than one acre on a tract (one half acre in a water supply watershed). This ordinance allows the County to review plans to ensure compliance with federal and state water quality laws, regulations and rules. The impact of this ordinance on water quality is not known at this time. Wetlands Unavoidable wetland impacts will be mitigated and efforts will be made to replace wetlands in- kind within the same watershed as the impacted site. Increased development expected because of current development trends is likely to result in negative impacts to study area wetlands. Minimal impacts to wetlands are likely because of development induced by the project. CULTURAL RESOURCES Historic Architectural Resources: This project is subject to compliance with Section 106 of the National Historic Preservation Act of 1966, as amended, and implemented by the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800. Section 106 requires Federal agencies to take into account the effect of their undertakings (federally-funded, licensed, or permitted) on properties included in or eligible for inclusion in the National Register of Historic Places (NRHP) and to afford the Advisory Council a reasonable opportunity to comment on such undertakings. There are three NRHP-eligible properties within the project area, the Ramsey Farm Barn, the Ramsey Farm, and the McKee House. In a meeting between NCDOT, FHWA and the North Carolina State Historic Preservation Office (NC SHPO) on September 15, 2010 it was I-3819B Individual Permit Application Page 13 of 16 determined that the project would have no adverse effect on the Ramsey Farm Barn. The plans shown at the meeting also resulted in a no adverse effect call for the Ramsey Farm provided that no noise wall was constructed along the historic boundary and a landscape buffer could be planted by NCDOT at the owner's request during right of way negotiations. Lastly, the design plans confirmed that there was no adverse effect on the McKee House because there are no construction activities planned within or adjacent to the historic boundary. A copy of the concurrence form signed by NCDOT,FHWA and NC SHPO during the meet is attached. A review of the NC SHPO on-line mapper(http://gis.ncdcr.gov/hpoweb/) on June 20, 2019 showed no additional sites on the National Register of Historic Places of eligible for listing located in the project area since the 2010 meeting. The proposed I-3819B design in the vicinity of these historic properties is generally the same as the design considered by NCDOT, FHWA, and NC SHPO in 2010. Archaeological Resources: Per a memo sent from the North Carolina Department of Cultural Resources(dated March 5,2004 and included in the EA),they conducted a review of the I-3819 project and are aware of no historic resources that would be affected by the project. Section 4(f) Resources: Three potential Section 4(f) resources were identified in the project study area and were subsequently evaluated for Section 4(f) applicability. These resources include Pressly Elementary School, Northview Elementary School, and a greenway owned by the City of Statesville. The Statesville Greenway/Museum Greenway traverses the project boundary and parallels Fourth Creek. The current design will maintain wide-enough bridges to allow for greenway crossings as in the preliminary design and outlined in the environmental documents' Project Commitments. As established in the Project Commitments for the project, retaining walls will be built along the shoulders of I-77 to minimize impacts to Pressly Elementary School. Retaining walls were built along I-40 to minimize impacts to Northview Elementary School as part of the I-3819A project. Section 6(f) Resources: There are two Section 6(f)properties within the project area: Albert B.McClure Park II and Martin Luther King Jr. Park(previously named Lakewood Park). There will be no construction activities or impacts within or adjacent to the Albert B. McClure Park II property. The fill slopes along the Martin Luther King Jr. Park property boundary were revised to steeper slopes (1.75:1) to avoid impacts to the park. FEMA COMPLIANCE The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency(FEMA) to assure compliance with FEMA, state, and local floodway regulations. WILD AND SCENIC RIVER SYSTEM The project will not impact any designated Wild and Scenic Rivers or any rivers included in the list of study rivers (Public Law 90-542, as amended). I-3819B Individual Permit Application Page 14 of 16 MITIGATION OPTIONS The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during the planning and NEPA compliance stages; minimization measures were incorporated as part of the project design. The mitigation site established for the I-3819A project in the northeast quadrant will be impacted by the proposed I-3819B project. NCDOT will coordinate with NCDMS and the USACE to reconcile the mitigation credits offset. Avoidance and Minimization: NCDOT has reduced impacts to wetlands and streams to the greatest extent practicable, however avoidance is not possible. Information regarding the avoidance and minimization efforts is also detailed in the 2006 EA, 2008 FONSI, and the 2011 Construction Consultation. Specific examples of avoidance and minimization measures for I-3819B include: • Wetlands WC and WD and stream SJ in the southwest quadrant of the I-40/I-77 interchange will be bridged to minimize impacts. The ramps over wetland WD were redesigned and shifted from the NCDOT preliminary design to minimize wetland clearing impacts. The redesign/shift of the new bridge also completely avoids impacts to wetland WG. Fill slopes at either end of the bridge will not encroach into the jurisdictional wetland boundaries any more than practicable. • Hand clearing will be used in wetlands WC and WD under and adjacent to the new bridge to avoid permanent impacts to the wetlands. The hand clearing areas on the east side of the bridge will be used as a means of construction access and steel and wood mats will be used in wet areas for construction equipment to avoid ground disturbance. • A temporary pipe crossing of stream SJ will be used for construction access for the new bridge in the southwest quadrant. The pipe will be removed after construction and the stream will be restored to pre-construction contours to avoid permanent impacts to the stream. • The bridge proposed to span Fourth Creek at Permit Site 5 is being lengthened beyond what is needed hydraulically and will span an additional length of wetland WD that would have been impacted by roadway fill. This bridge over Fourth Creek will be constructed from each side of the stream to avoid stream impacts associated with the construction of the bridge. • Roadway fill slopes at a 1.5:1 ratio with rock plating will be used at Permit Sites 3, 4, 15, and 23 to minimize wetland and stream impacts to wetlands WD and WF, and streams SI, SX, and ST. In the other fill slope locations in wetlands and near streams, slopes have been designed at a 2:1 ratio to avoid and minimize impacts to wetlands and streams. • The alignment of the ramp in the northeast quadrant from westbound I-40 to northbound I-77 was shifted to the south from the NCDOT preliminary design to avoid direct wetland and stream impacts within the NCDOT mitigation site and minimize impacts to the mitigation site buffer. • An existing culvert under I-40 to the east of I-77 will be removed to daylight stream SK and a new bridge over the stream will be constructed. • A temporary bridge will be used over stream SK for construction access for the new ramp in the northeast quadrant. The temporary bridge will completely span stream SK to avoid stream impacts. I-3819B Individual Permit Application Page 15 of 16 • The new retaining wall at Permit Site 22 will be built along I-77 to minimize impacts to the stream ST. Construction of the retaining wall will be conducted from the road side of 1-77 and not from the channel to minimize"in stream" activities in stream ST. • Sedimentation and erosion control best management practices(BMPs)will be strictly enforced for the protection of wetlands and streams. • Impacts of the project are minimized through the use of Type III clearing and grubbing which does not clear the entire right of way width. • Eight preformed scour holes(PSH)will be utilized throughout the project(see SMP)to provide diffuse flow in locations surrounding Fourth Creek and adjacent wetlands. • Nine dry detention basins will be utilized throughout the project (see SMP) to mitigate peak flow increases due to increase in impervious area. Compensation: The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent practicable as described above. Tables 2, 3, and 4 summarize the wetland and stream impacts for this project as well as a breakdown of the impacts requiring mitigation by the USACE and NCDWR. This project will permanently impact 1.41 acres of wetlands (0.02 acre from utility impacts) and 3,194 linear feet of streams (2,175 linear feet of permanent fill and 1,019 linear feet of bank stabilization). This project will temporarily impact 0.07 acre (394 10 of streams. Per Tables 2 through 4, the total mitigation required by the USACE is 1.41 acres of wetlands and 2,175 linear feet of streams. Total stream mitigation required by NCDWR is 1,407 linear feet. The DMS will provide compensatory mitigation for these impacts. REGULATORY APPROVALS Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the above-described activities. Section 401: We are hereby requesting a 401 Water Quality Certification from the N. C. Division of Water Resources. In compliance with Section 143 215.3D(e) of the NCAC, we will provide $570.00 to act as payment for processing the Section 401 permit application previously noted in this application(see Subject line). Thank you for your assistance with this project. If you have any questions or need additional information, please contact Erin Cheely at ekcheely@ncdot.gov or (919) 707-6108. A copy of this application and distribution list will also be posted on the NCDOT website at: http://connect.ncdot.gov/resources/Environmental/Pages. Sincerely, ' I Philip S. Ha is III, P.E., C.P.M. Environmental Analysis Unit Head cc: NCDOT Permit Application Standard Distribution List I-3819B Individual Permit Application Page 16 of 16 U.S. Army Corps of Engineers (USACE) Form Approved- APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB No.0710-0003 Expires:01-08-2018 33 CFR 325.The proponent agency is CECW-CO-R. The public reporting burden for this collection of information,OMB Control Number 0710-0003,is estimated to average 11 hours per response,including the time for reviewing instructions,searching existing data sources,gathering and maintaining the data needed,and completing and reviewing the collection of information.Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense,Washington Headquarters Services, at whs me alex_esd mbx.dd dod-information-collections a©mail.mil.Respondents should be aware that notwithstanding any other provision of law,no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR APPLICATION TO THE ABOVE EMAIL. PRIVACY ACT STATEMENT Authorities:Rivers and Harbors Act,Section 10,33 USC 403;Clean Water Act,Section 404,33 USC 1344;Marine Protection,Research,and Sanctuaries Act, Section 103,33 USC 1413;Regulatory Programs of the Corps of Engineers;Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit.Routine Uses:This information may be shared with the Department of Justice and other federal,state,and local government agencies,and the public and may be made available as part of a public notice as required by Federal law.Submission of requested information is voluntary,however,if information is not provided the permit application cannot be evaluated nor can a permit be issued.One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application(see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity.An application that is not completed in full will be returned. System of Record Notice(SORN). The information received is entered into our permit tracking database and a SORN has been completed(SORN#A1145b) and may be accessed at the following website:http://dpcld.defense.gov/Privacy/SORNslndex/DOD-wide-SORN-Article-View/Article/570115/a1145b-ce.aspx (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE(agent is not required) First-Philip Middle-S Last- Harris III First- Middle- Last- Company- North Carolina Department of Transportation Company- E-mail Address- E-mail Address- 6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS: Address- 1598 Mail Service Center Address- City- Raleigh State- NC Zip- 27699 Country-USA City- State- Zip- Country- 7. APPLICANT'S PHONE NOs.w/AREA CODE 10. AGENTS PHONE NOs.w/AREA CODE a. Residence b. Business c. Fax a. Residence b. Business c. Fax (919)707-6000 (919)250-4224 STATEMENT OF AUTHORIZATION 11. I hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish,upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME,LOCATION,AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE(see instructions) TIP No. I-3819B;Proposed 1-40/1-77 interchange area improvements in Iredell County,NC 13. NAME OF WATERBODY, IF KNOWN(if applicable) 14. PROJECT STREET ADDRESS(if applicable) Fourth Creek,Morrison Creek,Gregory Creek, Beaver Creek,&UTs Address 15. LOCATION OF PROJECT Latitude:oN 35.809806 Longitude:=W 80.861192 City State- Zip 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN(see instructions) State Tax Parcel ID Municipality Section- Township- Range- ENG FORM 4345, MAY 2018 PREVIOUS EDITIONS ARE OBSOLETE. Page 3 of 1 17. DIRECTIONS TO THE SITE See attached vicinity map and cover letter. 18. Nature of Activity(Description of project,include all features) The 1-3819B section involves the construction of a turbine interchange.The current interchange will be revised to a two-level turbine interchange replacing the loops in the NW and SE quadrants with directional ramps.New bridges will be constructed to accommodate the two-lane directional ramps for eastbound 1-40 to northbound and southbound 1-77. A new two-lane bridge will be constructed to accommodate traffic from westbound 1-40 to southbound 1-77.The ramp for eastbound 1-40 to northbound 1-77 will be constructed as a two- lane directional ramp. One loop ramp will remain and will be reconstructed in the SW quadrant to accommodate southbound 1-77 to eastbound 1-40 traffic. 1-40 and I-77 will be widened from two-to three-thru lanes in each direction in the project area,with additional lanes constructed to accommodate the new interchange ramp. In addition,a new eastbound collector-distributor roadway will be constructed along the south side of 1-40 between the existing US 21 interchange and the proposed turbine interchange. Improvements will be made to the existing eastbound 1-40 ramp at SR 2158.The loop ramps from E.Broad Street to 1-77 will be slightly realigned and ramps from northbound and southbound 1-77 will be widened to accommodate one additional lane on each ramp. 19. Project Purpose(Describe the reason or purpose of the project,see instructions) The 1-40/1-77 interchange is currently experiencing traffic capacity deficiencies and the diminished ability to function as a North Carolina Strategic Highway Corridor and United States Interstate System.The primary purpose of this project is to improve traffic flow along the 1-40 and I-77corridors; and improve regional connectivity between Iredell County and points east,west, north,and south within North Carolina and across the Interstate system. In addition to operational improvements,there are several safety benefits associated with the proposed design. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s)for Discharge Proposed impacts are required as a result of widening the highway and its shoulders,constructing redesigned intersections(directional ramps and bridges)and lengthening/replacing existing hydraulic structures within the project area. 21. Type(s)of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards See attached cover letter/permit drawings. 22. Surface Area in Acres of Wetlands or Other Waters Filled(see instructions) Acres See attached cover letter/permit drawings. or Linear Feet See attached cover letter/permit drawings. 23. Description of Avoidance,Minimization,and Compensation(see instructions) See attached cover letter. ENG FORM 4345,MAY 2018 Page 3 of 2 24. Is Any Portion of the Work Already Complete? I IYes Xj No IF YES, DESCRIBE THE COMPLETED WORK Early works construction began in May 2019 in areas that would not impact jurisdictional wetlands and streams. 25. Addresses of Adjoining Property Owners, Lessees, Etc.,Whose Property Adjoins the Waterbody(if more than can be entered here,please attach a supplemental list). a.Address- See attached table and permit drawings City- State- Zip- b.Address- City- State- Zip- c.Address- City- State- Zip- d.Address- City- State- Zip- e.Address- City- State- Zip- 26. List of Other Certificates or Approvals/Denials received from other Federal,State,or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL* IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER Would include but is not restricted to zoning,building,and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the al Z°9 GNATURE OF APPLICANT �- c AT SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity(applicant)or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than$10,000 or imprisoned not more than five years or both. ENG FORM 4345,MAY 2018 Page 3 of 3 otsrmr., +'� :... ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary July 12,2019 TIM BAUMGARTNER Director Mr.Philip S.Harris,III,P.E.,CPM Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh,North Carolina 27699-1598 Dear Mr.Hams: Subject: Mitigation Acceptance Letter: I-3819B,1-40/1-77 New Interchange and Improvements,Iredell County The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on July 11, 2019,the impacts are located in CU 03040102 of the Yadkin Fear River basin in the Central Piedmont(CP)Eco-Region,and are as follows: Yadkin Stream Wetlands Buffer(Sq.Ft.) 03040102 - Non- Coastal CP Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2 Impacts(feet/acres) 0 0 2,175.0 1.41 0 0 0 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This mitigation acceptance letter replaces the mitigation acceptance letter issued on May 20,2018. DMS commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Beth Harmon at 919-707-8420. Sincerely, James B. Stanfill DMS Asset Management Supervisor cc: Mr. Steve Kichefski,USACE—Asheville Regulatory Field Office Ms.Amy Chapman,NCDWR File:I-3819B , 116CINORTHINA E IrS , North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 Section 404/NEPA Merger Project Team Meeting Concurrence Point No. 2A—Bridging Decisions and Alignment Review And Concurrence Point 4A—Avoidance and Minimization I-40/1-77 Interchange Area Improvements Iredell County, North Carolina Federal Aid Project No. N/A (formerly IMS-40-2) WBS Element No. 34192.3.2 TIP Project No. I-3819B Approximate lengths of bridges for the preferred alternative for I-3819B are included in the attached Table 1 and are referenced to the attached figure dated March 20, 2019. Avoidance and Minimization 00 Resources within the I-3819B project area that were committed to being partly or completely bridged as part of the May 13, 2008 CP 2A/4A Agreement are still being bridged under I-3819B. 0o The design and location of the bridges left to construct under I-3819B at current Resource IDs 5, 7, and 8 have not changed substantially since 2008. Impacts to jurisdictional resources are avoided at these locations. An existing culvert under 1-77 will be removed at ID 7 and replaced with a bridge, as originally planned. 00 The bridge at current Resource ID 6 has shifted to the south as part of the tighter turbine interchange footprint. This shift avoids impacts to the restored wetlands and streams in the mitigation site in the northeast quadrant and minimizes impacts to the mitigation site buffer. 0o Mainline I-77 has been shifted slightly to the east, resulting in minimizing impacts to wetland WD. This shift has resulted in a minor fill impact to Wetland WH on the east side of I-77. Wetland WD has been rated Medium in accordance with the NC Wetland Assessment Method. Wetland WH has been rated Low. 00 The bridging to be done under I-3819B in the southwest quadrant has changed since the May 13, 2008 CP 2A/4A Agreement to be less extensive at current Resource IDs 1, 2, 3, and 4 since the tighter turbine footprint avoids a lot of the acreage of wetland that would have previously been bridged. o Based on the mapping from the 2008 CP2A/4A packet, there will now be less impacts to wetlands WC and WD (W15) from fill as a result of the turbine interchange footprint. In addition, wetland shading impact is reduced by about 1.0 acre in the southwest quadrant. o Wetland WG is now completely avoided by the turbine design(no fill or shading). Page I 1 The Project Team has concurred on this date of March 20, 2019 with the approximate bridge lengths proposed for I-3819B. The Project Team also concurred on March 20, 2019 that Avoidance and Minimization efforts to jurisdictional feature and other important resources (i.e., the mitigation site in the northeast quadrant)were completed for the preferred alternative (Turbine Interchange). DocuSigned by: r DocuSigned by: USAC `L,c-t,Ole, R"` ,,' a4019 NCDOT '-€ -6/5/2019 §1oA17 lgaactiv43A... PegatotMel USEPA Q�Ma�t{�a �0►MtV1tit 10/2019 USFWS aztivt ' 6/5/2019 osafewadW.08 Dt89116@aftS6945D... NCDW 40NA t. 41rooa 6/10/2019 NCWR taz/a. 64.444, 6/12/2019 APPM/41105151476... ®PBUINE ®4AD4C9_. FHWA 230,1..,,a.* 23.res„ 6/6/2019 SHPO kenez jJQ,edknxa-F:u 2019 B96E8B70991E42C... C26A1556A275464_. `'''`�'�' Page l 2 NNEI ) LANE Meeting Minutes 1-40/1-77 Interchange To: Concurrence Point 4B Merger Meeting Attendees From: Everett Gupton, PE Date: March 20, 2019 Location: NCDOT Structures Design Conference Room, Raleigh, NC Subject: Meeting Minutes for Concurrence Point 4B Merger Meeting 1-40/1-77 Interchange TIP Numbers I-3819B, U-6039 Attendees (* By teleconference) (**submitted comments by email prior to meeting) Nicholle Braspennickx U.S. Army Corps of Engineers (USACE) Monte Matthews U.S. Army Corps of Engineers (USACE) Amanetta Somerville* US EPA Claire Ellwanger US Fish and Wildlife (USFW) Donna Hood N.C. Division of Water Resources (NCDWR) Marla Chambers** N.C. Wildlife Resources Commission (NCWRC) Tim McFadden NCDOT Design-Build Dan Duffield NCDOT Design-Build Erin Cheely NCDOT Environmental Assessment Unit (EAU) John Jamison NCDOT Environmental Policy Unit (EPU) Larry Carpenter* NCDOT Division 12 Matthew Evans* NCDOT Division 12 Mark Staley NCDOT Roadside Environmental Unit Anthony Moore NCDOT TEA Patrick Tuttle? NCDOT L & S (Region III) James Jeffreys? NCDOT L & S (Region III) Matt Miltner Lane Construction Everett Gupton WSP Adam Karagosian WSP Daniel Bridges WSP Jason Gorrie WSP Chris Davis WSP Jon Becker WSP A Concurrence Point 4B meeting was held on March 20, 2019 in the NCDOT Structures Design Conference Room at 1:00 pm. The primary purpose of this meeting was to review the submitted 4B plans and discuss significant design changes. A summary of the agenda and discourse is provided below. Note that the original design which was presented at the 2A and 4A review stage is referred to as the "NCDOT preliminary design" and the current design being proposed for construction and review at this 4B meeting is referred to as the "WSP/Lane design". Page 1 18 NNEI ) LANE Meeting Minutes The meeting began with attendee introductions. After which, Everett Gupton began a PowerPoint presentation which has been attached to these meetings in PDF format. During presentation of the PowerPoint, several topics were discussed. • Everett began with an introduction of the project, and how it relates to the I-3819A project, and provided a timeline of the project history. • Everett presented a project timeline and stated the full construction is anticipated in November 2019 while earlier construction work outside of jurisdictional areas may commence as early as April 2019. An exhibit is included at the end of the minutes displaying the areas of early work outside of jurisdictional areas. After the project history, he presented the environmental commitments from the EA. • Exhibits were shown which highlighted which improvements were part of the 1-3819A project, and how the current WSP/Lane design ties into the 1-3819A project. • Exhibits were also presented which compared the overall WSP/Lane design to the NCDOT preliminary design. • For reference, Everett mentioned that the quadrants of the proposed turbine interchange are identified as follows: o Northeast Quadrant— "A" o Northwest Quadrant— "B" o Southwest Quadrant— "C" o Southeast Quadrant— "D" • Daniel Bridges presented a few of the significant design changes, and the impetus for each. These changes include: o Shifting 1-77 (near the crossing with 1-40) to the east: This shift minimized wetland impacts within quadrant C, and allowed for shifting of ramp in quadrant A, closer to the existing 1-40 alignment. • Everett provided a preliminary table of impact quantities. For the proposed design, WSP expects a slight increase in stream impacts, but fewer wetland impacts. • In quadrant C, Everett presented that the proposed bridge over the wetland "WD" is fewer lanes (2 lanes) than the NCDOT design (4 lanes). Additionally, the alignment was selected to limit the number of bents in the wetland. Additionally, rock plating is specified along select Ramp C fill slopes to minimize impacts due to fill. The WSP/Lane design impacts a longer stream segment. This is due to the revised ramp layout. An existing 54" RCP outfall will be replaced by a 60" RCP outfall further downstream. However, also due to the revised ramp layouts, proposed wetland impacts are significantly less than what was shown in the NCDOT preliminary design. • In quadrant A, WSP/Lane proposed reduction in impacts to the existing mitigation area buffers (as outlined during the I-3819A project). Everett estimated that the current proposed slope stakes encroach nearly 100' less into the mitigation area than the NCDOT preliminary design. o Nicholle Braspennickx asked if there was any credit given for the mitigation site buffer. Erin Cheely indicated that the difference between wetland/stream credit and buffer credit was not broken out. This detail will need to be quantified and developed further for the 4C meeting. • Everett presented that in quadrant A, the WSP/Lane design incorporates a channel change, in order to eliminate the need for a box culvert under the ramps. As with the NCDOT preliminary design, the WSP/Lane design shows the removal of the existing dual 7x7 concrete box culvert under 1-40, and replacing it with a bridge. Page 218 NNEI ) LANE Meeting Minutes • Everett reiterated that the design changes in quadrant A primarily minimize impacts to the mitigation site, and eliminates the need for a proposed culvert. Instead of the culvert, a channel change will be required. This results in a net increase in quantity of stream impact, but results in an open channel, rather than a closed culvert. • Donna Hood pointed out that the NCDOT preliminary design is what was previously signed-off on by the Merger Team. • Donna wondered if there is any way that the design team can gain environmental credit as a result of removing the dual 7x7 box culvert. She also discussed the possibility for"natural channel elements" with Erin. Donna asked that WSP/Lane evaluate options for a more natural stream surface (e.g., constructed riffles), as opposed to simply dumping riprap in the channel. Matt Miltner agreed that WSP and Lane are open to evaluating such a design. Everett pointed out that the channel is very flat in this location. Dan Duffield expressed concern about impeding hydraulic conveyance. Donna asked that at the very least, the riprap along the new channel bed should be embedded. It was mentioned that discussions regarding the channel design will continue up to, and through the 4C meeting. • Donna asked about a comparison of pre vs post-construction discharges, and expressed support for the use of stormwater detention basins. Everett mentioned that the WSP/Lane design currently incorporates 7 detention basins. • Nicholle asked whether federal funds are being used for I-3819B. Erin indicated that 1-3819 has a federal EA and FONSI but 1-3819B is now state funded. The I-3819A project used federal funds for construction. Following general discussion, Everett presented each 4B plan sheet where potential impacts to jurisdictional waters and wetlands exist. Marla Chambers provided comments through email. Those comments have been inserted in the appropriate locations below and responses included. Sheet 5 Everett mentioned that the existing 60" CMP was filled with flowable fill, and replaced with 72" RCP during the 1-3819A project. The WSP/Lane design does not propose significant permanent impacts to jurisdictional features in this area. The design simply proposes a new headwall to reduce impacts from the roadway fill slope. Sheet 7 No impacts to jurisdictional features are proposed on this sheet. Everett presented that existing stormwater outfalls will be retained and utilized. The WSP/Lane design incorporates new riprap to ensure stable outfall locations prior to flow entering wetland "WAA". Sheet 9A Again, Everett mentioned that there are no impacts to jurisdictional features in this area. Existing storm drain boxes will be adjusted to match the new proposed road surface and an existing riprap spillway channel will be utilized as an outfall location near Fourth Creek. Sheet 10 The WSP/Lane design incorporates a proposed bridge along YRPCA to span an existing UT to Fourth Creek and existing wetlands. Stormwater outfalls in this area will discharge to old sediment basins. The berms of these basins will be removed in a manner that ensures minimal velocities discharging into the wetland. Nicholle asked if interior bridge piers were displayed on the map. Bridge piers were not shown, but Daniel and Matt offered to provide an elevation view of the bridge, to display the span configuration and the pier locations as compared to the environmental features. Page 318 NNEI ) LANE Meeting Minutes Everett mentioned that the proposed 60" RCP in quadrant C (southwest quadrant), which will replace the existing 54" RCP, will incorporate outlet protection to a length of 4 times the pipe diameter. Additionally, the 54" RCP will be removed where feasible, and the rest filled with flowable fill. Donna mentioned that on the 1-85 project, they had issues where their jack and bore conflicted with the replaced pipe, and the outlet ended up in a different location than initially intended. She asked that WSP/Lane confirm how much space is required between the existing pipe and the newly proposed alignment to ensure there are no issues during the jack and bore process. Matt reiterated that only the portion under 1-40 is jack and bore, the rest will be installed via an open cut. Matt confirmed the separation shown currently is within construction tolerances for this type of work. Sheet 11 Donna asked that the design team modify the alignment of the proposed channel change, so that it does not intersect the existing stream at a 90 degree angle. Marla Chambers Email Comment: "Suggest a better angle where the channel change outlets to the stream". The design build team confirmed that they will look to make a better intersection angle where the channel change enters Tributary 3 to 4th Creek. Nicholle asked if the plan sheet showed a bridge over the mitigation site. Everett clarified that a bridge is not proposed here but roadway fill for the ramp is proposed in this location. Everett reiterated that the WSP/Lane design in this location does minimize impacts to the existing mitigation area, with significantly less impact than the NCDOT preliminary design. Everett presented that there is an existing bridge over tributary 3 along Ramp D from the 1-3819A project. Our work along that bridge will be limited to shoulder pavement reconstruction. Everett presented that an existing detention basin in the quadrant will be utilized to provide peak flow reduction, and Donna voiced her support. Sheet 12 Marla Chambers Email Comment: "about station 122, is there a jurisdictional stream involved, being put in the storm water system?" After a brief review of the blue line on this sheet, as presented on the 4B plans, Adam Karagosian and Erin confirmed that the line did not represent a jurisdictional feature. Sheet 15 Everett mentioned that this sheet portrays the eastern extents of the project, and that although the design utilizes an outfall to an existing wetland, it does not require any physical adjustment of the storm drainage system in that area. Donna asked for clarification on the large ditch drawn between the "L" alignment and the "Y15RPB" alignment. Everett mentioned that it may not necessarily be that steep, but both Dan and Everett mentioned that it is fairly deep. Sheet 16 Everett mentioned that temporary impacts will be required along the eastern edge of 1-77, in order to install rock plating (and a 1.5:1 slope). However, there should be no permanent impacts in this area. Donna stated that the stream in this location showed signs of degradation and stress. Donna stressed that constructing the rock plating in this location will be a challenge. Erin indicated the stream in this location is intermittent until it crosses under 1-77 to the west. Page 418 NNEI ) LANE Meeting Minutes Sheet 17 The WSP/Lane design continues the slope protection (rock plating) through to the existing culvert at station 37+50. The design also incorporates a supplement to the existing pipe. Donna asked if the supplement is big enough. She was concerned about the function of the creek, and how far apart the pipes might end up. Erin asked that in the 4C meeting WSP/Lane show worst case scenario for jack and bore. She mentioned it is easier to show "more" impacts, in case the jack and bore ends up a bit further from the existing culvert than expected. Everett confirmed that the permit drawings will show impacts for a graded bench. This will provide a conservative estimate of the impact area, in case the jack and bore ends up further than expected from the existing pipe. As such, the design is less likely to require permit modifications. Dan asked if the design could incorporate the standard 500 feet of bank stabilization. Donna stated that she was not overly concerned about permitting of stabilization. Ensuring the stabilization measures work well, is more important. Adam asked if stabilization could tie in to the toe of the stream (below the ordinary high water mark). Erin confirmed that such stabilization would be a permanent impact, but would not require mitigation. Everett moved on to second cross-pipe supplement location on the same sheet (Station 47+00) and another detention basin. In the vicinity of this second supplement, Erin confirmed that the small segment between the existing 54" RCPs east of 1-77 is jurisdictional. Donna mentioned that this area is very flashy and asked that the design team evaluate larger pipes, or at least to ensure that the inlet and outlet areas will remain stable. Everett briefly mentioned the current design criteria, and that junction boxes will be utilized to ensure stable conveyance. Sheet 19 Everett began with discussion of the triple box culvert extension and highlighted the Broad Street bridge replacement. He also mentioned the location of the retaining wall to limit impacts to the stream. Everett mentioned that there will be temporary impacts during construction of the retaining wall, but permanent impacts will be avoided where possible. Matt mentioned that WSP/Lane are currently evaluating wall types, and are conducting soil borings right now. Donna asked if the existing concrete slope protection under the Broad Street bridge would be removed. Daniel and Everett presented the proposed channel geometry and bank material. Everett also mentioned that the pier will be located on the bench. Everett mentioned that a channel change will be required beneath the bridge. Daniel offered to provide an elevation view of this bridge as well. Everett shared an image from the current BSR which displayed the proposed layout, the slopes of the stream bank, and dimensions in relation to the proposed wall. Everett mentioned that the impacts in this area are consistent with what was shown in the NCDOT preliminary plan. The WSP/Lane design does shorten the length of the retaining wall by approximately 400' (1300' total instead of 1700' total). Erin asked if Everett could quickly address Marla's comment about the flow distribution between the three culverts. Everett mentioned that we could evaluate design options, but there would likely be issues with the base flood elevation if the design incorporated sills, floodplain benches, etc. Since this is a culvert extension designing sills and floodplain benches is not practical. Page 518 NNEI ) LANE Meeting Minutes Sheet 20 Everett showed the detention basin in this area. Donna asked for clarification of the material of the spillway. Everett confirmed that it will be riprap lining. Chris Davis mentioned that it is likely a City of Statesville easement in this area. Erin and Donna wanted to confirm that riprap in the bed will be embedded. Marla Chambers Email Comment: "lower left corner, 42"CSP & 5'basin coming from dry detention basin appear to cross stream ST, rather than come to the edge of it. Also outletting flow at a perpendicular angle to the stream— may need protection on opposite bank or angled differently. Also 5'basin at outlet of 66"CMP— basin rock should be imbedded in the stream bottom, if not already. Center of page— new 48"welded steel culvert— outlet should connect to the existing stream, rather than a riprap pad." Sheet 21 Everett pointed out wetland impacts near the US-64 bridge. Everett mentioned that the shift of 1-77 begins in this area and slightly increased wetland impacts here would be offset by decreased impacts in quadrant C. Sheet 22 Everett highlighted the layout of the YRPAC bridge in the southwest quadrant, and explained that the horizontal alignment, and span configuration had been selected to minimize impacts to the wetland. Specifically, the alignment crosses in a narrower segment of the wetland, where one fewer bent would be constructed within the wetland boundary that in an earlier WSP/Lane Team configuration. Additionally, the WSP/Lane design impacts one small/skinny wetland on the east side of 1-77, but it is more than offset by reduction of impacts along the west side of 1-77. Sheet 23 The WSP/Lane design requires some impact to the existing mitigation area buffer, but not to the jurisdictional resources on this sheet. Donna asked how that reduction in impacts will be quantified and assessed. Erin and Nicholle will discuss if that is on a square footage basis. According to Erin, this mitigation site offset impacts for only the I-3819A project. She briefly mentioned that DMS may require re-payment for any impacts to the mitigation site. After seeing another detention basin, Donna reiterated her support for them, and would like to see the level of storage and treatment provided by these basins. Sheet 24 Everett mentioned that we are supplementing an existing 48" pipe with a proposed 42" pipe. Everett mentioned that the WSP/Lane design will utilize a trenchless pipe, a proposed headwall, and the existing riprap. Erin suggested that modifications to the riprap at the outlet would be bank stabilization impacts in the mitigation area. The rest of the group appeared to agree. Sheet 27 Everett mentioned that the northern extent of the current WSP/Lane design does not cross/impact stream "SR". Page 618 NNEI ) LANE Meeting Minutes After completing the review of individual plan sheets, Everett opened the floor for discussion or comment. • Nicholle asked for information on associated projects. Erin confirmed there are no permits required for the U-6039 portion of the project. Everett showed the location of the U-6039 project. • Nicholle asked if the project area has changed. Erin confirmed that the project area has not changed. • Nicholle pointed out that the DOT and Merger Team previously agreed that this would be a modified Merger process. Erin mentioned that concurrence for 1-3819 included both CP 2A (bridging) and 4A and the merger process began at CP 2A/4A. CP 1, CP 2, and CP 3 were not included in previous merger discussions and decisions. . • Erin and Donna discussed the 54" pipe in the southwest quadrant which was proposed to be retained in the NCDOT preliminary design, but is proposed for replacement in the WSP/Lane design. They noted that the existing 54" RCP was not large enough at the time to be included in the previous CP 2A decision. • Nicholle asked when WSP/Lane would be submitting a permit application. WSP/Lane offered to check the schedule, but estimated a June timeframe. • Donna mentioned that any significant design changes should be brought back to the merger team for review. That has not yet been done. She admitted that the WSP/Lane team has just recently developed a final design. She asked that an overview of the significant design changes be attached to the meeting minutes. The overview could then be reviewed and signed for administrative purposes. • Erin offered a comparison of the two designs (what was presented for 2A, vs. the current WSP/Lane design). • Erin said that the Team will resend the 2A/4A materials with the meeting minutes, for re- signature/finalization. • Nicholle asked about the presence of threatened and endangered species. Erin indicated three species are listed and none are an issue. The updated NRTR (2018)found no heartleaf. Bog turtle is not an issue here. Northern long-eared bat is not an issue. Erin will check but believes a SLOPES memo has been completed. Monte Matthews confirmed that since FHWA signed off on the NEPA doc that they will be the lead on the NLEB. Erin will check to see if clearance has been provided to satisfy FHWA. • Dan (Duffield) asked for confirmation about why we need to re-send the 2A/4A forms for signature. Donna and Erin mentioned that the forms will simply present the revised footprint, so that the signed 2A documents are in line with the current proposed design. • Daniel (Bridges) asked for, and received, confirmed that even though the 2A/4A forms need to be re-sent for signature, the design can progress toward 4C. • The updated 2A/4A form should describe "avoidance and minimization" • Donna asked that WSP/Lane "keep it simple" on the 2A and 4A forms and simply show the footprint of the NCDOT preliminary design and the footprint of the WSP/Lane design. • Adam asked for, and received, confirmation that 2A/4A goes through docusign only to those that need to sign. Everyone else will only receive the meeting minutes. • Donna asked about utility impacts. Daniel (Bridges) mentioned that there is a tower carrying power lines that will need shifted. He also mentioned that the design will relocate the sewer line that is currently running through the dual 7x7 box culvert, which will be replaced by a bridge. Page 718 NNE ) LANE Meeting Minutes Daniel also mentioned a sewer relocation at broad street. Daniel reiterated that the only utility impacts outside of the project construction area is the one tower that needs to be relocated. • Dan (Duffield) asked if anyone had final comments. • Meeting closed with no further comment. Page 818 NNEI ) LANE Meeting Minutes 1-40/1-77 Interchange To: Concurrence Point 4C Merger Meeting Attendees From: Everett Gupton, P.E. Date: June 20, 2019 Location: NCDOT Structures Design Conference Room, Raleigh, NC Subject: Meeting Minutes for Concurrence Point 4C Merger Meeting 1-40/1-77 Interchange TIP Numbers I-3819B, U-6039 Attendees (* By teleconference) Nicholle Braspennickx* U.S. Army Corps of Engineers (USACE) Donna Hood N.C. Division of Water Resources (NCDWR) Robert Patterson N.C. Division of Water Resources (NCDWR) Tim McFadden NCDOT Design-Build Erin Cheely NCDOT Environmental Analysis Unit (EAU) John Jamison NCDOT Environmental Policy Unit (EPU) Larry Carpenter* NCDOT Division 12 Matthew Evans* NCDOT Division 12 Mark Staley* NCDOT Jeffrey Wyatt* NCDOT James Tortorella* NCDOT Roadway Design James Jeffreys* NCDOT Division 12 Locating Engineer David Stutts NCDOT Structures Management Rodney Gantt NCDOT Division 12 Staff Construction Engineer Jim Seybert Lane Construction Matt Miltner Lane Construction Everett Gupton WSP Adam Karagosian WSP Daniel Bridges WSP Chris Davis* WSP Jon Becker WSP A Concurrence Point 4C meeting was held on June 20, 2019 in the NCDOT Structures Design Conference Room at 10:00 am. The primary purpose of this meeting was to review the submitted 4C permit plans. The following summarizes what was discussed. The meeting began with a brief project description by Everett Gupton followed by attendee introductions. (both on the phone and in the room). Everett went through a brief agenda and a brief project history with some key dates. Early works construction commenced in later April, 2019. Additionally, Everett showed aerial photos of existing conditions as well as the preliminary design vs. our current turbine design. He mentioned the goal of the changes regarding minimizing impacts to the 1-3819A mitigation site in the northeast quadrant and the wetlands in the southwest quadrant. 1 I 6 NNEI ) LANE Meeting Minutes Everett gave an overview of the Design Build Team's (DBT) stormwater management strategy that includes 9 detention basins, preformed scour holes, and vegetative conveyance to help with water quality and peak flow reduction. Following general discussion, Everett presented each permit plan sheet where impacts to jurisdictional waters and wetlands are proposed. Everett also mentioned that Site 1 was determined to not be an impact and as such has been removed. Sheet 2-9 (PSH 10): Sites 2 & 3 - At Site 3, the DBT is proposing rock plating at a 1.5:1 slope to minimize stream and wetland impacts. The permit plans show fill impacts to the new pipe outfall. Donna Hood mentioned that the geotextile shown in the bed will need to be removed from the outlet stabilization. Additionally, the endwalls for the 30" and 60" pipes will need to be combined into a single endwall. At site 2, Everett reviewed the proposed bridge construction. Donna suggested bank stabilization in SJ, near proposed bridge bent, since it will be close to the existing top of bank. Donna wondered if any sun would reach under the bridge. Everett mentioned that the bridge has a minimum of 5-6 ft of clearance above existing ground. Everett displayed the bridge profile. Sheet 10-21 (PSH 11): Sites 9, 10, 11, & 12 - At site 12, Everett indicated that the DBT is proposing small impacts only as needed to remove the culvert. Donna asked about the detail, which Everett presented, and was approved by all. Everett moved on to sites 9 and 10, presenting the channel change and the detail for the channel change. Donna asked about the details which she mentioned looked good. She also asked about the proposed slope of the new channel. Everett mentioned that it is approximately 1.4%. Donna mentioned that additional structures may be required in the field, to hold the grade and ensure stability. Donna indicated if large storm event comes through, the DBT may have to modify in the field. Everett moved on to site 10 specifically, to talk about the outfall of the channel change to the proposed stream. Donna said that it was good to outlet at the normal water surface elevation. She mentioned that it might be worth it to look at stabilization on the opposite bank. Everett talked about the potential for overtopping in Tributary 3 if stream is ever flowing deep so that will help dissipate energy. Sheet 22-25 (PSH 16): Sites 14 & 15 - At site 14, the DBT is proposing adding stabilization since the last stick of the existing 48" pipe had fallen in. Donna mentioned there is a big scour hole at the end of an existing pipe. Matthew Evans confirmed it is the 24" coming from the south at around Station 31+00 (from the car dealership lot). Everett mentioned that is past our limits of reconstruction. Everett moved on to site 15, where he presented proposed 1.5:1 slopes and rock plating to limit stream impacts. The DBT is proposing riprap at embankment at the end of a proposed pipe which is replacing an existing pipe outfall. Everett mentioned that the current drainage crossing the road will be re-routed. The 18" CMP will not be retained. Sheet 26-29 (PSH 17): Sites 16, 17, 18, & 19 - Everett presented that at Sites 16 and 17, the DBT will be supplementing the 54" pipe with a 42" pipe. Donna asked about the headwalls. Everett mentioned that the DBT is currently showing trenchless installation, but the DBT may be able to open cut it and lay the pipes closer together. Donna agreed, that it is good to show a little space if boring the pipe, but the DBT can move it closer if this location is open-cut. She just asked that the headwalls be combined if any closer together. If they remain 10-12 feet apart, just stabilize with big rock to limit erosion. Everett mentioned that site 16 is the inlet site, and site 17 is the outlet side. The DBT proposes more riprap at the outlet side. Donna asked to confirm if it was a ditch coming in from the south which was confirmed. At Site 16 Robert Patterson asked if the Gge 2 I 6 NNEI ) LANE Meeting Minutes inlet pipe into the SWM basin could be moved away from the outlet pipe. Everett indicated that this change has already been made and will be reflected in the final plans. Everett moved on to site 19, where an existing 54" pipe with sufficient capacity is proposed to be retained and extended. He mentioned there is currently a small segment of stream between them, which could not be maintained given our slope stakes. Donna mentioned that she does not like small segments of open stream between pipes and is good with the new pipe section here. Donna asked why the pipes were zig zagging. Everett mentioned that the pipes were set to work out geometry into the box, and to limit HGL issues. Donna agreed, that small stream segments between pipes are not necessarily high quality, and there is not a huge issue with combining this to one closed system. Everett moved on to site 18, where the DBT proposes a junction box to help with elevation. Robert asked to extend toe protection to the 15" CSP (north of dissipater basin). Donna asked how much the pipe in the junction box is being lowered. Everett checked and said that there is about 5 feet of drop in the junction box and is needed due to a large scour hole. Donna asked to confirm that the ultimate pipe outfall comes out AT or BELOW stream elevation. She just wants to make sure that energy dissipater does what it is supposed to. Everett presented the detail of the basin. Matt Miltner asked that WSP provide a callout in the plans to label the drop box in this location. Sheet 30 — 36 (PSH 19): Sites 20, 21, 22, & 23 - Everett briefly discussed the impacts. He started with mentioning the Broad Street bridge replacement and the culvert extension. Everett started the presentation of this area with site 20. He mentioned there is an existing pipe carrying an unnamed tributary to Tributary 2. Everett mentioned that the design proposes a change to open conveyance with a channel change to carry it to Tributary 2. At Site 21, Everett mentioned that the DBT is performing some bank grading in this area to accommodate the culvert extension and improving bank slopes. Class 2 on the banks and native bed material to fill scour holes is proposed. Donna asked to confirm the hatching was impact. She also asked that the stream alignment be adjusted to include a more natural curve of the channel change into the Tributary 2 upstream of the culvert extension. Everett moved on to Site 22, and presented that it includes the culvert extension, the channel change under the bridge, and the stabilization along the retaining wall. Everett moved through them one at a time: extension, stabilization, channel change, etc. He mentioned that the bed elevation modifications were only as needed to connect the two in a stable profile. He mentioned that once the channel change ends, the DBT is only proposing class II riprap from wall bottom to toe of stream. Everett showed the detail. Donna asked about access during construction. Matt Miltner and Jim Seybert confirmed that construction will be done from the road side and not from the stream channel. Everett mentioned that the wall excavation will be performed to the depth recommended by the Geotech team, and riprap will be placed to re-stabilize the bank. Jim confirmed there are two options to accomplish all work from the road side. Everett mentioned that the DBT is assuming this long stabilization does not require mitigation, stating the stabilization will eliminate the presence of bank erosion occurring currently. Donna, Erin Cheely, and Nicholle Braspennickx started discussing if this area is mitigable. Nicholle indicated she is not willing to commit at this time to a decision and asked for Donna's opinion. Donna indicated she would want see the final permit application submittal first, before making a commitment; Nicholle agreed. However, based on what they have seen in the creek so far, Donna is leaning toward not requiring mitigation. Nicholle has a similar opinion, that it does not seem mitigable, but they will not be able to commit at this point. Nicholle and Donna confirmed that if stream bank stabilization does require mitigation, it will be site specific, not cumulatively for the whole project. Page 316 NNEI ) LANE Meeting Minutes Adam asked to confirm if embedded riprap in bed requires mitigation. Donna and Nicholle said yes, it does require mitigation. Daniel Bridges asked to confirm when and how that decision would be made. Donna mentioned that the DBT should submit the permit as is, assuming no mitigation, and she would inform the team if mitigation would be required and at what ratio (i.e., likely either 1:1 or 0.5:1). Donna also mentioned the possibility of not requiring mitigation for the entire 850+If of bank stabilization in this area. Everett moved on to site 23, where the DBT is proposing 1.5:1 slopes with rock plating and temporary impacts only to ensure sufficient space for construction. Sheet 37 —40 (PSH 20): Sites 24 & 25 Everett presented Site 25, where there is a 66" RCP extension and junction box just upstream of an existing CMP (the survey shows the existing CMP as 60" but it was measured in the field as a 72"). He mentioned that the DBT is currently proposing a nearby detention basin, but water table tests are being performed to confirm if it is a feasible location. Donna asked about the discharge into and out of the basin. Everett mentioned that the 50yr in is 36 cfs and out is 28 cfs. Erin and Everett discussed that the outfall of the basin should be drawn as outlet stabilization instead of riprap pad. Sheet 41 —45 (PSH 21): Site 26 Everett presented Site 26 where the DBT is proposing a total impact of the wetland along the fill slope. No other comments were made about this site. Sheet 46 — 57 (PSH 22): Sites 4, 5, 6, 7, & 8 Everett presented the title sheet to illustrate where these sites are. Everett started with Site 4, where the DBT is showing mechanized clearing due to the proposed slope stake's proximity to the wetland. He then presented Site 5 and described the dimensions of the impacts the DBT is showing for the proposed bridge over the wetland. Currently, the DBT is proposing fill impacts at the interior bent locations with mechanized clearing offset 5 ft on either side. The remainder of the area under the bridge and 50 ft on either side of the bridge face is being proposed as hand clearing. Everett also mentioned that the DBT will be using a temporary pipe across the existing stream (SJ) for access. Donna asked how the DBT will be accessing the site. Matt confirmed that steel and wood mats would be used in the wet areas. Nicholle asked the DBT to confirm if an access road is needed or if the DBT is using mats in wet areas. Matt Miltner again confirmed that mats will be used to traverse wet areas. The hand clearing areas on the east side of the bridge will be used as a means for construction access. Everett moved on to Sites 6 and 7, where the DBT is proposing riprap at embankment impacts. Everett mentioned that these are the only proposed impacts to Fourth Creek on the project. The new bridge over Fourth Creek will be constructed from each side of Fourth Creek without additional impacts. Everett moved on to Site 8 impacts, which includes a small section of wetland that is proposed to be impacted by a fill slope. No one had comments about this site. Everett briefly moved through the cross sections and profiles to show the elevations of the bridges. Sheet 58-61 (PSH 24): Site 13 Everett discussed the drainage system changes, and that the DBT no longer needs a jack and bore. Everett pointed out that this impact site is within the I-3819A mitigation site. He mentioned that a combined headwall for a proposed 24" pipe next to the existing 48" pipe at the outfall is being proposed. Everett then discussed the existing riprap in this location, and that the DBT will just be supplementing it with more riprap and grading a bench. Donna again reiterated that no geotextile be shown in streambeds, ANYWHERE in jurisdictional stream impact site. The DBT will revise details accordingly. Gge 4 I 6 NNEI ) LANE Meeting Minutes Adam asked to confirm how that impact is being listed, and if bed stabilization is appropriate. Erin and Donna agree that the detail should be adjusted to label the "existing riprap". Sheet 62 — 65 (PSH 27): Site 27 - Everett moved on to site 27 where the DBT is extending an existing 60" RCP. Erin pointed out that this is new since 4B meeting. No comments were made at this site. Sheet 66 (Impact Summary Table 1): Sites 1-18 - Everett briefly displayed the impact table. No specific comments were made. Sheet 67 (Impact Summary Table 2): Sites 19-27 - Same as above. Utility Sheets — Everett started by describing Site U-1. At this site, the DBT is proposing a sanitary sewer relocation to remove the sanitary sewer line from the box culvert prior to being able to remove the culvert. Everett mentioned that the proposed pipe will be bored under the road (1-77). He showed the proposed alignment, how it will be constructed, where it will cross the wetland (WJ), and where it will tie to the existing sanitary sewer. He then moved on to Site U-2 which encompasses the Duke transmission tower relocation. He mentioned that the existing tower will be relocated, and the DBT is showing an access path along the edge of their easement, to minimize wetland impacts. He mentioned that the DBT is showing a permanent fill impact for the new tower. Adam pointed out that coordination with the Duke is on-going, and the impacts being shown are our best estimate of impact location at this time. Nicholle asked for clarification on what the access path entails. Daniel mentioned the DBT just received plans from Duke, and that the DBT is not sure how they are clearing. In subsequent conversations with Duke Energy, access through jurisdictional areas will be accomplished through the use of mats. In addition, the proposed construction of the tower will result in permanent impacts from four 4'x4' footings for the tower. The remaining area around and under the tower will be used as the work area and covered in mats as appropriate. Nicholle asked if the DBT will be monitoring the Duke work. Duke will be doing the work, but no one is sure how the permit will be set up to ensure the appropriate responsibility/liability for the parties involved. Nicholle asked why the DBT is showing an access road here when access roads are not shown in impact site #5. that is Nicholle asked why the DBT is hatching the access road in the Duke ROW. Adam clarified that this hatched area will simply be for access through this jurisdictional area; the expectation is for Duke to drive across this area and have some soil disturbance, therefore it would be a temporary impact. Daniel clarified that the DBT requested them to use the south side of the easement to minimize wetland area impacts. Erin asked the DBT to confirm that Lane's proposed access roads are within areas hatched as hand- clearing impacts. Everett and Adam confirmed this. Erin then reiterated that is why access roads are not shown in impact site #5, since they are within the hand-clearing impacts. Everett asked for clarification if the DBT can stop the Duke access road at our limits of hand-clearing. Erin instructed the DBT to show separate impacts, but label that it overlaps with other impacts so that they are not double counted. Adam pointed out that an area within Site 5 does not contain trees and is very wet. This area is identified as hand clearing impacts. Adam asked if it needs to be classified differently depending on how many trees will be cut down. Erin clarified that the question is whether hand clearing in areas rage 516 NNEI ) LANE Meeting Minutes where there are no trees needs to labeled/quantified differently. Donna indicated that identifying this area as "hand clearing" is acceptable. Nicholle likes that hand clearing marks the limits of"authorized" activities and mechanized clearing around bridge bents is shown. Everett asked if temporary impacts are fine around the tower being removed. Erin said that temporary seems fine, just give them room around the tower to work. {Note: In subsequent conversations with Duke Energy, Duke staff informed the DBT that the removal of the existing tower would result in the existing footings being hand excavated and "cut-off' 3-4 feet below existing ground.} Donna asked the DBT to confirm that drawings submitted for the permit are the same ones given to field staff. Proposed Early Works Everett moved on to early works locations. He mentioned that not all blue shown represents jurisdictional features, and that all drainage infrastructure is shown in blue. Everett showed that the majority of early work is along 1-40, east of tributary 3. End bent work will be done over tributary 3, with no impacts, since there is an existing box culvert in this location. Everett moved on to ramp D, where the DBT is staying away from wetland impacts. Also, the DBT is showing early work along ramp AC, but again, it is not near any jurisdictional areas. Miscellaneous Items Donna asked about the concrete plant. Jim confirmed that the concrete plant will be in a location other than the first one proposed. He also mentioned that fly ash would be contained. Donna said another site would be more agreeable. Daniel mentioned that the new site is not by any jurisdictional features, and it is out of the floodplain. Nicholle asked when the permit will be submitted. Adam mentioned that it will be submitted to DOT for review within the next week or two and it will be several weeks before it is submitted to the agencies Erin will work on accounting for the impacts to the existing mitigation site. Donna confirmed that no significant portion of the mitigation site will be impacted. Adam asked if the DBT needs to include any information in the permit application specific to the impacts to the mitigation site, and if/how it will be reconciled with the "A" project. All agreed that the impacts to the mitigation site should be mentioned. Nicholle said, feel free to reach out with any questions. Page 616 Federal Aid#: IMS-40-2 TIP#: 1-3819 County: Iredell CONCURRENCE FORM FOR ASSESSMENT OF EFFECTS Project Description:Improvements to I-40/1-77 Interchange in Statesville On September 15,2010,representatives of the 2/:::" North Carolina Department of Transportation(NCDOT) V'Federal Highway Administration{FHWA) North Carolina State Historic Preservation Office(HPO) ❑ Other Reviewed the subject project and agreed on the effects findings listed within the table on the reverse of this signature page. Signed: t.."-A CA--t---,—../71-1-14 \r\-4-4---,— CI ilc i7f)1 0 Representative, Q Date .+e___11-,--45----- q-) S " /0 FHWA,for the Division Administrator,or other Federal Agency Date Representative,HPO Date Cf--i&i_e_) 1tL-4Z— q- 'q- /540 State Historic Preservation Officer Date 3 „, CD co ck yx r CD m m "E. ri: E '''.1 i Z a o d u, 1: n �, N w IP 0 My T cg (1 ro .4 .1 _,,k) ; F 0 ., , cn a. LE ; g3 _-_, -' --)\---. .._ ____ _. c P- - � 0 Li) n' -. ' ae 5' D7 E 0-:/') c! t__-` , g —c -s--- 7 N 9s' Lc j,,=,,.1?.. i . '. r: ",f—irii5'-L 1 , L/2. 1\1 k III f7 North Carolina Department of Transportation S Highway Stormwater Program STORMWATER MANAGEMENT PLAN III ii_'• (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 34192.3.2 TIP No.: I-3819B/U-6039 County(ies): Iredell Page 1 of 6 _ General Project Information WBS Element: 34192.3.2 TIP Number: I-3819B/U-6039 Project Type: Roadway Widening Date: 3/13/2019 NCDOT Contact: Dan Duffield Contractor/Designer: WSP Address: Design-Build Address:434 Fayetteville St,Suite 1500 1595 MAIL SERVICE CENTER(MAIL) Raleigh,NC 27601 RALEIGH,NC 27699-1595 Phone: (919)707-6611 Phone: (919)836-4071 — Email: dcduffield@ncdot.gov Email: everett.gupton@wsp.com City/Town: Statesville,NC County(ies): Iredell River Basin(s): Yadkin-Pee Dee CAMA County? No Wetlands within Project Limits? Yes Project Description _ Project Length(lin.miles or feet): 4.00 Surrounding Land Use: Existing Interstate with commercial,residential,agricultural uses surrounding i mml Proposed Project Existing Site s Project Built-Upon Area(ac.) 184.5 ac. 107.1 ac. Typical Cross Section Description: 1-40:Three 12'lanes EB&WB with 12'FDPS and Median Barrier-concrete 1-40:Two 12'lanes EB&WB(typical)with grass median 1-40 EB CD:Two 12'lanes with 10'interior and 4'exterior FDPS-concrete 1-77:Two 12'lanes EB&WB(typical)with grass median 1-77:Three 12'lanes NB&SB with 12'FDPS and Median Barrier-OGFC Broad St:4 lanes w/center turn lane Broad St.(Y9):4 lane divided w/center turn lane and center island Annual Avg Daily Traffic(veh/hr/day): Design/Future: Year: Existing: 1-40:65,000,1-77:64,000 Year: 2017 General Project Narrative: The Design-Build Project I-3819B/U-6039 will provide the ultimate 1-40/1-77 interchange improvements and access management solutions on SR 2321 (East Broad Street)from (Description of Minimization of Water Vine Street to SR 2422(Signal Hill Drive).The project will also 1)provide 1-40 collector-distributor roadways between the US 21 and 1-77 interchanges,2)modify the 1-77/East Quality Impacts) Broad Street interchange,and 3)widen 1-77. No direct discharges from proposed bridges to jurisdictional streams are proposed on the project. Project is utilizing vegetative conveyance to the maximum extent practical while utilizing the use of dry detention basins to mitigate peak flow increases due to increases in impervious area. In total,9 dry detention basins are proposed on the project providing treatment for 2.2 ac-ft of volume at and average precipitation depth of 1.25 inches over the impervious area treated. In addition,8 preformed scour holes are being utilized to provide diffuse flow in locations surrounding 4th Creek and adjacent wetlands. In the NW quadrant of the 1-77/1-40 interchange,the project involves removing a 2@7x7 RCBC conveying an unnamed tributary of Fourth Creek under 1-40 and replacing it with a bridge. Under the bridge,a constructed channel consisting of CL II riprap for stablilty will replace the existing culvert. Upstream of the new bridge on 1-40,a new bridge will be constructed over the same unnamed tributary to carry ramps from westbound 1-40. South of the 1-77/1-40 interchange,a new bridge will be constructed on 1-77 over Fourth Creek,replacing the existing bridge. The project also includes the replacement of the Broad Street bridge over 1-77 and an unnamed tributary to 4th Creek which includes armoring the stream banks and some of the stream to stablize it with class 11 riprap. Upstream of the Broad Street bridge,an existing 3 @9'x11'RCBC will be extended on the upstream and downstream end under I- 77. This culvert to will have some armoring done at the inlet and outlet to stabilize the channel. Waterbody Information III. W Surface Water Body(1): Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Fourth Creek Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) E Iigi twv.tv North Carolina Department of Transportation 5[C}1'1i71V11 itFPT Highway Stormwater Program . . STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 34192.3.2 TIP No.: I-3819B/U-6039 County(ies): Iredell Page 2 of 6 Additional Waterbody Information Surface Water Body(2): UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None — Other Stream Classification: None _ Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SI Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(3): I UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SJ Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(4): I UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SK Buffer Rules in Effect: I N/A _ Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A _ Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) EMI Surface Water Body(5): UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SL Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) F Iigl7�n'av North Carolina Department of Transportation Storiii +dater.: .-*- _ Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 34192.3.2 TIP No.: I-3819B/U-6039 County(ies): Iredell Page 3 of 6 Additional Waterbody Information Surface Water Body(6): UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SR Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(7): I UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream ST Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(8): I UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SU Buffer Rules in Effect: I N/A _ Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A _ Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) IMP Surface Water Body(9): UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SW Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) F IigI7vn'av North Carolina Department of Transportation loan +dater.: _ Highway Stormwater Program 0 STORMWATER MANAGEMENT PLAN �'^ (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 34192.3.2 TIP No.: I-3819B/U-6039 County(ies): Iredell Page 4 of 6 Additional Waterbody Information Surface Water Body(10): UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SX Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body'? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Surface Water Body(11): I UT to Fourth Creek NCDWR Stream Index No.: 12-108-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Stream SBA Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) MIL Surface Water Body(12): I NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Supplemental Classification: Other Stream Classification: Impairments: — Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: I _ Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? I Dissipator Pads Provided in Buffer? I Deck Drains Discharge Over Water Body? (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) 1 .11 S Surface Water Body(13): NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: _ Supplemental Classification: _ Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Hgl rxay. North Carolina Department of Transportation :StUYl1riW'c1tC'T .40. ' '' • Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: TIP No.: I-3819B/U-6039 County(ies): Iredell Page 5 of 6 Preformed Scour Holes and Energy Dissipators Station&Coordinates Drainage Pipe/Structure BMP Sheet (Road and Non Road Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/ No. Projects) Water Body Type Riprap Type (ac) Structure (in) (cfs) (fps) Buffer Rules? 22 Y_S-119+77.66 (1)Fourth PSH Class'B' Pipe 18 9.0 12.0 N/A 222 LT Creek 22 Y_S-120+90.01 (1)Fourth PSH Class'B' Pipe 15 0.5 5.6 N/A 117 LT Creek 22 Y_S-122+17.70 (1)Fourth PSH Class'B' Pipe 18 6.1 12.7 N/A 152 RT Creek 22 Y_S-123+37.62 (1)Fourth PSH Class'B' Pipe 15 3.7 10.4 N/A 161 RT Creek 22 Y_S-125+00.28 (1)Fourth - PSH Class'B' Pipe 15 5.6 10.7 N/A 182 RT Creek 22 YRPC-22+09 (3)UT to PSH Class'B' Pipe 18 4.6 10.1 N/A 79 RT Fourth Creek 10 YRPCA-16+67.32 (3)UT to PSH Class'B' Pipe 18 2.3 3.7 N/A 2 LT Fourth Creek 10 YRPC-15+11.92 (2)UT to PSH Class'B' Pipe 15 1.8 7.8 N/A 70 RT Fourth Creek Additional Comments Refer to the NCDOT Best Management Practices Toolbox(2014),NCDOT Standards,the Federal Highway Administration(FHWA)Hydraulic Engineering Circular No.14(HEC-14),Third Edition,Hydraulic Design of Energy Dissipators for Culverts and Channels(July 2006),as applicable,for design guidance and criteria. • 1.1ignway North Carolina Department of Transportation SiUY111wdtC'Y • Highway Stormwater Program ✓� ': STORM WATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 34192.3.2 TIP No.: I-3819B/U-6039 County(ies): Iredell Page 6 of 6 Other Best Management Practices New Built-Upon Precipitation Depth Station&Coordinates Surface Drainage Area Area Volume Treated Treated over NBUA BMP Associated Sheet No. (Road and Non Road Projects) Water Body BMP Type (ac) (ac) (ac-ft) (in) w/Buffer Rules? 10 -L-127+01.68 (3)UT to Fourth Dry Detention Basin 6.2 1.1 0.097681359 1.11 No 244 LT Creek 11 -L-144+03.15 (4)UT to Fourth Dry Detention Basin 9.0 4.7 0.523002755 1.39 No 183 RT Creek 17 Y_S-37+50 (10)UT to Dry Detention Basin 0.7 0.5 0.060353535 1.56 No 112 RT Fourth Creek 17 Y_S-44+00 (9)UT to Fourth Dry Detention Basin 2.5 1.2 0.147773186 1.61 No 105 RT Creek 19 Y_S-66+00 (11)UT to Dry Detention Basin 5.8 4.3 0.215105601 0.63 No 155 LT Fourth Creek 19 Y_S-69+00 (7)UT to Fourth Dry Detention Basin 12.7 2.2 0.236524334 1.35 No 150 RT Creek 19 Y_S-80+00 (7)UT to Fourth Dry Detention Basin 4.8 2.2 0.365587695 2.11 No 150 LT Creek 20 Y_S-92+00 (7)UT to Fourth Dry Detention Basin 4.4 3.7 0.307713499 1.05 No 150 RT Creek 23 Y_N-156+00.09 (5)UT to Fourth Dry Detention Basin 3.0 0.9 0.118250689 1.68 No 205 RT Creek Additional Comments Basin located at-Y_S-66+00 is constrained spacially due to existing ROW limits and the presence of a jurisdictional stream in the vicinity. This basin was mandated by the RFP for the project and was sized to the maximum extent to avoid impacts to the adjacent jurisdictional feature and avoid additional ROW acquisition. ri STATE OF NOR E CAROLINA STATE STATE PROJECT REFERENCE N0. No SHEETS m 6 ON N' 9Dn z i N.C. I-3 819 B/U— 0 3 9 O0cO m 115 i 6, s BEGIN PROJECT eFOARO v DIVISION OT BIGuWA9S STATE PRdN0. 34192.1.2 P.A.PRdN S-40-2(124) D88CRIR ION P.E.oa CH 34192.3.2 WA DESIGN BUILD a '� v°� IREDELL COUNTY �jS I; STATESVILLE 41 in yti�'•. SULU MMRD.i 21 �` IMIT 21 CIN .. '.;.� � P': 920°�, LOCATION: I-40/I-77 INTERCHANGE INCLUDING 1-40 FROM WEST OF j► P° SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & 1-77 FROM SOUTH OF _ 15 , ,,d- SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERS RD.) 21 64 TYPE OF WORK: GRADING,DRAINAGE, PAVING, STRUCTURES, 'BOP,Ir omn°m ao °°°'" RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL • • ( END PROJECT �/ `�♦ Vance BEGIN TIP PROJECT I-3819B V <-4\ _ -L- STA. 7+83.00 LITI4 �, sa Tp ti �, o *.m I p v p �p9y END SEGMENT "A" BEGIN SEGMENT "B" �2`3 O VICINITY MAP s -Y N- STA.175+00 QO THIS PROJECT IS WITHIN THE MUNICIPAL o���i� �� PS BOUNDARIES OF THE CITY OF STATESVILLE �� AND THE TOWNSHIP OF BETHANY ' ti END CONSTRUCTION Q �� s0 ��ti y1 . Y POT STA. 205+00.00 ��� 10004 so 0 100 200 BEGIN SEGMENT "A" '�'9 `sto N. a b END SEGMENT "B" '+ YRPB- /"40.,... � �� SITE #27 PLANS -L- STA. 92+00 c� .. v LCDWB- ti5 ' `1 -LCDEB 4 ' \ �� WETLAND AND SURFACE WATER IMPACT PERMITS 200 10� 1 �11 0 200 400 S� f' `. tia I I �^�`I tea`' !1° o �� SITE #13 DATE:July 12th,2019 OVERSIZED PLANS SITE #2 � i�-YRPCA- Q -YRPC- (Note:The sites highlighted in RED SITSCALE VARIES SITE #4E #3 �il, `', iN�����L' -YRPA- i are included in this submittal.) 1 11 ` I -YLPC- \'� r��.� ��� YRPBD ~ SITE #5 A SITE #10 INSETS SITE #6 mot �� ������ L • ,), )0.„/ --�` ,1_,e SITE #11 1 Dqt,- S i VI �!/`�+w R. r► -YRPAC- BEGIN SEGMENT "A" Rva �,_ "=,•+ " END SEGMENT "A" PERMIT D RAW I N G END SEGMENT "B" lv ? SITE #24 a SITE #8 BEGIN SEGMENT "B" -Y_S- STA.111+00 U-6039 E 8Ro9D2321 —L— STA.178+50 SHEET 1 O F 67 SR o rn NO IMPACTS SA4 4. �r 31 SITE9 7 SITE #21 ,Z,, SITE #26 -YRPD �'*�} 2158 0>yL�Iv' r� SITE #20 �� SITE #25 Sr zkk\' s fcs, LSSITE #23Oo " » SITE #18 J BEGIN SEGMENT B slrE #nEND TIP PRO ECT I-3819BN -YS- STA.25+00.09 ✓ -L- STA.219+50.00CLEARING ON THIS PROJECT SHALL BE PERFORMED .7 ' �!'�# o • TO THE LIMITS ESTABLISHED BY METHOD III. ti> 001, sslrEITE ##19 rp ly ' gJ , 4 U-6039 IN o ` V THIS IS A CONTROLLED ACCESS PROJECT °��. SITE #16 NO IMPACTS STON- LANE ON WITH ACCESS BEING LIMITED TO INTERCHANGES °�° SITE #15 ;. S-q4Fnr _ E SITE #14 x. a Mimi INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 3 C DESIGN DATA Prepared in the Office of: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS • • GRAPHIC SCALES 1-40 1-77 PROJECT LENGTH WSP STATE OF NORTH CAROLINA 1001 Morehead Square Dr., Suite 610, Charlotte,NC 28203 ADT 2018 = 57,300 62,900 Nc zrc NO.F-0165 'FTADT 2040 = 72,500 77,500 LENGTH ROADWAY TIP PROJECT I-3819B = 3.885 '1�®f xon�y�4's 2018 STANDARD SPECIFICATIONS a DHV = 5,800 6,200 LENGTH STRUCTURES TIP PROJECT I-3819B = 0.124 P.E. E a) SEE ABOVE D = 55 % 55 % SIGNATURE: a RIGHT OF WAY DATE: CHRISTOPHER D. DAVIS,P.E. TOTAL LENGTH OF TIP PROJECT I-3819B = 4.009 • r i O T = 16 % * 19 % ** OCTOBER 30, 2018 PROJECT ENGINEER ROADWAY DESIGN AA'rP MI V = 60 MPH 60 MPH ENGINEER of rwwMs@ 0�� * TTST 13 + DUAL 3 (1-40) LETTING DATE: ERIC W. SECKINGER, P.E. 0 p PROJECT DESIGN ENGINEER L� ** TTST 16 + DUAL 3 (I-77) OCTOBER 30,2018 a ON�� J CLASSIFICATION: INTERSTATE �l /L SIGNATURE: FE STATE HIGHWAY DESIGN ENGINEER PE l DETAIL 4 'I� DETAIL 32 SITE #3 INSET &MOB I sn.,,BI RIP-RAPPED ENERGY DISSIPATOR BASIN PIPE OUTLET CHANNEL STABILIZATION ��- ��� " ///. DENOTES FILL IN „� ` e. `=, I Nm w Scale) N Piga 3344869/ Ple Sid 337+9663 Pis Sla 344190/2 PI Sb 346M.V Poe SM JA+H9 pi 518 558,5478 Poa Sb 58,35.80 T secrwN n mn.o l/ WETLAND pP. ,umle, A-ff2743B(LT19.-PJIM9 6e-P57'489 A-P19"09(RTl 6e-P57'489 A_Ne 4975,787)0e-4.57,6.4' `""••`•••`.• " ° - jo H Elevpeon D-f54'J59 le-P70Dd Is-24000' 0-E•E9.0,7' Le-24000' 0-652 M7• Le-IHOD' "o nl L-444 LT.180DP LT-NDOP' L.94D0 LT-I600P' L-p6�7,�' LT-960I om.u"lino"r.o• DENOTES MECHANIZED O Groon Gmund RR—Added' Sf 900E' Sr BODE' R-•9 Sf-8002' T---Sv�pgl' yT-Iggp "°^• ,"o WE `io NTO."..,:� •�:s e CLEARING Z ry5E 08 niuw ' - MPH SE a I ®® w�l "" "°"""°""° DENOTES IMPACTS IN DS-60 MPH OS-50 MPH _ %// Ts a -Y�- -MPS- % '" 4�/1 �1 �, v///� SURFACE WATER Po SYa 235+9232 Pb SYa 239+2093 Pis Sla P46+JpJ/P/SM PA+N90 1 (� DOCUMENT NOT CONSIDERED FINAL Channel Bed '� A-,VOf 59T al'9B-f5I J59 dB-P57'0J7 A-P725/B(RTl pig 6Ya J0+6B.0 PoSb J4+P40J Pk S.Jr+66E4 f . %/ UNLESS ALL SIGNATURES COMPLETED n ble 94 D-rsi sss le-20000' --P4J00 D-PP7'JEB -9007B9 A-P909 P/8lRfl es-OPD'150 41, "�,,,,, i ,, / �./ DENOTES TEMPORARY /U l"ng,h= zz H. Keyed-In ,, [T-/6002 C-pJ60' Le•P9700 D-SOfIJs 6e-S0f159 �' � IMPACTS IN SURFACE WATER L-52534' LT-IJJJI LT-14671 L-55798' Le-P0000' • -A• - TYPe of uner= CL 1 Rip-Rp Keyed In(No GwleMilal _ T-P67JI ST 6657' ST 600P' T 5/6f /I-ear __ �- -YRPC-STA.16+04 RE- SE '�� wee T /130pep_ F ".,.„AM `-` s■-■-� R-U700D' Sr-70.90' sy ♦ p� y [ �T MEL REALTY TRUST--RC OS-CO MPH OS-6 MPH /}K� 50 MPN I �L DErAlC 2FNTRT15RtMIs8t�l1�K!Im f —rIPC— -EXAT'IDOSJ a J"•-J' GRAPHIC SCALE-INSET z� VI suu Poe 5/a/IMJH9/ Pb 57a E4+607r PI Ste/8+4405 / i I `� ' " r� _. _ �1 .�. 66-Is 4920E es.15.4980E A-PJ2Nr52.f(R73 l �• 1 Le-POW Le-1m00 0-IP 45'258 — \ •••• Lr-RJr09' LT-,Vr09' L-11751N I I ® �� �.,y.— ••.T••�.T,�.�•• :..",•°•,`•°u"° sr-537P ST-537P Tp-5922f r 1 I -.gym me.��1 I 01 It. �;•, „,,. , /ro—®------ �,U,.. wIII.YI �Mo q \\s' 1111 mme_.a.m.mi • 744 CFRMO M MgaMRB T LLD T' : R3MBRNMA MC : /�8 �s ', O ,F,.n,,,,,, w ' f -----_ z, .„..1, �.�,,` fir/ / �� L\ \ .�,„.��,r. ,,..�ti.. �� was B "'"^�• 1 i'rr'- I 0 % /. ,r.�' \ p j ">,I sn,,,1<, Sill SC:.1, II '...:..k: mn.11 �}t r/- > m < f1ETAIL 20-PREFORMED SCOUR HOLE ,� 1 • %-- �/ �\ fei Oa I�1 /•*1 iii I / •�;P �� W �I°=:4 —�.a — uc•—k� % I ��• --.—..,./ - . f' F;.wnr, s � as = — - ,� •� ill. <.R :.e.i.x.�e __ms—___ Y r / / w LLI . \ 0 1111% � �—am o �i I= Iwil \ L , � 4110171111:11 etammummi -'ter _ - < " %1,4 *''..._� t' .(11/17 ��p mom3'�� a�rs� ZIlVR� ..," ICo 1tnEB- �� I. �� telI.a � --------c'LLA'A"'"rit .._ lin/top a i�!:'�'!�ti'L �� ,� �ti �"`s+`��rsrz __ z `•:.��t „..: . ,L,,...' mo , ,„,„ m // / ./ \►■ •��'�:=���i'�I��I�� A `� l. Lu - (O�^�ecn� -.., �w.si -_tea .. . <.,,.,,. ♦•�•'�,-.�n.<u5,<n<.<, IL ,o. ° % % ,/ -\I �•��.��.�'ILIj. 1' Via\p O "� ` �..asi�i rsio�:.r. ,...�„„�4I c:.FA1 e....,, -'.. •�•• . `47,':"°a°., m 1','','.�' '� _•' / i .. i� ,q>,3ri:.,rg - FrO� � E1Ip <. •C•••1s ��� Imo,, ��7I�1�� 0 \ ��./,fi' r+ :����- �� ® ��L7 ,.. ��'�•. .. 1/ SEE DETAIL 27i'� ♦ti, �' �� GI J' .. ttq � .,.P`�ii,�..�ff .0 +'� ,, ` el.`®yo'.a •r`�ssa> r.ari � .e• ` , � � ' ' . .� ' ' g prof RR r tr e-^" a,,. ,"�` ' �� .� / . 4',, r I /II ROCK PLATING i�''►�1'' ��11140 „,",,.,. 4t. d v �� • �: p emu. pR,,. a — ,r► ► /%.,�'r � �►y '�� •. •• I� W/1.5:1 SLOPE ;"�off:'.::::,� ,� ��, 10 r..N i w.�J �►• Am� �4 / gyp II _ — / �� Bps..•• -- • ♦•1� / ik,L . �•• - I' \ L► WORT canrA BRMRrtaT ,.,Mcir,,F pRTR •.. .-...._- • _ ♦ v. N ' '��� 'o< A Mw.. :..:• : 4.4 n * m F 11�>wI I ♦�WF • ♦ ir.i�t►i�,.•.•'.•..;;. . �es 0► `VIr 0II II * * e r-l�� Imo r��.v. R: u.o" �i 1 �ITI�TI�. I'LI'�., O -L- ' : -mows ::} '' < \110 ♦• a © . r •I'I' I'I, 1'♦� 1Posb l vum PISA:18'flM8 PoSb 72 80.96 MS/a8ft25p/ .:' I ••* 1 �4,, PIPE OUTL�ET CH6N L• � /,lip nI',1'�j'I�I�j'I�,I'�IA-PJalPrrtn PJ9/PTMd PJ91P7•rvi A-ro9/wren •:.] � ''��� ti 1 \ �•,y.� 0 bTAILIZATI�N* j - � I ���,I�I �,���j 0-o29/zr $:5Z/ig $:vile, s.:VI4B • •� I i v . i , L-7ePJr' L-7823P L-m,c6' L-73117 ,� � 'I�3� ^ \ i-. o•. 0 C 5 1'YtIPRAP 1` � �I ��I�,��j� r-JWffi' r-79ITB r-Je96v r-766or 1 � �� a © .�`�l ,o ��` W/, �I, I O:' ,, .1*. E / SEE DETAIL' ,,r '4= ' 9' �' \11.----c, ' SE-NC SE-NC SE-NC SE-NC VO 1 / \` ".4 �. •'�.♦ .� A s �� ' Os-to MPH OS- MPH a6-w MPH Ds-So MPH }':-. N Ake* -I(1 \ .4 ITEMPMRARY . fRF CP Lj 'I 0 •, �1 —� DDEB- itPAC- 7MC- •.. SITE #3 ►' ® \\ SI SITE #3 PI Ste 67+4778 B- 75+26/5 PoFG 58+7499 PoSb IE+61JJ Poe Sb I5+5995 .T `��i 1114 \\ J / �e ./ r \ A-P79IPT rLTI A-PJ9IP7'(Rfl A-/J629,V1lLTl A-J612 J9f(Rf)dB-4'S7'08.4' .T ya[ y �1 �,�. \ \\ 'e /o — . 0-02008Z 0-020/8P D-652 M7' 0-652'MT Ls-I440D' •.d ® • . ,L-7e569 L-Tr909 L-L69P98" L-5/19P Lr-96M ' ♦, - \ \ ,t!e" R-l• H-189P800 R•-/BJ.T 00 R eJ m - ®.u,,,T ::Q' ,,I,k +�4+ \\\\\�. / \ UJ SE 07 SE NC 5E-06 SE-O6 •:3'' ' 'gip* `I 441 N4 - \. DS-60 MPH DS-60 MPH OS-50 MPH OS-50 MPH -- z1�O ' •1, ,� //// DENOTES FILL IN O�O• I (Rf) MJJ�9i Pis -f757' f �"'::::z:: ••' • a111 " 0 \\. WETLAND \ 0-4'S956.7 Lo-/4400' Le-/4400 1 k `6 �'\ L-7B696' !T-960E' U-96DI ® \ ' �k�-r ���v` DENOTES MECHANIZED r-40959' sr-4BOP' ST-480T " ��-. `'4L♦� PERMIT D RAW I N G • ••. CLEARING R-N50AY \ ` Q.( OS-5500 MPH ® �'v':-%• >s� ♦ �4GryQQ QG �IsI DENOTES HAND 1'•••';� ••i •• ••i (i��0/ y�YLq, SHEET 2 OF 67 IY/�� CLEARING \\\ \ •�T .a .� FYII :•.••�y.--•: :.' ` OO�0�� ,a<.,,o". �'/�'�/,,//// DENOTES IMPACTS IN \\\ I••::;\ �� I;;:`1 11� 1;bL1_N XO '� 7// SURFACE WATER \ \ \ I•:.:::. WG E)I eZA ::: / pAATCHLINE �P' ` 5 p a,„ p" ,.,o„ \ \ �.• : YRPAC 5 F4c o //g/ DENOTES TEMPORARY °� _ - I••:.•...•� > 66+90.00 L7 S <,<�,o., o,�.E � p.,. u-zp,. // IMPACTS IN SURFACE WA�\���\\ `- 'y ST SEE 22 -'r'•:: '•'` SHEET NO• DETAIL 4 B -_�11111�11/l�ll(l�111I%' 7 � ETAIL 32 °`"`.. Fr" SITE #3 INSET 4L'"y` ., . .,L : RIP-RAPPED ENERGY DISSIPATOR BASIN PIPE OUTLET CHANNEL STABILIZATION �gB6J " DENOTES FILL IN `"`""` "a `"`""`INmw srolol Ne sra4pem •M.4 Re esa J45+R.X) p. R: t'+, :41, sRcroN E e".,E...F „,„..e �/� WETLAND x,role,, p-B9r4TB0/sb-eJI 6e- 'S, A-2,B'Rd lRrl paj; - 0.!SY J59 Le-,l70ffi le- 0-27BpT "p•70980940 U )""�-�"`- ;^\ DENOTES MECHANIZED Ground R R-P,T20�' ro.Of.E rer ePz6e s�-awe sr-60OP r-naa r Gre"'" o1"ro1 i ¢[ , - a ."o o..Mo;ro".rowc • wse CLEARINGil 0 DOCUMENT NOT CONSIDERED FINAL �SE SE-O6 0697 YPYIOs•to rpN• D5 50 Yp1 "��—��” �� - `A. DENOTES IMPACTS IN p-.PJS PA Sb PJ9+f099 Re 510 P46+Jp7/PTi9a 2AIN, -YRPB —�L: s L Vf/ SURFACE WATER Channel Bed IDQ`'SPT( 64-f5I Jds-25r 0Jl A-2Je SIBf' Sb JOrbB4O 4+e4 �/ JT UNLESS ALL SIGNATURES COMPLETED IvpnanlEl D-r5I Le-80000r SJIJ.'A-e80SY, (Rn, ° ? ,ro,A /�/M-64040 •--' ' -- - �� _ T , 4 DENOTES TEMPORARYLeoGRi= 22 H. a"°'4O-SPf IJ3L LT ,JJJI !T-/60D2 L -14y� -55J99 b .ur / IMPACTS IN SURFACE WATER Type of Liner- CL 1 Rip-Rap Keyed In(No Genf.4/ I T 7633/ ST-666Tr ST-8042 T 51: ... - ♦♦-YRPCpL�-ASTyA�.16+04[ NN a r SE OS .. J `-7J,a' T-, , .: I I man°" 2s 1?s p 7 DETAIE23 TRPPAN;IfekrE R!IRE ~'\� r .l'i -EX�T•(� 'I°' •J•? WGRAPHIIC ScAIE-INSET 1 v-_�w v-w �1� J� �� IACA�i �. \� wee �1��� Art i sr N BSRP DS Pis Sb e4+607f P/9b 557 7 ** i ii; I se*.' , ,,,_ %., :411:* -111,: 0,1 LI-1--1 Ili i ..1411.111.' . , .41k/!A i• ,I, I ..5 (JA . (1 -k -4ill' ' - 7,„.."F°.`,.7. ' • At 7V.,‘11!, 1 -- Wirei ciVk ;,-,-..4 ly k 0 I671414 Pr4.46e..ci, . ...v 4 i 01 ,,,,,,,,C: ,,,...f aM ow-,r. ,�:�:.. '1: .. ! ,?II4 N t ` t o- f/" /// "mil//Ili .,3N ' 4Ai, \ 1;`� 11```; �UIal /1Sk t - "//// L / 6 40 / '17 11itht pEPAIL 20-PREFORMED SCOUR HOLE 1� ® �^ I g:!f,; B\ - �"- / j am '� ,f \ �:!�� mor Ta suiE Ar - f O rm... t**144 kill !�•'.. ....---,---... .1 /�1III_I�� �j/ �E '�{'e' S� / // L. ' ... --'''''..111/div/BILINt.tilihr;11 ir.... I I‘Nl\,1 11 4. /..filir '‘.4 k'.11* Lit w 3rr'n".. �3 , Lam. ,, a'--- .� ---- . �,,,'T-L. = li �s��— 2 . �\ 2G\ �. '�� . 11��ME -� �1� �Ra.. -wll® ��� T. f rTT '��a� •, iii C m, 1� _� --���Wo 7. � 11RL11I j lsy ► u � \ L , i ��1 Il \ If1 a err. — - _ �_! lli ,o =��1�t4i �I1�' ^ ate as1uf���t.� \ V I♦♦� �S1 1. _ � :_ � © __emu,I - »om� ♦>♦ �a _Fit,,.,..--r-,..■.,,.��..r.�...Eiam.mmmiiiiiigm ���� ����� I' v ♦>> '! �►> �® � �,., ¢_ ,ate -� '� I'♦ i \It �, O&<--g-z: . �-2'. �_ � ,._----- ♦�'Ate,+,+�, ''' \ ��I♦>I��.I�>/I♦ r !�w __ II -/ >rii. <r. �4-:5,, t v, ®�`4.1Pa I ,��I�itez -- - A�zoo. L,`�1 �� .''�� >♦'�j I♦.�'� \414:1:11:'‘":1'/'/I:k‘i I �:• it/ r A �s%� v. Iw. ♦z. I \ ♦ ♦ r 1_ _ �I �, .Eal1 ..� . SEE ETA �i'♦' r*' ♦i! � G�.15 V - '!0 q, , �,f,�,'�i.,jlir..r%� 90,. f � f:5* .�.10 s.; .— ®� ���lu �►� !•• ! �coA�c�a� If . - T .>♦>♦I�:�.ya r�:�>p�II'> ' .��` +�� - �z: � ..�il.�ff. �,/�'re f -�s. �. � i► `a°e�, �i���` //� f /� ".; ♦i i, ♦I�� 6� � � w- ��� ,�.�� ,� �� � tee, ► � r-.>♦> �=�i♦�' „E1 ,� ♦.A�. \\ 'I�j ROCK PLA _ �I�♦ ♦ ♦ ♦ ♦ ♦ro",I.,. r+�i f ���� rw' ff�"� :��.00•s ; $s4 4 ��<\ 4t*��i'r111`1 !j♦�! 4°��♦I�♦v�!�;/ b 1 .ae,ril ,..;,,,7-- • :••••::;:---:::-•:::::::•-•----:i: • N'arai-Lial Inikt--41/4 s ' * �:..�ei.� �...s� f>/',rf �; ►, �1� ��. \\ .�1 W/1.5:1 SLOPE ♦!ri ♦♦ v1° �� •QoigamigmoTer• 'Qxi.-:`r`:e. �i'S4 __,., � +Y1r� v , 1`+ri1� �' 0/ ii . �,"11�\%♦:,ys �j 011‘44\s4Itio.141 41 ® �� . e 1�♦�\1/4-.11, i al 4 ‘ 1•\k'' �`''1 ® • Q: +�A t'lk�,i..: a- - . - _..,s, illf ..•1 >, 1 Nt�, ,� ;.ai. V1• �4,* PIPE OUT T CHATI L- / ,�/;% 4, ,,♦III'♦�=•��1��'I��j♦ psm nJ+sisv p,. eui6• , . .I �� kt � c''' �:. S �•+ i �� AEI I'♦j I ♦ ♦ ♦ ti n-2Je,fTrmn- JsreTmrl -zJe71",•�.�- +'� .♦. TAILIZAT N ^'•.,D-offivr D-Offi1JJ offi D-oizrors , 9 /., 'L-Tear L-TBYJrc-TTSDa L-TJ/59' -` . '+_ �.,\�+♦♦. `•,. C 5 1'YtIPRAP i`I ♦> 1♦j1►>♦�er \ r-JWffi' r-Js1aB. n-Jesse r-Jfi6DY1,0„ �'�y 14�,�4.R R� ���� �\� / � ����� 1 ♦ ♦♦ ♦' noauaa se•Mc -16,92809 s"e a as - 4lA �A 1 ® 1 e 41,134E` + �i� a �. • .♦♦Z� "f _ g� '� i `� 1 R _ +�. SEE DETAIL'S �/_'. � ,♦ ♦ ♦'♦/ 41 _ es-so MPH as so NMI a s-w MPH es-so WV \ I 4 ���� f� ♦iiir 111� 1 ♦` �r ♦:♦��vpl f1 , —' --� -rcaEe- irvx- �c�7"' � 1 � ' '. n �VIA, �.�® \\ \- � � Tr r ♦ � � ❑ �♦♦♦ o PI SA,6r+AT78 PI Ste r5+ffi15 - P1 Slo 56fl P1 SYa @ f- -1'- at• �\ 1./r� .a lul L[�,' ,. A-2J9/Y]'!LT)p-2.T6'IYT rRfI ,./1665�„� 1�_ ►.,��'• �, . � � :.♦i SITE 3 11 n D-Offi06P D-Offil83 D-6'5eM D-652 MT ,.• .•f .., � '�� �1� ��; t1 \ a � / �I ,• / L-TB569 L-T79D6' L-1,sszse L-msr Cyq�l.�9�1 � o \ - (r' � , � � , � � � q .�`/ • e -R� 07R 39296 A: rpp`-lga,7s�r6m0• R:gym ,. ::•' ® '. ` f�iik)�I,r �'�kL •.,L �\ /i \ \u \ ' OS-60 BPH DS-60 BAH , 50 NAN DS-50 MPR I , � �,��1 ��.•\ ` DENOTES FILL IN -YRPOA 0 7 iri //� WETLAND ESHAfe • 35•14.V Pk• JH6La7 �� �''�� �, M J25449O.frRf, Be6 -J'JSMB 6b'-f3r08,} ((��33.. k\ I G -I5C56! La-/44Dr Ls-HVq _1-s• �/ \ DENOTES MECHANIZED T .n- ;mob?-I60.J \ • It �t l x, ®r�nd1 PERMIT D RAW I N G . ••••e CLEARING �R-106DOr �\ _�/ �. �^ `:4;.c S• w N - /.�.�� r DENOTES HAND .. i' ♦ ��. Fvl (---- � �• � o0�0.' ✓HEE 1 3 O1 6/ �wno- �I��I. CLEARING O1y■t /p �`vp. �%,�/ DENOTES IMPACTS IN �+" �\ �� o �� ■7 �'\'lqx��(� .,r// SURFACE WATER f� �� \\\ t ® +90 00IN YRPAC 9�5 PS�F y a a,e. p"" , „ ', DENOTES TEMPORARY ,>a•A. NN �y,L...rr,- ��Y1 STA.GG Q.LL o"pN.o eY. c w.. // IMPACTS IN SURFACE W \ � �,� vi �� SHEET N ".�.p.. n,�p,,,p.n, p.,E u:p,r .„ \\\® -, ��' .. \ SEE SITE #2 LANE I "S I PROIE/T 38�9BE NO. SHEET 10A RAW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER iv WITH CLASS B�RIPRAP TO REMAIN .-y SEE DETAIL 31 DETAIL 84 P-III 2GI 15" RCP-IV iNi" RIP RAP BANK STABILIZATION r -- (Not to Scale) I2G1 See plan ✓l cV Ex.or Pr. 1.0'min. d* DOCUMENT NOT CONSIDERED FINAL - 15" RCP-III Grade Do not disturb UNLESS ALL SIGNATURES COMPLETED 2GI bed or opposite bank 7 - — _ _ —1 ' — I —1 i Type of Liner= CL 1 or CL 2 Rip Rap (see plan) /5 ��� ii F F *d=18" for r 1 and or for CL 2 (No see plan) -YRPCA- STA. 18+65 RT ,, r �_� ___ 'Falimaim7---- = A. -YRPCA- STA. 77+00 RT - . '-- --' ' A 1 r-SPIreird 117 rA I.Iller4111TI ,- gre Fif *.*.* • .I -. ..-*-* *.****,at te * * * �• r i Pqft 1_ 12-*k - , .* ** * * * * * * * * -- die%t 'Ateer Age* * * * * * * * -_ * * -SITE #2 * * * ** * ** * ** * * * �* * * * * . 2GI 24" RCP-III III I_ ' • ' - - - -]_- - "T - - - 1- I CAT-1 OE "bTECTI�N - 1 - - MTL _ - WIT CLASS B RIPRAP II' - - - F \ SEE DETAIL 31 = - - - - - - - -', inki.W r Agilir41,prirmiliti-aiiiiir_ ''20-71-06 - - Iiittiremi poor Alt ;k . spaimniv - _ ._ ..m______ IIIIIIIIIIIIII T 71,4 F� DENOTES FILL IN �� �����it'y.II►_ ���•�,y' � O �/// / WETLAND co _ WD �111, �I� ., �, 7 � � I � 'mp DENOTES MECHANIZEDNIZED � . �� ir "�- �:_�,•�'A� DENOTES HAND co ' do 4___RE /�*//i:!// CLEARING ♦ 'J` a �F � l� � -7 '44 7 - W.A' • • . Ai `TP' 11: PERMIT DRAWINcBANK*ST+ABILIZAT,ION """ -1 _ — SHEET 4 OF 67 ** * SEE DET1��4 lip * * * * * -walwaiii 6_ *100 TON �� * * * A * * * A * CL B RIP [: C5 U % U El. Z 50 25 0 50 100 oQ th11illEillft.. -o3 ,,oc GRAPHIC SCALE - INSET r-,0 Nia SITE #2 SANE I "S I PROJECT REFERENCE NO SHEET O. R'W SHEET NO. /F-11 ROADWAY DESIGN HYDRAULICS • ENGINEER ENGINEER TO REMAIN NI WITH CLASS B -R RAP rr SEE DETAIL I DETAIL 84 III 2G1 15" RCP—IV CN 0_ -- RIP RAP BANK STABILIZATION r _ - � _ — _ _ (Not to Scale) ICI r See plan-► r. CsI 2 CV• Ex,or Pr. 1.0'min. d* DOCUMENT NOT CONSIDERED FINAL r1 15" RCP-III _ Grade Do not disturb UNLESS ALL SIGNATURES COMPLETED m- zt 2GI ^ bed or opposite bank .,■■:� ��■�eaem;� :� 79e Type of Liner= CL 1 or CL 2 Rip Rap (see plan) �� _ ����� �tl � _... ............ ....... *d=18" for CL 1 and 30" for CL 2 (No Geotextile) 84 ,® � �; -YRPCA- STA. 18+65 RT �� ��► ..7e, �Q Ali r ��,, wrl^,�ietr y •....,M=a t *II - 'ti. YRPCA STA. 77+00 RT • iitt, if,Alf,: * , 404, jordorov--- -*--ii**----._tftgr___ AIL ir- :1..---— '."'''.."'"a' ' —---'TO - -fr- -1. .--' --4.7-17-- V'A6*---4f, . A FA FAI 0 r: A re r-A*4z 1:La i n-r--, CCL fr •4;14,0,1,40, :. AL 4C.**if ik iF4(-it if.k* ifkiV3/401, Aer, 4 a,* : ., * : . . ibi , „ , . 1 . „ . , .. . . . ,. . 6. •, , . . . , _ .1.,......I___ . . * . wi A..--.,ii. i. i. 1. 1we ii iii \ _....imisizi,..„...m.._ _ _. ..1413exim_................ ... ....,_ ..____...„..__ _______ T ' U �_Ln �11�� AIM in M c0 Ma =I 11141T.111 --- --'...11-:•17--- Aillajilii• /11011611r4W,'. 4+011114,11#& Ill& i 'Itt Niiitr.--L 1.-....1 , . - 1 F' -' wit:*""""Tirmmirm.... . ., .1 .w..7. -. -. --...,,,,........_=-:..... ----- a � �.1frNPIIIMINI ` _=�.. �V ? �� �� ` C1� �11 IV/F DENOTES FILL IN Cr �� f�Sa���` ��� ` �i_ vita/ ' `1 �,immis I DDD WETLAND �� rAr , r ' DENOTES MECHANIZED co e ,- „._it z';4_ _ ' ' • .,460,0' 4� ' �`Wer,, • • ♦ • CLEARING � ��e� Iriti e rilliWAVIr4111rAwrgiiin..-••••-•-At....-.=_AM114111 � �:! A DENOTES HAND CLEARING (n dpv.-4f El „.• / ..4 „ - . avordmIN -*--4-1 . , 4., , 4 ,, Jr, e. -.4P , At'1, ... i- e" ' ige N . ..7. , � �40 ...s, :,.. ' � 1Z� i V") '��, Q PERMIT DRAWING BANK�ST+ABILI ���• -, .deled:11,0. . . 4t SHEET 5 OF 67 io SSE DET I� �`�' i e _ � ► , .V4. 1. . p U MUMBialli Alle i m(H 50 25 0 50 100 oQ `1111� o3 roc GRAPHIC SCALE - INSET N/a 0- 0 5 10 PROJ.REFERENCE NO. SHEET NO. N 11 1 1 1 1 1 1 1 1 1 I-3819B XA-76 ■■■■■ YMEM- Y■ PERMIT DRAWING ,.,E A = SHEET 6 OF 67 l\■■1■1■■1 F. 1 \'1.1r■1 ■1 moral .YoCniimm YmmoYmmm -LCDEB- ►/!A•CA - ■.r.Il,,l ■■■■■ ■■■■■ +58.09 ral;lrl.■. 11 64+50.86 I 793.02 792.47 _ 1111 ,1.1Y11'11■I:. 1'.�bl/1il 0•020 Fin _ - illii, ■..I61 iGl I ■Y Y ■Y� ■ YY ..■ 11 -YY Irti�� 11111111111111111111111111111111 11111111111111111111111II"' ai1aa,a.Ilil11 ■■rjr]lil """' IIIIIIIIliiiIIh11111111': iillilllllIIIIIIllllllllllll 'IIIIIIIIIIIIiiimWuluuluuw"1 r,r.4111■■■ :11111:::1111111:IIis11111111111111111111111111111111: 1111111111111111111110 Iu :ln --�l---•---,1- IlaiiIVA-.ion. LW" IIIIIIIei11111111111111ffiadIiIIII 11111111IIII�°"°==ii111111II 11Ii11i 111111" sl��"''°° - °°°•`"�` IIEi,7i/ 11111111111111111111111 """111111!':l111111I11111Ii ..."'111111!':l1111111" Ildlr/... 11111111111111111111111 111111111111111111■11111 111111111111111 1111111 ii111111ii 111111 111111'''11111!'''i1111 111111111111 1111111:a11111111111111 111111i::111111::1111111 111111e 1111111 ■■a„. 111111111111111111111111 IIIIIII 111111Iili11111i€oo11111111i11111111 ..nii.o■ _ 111111111111111111111111 1111111111111111€::::11111111I1111111' I1�Tii:l:1 11,12:L14i11 11111111111'!1!!!" 11111!::1111111 111111`11111111 filliilil■■■ �IEIE 11111111VV1i1V�VS��IIi: 111111iia1� 11: 111111111111111111 •R"i'. - Il..•,lll, •I'111 .....;11111 �1'' rl., ■...11 'll 111LAMIN __ :11111� �, �aC��al a��''1 ••• :III ■ii::i - iiiiiG - ---_--- ,-'-- - �c■s==cI� 1r ,t.!ir_ ill ■ 1 1"�/� ' '11111111111111111111111111111111111111111111111111111111111111111!II?1111111 ''1 1rl�!1LI,. mmunThiA MIMI '"IIIIi1111111111111111111111111111111111111111111111i 11111111111111 ur:,11i/■■■ ■ 111 11 111 111 1111111! ll�i.=.■e.:°_■I.r/.�■rl'1 -_ ===.=cacae_A.■YYYYYYY■ 1. iiiiuluiiiimalibb111111111111111411111111!1 II 111111 ■...■-- 11 =°"°°°'° AI!! 111111111111111111111111 11111111'1■11111I111111111' 111111111111111 BEM 111111111111111111111111 111111111111111111111111 11111111111111! 111111111111111111111111 111111111111111111111111 111111111111111 m N m a ..r 1I i1 ;nii1.Y o 0 rn LGDEB— ,L,,■_■I, ..L;r,lil �..... blll;lr/... 63+50.44:- ■sm.� dO r:. 1111 . _ _ 1111 iniv'ilr1■Il. - IlAI11I 79 11■Y■11.' pIr.1 = G I I �1 11 ll _ - �� - - - • IIII.: 111111 r.rT._ a --- --ii_==■ - ._ .I - - - [l N r1..►v_ � ut YYY■■. _ Isar, y 0 U _ 1, ■■,jr iIFI :-.Pibarlu.-1.1 urnlli�Y■ o -ecluuoeac� a 'I■r II. ' ..LJ iiiiGiiwfiii■Giiiri.•■GGi•.r.d\... ZUB■!!!fl==7■=G=■GcarGGi✓■... 1 El II A 1!':9 El II 11 11 11■El■1■I I II a -.■uY-il.o-Ac. i m av Yrn,liil ui.liil.n .sr- U '-N. .qrl■■o rA■'i■•UI.■■II Amor ma .1I■■11■11 . r�a� ,1 7:1 7. In UM 0- 0 5 10 PROJ.REFERENCE NO. SHEET NO. N 11 1 1 1 1 1 1 1 1 1 I-3819B XA-79 71:■■1 ■■'i►aiil f�1.1�1�■■l I ■■rii/lil iore7l dl r=..I.l.1 I.:Wiaa.J■■I r.1l I■■IN\■I. I I. I.�■■I;l.-..I I■I lel;J■■I:-JI IN/•1`■►\■� rill.//■■■ I■■■-IL'7L'7■■LLlha M67:J-7■■LI■L7Il11L.1 W 1 MEW WEE I a -k 6, 3 I 69+0 �',••• YW i i ali•Lov = • • 796.44 - Il■I/Id'1■IIC ■a I1111 A Nri 0.020 . 1111E :. .,■ ' uu _■ .ma■■Y■■■■lI••• •GG■GGGac • ��� �- -III; 11 oe� 1,■ I y .KM �W■ YWY� GGac_=■e___ -WiL 1 4l41:■11 ■■Y■■■Y■W ■■Y■■■Y■ 1 1 ■■rllia:l I rm:Ji/■■l I , 1 .i■runrn>wrrac, I --Gr6-==■2•• 11 _ ■■Y■YWYY■■■Y■ ■■IIri11:1 II C=_ nnY nnY Ilrillil■■l cae__. li111111N:1.11o11;1711 1111111 11111111 1111111 1111111 111111 1111111 11111111111111 v .. - -.- .. --.-..---..--... 1 ...L,II;, 1111111111111 1111111 11111111 1111111 1111111 11111111 1111111 1111111111111E .Gi'll;/... 1111111 11111111 1111111 1111111 11111111 1111111 1111111 1111111 PERMIT DRAWING IFE011l 1111111 11111111 1111111 111111E 11111111 1111111 1111111 1111111 SHEET 70F67 1111111 11111111 111111 1111111 11111111 1111111 1111111 1111111 1!!!!!I€!!!!!l111i!!!!! 11111111!!!!!l1ll!!!!!1 1111111 1111111 I �111!1:, 1iiiii1111!!!!1!!!!!!!! 1111111!!!!I!!!IIIII1 111111 111111 11111111111111111111111 111111 111111111111111 II III111111!C: 11111E 11111E li!!!!!!1!!!!!!!II!!!!!! 11111iii!!!1!!!i!�!�!I!!!!!I:_I!l111Il.II9I .- "/ .•\■I 1■I■I•• lI 1■I..� ..• :iUWIIl 11111111111111111EIIIIII liiiII!!iiIiilliiiliiiiIiiliiIIiIil!illiilI ..r:,lrlW. 11lI 11 NO � 1111111'111111!!lIIIII i1!!I!!!!1111111l0lylaE k E!!!!!111111!!!!!I I. :l;;i:,... Ili ��-- -_ -11111��1 �� 11111111111 I:•••I •jd_IP.�... I 1] lIIIIlI€lilllll!!lIIIII 111111111111111111111111111011111111PIM II IlEll 1111 llla��h°°°°'I' ■---- � �E— -- G==■==- ---u 22411111111!!!!!!!!l111!!!!I IlIIIIIIIIIIIIIIIIIIIII11E •' ! I ••'1ii:Iilli '1l1111l1° 11I E 311i!_III I!!!!! E91111111!I!!!!!!!!!!!!!!!!!!!!!E gill ii UI119 ..r/dill:/ _ 1IIIII1111!!IIll 11111114UUlill111111!!!!!l111 ______ ______ __ __!!!_!_I _ ___ ____ _____ /,.illa... ,• illllll:lillllil.illllll iIIIVLYIIIIII! .G °I ■ illllll.11lllll!`"'•II• aG ■ GJG=G .==CIC== .__ ___■_ x !!!!!lllli!!!llll!!!!!!! !!!!lllll!!!!!11 1!!!!llll•■!!!!!! -„■■1 E ■■r/Ir 11;1 /ICI lrl■■I a 111111EEEEIIIIEEEE!!!!!I !!!!!lllll!!!l111111! 111111111!!!!!1 !!!l11111!!!l111111!!!!I 111111 111111111111111 , / m II v II I■I/■1■1 I■ /■�■1 �_ II I\■1■I 1■ '- -_.■■I I m II �I IN. 1 IU I- ---"FA, FA CL II m II _ a Yrn/liiI IIY■Id r.l I.■■ L\I■II•.■■I III 1■■.1■�■I ;11II/■■I / IIMEMIIIIIMIIMME10111PAILAAMMEHIIIMF.11110111.1 I'■l I■'I. C - II■■■r .I.IJJ. Uh : I it 1■II EMI 1 I II 1'I11 II IY 1 II 1 AL Al 111. 11 o p -- ■um= YY _ III I IIL'R!■■r1■.I.. _ .7._ ■■r.;r,:I -- L!') ---- 68+02.34 11 :: _ bllgi/I■■l II il 01 11 :IL'Jn _ 795.14 ■r,p o Ilk III■II 1 N 0.020 A I.: ilk E 111E r- 0.020 - 111E 1IRIYrI C■'.67 a _ ■M■YWYWYW __ _ II 3 Yr1\:Ii1 a F0I II F1I Ii/■Y y 7G■rA'■71 ■■Y■■■Y■ ■Y■ - r- C I .'.1 _ II - - - II III I U '3 a '\ L.IL•ri11■I:•11■Y■:1 1, ■■IRiII:1 z7lsm■■■■MCl C'l1!!_• __ rlrill:l■■l O I1 II ..=■---■[__MP!! _ 0_ 9=!! - _ __ _ a II a.aiG.-__7■---■= 7[_ _ V II Z _ 11 a II -_ 0 IMME eG•WORlllr■l■LO. a, ■■rllJlil I/I IIi1■■l �r Ur, II 11 o,0LLl ••■ri■■•• ri■ri■I.I■■■■II 0 0� UUII■II■■■r1 .n jY - ,1 �71 �7. .ul .. '' .. .. .. . .. . . .. . .. . . iJ .n n .. n .,r. rr . . y9 . • . ,. ILI . . . . 9 CO OD 0' PROJECT REFERENCE NO. SHEET NO. ro • \ I-3819B 10-1 n 830 I ROADWAY DESIGN HYDRAULICS -YRPCA- ENGINEER ENGINEER 820 - P1= 12+00.00 :.a :r; u c BEGIN GRADE:: EL = 79026' - RDCA- STA .6 34 70 YRPCA STA. 10-4,0 00- VC = 250' EL.792.94' F:791.42' = K = 209 810 DS = 63 MPH - APA&OALI-I LAB- DOCUMENT NOT CONSIDERED FINAL �r iE IN APPROACH 5 LAq 4 JI - . ' -- I. .5, UNLESS ALL SIGNATURES COMPLETED YRPCA- STA.16+10.53 PRO SE'/ EL, 796 50' EL.7f2.79' OR,4 ENS :'d 800 -A- A. + o' : 800 "" EL 795 I 0J!61x 790 ) 0 rrr�- _ r. L / _• r r�_1' 790 • _` -- _ _,„ —H-1—•-• EL = `_ S/ 780 — ■ �� 90 780 770 I 770 • GNP 760 760 I 750 750 SEE SHEET 9,10 FOR -YRPCA- PLAN III 740 I I • 740 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 P1= 38+00.00 EL = 867.00' 13EGIN B GE VC = 840' 870 . . � S'4 68y1 -8 4 DS 50 MPH h 870 1•1111111111111111■ _1 II •••••••••••••••••••••••••••••••••••••••••••••••••• 860 • . IIII BEGIN 4UUMOP 860 1. .■ IIII "' _■ ■■■■ C IIIIIIIIIIIIIII F- 1 _ 850 1■111111111111111 ■ MI 1111 _ _!— - 850 • 1l1IIIIIIIIIIIIII I MI IIII _ �.,�. • 840 •- i.iiiiiiiiiiiiiiii��I Ii a liii . E 840 ._ . — ��.... _ • 1_ �1111� iiiiiiffilliffille _ _ ■■■■ 7 M/N MlV111111 1 11 1 1 111 11• 830 - 1=1111111111111 _ z�'. ' '"- = —��.... ••' ' 830 • ��_���������������� lls IIII 111111111111111111111 ��� 1111111111111111.111. a ' _ I i� 1 I I I .... ■� ■ . ■■■■� I oo yuo I 820 1E111111111111111 I 1111 II 820 Hu PI= 24+15.00 ■ImNINNNNNN ��- IIII ___ NEENNENNEN ■■■I EL = 79775' ■— . . ■■■■ E 1m �� IIII �1�1111111111111111■ '••' �! VC = 440 ■■■■ s` - �� rn ■■■I ■ i 1 1 ■■■■■� ■■■■ 1 _ E 810 in DS = 5/MPH 1 1 ■■■■■■■■■i i' —■ a■i������11111 �� 810 1 1111111111111111 ism - •••• N • ■�■■..-c ■- ■■■■� u■. _ ........r ■� ■ =1E= •7� oo moo■ • 800 ■- �>.�E • MEoo 800 III 5Ap00' ■■ _ pEll ...1 '—gms °— — — PERMIT DRAWING o •� -�.■ro . I I I r I I °XISTINI a• 790 ..-- ■___ •••� •■ - _ SOUND �'f'^Ewr■fncEtic Sur n'€�a� 790 '�""""""" •■ • SHEET 8 OF 67 4 ■...... ■� ■ o■■ _R7` STA253 U94I ■■_■■■_ I■IIIIIIIIIIIIIIII■ =1 1111.■.■■■� �ti •• ••• ■� ■ �■ ■■■■ SEE SHEET 10,22 FOR -YRPCA- PLAN )� 11111■ 1�1111111111111111■ �1 IIII 780 11.111■ 1�1111111111111111■ �1 IIII I I, 780 ,..a 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 7`0 II I 0iiii5iiii�10 PROJ.REFERENCE NO. SHEET NO. 2 � � 1-3819 XA-252 (O ■■ ■ cr c.4. ci - 20 0 ::� 11 .ir ::14q PERMIT DRAWING SHEET 9 OF 67 11 ME■■ ■■ ■■ • ■■■ 'WHEN 111 III IIIII 111111111111111111111111111111 1111111111 1111111111111111111111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111II 11.1111111111111111;1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 111111111111111111 111111111111111111 111111111111111111 111111111111111111111111111111111111I IIIIIIII ffff IIIIIIIIIIH......... II IIIII IIIII I1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ■■■■■■■ IIIIIII IIIIII!11EE11111111 1111111111111111111111111■iiiiii II 111111111111111111 111111111111111111 111111111111111111 IIIIII1111111111111111111111111111111 IIIIIIIIIIII �1 11 r,o 1::::::::::::::::::::::::fie::::: _- 11 II r1 11111111111111111111111111■IIIII — II iiiiiiiiiiiiiiiiiiiiiiii IIII11 II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII _ ••11111111111111111111111_.11111 1 1■�Ic%� :: IIIIIIIIIIIIIIIIIIIIIIIIIE■IIIII IIIIIIIIIIIIIIIIIIIIIIIIIC : 11 1111111111�■IIIII AI 11 ■■ E _ I::::I1�_•:::hi. �� ■ice �_ ■■ ■■ Nom NE NE NE NE NE MN N MN _ _ umir I ■■ 0 .= II O -.i! ■■ C .IIi1 — m p �, ` NE � ■■ NE E - ■■ NE mEmmmmos ■■ - ■■ NE O o' =Twin _ . a 1= 11111111.11111111111111111 1111 o ■■■■ i,r, .� — —1 o �-- • mil_.—_ %� .• •• •• •• 60 -- -- 80 - 100 120 - 140 .O,EI— E xo I Rx1„0. MUR E„4:, -Jl '1' -MATCHLINE- SEE SHEET NO.23 I'"''' / f Ld 00 O' :... � �� 1.:: <L' xyO� ,X:'•'.':•'•:i IuItlR79Q�711 � dl: • •_I � � lv UNLESS.«SIGNATURES COMPLETED F, `4• {.•.•. f vR•9,:,. -..J { DETAIL I2 Z SITE #9 L CHANNEL CHANGE b / '. r-",�t�� ,�� C ANC TEMPORARY SURFACE El SITE #9 � �� o DdP = -I ',; DE WATER IMPACT xkr ° .10 �':.. +r. \\ io:,° w:a.H0 „Iii {. R 6 Ft�-�•1 li/a �i `•I �\ TypeedLmr 6 Class I RilYRop b 10 FYRPAC-FROM 3TA.2)+]4 TO 3TA.33+50 f� REI 2 EXISTING 7'X 7'BOX +,ti, .. �0:64iffilote C M r y� \\i it. #12 CULVERTS TO BE REMOVED �j '� �Ej I /� SITE \\�',rl �J y Kj DENOTES IMPACTS IN ` t \N'� �:.1 " F/ >R _ \�\\\.I C>� S1 \ SURFACEWATER s' 1/ / : ' III lU 1 I/' il; / sosolACca C— \ )J'��,���., ,,. �/� X 7 CONC /. �•I DENOTES TEMPORARY " ----- 1 '/% \ �� Y�II.f /! ICONC //� IMPACTS IN SURFACE WATEF �' 7/ _ 11Rn1-. {!G! �:v �. - - �i —. ra�si' vrscureeeeii c c \\ w t J dlsiel. ■w� \ ) ArAP ti� 41� ' 2.a 2 �� ii1iTPA.➢A4*-4O JiLil -.�� _ r ■ \ ,E // % 11�r"� F El fi 111111/1 irr 11 1 i i���_ ia�� 7 — , \ \\ O GRAPHIC INSET 1" I ,) 11 F, �1111L /��I�/ \ Z o 1 \ I ..o SCALE cs4iw.°°.,,rs /I 11 yY 1111 11.f.� , J W w u s„w O ..-�__ �` 1 0.) 11 \ „,—tit. " �.1`..SZti��i .\ --"e>:+. v "•$04.,1►, tr III i "' 4... c w 1 • 1:i0Eo ♦s s�f�I _ OE P.o. Lu ��•�4 nxc sse • N MO .... .1 // \:.,.._ ��n���..�'fiz, :.1 C9 1►G l\ - MMMM 3 -rm, a_W- ,_ ® : - - - �' ��==�•�i •=ce "y�e[P • --= _-1 +,,.� NNMIi ' —*7 _ - - — — — — — — _ — ��e� - 1 ■�HI / ia. i � '�<I 7lpb4/.�i�c-sue - — ' �c c c e ��..,,gr>.•. x i �,.,. 1 i.t1i• ail► 1 ,` _� v v v a mEU-n' ,r' T" •'-'.•M — x."' "''"s', 1 1 Tr".�n ,u1, •r �rsAlr�i�:ar "�f�.Tr.z-a.. a ,. 7-� >< x ...., ■" _ o w iri1� n♦i�lli��� =—iir•1ze_� . �.Ai.. � � v — � , �1 N - - 1 .1.1M11•' ®�// DkWIIgpllri i1 A3#} ,� .. _. _ -„Y L _ o-• 1..Rs�o i.nr•+..��. Q 's' 1.■•i'_„, .. ra—.,���.-.r+ _r, - q , {•Y•. S F i � �� N .. -+- -%fi.7ii OAG 3.�Il1111KEi i i l?::, -� ,�� + .ter-,-r —ii■;�i■■lu■;11 itr menace 0 . �I%'ti; .�_ �,- - _ ,.cP (saEB- v~i >e J lsl 3/ Jd - _ R`2,^_,+JIM�ISr�.n- ,,.) - ., _ .■E Ili NI II IM ■IiF u, w 112.6WB IIIl.E 818.I I%II61�. - - = .; •_ - - - vri�Glll'-.v'4' 'iy. =//.I + � i�i��l! y i4 _ ,,i,i'F . .�-.,.aa.,a„�= � iiiiiiiiiiiil �y71 — v P}'�• ♦ �•- 1�I v v v v v� NIP" v /11PF11'11 .JI'* 00 TM"I I min I m °.. . E`Too_ _.. c —c `— IL. o .r n^ c , r,0 ��r—�v.'siiiy,� 1.7-- ��r_rR.—=`— -- T �e 2r�c, C L. ,OxE,,. w ox.o ! / _ ci A amn s cTuni P - - .. — . _ se onu,ox sxsn xa_n - � _ . _ f .�a�l �� Ian — — !,� c��' INSET C soo /// o sEE onuim xE us ` * 11/27 tl 1'AyR ;st, 1— I �I y/%Iy l '� lt '. %,.� ;�� ,. ' — -=_ fir`iCZJiW //Ii►g f / ',Nerd,' Vil //.o„C.o.x .x.— `� ,.° �� 1!�l+ ®�/.; '� ( /J/r -��\yI� ",v��'r�`�/� 2 EXISTING 7'X T BOX `�/ �• tir ��c� // ,r E„� 2, f • " Atli I ' — CULVERTS TO BE REMOVED o� oVp ,'4i"i'a`�� i /••:.••• /i ._ Y iIti �� RI1r � Aim_ifv �,r. ♦i • ./ tiff - /��_,./�\_ �- TEMPORARY SURFACE WATER /��y� is _ � X�i�. IT / . .illi V. MC►/ IMPACT 2; ii'"1":7"," /di,/ ' y .-; ' , zr..- ..„...-- "I'.•1.1'..': .".....:.:•:;',"•,, it 1p'>-- -It,..".... I -----''''''''. ---- ---5 5 u t Iy/�/� DENOTES IMPACTS IN /, ,,, / ''"4 Z �''•••' •..1 '�i .-•�`. b�Yrrifr _ V/////// SURFACE WATER 3 . .. • .-' S • • r / /•• �/ E .Oka--,Ir , ` DENOTES TEMPORARY_ "C' , I - ••DENOTES•FILL IN i _ C F� r //� IMPACTS IN SURFACE WATER ��i , //�b l i . Z Y/� WETLAND �_ ss = � PERMIT DRAWING I. Z fY / I,/� ,.4, DENOTES HAND �� r'41// /,A CLEARING / GRAPHIC SCALE-INSET _ =''/� . . . . SHEET 10 OF 67 _ — / ounox .RCx.xxEl DENOTES MECHANIZED ___ 2 V / 3%� I +� CLEARING `� \ / u E n c ,• ,/ .. _.x,d j •` ' DENOTES IMPACTS IN SITE #12� \- / ETAIN k // SURFACE WATER / / / , ,,,„o-0a�RR Co„„,.�REOE,E • -/ r• `• I 1 � IMPDENACTS IN SURFACE WATER RY ' I, \N/ % =P G D� oE:��xEo.v. `.w.�: . 1 - C„°°"°' o."ixsv,ox"' "`" <-R"' , v ,.... . . . . A N.,,,,,,, -;•:;::,....-::::, „gi' ,,,,,,., A -MATCH LINE- SEE SHEET NO.23 3Ir —41F''''''''''' IIIIIII C) 0. --... . .-••••."i_vw--_,..-ww,_ /arc ear-Akt„:6111,1;,.i',.:;* 7 Ifit,„ ,C. 0 ' ..*.:n•:•:,v-, 1p. '11:14NUNIAZII, . .4,,,r,' - - ...„..... ALL GNAT li •'METED -...... ,. 44.....-,,A\;,•:.; , ,,,, ; f i N-0.:.<1,4 5, ':-:111t. ....• -1 Immature w '•.;,....;.... . -1 rzw. ,--.7N//11111lffi'V''''' . -1 l'i— CHANNEL CHANGE SITE #9 INSET ,i‘4,440 /40111slit 0 4, -ii.rs.,/.' ii,i- - • NAV 1 appalmitir, tiot . , 1 . te' Ilrii.%*4%11 igriporsotio .. .- - .. r., TEMPORARY SURFACE \ Drol .. tku. . INMII.W-Arffi ,,,,_ w. 11_,.; -_,..w.e.41?'7:.•-•:.... -.1 :41''' °tillittirldi il,,/,',,ih I_i ,0 I,--".'""".1111 _ , 1...lik ,........ imppyr.T./f,7 -7,;44frptity/is i Off• - ,c sk ,,. NNIX.d Ft. APAPM:"::::iONtitil.v.,, 4.4, i '-' WATER IMPACT .„i MAW , . -YRPAC-FROM STA.2,74 TO STA.33+50 a"l'O '/iliP. W 4/0/' I / REh I IR '?"*.%:6-",,,,,, ,,,:;•• ..,--...Ali:0%M*!1,11„,-,_.,e, t'( ,,,, , ,I, ,,,,,,A, ' . ,,,„, / a , „,, e 2 EXISTING 7'X 7'BOX e,'fr. i CULVERTS TO BE REMOVED •,,f,,I..',V:'..t.t.::7!,'7.71cii."013.trr-IflAft-l31f lit Atil-.1 /'J'''' '''.----. --'----__-_--- - --- -,z._. AVILA ' Sk, \I:il'ioi•-•.;-,,,.:',..,:,'.,,,..:.,..-. 1::::,...4 -,,,,,- 04,„,,,,, 1/ ' r • //4' ' ___ ,, .----- ///f/ DENOTES IMPACTS IN SURFACE WATER ,-- - '2,131.111111,,I,-., •f-,' 7........s:---:--i....---;;-,IVAKI.v---- -=4._,.;,4.......': -4'''-'-41"' Rgea:?:!"••':=5;T%' 4)tareat -a r DENOTES TEMPORARY ' A IMPACTS IN SURFACE WATE CN 41...-,.-fArir,„,_,,,,..-„0„, ,..7.-,,_-,_ _ 6:•=i.=•= 5,„ ,,, , „ , , ,,,,v„ t, . ,,,.0 I P-1-''4 „K0, \‘\.1i ‘ 1i'' \,END:EXI...S'.NT..AP'..7 PG-.R RO.A.AP.C-H H•I C:,.'-.4z.'..Sk.-AC••rA-,• -t i Z.•X,•-•m •s•-'•,/%,':-....1-.:;),"-4W_,,,,A44,7'.•-.,1....„.,."",•,1:_:_"'s._7_:',;;,1,,."V'0li1,-.47.1.-:7•_-I'1-,1.7r_1-A4 11.- /lfA/ia __riz_l-,„am—n,a,,su_r-_zAr,i-_i•r c__._.A,__a4r :,/-1—A"."".m,-,- EE WSE _ __ ,Avt A kk‘ ji _ . , L. AL. _-4"qii-,7--,,---:.------I----gor-- -i-T-,n, --CIIMC--'Rft...._-• - -7- 'ik ,h-*-,, a*r0.‘''.i.,•-''k.-I_..„,!ih.,•''',tr.?._yit.,NiwwteNmrp_.-''' ip„ft...-ft-,..._____&,_-0...7„,__—__ 0, ,n _ .„ _ __- ,I-./.7,2::pi\ ..^,riMI.-..11 .5 .1117...1.(1126NrAMNiall••::: -.. ..--100.... .A.. _, .--' ..- ...- -- ...-....... --- 1......__........... ....._ ...__ ........._ -.•••••••.. 2,::..L,. =---..mnr 0. Lu ----"= "mmtNr-;.....-1-.. .1*2,1511111M111174T471 ";777'-'".17. ..---"-".-------....-".--'---.a: ---'-"'--- -" --------------------=------ -;13171-=--- ------7-7- 71iii"wallrillmr"mig""' Amlimmmow-..z-.==.. ,=====ra-g=======Afasa-ailifflot ,.., wmulutor T71111 I Inv m i- • ,u , NIMMIMIMMIML1W- MIMM.M==9:E17, ====',Z..1111y.W=1=======erwf - tn r-r T"'"ail III II EMINMETIrm, ..- ,,MMIGw=likla, limiy,,631M1=2,1:32, =PM IPM=I.....': WM,--NWIIWW mmm. =====,.. .,m,,„=„,•r-a..7 g4131374,18; _wAIWIIIIPPECM&K. =NMI_ .. ,====.mme_omi, TmmmnmE,L ,m. wmm,wm _ •:. -1133:0111=V1..!,.. , , . , ,,,,. ,••• W.A=_Mill134/ _ _. -..-.•-_,Wir;1_Mr....Sr..-1,_•03S?.. ...1 .. J ''' ill tieing'rullEragEMW_ ITURMINIK111124q111.. ...,..?....-F„. ..7.- -.±.... 1.1-. ...."-_ ,." ...,,,.„7",',..,. ....„.i. ___-,....-,,_---..-- ..-._-_-_..---._ ...__ .._ __---•:..-=-••, , __- .----.---,,,,,,.-__,-.= . ,•,•..-_,..._-,------,-. -,-,--=',..-----••=•-- - - - ..0 1 '_.... ii...47... ...---,C,dmium mu m• E:,AT. IIIYI VI INNI•MIMAI, 0 '. -'- ' ' 77:-. ". -,.." __ ' .-_-__ ---/ =W.A.;mzezii---" mit===r mosn===inv,zszA===;&" :1===6"--a=r•-•.--.===-'7='.":”t=m=A6immi=ga==._i=m1=6===== =•=m„azkA=1== .=.1117 .‹._. 0 M b- ".; FA=rA=='=rkg===.=I E:=M==g 0 •.,Ai r- d ' ... ___- . ' -imr". .i.,, ,C1 1=1E1:l3cil''IC;1 11'Iirii....MEGMEAAr.V M-' ' ''4 ..1Mnillil'''''.': "riF- -- -.-_-.. ._,-=--:'2"-r.=.4. .---A`'.•77=MI''. 1111J P.',,,,„ ' IriL,....... --. ..•-•'-•=MilM1221 .. .7,........-•=4m22.....M===..==._......7 ...=.......:=.••••.,..7•11MMIA.,..=.",..M.,,,..,,.,__._: IML,74,,,,.. ,A „..1‘ 7,......_...,....7..,,meme7=, _..........._=______..........__7___.........7_____...................- ===.,_,.._...=-,......_•=-7........._=M'__.........7tai=mwo_„..........7=-_,..._=-_„....;F u,1-1 I IN 110 MEM I WW1r.7.74,433W. ,...---"- --7'f.„---".. .;,--Z....,-,,,..,..„„..,,,.._,„.- _-_.=.T......,,- ._...... , .,......,-...3.2r ,_____ "w If,.....-R,E .HAIIIMAE ___,,, ,_..„,. ,,A -' An,....m,,ffl.-zdEp.-- -..,--,-..n,. .-.------ --....„„..„ ... ,-..„---z----------- ___-_,.-f -=-- ---- __ + ,I1 ''' 7..1.L77: -- ---. ' .1r--'-- --'''''7- ''''' 7-- ---C,,-,- It•z_---- ------------- ----,-----=------------ __ _ _ _ t' ---- --- z=, ----*;--- r'' ._ i Er iiIMI/MN irAgiWiMilliffiaageniii- ______. .., "-----.,-. ."-...,,,,..M. ....._ . ......._ „.., . ii;,,:::..11,v______________,,,„_.....--_;„.... .... _ _____,—._ __,___ „._ _ n____„ ..,....„: OW III M.NIM1111.1131_ 1......_......._- ____ ..., --.›..,.0,.......... .._.2.....„..... r.,_.... ., _ _ ri..., ,..., T=Tr,-`,i.. .'...01=2,........mniWeMt-"Ial-t"...- -:7__ .' i Min!Iiii 1We rw -me.,-! ..-_- _ ,71--7----`77-7=':, f - - --.-,-- IMO 4101111- -M•i'f•------- -- -___.---1--mji- _---- .1"...-_---------- ----- - -..—."- :----!, .--"*"7"-'"rilth-Li.,0,11:.1144 asi.--.... g Arffir __-__ • __ , ir II ly ir. Itiroor ,-- - . 4imv -- , L;',',, --,"` 1 ' Iowa= Ami.C4 -11 ENO E B SHIFT -.."•" Ato-::_ __-__.-,._--%---:—.-----__w0--- ------- '' -- - 13338":00 OM rge0" ,--- -..--=-- -,___---=--------------- -----y•----i---7_•.. - ,dur •••.. I, L.) 1- 0,•••• --....67.-IPIV „ tr _ _.. -)--- v) :-.END.R.'EAC.rASt,7746,1 ' I 'M..--L-Ei-POi-IGR:6.3 _ _____ _-:''' ;•7'''•:f!'±'' -j----__,'-',",... ',.,.:i -2:---',-, _,_r„,0''--- OW° = ' - ---- orsPN!'__ .-615.---:-7 .1.-41_'. ----- -- - ------ --4------...,_,,,---r•---. - — •4 ____ -.- ,z' r".5fWit,..--r--, .!.• --7-,;„,--••• -....,---,...!Alirt . I POT 94.041,-- -.. -- .0.-1:„. ,,----- 1---- - 7A APIRIZMF Ami INSET' = ---,--,-,_, ...-,1-F-1 ,. INSET 1,-- 1111.--.i. er. ril .6011.. 1452513 -14311e4."-. .-Aln'emtimt / SE *ask re.r,-.4:,,z,,, ,ok .Aripi, 74.... m,- ./........___,........„ _,.,_...„._,_„..„...._ _ _,,z1: o -8E...y441— oz , . 0 1 11- , ,,,,„,,„„.. .,.::„. .,.. . ..,...imi. Atr:_ , .,,, ..,. .,.. ,., , . : ., ..., . (.,k .‘,% •.. 1................,........,... .0,00,..,,, ,,,, „. ....,. .,:„_,_,. _, v i _, ...:0000.----->e'''_,......„.0‘..-._;,,, -------- ------: __,,,,,,i..i_-- ,V, (.( Illi ''.az 41111Millgr-- ,....- ,".- -','. ;'''' j 41-larl'i". 111,AtiViglir-73011,0046.1111..4111111_11. ..... ..''''-;.:z44-1.41 ,*".-,- .4....494,4i rai4 ..„,-- ,...m,-„,04.,-,..R-.7_ttur-m•amr:=1.4"1-4=-7,r,rize Li-i;fdiauw,......... WV-02 `1.1 dill!!!! ' : '''''''3....‘°. ; /•'‘Ir------'-°----- -' 411111,1011111174,-W70.AratSFAVATI4 '-/'1,•'-- / 0.' l, ... • _,. ,.,/,,,,,,-;--- p". ,,..e, , . .,-r....,,.f..X.'' V 11:1r,•-.-, \(,' , l'r-M".1.;r1-41,;tral "- :7 417airEq144;f",7,30itta ' I' '' ''' ' •''' I I fr. ' ---•-• :00* ,%410"" ,,F Alf ,ft?' .:,i' Y BEGIN APPROACH SLAB . e'''.---1''c:-- Vis,;•-::,"- _I A Re f' ? :1//: R ...,.4;4 ,' • „.,0.-elli /I/ ','14'41 1 ,OP,•‘'''':,',: ' '''',/< 'S;r4 , #1 I iii. r 1_,. ._._...,„„,,,:dor.t,,,,,,,,,,1,,,,;,_-- --10.ip."-Ififite...... "1.-we, • 2 EXISTING 7'X 7'BOX =•,...N.W.0-.7.."-•3.WiCIVAW llosinr-rnitikr.- C U L V E RTS TO BE REMOVED ° 9 4, ,•/doi ' ' „,../..‘...."'„,.. .:".',:--...7;•-i.3'0'.V... 4 i,, ,--64i1 ,4 .141,70.4...,atAL-4e49.,./Jite...IPErr'--•,,,----.../Are'llza-P.W..43:12......4..S4t,,,,:„Aixtititti241 7'-'4,'; f-A-7:4snam -lopiri-e- ,- ‘1,7-4r.--_,ArumailiatAill7P trawrriAorte,,:,2,01- ,, ,, Af,,,,, ,,,, flitr..,, Air/ AlTi TimEMpAPcOTRARY SURFACE WATER 11176 illV2W"•14""' .1%"'",040 I ii . , Lai , -.,,,r4,11, A jel 7 ' /' ''' /A 4•4!).--' ',3 --liat.:::4°;;;•171',f74"; .i-;''14..' 247-Pfe: 1(11 ..""---i- -;$)1,- 7'17/:',74113::.4741:.-:4''>ir.:j::' '' -t) it/ '/ _:"•;4.% 2---,,- " , ,_, /'-' '. :.j171'...:::4 1 e.•Ctlir 7:"49 69 7, 1;-*,0, /, ...-',, ,,,, ;:.;t",/,*-2,•ri, - - 0" ;‘, I ....:„:-.;;%;:%•:-../ 'Jr , Villflitletar 1 / ii4- '-'80,4-- - ititt14.1.11 , WM It!WA'TN LIqmArrt:TS IN ,S', ' i, 4-1,-;;;'y' ,- r i •:. .74'7'.".-',. ." :5)2. / WW1/Or ,/,' y &V ., ...••• -","- ,,,,,•' / i //,1 . / lece....d----- -,...,. ... ,f,?%5 , -' :::-/.•::• .•;;IV., , z ' -16111 ., :,.:- •'''••,' ' .a / 11111111111177"/ /../4% 4.410 7/y,WA ra Off, / • 'a /A,,...• i AA.r. *.,•.''w-4,.n.de , ,:f rox----0 ...,,,,,, ,:„,,,„.,.. _ N vp., Bei DENOTES TEMPORARY IMPACTS IN SURFACE WATER , i ............ "//' /.4r r,„.---,:,,,,,,---• 41.' ".Illf la , All elf A r0; co i , -7J• .0,,, „,„...,_, ,f,,,A01110t; i? of ... . „), DENOTES FILL IN / WOO 0 I iliSii Weal i iiiiiA 151111..111 25 12, o WETLAND y Z ' / AIN AC A Ott'.771C111 IAA-A-Mir GRAPHIC SCALE-INSET 440,7( fr-->,,,xmori ito: , r.„ ,,, DENOTES HAND , r; ''ifr"'' .1.10V4e4IP: ' 'f. Am CLEARING ' f frit/A , -,:: -,- , 464-, '',"•,' if -". SHEET 11 OF 67 '" ' ' ' ' ....••• DENOTES MECHANIZED ,-4r / ollinimat, riArir ' A,/ pd 4 • ___„%fi DENOTES IMPACTS IN OW SURFACE WATER . ft f, SI ' •7'• 4!4. '• ' Win ti . grN.77 ri . elfr ,, "//,,,Afr i& • /- . M1411-••••••Trai 2 ,/, r DENOTES TEMPORARY 24 LANE I ``s I ) PROJECT REFERENCE NO SHEET NO. 1-38/98 /lA RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER TEMPORARY IMPACTS IN SURFACE WATER //*��* �, *\\ C .'NNEL BLOCK 4.4• SE DETAIL 65 OCUMENT NOT CONSIDERED FINAL UNLESS ALL SGNATURES COMPLETED • * ,AN ' .41, F #�� *_ CHANNEL CH W/ '�e .,%� `� ►•�;w ;� - 7 10' BERM & CL 2 RIP g', "'4, V' � �a7►01 •♦`�i,A��iT.s SEE DETAIL 12 � r , tiff, ir: 1 'AA'64"tfp' ♦ i :�c , /* _ _ ....., APR •14" �14 V 11:41'' ♦♦1i��i�i�i:: 614 •:: ���4""::♦;;;:::: F �A� �/ \CHANNEL CHANGE ni�`-i�i�ic�♦i`i,►i��•��O��il:�i�rc>►��..��!i�•z.�`�i•• . 36, op, lit.. II It* —k--------'. --------- -#4 t. --„, ----.E._ _ ta.1 c.4Ni..r.0 -i--" �© °��2l,1-l- �#AA7i,4 ►_.4 ` -- _________ ---- ____ ..___F_"N .• SITE #9 _ �� 'r „ zGI Vi' B-77 A ---,,,, intimmsacikikritts.mAterAle ... . ... ................................. . 4b idernillikill...........:5° qp SITE #9 �� <�.�. ArS _ern_ i`siAir 1 50:1 �t "' - up TOE PROTECTION PIPE OIdT �,- AN� ,. '�, 004Ap. WK a . ,�� to SEIE DETA :IPRAPBIATIO Y r`�titi' 1.1 0 EE I TAIL 26 ©;��� ":cD • F �����"' � � CHANNEL NDETAIOL 65 a ;:;;;; ............................... �CL I RIP RAP �` ` F.. O 16 SY \�� Mara �r 1o,01 1.,`" ��' -- CHANNEL CHANGE w/ • ���� "I "°^�"�% ��� �'� 5' BASE & CL 2 RIPRAP "���� �.,�`'`LMTz .... I — � ,��� �%,�,,tl .' //i'/// SSURFOACE WATERTS; WATER • ���`�` ���� �'�� F c0 . �� F F __ 6' CONC �i// �� //� DENOTES FILL IN " �� N� w �11�..'���•�"-��1AT�a'���Z+Lt.�'a. �Iy=�J _vim �+ 1 . • / / WETLAND �� L N L.BLO ' ` i �� �� �wl�y� j y -� ** ** *** DENOTES MECHANIZED ����� ' . $ E A •5 >f' �. ►.✓ -�� i * * * * CLEARING y `GV �_ & �•A�.� NI wn T r•iill►��! N 7 4, C Z PERMIT DRAWING 0 a SHEET 12 OF 67 SITE #12 50 25 0 50 100 coy_ ` IIII� N o a GRAPHIC SCALE — INSETS O L_, ��L r-.a 0.0_C LANE I "s I ) PROJECT REFERENCE NO. SHEET No 1-38/98 /lA R'W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER TEMPORARY IMPACTS IN SURFACE WATER • /11/4 i/ �,, 111 C NN BLOC a DOCUMENT NOT CONSIDERED FINAL '.�`j *' SE DETA 65 „) / . UNLESS ALL SIGNATURES COMPLETED ‘,4,., , , ;TAIllbp 7ink,... . „„0„,,,t1A,„ 1 ,le,10„ 4, / 41,,,,,„. ilk ;4:: I4h> �ti oIt:• :::t--- - 4&-&,- : :" _ 7 �' ��ti.....)� ��- �.��`�Z��►!ii"i`�ib�!�!zq.�il•!,cti�Z►�•� � ♦ / � ��tiC�iii����P:'��As��io�'��cbPr►74ig":::IT-17"Tl4:::.:tt:::::::: :::r*:: � � <i IA �i� 1/�II! �����{i .ji.♦ -� I' ,��� V V f� ����i�1�►` � �ci�iit►���:�p��/��:4:7.; ��Soir, /itio , ���� , ��zii ��,,,,�,�r►tai►•ri���i��P•��i��•►- � sp, � �� .�' -a.r��Q���iTt.�•�.����fy�l��1L������i�r�ih�;+�Q6��► k. . � � � Fi i �►8 . �ti�QTl r� A.• i � %. ,,,iiv s tifi--,,,-------WO 41,i, ifik#) Iliftik :: ir Itt--,..-- ,—-_ •441 �'��.� ere =�� .vim a�� `-' _ Pv. .� '1/4.. laillir ®� ' r I."l: ' • SITE #9 r V duis ima imiwa �:,�„�`:��© a _. ; �/ o., ► !i!to :`�4 .� 4IN. Alis,r ��� _ . WKiljli-mo: o ,,,,,!,,-'4,,„',,'„N,'„'''„,v-,-.„,I,.,,,,.,..,,,.,.V„,.-.;..,I.4,P.,c.',.-,'.,h:.V*,'._z,..,:,,W-L,,',/,,iE'i•,'i'..„..:-'-..,,...:„,.,0.-.1,.:.-,,1,-C.sN-,,ii,t..tr",•t,,"._t-,..-.'......14-k•k4,I0 ,.,,4 f- .O,*1:4.sr,•,,,,t(..'i;i-:.,f)"-x,o-11.r ...1 ,-,A,4-,k+k,4 4.t,,......1,d c.w, ,.,A.,4.,r i0„dlr0..h,.6 rw 17 rrtay.sVAtinus4t-VA 4,--1•&,6tr.*-.4,.-41.-..:. if1,...,.. :10:160;m,7,1;1,1;4'1''1m1/41.p,111Ef..,rl,1, .,�,` XL �� �� M`�' HANNEL BLOCK / �� `;; _ '1� t`�!� SEE DETAIL ; ;17 U A! CHANNEL CHANGEw �. vj 5 BASE & CL 2 RIP' ' ' DENOTES IMPACTS IN ' , .4-our air , al iii."..4. ,:icrympl. raus"Aiwohearke iffilmiikmma.)"&-qi- .....ra V) %V.FI "-40A Li 1 1 Ts,,p vwf,-AN -„tb.,.: .., _.‘sq -q.w__ --_4.01.- _.....--- -, ..„..„4„1„....__„4„,„1,4p.,(44,*; ,.......„ 4- : 0 BP SURFACE WATER _Fzae- M , \ N ��A�I t �'/� k�� _,S► 4 � BEGIN , „ %/� /� DENOTES TEMPORARY M �� � i �� �r� P° ��� .N �a ��� IMPACTS IN SURFACE WATER M �4�.�� ���. 0 ,��.1 p' _,�_ � � - "'� 6' CONClKDENOTES FILL IN�� -M ► � �. • � .� _ .� �il �,�_ �� �= c 1rAtWytY • �' // WETLAND , l� j�� 1 ` �- 1__P * • . DENOTES MECHANIZED ,_ �� ♦ -=`G �`����.�``�`�` _� �i7i,7. �ii�i� Z ,t _��a+��� i :iiii_o. '»'*"* ' CLEARING y � U c) 7 C a) y PERMIT DRAWING a SHEET 13 OF 67 SITE #12 50 25 0 5�0 ma3 N�¢ GRAPHIC SCALE - INSETS O L, ,L,L r—..a 0 UL LANE I `` I PROJECT REFERENCE NO SHEET NO. 1-38/98 118 RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER • � *�*�� / DETAIL 71 I SK CDCHANNEL REPLACING EX. CULVERT (Not to Scale) ,`s,13 25' S 17 23' .►��� rCHANNEL CHANGE W/ • DOCUMENT NOT CONSIDERED FINAL 10' BERM & CL 2 RIPI at 1"�t. �s.� I CLASS II RIPRAP UNLESS ALL SIGNATURES COMPLETED � SEE DETAIL 12 • *W �5• at 1"/Ft. SLOPE PROTECTION CLASS• II RIPRAP TO EL. 797.0 �i �• III*I • ON BANKS CASS II RIPRAP GEOTEXTILE • CLASS 2 RIP RAP �y EMBEDDED ON BOTTOM 10 ON BANKS ONLY • F I '/ NO GEOTEXTILE � AT EMBANKME *I • y/ • -L- STA. 149+36 4 � ►� ' i �'Y �460• IN SEE DETAIL•• < I , . _ gig*A -� I DETAIL13 ....4; aiOrr ...- RIP RAP AT EMBANKMENT ��� �iZ (, as (N le t ,..***iC��'�ry � e� Z-�.0„.„koo�..-. iw���i�j;ie:-,�' 2-. 10'min. iZ �a�� �l 7 Ditch 2, 4'� �Zr1��-T4�41:4 tip0.0��������� h �y • 3L TON IP11�SY Grade 1.0'mi �' '�'�� `,fir I E . F • ���� ,�ic r, SITE #11 U GEOTEXTILE - _ F �b.;44,�4. f = WAN �-6 ill r 1 a� "WO Type of Liner= Class 2 Rip-Rap i- .- Itatil‘, v:044..)s • ,,-,,,.......-4... li . -- RC'AV_ / aYYi4:11.__1 1744_ l/��d��y alisrtiiliti�ti 41111111"2111111111 3� y _ - � ,__ E_L.:"4' .','- ' r ir' 18" RCP-III DETAIL 65 .s"SPECIFIED IN PLANS aADKTILL, s.3�RADE AirdimmiMIi �����1�1/ = LDMPAOTEL D CHANNEL EY LOCK 6 -=-� Y1r P EXTEND 4 DND IMP FLOW -` v��� IP ' �����ii• of Exxs*IxG CHANNEL ,:;`*``��'��' -%i7�j% ��� '~/I ^I ���I~'~'~'�� ,'•F �i 'O _•'ia..zr��:._►�ci.cZ_C_cA► COMPACTED __ �tititi Mp 50:1 - _:;A.T._�� —i-��u�.� ti�ti�r 4�� T `a KF f° CILRb6 fn "����� ����I/� MIN,.o'oerrx SECTION A- BALKFILL WK • L ,411i �yiMi ifbL ,� Tau am,iili --_i�.�.Ep�• LENGTH k3T STDNE C0 O'���� �� 11 ti Y Y„ a UNLMIPALTEO SACKFUL 4NNEL BLOCK F �t/~/'/�t ��i�i� 1l1, ce ° SEE DETAIL 65ID ilif �~�~/~I~/~/���� ' Y BALKFILL BALKFILL NOTES: �tiV� �� ANNEL P OCK`��"��) CHANNEL \ Z'ONANNELNBLOOK SMALL BE EOSATLTNE INTERFACEABE WEENNE%ISTIXG COMPACTED r 6 ti 1 P PROJECT SPECIFICATIONS. BLOCX S OULO BE INSTALL '/` - D ETAI L b �~~~~ CHANNEL AND PROPOSED CHANNEL. «T HANGE W/ II BOTTIXI OF BLOCK SNDULD BE A MINIMUM OF 2.0'BELOW THE INVERT LD , i~' '1"l _ LOLK�•fie OF THE EXISTING CHANNEL. ti , '••H F„�•,r::•F'HFIFH•.FF•1 E%TEND CHANNEL B I. 2 RIPRAP "��A �,���� � " /° ��1�",.�......... ,,,.,,,,,,FX.H.F.H...HFH ,,.,,�'F' MIN.DF 3'BEYOND LIMITS SECTION B-B BLOCX SNOM NTEND A MINIMUM OF 3.0'BEYOND THE LIMITS OF THE /Aeer� 11�1►~/ ~®//`./� EMO` W OF EXISTING CHANNEL PLAN VIEW WITH v..n. ACCES TC X ��y-+"""'F"•••• NLF,,.. ,� 3)INSTALL EROSION CONTROL MATTING AND SEED IN ACCORDANCE W CHANNEL BLOCK fi)COMPACTJBACKFILLITOCEXTENT rO33IBLEATIONS EOR ATTEXEGOIRECTION OF yl ��' A. ROAD D W I NOT TO SCALE �CV/Y THE ENGINEER. E CHANN :EPLACING SEI F 0 ___ 6' coNc ►417 i r� ;idEx. Box cuL•_ �__, . SK W/CLASSFII RIPRAP :: . cr, ������� "vv qt A/y►,. �A x 7' CONC E DETAIL 71 — s • t,►_;,.�yJ;•�,r±j • -CONC 9 - FG.�m., :�- �;,,•�•• . • we B1p�Yr{Y�t , 0' M /� If // 17�' �C� ,�� N.\ .r-(. f� r 1. r� //�'// M SE/ DENOTESRFACE WATER IMPACTS IN y /// M AOCTSS INE SURFACE WATER U SITE #12 O) /// DENOTES WETLAND L IN * * * * DENOTES MECHANIZED PERMIT DRAWING TEMPORARY IMPACTS IN **** ** * CLEARING SHEET 14 OF 67 SURFACE WATER a M 50 25 0 50 100 N�a `uIui — �aa GRAPHIC SCALE - INSETS 0 bi LANE I "s I / PROJECT REFERENCE NO. SHEET No DETAIL71 1-38/98 /lB R'V SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER ) J / * % / �� �,* -�� �� CHANNEL REPLACING EX. CULVERT 0m al r / / (Not to Scale) J �,\13- 17 23' I� DOCUMENT NOT CONSIDERED FINAL ♦At /4,1of t 1"/ft I CLASS II RIPRAP UNLESS ALL SIGNATURES COMPLETED ‘01,#4111111111111". 2P q �S j _1�1qt 1"/Ft. SLOPE PROTECTION , / � ".‘fi ti, CLASS II RIPRAP TO EL. 797.01► ON BANKS �����'�- I GEOTEXTILE �� Ia A R 1 7 1 % EMBEDDEDCONS BOTTOM 10 ON BANKS ONLY RI D �� N �� 9 NO GEOTEXTILE - /� ���Ilin n4 4 L- STA. 149+36 .Pilli � -''.�t114V . ` - + •` E DETAIL13 ��� �� e•., '� ����4 RIP RAP AT EMBANKMENT �T� ► �i••P '���` �m�P�•L•• iiinve0�®�� i �, i''-Y> • iC7 (Not to Scale) . / � 0,4 1► •• :oiriroto��6i.,4A T ie,a♦tge- -40-� / . Q 1 i y ��[ .yam • W o` i e► ♦♦3tr�i F t r 7 4 i� a�� G ���j� �����Z&��tti i�•i�i►•��l��ti����•����r 1i•1� >� ./C ��4i.�11",.• z�3�e�10;i OA* �t•r Ditch �! ��*�+$ ® ' 0(i 0:••`��i�� ���10,, i•. i�i C 1.0'm i n• I EZ i �.9 f ♦�. .yam►�.�• •�i�• :� CL RIP RAP 0 Grade 2' a , i,��a•1441 •��.��+i:�•r►���:��:1ae / •3 •N 11 SY ,,,,,,, j!•(41- 7 �'• a SITE #11 Z GEOTEXTILE )Ard7,077?"4472- �� �; ` •4 WAN '� , � :. Type of Liner= Class 2 Rip-Rap .....-/ ' ' ; kalSV 4 p .): 4 . A "" '' j4''' At0111; 'liffoii, ilitjartyir lelt Op---1,-40-..-1- --rar• .11 .."1"'—'11-6.....- - ---411.;.-%141 /8660/11/1.046._.4 if .44441.111%14:4)/ fir ehr -* i\ IMPV /�iiiJ��ti�� ""_ '�MMONS � a uncomPAETLE IV Air �� 1 ~-�m i iggeggi�i r_ — P- J DETAIL 65 HLEWSTXEANBANK m. rAEKPIu �jI Ogg II i ti tii,��� '� ay SHALL BE TREATED _�� SPECIFIED IN PLANS �_ lt. /,//`/� EXTEND CHANNEL OF EBLOCK LOC= I � 41Wirlir A aril:441 I f` • IIYt1 tititi ni-I////'I� r P OFKEXISTING CHANNEL6.4111r.11 MEET FLOW • • au M#1;4,4, ayii�Tgr��q/III %_:t�1�ti/� �Am.�,. { cg PATTED Apiii*ii; aL7.1_, ' tlyl�iAre aEKF ELLGG I BAGKF u if I ir,, it, 4114'����I�� ''������ r. ��� ,a LENGMNNk5]STONEFPTX SECTIONA'AC .Y , Y �����'�'~'� , ' \ UNCOMPLETED ol ,,, �,,,�,�, YY BLEKFILL 4NNEL BLOCK k. 4 ytititi�ti„ ��,, Nita c0 SEE DETAIL4A ����/�/�� Yti I• , BACKFILL COMPACTED 7:!:::::::::::::::::: 0 �W, AM Ir,ti,� �/,, A NEL • °CK`�(OnE%STIXO �. BACKFILLCK SHALLBE INSTALLED INACCORDANCE WITHTHE1 CHANNELAto �'��1U��� N �yti� \ XOIBEEINSTALLEO AT THE INTERFACE BETWEEN E%ISTING�_ HANGE W PROPOSED CXANXEL.H D- AIL 6 1 I0 LOCK SHOULD BE A MINIMUM OF 2.0'BELOW THE INVERT _ �� I � ��� 'i -� '�/'l_ LOEK�'C� STING CHANNEL. co L2 RIP• v'i ft ...01` , 0r �`f v -.44 r S SECTION B B MUM OF 3.0 BEYOND THE LIMITS OF THE _ 1x •�•xx EXTEND EHLNNEL B .J�+.�r�M�� !,//�I / MIN.DF 3-BEYOND LIMI 0] {��/ �F�/�/�� •EMO W �����xx^^�^'•"''•x''� �:::;'.,r:1;^::.•';;;�"°A ,CE 9)BLOCK SHOULD E%TEND A NINI _ N PLAN VIEW EXISTING STREAM CHNNEL. 3)INSTALL EROSION CONTROL MATTING AND SEED IN ACCORDANCE WITH , , `��y-y W OF EXISTING ENLNNEL CHANNEL BLOCK fi)COMPACT'�BACKFILLITOCEXTENT POSSIBLEEOR ATTEXEGOIRECTION OF a /� , • .. I,•Adik NOT TO.ALE THE ENGINEER. �� ��� CHA� :EPLA ir� 4P4 K E� :OX jir �6' CONC sew� a - % ., �.p���,t,��-0 � / �0- M ,�►- i - _ 4E:mu Iimiw`wi mi.w.iv m.12-.1W•rnn7.:0-hW7r =ems r 4' = r- ,r rMi DENOTES IMPACTS IN y //� SURFACE WATER Y /' DENOTES TEMPORARY IMPACTS IN SURFACE WATER SITE #12 F i //// DENOTES FILL IN c r WETLAND * • • * DENOTES MECHANIZED PERMIT DRAWING TEMPORARY IMPACTS IN •'*'*' * CLEARING a SHEET 15 OF 67 SURFACE WATER M 50 25 0 50 100 i• m03 C Nod �aa GRAPHIC SCALE - INSETS oor co I 0 5 10 PROJ.REFERENCE NO. I SHEET NO. N 11111111111 11 1196 XA-225 JI 1 I : 0 100 90 6C 40 20 0 2C 40 60 90 100 120 140 6A PERMIT DRAWING SHEET 16 OF 67 IIIIIIIIIIIIIII N Y..P. 1111111111111111 S li TE . . o u. 12+ 3.60 0 11111111•111111 Pon .t s•- P11111!! R40 �y s i �l i P9() s 9(1 5.53�� `— ', - — 4 5 IIIII II•IIIIII 12:1 33 +50.0/ --- T? _ , ss. S.S. 795.21 794.7 1 o, a ti E cc YRP Q 11+ 3. 7 _ L • a CV Co" 0.02 c 0.02 0.�3 I�i r IIN _ _ __ ....._._ _ M_ •LII //� __MI- -- l� iiiii - -- -- - - -- ;L li ...... % -- -- -- --- -- E a, _. ol --. ::: mE o M. __ :::_ �-% :::= 3 . TC. .... �__ 03 IIIIM *AI mom 12:1- 800 + 11 , 1 , — -�_.r� — � - - _ - � — S.S. 794.88 S. 3 y� 793.95 on % M� �!N 140 100 :I 60 40 20 0 20 40 60 Vglp{ I .1.90. �1120 -- 140 160 -- 0 5 10 I PROJ.REFERENCE NO. I SHEET NO. 2 HI I II 36119E XA-224 c, is 20 = 40 — 60 = :1 100 120 140 160 YPA o — •• +.03.22 ^ 03 839 63 r 0.02 coo 0 02 0.02 3.* m . .��m _ •• . iii.-1 ---- .� 1, � / ...WAIP P _ r.Oilmom '\ MIIIIIII Mr S.S.800.31 L _ • 00 • • - amEwwwwsm — — — — _I - � T� • . . _PERMIT DRAWING Lam; ' `NI - ' SHEET 17 OF 67 111111111111111111111111111111 ••••Ki • •� _ M.- r 1111111111111111111111111111111111 .9 1141 '1 •. 1111 111111111111111111111 III11111111I1111111 _ - LeA.,.._`_. • �= i=— E // 1 1111111.. 11111 11111111111111111111111111 . R \ O ... 111111111 • -R :'1 ••1111111111111111111111111111111111111�i.:•••• '� 11111111111111111111111111111111111111111111111111 111111111111 • 3 1111111111111111111111111111111111 111111111111111111111 nu MMINMEN=MMEN• ••11111111111111111 1111111 111111111111 m :ill 11M.C.11M111111M1111111 S!5.?ret3dvaiw... 27 11111111111 111,1 Ii1!!!!I_111111 1111111111111111111111111111111111111 111111111111111111111111111111111111111111 11111111111111111111111111111111 111111 1 __-- _ — � —— _� — - - — lowi1oa 7'71 45 3 a a yN ON V OD �1 R AC- ., 120 100 BO 60 40 20 0 . -. . :. 100 120 140 160 in OD co — I 0 5 10 PROJ.REFERENCE NO. SHEET NO. 11111111111 0-17 IInee XA-221 1:0 100 9[ 6C 4IC 2C 0 2C — 40 = 60 = 9E 190 14. 1-.F9 �'O0 SST E #9 N 0.02 coo 0.02 = _ ...------- - PPn 1 . Rvn I • c.c. L Ron � _ - - _ S.S 805.68 .794, 12:T ^ '/ 29+50.00 788.59 0 PERMIT DRAWING 0.02 co-.0 — SHEET 18 OF 67 Faille— IIII IIII r s.S. soa. _ _ —_ TN enn - T r Rnn \ S 957. 9.66 S.S.7877.48./ - - - - - - -- - - - - -- - - - fit ' - - �% 29 +00_.00 787 41 a END BRIDGE 28 I- 75 .00 °m E v a DI M --�_n 0.02 � 0.02 I - I �a� % -- Co N 0 % 3 O —inn S:S: 797.84 ann 'N., S.S. 793.01 : 42:r- - a .21• mm 28+50.00 Imo NE 1MM NE NE mm mm NE NE o 1MM NE NE mm NE mm NE mm //�A1 :NE : YRPAC yr 4 P/ ICON .ME MN . L..a� iN 1a0 100 00 60 40 20 0 20 4G GG MMM 1 • �� 0 1 0 140 co 0 5 10 PROD.REFERENCE NO. SHEET NO. N 11111111111 n 1198 XA-220 (D • .ca cL ci :0 1 60 40 20 0 L 20 40 — GO DO 100 1'0 ...1.... ..:140 1 I SEE BRIDGE PLAN- 1 °' L_0.02 00 0.02 n P� 1 . 1 — 1 • 1 • s i MO S.S. 78 9.3 4 . .. ::S. . 789.82 — - - - - -' — - - - - - -7�$.6z-_ - - - - _\ / I1711171l 787.10 j j 28 +00.00 - �" � - 1 1 1 1 1 I 1 1 1 I PERMIT DRAWING SEE BRIDGE PLANS SHEET 19 OF 67 cO 820 -\ O.p2 M 0.021 II III I I P90 #00 ` N. #00 a __ _ - - - -- ___ ___ - ___ - � _ - - 78 -- - -- —N, ` — � � — — " f cn 2 7 +50.00 'TN � , BEGIN BD I DGE 7 + 50.00 E WAN L / -o r N so 0. n 0.a2 m O.UZ ooc EmmENNEENNEmENN U vo -0 NENNENNEN•smEssmENNEEN O N -- O sommossmismsressmsmsms O = mem= — T _s5.722.46 : j 11111111111111111111111111111111111111 IIIIIIIIIIIIIIIIII - -= .1. am o o 0 ON on win -YRPAC LI]�? 1°0 20 00 Bo Go 40 29 0 2q 49 60 80 0 I � 1 ° 140 po-. PROJECT REFERENCE NO. SHEET NO. c I-3819B 11-1 L 870 —L—(LT) ROADWAY DESIGN HYDRAULICS PERMIT DRAWING ENGINEER ENGINEER ■11.=111■1111 = 1.. ■■1111■1■■ M■ SHEET 20 OF 67 860 850IIDOCUMENT NOT CONSIDERED FINAL B:GI N GRADE UNLESS ALL SIGNATURES COMPLETED - T-STA.145+60. i :I. . Pl= 157+00 DD 8 -.5TA.145+61 :7 „ p, I+16.z0 EL = 83/59' 840 A .. 3• VC = 180' 840 d-)SI ■ •PPROA- �3 K = 7/6 ■w .'. E:i,—, DS - >80 MPH ■11111■1111I>�>t:_r_a1_i:g 9,6' I P -II. . 1rimmilmippw. t �Oy 830 ____________Nil m111■1111mm13sLi3a1j■m ■■nll■1 I PI= /br+I b.0 2: filivoi�'■ u11111111111111■l.I' �C: =blll�llll���■1�1■m ■■1111■1 imem am■mm ■m ■Im•Illul___ .� .i lIiimm• 820 — • lli& iii _._____ ...... .. _-'_ ■=� 1�o_ _ �— ■ III= /.11111�1: I 12211E■ 810 -III11111 EXmSSTING ■liiia ��!IIIIIII■1 �' I CN HYV A ei �h/ Ill �j 810 ■11�111■1111■rliiilli- ■1.. ; ■Ii Jll■1■■IMEIN1�l13Y■WI'I'IPIMIM M l7�V . i CCHARG lei ,r•:• ��■■-o■�o••I.7V ,r,-r.•�—�■�� "i.17LLMO.•LL/ax..mm U!IliV1n..viM■■=■==W6■•L• LTJc>•rr-1:u.L2A ■ter ■111n1e t■NI .�■1MM� . ■ir:�;u111■1■■=l! ifai■1 M■� M «r OUtwCY = I•S ��■■—�•rrl us��s:rrais�••�•��, ..a•■■■�■���■sr•e�ma••••�•��••••� •� ■ 7 Ii1N .8 F' 800 _III.II 'I■■— •I AEIEJATIO = 813.82 ARSE_ + C 5 800 -•�■I•■q•r ••.IU..EI I�LLOIC••�.l,yI�E.�1•�•■•••.••. �IIN THE ..'TH' • `T lilt 0 I REPPI;; ,7�T7RaRava�ij'E�UENCY= ,Irljl +1 Y'•5 EH ELED i1ON T FLZMii/►iYli/.TiiiED RNEF. O'�1,, :M-I11IM 1 � �r i—■ ii11i1ggiYui CV-T/onr - r' I ■11M111■1111MIM1M■1EE nl•■imiaw.7e1111■1 r'T. 0' Fr 4 -I '1IIIII1IIII1IMM =1N �iill■•L B�I��AIOVED • A �4/ •I = F SEE SHEET 11 FOR -L- PLAN gym•• •••=•••• ••�•••••�■—=• 1.•..r-a••••��•••�••• ••.••—••••.••••••••••.••••••..—•..••.••. 'i--,. • .■■ 780 1 780 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 870 —L—(RT) ENC BAsf BER1v1 DITCH 870 W/ •SS B RIPRAP I'IS.A I S-h3i RI 860 EL.83►.52' \ 860 BE 3'BpSE B CH EN'T' 3'BP$E BERM ITCH` PI 15 +5C Iti Ph TA.158+32 �r m850 tL. . 0.99' EL.837.52' ` 850 s B: , •.•. ■ ■__III 11 _••• !! ;I r7••••••■—•••.••. _■••-L RT- S-A.145+61■ir�_•••••� ••�•� ••mow-ND BRlmb..,: •i • '-- a -L °B- S-A.145+61 ice■ IM �L_RT- STA.1 0+ .. 1■ 1.: EL.827.65' :�� T, . . :19.36' �■I■ ■ ■■1M111111 11M (-w 1 840BEGIN wry iiimmiiiimi ►. A-- _T. mumm N���1■IIIIiini1V��E 84O o' II■ -L RT- STA.- •• a" �■■■■� rI - �■■���■■■�■■■■� - se�rl. �■■■■� III FViiiric=�■M —��1■111111H11■��■ - m moo •••=uu EL. .»w/AN ••emu••= „ai .�..■iaaaa��a� ■ •• ■1 111■1111 eIN APPR•ACH SLAB ■■■■u ■ WNMig - N •••u•••• l�;p 148+11.42 •�u••u an ��� ■,u�n� u, • r. .r 830 ■■■�■■■■ - •�uuu ■•••��,�4 •••••uae.es�• ��—■ o acne_ 830 comc, ■■■.11" ■mom 822IR' � MM1111■ ■I�t1�i lid■� 1■111111 • 11■ wick,— co imatim 7e (-)2 979 111.1111M1■ —•••• .��. ;.�.��_���I���—■_••••!••i•U• �-:— 36 0.00 -- — 111■Ill:�:i_ M. ■1111u1.. •mimmumm r •, M-ll _IIII 11 .II111llHll■. EL =I83/599' -00,85 820 11� •l ,I — — 11— =_ M11!I■1■U■■IMW��:= __dC���1■111111H11■� tic = l80 820 16 '� — ■: '■■■'■��T �'"r i1 ■■I111111IHIII DS =7 80MPH ii■i■ii ■.___ ■_111111111111 r,7 "- \III ■■I1IIIIIIHIIE■ E 810 III - BM177E �, l i l�^ 1�1:f7�r ,t1 , 810 j N 7>4895 1449825 ��ll7KXOS�D CRCC/( �!✓ TAFI Ic11011 -L- STA. +97.89 —` 1�II, ��� YYI$TIN 217. 'RT I; h(A✓NU N 800 ELEVATION = 814.55 . �.; .N THE NORTHWEST C.RNER .i` 111 N 800 BRIDGE WINE WAIL 111 PI ST 1 .� S CJ1 \'D „H a, •••u ••••emu• I �I�. 1 1111 L.81 r 11� ■1 �: . 1111■1 1 STA.152+00 i ■■� ��■■■�■■■� •••�•uuu••■u■•—■�, E I 90186 EL..813. I'1• 790 11� ■111■111■ ��■111■1■11111■111MI IIII'I s 1SD I�1 ■■1�1111111�11�■� 790 11M M1111■111■ MM■111■1■11111■111— r 26' Frr ... ••••�uu•uu•u •••�•uuu•.•—uu•.u• - ��'.r>.......■■..� w 4uMN-7,LEA7AM —�r.iikelr.ils_lrarlv ■. ._—•uu•u•uuu—� SEE SHEET 11 FOR -L- PLAN u_ _uu•uu•u __uu•u•uuu•uu• .a•.n—i_■o■_''_raa_niaida !I I —�ii a■..u�aa ■. --■m■■■■■■u■■__ ■•••. gym••••.■■••. ..m••••.••.■■■■••.■■■ -- 1�}G-•••�■■■••. m••••..311�aW I.1-•1r,.I y11y 1►`f ly\■i,•ly■'r\•1�•17 i� I.1. R Y �-■�■■■■■■■■■■.. m ■•••. �m■■••■■■••■ ��m■■••■••■••••••■••• �.-�■■■••. •.■■••••••.■ • •►�{CLL'LiNi'alNWii�.-...-..�- —�_N —■m■■■■■■C■■■••-�✓r •- ••� �m•••=•••= ��m•••=•m•••••=••• _ �•■■•= m•••••■�• • �J1IA.171i1�7\-M/.n .:•:."1_-`.r:i_r.ICMI^A5IkI • •■■■■■L■■■NN-- O p�ju� - •■= ��■■■M■■■M =��■■■M■M■■■■■M••• _ _ ■•••= ••••••••�■ • �i.t7a•L7L'=![.L'aa1.•-•,••� -••Emismisms•ENNENNENNE ML" -■m■■■■■■L•■■m-� �`i 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 LP o= oc IIII IIII IIII PROJECT REFERENCE NO. SHEET NO. co' -3819B 11-2 n BEGIN GRADE ROADWAY DESIGN HYDRAULICS 880 -YRPAC- STA. 10- 0.0(S- ._-- , -- PERMIT DRAWING ENGINEER ENGINEER L.867.37.' 4: —YRPAC— SHEET 21 OF 67 870 PROPOSES 1 G13ADE 860 1 .--` PI= 16+50.00 EL = 846.43' DOCUMENT NOT CONSIDERED FINAL ii '`^r �' f KC_ l4 ar UNLESS ALL SIGNATURES COMPLETED \ ^ 1 l;mow OS = 59 MPH 850 ..../ _ _ _ — - -IN—___ f-�� - ; ; - 850 840 840 f3G 830 I I _ ` 830 1 1 �_ 820 �' - 820 810 EL Pl= 25+50A0 `�� = 5o5A230 `�` 810 VC = 9 K = 97 DS = 50 MPH 800 800 SEE SHEET 12,11 FOR -YRPAC- PLAN= , 790 790 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 860 —YRPAC— I sbo P-6a`` ���1�111 "' spO�T GTit�r��1Q LT DITCH 850 850 BEGIN SPECIAL CUT DITCH IU!UUH!U!HUH!UHIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII STA.24+00 RT • • �r■r� 1 EL.813.10' I,1 BEGIN ,°c.,i,i E D 1RRI�GF L - ■■ ■ -YRPAC- STA 27 sfi7i ,0,RaIrmrs__v T. ' E p1W.rIy a ,qua ^H 840 END SPECIAI CUT DITCH EL. Y is •_�' ti�.�. T 840 s PI S-A.2 ' 'DIE IN APP OACH S -:aoo■ 00007JI,W4 •ROACH SLAB '�� (+ . � 1I1 ...ddd ■1■1 1 •.•,..■`.r,r . ►. .71■■■■� a!+ STA 29+05.1: o �I�II IIII ����■� cr.Je =% P » Mr 00 LT . �." -° 830 /PI �i�io■000000l 111 EL.817.�5= ='..J.40' - - , EL. :�CtAl i' 83O N EL = 805.02' III I _T7820 K = 97 ■��■��■■■ - 820 o DS = 50 MPH ","„"U111�1 ' .� � 'CO • �!IIIII11;111i1 c r600/ 1�1■■1■ 1 SIC —off- ■■ ... i 810 ` o■o■oo■oo■o %_ i uaw.i /48. 810 Y'1 �� niuIl�'�,.M111 Do c (-Iq N. /. ���■�„� �= r s ^' i..:T 795.4 FT rn 60/j% • 5/N� AI I I / .r_b-».m1nrr ran - /8. E 800 - ' :ii■ ✓ B'.1 t NC1 = /00 °lam 800 1, '� CCU 1 A 10 III ���� _ ` !_ _ - OGfaiN. ' 9 & /6.a. rJU �■■ ■ Eos% mom �o■_o■ ■ r a■ ■o ■■o■ o0 i ■o �■■ l •. r Y! - I. N 790 — -■■ 1 1, 9Wa IL,otie_ ` "e �-- - OVERTOP ING ELEVAT. :1.•. FT 790 4' /of - _ - - - 'F� � , o - II �_,�; I �. - ',Wk..,.� 7a'a DATEELEV,01- SURVEY I ,.b ,LII i �. TO AT DATE OF SURVEY ='A FT xT� EXISTIWG a 780 .R CHANN A ■ANG CH�t�/. _ROUND BL�I J CI IA NLL CI]AI'dG L 780 - - m1=11—ooio Ale - - - - - - - PI ST 74 M STA 33+ 0 RT SEE SHEET 11 FOR -YRPAC- PLAN 5,, — E .786. ' EL.774.70' - oN m-,- 770 1. I - I I 770 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 Ln o= __ LANE I "(1 )I PROJECT REFERENCE NO. SHEET NO. 1-38/9B 16 PERMIT DRAWING RMS SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER -_______7 SHEET 22 OF 67 _ No NAD a3�s PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION ////! ' DENOTES TEMPORARY 50 2s 0 so 100 7�" / IMPACTS IN SURFACE WATER `u+u.�I - 1 GRAPHIC SCALE DOCUMENT NOT CONSIDERED FINAL I / / /I I / / / l / / � / DENOTES IMPACTS IN .IiUNLESS ALL SIGNATURES COMPLETED I I I 1 1 / SURFACE WATER • II mN � I I I II I I I I h / /�/ X• i II . I I& 1 j I j1 1 P I l / III / a0 / X � 1 111 / 111 / l l / : f1 II oI. //I/ 1 I I I I I I I I I I J / // X I.ULIA A. SUT ONII O FAMILY TRUST III O _ I II • X II II r�A Z __S 1 I I I 1 I I \�/ BERTOLAMI /FAMILY UMI .. PARTNERSHIP CON •,..E DITCH ' GR o / BE ,° .01SE WALL �� L J� a • O B ` I I 1�I I I /_ - - - - - - - - - - - ._DETAIL.5 I I I -E— <vz W 'PyO m. �r ` _�• Bsr /`=��8'• TIE w FENCE ' - .. .. .. .LL E V. x ��I�� I� = i'e c' :� N TW Wili SPECIAL CUT V DITCH /--` - PROP CHL FENCE _ / ` - -- %tirr '-'�"T v, W __.0 --r-_ E DETAIL 65 SW,7 14 1 HW EN - r-- _ -_ W7W W��u ` • e EXIS NC R� XX C/—w—r. ec, - ^ ��. __ - �� \ 48'CHL eE. .�".'.K. S� '5 1 48'GHLK.w3-' X X X X48.CHLX ' - W 7F 0 . _ OQ' M - �\ r� - 2GI-D FS 48'CHL cc��+,, :'CHLX��` W i r-- i • 'w�1En mni l+' / ! BEG NOISE WALL cry 3,q, .FS N\ n \` .. .. Y /' .. Im -Y_S-28+00 *,° 153,RCP-III BK B: • RASP 24,B5T—��� n ED it) a ill 1B NW 2GI:.'.'°�T. R m/ --- REMOVE HW— EMOVE HW,,,.,, D.BAR. S --__ • p �� FLOWABLE FILL Z imicimeMLI — 8---. /-77 SB 39'BST 30 �,� ° - rai i�s�ra rian�io +iir�c • /L/ ���� s.,l4fmmE �. •�41 Irr �T,.1ae'p_ ._.� '+!a - _ __ "ram _ 1��7�til 7�a rMW. S+■. lrirsi 7re�v.aAP/..,L=� - �,_. O _r—- �1{ualSIE+�' ill. .° O 1-77 SB 39'BST M L � ° "" BEGIN NB RECONSTRUCTION �����T -i 'TL E'ftCP 8 -AVED REMOVE 2GI 48'PAVED M'Mil m O MTL r— i- s r. PIPE OUTLET CHANNEL STABILIZATION • -z•�T>es�R r T �MT��� ���J ® �� W/CLASS RIPRAP� O —' 0 +91.1 1. — ® �► 4- _ ©w —mod _-� _ —�amm�f� -�' =— -- __ _.Iuu.I__I==_ TL I_n N8�85�Sf ��� SX(I) `+ (I) IOW-SAIL,. TAPER ..41.. .l4.11. .! _ �4 •. I / RESET GUARDRAIL \\ /( wje.,�. �q`f.,#j s•a•444f OF --v; i.ecLc�O..�gH P1871ri�.��.4 t.iFff=.�i(' M ���--- /�/ � in'" x48. i 2.ISBN x— f F � RN�RAP�L •1:,4 i .f BEGIN CONSTRUCTION / geW LINV--- -y );____--sr,_____------ - ROCK PLATING �{ Q / // • W - NOT $ $1- 5(S( �BANKMF $( BEGIN NB RESURFACING /i 48' FOUND —�-_. 3W/1.5:1 SLOPE SEE DETAIL 13 N //, END NOT ' •I'M .IA. T;•N Is LT; BEGIN SB RECONSTRUCTION // ' FOUND �.48'_WW ISBN -Y S- POC 25+00.49 // ENS NOT Q $/_ SITE #1 - ==— =SITE 1 — W RETAIN IB'RCP / FOU ��°e o R ——— 9 -- FOLfiER OR 255'BST - v — 0 �� ii Aaw " /� _ SEE SHEET 16A 6. D-B ------•- �------ "/ �W--_-- Z -----_,0 p •,�,e7 ii r ,,-= nlrn ss as B57 1PRA 11 __ � ,._ e s--_G__ _SEE SHEET 16A- ---=__— __ _T, c 4�\ '/ / //V / -- 18CP I ��, M• 18'RCPI EIP •' DI o IP - 28'g57�v I �l - + \\\ / // 6'COµ or 08'VC? I I I EJOSIIN 1 $ �r �� EXISTING R \�� / // , o \ rg 1 I/ BVDPg\ r= �I U yI R In �� /� // fyl 5.451S O�IEND NOT I C]- O ri I I I \ r r 4p:,,, ___ — L�-�6,_ �? / +FOUND ----JAI��-- LT —fir+ �� —�— n 1 j ` 18'RCP m /j // 'o + /, T DI A II FLOW 1003 FOLDER, LLC // m // // //,�J�' .(�,� //� /- RANDY MART,N FORD I i�� T - I I ( r/ LINCOW, NC m / 1)' // ,/�4� ( �/ _ I BST BST DI/ / / z J n m �// / 0a // / .e / A RCP / \\ I BST W/FES // / V `50 / // 40,5 'Jrei I In I DE ri0 0 :0 N C]-ri m f 1 III of O. _c // //// a4 / /�/ Pe a� �a\Oa E1 0 I� ^L ;A I yL�l� ��---- �� �� / .0 y -13 D� co // -1 / s �„ p= 16 v III Mk' m h e S; A n ll co 6 g FLOW 1015 FOLDER, LLC v� * II N -9a. N 03'02'01"E S 03'02'00'W co 49.14' 226.13' o N ,/ I Dlg I9 ' 02 N RT -/y -S- C G -o Pls Sta 20+35.76 P/Sic] 27+24.08 Pls Sto 34+10.24 N 019 913'E es = 0'39'58.4° p = 8'16'07.9°(RT) es = 0'39'58.4' I Ls = 200.00' D = 0'39'58.4° Ls = 200.00' . LT = /33.33' L = 1,24/J4' LT = 133.33' ST = 66.67' T = 621.65' ST = 66.67' R = 8,600.00' N� , SE = RC c”r� DS = 60 MPH sQ �IT I L._ 17,DC U)/IT n/a / � I "� I PROJECT REFERENCE NO. SHEET NO. ` 1-38/9B 16 RAN SHEET NOty..----; , . ROADWAY DESIGN HYDRAULICS PERMIT D RAW I N G ENGINEER ENGINEER SHEET 23OF67 N o NAD a-s I PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION W ' DENOTES TEMPORARYaQ 50 25 0 50 100 IMPACTS IN SURFACE WATER `�+ / i / I / / / GRAPHIC SCALE RED FINAL UNLESS ALL SIGNATURES CUMENT NOT ECOMPLETED / DENOTES IMPACTS IN A!# / ,. a IF'., 4f 1I // / / 0 SURFACE WATER II t I T lli)P/F 1 jI I:; I I I l� l l �� �� ,,,, N ,, I 11 I y IIII I / I- Iii IIII I11 III A A. SUTTON FAMILY TR ST _I I I _ _ r - _� I I / BERTOLAMI iFP�MLY LI COy '.EODIT'WALL 1 �� ENE Ark 1 zz. � r " '� ��i / - � — - � �arowALL _A _ ��� ��—��r` if m r "ECIAL C i'V'DITCH _ E �` •.• CHL FENCE �'�W' s — �� (� EXISIINC �s� - \ `��---�1 ,- -�� /irk+ :�c ' �.:. N� 'J - ,LOW AWA�� ®- , \} e . ralirAMM eesaa sTnr'Ti us _ , - s;�_ �;?ai� '•� ," � a�.Z :�n_tNira ��® -� I`�-.n7 //JJ/ e�d3". Asa!!' ��� - _�(:/`.�.. ° . >ti:._a BITIMEMINEMZEIFBIWBRNM��� SPA mile _ � �VAI I ae y o "yam' � ►. _�� _� I �� .. ' —1,,, - •=y �—Ilrt— was— � r' i ,��' I TT i�' c W �—�iso�— .>f ff af'hs , i��rf s Pr�ffa �,g, ' -' M 3B5': !slyrirl — a a Eau Syr _a�Pb.� `a..t.. �Ii'�.� >r Sri F. , 0 5 r 7171".7.00r,T.1.7s ..4,4 0 21 10.11Wif ----7= _-------z -----_-- -- •-----.. --------T--------- ------;---- ----- ----.yr------ sirim...w..., .--..t,---i'i!7,.7.---- ..----ir-artede • --:-. ..--------- - r— ,17 P % ��; = - SITE #15 „ y Z / -- SEE SHEET 16A ,_- — _; 1 — {`'.�- �i� o _R ! sse = —, it, SEE SHEET 16A �., _ rn � � r i,� 18 0 VCP , � 'ill�•��r s;.a' Iv:, E ■y*. , � f ] B M / ✓-•' / '� ,0 O� FOUND C]y o e a —Lh ��a e e I L e,.�ci I -- - e� I9 Rc•� e-- m y FLOW 1003 F. GER, LLC �� w�1 RANDY MARI., .RD I �i�. �A I �� BST 2 /: ,,,, 1:',,,, / z il tio, / / A n 0 =�O _ �� L1 m f i1 \,� _ �0 1m�1 P„,„0- //_"), . / o �� i A -0 firt- °D FLOW 1015 F. � • 0j11$1* i. ,407/ 11111."-- .Ac - T Ih 0 M p I 03'02'.'E 03'0�' Q II 4910 .14' , ,111 7_ A e W - Y - & 0 © 576 p 27+24A8 Pls Sta 34t/024 _- \-TII NO2 'ICE ( r\ 1 ) --)..\_) \ \\ Iri %'r 0'39'58.4' A - : /6'07.9'(RT) es i I v. Y %1 =-200.00' i = • 39'58.4' _ 3 41 L� = 66.67'��T 62/.65' 7 - 6.67' 1 R 8.0100 m4 SE = -I (i6 ✓ DS = 60 MPH I / r I 4 � �1 /, LANE I `` I PROJECT REFERENCE NO SHEET NO. 1-38/98 I6A RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INSET PIPE OUTLET CHANNEL STABILIZATION DETAIL 64 W/CLASS I RIPRAP SEE DETAIL 64 PIPE OUTLET CHANNEL STABILIZATION (Not To Scale) Natural Bed _ Elevation DOCUMENT NOT CONSIDERED FINAL _ _ Natural UNLESS ALL SIGNATURES COMPLETED — Ground Natural — — Ground SITE #14 SX ( I ) L 125 Channel Bed Length= 16 Ft. (0-2 FT) Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) Xq g" -Y S- STA. 28+35 RT RETAIN - -- de"To. - - - � A 04 4811 CNP - �i��a 1.- TEMPORARY IMPACTS IN SURFACE WATER INSET C` DETAIL 13 - - - RIP RAP AT EMBANKMENT R. ► SITE #15 (NaTfa Scale) 10'min. c I Ditch ��1.0'minI 2' ►1r- i1w S X p'� ���rlW rikV���A��C 1�ainoorgwa��,ffie 1 1�II �1 Grade m 11ged,111444:4841/04101441/WISPOlifitifett , ~� 1 1- �� i�� /I CI���I�e � r --, �� �� I.01 , ti �I 1 Iw OpIE F �.:��` _ --1�i�.—z_�i.�.�_ �� - Type of Llner= Class 2 Rip-Rap PERMIT D RAW I N G �, � �_ �._ 1 SP -Y S- STA. 121+45 F SHEET 24 OF 67 ICI PATt E v BAAAAAAAts KM El Sf N M Mo0 SEE DETAIL 3 _ RT) NC GRID NAD 8395 TYP Y - /// DENOTES IMPACTS IN ,48" WIN &�IS3W x X � SURFACE WATER z N DENa //i�� MPAOCTS IN SUR TES FACE TEMPORARY WATER TEMPORARY IMPACTS IN SURFACE WATER 25 12.5 0 25 50 =� o, GRAPHIC SCALE - INSETS �,- �oa N - (.5 ooc UL LANE I ``N I PROJECT REFERENCE NO SHEET NO. 1-38/9 /6A R/W SHEET EET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INSET PIPE OUTLET • ANNEL STABILIZATION DETAIL 64 W/CLASS I RIPRAP Air SEE DETAIL 64 PIPE OUTLET CHANNEL STABILIZATION (Not to Scale) Natural Bed Elevation A4- __ -- ,- C))15 DOCUMENT NOT CONSIDERED FINAL - Natural UNLESS ALL SIGNATURES COMPLETED �• Ground Natural Ground I I - /- � ... S X ( 1.25' .1 II II_�r 910 Channel Bed - Length= 16 FT. (0-2 FT) �, Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) 1, „6 •• -Y S- STA. 28+35 RT 6 TEMPORARY IMPACTS IN SURFACE WATER INSET C., DETAIL 13 T — - -- - RIP RAP AT EMBANKMENT R .F MSEWIl (Not to Scale) 10'min. c i=ii - r� 7�.� -�L �k 'iI ��� _ Ditch 1.0'minI _-f' .��`' I� r1_DMiti r -- Grade 2' SX to ro WrilidaViAliatealilIelleilr Affai litf y-,,�~�' I�� ,�`� �� ���, �,��1�'��~Wi�~,�� �M'��� GEOTEXTILE r ,„ - f �i�S -% i���_,! PERMIT DRAWING E �i� ��� mall Type of Liner= Class 2 Rip-Rap _ _�— -_.__ - _ SHEET 25 OF 67 .•--- ��= - == —Y S- STA. 121+45 LI �V��Tii� I �.� �. cr M —�q88 �, ;:= ��p:O .- (01 cr -o a. NC GRID NAD 83/95 U DENOTES IMPACTS IN ; I�1 1'1' P6g- ,A // SURFACE WATER N DENT v/T //i�� MPAOCTS IN SUR TES FACE TEMPORARY WATER TEMPORARY IMPACTS IN SURFACE WATER 25 12.5 0 25 50 -; o, GRAPHIC SCALE - INSETS ,oa N - f Q 0 UL V I I L J d V V ' V / - PROJECT REFERENCE NO. SHEET NO. InNnri 47 INSET LANE I NN S I ) 1-3819B n RM/ SHEET NO. ROADWAY DESIGN HYDRAULICS ,,F PERMIT D RAW I N G ENGINEER ENGINEER /�/ // SHEET 26 OF 67 NC GRID NAD 85 REMOVE HW — • 4' CO` SW a /0 50 25 0 50 100 JB w/MH Q�� lti���I L GRAPHIC SCALE DOCUMENT NOT CONSIDERED FINAL X •�� x N 23 . / UNLESS ALL SIGNATURES COMPLETED — SITE #19 Np SzjB • Ap' 7 JB F 11, q N ���{�0 i�D. 6'CONC Cu 8 CURB Z 140* ,4 v 10LIC DIOCESE o o ••co;o '$��� N 6 LOTrE, NC ti �� / /ri 4 �IR�Ki~ o � � `III%Irl%%/11%1/11%1��%%Mw•'�1� "''' 25 12.5 0 25 � � x":s �'.f J � m H , 4Jt. Q �116■ / I� , I m / i BST �/ ww k >Fn J S "� CO /� / GRAPHIC SCALE — INSET v BsT mac., 1` DI +'" © ( mrn / THE MAN CATHOLIC r* * *� * 4' �; -0 z _ DIOCES F CHARLOTTE, K'� ST?PHILIP RIP P" ERGY ny CJ O _ HUMAN LAIHUUI. UIU,.ESE V - - I /� /. +I OF CHARLOTTE, NC / \ * COS CATHOLIC OCHURCH CL PPBASIN #2 NN A� �� p Z _ - \may ` / "�I;iF;. SE' r,TAIL 32 T•_ rD m -i • V ff n •O TLET CHANNEL SX PW:Y.' - N f�np '^ till; 20'LA, KROP TAPER L * .,al3a,_ _ _ -F' C 1� •- 1O t�_4. Z -- STABILIZATION • wo' o0, + • \ / DI� _ C'1I1/ %�I >'Z LJJ SEE DETAIL 48 O� £ f \ O�PRO JVV ► Znf LJJ '= L LATERAL CL I RIP RAP Q 4i E SEE F'" S B RIP•" r ° LLJ— BASE DITCH 136 TONS �. •�/,,✓ - •_ SEEK 'IP RA !!t yi r i� , RIP RA �� _ eENDEXP.GUTTER ,7 __ e� SEE DET. ! - 7rr7 1_I 3 r 1 TONS SY 11 i S 5 5 T:' - , 238 TONS ..//� i,, lam, BEINFB �:, 2N . 'i/O/ �i .. y„a - .. _ .■. .a. a .■._ +T0_d�af.r_�Q' BEG SFB W/ i�/ i Y i •r _ _ r` k111 NOISE WALL -IW rj ✓ / ■ - :CP III f51 / ,•ti i�r 15'CSP w/ELBOWS to i��� -1��i��Ol��t /r K7`%/ ='E%SnGRW . - n F X�X w` I X N��X LLJ Kff111 /�}Ii1� W ''ww �■ =�i•�� f• IMkt. __ _ _ _ 48'CHL / LLI 48'CHL (DROP BOX) 48'CH r�e '-.4) Y7 ��_ r lir // 15'RCP-III TB ■`"^' '•'• I L B RIP RAP T OVE - -� -- -- -- - TB 2GI _ _ CAT-1v,, 2 TONS 7 SY + -�`' u._ -_ _____ _ u _ _ (� B 77 yl� `• "' r TB a 15 RCP-IV 2GI 15"RCP-IV B-77T8 I E E EXP.GUTTER W/ .R I d iMTL r !.' i r L i _ s15"tIIDPrIY- TB 2GI ai B-77 2GIWW HW 'WTB 2 I�Mill. OLLAR a N __ _ ---- --- —_—__ SITE #18 • --(? �FIlf5F4-W/SSE I r'!o,— o 0 01 Y BEGIN EXP.GUTTER - O p REMOVE 2GI iv _._a ..._ 4Q'/'oo +rr.: Tr v 2GI ma— 4 n _45 I —. — ^' —--f '91 MTL T �1 MTL i I O 0 �1"''�C fir MTL M7L T 14a•`Pdv r �K1 MED.BAR.(RE ME T !f r r d O , '� _r 9B'!'A i —r ®r SITE #1 7 IL T_ ' r_ i T_ .MM..�� —MTL V L _ GI ,5:%BCPJ 1>•8'R�1 akt MTL _ r T - - SEE SHEET 17A �I -_ - O -.L ~ m �y SEE SHEET 17AEMI `=L- REMOVFTGr- REMOVE a REMOVE ] 1O RCP-II o - �: p RETAIN REMOVE CB O �± - , 4OVE HW �W —i— -z �. T/(A —� , -- _ in _ • � L 1 "R MEM - T �-^_�1 1 MT T MTL III 6 NI' M fid e�N CB I "RCP-III CA7 1 END SBG +20 \ _ �, V ialkkgelj r �r itr }7 W HW o _ _ :1 2GI F� �, ® REMOVE HW :•.4'COIii �`'� _�Sf ) ••- frees'1"W :'l.<._.,., ,:ORE_ Y W/,,BIV� io+ �8.6 Xg'-�X48'WW r/IV:1 _ XX X- X48'WW ISBN x --.•m� . "SLOPE _ ,_ ����� J�� CI_^ ��,q -i •FOREBAY W/ o 'oi v N V) • n c - WQV 2,562 CF t C _ INLET CHANN L �'H --/5 �l� � DRY DETENTION BASI •x A CLASS 6 RIP�X,IIII'.J� -,I. '0' •/ FS �: om J RE"IL 50 l� - D �_ �� BASIN VOLUME=2,662 CF C ��- - /// /36 P�0 _„Alma B RIPRAP a 2: ��:ec _ E PROT ION '.0 • I CL RIP RAP -- TOP OF BASIN=877.5' 75F �� SITE #19 `L rn i r I¢ �.t.IF 50 YR WSEL=875.7' R •\ G WITH CLAS` �_� 7 ko. G W — —GPI�a�GP TL- ___ B �1 -- _ NrF L �1 G SEEEDETAILL •3AyTU PROP CHL x� Z --T81 TONS JB DU li SITE #1 - - ----G - 2 /tflpa1;7K7;L\I\^.lam— t,REU MTL 2 - ' v J trl 158,Od iJ[1 aa074 o v —GLARE 5LREEFJ-- -- �- J _ SS 8'VCP�- CFF 2 I (- �) �� DRY DETENTION BASIN DETENTION OUTLET CONNECT TO!,, SEE INSET �-- /L---- L.) � - y/�0_C&G--_ « WQV_6491 CF STRUCTURE EXIST.GUARDg,gILFOLDER OR �- - -11a-1\----J�r� 1F----'".-.SEE INSET —END 'PO 55>t- sc.rn,.�,- ss In,rx.r. ®BA514'!i`IOT Z$�'i<.o Lx =--. .ASP--=T n, -' 7'.-RS- - .i - SS 30'CEO�s ® - - 0 a INSET - DETAIL 50 Exlsnec R/W rn aE S B G W/G.R. COLLAR I T L INLET CHANNEL STABILIZATION ^. I __ (Not to Scale) --��C�- �� zI NG FLOODPLAIN BENCH NG 24•C&G -i , _ _ WITall — OJ _ - �_ ON'II' ®ST 11/� ~~1 s x ~~~� , ~~�� ~~11 �''~11 1~~1 , ~~11 , ~~titi 1� �ori•aMnPNRic's , _ ' CLTRIPRAAP uPERTIES, L.L.C. III III��iltoi allr' 011.-- ~1'�,�, gear, "ki -lialtir ~�i/fli- ��_ TB 2-GI CL'I'RIPPAP H PNATIVE ULED ONFTOP24'C&G JI�, ,—,~-�, ~1 1' ~~}, ~ 11, ~ ~ �, ~ )1� 7 PU<ED ONTOP5' I♦VARIE SON BEDS OIDS - __ 1II,, �' ,, '' ,, ,, 1,,, y,,' NATIVEMATERIAL 50.4'S Ie����� �.d*, I..I.� �•88 �I�I 1 ���i ��A ��Iwr , D PILL VOIDS1 11 ~ ~ ~� ~1 ION BFDI (No IDTS'lile) ����1�,1 _ /',,�t'''a1I�1/�,,~ 1�,,,11��,,g!r �,I 1�. DJ'i' )7., jC -Y_S-STA.37+05 RT DI X N �, �� l )l -� ''11/'l Oil!rape ji thilanI 1.- f aI„-0 �1,-` '1II 4_1ti1 v — i 0 yi1i ~-".. �`�� gra= a�rip,- „ei fall,0.--Want-,i;�����mi A SITE #1 V Emu o o• '/.��1.1/,�~ wok ~1 ,,1�1(V ��l _ 1_�',�� OCK PLATING —� ,fw..;� - —�� �%�.`; .��� �_ vd ��_ _ DENOTES IMPACTS IN FBDND _ s���- z. i��>z� ��� lg. ���tl���%',� • SURFACE WATER o T(v, 1,ol a�� •��W�_ nf 7 DENOTES TEMPORARY $ N -..,,� �� ��a�— , �� IMPACTS IN SURFACE WATER m. SURFACE WATER "- 06 _�� I I 25 12.5 0 25 50 oQ _ INLET CHANNEL N GRAPIC SCALE - INSET/ `N IHW/ \ - PROJECT REFERENCE NO. SHEET NO. 865 � INSET v LANE I �� I ) l-3alse n RAW SHEET NO. ROADWAY DESIGN HYDRAULICS — — ENGINEER ENGINEER PERMIT DRAWING 855- ./`-i.,no .. _�� 1• SHEET 27 OF 67 NC GRID NAD $ 5 , A ( 041) I\ _.,. ,r,„ / SW Aar /1111111111111111111111.111111— ' S`I�II�D�0 _� s/� 'lliir GRAPHIC SCALE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED v r- � �� � SITE #19 :......., _ � � •�'` - B CURB 2 \ �� �i'►fin�m ..r::��o- ' ,� 11��/MIIIIIIl.LI�I,Y rlr�rl1/1N111r 25 tz.5 0 2I a� vi os,.. - 4 AA *4 ' �e v:rrrrrrllrroi.,►1.►r�_►,`� nr ili�/1/111!%_'�;` — I 41' + -t ,.' '/ —/ .. r �___ _ GRAPHIC SCALE - INSET ip..- i'iligAii >ff ,D� oar � ~' - 1 E. 9411101111111! � AN OLIC a, *, /,,� DIOCE�' CHARLO ^'�.Ji'� zseHR rT►! ,% kiNi,, •°v • ^ eR J' .. / i.�", 'rl",gtrn •r R e i r # TH TAPOILIP ff Z _ _ _ — —oroo— �_ il/� �/ r 'A'• Ncl caT tLIC CHURCH / �� . ail O .•/ ICL1111 D. _ 1�.- �1c.-_•ROP TAPER 1 71�' -.�.T�._ .f r e t . [El ���� ~y�r li,er ' �� PRO RI III'la.!N#1,7 ` W1 } ,/ •SS B P• N „F' Y r, Y2 4► ! 7 �GIs s�p� l� W / W r1 • • •-"I'x' �'yry, W N �� J��,,,r 4�• i CJ % pie AMMO I 1' BErrr �0 �j�' IIIII�I ( 1� J7 aC ��. 1 K 01 �r �� /, r . a�/ 'TWai -�s � �i��`�.` iQII�� ✓ /i c" ' s 1, ��%y am- • y ,,ul• r_ II� III'p �d i v > �s W A'� 'e,.... � 4ie 'q�. '��A'i_, ' < �jj� __. IIIh M R Brill�it 111\\b U,14A ¢?7 � y4.:, W W s •..iiiPi_i%:% I�3y�ry`-w�h �_���� �. yt! G....�. +fi.�:����.._ a� r •l.VId:IID aI I!I�II`'+��'`Ii1r\ �� ` = W N <� �I/��- .ice ; `@ �_� 0 *� " r ,5*;",}' AA _ i, r37- :,GIN EXP.GUTTER1▪ 10 ti N ti saner Two^-` - --mot � r-= _ -IIMIIIMMEMB-Mr -- - r -r v - O O �' SITE #17 � - �•°"• __—_ -, SEE SHEET_17A O —mat— �2 TL T_ — a1L�i �� V ��aY1►a��� MTL r— — O J ® _ SEE SHEET 17A ----_ ,~ IC �r REMOVE q r -- — 15"RCP- 0 III f O • - A REMOVE RETAIN iN iY7� Fil ..s < r .. l 1 ! 1w- . .�y�-�" ` �Wl3+ce -- ,.sir • Q - . 1 S I -..n Y�I II DRY DETENTION BASI ^ ,., _ :ao_ ,imilipmesuz - .. it!}!� 1111.E ,1;• ��.L`rlA - �,,,�/ r ._ r� _. ,_v _--- — %�� BASIN VOLUME=2,... CF _�" - 1�I.'r 7c ..' I �` - � �7.r. �r'r 111 III � _ _ � � TOP OF BASIN 877.5' 111\� - � �hti'w`+-� -_ ter'. _MTL- '_- _ — 50 YR WSEL 875.7' 75• it^ �� t.. . .-.`— _ v-� LLI - __ °a 5� - I T E 1 /L� : ,_2_,. --_ G - —= �_ =— SITE 1 .�: IIMAA REU - O PROP CHI z F '�JB DET, # V _ -- ._ �ts.!ra1:7•J;7c1I�:l��� Z J in -5"3-• '3 0 -Y -• �i.•. s2.R'EFJ-- DETENT r OUTLET --- - B• - _-SEE INSET - — - - —— BASI . . — - _ CONNECT T-- SEE INSET_ -- v Li ss —_ a OYVD 6 ENTIO ST URE EXIST.GUARDDRALL�F0LGER DR 1 Li r , --I / - ---END_________ :>m•. =sue' -- % ss �s V O. 0 E gFj r r- i8„ INSET DETAIL 50 ��—=v; �' -H w�:��.,"-- • ' ="�� �� . INLET CHANNEL STABILIZATION —170017 I — ••• rA'I. (Naito Scale) — L , -�- NG FLOODNAIN BENCH NG 24 CE.D L -- -_ ��-_ -�_ __� • lis ON BANKS C) MI Jz�/ram _ �z�� _ �iG�tir_���= a =ti G'- v4 ��c�7.._GC-�I BST r aI 7 INUDP2T a aI -� - —4 1 rs��—r r a'n'wPRnP r a / _�/I�1��/ 11�- �1�,�~I1�1�, 1ti�,_��� 1�� I v� � ia .�i'7� ON BANKS NA'EPRAPEw/ P2-TIES. L.L.'. �l �I 1��r.�1�1 /dIti1ma._�I 1�m 11�1� 1 i�1fi a7I�'�1 ����A �_r= 1 To Flu volos 24• &G�_ PUCED ON TOP ��� N♦ �� CL'I'RIPPAPH O' S �J�11�I , 1 _ 1 � ti 1 n I ION BED( I � 1 �,, �,,',� f [� NATIVE MATERIAL� 5 If 5 0.4' N. I_ . III.I1��� ti III~�Z,I / '� PLACED ON TOP -iII '�- Sitav►ltiaistAr �� 11� . ~ . �'�iori�p-1 fr/ ' y� (ON 1 Gear�lle) �• � wy� / � ` To Flu volos � ~�'1 11 � 1 -- 1 �.,l�l,',� }��';///�/1 ►, '�7I- Y'�YI"Wet/,� ,� I —Y 5-STA.37+OS RT Na � � Y" DI laA)LA ��� 1 y61, �� z��I. (�ti���I�IIIII~i=�N�l�ti'r�'.�-�/I'id // �} � rn ti�i� a .ti�IIIIA-. •��A3wa — sti 11 I wait -�h_� �i ti �� N at,A115 irar lifirlim�,�� I_Ig >u-,� Iar�. a�/hizt//r► Jerry %►l�'4 ��� SITE #1 vll N �,to ,..1 ,��Ea'lw I~�l_� �1.��%- Lr _ „ N NOT ro �� � 1_�—��l �rrl � Y� Y/ FSUND $u 4 � � .F- l s���i���/�� .��►; ,,. =�I�/� �I ���'///' i r — DENOTES IMPACTS IN lw� A _ _� � W��I� i� i �% =(Ii��j • /// SURFACE WATER .- ii Al �.. �.�>, � -ems �''� �-% 3 _J:::::::17:11" • .>erealreel ea�� _����! �,_� � ������• ,Jy /� DENOTES TEMPORARY �'�� •�,� ��—��� _ >������r� �.� �V 7� / IMPACTS IN SURFACE WATER 06 t rti ��--_� � tel 25 12.5 0 25 q oQ Imat� warm L8 J . „ia 1 h1 1 _ i��-'_MT r �' GRAPHIC SCALE - INSET N pC _ N/a - �i����1•, `�I���D� —�. � Imo. / I I LANE I "� I PROTECT REFERENCE NO SHEET NO PLACEMENT DEPTH: /-3819B I7A DETAIL 32 CL 1 - 24" DETAIL 48 CL 2 - 3 OUTLET CHANNEL STABILIZATION RAN SHEET NO. RIP-RAPPED ENERGY DISSIPATOR BASIN (No Geotextile) ROADWAY DESIGN HYDRAULICS *NOTE A:IF EXIT VELOCITY OF BASIN IS SPECIFIED,EXTEND BASIN AS REQUIRED TO (Not to Scale) ENGINEER ENGINEER rE SECTION OBTAIN SUFFICIENT CROSS SECTIONAL AREA AT SECTION A-A SUCH THAT Q devIS SECTION AREA AT SEC.A SPECIFIED VELOCITY. NG FLOODPLAIN BENCH NG PERMIT D RAW I N G DISSIPATOR POOL APRON "NOTE B:WARPRP BASIN TO CONFORM TO NATURAL STREAM CHANNEL.TOP OF RIP-RAP TOP OF BERM NOTE A IN FLOOR OF BASIN SHOULD BE AT SAME ELEVATION OR LOWER THAN TOP OF RIP-RAP NATURAL CHANNEL BOTTOM AT SEC.A-A.PROVIDE SMOOTH TRANSITION FROM NOTE B END OF APRON TO NATURAL CHANNEL WIDTH. CL 'IIBANKSRIPRAP SHEET 28 OF 67 1 TOP N NATURAL ON BANKS �* ���� �\F' CHANNEL NATURAL GROUND ���i�a NOTE A " CL'II'RIPRAP N �' • `Ili���frl.2ii: �,A A ON BANKS \ CL 'I'RIPRAP w/ i�3!i�+.,iVL�` A c �- \ NATIVE MATERIAL B B B B GEOTE%TILE T CL 'I'RIPRAP w/ PLACED ON TOP DOCUMENT NOT CONSIDERED FINAL NATIVE MATERIAL —►{ 8' VARIES 0-8'-11.- TO FILL VOIDS UNLESS ALL SIGNATURES COMPLETED SFr A-A PLACED ON TOP (ON BED) >- 5 GEOTE%TILE TO FILL VOIDS NC GRID NAD S HALF PLAN B " (ON BED) SLOPE FROM INVERT TO NATURAL BED AT APPROX.5% XTOP OF RIP-RAP 'I —Y S- STA. 3 7+95 LT D Poa°wIPE�P i ��/ -+° ,�T. . -f DENOTES IMPACTS IN i SFrGoTETILE E%CAVATECL THIS LINE SURFACE WATER BAD%NLL veCIA53 I RIP�AP RIP RAP NI ppPRO%FO*,. OFWATE!CULVERT el 0.0NTAL�1111116--------------. "B ti DENOTES TEMPORARY '�` -la + O� AS UPORORPRERAP // / IMPACTS IN SURFACE WATER DIM +RIP RAP BASIN# BASIN #LOCATION TAT OUTLET) SFr GEOTEXTILEEEXCAvATEBACKFILL T THIS SRLINE 1 2 3 4 5 6 7 R 1 -YRPCA-2295,162 RT W 25 12.5 0 25 50 A 30" 30" _ 2 -Y-S-47+61,142 LT B 20" 20" 3 B ',,' AI C D 11' 1.25' - 5 NOTE GRAPHIC SCALE - INSETS E 3.5' 4' 6 Wo= DIAMETER OF PIPE, INSET RED AS O F 6.3' 10' J TO SUPPORT RIP RAP WIDTH OF BOX OR SITE #17 G 10' 17' B GEOTEMILE SPAN OF PIPE-ARCH H 5' 6' SFr n_n CULVERTS S05 SX ( P) Pi . TEMPORARY IMPACTS IN JTLET CHANNEL INSET SITE #18 SURFACE WATER STABILIZATION 14 �7 SEE DETAIL 48 Q / ,�� 4i--------N----------- _ CL I RIP RAP Q --%,'� �Ar _ 111N II D:4\ 13 6 TONS 5%"%zi�,���//�- �^ ` S C I �j�00` �I%f..i TEMPORARY WP t;�e�.. %�-IA�•: _/*Ar1 IMPACTS IN S .� 238 TONS / i1.�a.•,►. �1 �/c SURFACE I ��/itattriti,�i _.!� .�!,, apte.4. WATER RIP RA D I ke illi��!I liggi _4‘ ( lit _r�i� r �._1 TONS 5 SY �,� ,�� r 1 4„ RCP—III HW��lr $r1$$IIi. !y� veiAr I 4 — Air wow-.....I'N ''. --ivi.' EXIS _ ___ — ---,„ ...... -444ry x _._ ., , i s$ i* E 9 0. / 47, � . CP—III N �� HW � � — cr „ie 00 � ,, HW ' `� H k. // t OVE y RIP RAP ENERGY .1.,...„',44* ,. I TB DISSIPATOR BASIN #1 / ///.Pin CL 1 RIP RAP i (DROP BOX) 3 _ SEE DETAIL 32 '� V T L w SFB W/NOISE WALL Mil a TB 2G1 15 — Z — - - s a 1=m ME mi1 / / /NOIW COL ! � Z,�D �, � NL, / .0 oa vp- tir • PLACEMENT DEPTH: LANE "N I / PROJECT REFERENCE NO SHEET NO DETAIL 32 CL 1 - 24" DETAIL 48 1-38/9B l7A CL 2 - 3ex OUTLET CHANNEL STABILIZATION REV SHEET NO. _ RIP-RAPPED ENERGY DISSIPATOR BASIN (No GeotextiN ROADWAY DESIGN HYDRAULICS *NOTE A:IF EXIT VELOCITY OF BASIN IS SPECIFIED,EXTEND BASIN AS REQUIRED TO (Not t0 Scale) ENGINEER ENGINEER r'E SECTION OBTAIN SUFFICIENT CROSS SECTIONAL AREA AT SECTION A-A SUCH THAT Q devIRP BASIN SECTION AREA AT SEC.A NATURAL SPECIFIED VELOCITY. NG FLOODPLAIN BENCH NG PERMIT D RAW I N G DISSIPATOR POOL APRON "NOTE B:WARP BASIN TO CONFORM TO NATURAL STREAM CHANNEL.TOP OF RIP-RAP TOP OF BERM NOTE A IN FLOOR OF BASIN SHOULD BE AT SAME ELEVATION OR LOWER THAN TOP OF RIP-RAP NATURAL CHANNEL BOTTOM AT SEC.A-A.PROVIDE SM::T: TRANSITION FROM NOTE B END OF APRON TO NATURAL CHANNEL WIDTH. CL 'II'RIPRAP SHEET 29 OF 67 1 TOP OF NATURAL ON BANKS �* ���� �AI CHANNEL ROUND 4,71 I!EB BTE%TIEUD " (ON BED) SLOPE FROM INVERT TO NATURAL BED AT APPROX.5% XTOP OF RIP-RAP ' —Y S STA. 3 7+95 LT D Poa�wIPE�P WM --F° VI -f DENOTES IMPACTS IN i06' SFr'G-RxrlLE E,Gcc=i TO THISLINE SURFACE WATER ...- B�RFRLa,3 RIPS P RIP RAP 1 APPRO%EO *,. OF WATE! CULVERT�B°�Z0NTAL� � "B ti DENOTES TEMPORARY '�` -la + TO�S AS UPOTORIP-RAP // IMPACTS IN SURFACE WATER DIM RIP RAP LIE BASIN# BASIN #LOCATION (AT OUTLET) CFf GEOTExTIL 0-0 EBACKFRLETO wO SISRIPNJUP 1 2 3 4 5 6 7 8 1 -YRPCA-22+95,16 RT w 25 12.5 0 25 50 A 30" 30" _ 2 -Y_S-47+61,142 LTT vi B 20" 20" 3 B ',' IMEMEEMIW D 11' 16. 1 25' _ 5 NOTE: GRAPHIC SCALE - INSETS 6 Wo= DIAMETER OF PIPE, INSET AS REQUIRED F 6.3' 10' J RED SUPPORT RIP RAP SITE #17 To su - WIDTH OF BOX OR G 10' 17' B GEOTEMILE SPAN OF PIPE-ARCH r� SFr IT-D CULVERTS 0 �/, �5 SX ( P) TEMPORARY IMPACTS IN 7114 � INSET SITE #18 SURFACE WATER AB •�,�e * �i - - V i A 8 7 / A Y ! 4fftV 111111,1 �eil0 I OF r �,'� /,.•...i I�T/19� -�i� TEMPORARY �t % �z��=mayg �744 IMPACTS IN SW ,.�, � 3 ;, .T�1 �/� (.1. ;�.... 1*, ,. / 3,� � i,��!,y �9!��, // SURFACE 1�Iy1.-�q/'\ �� ����I /,j'/jp t.Q,Tye . � ��I�L\I���►u�,. • _,A, �,.�:., , ' .� (: a 4.t•- �1111 F'r -4 M-1 �•,. �i Y �y /�, WATER �� �' a i, R 1 s��// YAV . TONS �� ►�►�,���i'�'�i , :iDirrill-(0,;-'4Parftlyp %r'i//1//1 .i, .i,,9I1/I ►-,_ \ je:. �,T��_I��,�i� �� ,T7,"* 40100h.:41 i��j11��*�j�11%� IV•.A,� c►r 7 �a.., A /UAAUI"L'''�_* �� / t�I��� t IIII/ii111 mil„,.AL e MKT' 171-,,; E '•�i�'''*�1� �/ ' 4 5'5 Z'cl C3 ' '1111P 41#fir r71140 _-- I••.'-• ".1 111 1 �r1-,144111 /1�)fI/ milttag/,�/J //I .7.0-, ................................. '11' Dr 4' - ..7: ) MAW IA ilwilli PPP- ot,, otai 101111?,)4:6 NJ 41/4? Vir/f 4'14 ,/?M1111111111AMI11116/ 1 r i_vi "I I I I i r,* .. -I I i bW4-ir 41 I 111 I I 0..d 1 CO 41111111%111111imeftwilik 4111111111M -Ai RIP RAP ENERGY _ '��C�;, _1 � - ;_N �i- A'sJ - �� �. DISSIPATOR BASIN = ```,� G�r� �zg - - CL 1 RIP RAP � �rZ` "•` �,�:1��:�f�' — . — — ter- . - . . . mlR SEE DETAIL 32 o GICI —lir ------- _0 _ _i1 ' T T ---------- _ / _o Mir MILS 3 • -s e .�-Os®riT�I.�Lr1 � ��'-^1 '���l.T/I4\�K W_1 Al E_'�'/ `�� m • g ( ^/ !' �`� N L� aL 0 o_c MATCHLINE STA- 19+50.00 -Y9- SEE SHEET NO.28 0 A\ '8 ...xd4 .. Il.�imllR" 0 — , ' PERMIT DRAWING ��,n y� , u'� i I —t 5 -�� ` �ti f 1-111 , ©® Wawa a SM..a _ �- / NA .� EO J , GRID DOCUMENT NOT CONSIDERED FINAL SHEET 3 0 0 F 67 a . . , _ _ _,,R�✓ UNLESS ALL SIGNATURES COMPLETED It'll pE�� et-� - - —� M nMod yyy�/y/, DENOTES IMPACTS IN �,RM�y �' •'�' [ j III 7.1 . :�,�•,,,. 9 g V/// SURFACE WATER x1 \� YYYYIII r-..cvn- J�11�1 ��—.s rs°'q -. .... 4= iE,.l.f aO :'TO i` �1,\�� xau x,w rf cd.,� I H�r�p .. !@ �41 .:a it ♦ Ql r � �g1 I ////// MPORARY ENOTESPACTS INE SURFACE WATER 1� R i P' �i Ir,MI 11 I7+ liMil ? `g - \�.. 1�� . >, `I'/ - il y�: .,,.. 41 k E.3 P"y- ril: GLOM L \ ��• I�f� i.. g I R 3 p ' li. I• , �, 4I/t ., GRAPHIC SCALE �� n IIRN1 L �� °i� �_ 1.! I I�' I ----,--,,..- 67. T�M1 Ili' © .aMl .. r �'� ..° � . 7�ry� � yi_'+.•�iL a.�!© � u•: ^` ...., -----7. �I ::: �, �"' eawaAmMamw „ . ____ 7����i•�lzy `� �6� I�\f3ar,�7/.s -�"\ y - r1 1,�m _�.�'n�lfU.}ffrliit.T�".. i'l\ rr me ea:-r�I +T ;�,i �. rrf��RRSA= � �� , .i ► pl�"i ,mr RmeR, � �� �: yam'�' � �T+• �7:. \� 'fib a ► ®". ■� ye �� +�,� SITE # 7°ofl.s,a A r y .iii .-�� . .R '�� iiiii � I t .P:F " " ,',S7, E �, �� a I a m m -Poe r i �, ,E2111+�� w• SEE SHEET 19A u..r.r. I I. i 6� \ � Tj,,tt \ aD . m.l 18^' i �I e o -.Y,tilish. riliti„„,,iiiiiiiis.--.77---- * IsP �1�'1 _\ c`\• lli� �=e.' ,.E o,,.,,s: aP�A,rsuE p �!` ittk_.: (V\ ` I7 r ' , eC SELOT `7.71I I. ^\\\'0's \�� I 71 Z :s �� �. tM� �.en�ooa..,wsM 1- a \\�\'°`i`.., �..��\.°�v'\_ aEo.a.. u a \� I y: 'x 'itt w I � �ii l�i,, f_11PiiiIIIIF•i� �I1k - .=fie e \ c �•Y'`1' - w• 2 ,� ! �� ixll-1 i / f; i;. t^:I.ryl �I`\. A �" -.-..-_ c c c oe �� \\... :: T"`uw'F- xx-2 �, /// , 1 t II ry; Rip - ✓ c W • — Wit , All,I _ ,� - r 1 -- L. u .,._ t�� *. 'r_ M Li . r Rom- . . . RF �� Ry ��.�rR 9i[-m'�'- .esar ri •.- PQ �c�I■■ID IYr .M� •P� +,► ,�,. R-, - _ _ __m ,� N®= """" Yr �'•-..:..•,_.._r_.-- .m.r.,-. _�__- _-..i. 1F...'" R°-a- ." i■■Ill M U ill"_.. �:i , _�■ al:tiw i,�." _ '^fir ®M s7 .,, :n,>!, r..,-alp.,.- -� ��+¢=-41I - 1 •--,aals..l __� _ .EMo"-�a -,,, I >_5_..--ems. : \.�-,.,_,- I■■nI l■■�© — �. I ®MM la ��:\ IEMU e-■ I2€� — l' - R..or: . ' �= } 0 o �: .S.e `' it SITE #20 „� _ e ��.��� _ —.11 _ m.��a„�,—___:_�� - ��� ' 0 �. .—. a-aA].,�..-•_ e._ eXu's y. OCR-. . ,V^'....LL'�� .'JK: u -� �.t!»>� ire.uwe�� - �� 19. �_ a�� _r_� 7 u,e i:� �a -- °RC.. i- fm• IE ��ail O 0 MI MI i: PPITIT_, pli 'I MailigligiMMEEirdCW3M1 CD ±. i ce �_J_a-1\\\vim—j n MEIN _ I©���,..,,.,- ©i �rrrr -- �. - � -i�T■�E. _F3,..4+ LW=�i EI '.'... �... g � 'e r� '■■■■■■1 .,..m ® �mera�e�y Q Y!9y ` - --_' / © ,,w\\�R - ,F,- ,gR R^ r v•Etr; .,. .0 A► II Q r R tn .% 8 r' +1 :�i *m-0r_,� /,a /.�. ol6f/iJ//! ff,r�lti,'/: °x _ is1/�- /=--•i_ i _-, iS'i!Ilsrww."'^r+'. �"' 1 #'�111. "lir VIN* 5111.. . \+ ` .:: Ib,, ,. •fc° -::. n?;n :'siii►' * ..�I' _ _ �_Il u+._- -zN •, �. iNai �a�. 2 -- '',,,, 1�, m r. - '.,�.� .. ,.. SITE •.._.�.: \ /' I :/t IF' iP d�a ��,. �� SEE SHEET 19B I u_ \� \,rlI i ITE 22 ► �'.>3 W.sA nr .. 2 ._ \ /F' L SEE SHEET 19A wu "1 !�1,44:. \ IR` A4j ao"u 1, .f'1=" SEE SHEET 19B Hilt ".-- -.°Q '� ' .g -- 1 `'a l' k ' `'.►R �►r• • d , oa 1��U P PLL' ' w , "NICE I:�I. mR .�, L* �; an" p a I 1 0 N� o".r / i- a I R o SEE SHEET 19A r� I { �'-�ro„3. �_�sP _.Poi `.. 104 t IIk^, 4, i �, d '' *" B I '1R i I R�, aV II gg ns P I ���P4ftrw Ym c/ �,� ����� N��A �� 0� `• { 0� II .<r,zsy l '9 �:- RS I• �'.6-. 4 Y 1 a11e Ia�'2n \\ \�-• .`\��\ e ce ``:. ,.. S I�fR' I I �,y,�,�•� �t a= g~ - _Y '�'�- ' '� Pl51.I2+5005 Pie Sow+,K 970 P/S7o a+8268 Pk Sla/2/851/ PI Ste 10 PG SO,I6+7r2+ I — ;.° 1, uoi FIRED I9 I , gg tt$fi n-J2rI2JrRn -0,a24r A-If4B 22s(Rr) -r�43r n-e39 9srRn -ro343! g • j 1A `'' `� e - i N I § e 0-99 260 Le -T09'454' D-T09'437 la-/33.44 D-T09'437 1a-970f1D' 'd.a.,.oS1MET.rA,�OM ©, N. ® ` � �� Ptea- I r� =�S _ - - - ,;gs T-•2500 LTT-/e74' T-8�vr STT-lam T-/3/40 STT-lam• '' \ IT � \ • x/ - R-850000' ST-725J R-8000a R-8000aiW \ \ ` s • YPN • YPN YPN i2 e�' � f'`� \ Nlr� � " :Fri;,!Iiiil'ip...,,„siro-o-581k4: Z/ —m••�• Pl.sm/9+s/� PIm awszo4 q$Pk Ste 5+3158 Pk Ste 21498.42 P/SYo 2 45920e '4 .` \ ` =Ji�� � �� Ma6R'I- , ea-lr�'33o n-la.ua39rcn r "^-^ ���li Le- r Le-I0 0- 3300 rvl LT-1336P L-/81E'\ \ �' �� «■ilk..s1 Le-20000 0-If 2r 330 \ Nt� >• H , _ LT-I33AI LT-/336Y T-It S7-88g2, r-8159I ,f P .%�� Ilfll15T-897T' S7-fiS9P' T-9ANR SE-06 SOp(p' I /+,.RIfI@ }h.Pwlr -, r W.ii. ua 4�R 50000 SE 06 05-25 NPR OS-Y5 YPR 0'Earl] e/ • - r@ �Y I IIN -yglp0- -fStPM I `-- i� W Arz t II I,I I � �1 Plo Sf0/I+J594 %S/S N+HP9 P/4 Sla/5+7/748/0SbII+3804PISla/S+2433II e CCel•elry11 g I I Ge-3830559' G-10828.39.8A79 e.-34.3756g 6s-+5'R'352 G-/3r2P JT.I(Lrl fl �---��g I M-9700a 0-3fJa559' S-2000a to-20000' 0-458.35P e '� '4.5-�� g. �4 : 'Ilan - `t ❑ LT-IJ598' L-JO27a LT-IJ599 LT-13798' L-3033P .'..•f s r r i 4q� 9 ST-wa9 R-& Sf- ST-70A" R-12650 I I ' , r ,` �G SE-OB OS-QD MPH e ^ es a 0 7 ,. .I Ili y,,. YroarANE OM AN.,COMPANY Nq ns-25 MPH -r9- -ne- PP k / i PISA,2N5798 PISA,24413.33 MSG 30409.40 PISA,33+M72 PISI.13+371I F. +, ` .,,r° , �' �. I �I I : ��- A-JOIO20fRT/C-JOI020(LTI G-J59'J2J'fLTI p-f0J 479(Rf) -4JE0'J8J(LT) 0 II��Ilryrypp '// r :-p f 4 D-f1204P 0-f1204P 0-f120a2' 0-fIP 042 0-47'4I47J 2 11 \- _____ o ,.., ,,t•> �: '.:�..* .M I7I�c��Ny 4 OS 40 MPH DS- Lam-J]BY7' -Ate' g r`W".°�' \`\ ti I �:E 4 7 I1 - 11�i MI R-I47700D' R �477tX0' R•47700a R 4,T7 S-10000'yg 44y J • 5i L t_ -MATCHLINE- STA 34+00.00 -Y9- SEE SHEET NO.291. g -MATCHLINE STA- 19+50 00 -Y9- SEE SHEET NO 28 1-38113 tN\ „ q Ad PERMIT DRAWING to.,„ ,..-W ‘'0,*s * ''''' -... ItIMITI-NjAMD".8'75 DOCUMENT NOT CONSIDERED FINAL SHEET 31 OF 67 WzoN:APTIvs - UNLESS ELL SIGNATURES COMPLETED I \ ...114, ..,..„„. ,, ,\„ \..,,, ( ... 2:11 WIP 1411LiIii.A ,._ toll EltiAt V/7//gA' IMPACTS IN TEMS=WATER tip . . i. RV -1 k7.1L‘ \. 17*°4;::'1314;44 \ \.4:7(kA 1 11 I ibl_141.111rLL )1 ....''',:-)01;ir rl rja"" libi41., ......- ibirAlkil, 1 I 'kAtt., * '''''c 04.70% ,.....,:r-it* ' -446,a. ",\ 1101F-FiejA Ah FA Ir 711--::A•ft,arirrigiklximi,P4 I 1 1,4411t,4' 1111111N.- TAINftimek.W/ ,, ___________---- Siiisula.......1,0;i0 GRAPHIC SCALE 411 e$2..'--• \'L:: .=-'----'-.-,.____,,,,---,__S_-'-.4."1-.V2.41/4.At,, 41 il 1 Iv, _ .. ,'-eillIAN, iimetimar 01144,iv till tie - '‘. . ,L=7 " --,..„,‘,140, , 10k Airuirm9^4,-,111....., iropiatil . 4A0-04-66.-Z;r-- vs, _------::... ** 141W-;•t:,, iin . .11.-40:11-47M-041 .2.--,.•erApr4., iiirklgicieW/VALV 1 ‘_. ., ..,--7- . ri' A.' 1, ,,,,:--;••-- '''.*-7-,14--,-118.4*--,--04 '‘ -- ---- --- wienis --- W•diolv*Cr 104- ' 0,evi ,-....-7 --• '''''''''''' 11 ‘", w--____,-,-=----=----- ------------ I c1114 , ' : - \t, ' -7-----"-:=-. - Allr'' ' ',1,e,,,,Milk pfifinril ---,--- —..,a-exzr,-------------ttik, • 4.‘t,i- ., . ..„,.... . , -...,...--„, 1 ! ,.. --e-... .___H,,,,,AL,, _ ,,, , _ .. t-.7.---,...... ,. ,,i. ,...,,.. ,..Ni.r. ....x...!,ki,..i., .„.:... 0.1,,,4.,..: , , ••1117 , Atoctionrittip 11 .r, 44k = ''----'‘..---'-`--- --tei% ;NOtt*,‘ A.. . - .. ./f\-5.--- __ .. -Ail' . 11.,.. .iri ! „ l'°Z ,/.9.1, O. ,isiDDIft.----k-.`" .-,..., 460- .- --.=, , .__waillim..„%".. uh....,‘" 4^A- 1.:::._ -__ ---.---"•-•,..„..,-.-''‘''4.14%............._ AWY,10011#111,-._,,„,,,..-ii--441,,v4/6„,„„„Liproprastamtm. . ? na,....-.0 ,..---- • ,/ -Ap...._)1010'- -. ,,,..,,,,,„....41,40,'•••!.....4---,'-,-••.-:--- --- -------,-,,-..---._---.:•.,...-. . ,. .- -,.. - - `"-- -- . ''' "'.„,_ ' ''''''''''.•:••4\"N.,„,.,„, \ ,": \, ,, NEEL. k,,,,. .---.. ...,,•&• , . ;Irmo\ I 1 ,,,,,, „.... ....,iorr,,....vr„:.;.iaooiee, ....-_____.„,,,.„..,,, p,---..•_,,,,..„, ,,_ _ _ _„,, t.47.,,„-____-_,, .,,,,,,,, ,t,'........\_,.._ _-_,..--- -,--. .\ ,-.„,,, _ '. •••,,, ‘47'._ :-.'L:Agz.,-,..' . ..li ‘.rg avramt,..kira...- 1 tt,:-... —..!......... _....... ...if° -..-- 7, ,.....i ...."0.,.._..2e..........__.s.,..... .. ___ ________v_________ _ _,___ _.:m._ -."-°_......,"- -...201..--- ______..4 , - --, ---mi •ms "-,... .".1:: .--r--, - -ZEIRMNIAD....___--".,. _ou!......„.20- ,_„,...mm...--- ,_._..... ,..,w..., ;=L.........__ _.,__ . vi>.&-ca-...-...--r --.c-- .-1---::.---------- --,- ...-------,---2'—.._-.- ...--------1_----- -.._-..-7-7. ...._---___ --1- -7.7-v------ -. ------ ---.... L aim, 1 ,_-, ---,- -----_ .__...p,imio--.........•0A,,,,•.,„,,,_....--r.u.,...., ........._ __........nmwmim, .. ..... .,,,,, ,___„.., 1.......,......c=m.... .-. --- -.... ,,,,,,ims.rilliwnisariliim=b_... ..,,,==iwiwP, m.i-- p '---'5----''''-"""''`w-'"-IN"14=Ax=si•slii- 1 rmm.. :=. .. , ,, _1 mmau:= ,TErmai,tim. I 1•11,1 5 IN / ••MMMM -- _ ______ ,.,...,.._.=___ , ......_.... _ .,....,......„.._.. _. ...... 0 7 f 7,,'' w3_,.._._..w-Wi-a 11-'.7". - -, L--A•FA•I. SITE I T E #2 0 -4 .-ILw-ii-- "i7-2.17' -‘ w- -- -"1 .-Ll''---4.T171ralt..re li• IN. , , ---...-------....,-r•-- -••=-.---- .s....... .r_.-_ __.- , _ -.0,..... .. •••••••-.-0 .4.+....-- .. .r.-- 1 0 --'-'- .----',.."----.0---__,'... .-,y. ---... -....-... .rimil a r m I _ N== ... T .•' --imma&-imm--''-='"" • -G,, ]•".A.MGGM i .111 I I ' 'IL.H=MMEIIMMMIW 'YE 0111111-111VAMANIO 8 c;kiMiiiMEIMiliammidirasT•IL PIDITM.,,ADEIPISMII -" 1,..—....i.5. 1„," -. ,- - = _,..imimmimm __ ±7111,•=1 (S1.11. 11•001=le I Mill I,D soM°WWI ' 1=. 11 - ,.,....-1,. .-, ..%7X100:1 I MEM I WI II!I 17111.1..--. 11111IIIIIMTTIMI.ff__LI.MIM=. ..._... , ... _ leirw =11 .. ..,i ..........m. .....g. ..._,... ..tt,iimp....,....441...,... 0,04 ±V-4i1111/MVII —AIMFAMIWX.WiliWAiiAlA2IMVAliMiiiMI.W21111MURMV A wis.. ..viklay.....,....__.,_,... ,,,=. .....z.13,Iimr1 1 =.. .. ,. .......___.__ .00.....e.. .0 immiew _omm......„...................7. ,.:_.,. titr„...._"7.... .....%.--.1."....c.....-4,--.... "--- - -"="51."--'-'.."."....".-----"'.....--- --- 11 -.". ----. -00.--.....-- ..,.._. -.----- --. -,.-Mr- ••-•I IMMERIR!.rii.........___. .. ...... ...... ..... _ ,_ _ _ --'---- --."-"-- . 7,.._ r ,, ,...,,,., r,„,,,-..r rz,r,, .___„7" ..---' __.--a".---..rr '= • --- ,'•- ...,.,,Tl. I- '--=-----4411111----"-----...,....71111•0 • *4...-.. --11,),..__. --=,=— , //I, ,,,, ---i ,= - " "--"-- • • — , -t- -- ._---- -..,44..7-._ 0 ,NkikY-1., lr'ii,/ .,,,,, , ilka--\\,.;1,-- •••- .111 1 z L'-'------••ft * ''''''' "••••:=*a*"... . N ,1 iv! .1 ,p,,- m — - . ,,,,-----=-_.-!----_-----.,.....'!;-7---- - = „i-7- _„---.::-,,-,, ,No., „."4, , .f_ -,-;-4.,--... ,...,,,m'Al. z_..------------- -------„,4.),,,, me • AT (,,,k4, ,..,...._ - Ig 1- 111111.1._ i i-0 i 4 I"... . i. CA ' ErK_N, I,MRP_ g•-;- . --. '--- ,rt:4( ,,4100,1 ,,,•--_-_,,_. I, \ •74. .1 4...! 1- -`---- wie . ,rfe z‘.s. ''''-' . Ito iv -', ( h• "" 44)7 ,/,),-SEE SHEET --.min it.,1,..-!, ----,-------1-40 .44..«0, -,. -- , , ' ._. (14L-,•-- Alr'id-hoiri - \ 5ir 11 u 0 ANIMA'li'dihillilll Ilaiiiielik,'-' s 1------------1*40,,,T_io-,4,_,,,,_,• .44," , i A k., r;si i . "A..4 /r, - • IVAN A ,,Wic: 4.41. r ,, 8 • _ f, , . 4 „„ . • SEE SHEET 19A , I , ) ,ogossiitgalftw, -,-Jk. . *IYS, ^'Z 44 A A • ' gi r,r1 Illa, , ' 44,;.‘-r 1 s,,. Piit, 1 • ,..-.""lk{ 4? • ,,, Sat ‘ '''‘,,) A. tp,o, \li.iii 0.,, ,,,4,t) . /,it •I IP 'Ae„ILii, 1111r.'..17:1; * 1 ii jig --- ilillkILIMIL .4 \t 'Alt#1111(1-1111 II- Alp/Hr44 p 4'4 A-11111-.t I *,....,,,,r- 7*ii-V, 4,:s.-''''.-----'4--- :- Iii, \.s.H*4RX.,,4%....1a,,,,, ,..4ttirtl,,,.WO \ '''', ,.... -'. ..,,- 44110 - ------ 547H .0 0 0\...VP'''.....'''..•1•"Iii 0.NV 9 "'*6- .".18'':°:. --7'..°I.' i "'"*. Nr, _ ...._ .........__„...r... A., • E.1,5920 It, SP, , 4° 2009204 ,E N•. ''''.f,4,ss N Os TOM 431 0su:200,00,ItZ"MO t rirY305510.71 if ,.,, 1 iir,3'33,f!,43-"rj ...-- 'ft Imimmm.... __." . s., li ;E71-fil,.ihla— trr'18Z4,a FT:MOP L.kIttic -16;2, low \1, 4h ,'NT":7-----r,==---- --7---*---,,:---:-• '' \ ,- . :vii.„6;11;PIE0174 1--------':"' -- 4 - /////7 1:4:);4'''1:17.1.,\ ,Lt._ 4,4,A.4017"., ,:"' li -A 71, :i.:,- ..,'';1' -•,f: —11' - ( _we_ 06 it 1 I'? '--", It,* 4 i I ir# . 1 ) ,.. , ' ';;, Ail 111 1 ' I ' P4 St°"435St 1:%l'gair4f 28'393,37 517 2 :a:' 7 ar.• Ly.mom 3027.7 Y 8 2 I I I 1• a P , .1 , ---.. 3040940 PIM°524,4476, Mg.13.174 '''' nS't 24H PY . symyan a-,rayveam •43.2a 38-"" ti44.r a r 7".r'l''' : *:,t 12,,41::., 0 t12•04.2 0-02,042 \ ''r4147-3. Pi , 1/)), . \,\ ‘.•\ lito_m_a4lufgisi Ili -, •;-, '' _.,,, -477000' R-477000, 4 04 SE.Nc--t?„ sErviff-..-7,(, 6,-..21575:„c it...331r , 1,-..1772L401 P ili, )JI ell .l.- in- 0 /---;--\-- ----,____---,- = • \ .:. 1,,_, —,.,•-........., ,fli , -'i,t ,,- . • 11 Ds-40 OS ,PS _ ,.. -MATCHLINE- STA 34+00 00 -Y9- SEE SHEET NO.29 2 LOCATION I-77 AT E BROAD STREET 1 ' (I((/ .if I COUNI7 IREDELL DESIGNED BY C DAYS f ,,,c.o ,,,. LANE I `` I PROJECT REFERENCE NO. 1-38/98 SHEET NO. /9A R/W SHEET NO. ROADWAY DESIGN HYDRAULICS PERMIT D RAW I N G ENGINEER ENGINEER DETAIL 13 RIP RAP AT EMBANKMENT I Nol to Scale) SHEET 32 OF 67 Ditch 1.0'min. T• Grade INSET GEOTEXTILE � A RAP A Type of Liner= Class 2 Rip-Rap • • CLASS RIP RAP I \ Y°515TA 121+45 AT EMBA ENT DOCUMENT NOT CONSIDERED FINAL CULVERT CHANNEL DETAIL 51 UNLESS ALL SIGNATURES COMPLETED SEE DE IL 13 N CHANNEL CHANGE IMPROVEMENTS CHANNEL G <' CHANNEL CHANGE • z SEE DETAIL 52 N°:°ral I jLASS1RIPRAP • °' Groundz' D Slope OPOIA SEE DETAIL 51 c ; CLASS II RIP RAP �ed. @annly) Min.D= 1.5 Ft. MaK.d= 1.5 Ft. • • DpE ' +74.14 —Y_S— men B ie< 6.0' 8= 4 H. • j •,• r m 7 178.2 9' LT PROP CHL Type of Liner= Class 1 Rip Rap 6= 5 H. /�E� IL -Y_5-FROM STA.68+38 TO STA.69+50 LT s� ,, .- SBA �L �, iyyti_► - Imp Q FENCE DETAIL 52 Pr `� , S. 1 L �E�y%/►�_ CULVERT CHANNEL IMPROVEMENTS /` i-\ -��TOy�����01.►' ��1i► NEW & ,1 NATURAL GROUND (Not to Scale) Cy\' TEMPORARY IMPACTS IN a �� `��'�►1�i1�y�/rii�i,.. i►:�.. . I fi EXCAVATION CLASS II 11 TON' 2 � ly►`F ,_YA�� l1��ilie�I�lY;inll _i�+iilYly1111111 RIPRAP(TYP) I II '.v/Q► 'G..'� 1'r-y���l•yy 1 ra» END S DEPTH: SURFACE WATER ��■ '� �>f►yul��r�.ii�►n�,.,�ii7�►,. 36 ��,+�� W/NOISE GEOTEXTILE tititiytlu�uui. ���,�7►s� .. .. �:i/i!y.���yy'ii��f/y�. v►1/0 711 0 010!%%!� E nP) ofi�� -w.��//lip!, 1 + '1. : �11.........n .nn.nn�[!lli�4 1n , �� llititi:lTou�l��li�l<, e� !� �i �ti///TITIYs1ii..-5 C --1 "_��e n.n►.nnni='y '1/!%/111Itll/����Yr` I •� ITIl7�i1��111111ti 29.0' F — IIAAAAtiir�l����!!!L \A FILL WITH NATIV — — �. iirou��nuoresix,,, I / ' BED MATERIAL INLET CHANNEL VARIABLE WIDTH BENCH rr l�ltytititiul�► 0_4 @ 121 , �^ -y11�1����tititi!l�1A7f _. �li��RAY01.4.4 — — — — — VARIABLE BENCH`�'Sr� ��Q//yl!'llll,` ,iTryrgl:�r�ie✓ WIDTH @ CH `►I H v�1111111111��e►. i• Tis��l�lp�~ F F • ��: y41101,1. �. UPSTREAM CULVERT EXTENSION EXCAVATION �1e�1�� NATURAL GROUND SEE DET O L 65 --root. wav, HL X� �� �➢ �: � LENGTH R <MOVE DI 15" RCP—V �— F IVF '•_ 00 REMOVE JB REMOVEi: c �` —X X X x, 2 ry���°` _ _ 9 • 0 r� _ GEOTEXTILE(TYP) I�` SFB W/NOISE WALL ��� n� ?' , SITE #2 2G1 BED:CLASS II RIPRA • CLASS RIPRAP I(TYP) WITHOUT GEOTEXTILE OUTLET CHANNEL 3 9'X 11'BOX CULVERTS Se.� _"►.`J•� •.lv` 1s yt DEPTH=r) _ �.�-.. • �y4 _ - -STA. +45 LT • ��- Y_S S A 0 -Y5-STA.71+60 TO 73+25 RT A%I: T nnu nnn DETAIL 65 NEW STREAMBANK SHALL BE TREATED F<op _ i S SPECIFIED IN PLANS 5 - TEMPORARY IMPACTS IN Mx EXD LG NXEL BLDLK TEMPORARY IMPACTS IN a / " DF=.°'RE"°"°I"rERT • OF E%IGTIXG CHANNEL $''" -- SURFACE WATER SURFACE WATER / „aN '<<� � ��� T COMPACTED RIP-RA, SACKFULCOMPACTE INSET INSET BACKFILL CLASS I VON:" SECTION A-A LENGTH" XST STONE D: \\ >rR� DNCOMPACTEO� -O _ BACKFILL e END RETAIN.WALL 0 BEGIN SRC +DD 2GI—A to24" RCP—III t,?, m COMPACTED HOTEs: - CHANNEL \ P CKFILL 1)CHANNEL B INSTALLED IN ACCORDANCE WITH THE > TB JB w/MH .— 7 EXISTING ,)e E INTERFACE BETWEEN EXISTING P—III _ e(71 INIMDM DF s.D BELOW THE TNrERT D" �_ -�..:.-- P"�'!f ��t -.-, 1 EXTEND CHANNEL BLOCK<e s)a of s.o asvoxo THE uMlrs aF THE - ynriy,,--.ili7�.ti. `ww'' tokiiI�%�for-I�iI%o ogrepi' 48'WW MIx.aF s'MErox°Lxmxrs • SECTION B-B A)gigaiTCERIAMTUTI:M]:0:EF;i:IiRli.;:::HE WITHa •���Ci 1!l�fl�/L1�''l0 :' , ",.��I ���T. „ �/ �/ X �/. OF EXISTING CHANNELD AF ERA HAUIi.i i1f 7 g���Yl1�H'r vf� l / Fr' PLAN VIEWGNG AND SEED I E li'yl �lI,y Pliiiiiiy>y oi: r r1:tIbla 16'"- i."---Ara��i — NG W 4 CHANNEL BLOCK G ;HE ENGINEER. LTD EXTENT POSSIBLE DR AT THE DIRECTION OF ` NOT TO SCALE imim -o 9...ii'5CLtR 10 f//!1.11114 VOltilIIfP'"g'"--�= ��/'v■%!/�y■�/Mi1.dTL 3N�E1R:1 i l.rq`'`i IPb E r 1lll��►/�11�11ao_ rlli��li.I .. /Y�YWil7 v 4 Imo...__.._ •�� CrETAIL �/� 19 S� Lr� PIPE OUTLETDCHANNES STABILIZATION M ` v �•— _ �� • ST "°m0°°'°' faN;O°d /// DENOTES IMPACTS IN — �7 G,°°n Gp°pa SURFACE WATER . END +SBG 00 I D ST oo Gw"IB.d """ ///7/. DENOTES TEMPORARY I II R rvarmm<I /� Y („ TypepfGmr- aI:Rip-RaP-Keyed-InlBonke) IMPACTS IN SURFACE WATER U I ' -n , Type of Liner- CL RipJtap-Coamersunk(Bed) INo GeMe.Nle7 °� jiTE #22 1 �1 ' YS STA.94+40 RT I SITE #23 PIPE OUTLET CHANNEL STABILIZATION I ND NA I I 300' TAPER (REST sEC`DETAIL 54 mmLai�Rtil'- 50 25 0 50 100 3 O�L GRAPHIC SCALE - INSETS 0a N - �°c I-..a 0 UL LANE I "N I PROJECT REFERENCE NO. SHEET No 1-38/98 /9A R'W SHEET NO. ROADWAY DESIGN HYDRAULICS PERMIT D RAW I N G ENGINEER ENGINEER DETAIL 13 RIP RAP AT EMBANKMENT ,N.11.Scale) SHEET 33 OF 67 Ditch 1.0'min. 2• Grade INSET GEOTEXTILE Type of Liner= Class 2 Rip-Rap • cc RIP RAP "t 1 `-��\\\� \ I -Y_s STA,,21+45 EMBA 1 EN '►1 1 �� DOCUMENT NOT CONSIDERED FINAL 1 CUL CHANNEL DETAIL 51 UNLESS ALL SIGNATURES COMPLETED N CHANNEL CHANGE SEE DE IL 1 ,�• �I I IMPR•VEMENTS Na.,a Scale) L CHANGE 1 SEE D TAIL 52 / G`ou h .' d( D I Slope Ty/ •SS 1 RIPRAP �� ilikA,N ��\ C •SS II RIP RAP (h^°Ok o�i Min.D- 15 FtSEE DETAIL 51 �'� MaK.d= ,.5 FL� _\ +74.14 -Y_S- \ When B i.< a.0' 8= 4 H. - W\b" ' PROP Type •of Liner= Class 1 Rip-Rap 6= 5 R. �J _ 178.29 LT 4.:, �� �� "111B1111— ,...,..:11. � V -Y5-FROM $TA.68+38 TO STA.69+50 LT ` � ,- _ 1, II�4I Q FENCi DETAIL 52 •/ CULVERT CHANNEL IMPROVEMENTS ViLiiiikar4,0111111411111111111111/14.0-0 .- aa11Ei► _y �\I - NATURAL GROUND (Nwro scale) y�. TEMPORARY IMPACTSIN `� m:!� -•� EXCAVATION CLASS II q� 3711/%1M13"7:4101;121Eirs:§di::::.:;:0" ��aLlrla v.� �J' y� RIPRAPIrYPIIlit1IL a"' SURFACE WATER '-11::_ "'^=' :;r2:isa :r., n ' DEPTH�24"� /n1�, �l�llu. END S�1,�` .�,�,.��Ira�pl�W , _ .•r,�►'Iyi�Fy' W/NOISE WA I 1 .�� �,t► � ��� hy.A ,�� ■nr!! . �r GEOTEXTILE ITYP) ���Ocr o��� ����1►L��i�����w . AG�:i/1r�' r • ���G� �tiIJLI� m)ly O : __ Ae�` fi T 1 L �,.� y aa.rf!:aB W �liZi' '1 y A +, ,. 1.�olinnnnleee.>irnlnnir/lL��!y�rl�y 't7����� �. � 1. ':l 1 .nlllll►��1e111��, C\ e•�' N gAr ann►u�nn smosi i— 4pa 001 1u11111��ngo,1 29.o' a M �� - ����Ir�s!r.���1�1 yyrV� j 1�I�n1���1��y�yypA. �!/��I� FILL WITH DITMA MATERIAL — ,�� r.� / yy/:/ / ���•1;M/.�r� ��I�I II/IGAMOVw INLET CHANNEL VARIABLE WIDTH BENCH r.',4 �l�l 1.111:. .0.6- l Ai I III:31 ti BOWBBIB — — — — — — D-a'@ lza a`.`�`,Ilti 7�I�1F :�����tik:.� III'IIL1i7�Y�Q1;yw� VARIABLE WIDTH BENCH Iy� ` .�;�1� y c 0-4'@ 12:1� �.���; L.I• r \//��1��eL� /•� `� 3`- / EXCAVATION •' 1�'•' �� ��e/,0 UP ' AM CULVERT EXTENSION NATURAL GROUND HL o S E DET• L" 65 "��1 �/4,1 AVP LENGTH •1' _ �J, �� R VE DI o- -� �� s= _ REM• f, c�:��., �t�i' X 11,.;; a��� _ :v it r-- "r _s,�_v--.. iA�...\� C_ ..-a�_ GEOTEXTILE(TYP) - Q ��_- — �- -r 11/I mraa M.1 .V Try w� •_ _ ••_• 01 — — — - BED:CLA55 II RIPRA -. ••-•,•• CLASS II �� —�, L�I mme� draw �� �� RIPRAP P Eo •./� � .� WITHOUT GEOTEXTILE OUTLET C ! '�'1�� »�i�� j<r ..�a�► q:��� _ �� �� (DEPTH=2) CHANNEL ;_ s� ��s- wrs �r�-��-t * a.'- — � . -Y 5-STA.7176.0700473E+25 RT a DETAIL 65 NEWSTREAMBAXK SHALL BE TREATED 5'Min. 161LKF 10' FINISH GRADE F<^µ AS bPEGIFIEO IX PLANS . ._ y EXTEND CHANNEL BLOCK —� TEMPORARY IMPACTS IN TEMPORARY IMPACTS IN P XisTie�cxa„eL="YE"T - : .-1.i.�`,��, SURFACE WATER SURFACE WATER ;„',;=- _}' �����i!�`���. __ INSET INSET BACK ILLO BIP-RAPT BACK ILLCOMPACTED LLABB I Mxx. MIN STONE DEPTH SECTION A-A /�J" -- •1- LENGTH w5]N OXE Lki DI \\ I -95 _____________ $ BACKFILL 2GI- B - •rr s _ BACKFILL� I 0 I ors _ - - \ BAMPACTED NOTES: EXISTING N � � �. - CHANNEL P tKFILL 1 CHANNEL BLOCK SHALL BE INSTALLED IN ACCORDANCE WITH THE ���k:i•>•�j� V1 ✓•1� ,�� PROJECT SPECIFICATIONS. > ,=a.9/./ail *A.:-- ,gI%i��..,.i.i'�..gesso_// \ z1 BE INTERFACE BETWEEN EXISTING _- --- --- �� �r �. ...,�•...:�% ���i�;���� !�� j 31 CHANNEL A MINIMUMOF:.D BELOW THE INVERT _ _ _ - 3"',AUM ..../�•••'%a/i�Y]i+,ilIti�„Y -% ,1U %%��•_ L EXTEND LXRNNEL BLOLK�'V __� MIN.OF 3'BEYOND LIMITS SECTION B-B 4)9 .et y,.lJaaairlal 11 °`'i��"•�/''' I/!IS�I�Y s„/%z��/ aF EXISTING NNEL MUM OF 3.0'aev°xD THE LIMITS OF THE a /��r��l:�/!:�v�' ii. , EzisixxiDsinEUTi"nx:EMINIMUM " WITH ar >,a;nm�nrr_!r_::��1l:i::OSln!! " i:.!t-F1i:ii. �i.- r�i� 8_W W ,w1��_ IEWiTiyyr ri -i Imo, „ i�� 1 1441 _ = S► PLAN VIEW 5)INSTALL E - �;,I__ nggiimb., 4 v�.elif „ ra rung. me NtalA,m!aill0i•._�Tr :_ �, = ' CHANNEL BLOCK B)COMM EHGI PROJECT LTD EXTENT POSSIBLE DR AT THE DIRECTION OF THE a �, I�L7151 yrr.r-ar�. .i .I/�/I� ♦I _� -_ ' _� �� NOT To SCALE JNEER.L cr ro rodrag�IILyy��--__ �•. �� �!�; •' ��s � � DETAIL 54 D-. �fI— �1�4�,� �``� - —_ -w- _ _7.1. 11� PIPE OUTLET CHANNEL STABILIZATION M3ilffL��L7 �lz..�._ to ST _ N�bSr°LI Na�mlBed /// DENOTES IMPACTS IN M \ / SURFACE WATER 72 . '=�'__=tea i� END'o ' =rvaa&^ °Gl" "D 1f DENOTES TEMPORARY Y +A I �• _ T:::2::- a IIMaJtaP=trtsunk 41) (NO GaM....l /' m r M //i�� '/� IMPACTS IN SURFACE WATER � ` n �1 //� I `I -Y 5-STA.83+65 RT T E #2 L � YS STA.94+40 RT � i _ �i V SITE #23 / s _.t_ :r:_1 PIP- OUTL T CHA NEL 1 F \ ST• :ILIZA ION I NC D-NAD 83�5 1 I � 300' TAPE' (R S 3E' DETA L 54 i - '.• 50 25 0 50 100 ` k__MAILE__Eir 3 co�L , GRAPHIC SCALE - INSETS Uoa a- r-.a oor LANE I '' I PROJECT REFERENCE NO SHEET NO. 1-38/9B l9B INSET RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER L gC CHANNELII i,1 �( �0 z o I _ U, REMOVE CB d`e, -� Bt��• ..: : �' TAIL 52 IlatI.�. 10 I wI V I: +01.93 (y1� 11 "llinIh �I - /' ��� - - _ - _ 1IRYl��INIIUfII11 - DOCUMENT NOT CONSIDERED FINAL -Q� v_ •���� �" �I�luli Mil „ilUNLESS ALL SIGNATURES COMPLETED Igi.-- Iblv§ixa.---t,_00!°,—'-.111.-:---‘1I'v .;#20,4;,,,ti 4pr�� j♦`o • iviti •ii ` Zi �r ..�,�_ �.� 74•:40 11iiii l'ry//l/i1Lb4IN�71%L`�%!!�1•r�q �!TiL 0 71.. � ♦ �� 1. I4f8[RRK6B�0�� Z i11 P.4h�— rj'.ca�sr r ssa.nee �� yb ', 4rR; 'B • 4,•••14.0 sr= ! 'isa a ���4 -0 �� ♦T� ' Oh— o �...;Iipr _ � ��1 cielPI,_�s '- • • �'►a •i'' r � +87.5 vi ,;q� .� • w♦- �� �.���. F IF 0 Li 0 Li& �� " 4�.., >g�♦ r iA��r� �4♦2S�ii,►lIAMMO ceZaU cUTMMI7MIMMgM cW,MIcoif►N '`!r� 0 1,AiitAk4 -Jr i 36„ s..-0.44- �� � iti�i!t������i!i�i� ,���i'���►♦♦i�� �� �♦��!�i��!�i � ►i i ��i!�i / o� E E DETAIL53P ♦ i�♦ • e. ��♦� 11St ait t aft till'l�. ♦ 'Eli ��� ft6.RT!"c . ♦� E� ,i,i 0 © v �� iL a♦ rs lir 2�yel k . 'Nolo. 4��♦♦♦ +2 5.92 -Y9- �Q. 4-4*•.�.S,♦!4.. �.��'3 �' i. 14 ♦ *44 "44- i "� �'�♦�O"4060-4 it 4 ��-411,1�-'At14 ♦,♦�!iy 94.52' LT C0 r#,0,z,4J ," _ - Z� '..4���40-0i�04-.♦0,.0„♦4�-41/40 ��i♦0-.4,/ki�i�1 kLi �♦•4 6♦/I1 f► ♦ (fir 0R44T ♦tt. BEG. 2 b j,��.,,- fp,4'z t R.. 04• %- ♦4♦♦44-444♦%4 - ♦♦♦�� ♦41♦�� 11,♦1, -♦/1 M , ♦ to44„11�*4,�0 �R♦♦���44 2'6" C&G- . + :7.5 awr►r♦'ic��irT���♦4♦10.4h-,41 10%4�� 4o44-♦��40,-10,4,4��� ��4,0440� -064.►♦4_, ♦ 141j _ 1 'z y f .. y�♦� 4�+ ••,•4. --i ° ♦� ♦ ♦, ir ♦ ♦ ♦-..fie ►?'I�♦��u� �� R � ♦�`�..`, 3 9' X 11' BOX CULVERTS -t•%� �_♦�`) ��411-.0-14%�4440 0444-4� �������I�♦wit# "��t�;t♦t t_��,i '� 't• ' 6 ,,! ►P=r 1". Doi I M T L •BANK STABILIZATION SEE DETAIL 76 SITE #22 INSET SITE #22 c L,bLh —— 7(71 , 2G1 2G1 ZN � - 1_" RCP , ''r''. .. - - - - - - - - _ - - lain ...--�- ,,,��.�■wnngl%p%%%� -------�-�--�-,-, „ w,n„�� ��glgl%%%%%?ly 'i ,..... .�■n■w,•1 %%L/%��-------�-�---�..�..., ,MIiA/%%%<l` �---- -- -- lfi�%%%�1►��1�i7��.'ri�il�uul�uy l�ii y. T�111r��ti7�aiytii��tiu��uu �IYi� r�rYSiitiw�i.��y kli 1� �.y,�1��f.ks:i�iti��wti%�%ti�� ��iny.w�tili l�li _��ti y��1�y w� irw.,wui�j�ti�q� �%11%�/1b.ulW,uuuy%���y..n`?11���11>/iu7%%y %11�I� y�ele��ioi•�e���y �R�.T1 %��biy�����d�IJJ':Iul� i y .,�, y,�,..�[ �J�.,�C,..1Y■�7■n � y y�%�111%T1���7�i��Y...��e.�i■ �i�r1������YlYe�l�: � yL :�1e:??!!l���f%�11%11ti� b ���yy ",..� L /I//ti//111�y�11�1���t.�'I.��eykii�_ _,fib__��Y� ��ti��.�:��:" ■ !■:�lf'i`� b�.o���y���n►r..�lZ__➢�i ti� ���%y ,_ i�..�i.�I�C:��_ ��E�E�. ■.%%%% r,__ �,,�ATi� %%�i�it%�� T�1Hf1� 7�.,.�i.. ,:ogro airs �Y ��. ., 1. 4.� .,ei:�n%firar,�tiZ.____ ?.,'��_ rifo i_,._L_ tom. 41-0.. r,.�._, _.,���r��i.►.■ii" _ .,,_,5.07�i� 1:11 �ib�-5111� t:oNlo: l u .u._c�!i.r'gill ma�■�y.. : :l��il� :18t.rwl :r■ C �/����� J%l.•�fi� 3.y=s :A3 - .� �.'•�; � 7� - - - .6. r►1l�i //ti/ �y � w�y�/�J • '�'.' •'� ..'a r R�i,YF1../iaFf�4w ?7�' '�'.i.�r►� 1.:I 'y Yl /tir_ Jbti y`+ �� �I� �E����� /� �%y� �,.o ��r/� y-. �, .u.'r �...►J ►� ��V yi Yob .atear' FAPrAirAPIr '� �� ��:�� y it�� 1 � ����I' ji' ii► `ii� A Itifr;vA 1 I rAlf.A r /• �• r�.w_ �. I 3 y Ai 1 % fi�4.rgil .t���i11 �it::ti�lrrr ,y ��: + 1 __� b..may,-„% v73 II� C-51 m III III Ihdm -I rn N 81.23'S9"W IID II Z ZII-o BRK \\-° Y MOCNY REVOCABLE 65.69' Q m ALPH MOCNY& Z II - - WALL H1 uM�'"' CNY CO-TRUSTEES _ - --i: -f: ' -T'���Sl LAN " C& DP 6" CURB N 04'46'19"E 6" CURB c�1 O 9 1 } �. s-. I II I "' 1 356.U7• n ii' �� r'� I Or41 I I I I ro 00 a DETAIL 52 DETAIL 53 a CULVERT CHANNEL IMPROVEMENTS Smooth-Faced CHANNEL CHANGE -o Retaining Wall N'D NAD 8 5 T NATURAL GROUND Not to smlel ,yam G EXCAVATION CLASS II 1 a RIPRAP(TYP) iR. 12-14' "'•' DEPTH:24" ?' 4.5' of 1'7Ff. SLOPE IPROTECTION MIN.2.5' WITH GEOTEMILE N ,"' y;,''1 _ _ " cr. //� DENOTES IMPACTS IN SLOPE PROTECTION CLASS R AM B BRIDGE ABUTMENT) SURFACE WATER 1°�� CLASS II RIPRAP ON STREAM BED '.n. rig. "'" WITH GEOTEMILE (WITHOUT GEOTE%TILEI 0 GEOTEXTILE(TYP( O FQ- 16' GI `� 29.0-� ry3� Slope-0.3%co / LD FILL WITH NATIV -Y_S-FROM STA.73+25 TO STA.74+65 RT / N BED MATERIAL INLET CHANNEL VARIABLE WIDTH BENCH - // DENOTES TEMPORARY co GI VARIABLE WIDTH BENCH 0-4'@ 12:1 IMPACTS IN SURFACE WATER tp 0-4 @ 12:1 EXCAVATION 00 DETAIL 76 NATURAL GROUND ","'", ,,'.,O— BANK STABILIZATION PERMIT DRAWING co (Natty Scale) CD Proposed Y � Fill Slope SHEET 34 OF 67 ; °o,hFWdl Naarl — s GEOTEXTILE(TYP) '•,""F� iaq Ground� ''e:.:aiil� _9�ioi:•wsjii}' n o a BED:CLASS II RIPRA' RIP'PRRAP I(YP) 1 CH. �11 J WITHOUT GEOTEXTILE Slope Protection OUTLET CHANNEL class II Ripmp (DEPTH-2') To Ex Toed Exist.Channel Bank 'Bed to be Restored -Y S-STA.70+45 LT Pre-project Conditions) a'-Le -Y_S-STA.71+60 TO 73+25 RT (No Geoteenel 50 25 0 50 1 j0 O a -Y 5-FROM STA.75+10 TO $TA.84+00 RT ■ ■ ■ GRAPHIC SCALE - INSETS pia N GC \/lY I-ia LANE I `` I PROJECT REFERENCE NO. 1-38/9B SHEET NO. l9B INSET RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Z \\\ ` �� ! LV " CHANNEL ,+�j z `ld.i':III .. ► I �`�`!+ m n nv 0- RE'• EVE CB END E& - �' I !IfIr ■I• Iq W I V BEG.: B& _ TAIL 52 � ss'n•_ �/� nu�R 111 0006,1peuroom / ��. - _— ----- � ' � _I�1 �I�I� n -- DOCUMENT NOT CONSIDERED FINAL 4" C&G 21111"1 .8 I�r+!* � ` �� 80, ___ Ei�. c�� - �ii��� n!� _ ��p -800 UNLESS ALL SIGNATURES COMPLETEDrail �1p���7�, IN. � t���h' �+i EP og - _ -_ - _ �� a 5�. P'''' 7> ij '-'-.1ff t- �� �a .4..N.� -� r � � lady Ry�.'tT.tis:13�!4���� _ ErY:LFa ' a�s•.�obc nsaimal► _ �___ B '� `y aa.�2� �Ti�7,4A.�Y•• �►i it. ,' I�`./. ,m �41.0 ram._ i �<�` ii� ••'►' y? i , . . ter._, I� I 1 II '- -•-- _=.— � Cr ¢cZi�t�. i �°> .� � taR� �� III I I 11 y ? ; -� —e _c_:�= ZR�. �� ^��s ♦ ���Y�T .P"ye`�,a y i1.rz e9r,_ - z� t7 �ireZt `,yC:� .� a�.r�AO G �6 Gamer i I tit I I �iC• 7 ::' ©�. ♦ ♦ �..s i_i-•tea -1..... - = 11 S =i �.._.tf� �y►��i , j7z.r�� •�_ �7f' �. • ` EE / R• i e4 . \>-'.• - .. ♦s.14 - s .r • - .r am=-. I WIN"' if �t _ E1= i .7 .,-- C NI iglit 414 t• s �tA��2��4i j)•y y� . - �...1 .• ��j�i��—r��� f` — ::r r� ry- . .. :. Z�� � p ���_-���. ��' gam + -- 9'X 1 ' BOX CLLV R S �vA•ier-",,,-. •.w`: '1 ''' :0 �: ��� ��1.._ - ,, .� R�dke x ,0m I4# ♦- Ft Zy. 4 z _�- 04 I G ��I Imo-_ �� 0*.�l. r ..4. _ b g apt - co�I TL Ir* 'yE i}� 'fie �_• i� �i�i o��I������i��A��`cZ��ri1.,ioF l `�' �t, ! i'7� •' �� p` - ti i �Ie�...i, hJii BANK SEEBDETAIL076 SITE #22 INSET SITE #22 — irk n . -,'��— • .18. — _ — �A... _� __ __ — — . =�_ b��. ,.-- ,_�__...■■■■. rrrr�--___-.. ....ram .a .maamei�■m ._____ �- ■ !■■■■■■■■■■1 maa _ -.....- .■�■rrr■-■re■■r"r■r, - .■o ti...� lr.r,/ �,.ti+_ - _L�b,.���� _ rti�i'"�+.,- _____ $_'" 'sj'4j ,� ■ !� aYi'il /��li�lr 'yirr.p..�l ... rrrrrtR ,,,,,�-�-�-� _�__ ,_� - .,,.■ ■rrrT. ravy�- .. = �__�_ ___ ___ !1!1_J�I -- -- � .... ■■■ �,-sR__ =■�e�._-------- ---- L � g ::.�-�R■-tia� 'r- t.�:ti - ,,�.L _ ■�ii .�1�.14 � 1/_ ry -- ------' ..■■r a, ■ .. ■-- - -- ��-_- --�= -- � .•- ►� �F�1Rl�■■rr _ br!■Ir '%�: a■rr■ Qti%iirr3.oa.,. ._..■rrrrnnn� S:. - _�;;;;__ ours. ■ur XR■■ _r _..tiro. --- - --■! ■liy �.a 3,ta. _ _ _ 1/;/y . ■■■rr - r rr ar -litER $' -- ,�� ---- -- ����y111�111 'sfi _ - - - _ ,.� w■■Iuorrrr �.�_ _-i■�iiiii' .�_ --- ---------- ��'//.I,I��Y■Y�■r' - _ _ _ _ _ _�.� ___ �w�a- ,•zonnrra _ _�,,_�1liw�� Sir ■■ ti�. r ______ - ...- _ "= su _�.-__d-__. - :�__._:__-__ _.. _ __e ,____. __. �� � Ste" - �ii■r■__ .i■ e '-�� rt �yf■titi1.r�.- ■..r rrr � - �-__- ...".: y:: �� f =-==_.:_.- " . _� .av_-®_��_- ______ -- -_ __ _ - �■ii' -- ■r�+. r ---- """""---._ .. _- -may � " ur�T,irirrrr �l rAir Alma._ -__- _- act,-.-:_ -_ - - -."------1.---____",. e£__ _____ _ _ , r �- T��1�_� �►,o. - xl�illrAL; ... r T. _=��•,...'_-u!w-.� �� .�� a %L�_/1,-_ .=- E-01111- 77 m �i1 /��IIL 61 G i RB IS oase.o7 ■ I O I , • O G- . E DETAIL 52 DETAIL 53 °- CULVERT CHANNEL IMPROVEMENTS Smooth-Faced CHANNEL oSHANGE -D Retaining Wall N'D NAD 8 5 NATURAL GROUND Not to scale/ 5, G _c ` EXCAVATION CLASS II f ''' co RIPRAP(TYP) iff. 12-14' CZ' "'' DEPTH:24" ?' 4.5' 0W/ft. SLOPE IPROTECTION % MIN.2.5' WITH GEOTE%TILE ,"' ;,:'1 _ _ . ti //,4 DENOTES IMPACTS IN co lu�•• SLOPE PROTECTION CLASS R AM B IBRIDGE ABUTMENT) SURFACE WATER CLASS II RIPRAP ON STREAM BED GEOTEXTILE(TYP) •- or recur, WITH GEOTEMILE ,6 (WITHOUT GEOTE%TILEI 29.0-� ry'' Slope-0.3% / WIDTHH NATIV co B DIT MATERIAL INLET CHANNEL VARIABLE WIDTH BENCH -Y_S-FROM STA. TO STA. RT // DENOTES TEMPORARY 7 VARIABLE BENCH 0."'@ 12:1 IMPACTS IN SURFACE WATER In 0-4 W 12:1 EXCAVATION DETAIL 76 N NATURAL GROUND ,"' ,,•.,O- BANK STABILIZATION L PERMIT DRAWING co IN.tt.5°ere, Proposed Y�F Fill Slope SHEET 35 OF 67 ; ` �L°°'h�w'' N , — s GEOTEXTILE(TYP) .� '•, inq Gr end •'e:.:aiil':o_9.ioi:•wsjii}' n o \.,I .2.5 a BED:CLASS II RIPRA' RIPRAP II 'iFt. �11 J WITHOUT GEOTEXTILE Slope Protection OUTLET CHANNEL cress II Ripmp (DEPTH=2') To Ex.Toed Exist.Channel Bank 'Bed to be Restored i -Y S-STA.70+45 LT Pre-project Conditions) M'46 -Y_S-STA.71+60 TO 73+25 RT N.Gemeeilel 50 25 0 50 1 j0 O a -Y 5-FROM STA.75+10 TO STA.84+00 RT 1 ■ ■ ■ GRAPHIC SCALE — INSETS ia p NOC I-io_ 0- o" - PROJECT REFERENCE NO. SHEET NO. I-3819B 19-X ROADWAY DESIGN HYDRAULICS PERMIT DRAWING ENGINEER ENGINEER SHEET 36 OF 67 250 -200 -150 -100 -50 0 50 100 -I 0 200 250 NLESSANT IGNATUSISCOMP COMPLETED _ UNLESS ALL SIGNATURES COMPLETED SITE #20 SCALE 1" - 50' HORIZONTAL 1" = 10' VERTICAL c 71 +02 -Y-S- 2:1 OR FLATTER GP ELEV= 80/.4' 820 3 @ 9' X 11' RCBC w/HFADWAI I PR. US EXTENSION 60° SKEW 40.5' p 0.23% US & DS EXTENSION 810 100yr WSEL = 797.5' PROPOSE ROADWAY f 2:1 i F ER 50yr WSEL = 796 3' `, _ SIC ENSIGN 800 WSEL 788' +/- I• / �� NG LT ►. -'•-- - w I ------L---- 1\ NG RT FILL WITH NATI E _ -- ��� -t I1 / BED MATERI ' L = �, / m 790 1 I 1� � i. -.-.-• 1 .. BED: CLASS II RIPRAP I WITHOUT GEOTEXTILE - - - ` = FJ( �`OPt - 0.2 % 1 I (DEPTH-2') N - - I"' Illf \ , EXISTING STREAM BED / - 780 c M 79 PR. UPSTREAM EL: 787.2 PR. DS INVERT = 786.5' VE-RT = 787.1' EX. DS INVERT = 786.6' PROPOSED FILL RETAIN E S E INLET DETAIL EX. CULVERT EX. UPSTREAM NVERT = 787.0' ROA DIY CROS$ SEcTI-QNI /CULV-I RT OZQFlLE Y a 9 a 4N 0, O oT m O)1 a V/F cC moo= N 2 5/ ��� i / mX ,V I IN c m ® mI� ® g ttp LANE I "� I PROTECT REFERENCE NO. SHEET NO. 1-38/9SH 20 2 3q• a ry O m ® '" S 8423'S7•E o o RAY SHEET NO. /697 E a Ivm' o. • roxoo 'a® DI p-0 • 15.54' u ROADWAY DESIGN HYDRAULICS 24'VCp'a N OB•22'13'E�' <D• 7,' O $ •_ 5 77.66' "<wERS4M},I of Im y IS.RCP b A a ® o y / o ENGINEER ENGINEER F \ 6BT0.3i• E4gMENJ F - m Q m ,,o N 04'12'59'E M> a ) 1 \6,$K' II®W m I 59.00' I r 1 d0'PR VATE ROAD R/w ® _ ' ' F / ra' J 2a T. , 3 ' � r Ilv t 9 m (�n x, -!Q d ,B' w �� Noq_iz orE a'RCP DI/ 1�! I:: N GRID NA 8395 ��-sue/ \ rz Pv + w a I p S 7 o5.50'E I . r x "v f IS'C&G ss I a 8•VCP -t,`. t s u!w ,- C \. g �_ y Ili 9 pr^ Z - N 12.5204'13'00'E o VALIANT OR 22'BST m o® h m /gym r „"C nR IS'C&G- �s2.52J �I o rs^ r ,r+�at�a„ F_ �� m - Qc, &0\ �� �..i ca ' c. .f -72'PVC - o 1\ ' SITE #24 . TcP --LJ 9 . P'IVAiE o z�I�`nzSFAPT L- ,A / ' ,,, �. m . /B RCPI� Qp N 047'00' 'Vp �cQ /�; S. o +;.:Y S1, 4Y�v, e / '4' a °' _�/�� (8', '^ ® 6a /m2PV MR. AXEI�• es o \ 1 m /� r •b os. IN / gII \ ;•o f.,,'../76 059g. '%', & . ��eaa4.•Q s. ✓>, �r or ;+o 4, a l P I� ^ Y'`� \ I 14z6�• $• ` v>y,, +2e 23 e TODD ELLIS BUILDERS, INC. a/;,�;o,�®Q aFc • 7•Pvc \ 0 \t.: -. `��F�g1t �oi r �� ss CgC taJy Cp n\u''1•��S- `'.�, � w o w am• op - DOCUMEMCOMMONS - Ebq2 71r . ,1 �,wO � c Bsr `r ,yti y =c, �, ---O HOMEOWNERS � aT a�j�yrr I:* �``..; ." h • a•® oo/ 'i,6 NC ''' J -9 mjc---=R``--& OO ?z<sbl4 �, NC 2�,Cr ,,,4-VOL 0 E4°'48'CONC +a,9s• 2,.' gr4.9. yo I1•v 72'PVC� X - / BEGIN NOISE •'F - el S •2 a i ta' 62, o o•• a qB.W0 X, ..k OO Irl ER I WALL W/SFB +00 '�" q `1 �9.3 i o �. .'- N 12.55 �j o Q„i o 1 _ RAIL. -r - AIL �� 1 os I �•,0 BS I �I i \ \ m A.1Z 1•aAy20 CpO OO Z3 g G ., 0O.a2•. 2m©, S 'w ` 4a EJ� •Y.©02 • ry Q tea-__J v� PVC \ A \ tlLyw� I9a 4 p•P, 15•C&G {/ X x 48'WOXfi .I m ® ;4 C �r C 1$P4 79 ��`, Rr 4��. '�i. 4. 27. 2413' 64 ��.� •...o RETAIN Y,C cR. ,'`3.p^-..•�.:.. VP. \- .. . r END NOISE WALL _ '.� 79 r p7 O /9 $4 a\s *c. C •. 0,m O3' ; O - a' ;'..to,,, •_,�} 22•NE ��••,_o Li N 0492'49'E \_S :493'00•W U \ 9 .. N LW Y-STA.92+30.55 /� at..r_ a\.>< _ .. 3, O 28.3 0 tr; 4: 64 29.25'� ,1 C V In 59.00' p 9 O R ?9• 0" oa `0^1J T2•P OD 27,95' •1, �- 48'CONC 104 00' D 95.5'LT -.Mr" �!^SEED .�.30. •V� •~f �„ E4 ACp ,p• 0 72`PyC VC co } _ I• TO P OTECTION • X X X-X- I,/ L I RIP RA. 2`,�$'9 Z9 '�• �• 27,0 �4.13' 2SFAPT c 1 _ •F' ''EN /R� r'* EXSTNG R/w - 2SBARN OD. 70•WD •! 3:�9 '•� rg• 7 O 0,,'";.' .� H •1n 1=• C.� �'�j. } } WIT LLA55 8 RIP' P END NOISE �- . TON$18 '� a CO B B• NCRETE'V'DI ���n 24.64' 1 '� .►"-- SEE DE IL 31 I +3 -7.50' CON.•ETE D.. 7 ��• ♦'VE' dT,V " � 'ONC NC� d5T•�w0041,5 - O / ` 4 5, `_ ! HIND NOISE WAL 22p _[�,_. l J rOq 00'1-r 15"RCP-III 'EE . RETA MN/ W•L N 11• ?C C �� NC 112.•• LT ISTNG R/ - < E;1'►`M�F,� E DET -�1�L/ bC S 12 '05• I • \F J \ 'CH°i+1 ...a _ !l�•kPY- ��W�.1 � ,T S d493'.0'W J -5 ,i IPBR W .. .. .. .. .. .. 2GI-.4 I\ L Lu T! F o "`\`HW X-7- - fi/ v� �_I L ��I' �� r . r rm I ( / 2GI 24"RCP III W GI rrr nr r r r Iiil 2GI C C C -R S 6' - �.- - _ -_� m N 1R w•1" .f 4�� JB !r rZ n^ 11_• -_-il SFB W/NOISE WALL < �- r W SFB W/NOISE WALL. 1 2 "r `"''C^'• 15"RCP-IV I ,`l '-'" - ---185 P-= .. 'ET.WALL W/SFB 24"RCP IV'4 d 2GI-A LU r -._--_ .. _ "..-...--..• •t` .r- O _ .__- .a..�r� - n.:.i. a.t.J y -_ - _ - \ _ n �, �t -_- - -• Ill- � 1I I _ 19'CON H'•- -•- 9 •- -�na r� N REMOVE HW U „r T ow,. O/' +50 �R 6K •EMOVE HW Ir � � _, _ .. T_T- S_ � _T_T_ -S -r-T- � � �� r--, --- r uy 24"RCP-IV o - _ LLI I 2GI REMOVE 2GI V 4-y05+00" Mil LLI -_ SEE SHEET 20A _ -- -- -- --� - - ,..,y 00__ REMOVE 2GI F� ry (� 0 O n -' Al L .., .._. E - J •- - - T MTL -+?i w6F'-Hli TI r -r T-i- >- i r T y-p �I r T -'$"1��6 Ti ff ''� II A1TI MTL i T MTL /-J�- T.L }_�_ 3EMOVi2Gl r4'PAVEDr r- C.pgED.B i gr;tr -r .60 f 4 VED -ram MTh _r r L iMT� _i r T MTL . z J- 1 r 2GI,- _,- �- I 0 o _i 2GI iMiaMk -- --_-- 41---- -- REMOVE DID~ �� �� o., N a 0 m ~ P, ? I-77 NB 375'B5T ` PLOWABLE FILL s I nIN sate .F.- i. BEGIN G.R.W/ BEGIN SFB -H _ �.{\ 1IM1 • _G ..9E46RE€N--- --- ..' - +50 11 N �5"RCP-III -r -r i T �y. . 1 ! '" -_, _ e, �� 15"RCP-IV + /I 1B wiMH r- L-� l �Y_• . YY' •I••�� 2GI SSG(-A/FUJ AR ". ' 4'48 a: ry MTL� r -� -t V ' MTL/ I .Ty J. J. iA JBivdIA ND SBG +01 1 1 l� N X- ,, _- - _ _ - _ O �. • ..., . will � ^ 15"RCP-IV REMOVE + U X�� '-�-Ocaa'ra��� •yam w.:,' 0 Q - - 66.,"NW . 48'WW F 4.1 _ AS -- - - li � 7��� I�3� U - "- .�. _ -- t REMOVER 3y�•F - -_.. ..... la f -C�6 RT.RAP \ - •'•r' Ao_ o - \ �� - - - -- 1 F P"wP H F lelianaliF 2 SY70 N � REMOVE >rrrrr '\ ETAIIJ T CLASS II RIPAA.� PROP 7HL FE ---- I •••-• A ttu . /- I o 7'rT� r rr�'irrr DRY DETENTION BASIN //t:2'.15"RCP III 15"RCP III EASENENT " WOV 13,580 CF •-%�-H• _ /Cr LU IlY1` Ir' B IN E .. .. .. E E DB 351 PG 5d2 //� - IN F • y L PU �PU ,.,E � E �.....11w • •'•ASIN 783.0' � ., _.1L��. •. -.. ^/ .. t"-� -� P)+ / / 1 1 Q Z •F.:1i 50 YR WSEL 7818' I II STABILIZATION ITE #` v PIPE OUTLET STABILIZATION A >,�;G- \�/01000,„,„11., �' .5 �f- I- W44 7 SEE DETAIL 54 SEE DETAIL 64 65� 01.1 1' ?y. / I• BEGINI 5'SNJJ J �I ,/-' CL I RIP RAP CL I RIP RAP INTERSTATE DEVELOPMENT COMPANY co _r r o.. 32 TONS SEE SHEET 2OA / 26 TONS 30 SY DrEND2'PS I \\ N m rnui' 2"RCP-III a CL II RIP RAP m F.�'' \ GR`'!nn'yrrrr,' •� � 55 TONS �� C BEGIN 2'-6"C8G CL B RIP RAP V Ii ATI V \NIP." a N' 75 qv REMOVE //.�•v � �� +50 / 5 TONS 14 SY \ LU FOREBAY y SPECIAL CUT'V'DITCH . / $1,'C 14 ,✓ \�' �• _ - GAT"i 1 SEE DETAIL 41 / //" J DETENTION OU LT I ' EX5TNG!VW STRUCTURE // s WILLIAM R. AXLEY, ET.AL. I SEE DETAIL ON SHEET 2A-11 E / ,l c'°� • U Sf `I Y ` Sf Sf �`' / /4/I//I,, m /( , / / N 0- \ \ ST / N / L / / / /// DENOTES IMPACTS IN r INTERSTATE DEVELOPMENT COMPANY / /`` / SURFACE WATER ro I LI I• //// MPADENOTSSINE SURFACE WATER RARY o ..I / N Cr M yT/' • M PO \�1 EASECRAMENT ;.4 NM. I \ OB 2151PC$d. ry' ��I PERMIT DRAWING PIPE OUTLET STABILIZATION I v STABILIZATION ARIFRAPON : I 1 .. .. SHEET \^H E ET 7 OF 7 E SEE DETAIL 64 I J / ' -Y11- -Y-S- I P1 Sto /2+82.67 P1 Sto 18+66.65 P/Sto 21+3123 P/Sto 107+16.73 N o A = /6'28'00.0'(RT) A = 4/"46'38.6'fRT 1 A = 36'23'21.4'(RTI A = /'47'49.0'(LT) ' a_ D = 4'30'00. ' D = /9'45'00.0' D = II"30'00.0' D = 0'10'28.9' _o L = 365.93' L =211.53' L = 3/6.43' L = 1.028.69' I NT = 18423' T = 110.7/' T = /63.76' T = 5/4.39' R = 127324' R = 290J1' R = 49822' R = 32.800.00' -. ST gI - I SE = EXIST. SE = EXIST. SE = 06 SE = NC h N/I DS = EXIST. DS = EXIST. DS = 40 MPH DS = 60 MPH \sr• I ,v1 50 25 0 50 too N'a I4I / Iiiil�I o a2 'I.\ / I r^-..., GRAPHIC SCALE vd: v ? i / X sae i1 M♦ I Q � �w uu ' LANE "N PROJECT REFERENCE NO. SHEET No. '•� Aimslit �1 — y��(�� I I 1-38/98 20 i� t Aims .•.V of ^' � �' RM/ SHEET NO. taillr41' F ' A. -Pl, ari- �_ �`"' .. - , �- �` I� ROADWAY DESIGN HYDRAULICS _!. '' �_ _ y bi •..I ..� a �'_` -� - ENGINEER ENGINEER �, � m lid p =''"` ,®dam_ .) . ��. _: y� • I e� -41141L- IM ' # �ri 1 ti�i.� N• GRD NAD 8�5 j �1 �"+-� r -- Ali _ 7�'O S•50•f -Mv r •- v '.F_, -- 7�*'� �� N 0993'00' —� ,�iJir . SITE #24 -\111l1r - >-1�' oN - — ", , i2.5 IL\ i E,.3, /, �1.1 ffai00 1t41LIAM XLEI 11 ‘ (`y, Oir,%,....-1/46:3,,,,9.,, ze +�rs•CW 2y` *„s, }1;e 2�, e. T6•D EL.IS BUIL6ERS. INC. a a c°,�a• Q� �.'�.• I •�1 •7 Pvc kie. "^s` �• I �' -�� '1� FINAL ` 9r" � &p/ n ��/,,uyyy'.L�� ?2, -yP _ m / a• ®4 0�. _ - _ ' ' , BES UT COMMONS 49 �,/ ?• N., ,t,)>„ FO \ B,. \s �e y =� e� , r� a0 O .IRSASSOCIATIa � { u• zap ! aeyy` i oq 2 ry�! c" -i a• �o tie NC.y/�Qc , ■} ,.<_�_ _ ��//// i ?BOO � s 'A► Ia�1'�C �`(22 s ef� � '48'CO )Y 2y � q.,a"•� b� � X_- / =e.fir'4 _.00 Z 11,Gl NOISE O c '��/r y, `'�l+J :ark NC �o tO' 6p, o�' �'4. I7-7---59..-54-.,-. / ..a W/SFB 00 i....,:.r-44-,-----3:..„' ,. 2 3 �� 3. �' p N 12°55 ri © c, Q„1. BST 1 °RAIL ki, A A :i� �L�� II54�(•p0'(•pN9s OO2 t s� - a.•q 5���9a -";na EJ "..r o=c, . tip. It •�_�� �..�e,.LA \ AI .w. W ENDNOISE WALL! . ,1•J0 29�4P1 r��r1'� s'�De�� •�04.�227.03. 2913 24.64 f29.25'f aG -CRETAIN °a'IJi ' 'y!,' \- 3.+Y-STA92+3055 .' �/i� 3,r9 � 'S3. ,t�• a - N� N 4°I2'49'E �, �T N o° �A zy, � 0• e� 27.95' O 44 . ' TO. LIJ 95.5'LT �'1 v� x 1� ��9� f4 0 72'o 72 PV: ©m .. k m TO:PROTECTION1i '� '/nl7 pa �� / 19I �/J _ /� X x WD x I `.� �\ ,• ���: ....�\�� ZBO w'� 'V"�.4• N iry �4.13',12SFAPT c •.1>> �_.. , �� CR-.''Q 'i110';� WIT LASS 8 RIP .. i � �� _ � R N �•: w��. !',,/ g6. •..NC ETE'V'DI O ONC64 d5T•i.w00, ,- �'� co SEE DETAIL 31 �E. li INc ,L � ,jilik i�F� all "AR 1 lii a .i:71��1 i ` aJ i V \ L.r •i+'.HI m 'mil.- .., �f ANC F \ L i 1704 003_r�I Ij�'�/41 ,:• � _ NOISE �� o - • • .f nirrilim '!i r� - ..o+-1 •0i--- •&PLr► FSFjn rr� �----\ F f' � ttz T '', Ilk LLJ 441 AN __ 1.I �� - - � -i��i•vs"- r.z.--- 'TI _ ..�r� -_ --- (/' � � - , .._ 11 _ ������_ — —� — —— i _ '- I �I — 'I ,_. _ r� — — f/ — — — -- — --- ff 6 ' -_-- - F I EMOVE "' LL.I /r LLJ SEE SHEET 20A _ ...,�. -MOVE I I ,r I - - -- _ - Nf -- - V. cn c INN* . Tr" • ' - , , ili- vim_ pn - o - -� i - -tea - - - _ : p FLO ABLE F LL MOVE DI �� N - �r s BEGIN a R.W/ •a4 I.. ..BEGIN SFB -.-o._ .. �_ . . �.; tea•.. - Ali IM= —� , — ., 1 I N _ sue, Tom :.`yam•,-���;�� : _ ` " -- RCP-Iv O - - - -=--� - - - ..._.. ,��.. .•.�..w�.. .. �.�., �..�v.�.v�. �� •,a•'J�►��'�` '1��'9 �. p K av i' ,IIII REMOVE . =� 3_ 11 �� �".""� ° ate dr F Fa • MIL hfra ill' ill elljh ! +-ram�.r _�//� J- /" 1°/T -cli --•�� y icy 1 �r�_� �f!►, . �O _ HW� A te_ f � �Ll _ lagitigettlit L I��� � n�/�� f�� [ �� /�� ��� r�:[� ice. p /.i1/rr •' • " ' ION BAS- x •i ��_J .•. s•� ..IfInfalfLITILIUM4- .-,J' j� „�.�I 1•/':n- WQV=13:580CF �i vs.!'=•1:. _7 /� "it t; rLLr./I/+ B, IN = .� �lll�w � '% 0�4�Y.--i N .L1111 .A ••^1S ►1 /. � � .- _ ithik Ai < n• :ASIN 783.0' - - q. j� r-� - 4. ;e� �Z�i'�///� / �. i .. 1 Z i//:: •WSEL=781.8' 7' ��P • :ILI • `� , •I�. v� f�'q��/���1 °� � � �� i, •111 �J i�i ill �r�""' 2ONSILS �: - :0 �, ,, I 1 -�i • N LIRIPRAP 4 - •- -• 7 ill: • v erg' , .• 11611 I���*� ► '5 1TONS.P A l!%=� IC Q �� \' di F RE -- / ,\ )1:h, 1 Lxrsn DETENTION OUtLC / STRUCTURE �: ipriowc..... 10.,x.r.,,,, , ,,,r ,„.. .......-- 410N„,�� RCL - g1q] �� SEE DETAIL ON I i,�1 . 4, SHEET 2A-11 1 // StapliciAee 0 �� ©� V -cri 0 •• _ =�c laill°4361 . Sr j _ I L .RIP RAP Q llr , • co . A 4\ 44/ i.. \ N ;)4 eMnr ''. ' \\.\--...,._.......„.........IN / liirlitiorill' \ hrt G. / tir / DENOTES IMPACTS IN -� Dj!�//� SURFACE WATER rcr I' S DE I- OPM NT • P I\ D 1�eid �!11114 j DENOTES TEMPORARY N ✓:III //// IMPACTS IN SURFACE WATER 00 M PM4 III, . ENAG 00 e y1ill ;fie PERMIT DRAWING ' PIPE•UTLET STA:ILIZATIO 1110 � v y W/CLAS TRIP: ' JrHEET 38 OF 67 ./. 3 - - SEED iii _ _19 0if 1), a o ,. p . /: :.,65 = :mac 7�`-zT1 �'�� � l o e : o i,p•(: ♦ = 4l'' : (RTI A _ pa..I_3_•� , a .1�'��*a _ �/ \ = ' “ = 316.4 ' LA, 6 .* , N 8 1 : T - 6' ' - i7.24' .a - 498 ' r :.1c�e $T x m�3 7$ EXl T. V � /..ilw � %►��..�', - /' �4`Q' a I 50 25 0 50 100 o a2 -4� \.\/�' �� `\ `\ r1 I ' I I - ■1 1 GRAPHICSCALE LANE I `` I PROJECT NO SHEET NO. 1-38198 38/98 20A EW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE #25 INSET SITE #24 INSET � SEE DES ' "Pi/' ' . �,:II JB w/MH \(ci, ► 5jO359. C R P—I I --' - "L I RIP RA 9w �, C � 48 WW - - - - - A. 1 TONS 18 -Y :-;.�s, -=: �'� 2"CHL RETAII�R__--= -\: CLASS II RIP�Ar � Hw x F X is i" t 11 I N �� I HO E A2- I.', IIIM/M/MIIIIMIIIIIIIIUIUII ��,�i'"��; 111111/11111111�%j11IIIIIIIII%i �~ i%i%%I~��I�M ^ — — •I vie ', O v ���t�� JB w/MH . 15" RCP-III - 7 �� PIPE OUTLET CHANN SFB W/NOISE WAL � A STABILIZATION °=\�� _ SEE DETAIL 54 - - sU `*1`' '� I8' C0\C H � �" �` CL I RIP RAP hit—IW- Lam,.,,.1,�A ctit;_ _ 32 TONS RCP—III s�, *OP CL II RIP RAP L T Z T S T ���� TT 7. TEMPORARY IMPACTS IN 55 S RN)25 SURFACE WATER, \ _ -—mill.a N N L DETAIL 70 DETAIL 54 1........,. ,---, NA N D 5 PIPE INLET CHANNEL STABILIZATION PIPE OUTLET CHANNEL STABILIZATION ro (Not to Scale) Natural Bed (Not to Scale) Natural Bed NElevation Elevation Natural Natural /// DENOTES IMPACTS IN m Ground Naturalcr Ground Natural SURFACE WATER -o Ground Ground 1.z5 2 /�7/� � �/ DENOTES TEMPORARY �� Length= 22 Ft. IMPACTS IN SURFACE WATER i Channel Bed Channel Bed c (3 FT) (Variable) Length= 12 Ft. Type of Liner= CL II Rip-Rap - Keyed-In (Banks) PERMIT D RAW I N G Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) Type of Liner= CL I Rip-Rap - Countersunk (Bed) (No Geotextile) —Y_S— STA. 93+79 LT SHEET 39 OF 67 a i L i i 25 ■ r ■ ■12.5 0 25 50 3 0 GRAPHIC SCALE — INSETS oa N ti 5 — . 0 UL LANE I `` I PROJECT REFERENCE NO SHEET NO. 1-38/98 20A RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE #25 INSET SITE #24 INSET __ _� �0�� -- A �, ���, ��� '�� HW� ��f���, � ________--�----- - ----- N ) A , 7:.,,, , ----(--_, _,- ---)--F1 _-iNA%,, . I R s _ _ ,,� CLASS I I RI PLP �,�� o+- *rk 11 Imo. Y^(ip e � a, _ - - - - - - m u m.a.uuuromprsu���a��'r���tttruu�u���auuauau�u�aiac��:: — 11"74f nionramhcnaa 1►+I�Aitc is J w/MH ,�v. 9 � �It�� - ,A\�� 1 " ' CP I I PIPE UTLET CHANN `—� . — — — — — — — - -' STABILI SFB W/NOISE WAL 0 \tr, MN J/ ��\\ SU _ 6610 S DETAIL 5�' � ��=� , . .e1►�ri'��' "w' /\4 .,a.,r, L I RIP RAP MN. — .ti; • wit . . 2 TONS VMMIIIINIPIIIIIIIIIIIIIIIIIIIIIII........mm—_ _ _T_ __ _ RCP-III .ram• L II RIP RAP —��� Z TEMPORARY IMPACTS IN ,``r� S T N SURFACE WATER S r2 5 a N N Q DETAIL 70 DETAIL 54 I —F� NA N GRID 5 PIPE INLET CHANNEL STABILIZATION PIPE OUTLET CHANNEL STABILIZATION (Not to Scale) Natural Bed 1 (Not to Scale) Natural Bed NElevation Elevation Natural Natural /// DENOTES IMPACTS IN m Ground Natural Ground Natural SURFACE WATER -o Ground Ground 1.25 2 / / DENOTES TEMPORARY �� Length= 22 Ft. //" 7/ IMPACTS IN SURFACE WATER i Channel Bed Channel Bed (3 FT) (Variable) Length= 12 Ft. Type of Liner= CL II Rip-Rap - Keyed-In (Banks) PERMIT D RAW I N G Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) Type of Liner= CL I Rip-Rap - Countersunk (Bed) (No Geotextile) -Y_S- STA. 93+79 LT SHEET 40 OF 67 a i a Q i i 25 12.5 0 25 50 3 i GRAPHIC SCALE - INSETS c,o N L, r-.I 0 UL 3o .. ' PROJECT REFERENCE NO. SHEET NO. BST LANE I �� I ) 1-38/98 2/ 1 305_C6C. ....- PERMIT DRAWING ti ` j6�� *- YREV SHEET NO. Ilo till, "FOURTH CREEK OFFICE" \ ROADWAY DESIGN HYDRAULICS o\ ENGINEER ENGINEER �4�..,k oll� COMPANY CONDOMITIUALS SHEET 41 OF 67 �\,4. ��� DAVID KOGUT, E 11 �' ISBKBU$ CB 1 o yll \II Nv_, 'a C. L. WILSON BUILDING COMPANY %s\ _ r till \ RETAIN fl,'�d�,,„.„F RETAIN a� _ • _,1 -YIODRI- " \slc,.‘k,., o\s,o °� �� ��� 1 1 5rryof _~* Pl Sic 10+75.76 Pl Sto //+65.63 \ k, N. , ° '44 ; '� L. = 25'06'54.6"(RT1 p = 10'14'48.2"(LTl MENT NO CONSIDERED FINAL \ `'' '\C`To '44 1 .11E nl t D = 63'39'43.1" D = 57'17'44.8' ME ALL SIG ATURES COMPLETED \\ \` \\ RETAIN, ° � r .} L = 39.45' L = /7,88'�-i--NAD s3 PROP,CHL FENCE \ ' •�n �(,> r i°i\ 18 r Ar T = 20A5' T = 8.9T NC GRID V) o� q v \ �, y� STA � y�� h, = 90.00' R = IOOAO' -4 M P & F ASSOCIATES. L.L.P, \ °• Cu55` n,�P 30'C�0 \ Jo ll SE = NC SE = NC QUE N M,ti "" y C1 TAIL S \ C' `"+ 2'-61&G B57 RETAINoI m m• sr\ \\�V �� RETAIN rr III a QVE r m 03 1 \,, PROP CHL FE - �� O Z 40.95'RT \ Qc`\1\\ � 12==�0�aE♦ y1 ' 7B B E '�\ S 04'OS'46'W C �.: ‘,::::,,,,,, , a s b \ . ``A H .. .. �_�.. " 456.66' ey �/ I B QVE yy E.SEr6' V. -� Y[T�( TGi,sPrAke,,,, ._ y � '���1 RETAI.IV UE_-��3 .,PEA 09 24� a/ 1 IT �� .. W f+�i ae �,,,,:` -- a C - C C C DN " F 1 LO L _ _ a CONCRETE DITCH �� a•♦ �\ n C _ _ CPS �n- ___ +END SEGMENT B BEHIND RETAINING WALL -o e , ,�a a- - _ 1(jy ' am 4► 1 „• _ SEE DETAIL 75 C \'�� .I/� �� � - - .. e O O �1 BEGIN SEGMENT A 'k*A. �e•e. r, _ I70 -Y S- STA. 111+00 ; " �/l a a��-c CB n / END ESPY GUTTER �' WILLIAM R. AXLEY - �• \' KEMOVE ss N markm, (� BERM 'V'DITCH11.\ \t441: \ t C PP v +00 M..;5'LT 11106 - " E• T. PROP C rLi �E D t r���� REMOVE C N D -B DETAIL - _.-i+aeArt��y _ r 1 \CNLa7lV \\ .9•PCp a MD R. BALL V tx _'�� •, l , _ a1�. .. F _o .�`�1• . \�°`�\ '�, E%P' UTTEB� JB v/M .iW ..•AIT.WT C BERM 'V'DITCH - �Az . ��ss B'VCP ,-:-�'�' �� Z -" C SEE DETAIL 68 147.10'LT \\�i•ztn��7., ��` •. C RET.WALL W/$F: •e winiaill _ - ��... \ 85 00 i 15"RCP IV 15"RCP-III 2GI �`.\��� `� .e.. , "{I. T 'e- iiiiiiiiiippliniiiiipianAhhaildihiiiia I f Mr �. M � N�`_\1p • i - I >. N _o� ivmfaigsigijijijiWw.,:it,,,e\nEMEN . • • s -- - ^� o -PLANE TAPER �O W I Z W REMOVE-- -N 2GI ~� O ��4MTL .- -MT C NC.MED.BARArL }n� �O`e�- \`1�4C\- ..- - _ �.. U T I o \� , VG_ - j= H" NO I H. `\\�`\� ,, -END EXPY GUTTER a.�P•l _ IA N CONCR y���a il T� ^E _ XIIW-=�i- REMOVE ��SyLyT II�Is�i. = - __."Yr� /, • I w o/^rW.. SEE , -ZGT '11a. '---'2,rrw__wwl `' Mr.AX4...,�"��IIy _ -..JY„iD LU I Q "-^' � imw .. 4'..;iw-DM .e. i�1\ .:,31\ NL? -i `.aJ4T'' dew►-LJJ O 'w.r.7I_ N_� rima . ,._ ii. Miro�4,r7��'� �� B END SFB c 15"R P-IV'" 5^R P-IV �1�� � `i4n� CB SR 2322 SIM NTON RD MMEE htai a\ A/�I� `lN E%PYt,. LATERAL c i3G�� _ s . I� L _ //�7 ", .! �� -'r.� b'BASE DITCH - .^2•. �� _ C _ r e..."RCP-IV "�Z= � Ti" W� _n �� \ 6 v r*r �'�y�'I..m *sill.-4*.�*f rn �Ya+P.� r ,� _ _�' _ .�+ p - ^_' I i�w CL 1 RIP RAP ma1.F4�..,,.�. is, ,+�, tea. ``---- , ._ .0' 0 $ 7dr .... .' ..e�%.-. "'z R,. /� -i "�" 'i„i. ©R V.,. %. ` <.. 74r4 i `1 3 TONS 7 SY a_, ..�a�.i:4 • REMOVE DI F F F - ��_� - r - --� WI �t N a IV V, .Si !trA6AA%�� cam_ _ - 0 r • �^� H i { �' ,may;���,y'r� a� ••gP -l'A .. ����i�44.7d N 1r s ''. E 5_ _. �� 3 " \ O 10„, ` - __ �� 1.--FENCE-- 5'BASE DITCH _-I, m R7a' y 21 �,ra.� - j ONION ��\\ �,,.. r CLA 5 ® - •TAIL SB 4C TONS P10 Mai \ }. I CR COL + TYPE 0•' C -_� \ 4C'&‘ A \ QE:-E.A \n1 W COL _Im ^ rs ��� - c�\\ SUPERIOR PROPERTIES OF IREDELL a Z R+ WALL k,;f ,J,��Z ��..€(\ ` '� LIMITED PARTNERSHIP �6.�� o;�•:y.i•D\ `� B H ALLEN CYCE. JOHNSON AND ° J NC GRID NA S 320 LT EOP TAPER ��\��' �`\\��. IF•�' s,P " " " I AN UND LADED 5%LAN ER ES -O TAP h Gd`„ � T .d t`+ 9-2 U �tPUE� � \ ,� E2GI v " •; SITE #26 eo SULLIVAN ROAD PARTNERS, LLC \\ ♦,\ .� 3696_n0_ '�►t.'.� � '�� v F+� " SEE SHEET 21A 07 / M TRACT 4 2500'RT R`v,e 8 N I F DENOTES FILL IN \ �\ 9, M /// WETLAND REMOVE\ c�.,�\ . �1* WBA YRPDB- -YRPAC- -Y_S- 'Oa �N * K • PI Sto 14+24A3 PI Sto 84+65.54 PI Sto 107+16.73 PI Sto 1/7+68,63 \\ \`\\.0 PROP: L DENOTES MECHANIZED A = 2'30'02.3'(RT) A = 8'41'335*(RT 1 p = r 47'49.0"(LT 1 A = 5'21'11.0'(RT l y� ^ ��\ FENCE CLEARING D = 0'38'11.8' D = r 00'18.7' D = 0'10'28.9" D = 0'29'53.6' \ .� \\ .' 7 L = 392.80' L = 864.78' L = 1.028.69' L = 1A74.43' ���\\. Avv I .13 T = /96.43' T = 43322' T = 514.39' T = 537.61' t 50 25 0 50 100 R = 9.000.00' R = 5,700.00' R = 32.800.00' R = I1500.00' CB° • \\\� . �\ y nil 1 SE = NC SE = RC SE = NC SE = NC IMPACT CONTINUES DS = 50 MPH DS = 50 MPH DS = 60 MPH DS = 60 MPH REMOVE MH I,- \ -Yll- -710- A \,\ �� " ON SHEET 22 a PI Sto 27+55.78 PI Sto 32+9227 PI Sto 23+34.74 PI Sto 31+03.88 ��� _o A = /0'00'00.0"(RT 1 A = 27'02'545°(LT) A = 4'2/'03.6"(LT 1 A = 4'44'04.7°(LT) �s,\�. N D = 4'30'00.0" D = 38'II'49.9° D = r 03'32.7' D = r 03'32.7' F 0 L = 22222' L = 70.8/' L = 4/0.83' L = 447.06' T = 1/1.39' T = 36.08' T = 205.52' T = 223.65' ,,' R = 127324' R = 150.00' R = 5,4/0.00' R = 5,4/0.00' SE = 05 SE = 03 SE = NC SE = NC oaa OS = 40 MPH DS = 30 MPH DS = 40 MPH DS = 40 MPH 00L r t )• •*..---00,. ,41 .. imilitta N., - '-dlkwijllillCmpmmm :._-44hihitiii..._ °'::' ,v, '.,, b<Xigesi -dp....,Pli.iimasuu....- .=-1 Ilt, . P E Illar a ) e 0 111. z 0 r:-. 0: 1._ticli_L AN E NN PROJECT N I ) REFERENCE NO 1-.38198 21 SHEET NO EST , ,:i RN SHEET NO ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PERMIT DRAWING (.4 ,11 -, • t3i\\\911f \c.\41iTiff( SHEET 42 OF 67 INk,„ \ rov 1 _N G. L. WIL :INBUILDI.,‘,..C:Ploilltri . ‘.‘\, .,..„, i4opp.ARNGiv„:01,0:Kol.,,,.+FicAm:,,,:,smaus RET N , , 1 10, .- .- :'11:-* • • . 1(11 i it f iii FAD/S:t0s:15:4743%.74. I. I 11/7114; .8.GRID ) 1 , EWE.1 CONSIDERED FINAL 4 Ri in- AP + ,r'i t = 39 ' PRO CHL FENCE iiiiiii,n T = 0.05 . * k r 411ii i fill SE = N• it AI P • SSOC A L.L.P CLASS • 1 '---44.0014 ill . A01111' i ,./ilai RI co 1 4\ \X',2, TR:TAciNg' aST P lit ' 90 I 6 41w%rni _ 111011% )1\kolVOtA\-di..10--- Arrao -vdv"Kilt li i 41114111144040.„._ . •• -"411Wimel#..'::*44144,it‘ 84i\Lkoi.\*40Ati .".iiltifliP-7114C,,_111*-Attt*.J4/414t%' '‘'.%-<-'1; '''.-j*-1.,1h:01:46**11 Ar,lkil t 44 wl 9 9. ...L ye& a ' -._-_, _or '. ••- 1"-... ...11/46"1. . 441•4411IL tiPikaNNWIlpr*W-iiimil7A:L..7-1-1,151Te!ii;:bilaillaill INN . ....,i> ' '''. It 4L i L ' ir- rn -4 ° iiiiii......„._ MOMEMPAmmoltig -__ ,, 11104 I .:1111( Alli i I i 0 111111111111464. IN BEGIN SEGMENT A 7--,IN.D.:4R'LE: ' :- illata.:14°'*. A tt‘te4:4;7 Nrirlifte45111 -7.44,W413491111Valr•-........ "Milir"--.2111.4111r.'-- 11 ............ . ----•.--A6._ ,....---° --'a' ...............aligo.114P-Iik jojwIn It .__... .x,...1 N) ..,0 -Y_S- STA. 111+00 ii _1:-..........,,,,, . '',.h iNTIY: '`4%`V401. \C•\ i,t f .0.--'44-. ......o .*** ••''''-.:.."1-.-1.:44:~..r.g.',,, ,,,..... ..l.-__I__,__ , _....--"- -....."". ...------0=-1 tsa 7%.• N %ob.. i)-44•44,, \ ,.,-•%. • mk, ,,-.-• .•••••••-• 4,..!..--•eralr.s. - - - _______,--__ - -_„,-.--------,.4„.._iniy-,0„,_di Allow- ,. _,,,Imr-- .7,1. -,-flw,--,.-, ______„_-_ ,A10,,,,tyst., •..„4.,,s,v,.. ,, 4214, 4i;34:__,,,,,,,,,,,,,,,,:. .,,,,,,,,:, ...... , ‘,..3......,.._....„ ------ ---------- -.....,.....,„-- • --0-41,iim.a.db, ____i-,-:_,--,..."42,-,,v.... . --,. __, ,-.4,u_....iivelei,,xikkator-20, -:,-,- -0-r-,..., -.-f•:------ -,---- -- -__ _- ____________ - - ,__ _ -_-_,stri 1 0 ii,,,...,„b_40,...k...iii--4111614.---.„,uo.„_::- -.7-.7,--,-7r".."------ --_ , imiamknoken -lim............,.10,00,-_ ADM w#,A, -4* ‘itsw•hz,,,.. . ...____,,---- ,,...„,...•-•„ffoi.. .....,„..>;...... _______--- _____. , _________ ___z_._____ ....„.„ ,........4.11_ ,..... .4••• =.-.-or,o7.1-11 4S1....,_ _.......... 11116...... - ----7".---.-- ----.......-............ I. 11.-... .................. ...._. ....,..,._...„.... -,..,,, -' ftk.lir ---.... .___.„----2.....2............ c,s1 I -'-'--'----,- vt,wwor....lllll imlIMICIRro _-r=a-alv . liek,,,-_„.,.., NIL_ 11L11CN-- --------- -Wskb,„' _.........,--_- ....... .------ - - -....._____--.....-..........._,... _...-7-p----- ______Ammommoll ---z..1. .„==- _..--,-______ , v---_----_•_..z-,- -.7-_ __,___,_ .....2,. iiim,..ii.,--44........_ ,, .. ._...w......„,. Lit rmr,„ ........._..in____ =___.;_ 1 ›...1 0 111 1 =7.-=---- - ---------g- - --i'm--....e21:\.-- -8irtift mm---- ---- --Imilmtakw. manwlmitiTilffialiiffilliir-ime-r-inucm----EtiLliz z _ or ____ ____ -- ----N1 6---- ..1 Mr-_,A..isrsi vw-ti.J1 REM°VE Applipiwiffirrinormarm_tworsAmm-Aumurla_ rAt. LLI 4 1 .s_cs A_ AME „.., -t ...4„,„...._„,--m.,..,,,,.\---_ , , -,--- .. -- ---... . Aw....._-.......„..._ , Lu _ .141YZEit, -- -I CD _ 11-V,,r__j- OMP.._taziaLr. __4MV, _.... ...o. --.41E,....___....._-/ : 77.. ;I-- I CD LLI ..--_-.. .... .2,,m.-f.,--•-•, _ .,._.:_....__ ___!,. .,- -,-1. --- .. ,... .,, .1 ...wia,.,.wai441 Lu 0 + v) __=1._ --___ _- _--..--=---... . MAMIMMMIRtigaMEMOINNUNEMINENII/INEIRMINIMWAP SEEM -1EINFIWIlW&IMML-VWW&Tik‘M/AMIM \ ImMINMIIIIIIIIIIIIIIIIIII N ilm mlL.-- (/) W • ----mqVINENN -----‘100nmk).-- "rm'i m mimmimimkxarax7f.,..7tff , tsmiwzorimusAuguerm mssAmvai-tamormrs -_,. .----.-F3 am..wi4. r-- I NMI ., CONCRET i,.....- - .'171 MINIM WAIWAIWAIW-- 10-07,:e.-.!--k°,-, ..---- -......-. .,-. ..... ..,- ---'1 ,......__ ______.,:...-"L' ___ _.,•___, ,...iv_lit 1 _...: MEM _ - --- 1111 u i I ...... 41.111111111.11.11/ _____-....- .....--- ,=_.-,. ......-..4..- --11 .-.--------z----•---- ----------------. _,..-------,__ ...-- . v) 1-4- _ - „......,„iii ,ww..m...w„.. .... oo - _gm----w----Mmix_.. .......„4 -—-•--47-r..-4--- - i'gremiw--------- - --_-_,-- --- ---,--_, ---_,----- iz.., + 1-- ---71ffiirThitIMMaltilEWIEMIMIIMMEMPA____ _74,!_., ''' _0110---2*---________Kiia , fab----- z.--ria;....Th-..m ....,----__,„ N'''INOti".15 ,1)17,, iNNIII \\,c17\1\710 WV"/ •".4.-COr '''.-64M. '..' RIPIW i ',' 1' *141 (::$ Wink__.- ---anik."11.1k,,,,VW ' _m.. .....141°Mmill*Wilinnill -7-'74-- ---7. .Thda.' '.. - ••• ASA 011,211M.11111.1..."-- -'- '.F.1-.--C. 1 tUV'IV IlLAWA*,IP' 4 '%4r,.c, ,F.4 • r-- -..-4,,, r-L --- --''''' illWrie.,:,,,LA,,,,,c„...-,-c r, .";-;: 7:, S 7 SY _ .. 4, .. ,,. \ \ • , ,, v 4i,,,,tacti Afrie.404.A' 4 •" ,-. ' ' Irtg6"41P'". 4.. ,S, R OVE DI F ,,., 2,4*,:t \\ \\\,,‘‘,‘ ,• Aimi, j V) co IC;COL NW I RIIIVtlOLL , \4%. , \s ,, , An rilliii ' \INV, \. \ `.15.a". ‘ \ •All SUPERIOR -•OPERTIES oF iREDEer •#4 \''..\\ '` •r4 LIMIT', PARTNER IP , ALLEN . JOHNSON ND JOY - JOHNS',q M NC GRID NAD 83/9b 0 320'Er Pop APO ----C '-'0 ..%Z.kt; 4•\ 4\41V ,\ , o t AN UNDI D 0 5%INT RES °- -'• V''''. N do vs* \-\ ' . ., 2 U IIPPP. *A•''\•, ‘' * ' ' \‘ \\\1, \ SEE SHEET 21A .AN -'AD P -TNERS. eo TR T 4 N I DENOTES FILL IN :Em04 :\\,:\::yr: E:,t.,\: : \ ..T j,\\‘‘.), •L...: REnno\l' Mk,\\\V\''4'..V• ,,1%1 " \\ -....N- WE3)4, _, e, / WETLAND '\ !,, \ %-•• Arr e, _...... YRPDB- -YRPAC- \ \\S4, 4,4 y\ .., * * * * DENOTES MECHANIZED PI St° 14. 4.0.3 PI Ste 84+65.54 PI Sto 107+16.7.3 --- ,PL.Stv7#68.63 „ ) p = •21'11.0'(RT) \‘VsS4 ‘ T 514.39' T - 3 ' 'V\''‘k!•N c,7,03 5250 50 0 Ni • '• 0 --24--- MPACT CONTINUES REMOVE M`''A ltr'"•, V, N. N.,_ Z nil I I 11111ft.-- .0111111 N 50 ' i • , - -------=---- VS =-1 5 0-MPH DS = 60 4)8Allr, „1,4,7 ON SHEET 22 . . V., • 27 Sto +34.74 PI Sto 31+03.88 ' ,6,' ' ' i' • '(LT I I: 4' .3.6"1 LT I A =\4'44'04.7'I T) .400")\1 .. \.4. _. a -- D = 4'30'00• . : - D r 3'32? L = 40D6' a) R = 5,410••., SE = 05 0 E = *N E = NC `i, DS = '• PH • • N = N. / = 40 M-H r-.I • . . 0 b_C LANE ``s I ) PROJECT REFERENCE B NO. SHEET NO. 1 2IA RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 5 R PiV _ ' G w/G.R. � , t , . ,--____,________ . agor- __1______- __X- . iirrA- LATERAL _ _ � —�•' Jil A,1-,t7 i-li•l.r DITCH X �� .rrr 42e 1. m . 2GIAii1"lw �` CL pi I PrA 41 Ali"FrA i 14!j4(9° .4 m.,I , � p — — --z-=--------+== — ________ — .i51‘111110A MIrAl"IrlfrAllairir . N,B— * * *, *- moreAmaarAm•KW..ammr-Amma ,..„,,,,,, I \ivawassigerw* 44 , 44fr, ':(6M06. ITT-� . llkismaiim Whrri.4141.:: --i--''''."!111. 91rrir.W .-/IIIIIIIIIIIIIMIlla a 111r""mill■Weve„ 411 --..2.,...,Nr-b. - CL1RIP ' �I ' , o" CL �A - WI LAT L 4 TONS 10 ,JAWS 5 Y 5' : w` E DITCH .,;',� SEE % ETAIL 58 A 2 s SITE #26 N GRID NA-1 8 5 M DETAIL 57 DETAIL 58 /// /� DENOTES FILL IN LATERAL BASE DITCH LATERAL BASE DITCH WETLAND ro (Not to Scale) (Not to Scale) N" b b '{ * * * * DENOTES MECHANIZED Natural ram- Natural I -.- **** ** * CLEARING Ground 2•� 1'Ft. Slope Fill Ground rJ 1 1'Ft. Fill D/ D Slope L B Min. D= 1.0 Ft. B Min. D= 1.5 Ft. PERMIT DRAWING 0, B= 5.0 Ft. �� B= 5.0 Ft. b= 5.0 Ft. b= 5.0 Ft. SHEET 43 OF 67 -Y_S- FROM STA. 117+00 TO STA. 118+50 -Y S- FROM STA. 118+50 TO STA. 120+80 m" 25 12.5 0 25 e �3LU. OO- `ia GRAPHIC SCALE ,Ooc LANE ``S 1 I PROJECT REFERENCE NO. SHEET NO. /-38/9B 2/A RAW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IPRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -__________—.............. r _ -ir- - . i '4 --1 01 __....rint -----/Wi_ Mar Ow_4.4 ti • erg/ __am__ ___:____ _______—,-.... ._ -------- 1111091,-v.70.1/1/terj p.."..."14/./Al& am, ________ __ 8k—aur"7 ,...,...,, -Iiroftiv,--1.-j inn - -401V1 I a: 1.-- 1 Fll PA I 4Wili 0-1 -, BA DITCH 411�� 1 X ��� _�-�� X X „,. I W fin. -r;�. irp-__7___.. ►, - i ;►. 2G1 ���CL PA* xiirr � is U ► ♦ 1 :211 % ;�` �1 _• CL 1 RIP RAP � ��, � �����•1ap < 1►�►, ...rrir.r mpi-now,-.r.r. i 3 ONS 7 SY _ 7 ,��%�4ro....rurorrrr.r�n� � � \ ��n.rs�>rrrnr / irri A - - - _ __ _____„__.__+_-,- _ _._______ .ir-A•mx-7"‘ra_q:;-!--, / WIkr\ik 4 ?rt_ 0 r i II 141 rrai rrA I PI i 0 rA i•r,ilS,t‘i 4 i IP 1 kt a......_d 1 I•humin I I I 6.1 N I 1111M___ , 4.71,-.1,...41111111,_••NrAtarrANNIA '- "-/I_____ -.. L..,‘Iimik"4";""4""wmgrIA#F----E'ilik ---------- - 4------ILIII"'---------' -... ----;—........"..FA7'1'.— ---11.1.1111111W— -nu"— aligill ...A.i.,, K ,i 4# - - — ------------- """wroww".."AlWillalWkl= * \ ..s ' -,_-•-- r•oriarA. A......-A-.-i -AeiMPAMe_7,r , ___2_____________A- ,______ ----....w,!Armiwi---.....411ft ilow. NCE ----- -- ----M.....111111W1We WilliAt>. 4 1111m., - ”1111rWA Amok IftWAI N111471.- w W I ' - ` CL 1 RIP .� . A 4 TONS 10 TL Q� • 5` Y 5' : 7, EDITC all co .,\ ' � SEE ETAIL 5 .� N Np NAD 8�95 SITE #26 L M DETAIL 57 DETAIL 58 /�/ DENOTES FILL IN m LATERAL BASE DITCH LATERAL BASE DITCH / WETLAND `a"' (Not to Scale) (Not to Scale) 1 b iv( b * * * * DENOTES MECHANIZED N I I '1 **** ** * CLEARING �, Natural �— Natural �— N'm Ground ?.� j 1'Ft. Slope a Ground 2.� Dj 1'Ft. Fill o v ,�" p Slope L B� Bin. D.0 Ft.O Ft. B BMin. D 0 Ft. Ft. PERMIT D RAW I N G b= 5.0 Ft. b= 5.0 Ft. SHEET 44 OF 67 D -Y S- FROM STA. 117+00 TO STA. 118+50 -Y S- FROM STA. 118+50 TO STA. 120+80 � iniminiimimi5 25 12.5 0 25 mN DZ O ,'aa GRAPHIC SCALE ,,,,CC iOia o0 0 5 10 PROJ.REFERENCE NO. SHEET NO. N 11 1 1 1 1 1 1 1 H I-3819B XA-145 10 0 10 20 3C 4( 90 60 70 90 90 140 1'0 S0 — 1:0 140- "5I — 160 170 "80 — "90 200 2 0 220 230 240 250 260 270 280 200 1 = PERMIT DRAWING 1 = SHEET 45 OF 67 L in YRPDB - - - N 10+9-9.64 `� 808.11 N — R•,RD .R 0.02� O.U2 Q.922 9.022 ' o I - -.b.... ROO 7 790 v.- , 9_1S.S. 779.82 79n les 7 .:3 SITE #26 p9n •PbB WI 89n 0 1n 49.7B N. . 0,14 tNt 0; RI 0.32 0.02 0.022 Mp R'n MI 83'1,96 .. \ I ram_ _ , Rr \`� / ✓ Rnn ',..` 2 / \ ✓ 7 . 790 r 7rn 117 + J0.00 - - - - - - � `1i -Ss. 790.33� --- - - - - - - - - - - - - � 7Ro j 'l a 1 E a P.O �-890 `., r r 0.02 g 0.02 N CO / ++, a R —_ _ — �--�-= _ - _ 817 811.97 r �� -- r 0 79- RI X/ l� -r 800 C \ r 3 0 79n r - r 791 o ......- - S,Si8 21 116 + 50.00 -` - 3 -Y S- 1//J� ) li W�� \ / ' / %� 10 0 13 20 3C 40 6C 7C :0 • 100 110 110 130 140 WI 160 170 180 190 200 z 4 220 230 240 250 240 270 280 200 O U_0 SITE #8 r INSE ,�yie QG s91 "ff. a. 1Q O s QA T I )f: �\ 7 ,C'O.Q. 0� �1ATC >��FJ xrpy�i / q *� ��4 lit' i" HS E S STq 235 :7 /'PoCP' 1 `' �, \\ \\ " b��yHEFTN +00 y9 5�j/� '�0,e.0 LINE- S •P'<,c ! L ♦t� O. RTf1 p9rngTCH C5 :\#4.4‘4%:ss �`\\ i�at ewe"i 11� �.�/ /i\ ` UNLESS.«.,•...�••.•...•.•o 2G1 6+9000 YRPA vv �•,.� Ai��♦/ �n�1�N '� �AhSTA.6 O.10 ` ♦ `' M�;1 IA! '�i i�g / .. SEE SHEETN � , ♦�4� A. ►i,i' b°i:4 111 � ����• t / . 6.1 A i 10 ... * k .4444.../ LI. i"dif :. ..4 1111.11111X0.---"441111.- fl'-' / 11 !ii �fviiA�'�pZa j� p 1 / '.1 / IliII_ 11 l ,1/ I/ ., II/!Ilan_ yi� � r p 4 c' a ��• `t, •E9 ::\ IIII h :/ PI/��ll ll: �I l� .a '� fl° oo�o fl �� � SITE #5 1 N,,. ig•:',:xs.: ►"�F/ll� l� ����� � �� =�o o oaoo i 2G ^" ° �• . llllIII i Q SEE SHEETr22B ►�N�1���"l ���ol e i . // •© • ►�►► , ��� �O f �, eP 15 RCP-I �\ ' / .., / h �� \C9i31.F t ►• 4 1IC* I /e p ril gill,' �� p _ °�''" a , ` 1 t4, r ill I E ,�� / o :1. 1 +°'° l;J :\ ``Ill is r� 1 ii �fr�� / 0c>°O ep n. � � : SITE #4 INSET .::\• • '-� �1'., f' i fiti-• J,1 / -i.tir ° rot `«01 00 -*�; ry ••,\ �^ �y,��,r�� S r•,. .�� • � ed I .e,!'/,� / x.`— �' �i �,, _ Q d p -r - ���..',-� \� I ��•r!�� I•f' • y� / / _©0 +n3 is Sb Yl.lI30 Pr Sb 2ba,T.9! its sro 29.039s Pis.. sro 3D.9sw 1.q s,.it����t ,\ -I : \� °� .rid:.;rt�`-J 1.,,, " r l ' it ,• -- --�- • • y f/ ,/ ,• .a+ 0 ;E:9.....70.2,9few.38,x1 D2JfRT,Bs:l57552e.29•Yl nprM,gs•l57552'B.v.lSraR.rt ��� ���� I " ��a' �' .��'��� • ;®: is r r / ��� ©a 92rraLT- asaD• 5.5 soaLT.ulnars•w+ar___ d' Q Q •3926a ST K T �2477 rr•%nf ST•%DI 1K���gg.=�� �' �a • • •• • W I f 6,� l 1 �. / ��i��� a t o©�� sr.KW 2 sr•ieDr sr.cos -�,O . 41 ♦��� l ti n 0 $� as-so wPH as•w MP" �������� \ ''•: 'I 'V lv, • F lit I / g ®�'��� R o-�o- P,S0,11;63 Pr9oi�o2 PiSro +De �� lir I e a .`;�f,b,... C.•rr,g3esr8n e-ziza5zrrm, • ������0,� ' , \g r. • 5 / r �'/ 0 0 o e0:ossnu�rt - 1�������� I • ► /J' ►r IV��I o o D-z,r+ee D•774725E����1=-�\ j �`yr°;jA;t' t / �'.��Ile 0 or: 67 r-_2`7.97 r-5922r -- 0 0 0 t-58,6 t-MIT' t • 1.0115.....111.61 t dr10i.�"�• ' ��� / ./j 0 0 0 R _ a R-25om ���=�����li I 4 • • / e?�.J N // 0 :# ©0 Des•ro OW PH Ylr Ds• os•io wr_1+r ravc- ��� ���� ',•rtfI11 r•!i _ I►�� / "'�/ ' 0 Poe sr.33,N3&Po sb 351.860 Pis S,232.6232 P/ � 0 6b-f5f 35S e k. Bf-73F b9 e•B'29'138¢rrtir -zroar D•rsr355 - none DV � Lr-R1DD7 L /aB2 Ll-r333r c��I�' P • Sl-98117 T._Pz2e2 57-666r i"' f \ r^��i ,� _ w s• • ��;/�' I ►N.. ` DS DPri �� ` - Pis SI*rrM335 Pr 9a PIM7D8 YRAD P�V!' 1 �'►' `/�I/ e,-rsr%r e.�11I v ! r ►��� /'' Ls-PROD D•6.5rar •rAma D�f'I�p /JN♦ ,[ .i6�rRr, `r yam. e�Iq rAI �,i1. I�♦ �i ` ti-96D1' c. t�V !f• t i- 4' , ��4*1►4•1 Si IBOS i•.65r1' ST sgp3• i/y f F.• I� ! I 4•� J l�///3S'tr�i� I�� ! /►N� i/ 4 er,!I /♦♦ srF o a 9�1_ter , P�1� m"'"a° � I►i,►,,,+,f1 � Jig /111 F /; 1 ®g w.ao..n nuc r � INn� e Ilj" L /� �yr3: 7i SITE #8 GRAPHIC SCALE-INSETS [� h!I 4,11 � ' \'7�•M�' ��\c' SEE SHEET 22B 1► DENOTES FILL IN .�r. R 'T r4e ;' \ '4,\a,ee .o �� 7//i/ WETLAND a`4tu ),: �4a \8\ ` �' 4 t' a !/, I •I' DENOTES MECHANIZED s .....0) 6 6 >pt SITE #6 \.. \ ���I Otilk�1 lie.:: �d� •••'•••1 CLEARING 1I tv�q i �, ��� DENOTES HAND 9 IqA Ye1 ,__----i iII *Ii! 4? , � 'M1 % DENOTES IMPACTS IN • 7Vyh�1, as , �1 // SIs 4i1 ! . itliitANT .• 1/ h, \\ //� IMPACTS INSURFACE WATER / .�.a.rrf 1rat1lil� t. N^� �,���u� E. vOv IiiL„ ro, �.4/1, ti•i iak1.1; inn SITE #7 \ P. PERMIT DRAWING l`' `�'�''Ill" i' �'`' - SHEET 46 0 F 67 57 �IATCHLINE_i. --IN 1.1 1 ItAE�`t 8 — \\�\ \ 42'11 a.eo+ao.00 sTq Ma?�y��,.lw� GQ/.� ���,�\ A. SEE SHEET NO R21 SEE SNE+00 Ny ', ti;�44/7 5 \�\ \� \ or•�®ry9, N� �ru , " ET H0,?I \ roc-��� 4>,0:- � ^ -235 SEE briL., as 20 oll tM 96,De LT. PIZ —W- 111 511 ON A ONE, a mg IN wril Fog No OR RIM Aim jq W, IMF 1 IL NN IN— ak OTES wft OLET SR law: LE I D NO if i IN ITE WFT nil Ff, No SITE# 6 INSET TEMPORARY IMPACTS IN LANE I NN N I ) PROJEiT ���NBCE NO SHE E2A NO SURFACE WATER RES SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER ` INCOMPLETE PLANS ��v, / DO NOT USE FOR R/W ACQUISITION FOURTH CREEK - -Q., CLASS 2 RIP RAP 1, DETAIL 13 AT EMBANKMENT iir.S RIP RAP AT EMBANKMENT(Not to Scale) DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SEE DETAIL 13 M. �� �? 10'min.-- J\ •. Ditch —" All 1.0'min. l 2( • Grade 4 � III 'W\ / . ♦ GEOTEXTILE W 40!1 Type of Liner= Class 2 Rip—Rap i —Y S— STA. 121+45 —YRPAC— 27+86 RT SITE# 7 INSET FFOURTH CREEK • • S 88,W. .E S 9823 IC OPIII7 DETAIL 58 PERMIT DRAWING LATERAL BASE DITCH SHEET 48 OF 67 �' • ITCH (Not to Scale) . b J ° D • Natural I m �— m I. Ground 2•� ��j 1'Ft. Fill y" Slope �, \ �,� �r B Min. D= 1.5 Ft. - �•.��� B= 5.0 Ft. t o <, ��•�, tA ✓d � b= 5.0 Ft. co —Y S— FROM STA. 118+50 TO STA. 120+80 1�� >Ir LASS 2 RIP� T EMBANKMEN1co E DETAIL 13 z DENOTES IMPACTS IN ���� SURFACE WATER _. T DENOTES TEMPORARY TEMPORARY IMPACTS IN �// IMPACTS IN SURFACE WATER SURFACE WATER a i '; O 3 <,.m 50 25 0 25 50 `Irll� O 1 \/O 0 o � n GRAPHIC SCALE — INSETS SITE# 6 INSET TEMPORARY IMPACTS IN NO LANE I �� I ) PROJECT REFERENCE98NO SHEET A SURFACE WATER REV SHEET Na. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER ���� �� INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION ilimmiFOURTH CREEK ��� . \tom . ��� CLAS I�A � � DETAIL 13 I `git-‘17--k!ip... .- 4 RIP RAP AT EMBANKMENT DOCUMENT NOT CONSIDERED FINAL AT BA A 1 (NOf f0 Scale) UNLESS ALL SIGNATURES COMPLETED tk SEE DETAIL 1 ;!.�el if `"- Ditch — ������� V� � Grade 1.0'min. y • W� 411bM1 14117&1 ��-. GEOTEXTILE \( 1�:4 �` Type of Liner= Class 2 Rip-Rap -Y S- STA. 121+45 -YRPAC- 27+86 RT SITE# 7 INSET `FOURTH CREEK 6 �ii _;� 40--........._—..,1..,......e..... ..„ -A......,__ � PERMIT DRAWING pp, DETAIL 58 _„„Itlim���' ' ',� LATERAL BASE DITCH SHEET 49 OF 67 woo, ,' • ITC (Not to Scale) b �` 1 rNir D •• Natural _____ m � `\ /,= __ Ground 2 �/ 1'Ft. Sllo e `— .���4 B Min. D= 1.5 Ft. p }G. `i- �� ==-_ 4.f , B= 5.0 Ft. t a IMW4 _ Weld ;o a*'- we'd - b= 5.0 Ft. n1 � -Y S- FROM STA. 118+50 TO STA. 120+80 N 47SVANIf . �� Si.ottgi LASS ; RIPL ThltAiR Q �/� // „ N AT EMBANKMEN . EDETAILI3 Z • DENOTES IMPACTS IN v Aire/ ���O SURFACE WATER S lb-- ..' T /' DENOTES TEMPORARY TEMPORARY IMPACTS IN �// IMPACTS IN SURFACE WATER SURFACE WATER a i F O 0 0 N 50 25 0 25 50 `Irll� O 1' \/O 00N an GRAPHIC SCALE - INSETS INSET LANE I " s I ) PROJECT REFERENCE NO SHEET NO_ 1-38/98 22B RM/ SHEET NO. I ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SI T E #5 INCOMPLETE PLANS DO NOT USE FOR RI W ACQUISITION 4444444 Y WD I _ . — \ 4 16004�icti411491 'EDOCUMENT NOT CONSIDERED FINAL.t: - :if.r. ►� UNLESSALL SIGNATURES COMPLETED d ,.... : 'irpo,;, ,_ 41\, , .* „,,,\ fr ' �` I. TEMPORARY PIPE ,,,,,.: ,41 . d - - :- \ 7e. isAK,.. _, , 4 * - '..- ',I Or, pi/ .- - : -; of / "* - - .r . itiogoor4A - -- i , ior 4 " . - p, _ diott- A , .44e4 7 Atopitvlor , . l 044 otfr - -* - - ...10,. . ..4,„:,4,,,,. . . * : .: A / . - & . - ' * 'Itgrrgl AV / kwarAeolty,s; : .,-, poo, / . ' . : . ,e, & 4' .* -* At 3 .::::: .,,,,,,r,/,,,,,,,,,,,,,,, Ai. 40* * " - - '* * * liAt° del OO "�' L. • kilo . : : - E,44FA ' -% "* - At t i 0I 0I _ , SITE #5 * . - r AormorAr - - .* love.(4- -: . - . - .. ' - 4 1416-1411r4400 .* . -: . : —, ,,,,404,4,, . ,,,, : , = . : -44,i,r1$0000,1,049 . . . & , dr, , . . r .. _. 4 ,,, ., , , . . -AVr4r 11 4#744' i *. - : i 00' i'li. . ' - /0- A tl, A ,, .* - "ANcter Ilk E : 'A .., 4,1404 ' ' 'WP.4 ° 4,0% * 100,1 P' 1 t 0 0,r, -`i °,' *::* % 14 pip - il , 040.01,11 , . it _. ,F . . . , , i00,0074,00,0 . C , r' A : & .* ed-0 roy- - . . .. 1$0,00, , At . ' . : ,- , lim 1 AO , to ' N.* , 4-0, Aol A 101;, i ig , . ,,,, 0,0„, . ly 4,,d LI , , -14 l, 'X'''' .17.-C-1 : r ' Livorooloav , ,, WD I A AtiiiiW 0'' A ° S * Ie4y"r.0 i1 :At,1i4Z.144 ,7 R' W DENOTES IN Cl10= 7.3 cfs / IMPACTS IN SURFACE WATER ; i �4l V10= 8.1 fps I�//y DENOTES FILL IN ilF0) , 04 r WETLAND AI I6 ... * • DENOTES MECHANIZED ��* �. A ..�` [ ( * * *** CLEARING o DENOTES HAND CLEARING EL, ,7 PERMIT DRAWING ,,a SHEET 50 OF 67 25 12.511 0� 50 100 `JI GRAPHIC SCALE — INSETS INSET LANE I "s I PROJEIT R38/98E NO SHEET2B R/W SHEET NO. I ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SITE #5 INCOMPLETE PLANS DO NOT USE FOR Rd W ACQUISITION 410 111 * lli �I �`1,,� EIS •I UNLESS ALL S GNATURES COMPLETED 1:in:iiikli *11 NI:„ _ op • �� . * � < ,,�; . .�,�, � •,�•,� •►`� c��� I • d© TEMPORARY PIPE iir,44,40,44,,,,.„ , . fr 440 , silio ‘,,__.__ hirinr4io.1o41r0. 'i�6►,'- °! .'. Wig +si.jt 0 V' ,001' % ' -..-ipt4,i.':.,. .AII wily 4,4,ftwl.41 r Pto ift. r'Aer *47 AI * lip vor .eovititst,:hz,v4oaht . .-00. 407 _i ‘ P .,.•40 -74)01 eirell;" V th,iam. za 4. ..4 ANtfrelltegttiritteW 41111L171 11,ARgtAigi!felr , °WelreA401141"Weir ifitt. , Air * * * * . '400A0414 IliVrerr kt,,ite. „. Alp,. ,, ,t_ vim( . ;j,* i. "61*11.4*1*4 1.1*1*1:a:.i*i*' ar..pl,,,r,A,,.4_0.' ri1r,0dy0r,o iA 4O 0 0oP.aA00r4,RPFb Ar0eOAgi,iei0 h,rr 40,,.--,-„04,-,..t. .ti...!.. L)*4ltovSkAt 4oPtgii rap1Ie,rtill"404tr1 i,rir-,A 1 �' ! SITE #5 , 'Grier Ot**4.001, * ..ir Avike-9401. Aor,0,1 0, _, . 4r - tee4P40#0,04 ., . wt, . 1 , .0007414", LO CO 19 '; it ' AA".44114NP41a\ 1,1,414 , • e- -.4, . 11, 1 VA, * pli .Aiv,404mor Yr l'ip "Will 1 >-: * :* .r.,._... 4„,„ . * t "J04 Awi „„,, Al,„.vo, m4r,41 , - AI "0111401' ' r'ir.' z N,,,,,,,_ ,.„, , 0, ,, ,it) ik..itorokorior Kr a 1" ' ': 4 .1,441 - 440 * *ide' -44,101100, - ,,--1. _, ,f-, ,,,, 0_, bajwitorirtdr . . * , ,1,4,4401t. rgswip, -F1 c.„ -1 - ,0- #1inyozi,00 ,-4, „ . -, - -' 40017".70-0, 0 N.. . e: -figiprorp;044/704 Ex, CV /JO 01 0' ,,,,,e. 40 , 1,4, .0,,,,, , , , N 41,: ,,,00 A0,01,,,ir ,, AAllirditid, D ,. .* A ,,, "tr‘cie-4114t# A _. 0, 0 -�0, if ,�� .� 747, 4 �.w c kr. or or i 4 .411 tv 411/ E. Al �E�` �► �" 7,74 r7 .. I 4 di il'l DENOTES TEMPORARY �// z IMPACTS IN SURFACE WATER Q10= 7.3 cfs INN Vl 8.1 fps DENOTES FILL IN \ �j// WETLAND m �- --�''`akt, 1,0010;144 Ar 10- to , � �� " W ^r �, r A ' " • DENOTES MECHANIZED m ....... .. . CLEARING �/ DENOTES/ CLEARINGHAND a) y� PERMIT DRAWING DN oT SHEET 51 OF 67 `zsI,z.sIII _ o so ,00 GRAPHIC SCALE — INSETS a 0 5 10 PROJ.REFERENCE NO. SHEET NO. 1 1 1 1 1 1 1 1 1 1 1 I—3819 XA-137 N \p 1 20 20 2o0 2 e4J e30 220 2'10 200 190 1:0 170 160 150 40 ":0 — 1:0 '•0 100 — 90 00 70 6C. 50 4C 30 2C• 10 0 10 _ = IIIn PERMIT DRAWING - _ SHEET 52 OF 67 = = = YRPC r — 28:+6:3:98. 1. 8017 cn /y4:8 3 0.04:::: :::: 0:04 0.C2 0.02 ■■■— - "+ - - - - - - 71- --- ■■■]— ..rg y , ■■ S S. 788.R"I - - � - = 11■■1■ 7R0 111��1� ii' — 1111111111111111 111..1. i�■u • .2 5 +50.00 ,II1111 iii::i. i_ __ _ v -_ iiiiii. i_ YRPC /V ■ �._ �A_ • riles �0!- . ..-■■■ in 1111111II 111111111111111111111111111111111111111111111111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ':.:.. . .. .. . i� _ .• - In -'mo 1■__1l:MEnimill.111 illilliiiiii III - _ ••■9 - - - - - - - - -. - - � _ , --- 11111111 -- IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1 ' ■■ uiIIIIII111111111111IIIIIIIIIIIIIIIIIi - IIIIII - 111111 • . ■ , . _ a 0 E ■ a 111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11111111111111111111111111111111111 ■■ Y_ _ ■■ ro :•hill/ _.1 t ■ 820 ,, =mairm. awadi_ww.maTiiii ilk __ 8.0 C'. Lo c :,:;:._ �� I-. Roo 800 CN v EIEEE r' - --- - 0.02 ' 0.02 =- -_- 1 - _ 3 — e _ 787 75 MEMMEMEMMEMEMEMEi iMMEMEMMEMEMEME o a _ —— ■ s - ' 1 _ 1- 124 + 50.00 o,on MMEN II.... 1 /1 O'T o = ",7 71 •• .., ,• rriorirri1 1TM , 0 10 100 90 8� � TO 60 -- 5,0 40 30 -- 20 10 0 10 UD III co N 11111111111 1-3819 11111I11111111 W 11111!lliillil Illlli!€illlli PERMIT DRAWING 1111111111111 SHEET 53 OF 67 111111!l111111 111111::1III!!: 11111111. _ lIIIII€ lIIIII! IIIIII!!!IIIII!€€lIIIII! IIIIII!€lIIIII! '1111' lIIIII! IIIIII!!liiiiii!liiiil i illlllmom iiillllli mum_ 1i11 :El -, �I.�.1.__ 1111 till . i i i __■..Y1_ ..r.3.'. _____----_________________________________ _ ____________ —_--_— I■ :BYO -- L■-------------------------------------------- ----------- ----- _ II --ell It ..rani' II rIG`I N= 1' 11111111111111111111111 __ ..rRllil - rir�Ilil..■ -a�- -dGGGG.G=Z.===7L===.==.l•_ ___ __ ___ ___ __ ___ __ __ •/.1}.II.r WA 71•7G __ ___ __ ___ ___ _ __ -- -- EG--OL---.---ai--7.---.=--=L---.-__7G==7\===\G===1===■===71==-J\===MEMT.ETTT■===== =■---iG--=L---■-- Mkii.. - -iG-- 1r� •morn. Il II '11 r.1.'111i __.rU__71-=..■■.mrv_- 1 1..1.■In 'I11.1 0 .,\I.■1.1-- -dr._' I■I.■1.1__ -:,A.1 Alga, 1\.1.r 11.■I LA. ilI A I1111: 1r.•.AN•--I - "II V AN.o I .-111f,5 L:. i I.AMINE I ..r.11;llil 'Iiii■u • r:iiia:l..■ I111 • -` fill 1111 l:, J',..y1J 1111 ..- A4141 II Ilill 0:7= _ - n__- _ _ J� I■ ..r114Wl illiiIIi,\o r/I:1i1..■ iIrl..r1'. MEMO M. M. 1 Q\O•I Z. 1 1 M. o c II I rn ===P_7- iiG°_ G=7CT!!U _ I 1014ay.1.riiiiUillI' a -G.GGGaGGG=L===.====l-9.--9C--9a---■071 -.---.r--M.--- I IY..I■.a..r!\r.1.•11'I' ■ a _. Q' E a -00 !! C .. CVr,"H \l•JI J.1!1 :: 1111 rllla.l7 r.'�L.1 - .. - 1111 .. Ilf.�r11 .1. 4.7 - ii 0 1 II 1 =' 11 II N rn IZAII.L!II .I --II -- -- .. -- - e ii i ..Ilrnllil --1 -- - ii - -- �i - nail..■ C 0 IP .7MEEMPU11 •■ • • EA AI � I - U. - _ E!!E i -1 - !l I ON Din 11.11.11 it ■ ■■ - ■■ - - ■■ (' c I.,1■■.rl .. .. ■■ m a� OJ - 1 ME ME ■.m - �11 �.m ,. •_, ,. ,n . . ., TA . . . . 2 I10 0 : : ?.. :: 2 0 o.cs'0 . A. y1 . 1 . 0 5 10 PROJ.REFERENCE NO. SHEET NO. IIIIIIIIIII+,11111111�11111111111111111111111111111111111111111111111111111 III pH mil III I—3819 XA-136 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII j r ii , ■■■ r„ ■■■ 1,IIIIIIIIiiiiiiiiiiiiiilllllliiiilllllliiiiiiiiiIiiiiiiiiiIiiiiiiiiiIiiiiiiiiiIiiiiiiiiiIiiiilllllliiiiiiiiIIiiiiiiiiiiiiiilllllliliilllllliiiilllllliiiilllllliiiill 1 111111 1 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 IIIum U. I 111111 di PERMIT DRAWING 111111 III II 111111 III SHEET 54 OF 67 111111 I.I.I. II 111111 I.I.I. :::::: I:: 111111 III I 111111 III milli III 11 111111 III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II li■■ dJ 111111 11 1 111111 111 — 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 II 111111111111111 III 11 111111 III 0 1 0 MI 1 0 0 0 ■r:i3i, YRPA r'i3i^,:: . +09.6 �■ 111111 Illllli�lllllllllllllll�l:t:;l 81'1 ' ' ".1'l�i1111G'll 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1111111 IIII 111111 IIIII■,------ l ■■ 111111 1111111111111111111"1111 IIIIIIIIIIIII 1" ICI n •' 11 IIIIIII II����������������������1������������� ! I'll" ! ! ���������������=�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIP :IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�Il1�111111111�111111� a"z�w_u111111�J1�11111111111111111 IIIE� - 11111111111111111111111111111111111111 1 IIIII-- 1 1 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111--111111------nnm"111111111111111--IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�11111�::Lg 111111111�!�111 I ■ ■ - =sE»-le�e�ee-a■���■era■•••■� �G7■C==■G.dfod..dG-=7■=C7■G777 .�� 11111 e III a -- --- -- --- --- -.■ ■■. n I I1I II 1� a r 1 1 1 1 I 1 1 11111 II I 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 11111111 111'l!!II ■■■: Illllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllii��'NIII llllllllllllllllllllllllll llll�l,L�.L!1111111111111111111111111111111111111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■ ■■■■■■■■ j1;;;;;;;;;;;;;;;;Iiiiiiiiiiiii: • • •n111�:11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.IIII IIIII IIIII L ••••••'••••••••••••••••••` 1c111111'llllllllllllllllllllllllllllllllllllllllllllllllllllllllllll "" ""' IIIIIIII ■ ■■■■■■■■■■■■■■■■■■;■■■ IIII 11111111 111111111111111111111111111cA IIIIIIII,,IIIIIIIIIIIIIIII" " I■I�I�����■��■Ilfil. "" "11111111111111111111111111111111111111111111111111111111111111111111111 1111111111 111 11 IIIIIIIIY YII YII 11111111 'I"""C""""""'��� : Ir■..�n1r111111111111111111k1111111111111M111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 E :: E •• E 111111111111111111111111111111I11111111111111111111111N611111111IIIIJN1111111111111111111111111111111111111111111111111111 1 C 11 E E IIIIIIIIIIIIIIIIIIIIIIIIIIIIII11IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ::::::•::::•••••••••••••••••••••••••••"""""""""""""""' I ! II• 1 1 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111 ■■■■■■■■■■ ?, " " : 0.02 O ■■■■■■■■■■ Ila - ■■.C■■■■.;:.r— --- —o�--= I 11111■r.,�aa■e�■■:..O ■l� ...___- . 2 - !HIIIIiIII : , ::: ::::: nnnn��R�����4�R�����4�R�����4�Roou0000u0000uo a■c■or:�. ���r'� _ _ _ — _ - -■■■. ■■■■■■. ■■■. . -■�--yr. -..= r== 788.52 a P::R::::P::R::PP::R::::P::R::::■4:R::::P:: ., nnnmuumuuuunuuuun■mnnnnnnn ■■■■■ , ■■■ zap■�����4��������4��������4�■■■■■■� nnnnnnnnn■�nnnnnnnnnnnnnnnnn . 1 1111111111 1111111111111111111111111111111111111111111111111111111111111111111111111 101110010001100011110010001110001000110000001000101111100 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1 11 11a., k.. IIIIIIIIIIIIIIII�ON ; N —Y_S— :::� :: 10 �� ° i� Ir ° Z� a ° r " rIr N1i i� TO 60 5;0 40 30 2;0 1■ AIIIIIIIYIIIIIIIIII I ? 5 10 PROJ.REFERENCE NO. SHEET NO. N iiiiiii i I-3819 XA-261 CO 1z 0 120 100 9C 60 40 20 0 20 40 60 90 100 1:0 140 L IH PERMIT DRAWING SHEET 55 OF 67 IIII II 1 SITE #.4J1 E Q WD ro V O Csi 0 0.06 co 0.06 ?� — 8�D— — � \ G1 2 BOO fg: �� o 800.36 E 3 N PC S.S.783.30 0 7R0 — — — a a im -YRPC- �? "L0 110 -00 90 60 4,0 20 0 20 40 60 80 - 11 91,1 I�,III ��;14o„, 1,I I 1,14� o--. 1 1 1 PROJECT REFERENCE NO. SHEET NO. ■1 1■�1���1■111■11■1��1H�■' R' F R/lll lC M aiv J I-3819B 22-1 LC ��■—�■ ■=••• •• ��ME= ROADWAY DESIGN HYDRAULICS �' __■=_■___■_■■■_■■_ __■■_■■�. n ENGINEER ENGINEER 850 ��■��■���■�■■■�■■� ��■■�■■�. DESIYN I t.RG = 78' .FS -Y S— ■11••M1■:::■::■ ..::■H.-■L E./„N N.•I u c-Nur •I Tit — __■�=■===:0:::0::0:mm::m::=i DES1GW yy , -NATION = 78 E■1m1••m1■:::■::■1••11■H•-■ ..17E or :Fs 840 M■�.■__.■.■■■.■■.■__■■.■■_. ASE e 7ii;ENCY .4.1 __■ ■ B _. INCIS 1:z1 rT II II ■II END LATE'AL 5'BASE ��OVERT•'rN DISC�,�� nI D w-i � E■: f:.. P.STA 21 I 45 -- ■ • • .'0-!/0 rI_ '!i!9.!�1lR .0F (1 830 -■1■ =.-- . EL.782.3D' . ,+.ur...D,,L�>.�,.rc.Lu.�,l- � ■ DOCUMENT NOT CONSIDERED FINAL ■,I, ■i■■■ii■■■-■■- --■■■ ii!! :::::: a•.wr®e i ail. : UNLESS ALL SIGNATURES COMPLETED ■111 ■I■■■IIi� � ill" i�llllll q . I . .I : : Noll■ mTnri� I■�IIIiIII��ai1Z�l��i119�3E1111� I :e IN c 7 . -`( RT- STA 2se+ -..- - 820 '- .-—Y LT- STA_'130+6'1 I ' PS 820 Y -- 1 0 4.59 U� IP..1: BRI•ag: - EL.799.22' ST 2:1717 9 ;' .rL _ ■ PI= /24+52.4/ 810 810 ' -Y_S- STA.113+00 39 ND :�' CSLAB EL = 78/28' -���' 799 87" .' VC = 1220 K = 137 PROP25E® - WEE.II DS = 60 MPHG-Aar Iiiii.��-- • I inlif I■■■II 800 ■iii■iiii =l i■'■-iiiiliii-Giiii■iii iiiii III 11 11 1MMM11 800 EMI■■II■■■■iiiCiri EA iii41=i!!!U■111 IMF II IMMII 790 „I'I■II■■.IalII■II M!!I!i 11!■!Ill II111- -P _ IEll r I■■MIS �GI�1' I 1 111■ 111■�■■■.■ '. •— 11;_ �11-1���11 790 i��3 : :::_::::e:•a::_!_Xili r i ill iMPI1 t !N ■1_■■_■_ll y M igMI■_�Ia7_INI:r:f_„i i:: �:*1161:igemi ����� .i:::::—�_ r .—L431„- � 1TEMMII _ �m.�mo ■=■�cr.� o rai, ■ �r +;.fir STA 12S+03.4• II 780 MIIIIW - III■III!iG1I11111� - —9. 8' T 780 --�3• _ •I _ _ ->aWO% MVO - IIIESS JJI11111� ■:I ON - 34 - � ►i 11l1r 'w i JF■11111� _ ° .• -E SOUTH SID- �,, ■II 770 EL.77e.5o' I��I■ ■-_ !1! ui•ii 11111 . . . 770 E • •' -- EaAL D. _ r� SEE SHEET 21,22 FOR -Y_S- PLAN EL.775.8 760 — 760 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 • _• PAGE INTENTIONALLY LEFT BLANK -O ui 4' _ . SL -0 0, CO COCO CO -0 a 3 O iP C N m O E N ' ao PERMIT DRAWING - SHEET 56 OF 67 3N ON OIL ol etc 5T I I -- - oo mLc d, ,- to o= c-0' PROJECT REFERENCE NO. SHEET NO. co I-3819B 22-2 n p■ do ROADWAY DESIGN HYDRAULICS 850 . ) —YRPAC- �840 E1•!I•! :1 -- 1111111111111111111: PRoPOS:� I'. GR SE 1��1111111111111111 "'" III;■■IIIIIIIIIIIIIIII 830 1 M IIIIIIIIIIIIII■■IIIIIIIIIIIIIIII DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1!iii 11111m —qln■ 111M.. : ■■� r ■ ■■■■ 000u0000 ■ �1111111111■1"== 1C ■:■■■■■■■■■■■■ U 820 820 1111111111111111■■IIIIIIIIIIIIii:: _ ='1Mill- iiiii:Iiiiii1127g11111111111111 i 810 ■■■ 1 ��.... .ir■ �:: 810IIIll���a*- , :y=,:;;4;�T !!!I IIIIII■■IIIIIIIIIIIIIIII I m . . 1111111111111111=M1111111111111111 I RPAC- S7A63-88.84= - -" MIME 111111MM1111111111111111 800 R^CA S-A 28178.44 800 r Ill ?T .1..1 i EGPOUND 790 790 A \ �780 —ss, 780 _ -tea�_ 770 770 SEE SHEET 10,22 FOR —YRPAC— PLAN 1 III 760 1 Ill IIIII1111111 Ill IIII111 Ill II Ill IIIII1 760 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 ■ N —► ==Cu,;,.%/Q-,Sa1111 I 840 MiiiiIIIIIIIIIIIEMPIFI►101iiii• • i 840 _ __ ■■ ZEE ■ �dY..dr�■■L'=� ■■ 1 IIIIII It■11_ ,L•1�,aS• �� ■= it 830 ■!_!.� I' ■111116iii1111111■■!!�� 1,;,1 ��� IIIIII .���.� .....'W4 1■_■1� .� -v: �1 Mr.I-r_r■■ ■-� .' rn - ■ ■ —/■■■G1V.r.�•a '-� ■ ei 820 • TiJM 820 L 0.0 — .■ ■ys�m-4w 1. ...�- fad � � i� fifes ■ ... wiiwi iI7• .ems_ • �om ■ mm • �_ - �� EL = 82489' • 1 _ — • . == VC = 100' 810 o' - =0— ' EC D = /72 Ed ®�'..�■� ` i pp DS = 55 MPH :11ilift11111111111ft111111111..L...... 800 I =_a I.:�. ■ • /rG I � 790 ■Y.■■■■—..Y ■ - .IA1//171'�_ qW J ! N �_ / Al — i / ryl l/II'l Ai/y 7 AI—J•I�.AMI'19i7�.:0 I.07= : I sNn,,mr�,.Ma1ari.INIF. a. ill 2 _ PI= 80+55.00IC a _ _ / " EL = 797.56' - - . ill"i.���ii�i:w� '11.'l`I�=A,'I:NW/IIII,1 I'f7-7I• ;� - PERMIT DRAWING MEM c K = 100 , r Tug ..� , C� • 1 ■■�■ OS = 50 MPH of%r 'v, F-iai1 EN �::i;i1•r.IJ�I:w�� 770 'EEK = _ SHEET 57 OF 67 /URTH ■■� a ■� ■—■ ■■■ ■■■■■■■■ ■■■ �. ■ 760 .I— 760 A DAP t st/a L - 770.4 FT ' SEE SHEET 22,21 FOR —YRPAC— PLAN F 0,0 0. 750 11 11111 11111 11111 11111 11111 11111 11111 111 750 M 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 LP LAN E I `` I PROTECT REFERENCE NO SHEET NO. B 03'39'46"w ' /-38/9B 24 YRAN SHEET NODE . -YRPCA- -YRPB- ROADWAY EENGIN ERSIGN ENGINEERS Pls Sta 74+96.43 PI Sta 76+4/.07 P/s Sta 77+8563 Pis Ski 11+33.36 es = 3'47'39.9' A = 5 54'5/.8"(RT)es = 3'47'39.9' es = 3'22'/3.2" Ls = 200.00' D = 3'47'39.9' Ls = 200.00' Ls = 200.00' LT = /33.36' L = 155.87' LT = /33.36' LT = 133.36' ST = 6669' T = 78.00' ST = 66.69' ST = 66.69' E = 1000 DS = 50 MPH NC GRID NA+'5 1.; CONGRESS STATESVILLE, LLC DOCUMENT NOT CONSIDERED FINAL M 0 UNLESS ALL SIGNATURES COMPLETED CV OEP I f Z 0 n : CLARK EQUIPMENT COMPANY • LV ©© o ' \,..._79 -.,St 0• .• \ . •• W E E `A1 E E E W /AER AL UT RY EASEMENT �I EIP X—X X X X , 1 AERIAL UTILITY EASEMENT N / - DB 21z]PG 6TI ® -EIP iYf ____- 148'w.,.-- __ _�SYNC RA 48'WW 54.1 WW ENE PG IO __ .T 48'WWX + 48'WW .Ww x X X 48'WW�, --THY- --T FD-- -1 TFO-- 1 —T_T iO-- --T-TFO-- --T -- --TF0- -TTFO - -T-T Po-- TF�- O SPECIAL LATERAL / Z �+ Z ro----- Z Z SPECIAL CUT DITCH If C SEE DD TAIL 18 - —� SR 2187 GLENWAY DR 24'8ST SEE DETAIL 5 ti s °W'i JB vdMH I JB wM LLJ MT — _ 48'CHL L I 48'CHL MIL _ 48'_L _ _ _ - �48'CHL .. ._._.. .. 48'CHL .. 48'C- _ 48'C Y-�48'C L Lu I O I C C C C C G C C C _ �___C _C2GI-A I Ty _ ( N O C c - -.- - - - - - _ _ -.. .. .. 2GI-D - : f ..�;� -a -a-; �i FS I - -is FS LLJ 2GI-A ,� y +26.4 °'" TOE PROTECTIO - ~l GREU TL-3 2GI-D I WITH CLASS B RIPRAP FS 15"RCP-III DI -'" 'w• LLJ - - 8:) SEE DETAIL 31 2GI-D JB w/MH 48"RCP-IIII_fV__ , 2GI-A (/) qa — " M i 1.211 _ EMOVE SPRING SPRING BOX _ I � ,:, -YRPB- E�IN - COLLAR a• OTCB _--- Qo� p- ---- 6"C FLOWABLE FILL w N - ® II- - SB 44'BST 2GI " c9' O. 2GI — • _I 71. T - _ �8 8 I -� _ , I RETAIN , •. --- i MTL � 'L— r � MT � RE • E 2G—A T � 'L— LLJ la • 1 - Sii�A Z g IMMO — 2GI-A — � 0 _L 1♦GL — PE IAL T DIT II ,.�� MIEVII ~ I. + V I _ , � .HW ' — _ I 2GI D B M. Q i — � 15"RCP-III :\P�pP / 28ii SLw� 1 \ i i�j-! 'M"R / 3 C Uii �RlrRAa9"TG, * p` ..: .7.-4 8.1�..-4—.r -•. . 'o . .. X X _ FA• Ili WP Q • m >�.��i,_- F►i'P F C . TO .IS. CE / ^ �D +39.21 �' - �• � - - - \ \ i` , ' / 0 'ynFICvE l P unv, - y �. �\ INC. cD i'_ ���P JAMES FARMS, T /C REMOVE DI- • �,�i�� Nio " / } / / - \ __ _ _ r a' BANK STAB!RATION p', A �+O / / / / - GR_ \ Q v v• 1 / I .. .. SEE A AIL 84 V+ SL -I-*•R. / N CLAS'I RIPRAP PIPE OUTLET / L ill rn � 1 / DROTpPER • 24 TO • 33 SY CHANNEL STABILIZATION / / _ - - - - - - - I G 300 LN •• - .. .. SEE DETAIL 30 'I'/ / ,/ aa ^ CL I RIP...•F RAP /- (p y A� 5QON0 SY + -0 / ,; + �1 sr y� SHEET + . / /// DENOTES IMPACTS IN SEE 24A ZL, 0 O .. / f +/. �,'. / / SURFACE WATER DEN TES RARY N p i . SL /, - + ,' //// IMPACTS INE SURFACEO WATER — 73 — T — - - - - PERMIT DRAWING -v .. .. .. _ 0 0 A . . � '� ' 3 SHEET 58 OF 67 _ic ��� • RO REMaNIENCE PERMANENT 3 , MITIGATION SITE #13 AREA U6 0gE c3 o„is „QC pia irziariv Lam LANE I `` P PROJECT REFERENCE NO. I SHEET NO. a- 1-38/9B 24 RM/ SHEET NO. A ii WEfII ROADWAY DESIGN HYDRAULICS - - -. ENGINEER ENGINEER 77'Sta 74+96. - • : . Pas Ski O = - 3'4T 39� - _6s - 3" LsQ 2i�A0' p �n�i Ls = -ppJi - LT = • 6' rf. _ _ / .3. . £Z, I = r Ll• °S NC GRI'U—NA 8�5 _ CON •ESS STA ,: , LLC ¢� M I I I (/ DOCUMENT NOT CONSIDERED FINAL N !(NLE +ALL IGNA UR S COMPLETED 0713\lid I �` fit �1 f� Ifri, A 7 ..444401 . , 7Q' n A. ,;" yr �,,I C . I *I • ., a ,y, •,� W W x, LIJ allilhil..., %kik • = . i rc"..4 .4•14 rt'�d '�r�..-ice `.,.�.:.:..� -...- W /AERM ••, Y EASEMENT E �� illt i' C� ��j` __ ��1 .•2123 PG I]il • N .�-T-- : _ J••ram -... `- - �. THY_ .•� — _ _ —T_ � T-- — — = TT ='.-._-_`-- `-A'�J 0 - ; — TP,— -- —T FD — _ —TPO-- Z — Z SPECIAL L SPECIAL CUT t14 r a — I SEE .ETAIL 18 -I -2IB7 G(EMYAY OR 24'BST -- --- --- -- i -- s pocyr L.,_ MT .:, H L�.:w_ 48'CHL MTL 48' L ,,, ,,, W8'CHL„ CHL - pI -------inniii....- = . ''-- F ._ ., -- .411i11 _2;-: -*----'" illikarlp if- .. 1 - 1 •1� LLJ _ ,___________________ v ..L.„L_ ..., v) 7:7_., 7. . ., ,,, -,.- -7-...: --_,........mirm-2:,--E.,,. .-_-... ..A- tia'L-_„„„..-‘46.7-_-.1%,. i . . LLI �'GREU"fiL-&s: �.. w.� ~ - �..F ^RCP-III • • . ''''-"'-...".-Mr-'''--- - �.. •' •ii��C `� LLI _..-_. ,!- •. -- .■�=Tim =! �,4:� — =- Z— .ai N '— =YRPB 1111 _ _ - - - -�� -- `zoo -- _ - _--- ---_ _ Pam„CM F ABLE FILL ` iii. : : i!5j . 'Man I — -- . � let ---- - I �. -__. —I i��� !�.` ., — LJJ TI ------ --.041g111"rwlffl . . .:1k111\..-_- 111111. LIWM=nimmammel . . _, . _ --- - U �_ .— I- 1 � � - �� Ilr� `1 � _ �I �,..-- sue I— _______.......0„.„... ___ p0:1401eTtit,W• "- : . r_,,1 '�li 7 _ 'T ' - - 3' ''''''-.0„,,,,,, . .� .• �,% (iti IN 3 - __ I , Z �WJGR - s A- 4 .a]na: ��' _ ' JAME FA M orn 17, -a - L- :------- 7 N ,, r � T" � /�� �� � �1•1 .•'. 61 t ANN L .ABI RATIO I - - >� I RI' RAP a (J� �� �'--,„/ • ,�., .*TO S 7� SY Ii "ri- �� 4 � SEE SHEET 24A V / ;�'/ DENOTESIMPACTS IN '~ �, � ,o =:..ram i /, /// SURFACE WATER / w L 0 �= DENOTES TEMPORARY Nco co fl 1? ^ .� IMPACTS IN SURFACE WATER n I ���/�I�� ��_r/ o," , , -- ( PERMIT DRAWING _� „ AI SHEET 59 OF 67 3 � �� MITIGATION�� SITE #13 AREAS 7 U \ \ _ A 0.3 , ,0ia LANE I `` I PROJECT REFERENCE NO SHEET NO. 1-38/9B 24A RAW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED / /44' ?)* / Ae‘e 7 C C pe o N N .. . . . . . . 1� �/0 NN �A— 1 DETAIL 30 / / GGjQ PIPE OUTLET CHANNEL STABILIZATION Not to Scale)I Natural Bed /�/ O • 1 ( Elevation "� / tV J ' _ Natural Ground Natural �// i ) Ground k •r���iit�tq��,� X 1.50' '�t♦1h���1��ik / v Supplement 1' )- ; H\A/ \ \ / ' Existing 1�i�41/;0,� ' vv ' Channel Bed Rip Rap on II� 14 Len th= 20 Ft. (Variable) �II""' ' Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotext`ile)West Bank 1:::::: `�" ` PIPE OUTLET I • —Y N— STA. 167+45 #0 ' i CHANNEL S Al: ZATION OW SEE DETAI DETAIL 84 i`��� / � RIP RAP BANK STABILIZATION / CL • RAP P (Not to Scale) " �/� See plan-� if, . / 50440 NS 70 SY k_i Ex,or Pr. . . d*GradeDo not disturb bed or opposite / - BANK STABILIZATION bank / SEE DETAIL 84 Type of Liner= CL 1 or CL 2 Rip Rap (see plan) *d=18" for CL 1 and 30" for CL 2 (No Geotextile) I CLASS I RI PIC/`1P —YRPCA— STA. 18+65 RT / —YRPCA— STA. 77+00 RT / 24 TONS 33 SY I 61 a N a - - NC GRID NA+ 5 , PERMANENT Ilk AREAI M TIGATIONI co / / il / /c'Tol /"/// DENOTES IMPACTS IN SURFACE WATER e DENOTES TEMPORARY cco o SITE #13 / IMPACTS IN SURFACE WATER CO TEMPORARY IMPACTS co N IN SURFACE WATER PERMIT DRAWING Y U SHEET 60 OF 67 50 25 0 25 50 m''' ` 1I11iliftft.. Uc, oQ GRAPHIC SCALE - INSETS -o3 is (vac Nia LANE I `` I PROJECT REFERENCE NO SHEET NO. 1-38/9B 24A RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A .� ' —860 Nit y ran 0 ____r__�-�'C"��rlw�+; 8 DETAIL 30 •,�� +__�'.� • Ss� PIPE OUTLET CHANNEL STABILIZATION I � (Not to Scale) Natural Bed S Elevation D •.DD % 1' :D Natural .� _ Ground Natural Ground r4!//./1044� , `�, 1 Q Su lement 4 1 I♦ tyipA4064freFiamil o/1r i s,044i`6:. .,e ,�I� \ / \ / E a EX.Pspn ��,•t te� ���� ► — Channel Bed Rip Rap on {) r ti� ��-��►� (Variable) P p 8 ' I��, II Length= 20 Ft. West Bank � e of Liner= CL 1 Ri Ra - Ke ed-In No GeotextileTYP P P Y ( ) � sor IPE 0 � TLET —YN— sTA. ,67+45 •' �ee�' HANN ' LMI) ZATIO ': 4 �'/401gf' TA DETAIL 84 i RIP RAP BANK STABILIZATION �Y� I II���, E. D /1 (Not to Scale) IIQ��er R/y 40 N , 70 S See lan-� I L p ��III�fI4�l Ex.or Pr. 1.0'min. d* illlllllllDo not �I rl Grade bed or opposite il : A STA: ILI AATI N bank SEE ETAI L 84 Type of Liner= CL 1 or CL 2 Rip Rap (see plan) ' A p pp A� *d=18" for CL 1 and 30" for CL 2 (No Geotextile) (mreirkihti LA S I R I R/`1 P —YRPCA— STA. 18+65 RT —YRPCA— STA. 77+00 RT , "IV 2 � T • NS c3 S ../ N j/ N a 3 /---93 fililirifir NC GRID NAS J ) / ��►'� PERMANENTI t""4"\f L MITIGATIONS N yF AREA j/ DENOTES IMPACTS IN N ' / " SURFACE WATER m DENOTES TEMPORARY co co SITE #13r. //� IMPACTS IN SURFACE WATER CO TEMPORARY IMPACTS N In N IN SURFACE WATER PERMIT DRAWING Y SHEET 61 OF 67 50 25 0 25 50 o m. ` 1I11� UE oQ GRAPHIC SCALE - INSETS -o3 is NpC N,--a LANE I "S I ) PROJECTI38198E NO. SHE27O. RM/ SHEET NO, ROADWAY DESIGN HYDRAULICS-- ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED \ ,, RAMONA LPVII tIOHNSQII WR ----"""--]K/;. \Sv •o SR )k\._ ' • N ( O GOFORTH, GOFORTH & CLINE. LLC ^ry WAB • • Z \ : .. . END SB WIDENING/RESURF. LLI 720'MEDIAN WIDTH TRANSITION )LT) q. -Y_N- POT STA. 205+15.43 LLI 300'LANE ADD.TAPER a / + .._/ '` .. I TIE TO EXIST.FENCE : \ . .. A LATERAL'V'DITCH +15.43 -Y_N- TIE TO EX.DITCH o V/ e DETAIL 7e WiTAIL'V'DITCH SEE DETAIL 77 EXISTING RAY w — WW —h n—x BEG.END W'"NB R COS NS UCT OI N Wy���� �"48'w£" / END CONSTRUCTION cn NB WIDENING & RESURF. o END NBA WIDENING & RE5URF. .. .• .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. '^s q M Y. �g�iyy� T + _ LMTLi_ i 1 i T S_ iMTL_ Z s'�`2C,1 -- a d— —GREU TL RETAIN RETAIN / r—r— �— —r CgNFRAEiA1FT�ECiNfiRAhfXISTIN6 — v o� a u. .,,!-- ;IF (9 RETAIN RETAIN//����\\ PIPE INVERT DURING CONSTRUCTION !. TIE TO EXIST! Q` i r w o PAVED DITCH AND CONFIRM WITH ENGINEER I s '205+ GUARDRAIL `O FULL OF DEBRIS RETAIN CONCRETE CHANNEL ---�_� �F=— _— 2/O4 ._ / ��7•F-�-F . r TIE TO ERR'gMC -- L E; 1• 1 •l�3C'�-1-,1,�A$I 1 .—Fr G— _F_,— — _jr .-- _C. -T T'.'V I•'— —JE— =— F/'MTL F 1 F MTL s—Fr� ^— T --MTL FI /YN n,rJ' ARDR IL 'L I O -T 'i v C.' T.CO#IC b T= T. T. n T .F—� T. TT—T T C NC. 1 T T _ TT T T T T TT T T T 1rleONCT T) MTL MIL F I TT MTITT T T T TT F Kr- O H \m N 0 CONTRACTOR TO CONFIRM EXISTING Ro y� o s2G1 = OIDE IuvEDT Nom)C rnuerol lrTlnN o: ~ /// ASSUMED 18"RCP LOCATION _ _ �� IfoL_ RETAINS ._AE1n ssalnple NIT± FNoINFER_ r___ _4 i __ /� TO BE RETAINED 1 Lm — CO -`: _ 15"RCP-III ' �f11° __ IIMMIV-0 N .^,... if COLLAR , _ �/W] - 16 --. -.. .. .. .. .. .. ^ Q 48"RCP-IIIIIMIR a 15"RCP-IV A —WAN.W '` •'3 T �- TIT TO EXIST FENCE T _ " —CL B TRIP RAP F A F S F F F r 48'WW ..„48'WW "S{ / -�.� i t. . ..�_ 4 7. m N _ I +n'b-A' j ,� 1 TONS 5 5Y - C.: R �..�\ `xR n.nL Ta \ 0 _ _ er _ • _ PROP.CHL FENCE • I .- 15" -1;'- , .. .. .. .. .. .. .. 3 TONS 10 SY• r�� ' ❑ .. .. SEE DETAIL 72 C. .. .. s LLI Z 120.00'RT 120.00'RT PIPE OUTLET' SHI 720'720'!NM E SHOULDER TAPER a CHANNEL STABILIZATION l�: LANE DROP TAPER F.18.CL B RIP RAP 18"CSP w/ELB•••;� SEE DETAIL 4 / • c 520'OUTSIDE SHOULDER TAPER E J PIPE OUTLET 5 TONS 14 SY SR CL 1 RIP RAP ;'I a CHANNEL STABILIZATION X TONS X S YS 'TOE PROTECTII' + 2 SEE DETAIL 73 /y/ TH CLASS : RIP' P +94.03-Y N- ' ` ,/ SPECIAL LATERAL'V'DITCH 120.00'RT sl v CL 1 RIP RAP .ETAIL 31 W/CLASS B RIPRAP , X TONS X SY Q! / o SEE DETAIL 74 m TOE PROTECTION /15 o ,j WITH CLASS B RIPRAP _ voi SEE DETAIL 31 / + SITE #27 m 5 N o�' I NC GRID NA�'5 M �� j5� SEE SHEET 27A 0 P// RETAIN GOFORTH FAMILY REVOCABLE TRUST /// SSDURFOACEES WATERTS IN rn �, 5k � DENOTES TEMPORARY /// ,4 IMPACTS IN SURFACE WATER E 0. PERMIT DRAWING 0 SHEET 62 OF 67 a , a 50 25 0 50 100 a) `1I1111.11ft.. 1_ :r. GRAPHIC SCALE or., 01 C U V .. , , --"NiNz...... LANE I "( I PROJECT.3898E NO. SHEET 7 o. RhV SHEET NO. - - ROADWAY DESIGN ENGINEER HENGINE ENGINEERR PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION O0 „____,N., ....„..._.........yz...-----i D. UNLESS ALL S GNATURES COMPLETED Q 0 L . •'•TH, •'•FO TH LL . Z Eii, .r-NI . _ _ , ,,,\\_ ,?____:/..-'---N----./)11-....0.,;...--- -,.---- , 4•1:ire ~ . 15.W 2 ' D TH NSITIO L pife.,,,,,, W 0 A .T ER \i j",\T-_ --- jot Atikri • EN 41 TE L H + ,4 -YJY-Si I I;I P..----.nil 2 'NIP NwRw " SEE iriyi .„ B O BWW i,,,i, z.I 2 d TL —— RETAIN _-.,„,.. -:-."-- -...,,;t7--__ _=-__m_,-.15e.liv4tr.‘_•-__:-°Kg4zrz.7,4:.%ktii,--7---_ — ,----- -----m-- --..4-:-_.. .. —_ N— ��E TO EXIST! - RETAIN 77 PIP '1" _____—__ __ w s -f b°1 PA . DITCH FULL • RET IN C CRET CHAN L a - O �' u'2GI — TOR TO -- ---- ---P. AS UMED 8"RC LOCATE N 1 1�IIIIIMIM MNN' =— v -- RETAIN - �— T - N --,..a-da-iii.'Am-4._......._-__ pr ° ilIRWIN N .. B R I a 4 WW 15„ P_Iy swim.. .. ow E-1ST E E m B RAPiii F F 4B'N < °01110 Or ..C - 4 m t!) i SY -•- L F C C igall m N .. .. .. 0tVin irmre'vr7v-rf-w-w-- — W3,..i -ki, „,,.., -A./,.p.,:..,,_ "7 NAP,r,f1.--r: .. e,,,,,,olia?-0.4::-- Vir--7,407101177.141116.41,7ZAW- I� W 1 Y N Z IF 12 I4 E ' ,, Ar I 72 ' a NEL T 20 _ RAP 8" SP E J U E SY R [ a T C L L N TO PRO . 7 L___Ir,______ ---___„1111rarit..,.. g 1 EE IPA 73 S RI SPECIAIA DIT SR sr 4 r T W/CS . RIP• ' A1101 , rfiliii O X Q FQ.. DET M < O IL 3 ORIP Mrel M I :SITE #27 NC GRID NAS SEE SHEET 27A;�� , .)_ --- jlY// DENOTES IMPACTS IN o R OR AMI RE CABLE RUST 1 ii��'/// SURFACE WATER rn a TES RARY 0 41.5� G //� IMPACTS IN E SURFACE WATER E • �- N� ....:.\\ ` ° PERMIT DRAWING y \\:::...„" r SHEET 63 OF 67 a J i a t S0 25 0 50 100 4 .>" �. 1 GRAPHIC SCALE or, 01 CI OT •' , II/ LANE I `` I PROJECT REFERENCE NO 1- SHEET NO. 38/98 27A RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 4 DETAIL 31 TEMPORARY IMPACTS PIPE OUTLET CHANNEL STABILIZATION TOE PROTECTION (Not to Scale) Natural Bed (Not to Scale) IN SURFACE WATER Elevation Natural 1 �� FILL PIPE OUTLET Ground atural NATURAL 7 SLOPE Ground GROUND } F� CHANNEL STABILIZATION d T DOCUMENT NOT CONSIDERED FINAL 1,5' UNLESS ALL SIGNATURES COMPLETED GEOTEXTILE SEE DETAIL 4 d= 1.0 Ft. Channel Bed CL 1 RIP RAP Length= 22 Ft. (Variable) Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) Type of Liner= Class B Rip—Rap —YRPC— STA. 16+04 INSET —Y_N— STA. 210+35 RT �^ L=0. 11Erili GAI Allaillailliiiii".1151"7 -r I X — — - illuist J B w/MH q8" WW ,„<i>,,fr. 141".11.111711111-11011111isi ,14 4#44,71.„ FS ---...-eat.-1, ..........r.: 110 —Y RT A _ - - - /V 18" CSP w/ELB •- ''� A N �n'�\ PERMIT DRAWING N _ + 50.00 —Y_N— SHEET 64 OF 67 1TOE P RT aE ROTECTI �► \M cr ) WITH CLASS RIP P SEE DETAIL 31 SPECIAL LATERAL 'V' DITCH 0' ro W/CLASS B RIPRAP M-o m SEE DETAIL 74 Y U N i -M NC GRID NAD 83/95 S R �`- DENOTES IMPACTS IN "7 m r //�'/// SURFACE WATER DENOTES TEMPORARY W / IMPACTS IN SURFACE a SITE #27 WATER 50 25 0 25 50 II U O», N° GRAPHIC SCALE - INSETS r-.I 0 UL LANE I `` I PROJECT REFERENCE NO SHEET NO. 1-38/98 27A RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 4 DETAIL 31 TEMPORARY IMPACTS PIPE OUTLET CHANNEL STABILIZATION TOE PROTECTION (Not to Scale) Natural Bed (Not to Scale) IN SURFACE WATER Elevation Natural 1 �� FILL SLOPE PIPE OUTLET Ground atural Ground NATURAL GROUND F� CHANNEL STABILIZATION d i DOCUMENT NOT CONSIDERED FINAL 1.5" UNLESS ALL SIGNATURES COMPLETED GEOTEXTILE SEE DETAIL 4 d= 1.0 Ft. Channel Bed CL 1 RIP RAP Length= 22 Ft. (Variable) Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) Type of Liner= Class B Rip-Rap -YRPC- STA. 16+04 INSET -Y_N- STA. 210+35 RT 860- 860 11111' -� % / •WA! Fir ,, , , r ,,,,,,, ,; ,. / .I /411!)„'10:- ' ....OpArs._ 4 asiis,q):9) fr:'4r Pr 4 8 --wirwirrior at.,,411/0,4Maiiims 0, tor. Av.& V•"•(4 ' St _44110 IV,4,,: '-4•011P-V•NP•pri Alifre, ---C( n Ao.- da Lir t,ilk/. A v ... 47 — v.II i ' AA, 44611 --Ohl- ---- ----- c I V g 0 , w\ 413 8 CS W/ELB e e , 2 r4 ..„ PERMIT DRAWING + 50.00 -Y N- Nfvfor, // i SHEET 65 OF 67 152 .89 RT a O / TOE ' PROTECT! �► / cr �� WITH CLASS RI ' '/A a SEE DETAIL 3 ' SPECIA LATERAL 'V' DITC M W/C A S B RI PRAP M m S - DETAIL 74 Y o C1 N `J 95 / - NC GRID NAD 83" c WO SURFAC DENOTEE WATERS IMPACTS IN DENOTES TEMPORARY // / IMPACTS IN SURFACE a WATER 50 25 0 25 50 � U3 1,';-' L °aIIIII"%ILIII° ,9cc) GRAPHIC SCALE - INSETS =a ti.1 obi WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 Site 1 Eliminated 2 14+00 -21+50-YRPCA- Roadway Fill 0.32 0.09 2 16+70 - 21+50-YRPCA- Bridge/Stream Bank Stabilization 0.02 0.02 0.62 < 0.01 < 0.01 42 20 3 15+75-YRPC- Roadway Fill < 0.01 0.01 0.02 < 0.01 206 10 4 24+00-YRPC- Roadway Fill 0.02 5 70+00 - 76+25 -YRPAC- Bridge 0.03 0.05 1 .94 5 70+00 - 73+85 -YRPAC- Temporary Pipe < 0.01 40 6 121+50-Y LT- Stream Bank Stabilization < 0.01 < 0.01 12 20 7 120+90-Y RT- Stream Bank Stabilization < 0.01 < 0.01 12 20 8 19+00-YRPDB- Roadway Fill < 0.01 < 0.01 9 28+50 - 34+00-YRPAC- Roadway Fill 0.40 0.08 0.07 < 0.01 747 10 10 28+00-YRPAC- Stream Bank Stabilization < 0.01 < 0.01 25 20 11 27+50 - 26+50-YRPAC Roadway Fill 0.19 0.02 12 149+00-150+00-L- Bridge < 0.01 0.01 10 54 13 167+00-Y RT- Stream Bed Stabilization < 0.01 17 13 167+00-Y RT- Stream Bank Stabilization < 0.01 < 0.01 44 10 14 28+50-Y- Stream Bed Stabilization < 0.01 < 0.01 17 10 15 33+75-Y- Stream Bank Stabilization < 0.01 < 0.01 11 20 16 37+10-37+20-Y- 54" RCP Extension < 0.01 13 16 35+90-37+10-Y- Stream Bed Stabilization < 0.01 < 0.01 99 10 17 37+70-37+80-Y- 54" RCP Extension < 0.01 17 17 37+80-38+50-Y- Stream Bed Stabilization 0.01 < 0.01 98 14 18 47+50-Y- 54" RCP Extension < 0.01 39 18 47+50-Y- Stream Bed Stabilization < 0.01 < 0.01 33 10 SHEET 66 SUBTOTALS*: 0.97 0.29 2.56 0.16 0.04 1442 268 *Rounded totals are sum of actual impacts for sites listed on Sheet 66. See Sheet 67 for project total. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 06/05/2019 IREDELL TIP NO. I-3819B WBS NO. Revised 2018 Feb SHEET 66 OF 67 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 19 46+00-Y- 54" RCP Extension < 0.01 34 20 68+50-Y- New Channel < 0.01 < 0.01 13 10 20 68+50-Y- Roadway Fill < 0.01 48 21 70+20-Y- 3@9'X11" RCBC Extension 0.02 39 21 69+20-70+20-Y- Stream Bed Stabilization 0.05 < 0.01 137 21 22 71+30-71+90-Y- 3@9'X11" RCBC Extension < 0.01 45 22 71+90-72+89-Y- Stream Bed Stabilization 0.05 160 22 72+89-75+10-Y- New Channel 0.07 225 22 75+10-83+59-Y- Stream Bank Stabilization 0.23 873 22 83+59-84+00-Y- Stream Bed Stabilization 0.01 < 0.01 37 10 23 87+70-Y- Roadway Fill < 0.01 33 24 93+75-Y- 66" RCP Extension < 0.01 < 0.01 49 10 25 94+50-Y- 66" RCP Extension < 0.01 10 25 94+50-Y- Stream Bed Stabilization < 0.01 < 0.01 34 32 26 116+70-120+10-Y- Roadway Fill 0.09 0.04 27 210+00-Y- 60" RCP Extension < 0.01 29 27 210+00-Y- Stream Bed Stabilization < 0.01 < 0.01 19 10 SHEET 66 SUBTOTAL 0.97 0.00 0.00 0.29 2.56 0.16 0.04 1442 268 0 SHEET 67 SUBTOTAL 0.09 0.00 0.00 0.04 0.00 0.47 0.03 1752 126 0 PROJECT TOTALS*: 1 .06 0.00 0.00 0.33 2.56 0.63 0.07 3194 394 0.00 *Rounded totals are sum of actual impacts for entire project area NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 06/05/2019 IREDELL TIP NO. I-3819B WBS NO. Revised 2018 Feb SHEET 67 OF 67 ���/�f)ITV T7-�j C ®q� ¶I TI( _}}}\\\\Y STATE �lU J1 NO I .T J�HI ., 1. 1 0 1�n I� V` A BTATB STATE PRWBCT RBPBRBNa6 NO. o. SHEETS ON s,,S 0 z. N.C. I-38198/U-6039 1 2��0° „s .� 77 DIV_S_0 N OF HIGHWAYS MI PRO/.NO. P.A.PRO.NO. B�ROTaN ORio sa �: N1P °0.� 34192.1.2 IMS-40-2(124) P.E. `^ ,° 3 34192.3.2 N/A DESIGN BUILD `s<s,: STATESVILLE IREDELL . CO UNTY z, . S ;: " y_:• 21 SULLIVAN RD.i. 21 70 \��1 �` IMIT 13 P� miiii ON apn , ��PI' 92To P LOCATION: 1-40/1-77 INTERCHANGE INCLUDING 1-40 FROM WEST OF +'" P° SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & 1-77 FROM SOUTH OF M� 751 0�,° SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERS RD.) Z' C aR�go, \--.` 0 TYPE OF WORK: GRADING,DRAINAGE,PAVING, STRUCTURES, °"°'"-= RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL i 1 l / Vance BEGIN TIP PROJECT I-3819B V <y " _ -L- STA. 7+83.00 W �`� _ � 0 TO �1/ 70 ,� yIC�O I� V \ 9b 4 END SEGMENT "A"• ;� BEGIN SEGMENT "B" ��� VICINITY MAP S -Y N- STA.175+00 �QO THIS PROJECT IS WITHIN THE MUNICIPAL •° o����sa �� BOUNDARIES OF THE CITY OF STATESVILLE ,y;. .' END CONSTRUCTION AND THE TOWNSHIP OF BETHANY 8 �!��` tit . SQ �yto l 45 ti� /� ail BEGIN SEGMENT A t� s?o e G 100 50 0 100 200 „ „ 'lb 4 END SEGMENT B % -L- STA. 92+00 '' -YRPB- Euoi �`14,7 LCDWB- ti5 PLANS - �. � ij WETLAND AND SURFACE WATER IMPACT PERMITS 200 1, 00 0 i 200 400 /r NI\ k ia ti ��•���•I� 40 tts & z DATE:JULY 8,2019 YRPCA- OVERSIZED PLANS -YRPC � "`y! %/� (Note:The sites highlighted in RED —`� j2 -YRPA- I are included in this submittal.) SCALE �1 VARIES 1 I V I � � �� -YLPC- �``i�i •.��1/�� -YRPBD- o INSETS SITE U 2 A% ��"'�'j�i. BEGIN SEGMENT "A" ��° us ' „_. "=Mit �� �� � ����4a4 „w YRPAC- UTILITY PERMIT H �E END SEGMENT A END SEGMENT B Yv_sR �e o 4 "A BEGIN SEGMENT "B" -Y S- STA.111+00 E al? s2i �.' a '' -L- STA.I78+50 D RAW I N G STE uU- •� 215t 1,1N. .`� SHEET 1 OF 8 sAit o P21#4, -YRPD Yo; -, ''a ,9 5 si ciL stiff: O � BEGIN SEGMENT "B" ����'' � � �' �, ''s � p•. END TIP PROJECT I-3819B N -Y S- STA.25+00.09 �' 41 :1�"'• ""=� � � _ � �� -L- STA.2I9+50.00 CLEARING ON THIS PROJECT SHALL BE PERFORMED ,b � � '�� o • o. TO THE LIMITS ESTABLISHED BY METHOD III. �`� \` rod `r ` THIS IS A CONTROLLED ACCESS PROJECT Q'" `�'� Sroy ON WITH ACCESS BEING LIMITED TO INTERCHANGES •o��o U-6039 \� S�4FM LANE o NO IMPACTS _Ho INCOMPLETE PLANS ena DO NOT USE FOR RI W ACQUISITION } J c DESIGN DATA Prepared In the Office of: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS • • GRAPHIC SCALES 1-40 1-77 PROJECT LENGTH WSP STATE OF NORTH CAROLINA j ADT 2018 = 57,300 62,900 1001 Morehead Square Dr.,Suite 610, Charlotte,NC 28203 NC LIC NO.F-0165 °f N•Rty `o ADT 2040 = 72,500 77,500 LENGTH ROADWAY TIP PROJECT I-3819B = 3.885 '�° oeo LENGTH STRUCTURES TIP PROJECT I-3819B = 0.124 2018 STANDARD SPECIFICATIONS w~ o� DHV = 5,800 6,200 I P.E. SIGNATURE: s a SEE ABOVE D = 55 % 55 % RIGHT OF WAY DATE: CHRISTOPHER D. DAVIS,P.E. A a o o ** TOTAL LENGTH OF TIP PROJECT I-3819B = 4.009 PROJECT ENGINEER ROADWAY DESIGN a` O T = 16 /0 19 /o OCTOBER 30,2018 ENGINEER Foe s@°e I- V = 60 MPH 60 MPH rwAtt * TTST 13 + DUAL 3 (I-40) LETTING DATE: ERIC W. SECKINGER, P.E. O 0 PROJECT DESIGN ENGINEER L° ** TTST 16 + DUAL 3 (I-77) OCTOBER 30,2018 %° CLASSIFICATION: INTERSTATE P.E. PE O k. / Jl /` Jl /` SIGNATURE: /` STATE HIGHWAY DESIGN ENGINEER / '''7 _ w. I xn qxD. 24'x GRAVITY SEWER LINE TRENCH DETAIL .xD.�. aaK. • II xI9EIND `L� -wATCHLINE- SEE SHEET NO.23 � . f \Gfiumm 'ROP.6'DIA.NANHOLE D1 WL ,', •/ ' p••, _ F86.19RT OF L •,/ m ..L.ssn..si cxnrun.s COMPLETED T .- � Idq:16. n 0 FT �' QJ �`(\ 1:1a71 Z\� DETAIL 12 2 �•••!�...�,,' F 24'•SANITARY CHANNEL CHANGE om' f��� 11 ,•, Y l!!/!`,__ DI PC 350 J1� F a m Rd ^� al ,,_ IL :1 SLOP 1:1 SLOP . i r` \ © \ ,F`��a ., ,, r - Fll w• ,� Y.,. IIL �r / \ tl 12 FT 'ILL �1 PIPE ® \+�.. `....s..w ^,.s 163.89 RT OF LINE-YRPAC- Y ^ ►.. •�A '\a �I\\ urns ann J,� BEDDING .. • xw.aD.n / 1� %l ;6N. Ill II I 1111 '•1 p FOUNDATION PROP.668 OF 24 „w a MD._ Class 2 RIP RDP o F 4 F 1 III U/ I�E1� MEP ♦ GRAVITY G� v qp �Y# F \ -YRPAC-FROM STA.2T+]d TO STA 33-50 I'I IIIf ROUxDART10N ` �� VT T / \\x- LONOITIONING ` s1 •��I \I- 1II AS REDDIREO • 1 f 0I \III III IIIeIIIIIII • � �� / \\ w w _ NTS _ ����E-'+miff \r Ir l • -.: A _ //•� ,\\`"_T�"—r `\\\,\ at 0 •�� •..». .. 1 �\ ►� \ Rs"yas� //nARu nnYn]T ,°.. ` �x� j� \ \\. x nwu x ( \ \\\ /F�///17/111/ •�1 y \ D.wD, bx (] !� p \ \ .a Daw•. 4.4.' t,9�� *ii :;,.F�! .. �• i Iv I"IR1 i11.1.1 " T'..,,. riLI r ,11 lik \ ‘ 1111, 7,?,::,r"s"" Iliklkillein.,„,...-,...., -,n/Sve...04,,-,,,,, '.11111.1111. • a w, • m �\ \ \ 1 ''' •a!�ii?i •"4 1 •� -U' �♦/ 9� II .Ewa.ae,m \1 �/� y Z `,'- /� ����.Y ,\ I litl 1 .u;" �:��i�7_�i��c'.: � ii" x4f••�t'aY •� r I \� ` _ w ��Y x.'a \ /i \ i�iiCe�iii�, u F ufld \ — _ —.'a—iOg_" 1 ——_• rn IY ••` - -ill / .A�Ji�i,... — -i-s, I F C!I!CC! _ ---_ — _ — �N �� i .=�!i�%A,4,•_•�i i�6 0 F-'I a _>� • — w1111NN I Ia b mom°' ". ,�' —— -r =R�"�:�, 7I1 CI1CC C;T.CII/ 1�// ur. _ __ _ _ ��31�.a - - - - __ - _ - _ _r.In u O Ln 149.1.1.061 .111M111111�•, . r x., - -- ATs -- o Lti If e CC®Ili ,-a.,or `I„ ©I \■'rr 1111 I ,.... ifA�Y _i_ ' o S �®=®Ii..dr.g��IIL „ _i �/ .ate MINIM CCCCCwm/CICm CIRCI ICE .. • ���I MEMO MI MI] '1 -:22121 n1.!I w ..i. r•: c/�r.rllnnlanri tea. ii a1�� Res n Ln ®�� r1lSlric/�rsl/■ u�uii� o`a 3iceleL r. jl -��l :�s _ �'"�� Q I V y. �- r r r r r / .4+*" Iiil „ �. • „,..,,...,•,.a.-^a•, — '. �. J_ _w_ �Iri ri I�uN� n�n a �'I.., 1„; -�esre'G:111111111:17 ____�_ — — _ _ ' vwL u / a.. Dx,x x„ e_ O i"! INSET V111 % D,Yx.«D.Exx,.xff �� i�. I �!/ � lmR� _ , 7 7gi dc xooY,. i II,. e 1 fl ,6 /. .;'� c+nw �w�(.. `//,��' �v" .41 . o // „ o�// �.:Y ��1 mt//�/ T 1��:..8 _ i. wC �� �' '� �� ��itt V V V III / xci � �}� ' y . - - ___ 0 -. lir •• ;/// , ^/�/`��,�, �l.,� A ERE 4, E'NE I T L V 11\ \ ° / ,ice �/ iv•`• i_D'/i :I�/r`•/ } :' �.*, A .* / Cn Sg ��i�ii� �/ / • A • I/ 4 � � �iji��i / q 3 " j��l\�•jal PROP 6 DIAL MANHOLE Al � i� / iiti�ii�,� .y/ � TI - 1 I TEMPO1 RARY FILL IN WETLANDS I•/ c/ �I`1iis� / j/ / ,♦' .,- •• [/yp/' 218.21 HT OF LINE-VRPD- / � ✓� IMPACT r'i:ii 1L / / .. - l I jii � •J j PROP. 130'OF 24"SANITARY �•+ I � . / // I ' ♦'�/ // /Y T -v ' �- (GRAVITY SEWER(flJ DI, PG 350)I / Y' /' / d aALrvr.Pt.•M +s uc / Y f •..., �� gr DENOTES TEMPORARY �� / �L © FILL IN WETLAND j� / ,I 4� /! PROP.6'(1DIAy.FLYAl4NHOLE 81 SITE #�1-1 * * A �j ��� / i . i bIA.A1.s8.65 FR I iNF l / Ik w ' 91.]3 FIGHT OF LINE-YflPD- .O i 25 I 5 Yi 5 ,1. Algol / GRAPHIC SCALE-INSET /* „lop A A /c: ,,.F c I I ��` DENOTES FILL IMPACTS 411t4)4 'AK IN WETLANDS /ai 1XI cnmm®n. ww�wm,x wm M� 1-381168 24" GRAVITY SEWER LINE TRENCH DETAIL N P P iliiA 4 ...b �'�INo (1, -AMATCHLINE- SEE SHEET NO.23 v,,i1,i‘....0 FT ����-r8s.,4 Idlll[H11P1. 1 .<,ail".i.TR:e��c. -..n�R"'.. x.' c�aa:� awl/dllq�fl/� p -- 12 ,i ..,v4 _ �. 1\ ""` )/��'Ill• CHANNEL CHANGE -I1..:1 SLOP 1:1 SLOP G '�A'T i�q.\5 �.,I 111��.� o�il • , v,,. II, EXCAVATION \ wil aI� /� r IIiIt 1�� ,11. �p11I��l�l�l��lI�y//�j�� I//� i `: j �/ �� ��tw 1 .1IeI 12 FT I 1 PIPEi. �, j .. .. 9: j I r .. �A� „A1 \ ann FWNWTION { 1 � Tm.`When B w- CNev x rtNp-xeo a-NO N. a F II I �IC I I carvoITIGRIH� � �� likt:�oF1 ' .. �I�1 i'l r f� -VIM I$111M FI2R[G AS 1 a/� --JJ`Y Q 1 �i I'I .....'.: P11I REGII[REO \ .`` " ���. .v" /..v-r�,. I/,p Jy�1 YI _ pI Fl1UNNunON \ r 11 � F w_:. III/NCl/,t ilk m \\Atilt,'��� � I�Illr(Il air** 1R �/ � + -YRPAC-FROM +]I TO STA33- + I- — ffi — JIB AS REQUIRED �,t �` I fIC�r/rN• / [� ,,,,,,„/,,,,,____________::_„..,Ntik„„, ..., __ a lll 1 ggg��� A a— ��EL 7 � / viii ti--"Vrik,..%4111111111 NTS "„!` -'�i�� r"iF i"l�lt�/ J Eti�.�\LR.I�A.v ,7 (/Y!' ,oni ,,5, aannnr sv,..�... A;, \ �► \\ �.-:mn �� EFFai1a1 ► 'r� '-.1:1 �/,1::=n.r�tinr I 1'71:n _ 71eE �u.nrrr e ------------":If----- *. ) , U 1 ,11 n \\\ \ -411° •sI , yT�Yee/e�r<�:eevt���� 1 `l, \ t/ ' R` - ie. eN� EI 71Nk'1���niI q�a " ,,.a�nnuann N1 ,cs a \\\_` .. , .... � •k .:a�i` . /inX: r1r[o un... +EI�Ek.aEEE&rsfe i IN6C,1 � \\. Oa r,-t-WB- , ` �I,, l ,�� �` ~ :oi-.,,w -�� , :.. • . ..lf ;In. j' u':C:se; i ,� rm�� � Z \ lig" //LL�LENERECdl, ^A 1111�,. �NE BB/EGE R>f•. Q. • 4 ///) ,, �C) BEG/N Ex ,• Nil -WB-PoT - �....S�i,��O.v�..JOa� `'S` ` - 'iM �. _i n�srr nR..� ..Nr. Ifiilll �E�_��� /F/i � riNpIW .., 1111�1 ��. • i, .Ji® �. .111 f �y� - 4 �� 1 . �� B c rnatr s. ♦Zt i ,.` Cr. w- �s • ♦ ,-ll• /_ ___ie O L �� pxE�xrxH su \ 1 ��.s r @ ®�11 -w._ w Z i _L-we-PEr/a.Bzss � �x..r.i.w.. _ _ -?' _ —�� LIJ H \ '� ^ter 1 - _,.:.,,-.-_���� snip-, a. .,.,.-''�;_► -,p-tiJ�.Jii a� _ 'rnlr n0135 7r14 - -.z _ - _-__ ��—eui6. -_ -= v> War , �Lr �- ...���.�-o -�i®���.'�•��i� = — � — — a ��,_�`_ _ I� _ii�.,. r.�i<r4•zas xrae.� - �T. � �-_� �_�T ,- _c{:f .�� ..aywA• — ems° ."_ • �\r$1 MUM II10�i � _ .R.,.., ' .�-...__.re e!c-.l� rt `, --"� i_—,ar_�.. .'. _ _ i aEk ar.:i1;4b 11AlN� tea_ - PIIMMIIIV it -� � IIEIi�P 7T„EI 11�/ T.'Y: L >� �=�rJ 1SSi..1 iS'n a S. ®® �2 C; 1=-1= ® UM • �=® 6 I''/.ECFC{v_.r.! .._, {C iAkWP7 l__ ..t—i ��lltt—� E ��ilR�l � � I P^Psxi a3C�11'����77; :rl -� o - = F7 EE11 11EM'II;EI I� .. 'nS1�S.:" �=.!+r cA ce C S rJ srr � ffi�- .� �— J ,�1 ins ■ - �' ! • _ ® 'LS—_ �."_:. 'Z-G� �,-fT.,,T'�F� I - ass-._,,:..r iriii� i{{�w��. f.t � _ �z r_e es�se t s ass cs�ss r asr„=as ®EE•� ____ EEW fCEE13 EI ��_ F'I, /, .�>m•, �� �-�� Si�.7�1.�5.,•yi®)�3 �/! 2:: d:. Y =A.'IC•l Z+S+C,.' Ei r=.'=Et\3SaCaCaESt StsI.EEEIaS EIA�- -3. i l wr *.r' '.,u-. IEIIEi.uiu \111� .. - �® 9 __ s:L . Wi'.. ® 4 0O - - I%INEIEMEN •II►.LE - „ - riicRR __ >i • t;_. - EF - 1R II�E�.�> - �-. . 1�'•'e o ©� n / �- -� �aA7� �6EES• —t�.�.T.� __ia�1R�1._ _i' Imo-' _!-;, DEICE■# EII/IE11t, _ , L>®®.,�. 1 !/ 1k ,,homo'i _ �ro -= M E --,.��--> // I"9 III 111%li!'pWMEEC i! i wn .:a s .. 1® Ep g 7EE�i=� - 'ski _�3!�-- y - -.=g' • -� --....,.- - I," NILF 9II/Bvlzr �3 - - - -.,\�.�' NNNNNNi - - ,rawe,� Ei+;_ a_��.r _ _ _ - -e..<,P ,...,. -= ti_ .�� - E� - z RE t �,�/ d✓A ;ems — - — �. .... a fir .' w ENE aemrsraccrovcii .. _,3 = �/� d/ ,.v A.� - —... ��-- � _ � is ., . it e _ ,_ .ar - //-� 0; _,.. � i' h wi vs, -.... _p -,; I N _ .: r /.----:: i. qz "li a •1./� ~ ret • 'i ff/Agyill_ INSET' fib:. BEWN '-ESE'W'�,. r, �, I' • / �- _i i%• �LI"— o/// lB .9rp .� - wrif/ (,,w/i )7P/17//),/. �� III � , �/ ,If' �i�/ 1, � '''S.II/` y� ,1� �_,.. VVJ rA.,,, 4^E.� t '�1 q 4 . /. 111° ''A 'E% lI" al.'.%111 `/ c'/ I `a'f BEWN A^,,,0„H SLAB T , . -ra• . . } foosl. SK ni¢ i1 � �/ : � . � .i � �!`�1,�r�'•�/� �,� �� � f, � I ' n'�,•� � � / `r , .Elidui iV1 , a�.,.Y. ;, .*n j. , runNUR / 11, /,� ix��'•i!'ii � /I .h4 Vicy4,,,„„ r�7�71 t�x��I�/�T �� / 1/f .c�pi0 , i7,,, 1 r' 4=ii i y .�n _ Rilg,Igiff311i EMB 2� 1�1`� .,`..�...�ii ;�-. i % ���'�'//,/ �II'� P�! / i# `� 1, le TEMPORARY FILL IN WETLANDS .y. IMPACT b / ! .f•¢''I /..��1y'li� /., __ j •°i d , ,,- 4- 'yji o la ii' ,�c,, III. G��y �.�I „r visa&Aid / k ������. 'I/// i : -, _. YEA.•, ,,,,5,.. .' �� : �. 611:_,,, yyV��� y/�DENOTESTEMPORARY r� �.i ' ..,+^�4..4 ' t y�% #._Ai 4 .t t �?� ���/7/FILL IN WETLAND si, / c ,.,...,. .,,,-; ; ,i,r ,, 5 j� 1 • ✓' � � � 1i- / / ]� / s yi GRAPHIC SCALE-INSET .. ir I�� DENOTES FILL IMPACTS 1' * / " o IN WETLANDS / ;117, / 41,. ., 1 �� 1 ^ I V, ` ,mu,®rvLaau� c wvs cwrm. . i �EGG ST9Ar �.._ . ♦ l Q C.O ;lQ♦p SFF?/x C �. a�Ka C p 0 0" C r x S ti ii wpxyp p �' .♦ �114TNUNSST y��pF ��� x \0 •..e SEE Aiisi.305.+100 1'` e5 •;\ y,'' , \\ ��i�l h►�ysSHE Y i :1 4'Of3o�` uMATGHLINYRPAC'�'� u\\0 �4..„« ,U���>I 0 RTA. *�►�aja� !49` I" All SIGNATURES COMPLETED 66+90.00 �a��i AO i ST SEE SHEET N0.10 ---'-- ,t,"'''',,o."/"; _ ,15 �:. ���\ + �f�% si"� Imi , ariel �0��, - .'.:117: 1 I jll . F I.' - _440 ,, '_ 1 1 '"� or/Ip�l>, ik y � i Z. ,r p p 1 I c1 /, , i!/���io1/iiii�� i���:� p 1 �® • ai iv !� lli j l (11 1/ tifilit- i� �illiri �i� y ' / ep fi p • ® fl�=> �\ 1 ►►�v�i�i;1,tii��v +.� �' ri 4 / //y © gip p pp at p / � ti.. \ \• \ • \ �SII„ •�l d p: ! l ‘' ": 4 as'.a l.. .\• o /I N.,r�,tpy/ I r /% '`'•✓�//# e• ..ppp co 0 ri 17 `‘:. - - 41,4),..,s,:„ ,,,,,,.., ...,.......,,::.::::•::!,..,::::..,..:.......::.: ifi, .... • ‘,..pa—. itrit,\ v //v. . i ,' ,,, .. � `` l , -p Pi90 14.1003 Pis 90 25.74.30 P19.26,4337 Pis SW 29+0194 P1s Sis 30.9594 �\ off•. rr33YY� -:•;:i i V �_{{7/r / / p `� �el l�•,,,,••'•••''•',1>`s1 'I 4,41 S 0•2'3002-TIRr19r•I57552'9•E92P110IRrl e,•4.52.552 e,•4.57.08, \... aw? •!!• \�' p L•• 87 it••9604 336 49 SOD Ls•P14960P Ls•M4p0 ._tea \' !. .., ® i',.i Yl! l lifitit4 $�� ♦ \.,ti \' ,� � e�7x * gpa,'w :90 sr .ea3 sl•*tar sl•ce9r a u.as0r LT.s60r \ • • I / I La \�\� "�i.. ^� • •. I e ..I 1% ���a� .3' .:; ,a* 'ro" :�>.- p pp p sro� 1. r, wso 74.02 P1sm 1a.«m ,,,,��� rJ9380041i 9•2570524.0M °<orroa,,,k ke p \\\\ I �' 1 ��.�. �, p ®4 4p © p p rsif r•53264 I a:2srs2 a•:i ' N.. ,♦. :•• •.h .�f. . 1 t 4 l I p "a a -rrrPO- / .\ \ �•;I,I.'•' J *t ill Dv1� " ' / { p Pis Vs 331033 Pi 9s 334.969 Pis Sro 2324232 P15ro 235.92J2 PLs SO 20.2504 Pig.24.669I Pis 94 28.5703 i \ •�J•/•I i 1� / # e p es•23fa0 9•8244380T, 0s•454 MY 9•4704WILT, 9s•I5rotur 6•173r249'IRII es.faros, ' - �y - \ �\9 . %/' �' II u•E7000 0•f5f359 u•EW00' 0•f5f 35B [s•M40V 0•857OP Os.µ,me .LL-'S8/. `\••p ' I I �"••.• �1� sr•,9002' L•4212 S •66.6r r• 85 31 u•%M 1• soar fa� \ (���y Sr•9002' L•EE C Sr•66b1 L• 5/•4503 3361X1 51•situ %ix ..+,.v \ ` \ .\\Q ` (�/,;, % \ I�I�I 1 it ei �r7 © MP11 MPx OS. 05 I h. c , \\ •:_11 •.\gq�yy>.- ►�� - ♦ ..- - -rRPO- O 160 -rIRCA- s \\ WC :‘::`'1...'„ '����� F.,ass R.9335 ,s,4.WOB P1s 90 6.60 PiSlo 22.0s Ns 90 3i•6693 Nils 41+3283 • es•I5,..., p•2230'364,0L, 8s•4.57.0'8# 9'YN050101 es•4'5r09.4' 9•9933,53•0/1 WOO' 0•8574/T,-1 \® \.\ `� 1\\�t ,� � Ls•LPIDIY9604 L • zr2r [s•19600 L •043.409' u- 31017 V " ;4 .; ��1 u•420 L• 657r p•saw L••365.9 LT-•960 L•1909.r p 1•3AC Sr.IBOT S.906 \ • p 'is `'`••• • �� :i 11,°>i 05• sl•'�3 OS••5500 PPR OS••8 fir,. \, , A�4 ,� �+ 7 i..,.• IFOURTH CREEKI S ,\ '. �}.•• ��1� i I ®.>nw+ow P>.==ssL uc `_;\ �� SITE U-2 �`: ';: ;; 40. ��� � ;;. SEE SHEET 2A I. 4 ° li ^ 1 71= ', w0 '°"'as,s„, .� * ' '\\ Is9-.�. I i, 1 I/ 4? "'.'R',�—'/ ell 'rj l • •..--, It:"%AM l* ,' Og • ...-- ..\...... N .m II // 14, ' F ,rqM r ,.\ �RYII�� + "o0 //// DENWETLANDOTE L IN ,i X.6" .L____:1 * 1h I 1..44, �y�,` y/� r//DENOTES TEMPORARY '\ io II !'C`'`1C. "� �• //// FILL IN WETLAND k „r�,,,,�, 1:,�,'�7�,i °� DENOTESMECHANIZED loi / c�� '� I J �i �* e[�..sj,(01.4,t,�4 CLEARINGrs..cs rose tt444 ,, ,4/{I/,/l , .` 11// ._.u,ew revo,�• _ 4 11 v lit�"i —MATCHLINE— f���/��' ,1 7.71:11/1-'-' =,..._.C,....11 ,..... . \ moo . .. o. � STA.80+40.00 —YRPAC— STA -i CNU�i'll.:C4;.>. �y °riA. . \�\\ \ \ i SEE SHEET NO.21 S 12p+ NE .,.+;,r /// \ \.` \ • nL EE SNE No)�El �// 5 -`3� Vic\ \ �! — ® . GO����� OFF?�x`9C ��. a�Ka �` x�o°oor,0'`.��,. 'MATCML�N_ � �/-� syF600\)..( 2` x � E ST i.., ,�i F 7 �P�1Q '�� C.� ,����� `/e°..,I 1,, _v�SEE SHEET•235+00 _ _ �i**4 � 'te\F:PACs ci I 00, IAATGHLWE p C�iP5��0 � �\A �" ��l���1.G��N�«lu��ni� yN� 10 YRT �.��`� w�< � i�� ✓ lei I� �.=Es�o<=s•.o.•Es�o..=E.Eo YR A �. A �t.. ► � t ,Ash z 66 II�� ��►IlYnYN i� � 1' —�7A J w, /�'i� i oo .=...o.o. eae..o< S . +90.00 10 � ::*2...... ,:k,,,', 0411*,. ;1/4? 'pi l',4) fr. , .....,,,:,,„10--.'_.•-•">-;1.0. „,,,---."-.......0,-;> ,.......,„4- 4_,asir, , \\, \\,,, 41 kitairite,,-_,,,,,,4 4 1 41,' Jim '''',7'11- 0'.4.'" '''' --..' / ' /'' ' r $)/ ' r 2] 0 itiOresomii..,-,•• .\_,‘ - "%\'1 Nir -ed/,Pep....:1..z....74orgem e..---....7,....... -02S„,,,;„.-,,-,...-_-----,,-_„-- .„,"- ,--- iii0111_.„ . r‘ lia "....1111111 Plikaj111111 & , \N AIA„,,,_ ,!..(14.4,,,.47:1;;__„ „cf „,___.._._ ,, 7...,. ..,_ ,,, f ki . ._., \\ N 4-'-, 1 ..,, ,•.--- Irrowl, ... .)-- \ t tii , 411* loth vizt ifti o °'' ';'.. .' (gy im E�I. w� _Sys ,r o A -� `Rn • ' �al►Yt�'p@Y.YjYi� li�� �i/ �S:r. • Nkii.„, ". +'L� �I `1 Ili:l1'`�s; �� 1 I� r� y.. A�� i Q P L ram, % '� � • � 11/4 111�pp1!lk•Y1 4, ' ' ; sfe, ► `, �a • � Ills � !. - .� ����I,. �. FYI ii�br �A ����Q7 �2 ' ' ,44 ' ' 44.40#$# AirW, --iiiiip 411 _ft jr_jr im--1/‘ it'L I .., "' e 3 l '�� Sb'P9M3.91 PYs 510302959/ Cai . bt, 4 'tififf,' ;\,,,.,.. ,,,,,. ._,,,440044b44,,N, ,7.4 3.....:, .,...t,,\ ..,,.. ....., :..:.:'Agib' - CON• •• 11 7411, ��� 7 57 _`\ e a 14 . E •!.. „�� „ _ * ,:1(04 . .ZSO 1 - I5.. •� fr.r,rov,.:T525 11•lSPO&fu _� ® •:: �,� 1�.r , � L.• D j4650O • Is.. _hA15S.A �.I.I ,, a. $r1:,.,, IIl ({uJ� tea, .. p �� l . <«,>tea1111:1 • - \. ,. � _ . _• I �>..ilIl� l "' j .' `✓ ~¢ •v '>3s�' u•q -o•zsz•a �% lSIL. � o v '. d I � !' i�: �I�r�li a L�. i jf p:q zsa O DTh9D /,,A,, .i e •�111 �,is i/ _ 1�_i Ali A _ S •! .rY a - �, yvo- ,-// , , tft,,4 �14 d� .. .� •; ����� .,r n v3 u se °7 Atil 4 ..„,. , . �lI� 1A�\ VL]� �4^ > 1 �.; li 41 �ri� � ��� ���.. = _�,. 30 MR, ' , r.. P� .32Bi �\:* , � 1.5;tiv ,!/"(if� ,� � ,�. I �#�. a i 1,/I 4t4: . . , �, /' ►� � ���� ,rr u tdow-,:m:;„.;:,1::, , 33532r"+, 1li, � � \ k i� r�! Ifht:41' i il� ''� fit ,.. 52'.u• I �� v �� . %16.19. cltes SEE SHEET 2A" I ' iJ�ul/►^i ��s, :,� • o a ' ill.. >,il, ill M . i1 i 1 if /ir llt i , ' A° ..,w' \\,,\\;\\\ \\,,l& I� \ o„ i�I/,/ .i all! Nill �� r..• 0 �)\h�\ � �� �. x3.• �� s ly��/� p�. : �� 'p/� .W fl DENOTES FILL IN F • �,� ,'V� �- A rRMI�N�F ! 6! i1 II e.o�.�� . Y9 D ��� WETLAND P� `:R'; Y.. 1�jll II� I��,�.Y`'`�`J � i ��I , �� \� V7//Y DENOTES TEMPORARY /I 8 {F FILL IN WETLAND II rik :iciT 'l , riA\_.__t__,___,:.,,i)\046 4*440414.1t/41/00:::: ;.'ii:*:::,..1:,:.•-"t ilijitii,*041/40004t1102411 \ \ N 0.° L III re*,vit -a ,�,,... g}v ®�' .}`,@�O q!f'%we AO' ' DENOTES MECHANIZED ^ - d ®lit 4 BR f)��4♦ T \ ''N '' '' .• . . . CLEARING a se ... ) 40.";*. ::S:":*;.::i:g:I;?•:'..fil.f'I fib 1.41?;4 1•1 '"41 '-1•414 ilk•41:4,t:,,,,:....' , ......•,......!!tilrtir.404412**. D -....,, ...., ,_ ,-_- :),,,,,04,,, vjj ti14TC Pl. �1�tlay� w ,�A V \ V v Q J CJ a 9 �a . o. � HLINE_ STA.80+40.00 ��g'1�'NS�h # ► \\ \ m , o� QNO.RPAC— STA ?l�TCNCIHi�d 41�� q ��I �� �� ��� O SEE SHEET 21 EE 0 • • "�` @"SH U �� EET N S \_ A� sj..7—.. �o a �n �O.27 = e I\\�Ou O LANE 1 XX S I ) PROJECT REFERENCE NO /-38/9B — SHEET NO. 22A RiW SHEET NO. __ SITE U-2 INSET ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER r * * ' * * * S • ' s A A A • *A1 -A A * * A - S S -' - A .* S A A A * -A A INCOMPLETE PLANS DO NOT USE FOR Ai W ACQUISITION * * * * * .N • N A * ' * "' * * * A * * A * * A * \1.* A * AA N * A • * *. SJ . - : A %* A .*, * * . . * A „ .,k * * 4...* • . • \ * A * * * * A *- * A A AA A AA * A * A A \* • A * * A A A : * . * • ''''' A A i,S A A A * A A A A AAA * * A * * A A * A A A * AA * * * A * * * A * * A * * A * A A • DOCUMENT NOT CONSIDERED FINAL 7)) V A A * * 4 \ A * * ,k .*. ,k ,k --„44, ..,... \ A * A * * * * A * A A A A A * * A A * A A A ' A A A A A * A Ai UNLESS ALL SIGNATURES COMPLETED A * \ * A *A ------'---\:: '* * * A * A A % A A A A ,A A A *A * * 4 -* A A * * I Lill*& * AA'k * * , A * .. * \ ,,..% ''''',04 •.• * * A */''N* * A * A * A A A IsT * * •. \ \ .•A * A A * 1 '(•-•)I * A * * * A A * • * \ / A A AA . . * * • . . ••-•44400("Alitk A * * * * A \ ' .' A * -'' * : * A A * \ . A * . * . N -% '* A '* * * * A * * * * * * A A , ..,, * A A AA * * A * A . * * * * * dS . .'. * • . . • -.' ' ,A \ * * : ,ke * * --... * \ * . • * * * 4 \ .* * * . * ** : 7' * * .:::':' • A :.....''T'''NN ,__ : A AA :*: : ,* Ili , \ ••\ A A ' A A A A * * A * . - - \ ... . A \• • * * A A A \ e * z? .4s. er„), . . _* 1 A . g‘*44: A : A * * * * -1 A : : AA . ...': '113,,,, . , * *'''''. ..,.....j.,,, 1 * * * 'k * * . , ' .* 'k * " " , * ''''''' . . A . ,k . 1 „ * *, * i 1 il'4 : ' . * A 1 A A 1 , / : A AA *. " " * . A ... .* .*. A . . . .* * 1 It I . . . . A, * A A ' kor . . 4117411tab A if IA * • * ' .* ..* * * A * • A A A . . .* . II, \ 0 / .* * . iri i A , . • A * A .. r..„\\ . TEMPORARY FILL IN . * * „.„1„,, . . . _ A . „ . * * .* ,..... . ,4,. .,,,"410% A A A A •A A A * WETLANDS IMPACT / . A : * * ..4 4* * t A 4. , : .... •,-, . . A . . . . - . 1 A _ . .* A . ...,.. „ . A • . • . , .* .* ,, A . . A•7, -..6'.41 :ipo. '.1;.•._ , ,,,,o, * , * A AA A *1 A A * A A * A A .- / A * A A A A * * A I * * A 1 Ln * A A A * o, • ......____,_----- * AAA A A A :* * A .* A A - , A ' - ir 74*, * ioi , . A A * A .* * 1 41 z N.,5,4\\\ . •• . . . A.* A . * . , . , WD .* A . - A . - .........* . . AAA . .* . i . . * 0 ? \ . . A A ,, ., /1/1/ 4PAri, * .* A *A , A .:: ,, \ . A . A . * :A / * ' ' ..** . A 1 CV A _c A AA * * A A < % A * •••••.1'44W_ * 10 A 0_ '• \ k \\0.. .- \ A * * . A * * * A A A • -CO PERMANEtkIT IMACTS @ FLOUR .* . * * . * * * .* .*`.:V4P.A ,14......&41 ..* A 1; - A AeA' TQWtRk FOOTIOGS . * A * A A A . . mla -,4‘ A.* * * r4r1r4744 - A A A .* A . * A ' * * . 4tAki '* (7-It' ' A.* A * * , " * * Lc * 'k ,.1 \ * * A * * ,s <9 , '4') i tm \ <<s/t • \ * * * * • * * , A DENOTES FILL IN L.n. * * A , A A A A * *1 IN P. .-03, • A * A • * * WETLAND NoRp., A A A * , * A * . * * A z * * - * A * . * „..,. . . \‘‘\‘' . .. ' . ' \ •. or cARouNA .* **. ' - ,° TRANsp-'APAR T * A A * * * A * A 0_ OR TA noNmEN 7 * * * A A DENOTES TEMPORARY * * „ v * A .* * A A * , ), & . ---..* * , * , , , * * FILL IN WETLAND * * * * DENOTES MECHANIZED . . . AREA WITHIN 50' OF BRIDGE 0 ALSO COUNTED AS HAND-CLEARING IMPACT IN ROADWAY & DRAINAGE PERMIT PLANS ig 50 25 0 25 50 IIIII 111.11 veil GRAPHIC SCALE - INSETS LANE I "S I ) PROJECT REFERENCE NO. SHEET NO. 138/9B 22A RAY SHEET NO. __ SITE U 2 INSET ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER t �_ � Jr� �� '�� * t t ire:1111:pit:\ n®NOT USE C®MPL�EIE PR RiW Q NS N HZ. s Ntt \ �� tC I * t ttt � tt ttttt tFt t t ttt `� tt� t t t ttttttt tttt * \ 1111 t t t 1114%t t t \ t t t tt t t t ttt \ (► ,N ,. �` t t t '� I\ . IDOCUMENT NOT CONSIDERED FINAL ®44. t , t t ttell t ttt tttt t tJ t I. UNLESS ALL SIGNATURES COMPLETED � ttt tt \ Sit ` tttttttt' I ttt t t tttt t t tt t t ttt t tt`' N�©,. t t t t t t t t t t t t ee 4, t t \� t ttI ►CAItttt11( *tt t t tt tttt t t t ik100 _-'411 . �� t tttt tt t t .* � ttt st �t % t t0 t t t t • t t t ipipil t t t t . t \ \ t sO /104 ��� ., t tt t tt t t \ � t t t k. t t t t t t t t t \ . iii ;:� t q . ����� t t t t t t t v ��� 1 • At �• t� t t tt t t t t t tt t t • IL \ �� ... .4�,� / t )111 :-.41t*-- -,� t10A \-4 t 4 AY Ft t t tom . t t t 1 � ��. P. ' '.W424,ri.flribloiriedill .,.ik ak „ *i. * . .* * \\ C) r TEi41. • 7MPORARY FILL IN t t t �aa,:• ��<.�t ��, t t t t tt �: : .* �� ►'rori.#* * * ' . z \ , WETLANDS IMPACT / Jr t t : ::: * :: ..*:t Jr-•.a,,��� / tt t . �. * *.* : • )."1,\\\ - . - % .* ,, , * . . ,,..../,_ ,4„, , rAk 440K4 * a! * . ,* * * * * 1 ,L,,,, 4 i i lc"r) \\ \ jir-WD \t t t t t tt * tt t t Also.- 4 : tart ;ii,„.„:„.:, ,,,,,,:„, t t t t t t .: t t t t t t 12 N �` \ �`� ttt tt t t * Jrt t tt�� � t t tt� � t t f, t t t t t t t t p A. o„ \ PERMANIT I1�1PA t@ t sin t tit t t t t t `4��+ ' tifitou#4�40t t tit�\ \ 4'�x4'�1WRt ®• = f t t t t t t illhaiiii ' , t i t 111Xib.......w4Wt \*1/4 ' q � t t t t t t t t t t t t t / t l F F DENOTES FILL IN m �� \ t t t t t t t t t t t t t /\\\ WETLAND �\', \S NOR M CA \ t t t t t t t t t t t t t a k �. / ROLI>SOOETMENT \e>1jt t tt t t t t t t t t t t t tj DENOTES TEMPORARY 222 �- tip+ `:* \� \ \t t t Jr t t t t t ,t t t I!' t I. \\\\\/// FILL IN WETLAND * * * * DENOTES MECHANIZED AREA WITHIN 50' OF BRIDGE ** * * * * CLEARING ALSO COUNTED AS HAND-CLEARING IMPACT IN ROADWAY & DRAINAGE PERMIT PLANS I L O I,a aN oc� 50 25 0 25 50 `1I11� GRAPHIC SCALE — INSETS WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) U-1 31+50-YRPD- Utility 0.02 U-2 75+00-YRPAC-** Utility < 0.01 0.25 0.02 TOTALS*: < 0.01 0.27 0.02 *Rounded totals are sum of actual impacts for entire project area **Permanent Impacts from four (4) 4-ft x 4-ft concrete foundations for new transmission tower locations. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 06/05/2019 IREDELL TIP NO. I-3819B WBS NO. Revised 2018 Feb SHEET 8 OF 8 CO See Sheet 1-A For Index of Sheets �� SHEETNO S�1S STATE OF NORTH C A I\OLIN m See Sheet 9-B For Conventional Symbols STATE STATE PROJECT REFERENCE NO. i rs�� �90 m DIVISION OF HIGHWAYS mmoo 6�U- 039 STATB PROlN0. PAPROlN0. DP9CR@TION 77 34192.1.2 IMS-40-2(124) P.E. O t i,BEGIN PROJECT sa FOac� j `C.) �1e 34192.3.2 WA DESIGN BUILD 40 `," � 1 ' IREDELL COUNTY ' STATESVILLE u a ��^ \.v., SULLIVAN RD.,, 2� `\ (�/ �` LIMIT 21 "1J .NMWk \ 4 \ 1 �� 77 ✓ Q� gym. �; ,i.� ,r LOCATION: I-40/I--77 INTERCHANGE INCLUDING 1-40 FROM WEST OF ,P.111144 - SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & 1-77 FROM SOUTH OF NI? y< tiv�� SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERE RD.) 0SR 64 -.7,9 i v. TYPE OF WORK: GRADING,DRAINAGE,PAVING, STRUCTURES, a RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL / END PROJECT -\ _ Eleili 4:, \_- < 1 , Vance BEGIN BRIDGE BEGIN TIP PROJECT I-3819B V ��4� -Y_N- STA. 149+92.32 -L- STA. 7+83.00 ��<� 4 ' sa 16, END BRIDGE W it1 jc END BRIDGE Y_N- STA. 151+13.82 n poi 70 1m Fogy -YRPAC- STA 47+78.80 / v END BRIDGE Y_RT- STA 243+75.17 O END BRIDGE ' VICINITY MAP 41j1--cr -Y_LT- STA 343+54.59 Q P BEGIN BRIDGE a THIS PROJECT IS WITHIN THE MUNICIPAL YRPAC- STA 56+72.08 o ��Z Pillilli BOUNDARIES OF THE CITY OF STATESVILLE ,,..N ; Aa m� 1 END CONSTRUCTION AND THE TOWNSHIP OF BETHANY S¢til , LF= y ti� j� -Y_N- POT STA. 216+70.00 EP a BEGIN BRIDGE 1466ii, ,- t1 � ryb -YRPAC- STA 46+32.80 ' YOB- END BRIDGE VIIIIII LCDWB tih �'%� r -YRPAC- STA 43+33.25 BEGIN BRIDGE -LCDEB- 4 �, -YRPCA- STA 16+34.7041 s9 tiA 7 ��. BEGIN BRIDGE�,� pRIGHT OF WAY ROADWAY PLANS �� -YRPAC- STA 38+55.25 END BRIDGE �� �'/ �• - BEGIN BRIDGE SUBMITTAL A (SHEETS 10-12, 22-24) -YRPCA- STA 21+84.81 �� ® \, ! ,/j PRPCA -L- STA 148+56.05 -YRPC- •\�' �:-...*>4:w. ND BRIDGE SUBMITTED: 06-24-19 BEGIN BRIDGE \, //- -YRPA-YRPA- �\AI �����II1* N#i -YRPAC- STA 28+75.00 -YRPCA- STA 36+16.25 -YLPC- �Iti l i i -YRPBD-5� �/ SUBMITTAL # L-031R1 END BRIDGE 4 :Or BEGIN BRIDGE ��� �l� ��, -YRPAC- STA 27+50.00 -YRPCA- STA 41+03.25 3p �f��I'/'-� END BRIDGE -no- US \31"7;� ,lla __ -YRPAC- STA 79+60.58 DAME ����,i �SIR r �A` YRPAC- A `` ilI +f v� END BRIDGE EB9 SA. ?. ����iii4it se' >> �� -L- STA 150+16.30 R(41,02 YRPD Ge �Y 1.0 411; 1777 g 1t5 x c . YES s c osarm��inliwat i� esn �� END BRIDGE OS� 4'� i 004160 e::# ,ti`,* L w6- STA 1ao+3a.9 's END TIP PROJECT I-3819B r � :y����i�I►1111B�kjir v) v fr � � .r rr��tlr1i�l� �' ,�� END BRIDGE �. -L- STA.219+50.00 CLEARING ON THIS PROJECT SHALL BE PERFORMED ,b �'tg,�iy L_EB- STA 140+38.97 ! !►�• TO THE LIMITS ESTABLISHED BY METHOD III. j1 BEGIN BRIDGE M N SJti� /I!" END BRIDGE L_WB- STA 139+24.47 #tysT\ THIS IS A CONTROLLED ACCESS PROJECT Q� BEGIN BRIDGE �N. " � LT S. co) oo Y10- STA 28+16.85 sA I LANE WITH ACCESS BEING LIMITED TO INTERCHANGES �o� BEGIN BRIDGE L_EB- STA 139+24.47 �sy �' -Y S- STA 120+24.50 BEGIN BRIDGE v - -Y RT- STA 241+22.17 DOCUMENT NOT CONSIDERED FINAL rn • • END BRIDGE BEGIN BRIDGE UNLESS ALL SIGNATURES COMPLETED rn -Y_S- STA 122+41.70 -Y_LT- STA 341+01.59 DESIGN DATA Prepared In the Office of: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS V GRAPHIC SCALES 1-40 1-77 PROJECT LENGTH WSP STATE OF NORTH CAROLINA ADT 2018 = 57,300 62,900 1001 Morehead Square Dr.,Suite 61., Charlotte,NC 28203 C' 50 25 0 50 100 NC LIC NO.F-0165 ®Rr y `III I ADT 2040 = 72,500 77,500 LENGTH ROADWAY TIP PROJECT I-3819B = 3.885 2018 STANDARD SPECIFICATIONS "-- ®F a�'� ° PLANS DHV = 5,800 6,200 LENGTH STRUCTURES TIP PROJECT I-3819B = 0.124 ,s e : D = 55 % 55 % SIGNATURE, ° 50 25 0 50 100 RIGHT OF WAY DATE: CHRISTOPHER D. DAVIS,P.E. I'I"� % * % ** TOTAL LENGTH OF TIP PROJECT I-3819B = 4.009 PROJECT ENGINEER ROADWAY DESIGN �� �� o T = 16 19 OCTOBER 30,2018 ENGINEER Air Op�Wp�ao�®�0. m� PROFILE (HORIZONTAL) V = 60 MPH 60 MPH °'3� LETTING DATE: ERIC W.SECKINGER, P.E. o 10 5 0 10 20 TTST 13 + DUAL 3 (I-40) ,-�'T r 1 `i I i i ** TTST 16 + DUAL 3 (1-77) OCTOBER 30,2018 PROJECT DESIGN ENGINEER N m v l PROFILE (VERTICAL) CLASSIFICATION: INTERSTATE PE F.E. t\9.7� SIGNATURE: STATE HIGHWAY DESIGN ENGINEER LANE `` I PROJECT REFERENCE NO.I- 38/98 SHEET NO. I—A RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS INDEX OF SUBMITTAL "A" ROADWAY SHEETS GENERAL NOTES ENGINEER ENGINEER 1 TITLE SHEET GENERAL NOTES: 2018 SPECIFICATIONS EFFECTIVE: 01-16-2018 1-A INDEX OF SHEETS AND GENERAL NOTES REVISED: 1-B CONVENTIONAL SYMBOLS GRADING AND SURFACING OR RESURFACING AND WIDENING: THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED 1C-1 THRU 1C-24 PROJECT SURVEY CONTROL SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES NOT CONSIDERED FINAL ARE SHOWN,THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT UNLESS ALL DOCUMENT SIGNATURES COMPLETED ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE 1D-1 THRU 1D-7 CENTERLINE COORDINATE LIST PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. 2A-1 THRU 2A-9 TYPICAL SECTIONS,PAVEMENT SCHEDULE & DETAILS CLEARING: 2D-1 THRU 2D-4 DRAINAGE DETAILS CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. 2E-1 SHEAR POINT DIAGRAM SUPERELEVATION: 10 THRU 12;22 THRU 24 PLAN SHEETS ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH STD.NO.225.05 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS. 37 THRU 42;47 THRU 51;55 THRU 58;61 THRU 73 PROFILE SHEETS SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. W-1 THRU W-2 RETAINING WALL ENVELOPES SHOULDER CONSTRUCTION: ASPHALT,EARTH,AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF XA-0 CROSS SECTIONS TITLE SHEET SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD.NO.560.02 XA-1 THRU XA-9 NOT IN THIS SUBMITTAL SIDE ROADS: XA-1 THRU XA-63 - - _______ ____ __ ____ ____ __ _ -L-(LT)CROSS SECTIONS XA-64 THRU XA-72 NOT IN THIS SUBMITTAL THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE XA-64 THRU XA-127 y -. -L-(RT)CROSS SECTIONS SUITABLE CONNECTIONS WITH ALL ROADS,STREETS,AND DRIVES ENTERING THIS PROJECT. XA-128 THRU XA-132 NOT IN THIS SUBMITTAL THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS XA-128 THRU XA-141 -Y_S-(LT)CROSS SECTIONS INVOLVED. XA-142 THRU XA-146 NOT IN THIS SUBMITTAL BERM DITCHES: XA-142 THRU XA-15.4 -Y_S-(RT)CROSS SECTIONS BERM DITCHES SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.240.01 XA-155 THRU XA-166 -Y_RT-(LT)CROSS SECTIONS AT LOCATIONS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. XA-167 THRU XA-178 -Y_RT-(RT)CROSS SECTIONS SUBSURFACE DRAINS: SUBSURFACE DRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.815.02 AT XA-179 THRU XA-193 -Y_N-(LT)CROSS SECTIONS LOCATIONS DIRECTED BY THE ENGINEER. XA-194 THRU XA-208 -Y_N-(RT)CROSS SECTIONS UNDERDRAINS: XA-209 THRU XA-215 -YRPA-CROSS SECTIONS UNDERDRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.815.03 AT LOCATIONS DIRECTED BY THE ENGINEER. XA-216 THRU XA-246 -YRPAC-CROSS SECTIONS SHOULDER DRAINS: XA-247 THRU XA-261 -YRPC-CROSS SECTIONS SHOULDER DRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.816.03 AND DETAILS IN PLANS AT LOCATIONS DIRECTED BY THE ENGINEER. XA-262 THRU XA-291 -YRPCA-CROSS SECTIONS DRIVEWAYS: XA-292 THRU XA-300 -YRPD-CROSS SECTIONS DRIVEWAYS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.848.03 AT LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY THE ENGINEER. XA-301 THRU XA-307 -YRPDB-CROSS SECTIONS STREET TURNOUT: XA-308 THRU XA-312 -YLPC-CROSS SECTIONS STREET RETURNS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.848.04 USING THE RADII NOTED ON PLANS. GUARDRAIL: THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL. END BENTS: THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS,DETAILS,AND CROSS- SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION APPROACHING A BRIDGE. C UTILITIES: = UTILITY OWNERS ON THIS PROJECT ARE -6 o, AT&T CITY OF STATESVILLE POWER CITY OF STATESVILLE WATER/SEWER DUKE ENERGY DISTRIBUTION C' DUKE ENERGY TRANSMISSION ENERGY UNITED IREDELL WATER CORP PSNC GAS SPECTRUM /TWC 10 ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS,EXCEPT AS SHOWN ON THE PLANS. -"o RIGHT-OF-WAY MARKERS: m ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT. 3 CURB RAMPS ° CURB RAMPS ARE SHOWN ON THE PLANS AT APPROXIMATE LOCATIONS. mw CONSTRUCT ALL CURB RAMPS ACCORDANCE WITH STD 848.05 and/or 848.06. 0 3U CV2 -03 Ld N 00 \/CC lD/0_ PROJECT REFERENCE NO. SHEET NO. STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS -38/9B B CONVENTIONAL PLAN SHEET SYMBOLS BOUNDARIES AND PROPERTY: Note:Not to Scale *S.U.E. = Subsurface Utility Engineering WATER: RAILROADS: State Line Standard Gauge 11 1 1 1 1 1 1 Hedge Water Manhole g CountyLine CSX TRANSPORr4n0N g SwitchRSignal Milepost = O Orchard Woo Woods Water Meter Township Line p MaePosr 35 Water Valve City Line SWITCH Water Hydrant RR Abandoned — — — — Vineyard 1 vineyard Reservation Line U/G Water Line LOS B (S.U.E*) w Property Line RR Dismantled EXISTING STRUCTURES: P Y U/G Water Line LOS C (S.U.E*) - W Existing Iron Pin 0 EIP MAJOR: U/G Water Line LOS D (S.U.E*) RIGHT OF WAY & PROJECT CONTROL: Bridge,Tunnel or Box Culvert I co�c a/G Water Computed Property Corner Above Ground Water Line Property Monument 0 Secondary Horiz and Vert Control Point • Bridge Wing Wall, Head Wall and End Wall ) NW ECM Parcel/Sequence Number ® Primary Horiz Control Point U MINOR: Primary Horiz and Vert Control Point a Head and End Wall / CONC HW / Existing Fence Line TV Pedestal 0 Proposed Woven Wire Fence o Exist Permanent Easment Pin and Cap 0 Pipe Culvert TV Tower IFIHI New Permanent Easement Pin and CapO Footbridge U/G TV Cable Hand Hole Proposed Chain Link FenceU/G TV Cable LOS B (S.U.E.*) Pro posed Barbed Wire Fence O Vertical Benchmark I Drainage Box: Catch Basin, DI or JB 1 Hip Right of WayMarker U/G TV Cable LOS C (S.U.E.*) Existing Ri g 0 Paved Ditch Gutter U/G TV Cable LOS D (S.U.E. ) Proposed Wetland Boundary WLe Existing Right of Way Line - Storm Sewer Manhole of New RightLine U/G Fiber Optic Cable LOS B (S.U.E. ) Existing Endangered Animal Boundary EAB Way O Storm Sewer U/G Fiber Optic Cable LOS C (S.U.E.*) Existing Endangered Plant Boundary EPB New Right of Way Line with Pin and Cap W A UTILITIES: U/G Fiber Optic Cable LOS D (S.U.E.*) TV FO Existing Historic Property Boundary "Pa New Right of Way Line with ® w R POWER: y GAS: Known Contamination Area: Soil ;� s Concrete or Granite RN/ Marker ;�; Existing Power Pole • Gas Valve 0 New Control of Access Line with Potential Contamination Area: Soil s ® Proposed Power Pole Concrete C/A Marker a p b Gas Meter Known Contamination Area: Water Nr. W ExistingControl of Access c} Existing Joint Use Pole A, U/G Gas Line LOS B (S.U.E. ) Potential Contamination Area: Water - w Proposed Joint Use Pole New Control of Access * - - Contaminated Site: Known or Potential 7 U/G Gas Line LOS C (S.U.E. ) Power Manhole G Existing Easement Line - U/G Gas Line LOS D (S.U.E.*) BUILDINGS AND OTHER CULTURE: New Temporary Construction Easement E Power Line Tower Above Ground Gas Line Gas Pump Vent or U/G Tank Cap O Power Transformer GJ New Temporary Drainage Easement TDE o SANITARY SEWER: Sign U/G Power Cable Hand Hole New Permanent Drainage Easement PDE Well ° H-Frame Pole 110—• Sanitary Sewer Manhole OO New Permanent Drainage /Utility Easement DUE * P Sanitary Sewer Cleanout O Small Mine New Permanent Utility Easement PUE U/G Power Line LOS B (S.U.E. ) Foundation I I U/G Power Line LOS C (S.U.E.*) --.-- U/G Sanitary Sewer Line ,, New Temporary Utility Easement Area Outline I U/G Power Line LOS D (S.U.E.*) P Above Ground Sanitary Sewer New Aerial Utility Easement AUE Cemetery I t I SS Forced Main Line LOS B (S.U.E. ) TELEPHONE: SS Forced Main Line LOS C (S.U.E.*) - -- Building ROADS AND RELATED FEATURES: School Existing Telephone Pole SS Forced Main Line LOS D (S.U.E.*) � Existing Edge of Pavement Church 11 Proposed Telephone Pole Existing Curb Telephone Manhole El) MISCELLANEOUS: Dam Proposed Slope Stakes Cut Utility Pole • HYDROLOGY. F Telephone Pedestal ❑O Proposed Slope Stakes Fill 4, Utility Pole with Base r Stream or Body of Water Telephone Cell Tower Proposed Curb Ramp cR UtilityLocated Object Hydro, Pool or Reservoir 7 U/G Telephone Cable Hand Hole Ed Existing Metal Guardrail T T TUtility Traffic Signal Box Jurisdictional Stream — U/G Telephone Cable LOS B (S.U.E.*) T �s Proposed Guardrail Utility Unknown U/G Line LOS B (S.U.E.*) Buffer Zone 1 Bz 1 U/G Telephone Cable LOS C (S.U.E.*) --T-- Existing Cable Guiderail n n nU/G Tank;Water, Gas, Oil Buffer Zone 2 Bz 2 U/G Telephone Cable LOS D (S.U.E.*) I Proposed Cable Guiderail nnnnUnderground Storage Tank,Approx. Loc. Flow Arrow - U/G Telephone Conduit LOS B (S.U.E.*) T= Equality Symbol A/G Tank;Water, Gas, Oil Disappearing Stream U/G Telephone Conduit LOS C (S.U.E.*) -—T - -,_' Pavement Removal �V g Wetland VEGETATIO TB N. U/G Fiber Optics Cable— U/G Telephone t LOS B (SSU EE*)LOS D ) o- U/G eTest HolenLOS An Spring (S.U.E.*) Single Tree C3 * Abandoned According to Utility Records AATUR Proposed Lateral,Tail, Head Ditch >> > > U/G Fiber Optics Cable LOS C (S.U.E. ) --T Fo-- rL� Single Shrub a T TO End of Information E.O.I. Sump — U/G Fiber Optics Cable LOS D (S.U.E.*)False M PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-01 SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION BLE BLW POINT DESC. NORTH EAST ELEVATION POINT DESC. NORTH EAST ELEVATION GPS4 I3819-4 754490.9140 1448117.7020 847.50 BLW13 BLW-13 754919.9730 1448270.1500 845.47 478 87-478 754355.6560 1448763.5530 839.38 483 BY-483 755019.0190 1448921.7970 842.30 C)O 477 BY-477 754956.9490 1449847.9290 815.70 BLW11 BLW-11 755141.1730 1449643.6170 822.00 476 BY-476 755200.8470 1450731.2280 828.37 482 BY-482 755303.1620 1450544.9710 823.80 BLE18 BLE-18 755401.4860 1451863.6110 863.19 BLW9 BLW-9 755477.7250 1451591.7140 856.36 BLE19 BLE-19 755568.3870 1452802.6400 892.40 BLWB BLW-8 755657.1330 1452559.3620 885.95 NC GRID (./) BLE20 BLE-20 755729.1870 1453740.0370 907.60 BLW7 BLW-7 755811.0040 1453522.3030 907.13 N A D 83/9 5 0LE21 BLE-21 755872.7750 1454541.2890 905.21 BLW6 BLW-6 755966.1790 1454411.0630 905.50 rn BLE22 BLE-22 756023.6770 1455453.5900 898.94 BLWS BLW-5 756141.3120 1455378.1000 898.70 g Y -100 rn BLE23 BLE-23 756219.6980 1456366.3730 892.64 BLW4 BLW-4 756334.2400 1456318.8180 892.30 BLE24 BLE-24 756513.6490 1457336.9070 885.92 BLW3 BLW-3 756591.3240 1457139.8820 885.73 BLE25 BLE-25 756786.9670 1458160.9990 877.17 BLW2 BLW-2 756983.5200 1458131.7650 877.08 B V 4 3 /I) BLE26 BLE-26 757158.9750 1459093.7350 870.75 BLW1 BLW-1 757295.9950 1459047.1930 870.79 O BLE1 BLW1 BY-365 AIL �0 POINT DESC. NORTH EAST ELEVATION POINT DESC. NORTH EAST ELEVATION BLE28 BLE-28 752356.4510 1436191.2550 897.96 BLW27 BLW-27 752484.0900 1436154.0060 896.48 BY1- 0 BLE1 BLE-1 752620.7520 1437075.8810 882.08 BLW26 BLW-26 752719.7220 1437013.0440 882.94 GPS1 I3819-1 752830.1780 1437614.1320 871.20 BLW25 BLW-25 752960.6490 1437845.7390 874.00 N GPS12 BLE-2R 752890.2320 1438005.1030 876.51 II O{ � 1 E0361 8Y-361 753238.1920 1439545.2160 911.74 �J ' � ♦ i O Q Z N o 71 w BY3A-18 DATUM DESCRIPTION *6. -EY03- THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT B Y-3 6 B Y 3 7 ___ -- __ IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "I3819-1" � L _�'Q3-_-_- - _ _ -- _ _--- WITH NAD 83/95 STATE PLANE GRID COORDINATES OF EY_ __ - _� NORTHING: 7528ELEVATION: FASTING: 1437614.132(ft) s G B Y 3 2 9 5 -- --- _�-_ - ELEVATION: 871.40(ft) �` THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT / I i B Y 6 2 -�� ���--- _ � (GROUND TO GRID) IS: 0.99988915 B IV #9 0 , ��� ���� _ _________---- LOCALIZED N.C. LAMBERT GRID BEARING AND �� LOCALIZED HORIZONTAL GROUND DISTANCE FROM I/#8 9 rig / _�_� "13819-1" TO -L- STATION IS B'° _=ii -EL-�-�= BY3-297 l�___=-_ ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES t ' - Ij i�- VERTICAL DATUM USED IS NAVD 88 i'� --- B Y A-2 2 B Y A-2 2 2 ♦ BY3-291 • BY3 29 i �� BY 36 ; _ ♦ BYIA 223 '� BY 366 E� I %j� I Y49 off\ / �W 25 j / R B Y 363 -- -8= YIA-220 \nnII 2 - I BM#50 --EY � ij�� _ � � '� / /\ WIi g8- - � B51 i ,AO BY-390 ; F- _ 28 E , CREST RHILL pN jBYI-106 ,v BY1 7 POINT DESC. NORTH EAST ELEVATION c rcli O 100 BY1-100 754666.3550 1440001.2510 852.80 NOTES A 365 BY 365 754480.4750 1440019.6480 841.06 o 101 BY1-101 754282.7420 1439912.9370 842.41 I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM o 362 BY-362 753607.3400 1439544.4570 900.92 L 361 BY-361 753238.1920 1439545.2160 911.74 363 BY-363 752950.0210 1439523.8950 902.40 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES, Ir a 390 BY-390 752493.9660 1439417.8950 897.09 FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION o 106 BY1-106 752214.6190 1439399.9340 892.52 A AND SURVEYS UNIT. oOO 000 CL✓ O 0 \ P 00� co PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-02 SURVEY CONTROL SHEET Location and Surveys MATCH TO SHEET NO RWO2 C-O9 W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION 1 q.1 � �` BY4-127 BY2 IQPOINT DESC. NORTH EAST ELEVATION • E0363 BY-363 752950.0210 1439523.8950 902.40 220 BY1A-220 753016.0120 1439829.2920 878.07 B Y 8-2 2 001 �_--_ 221 9514-221 753154.1290 1440030.4060 868.00 222 9114-222 753141.3080 1440478.7240 858.94 O R 223224 BY1A-223 753274.5280753354.6120 1441004.3730 868.13 1441628.9720 ` ��� ��\ ��1� "Y-4 7 367 BY1 -224 BY-367 753124.0660 1441955.2730 854.48 833.01 i J \J 368 BY 368 753144.0780 1442391.7670 829.45 n vL 233 BY2-233 753529.6210 1442510.7530 840.49 Q �I`� ''�� �� �(70 B Y-3 7 \ B Y-4 2 8 234 BY2-234 753580.0330 1442856.9000 814.98 �� 369 9BY-369 753319.5500 1442987.5210 802.45 238 BY4A-238 753489.8320 1443457.5600 792.58 NC GRID ��� E0132 BY4-132 753455.1120 1443668.0300 UNKNOWN NAD 83/95 c`� ���� _�' lir :Y-427 I BY8 229 (c:„Y ,rnr o Bvl#7 WAY pR. BfV#8I W_236 01 B 371 I GI-EN Y 424� Z 2� -___- -=_ _ 8 y 4 2 _ 0 '1 EY51 =11 II B 5 __ :� i i I Y 5- 52 -_ -_ BY 372 m BY 426_-_ =B �'___-___ _ g M#� �( �I ' B V#7 4- _ EYL___caw - � ___- --� __ --_ 78_______ __,________ - -_= __ i_40 _ EY68 SR 19 6 5 EYo3� _ __ _lr r rL ANTHER Rp ' BY 376 / �A 21- owl / 11 o G B Y-375 -�03= L- ___------ _-__ I - /� EY6 / I BV452 -= - _ __ =0 -I _- ®_--- == _- 0 _-- _ 4 g _ _ - -- _____ --- - - = n - - N -_ - �r�5 BY2 234 BV I �I I -EL- _ BY2-233 53 I; rr i BY4A 238 �� i � AVE. �� BM#6 �� ��� -: i Z YIA 224 1 (�\ �� �_� FR�E_ // B Y 3 6 J _ "--"__ BY3 POINT DESC. NORTH EAST ELEVATION m __ W 0 C I = �" - 291 BY3-291 753217.9290 1437481.7700 839.85 /72 BY-368 / ,1� - - ' \\ / -EY55- 366 BY-366 753031.4580 1437815.6850 862.97 _ 293 013-293 753135.0730 1438280.4380 889.63 !� i - __ 294 BY3-294 753282.5050 1438719.6620 900.16 O 41 B Y 3 6 7 J /i!( 295 053-295 753516.3330 1439093.4410 898.78 N / I I E0362 95-362 753607.3400 1439544.4570 900.92 A o, Iii 11 364 BY-364 753716.1190 1440066.0610 872.31 ( ) m BY2DW R 117 0134-117 753703.5300 1440701.3370 842.09 i POINT DESC. NORTH EAST ELEVATION >- Ll 118 BY3A-118 753774.4330 1441218.1780 854.85 O a- n W i �i1 375 BY-375 753913.2550 1441797.9480 853.45 (A) v E0372 BY-372 754491.9160 1443093.9230 825.47 i 376 91-376 754023.7600 1442549.7860 832.31 m 236 95208-236 754567.0600 1443512.3810 824.70 g Y-3 g g I 121 9134-121 754219.6700 1443265.5360 823.04 7E0371 BY-371 754659.1790 1443915.7220 796.30 ' MATCH TO SHEET E0370 01-370 754192.6310 1443802.1540 801.18 I BY8 , 1 NO RWO2C-12 v POINT DESC. NORTH EAST ELEVATION arai E0121 0134-121 754219.6700 1443265.5360 823.04 `� 372 BY-372 754491.9160 1443093.9230 825.47 lT\ \\ B488 NOTES A 374 BY-374 754997.0410 1443240.7960 822.38 N� m 373 BY-373 755330.4260 1443559.3520 821.87 \ I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEI,I 0 a BYBA a POINT DEsc. NORTH EAST ELEVATION B M#3 O 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. r m 229 BY8-229 754954.9390 1442435.6850 817.79 B Y 4-13 5 FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION 3 228 BY8-228 754895.9910 1442731.6520 796.44 AND SURVEYS UNIT. 0 227 918-227 755137.3850 1443023.3010 798.58 smrc 226 BY8-226 755482.2330 1443288.0620 808.28 oN o0" 225 918-225 756060.8030 1443480.5560 818.74 C�c PUT co PROJECT REFERENCE NO. SHEET NO. cr I-3819B 1C-03 SURVEY CONTROL SHEET Location and Surveys MATCH TO SHEET NO RWO2 C-1 0 W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION -/ / 11 ) \ 9;BY1BM# 5A 251, BIV#82 BY-421 k BY15A-250EY59_- _ — I - - _ —\�I I _ — — __ BLW 8BY 422 � y'T''g6_ y BY 423 DWB:r1- -BM#8 BLW- 3 � FYLNT�RP16= ) I a_ ___ , , i 1( Ye �IC4 -- 477__ 0 ik -- /— — Bv#76 y —44 BfV#87 I(n - _m =— -- ■ B IV#7 m / i mEYLC _� il! 'i' __-_-_,E-L----___-----__------ i 1 i , NI O n YS 3 i I y/ �N5 (-) r) i ill Abc)/ 0 41. . O ' y \J II N I BY-86 Ii ' Z I j I II / 1 NC GRID 3 73 I i I B M#6 5 NAD 83/95 41' BYS-I4 I LT 0 I iW X' N I , I I i BY-385 s 0 N5. BYN 13 - NOTES I BY-384 ; /"Eylg' I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEF.] ILI ;I 13819 3 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES, IF a �\ FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION I I1 AND SURVEYS UNIT. o MATCH TO SHEET NO RWO2C-12 N00 O0- ,,L \ u P 0� PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-04 SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION 1 MATCH TO SHEET NO RWO2C-11 / i I' BY 5-243 BY 48 n \ n B Y 4 7 4 BY6 POINT DESC. NORTH EAST ELEVATION Q I I - ^ E0387 BY-387 755474.952P1 1453551.P1P120 896.35 / 138 9-6Ov _ 259 BY6-259 755531.9800 1454234.1920 892.93 260 BY6-260 755414.7810 1455251.8870 888.70 i 261 BY6-261 755305.4840 1456065.9230 885.31 W ' I 0 ''r.) E0U262 BY6-262 755187.2520 1456767.0340 896.59 / N \ BY-480 �1 I �� _ N NC GRID �\Y475 ' 8 1 RI NAD 83/95 `� O 00 ' 1 I ��\6\ rn O to 8 , \,_ Z BLW-2 Z 76 - tL� N V /1 � BYI5-24A O EY-S T_EE8 E�, - Ey7a' O �A Q BY-479 � e� 8 --_—_ _-- � x72 ,` �,� �8� I. I BLW 8 / BLE-25 o I' t`L Lj ,01€ M#7 I e I n �' r` BY15A-257 B �8'/� /� t0n z LW 4 ���+� 8�� c, •o BLW-5 - e I BY15A 254 �=- �# 2 II BY15A 253 ir BLW-6 BY15A 256 �/e -1LE-23 B Y 5A-255 ___EY59_ 88_8.8e-� BYI5A-252 _8� ----_--___- --_ _ --__ 3819-5 -- -____ - --- y =-=- -- .E(S9% — _ �_40 B L E 2 2 BBV#96 BE2 ///l/ �! __ _ _ - BM#II /Illf E BY-388 s IOA-214 /II Iiii/ 8---- �- ---- --- - 6/ 11 --- - BYIOA-215 ,--(- -_ 8 —_ �_ _ — --__ B Y 10 A-216 ) ' BY15A-251 , `5/ BY6-259 8�=== -- ----_ 81 BY15 245 v BY 3 8 7 =Erie=--- -__- ���I BLW-8 �6�' BY10A-213 BY6 260 8N888_ II 2 BLE-2o PEACHTRE BY6 261__ 8 ���, E RD. \ ��, BM#39 tY6-262 L- ` Er63_ 0 B i A-2 7 +�e`'-�- CYIOA 211 BY OA 2;8, _ $-64 M rn U rn ZU Ti O 3 NOTESo I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM ia 0 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF IV FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION n AND SURVEYS UNIT. �U 0 Oer \UN W P 'U�T co PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-05 an SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION • BY15 POINT DESC. NORTH EAST ELEVATION 144 241 8715-241 758830.8500 1457419.4740 829.10 242 BY15-242 758317.0830 1457285.4960 838.60 �I 243 BY15-243 757707.3420 1457242.6960 849.96 GPS6 I3819-6 757495.4650 1457130.8400 851.50 i 244 BY15-244 756879.8710 1457027.2450 859.24 CO fo - �// GPS5 I3819-5 756095.7030 1456908.2300 877.27 47 (/� 245 BY15-245 755295.5380 1456796.0560 898.30 ) - + / NC GRID E0262 BY6-262 755187.2520 1456767.0340 896.59 l� �/ /� NAD 83/95 N V i ' Y 4 Q // c, B 5 2 / ' BY 15A � POINT DESC. NORTH EAST ELEVATION 250 BY15A-250 755631.4420 1452039.0170 867.14 171,7- SR251 BY15A-251 755702.0500 1452609.0560 879.36 ^ 252 BY15A-252 756033.5820 1453278.9590 891.32 Z / / 253 BY15A-253 756112.4090 1453721.6360 898.58 0 ` 254 BY15A-254 756001.9000 1454200.2310 904.35 w B Y 1 5-2 L 2 / \„\Fq 1 �O� 255 97158-255 756070.4170 1454809.5960 906.21 `�,\ FR 256 BY15A-256 756186.6010 1455285.4160 904.17 ' -; C 257 07158-257 756483.7420 1455807.3800 893.89 F 479 BY-479 756798.4930 456108.1070 880.65 / �� 480 BY 480 757200.7440 1456498.2560 870.35 % 481 BY 481 757688.2840 1456869.3490 850.41 E0243 BY15-243 757707.3420 1457242.6960 849.96 I I RO ''I! > n O EL- BL_W-1 cil c I Ao _-__. rn N I j;� BLE 26 BLW 2 // Z / BV#13 41 0 %i 30 i / O -------- BL_E-25 N I V CD 3 NOTES o I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM 0 a 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF a FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION A AND SURVEYS UNIT. oOO N00 L✓' Oati '0 0 P 0-0 co PROJECT REFERENCE NO. SHEET NO. � I-3819B 1C-06 \ '\ SURVEY CONTROL SHEET Location and Surveys I I �I \-----// W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION I \ i I ' ►1 ' ! I BM#70' ' BYN POINT DESC. NORTH EAST ELEVATION BYN27 BYN-27 765223.3180 1448924.9770 889.33 I I / BYN26 BYN-26 764506.4100 1448874.6400 912.93 //// BYN25 BYN-25 763858.7610 1448834.2230 924.59 B YN24 BYN-24 763001.1210 1448795.5710 915.33 / 8YN23 BYN-23 762077.1520 1448722.0050 878.30 \I 6YN22 BYN-22 761080.1930 1448657.6990 869.69 I // X 6YN21 BYN-21 759943.2280 1448583.3780 905.28 / \ BYN20 BYN-20 759056.1830 1448528.8960 907.16 A NC GRID 463 BY-463 758514.3810 1448496.2450 893.48 .` / NAD 83/B5 462 BY-462 757990.8800 1448482.6730 872.34 BYN18 BYN-18 757a87.9210 1448412.7660 863.09 I I J I 484 BY-484 756281.4700 1448526.7090 868.35 E G483 BY-483 755a19.a190 1448921.7970 842.30 BYN15 BYN-15 754705.8810 1448254.7630 860.74 J/ I it i �� 11 BYN14 BYN-14 753770.0440 1448189.7960 809.69 BYN13 BYN-13 752656.9630 1448110.3880 796.08 G PS3 I3819-3 752427.7960 1448104.7980 804.48 / I I Li// - BYN12 BYN-12 751774.9630 1448076.3650 UNKNOWN BYN11 BYN-11 750947.3570 1447998.0050 UNKNOWN I I i i 8 9 8 BYN10 BYN-10 750045.4450 1447909.4880 796.38 8YN8 BYN-8 748100.4380 1447723.5330 802.51 i iI 8YN7 BYN-7 747220.4630 1447636.4670 821.57 I BYN6 BYN-6 746261.7800 1447545.6020 853.19 BYN5 BYN-5 745452.7090 1447464.4410 866.90 Z BYN4 BYN-4 744409.3380 1447370.8920 877.51 t i1 I 8YN3 BYN-3 743456.9570 1447310.2650 914.45 w I I ii BYN2 BYN-2 742557.4350 1447343.3930 949.85 BYN1 BYN-1 741949.7990 1447370.8740 955.21 I BYS Ii POINT DESC. NORTH EAST ELEVATION A GPS8 13819-8 768269.2750 1449069.0880 820.43 II GPS7 I3819-7 766050.9590 1448919.5800 863.07 1•` 111 BYS1 BYS-1 765120.8670 1448813.1760 893.50 438 BY-438 764163.0650 1448749.5400 920.53 N B983 BYS-3 763612.2500 1448703.1390 924.21 i 8904 DVS 762734.6050 1448659.3060 904.55 I � � BYS5 BYS-5 761778.0190 1448596.3710 867.35 BYS6 BYS-6 760676.3290 1448525.6370 882.82 BYS7 8YS-7 759768.2780 1448470.0670 908.37 BYS8 BYS-8 758919.8350 1448414.7880 904.75 il BYS9 BYS-9 757985.2300 1448355.3680 873.99 461 BY-461 756350.4970 1448243.1880 869.76 0P34 I3819-4 754490.9140 1448117.7020 847.50 i BYS13 BYS-13 754209.3530 1448103.2580 830.27 l I I 8YS14 BYS-14 753127.3110 1448029.0290 786.63 8Y615 BYS-15 752107.4250 1447976.8030 817.69 I BYS16 BYS-16 751249.0060 1447915.6800 830.05 8Y517 BYS-17 750585.7550 1447853.4540 814.99 I BYS18 9Y5-18 749545.7430 1447749.9790 795.40 -o il I BYS19 BYS-19 748528.5500 1447656.6320 800.09 5 BYS20 BYS-20 747514.6620 1447558.8020 813.50 0 BYS21 BYS-21 746571.5040 1447468.1600 843.35 N I /� i 342 BY-342 746018.6270 1447412.4360 858.68 i i 8Y622 6Y6-22 745701.1270 1447381.6970 864.58 BYS24 BYS-24 743643.9660 1447193.7910 909.67 BYS25 BYS-25 742559.6750 1447220.1600 950.91 H II 8Y526 BYS-26 741981.9910 1447253.6330 955.86 COI T o i v i BIV#89I # ' 7 I 0 0 I 0 i U i C 3819 7 i NOTESo o I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEF.] O 03 �I WI 11 I I 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES, Ir FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION di MATCH TO SHEET NO RWO2C-07 AND SURVEYS UNIT. off N00 L O 0-" ..> P0� PROJECT REFERENCE NO. SHEET NO. cr I-3819B 1C-07 SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION 1\11 MATCH TO SHEET NO RWO2C-06 I I 1 I NC GRID II NAD 83/95 II I I I I I I IBYN-27 BYS—I ii iI I BIV 495 141 I ' N ThI'' �'� I i i 1 BY7 I ' I \\ �/ i POINT OESC. NORTH EAST ELEVATION I ll — II i Z I ` / 171 9Y7-171 763449.7040 1448440.3680 942.73 I I O y N., 172 BY7-172 763566.0240 1448883.1190 943.71 I I w // 173 BY7-173 763690.1780 1449160.3400 943.35 I I c '\ I1, BYN-26 ,I I 1 \\ ___1/ iii BY-438 I ' \JBY29 I I Ii I III 1 /BL— 8 \�\ 0li/ I BY 3\ I BYS-3 III BY7-173 SR 2171 JANE SOWERS RD. BL 17 Er2i %' BY7 172 I 3 // BY-434 1 BY7 171 I I „� % BY-435 BY-436 IIII ►I III C' /C /IBYN-24 I m 7 BL 6i II L N I I 1 MATCH TO SHEET NO RWO2C-08 ♦ BYS-z 3 2 NOTES . I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEF.] 0 a 7 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF a FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION A AND SURVEYS UNIT. Q,Iv o,, 000 2L✓ Oati ,.P 0-0 PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-08 SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION I II � BYN-24 BL-16 1,7 Il/ IMATCH TO SHEET NO RW02C-08 BYS 4 II 11, ill!' !' li BL- 5 I III /'i I__�� '' NC GRID I i l BYN 2 3 _`=, I NOD 83/55 I I I11 / ' I BL-14 ' z 1 N w / I i i ll 4/iL-I3 N I � I II , n I -' ' I BM#98 I SR 9 I \I SR 3 0 e !! li BS R i I BYN-22 O1 N - -_ i U5799_BL-z I . I °Th IP BYS-6 ; i rn m -- J' II 1 0 � h' Z II Iiil I I I xi U NOTES: / /11 I BL 12 BY-465 0 4I I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, I I N 1 THE GLOBAL NAVIGATION SATELLITE SYSTEM.I I ('� 2, THE SURVEY CONTROL DATA FOR THIS PROJECT HAS I I B Y-4 6 4 a BEEN COMPILED FROM VARIOUS SOURCES, IF FURTHER I I INFORMATION REGARDING PROJECT CONTROL IS NEEDED, 7 lit,/ PLEASE CONTACT THE LOCATION AND SURVEYS UNIT, BY-485 I BYN 21 U5799_BL-3 li 3 I Ii IU I BYS 7 1 I a I I Aa III i MATCH TO SHEET NO RWO2C-09 MATCH TO SHEET NO RWO2C-10 o.0 N00 O0- UL \. P 0, A C PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-09 SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION MATCH TO SHEET NO RWO2C-08 BT1 /11 POINT OESC. NORTH EAST ELEVATION U508 BL-8 757180.0920 1443636.7510 UNKNOWN I U509 BL-9 757819.2690 1443747.1930 UNKNOWN I U510 BL-10 750476.4090 1443845.0050 UNKNOWN /� U511 BL-11 759115.0660 1443984.3330 UNKNOWN B L-1I B Y-4 2 9 /►R U503 U5799_BL-3 759715.5740 1444049.9040 UNKNOWN J U512 BL-12 760221.0140 1444121.0850 UNKNOWN - ______ 73 U504 U5799_8L-4 760731.8000 1444191.8000 UNKNOWN U513 BL-13 761258.9880 1444298.7330 UNKNOWN ��-�___�_____ CAME FAR N BY-439 ---- ____ /`/� R U514 BL-14 761794.8778 1444398.9B7G7 UNKNOWN '_ 1 _ U515 BL-15 762329.1840 1444508.6150 UNKNOWN /- U516 BL-16 762889.0540 1444626.8000 UNKNOWN I i� ��� D• U517 BL-17 763460.0210 1444771.6770 UNKNOWN B Y-4 3 0 - U518 BL-18 764025.1210 1445016.5790 UNKNOWN r �/ U529 BY-29 764034.1030 1445327.5230 UNKNOWN I i -B Y �" ---- U530 BY-30 763772.8240 1446030.2920 UNKNOWN �/ - � 4 3 � 434 BY-434 763444.3740 1446562.7940 UNKNOWN Ili // -- 435 BY-435 763385.3060 1447051.6710 UNKNOWN 436 BY-436 763383.4210 1447777.2200 936.35 BL-104 D BT2 'POINT DESC. NORTH EAST ELEVATION (') ( ) 0 439 BY-439 759050.8060 1444207.4610 UNKNOWN / 2 2 w 429 BY-429 759022.1550 1444880.6750 UNKNOWN / 430 BY-430 758913.302P1 1445374.6240 UNKNOWN ill ce 431 BY-431 758804.7270 1446264.2090 UNKNOWN C. - / II I� 432 BY-432 758643.8720 1447096.3080 882.19 ----- O O�� I 1 NC GRID cn CI) gL-g j I NAD 83/R5 = _ mrf rn rn -I ---1 II Z Z I 1 O O i 1 / x 71 1 0 0 I N N �J BL_-8i ! CD (--- _ �/ CDC �V m I I i 4 M ;/;/// NOTESBL-7 J '�1� I, PROJECT CONTROL WAS ESTABLISHED USING GNSS, 7 N l THE GLOBAL NAVIGATION SATELLITE SYSTEM. O / \ \ 2, THE SURVEY CONTROL DATA FOR THIS PROJECT HAS .� B M#29BEEN COMPILED FROM VARIOUS SOURCES, IF FURTHER ' INFORMATION REGARDING PROJECT CONTROL IS NEEDED, U 1 PLEASE CONTACT THE LOCATION AND SURVEYS UNIT, `„J i��,G;////���. B Y 4 2 6 , BY8-225 N ,•U5799-2 �) MATCH TO SHEET NO RW02C-09 MATCH TO SHEET NO RWO2C-02 Noo �I\ 2 L N o a,, C O PUO PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-10 SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION MATCH TO SHEET NO RWO2C-08 MATCH TO SHEET NO RWO2C-11 ' 'I II1I Hi BYNI-20 BY5 POINT DESC. NORTH EAST ELEVATION 1 1 B Y S-8 j li )1 E0226 BY8-226 755482.2330 1443288.0620 808.28 I E0373 BY-373 755330.4260 1443559.3520 821.87 E0437 BY-437 755384.3740 1443887.1860 810.28 I , I 428 BY-428 755251.0400 1443961.3530 802.28 427 BY-427 754916.4230 1444188.2060 794.53 152 BY5-152 754567.9490 1444497.7130 804.25 j Imo, 426 BY-426 754369.9360 1444865.9440 789.73 I B Y 432 BY-433 425 BY-425 54516.7280 445572.8230 93.55 1II NC GRID 424 87-424 754606.4360 1446326.4520 793.45 B Y 5 2 I I NAD 83/95 423 BY-423 754842.1870 1446985.2230 811.39 L� l�- -- 422 BY-422 755237.3930 1447683.6370 UNKNOWN - ------------- _ _ SR 2173 TDB i B Y 4 6 3 421 BY-421 755839.1480 1448066.4020 856.58 159 BY5-159 756652.1660 1448171.2830 879.32 160 BY5-160 757419.1770 1448219.4080 880.53 y .1AM E S FA RM Ii 161 BY5-161 757989.1710 1448253.9720 880.86 RD• i 162 BY5-162 758528.7780 1448236.4140 893.35 I li/ F IB M#9 4 433 87-433 758602.8760 1447777.1500 897.46 1 vl 2 w I I o I11 BY5-16 ' ' BY-462 Cr, 1 ,� le i rn -I BYS-9 11 / l/ / 1464% I z I II I , O I IN1 _ BY5- 60 I /i (") 71 ,, W I o Ili III 11 BIV#72 1 I, fo O Iifo I I\BYN- 8 N ,o ' ' I, iI \ \ rn I N Ii i iI -rn�I11 1 i I 41 �, z I , , 0 M - 1 I1 I j �I73 BY5 159 iI ih `" I o c ' �l i N n II \ BY-484 o 41. uc BY-461 , ; I NOTESo III I'� I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEI„I, 1 ' 'a / /// I I �I II 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. o MATCH TO SHEET NO RWO2C-03 000 O0- ,,L .. P0-c c PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-11 SURVEY CONTROL SHEET Location and Surveys W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION '!' n \ -I I BM#61 NC GRID N NAD 83/95 rnI BY-466 \ 111 rn Y-467 Fis BY 471 B BY-7 69 BY-470 B Y 4 6 5 Z -EY58- 0 - PO BY-468 ODESSA DR. \10%. 10; = N0 Mtn\ z J, GO►1�\' I\ ,- a )1 37 BY-472 I�/ 4.°%....\ MATCH TO SHEET NO RW02 C-10 \� # BIV 62 i/ 90,6 ►'BSR1 O POINT DESC. NORTH EAST ELEVATION 485 BY-485 759770.0610 1448451.2170 912.20 464 BY-464 760058.0920 1448674.8540 905.69 O 465 BY-465 760401.0440 1448903.6970 872.31 466 BY-466 760702.0160 1449355.7740 852.21 467 BY-467 760527.0960 1449831.3570 859.47 m 468 BY-468 760384.0830 1450331.7530 869.25 469 BY-469 760437.5760 1450831.1410 892.81 o 470 BY-470 760441.0060 1451662.0370 910.48 C /�471 BY-471 760586.2200 1452176.9980 923.15 B Y- 7 i 472 BY-472 759723.7240 1452641.5550 909.16 `I 473 BY-473 758574.6870 1453234.7560 903.47 41 474 BY-474 757674.1020 1453699.6520 889.94 ♦_O Q' 475 BY-475 756835.0660 1454165.3120 898.98 • °J E0254 BY15A-254 756001.9000 1454200.2310 904.35 ` \ VO �� cr i F C NA � cn BM#63 -o NOTES: 7 I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, 3 THE GLOBAL NAVIGATION SATELLITE SYSTEM. 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS 0 Q BEEN COMPILED FROM VARIOUS SOURCES. IF FURTHER 0a INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT, MATCH TO SHEET di NO RWO2C-04 BY-7 7z O.00 N00 CL'' OQ. ... P6-0 o PROJECT REFERENCE NO. SHEET NO. � I-3819B 1C-12 MATCH TO SHEET N O RW02 C-02 SURVEY CONTROL SHEET Location and Surveys _ W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION BY10 MATCH TO SHEET NO RWO2C-03 POINT OESC. NORTH EAST ELEVATION E0379 BY-379 749687.0040 1444751.8760 906.22 B Y-3 A 380 BY-380 750063.4680 1445062.4100 896.61 B Y S-15 I II I ` L� 382 BY 382 750407.8290 1445553.7690 900.91 176 BY 10-176 751086.3600 1446641.4650 879.91 B Y 10-17 8 /- B Y-3 8 3 177 BY10-177 751546.9670 1447354.4270 873.46 C� '/., 178 8Y10-178 751951.9970 1447919.7550 845.12 1/ 383 BY-383 752147.7530 1448289.0210 834.06 II/ /B Y - 9 6 341 BY-341 752189.0550 1448354.4180 830.09 384 BY-384 752450.8440 1448681.8180 805.34 `'i B M# 0 0 385 BY-385 752830.0860 1449736.8860 786.74 NC GRID 386 BY 386 753635.0390 1450826.0510 862.21 NOD 83/95 1141 g M i$81 211 BY108-211 754996.0640 1452783.5480 887.22 \gi 387 BY 387 755474.9520 1453551.0020 896.35 i� g M#g g I B Y N-12 388 BY-388 755664.7030 1453966.9570 892.35 213 BY10A-213 755549.8150 1454505.8220 885.14IIn - 214 8510A-214 755491.1160 1455176.4800 883.93 215 85108-215 755379.8780 1455903.2220 888.48 I i iI 216 BY10A-216 755258.3250 1456548.0090 894.78 I II I B Y-3 4 0 262 856-262 755187.2520 1456767.0340 896.59 217 85108-217 755104.4670 1457293.8330 904.17 i 218 BY10A-218 754991.6530 1458111.0820 908.45 B Y 0- 7 7 li i \\ I �O I / BYS- 6 II 1 i I I II i BYII-194 r" 1� BY10 176 I BM#56 1 II ;BYN �G B Y 74( 1 1` __- Ill BV66 ! BYII193 � BY 338 BYS 7 B1II-192 ♦ BY 377 /Il1 - B Y 1 1-1 9 1 gY33 I I b,.- BY-384 WI III �� BIV486 BY 33 C> II 11 I • BM417 I BYN-10 BN#68 BY-378 BY-380 BY11 �-- Iila POINT DESC. NORTH EAST ELEVATION I mom, c _ m E0383 85-383 752147.7530 1448289.0210 834.06 m I Ii J N /, g IV 4 g 4 196 8511-196 752063.1320 1448197.2750 837.44 71 340 BY 340 751519.2010 1448125.1400 840.53 I II 1 1 -7 N 194 BY11-194 751149.3910 1448039.1830 827.70 ; 193 8511-193 750757.3940 1448099.3350 809.38 m� B Y-3 7 9 192 BY11-192 750567.5810 1448482.6880 789.88 I I I A, J j 41 �1 191 8511-191 750496.3560 1448924.0370 788.31 B Y S- 87 ` Q cc 339 BY 339 750531.4490 1449457.2390 810.57 Nt 0 m �� 338 BY-338 750697.0610 1449671.5290 820.62 I /N 337 65-337 750889.7830 1450016.3130 805.09 J v BY-381 Cme ° �/ 1 m / I t/) / o I III Fo U MATCH TO SHEET N O RW02 C-13 3 NOTES o I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEI„I, 0 a 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF a FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION A AND SURVEYS UNIT. o00 000 2'5; Oa" ..0 o-6-0 PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-13 SURVEY CONTROL SHEET Location and Surveys MATCH TO SHEET NO RW O2 C-1 2 W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION 1,) / III • / III � ' � "tv,. L I :0/7 BY9A 208 I BY5-323 NC GRID Z I Wii/ NAD 83/S5 N BY3 39II , N v / ;42-i7, g . 5 5 • !\ 7 \ J� I I IB S-19 Q j / �� = \\- 1/ '' \m BY9A-207 ' , > I / \ BY2-316 `'' \,T T ' 1 o I , I 4 (' AII BY3 3 8 BY9-20 w II ;/ BYI 311 \ \ LjJ Itt !.YN-8 SR 2321 // BY8-333 BYI 3 2 BM433 /"\ - _� ��� BROAD ST �'�/ ► -- BY9A-206 �ff --i---- - BY9 20� BY8-334 � Eyl6 308 BY9B 246 I I B / 80 i __� -=Eris_ BM#85 / , // BL-30\ yia III j '1 BY9 2:3 - \_- �� BY9 205 _ \ �, .E BY9B 247 I I� I '/ N II/ in l - -A-, BL-309 __ - BL 3 0 ,NW rn BY9B-248 \ III\\B1V#93 81 �_ ---BYS 320// BY6-324-- --- ! -EY35�'�� BY7 330 BY -3 3 �L :Y2-3 _\�� --� BY6\25 BYS 20 Ife BYI 314 O \ ' 1 I I / , BY6A-327 O , � I �I ! qi\p I� ' I /N I iIBYN 7VjB fv#5 7 Q \ _ I III !' o' ! %� BYBA-328BYBB 329 BY13-167It ��\Q / BY7 331 /� v / BY20 POINT DESC. NORTH EAST ELEVATION 11 \� Y 4/4) /_ \\�� El V, rl 315 832-315 748517.2310 1445765.3610 854.20 B Y 3- 6 6 Q , B Y 4-3 2 0 7 316 BY2-316 748310.2870 1445879.6300 850.48 1 \ I BYS-2 // ICC � N E0308 BL-308 748033.7160 1445930.8890 853.02 II // a 317 B32-317 747626.8390 1446134.6200 840.81 O iI // //:Y7 332 I �''� // 41 7BY21 POINT DESC. NORTH EAST ELEVATION BY13-1651,;It'' J III// BYNE I - �319 BY3-319 748581.5500 1446429.5580 852.80 B Y 3 4 5 /,/N // v E0318 BY3-318 748219.6910 1446473.7710 850.56 i , A // BY22 BM#36I Q I / BY-346 NPOINT DESC. NORTH EAST ELEVATION W Ill B fv#5 8 v 208 BY9A-208 748893.7740 1447165.5790 824.76 BY 343 IIBY 3�2 / �„ 207 BY9A-207 748416.9660 1447103.0230 846.10 I /� Fi E6206 BY9-206 748116.4020 1447090.3890 838.16 I II I� BY 344 NOTESo BY23 I I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEIiI POINT DESC. NORTH EAST ELEVATION ---_____ o aQ E0246 BY9B 246 748063.5410 1447333.1090 826.22 I BYS 22 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF 247 6396-247 747893.6560 1447262.1370 805.12 B Y 1 3-1 6 3 i 248 BY9B-248 747761.3770 1446936.5340 823.03 I I FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION j 'I ' AAND SURVEYS UNIT. MATCH TO SHEET NO RW02C-14 BN#92 40 I , , BYN-5 P U-c, PROJECT REFERENCE NO. SHEET NO. I-3819B 1C-14 SURVEY CONTROL SHEET Location and Surveys MATCH TO SHEET NO RWO2C-13 W/EXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION i B M 4 92I I BY4 IL POINT DESC. NORTH EAST ELEVATION U507 BL-7 756535.1980 1443700.4460 835.15 126 874-126 756140.7380 1443800.4920 837.52 il 1 Z i U502 U5799-2 755966.4190 1443843.7640 836.88 Ii II I}- ii 127 0Y4-127 755678.7580 1443915.2330 824.81 437 BY-437 755384.3740 1443887.1860 810.28 BY24 I 371 88-371 754659.1790 1443915.7220 796.30 POINT DESC. NORTH EAST ELEVATIONII i (� 370 BY-370 754192.6310 1443802.1540 801.18 ii B Y-2 7 J 370 BY 370 754192.6310 1443802.1540 801.18 E0205 BY9-205 747924.3190 1449087.9590 868.88 i 132 BY4-132 753455.1120 1443668.0300 UNKNOWN 320 BY4-320 747561.9720 1449200.0210 874.21 I II I II 389 BY-389 752709.7900 1443643.8540 809.74 321 BY4 321 746656.1100 1448872.6450 885.32 i 135 BY4 135 752243.4640 1443799.6780 829.31 345 BY-345 746179.9250 1448705.9420 885.40 i. ' ii 1 I 377 BY-377 750460.1780 1444669.1200 886.05 346 BY-346 746037.8280 1449106.8930 873.74 378 BY-378 749906.2990 1444633.1110 902.81 332 BY7-332 746541.4660 1449235.0780 893.36 I II I I 379 BY-379 749687.0040 1444751.8760 906.22 331 BY7-331 747008.5620 1449412.9170 885.49 ' 'I ' 381 BY-381 749332.7680 1445012.4030 896.60 330 8Y7-330 747513.7910 1449583.4700 886.14 II 311 BY1-311 748278.9630 1445356.7620 875.56 327 BY6A-327 747369.6650 1449924.5950 883.72 I 312 671-312 748125.3210 1445453.8310 875.08 lil 329 BY6B-329 747062.1200 1449997.6710 886.70 I Ii I E0307 BL-307 747794.9180 1445528.5940 879.37 NC GRID313 BY1-313 747607.1600 445644.6570 878.49 IIU ND 83/9J314 BY1-314 747376.9710 1445689.4470 861.97 BY25Il/i /C II POINT DESC. NORTH EAST ELEVATION 11BYN-Z BY9 E0337 BY-337 750889.7830 1450016.3130 805.09 1 POINT DESC. NORTH EAST ELEVATION 336 8Y-336 750440.7680 1450054.2860 839.44 I iI 335 BY-335 749923.6930 1450050.8390 851.56 ' i 307 BL-307 747794.9180 1445528.5940 879.37 322 BY5-322 749449.5160 1449936.2270 848.51 308 BL-308 748033.7160 1445930.8890 853.02 Z I II 318 BY3-318 748219.6910 1446473.7710 850.56 323 BY5-323 7486750 .2650 1449759.9270 865.9148 i I 71 E0309 BL-309 747798.3760 1449451.8920 876.36 201 889-201 748219.7820 1446745.0630 855.97 I II I B Y L -2 7 8 206 889-206 748116.4020 1447090.3890 838.16 246 8Y9B-246 748063.5410 1447333.1090 826.22 i 202 889-202 748051.6090 1447541.2390 824.37 203 689-203 747967.6940 1448173.3490 824.29 8826 204 889-204 747995.1500 1448629.4440 847.74 POINT DESC. NORTH EAST ELEVATION i i 205 BY9-205 747924.3190 1449087.9590 868.88 I II lit 309 6L-309 747798.3760 1449451.8920 876.36 333 8Y8-333 748183.2490 1450425.1120 889.20 L 310 BL-310 747750.0050 1450379.4530 394.93 334 888-334 748007.6340 1450357.5940 890.59 E0310 BL-310 747750.0050 1450379.4530 894.93 I1 1 I r 325 BY6-325 747498.4640 1450290.9260 884.95 ii 1 L 324 BY6-324 747632.8100 1449929.3870 886.53 B Y S_2 n BY12 E0327 BY6A-327 747369.6650 1449924.5950 883.72 L� `Y POINT DESC. NORTH EAST ELEVATION 328 BY6A-328 747096.7520 1449872.8320 890.90 1 0 II I # GPS90 I I33819-9 742229.52210 14468440 01.22200 934.1120 6 II B v 8 4 266 8812-266 742151.2440 1447208.8420 937.64 I 267 8812-267 742082.0130 1447623.5860 936.61 BY\l-3 I 1I1 L m 268 8812-268 742016.6120 1447950.5920 932.46 II 1 I ,�\ B Y I 4-2 7 7 BY13 POINT DESC. NORTH EAST ELEVATION 167 8813-167 746884.3480 1447158.1130 822.25 I 166 8813-166 746701.0570 1447254.4230 843.40 165 BY13-165 746323.1820 1447179.5020 869.47 of i \�\ 343 8Y-343 745998.4170 1447179.3300 839.34 iI I 344 BY-344 745822.7290 1447132.7480 844.36 I/rI i III 163 6813-163 745737.3660 1447027.9050 831.28 0 N i / 41 // it II BY14 POINT DESC. NORTH EAST ELEVATION m /i B Y 4-2 7 6 279 BY-279 745094.4800 1447581.7600 878.57 cr c' B Y ♦2 5 278 8Y14-278 744145.6700 1447433.3690 891.29 277 BY14-277 743329.0200 1447376.3870 919.90 v 4, 276 BY14-276 742649.1300 1447770.4050 938.31 m E0267 6Y12-267 742082.0130 1447623.5860 936.61 Bfv#59 BYNI-2 -om I 3 8 I 9-9 ni 13819 0 ' NOTES 3 B Y 12-2 6 7 I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEH 0 BY12 266 7 ♦ 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. Ir a B lv itB Y 2 2 6 8 7 9 m ♦ FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION 3 B Y S 26 •B Y N BN#gL AND SURVEYS UNIT. o00 000 OQ. ..a V 0-O `` I LANE PROJECT REFERENCE NO.38/98 SHEET NO. 2A-1 R/W SHEET NO. ROADWAY DESIGN PAVEMENT DESIGN PAVEMENT SCHEDULE ENGINEER ENGINEER Al 14" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITH DOWELS) R1 1'-6" CONCRETE CURB AND GUTTER. A2 111/2" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITH DOWELS) R2 2'-6" CONCRETE CURB AND GUTTER. A3 13" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITH DOWELS) R3 5" MONOLITHIC CONCRETE ISLAND (KEYED IN). DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A4 14" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITHOUT DOWELS) R4 PROPOSED SHOULDER BERM GUTTER. PROP. APPROX. %" OPEN-GRADED ASPHALT FRICTION COURSE, B TYPE FC-1 MODIFIED, AT AN AVERAGE RATE OF 90 LBS. PER SQ. YD. R5 CONCRETE EXPRESSWAY GUTTER. EXTENDED 1-FT. BEYOND EDGE OF TRAVEL LANE Cl PROP. APPROX. 114" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, R6 SINGLE FACED CONCRETE BARRIER. AT AN AVERAGE RATE OF 138 LBS. PER SQ. YD. C2 PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5D, R7 CONCRETE MEDIAN BARRIER (T, T1, T2) AT AN AVERAGE RATE OF 336 LBS. PER SQ. YD. C3 PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, R8 CONCRETE MEDIAN BARRIER (TYPE III/IV) AT AN AVERAGE RATE OF 330 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B C4 AT AN AVERAGE RATE OF 110 LBS. PER SO. YD. PER 1 DEPTH. TO BE S 4" CONCRETE SIDEWALK. PLACED IN LAYERS AT A MINIMUM LIFT OF 1" NOT TO EXCEED 2" IN DEPTH. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE TYPE S9.5D, C5 BE PLACEDR INE LAYERSRATEOATFI Al2MINIMUME LIFTT OF01.5"R NOT TOP EXCEED T EARTH MATERIAL. 2" IN DEPTH. PROP. 1.5" DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5D, C6 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. U EXISTING PAVEMENT. D1 PROP. APPROX. 3" ASPHALT CONCRETE INTERMEDIATE COURSE, V MILLING BITUMINUOS PAVEMENT (DEPTH VARIES) TYPE I19.00, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. D2 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, yiJ TYPE I19.00, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. VARIABLE DEPTH ASPHALT PAVEMENT (SEE STANDARD WEDGING DETAILS) D3 PROP. APPROX. 21, " ASPHALT CONCRETE INTERMEDIATE COURSE, ( MILLED RUMBLE STRIPS TYPE I19.00, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, D4 TYPE I19.0C, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS AT A MINIMUM LIFT OF 21,9" NOT TO EXCEED 4" IN DEPTH. El PROP. APPROX. 3" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. E2 PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AT AN AVERAGE RATE OF 456 LBS. PER SO. YD. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE B25.0C, E3 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS AT A MINIMUM LIFT OF 3" NOT TO EXCEED 5 1/2" IN DEPTH. PROP. APPROX. 12.5" ASPHALT CONCRETE BASE COURSE, TYPE B25.00, E4 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS AT A MININUM LIFT OF 3" NOT TO EXCEED 5 1/2" IN DEPTH. C PROP. APPROX. 13.5" ASPHALT CONCRETE BASE COURSE, TYPE B25.00, E5 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED • IN LAYERS AT A MININUM LIFT OF 3" NOT TO EXCEED 5 1/2" IN DEPTH. C N C- Gl PROP. 8" CEMENT TREATED BASE COURSE. Jl PROP. 6" AGGREGATE BASE COURSE. UT r1 J2 PROP. 8" AGGREGATE BASE COURSE. co J3 PROP. VAR. DEPTH AGGREGATE BASE COURSE. N m J4 PROP. 6" #57 STONE co -o m Kl 12" TYPE 1 AGGREGATE SUBGRADE. C Nl NON-WOVEN GEOTEXTILE DRAINAGE LAYER C U4V PRIME COAT. 0 3m P1 AT AVERAGE RATE OF 0.35 GAL. PER SQ. YD. Na -03 V LO N00 lD/0_ REFERENC Al 14" PCCP (JOINTED ) LANE PROJECT 38/9BE NO. 2EAET r2NO. WITH DOWELS) `` I 14" PCCP (JOINTED SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS c_ -L- RN✓ SHEET NO. A4 WITHOUT DOWELS) ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER Cl 114" S9.5B 48' El 3" B25.0C CL -LCDWB- 24'MEDIAN Q -LCDEB- K1 12" TYPE 1 . Iv- NON-WOVEN N1 GEOTEXTILE DRAINAGE LAYER 14' 12' 12' 10' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 2' 10' 12' 12' 14' 18' 6' 10' R7 '�CONCRETE MEDIAN ' BARRIER ' 17'WGR H I, II r\ r\ I Z C1) is T EARTH MATERIAL I I I II II r r O 114 ' 114 IIr %r 9' t I !1 a 0 DOCUMENT NOT CONSIDERED FINAL U EX PAVEMENT r r i r I I 1 I w ce UNLESS ALL SIGNATURES COMPLETED \ \r \r \r ® J J 12' ► 1D' 12' 2 O t t z Y STRIPSMILLED RUMBLE LL 11' 11' PS PS FDPS FDPS FDPS GRADE 111 POINT O? 0 0 al POINT O 0 me PO ADE 0 0 0vir ^ = =IIIIIIIIIIII 2% 012% I 4% 4% 2% 4% _ ---- IIII=IIIIIIIIIIII r \ f�� VAR _ 6 Al 11111IIIII1=IIIIII \' %i ® e • SHOULDE' /i 18.25",�® \ DRAIN -IIII-IIIIIIIIIIII z ,� 18.25" Co SHOULDER SHOULDE' Nl 2 U U e® DRAIN e® DRAIN Kl H •' 15.25" ® O J =1111111111IIIIII CL L GRADE TO THIS LINE GRADE TO THIS LINE LU 0 zu_ = 30' TYPICAL SECTION NO. A-1 —L— 1-40 —L— STA. 93+40.14 TO 114+82.99 Q -L- 48' _ %YRB- Q -LCDWB- 24'MEDIAN Ct -LCDEB- 14' 12' 12' 12' 10' 2' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 2' 10' 12' 12' 14' 18' 6' 10' . _ . . . _ . _ I,r I, `T r .1,1 I r ► . ► ir\ t /\ III�\ ► . ► 17'W GR li ?Iirt � 1il �I li 7WOZH UFOJ ' = L`10 11' 11 12 10 12' • ► FDPS PS PS FDPS FDPS FDPS1 GRADE GRADE0 GRADE A4 GRADE • '� 0 IIIIIIIIIIII-IIIIII POINT A4 POINT Om mO POINT O ®o POINT C .� 2% 4% _ %• 4% 1-4% z% 4%/0 4%v 2% o �� �- •_ --r----- ------ 4/0 IIII IIIIII-IIIIII �\ - o L �_ �M �A VAR a �i ---- �` `�^� - --.■ .-.: -w... ....,_r..-... - - - - :. 64� A'. IIII IIIIII IIIIII °- - ■v ® SHOULDER / // - / El __-•_- ® ® DRAIN GqR IIIIIIIIIIIIIIII �� ��///// U 18.25h Cl Kl 18.25". �® SHOULDER 18.25'4 SHOULDER N1C1 2•7 / O SHOULDERDRAIN / DRAIN ® ® I- / Z co 15.25" O -111111111111-11V11 N CL LT_ 0- GRADE TO THIS LINE GRADE TO THIS LINE GRADE TO THIS LINE coW 0 cs, z u_ a = 30' N M. m TYPICAL SECTION NO. A-2 E. 10 CO —L— 1-40 —L— STA. 114+82.99 TO 118+79.81 c Y U / -. o,°m NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. O 3U tV a-. �-03 P Ld N00 \/CC lD/a C Al 14" PCCP (JOINTED ) LANE PROJECT 3Sl9BE NO. SHEET N30. WITH DOWELS) `` I SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS CL -L- R/W SHEET NO. A4 14" PCCP (JOINTED WITHOUT DOWELS) ROADWAY DESIGN PAVEMENT DESIGN ENGINEER 114" S9.5B 48' ENGINEER K1 12" TYPE 1 NON-WOVEN q -LCDWB- 24'MEDIAN Q. -LCDEB- N1 GEOTEXTILE - DRAINAGE LAYER CONCRETE MEDIAN '" BARRIER 10' 6' _ 18' 14' VARI ES1 10' 2' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 2' 10' 12' 12' _ 14' 18' 6' 10' T EARTH MATERIAL ` 17'WGR 12'-16 17'WGR r MILLED RUMBLE Z U O~ STRIPS Z F W U DOCUMENT NOT CONSIDERED FINAL Y ZAt t t t t a U / / I / R7 Z UNLESS ALL SIGNATURES COMPLETED O i. 12' 10' 12' O 12' 10' 12' _ u` p �► 11' 11' �► �► -4 P. LL FDPS FDPS FDPS PS PS FDPS FDPS FDPS HA 1111IIIIII GRADE GRADE GRADE — O POINT 0 O Al ?Deo Y A4 GRADE Al O =11111=IIIIII-IIIIII c,, POINT POINT . O POINT T IIIIII-IIIIII—IIII= 44% 2% 41111111111111111 % A 4L% 2%1 2% 2%° 4%B 4% 2% 2% 2% 4% j4%y 2% 1 I 4i% IIIIII-IIIIII11111 VAR 47 6'�■ ..- _ •:. _3x "r--.Yu .� >»_. _ .�s-:.� _ ° ° , .._..,>.._0.�._..� , _._.._...ti_.. Q7 p_1 VAR luu Iluu=11m1 IIIIII=IIIIII11111= SHOULDER CO \ / \ SHOULDER DRAIN DRAIN =IIIIIIIIIIIIIIII �,, 15.25" SHOULDER Kl 15.25"0 Cl SHOULDER ® 15.25 SHOULDER Nl Cl 27 ® ® DRAIN Z Kl J F IIIIII=IIIIII-IIII= a 15.25" p =(IIIIIIIIII=IIIIII w � av= ° GRADE TO THIS LINE GRADE TO THIS LINE z o 2 30' TYPICAL SECTION NO. A-3 =. 30' . -L- 1-40 -L- STA. 118+79.81 TO STA 128+50.00 -L- 24'MEDIAN Q -LCDEB- 10' 6' 18' 14' 0-12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 2' 10' 12' 12' _ 14' _ 18' 6' 10' 17'WGR 17'WGR I- Z F O Z_U / t t t t t a U O 15 MJ D-O • Z O zo 12' 11' 11' 12' 10'� 12' = L` _ " FDPS PS PS FDPS FDPS FDPS IIIIIIIIIIIIIIII= GRADE GRADE GRADE =_IIII—IIIIII=IIIIII A4 O� Al POINT O �O POINT m O m �A4 POINT A4 L ' 4% 2% 2% 2% I 2% 2% 4% 4%1 2% 2% 2% 4% 4°/o 2% o c MIN IIIIII=IIII— 4/o 0 m — VAR �� _ �.�� ��d L' ° ° � 1 VAR IIII IIIIII IIIIII IIIIII IIIIII=IIII— 4'7 �'.-�..-m.-.�••�._la- =:-a-, - - �.-,..,.,_..v.,.rr=._w_... .._3_R. v-:.-_T_ _ ...� _ -� �' - Q A� IIII=IIIIII-IIIIII N O \ a Y ", IIIIII=IIIIII—IIII= 15.25° SHDRAINER IIIIIIIIIIIIIIII -0ER 15.25" SHOULDE' 2 °.' R-A• DRAIN F ® l ®C SHOULDER Nl e® DRAIN Nl� '7 Cco ZDRAIN co H 7 IIIIII-IIIIII11111- J Z W - O .11111111111111 m o L` - GRADE TO THIS LINE GRADE TO THIS LINE 15.25" a LT co U' W Z OLL O O = Z U- N - 30' _ 30' m N 10 TYPICAL SECTION NO. A-4 -L- 1-40 0 -L- STA. 128+50.00 TO STA 134+10.00 -L- STA. 145+60.07 TO BRIDGE STA 148+56.05 -L- BRIDGE STA. 150+16.30 TO STA 175+41.24 -. o,°m NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. 0 3U (A 0, \-03 N 130 ,,,,,CC lD/0_ `` N I ) LANE PROJECT Al 14^ PCCP (JOINTED SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS REFERENCE 38/98 NO. SHEET NO.2A-4 WITH DOWELS) A4 14" PCCP (JOINTED R'W SHEET NO. WITHOUT DOWELS) ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER C1 11/4" S9.5B C2 3" S9.5D -L D1 3" I19.0C -L_WB- VARIES 48'-60' Q -L_EB- E4 12.5" B25.00 ► I K1 12" TYPE 1 Q -LCDEB- NON-WOVEN N1 GEOTEXTILE DRAINAGE LAYER DOCUMENT NOT CONSIDERED FINAL 10' 6' 18' 14' 12' 12' 12' 12' MEDIAN VARIES 12' 12' 12' 12' 2' 10' 12' 12' VARIES 17'W/GR 18' 6' 10' P1 PRIME COAT -. _ '0'12r - - ► UNLESS ALL SIGNATURES COMPLETED 17'WGR 24'-38' H R7 Cr)CONCRETE MEDIAN I Z f BARRIER H O(— z CO VARIES a U T EARTH MATERIAL 5 2-14, w Y MILLED RUMBLE W U VARIE ARIES z_ STRIPS Z 0 12' 11'MIN 11'MIN. 12' 10' 14' _ ILL FDPS1 FDPS FDPS FDPS FDPS FDPS I -111111RIIII_ 0 GRADE O GRADE A4Q`� POINT QY e POINT 40 O A4 GRADEIN Al TO ^ -1111IIIIIIIIIIII IUIII=IIIIII 11111= 4% 2/0 2/0 1 Q/ I Q/° ?/0 4°� t � 2% 2% °/ IIIIII=('IIIIII V o 00 00 0 IMMIN 4� �� IIIIII IIIIIIuuu Ilu—AR 4'7 6�;. ,.,��.�- _ _-'-'_ - 'x _ _ �. .__�_�. _ _� ,.� r_.�� ! _ ���� 67 p_1 VAR uu hull=lnm .v41441•P IIIIII1111111111- ® O 15.25" \ va) SHOULD R 1111—IIIIII-IIIIII SHOULDER 15.25" SHOULDER DRAIN DRAIN SHOULDE- 2. W \/ .N Z A CI � CI 0 0 0 0DRAIN ® ® C� •7 O El 1— IIIIII=IIIIIIIIIIII= D_ LT_ 1525" O 11111IIIIIIIIIIII �ce — GRADE TO THIS LINE GRADE TO THIS LINE . a LT_= O °O z_ u_ 30' = 30' TYPICAL SECTION NO. A-5 —L— 1-40 —L— STA. 134+10.00 TO BRIDGE STA 139+24.47 —L— BRIDGE STA. 140+39.33 TO STA 145+60.07 CL -L- 48' VARIES VARIES 10' 6' 18' 14' _ 12' 12' 12' 12' 12' 24'MEDIAN 12' 12' 12' 0'-12' 0'-12' 14' 18' 6' 10' ti . _ __ _ _ _ . . . . ► 17'WGR 17'WGR H / 11( / / _ 12' 12' _ z� O Z W U av 0 t t t t t Zo 0 12' ► 11' ► 12 = FDPS PS PS FDPS 1 IIIIII=IIIIII=IIIIIIe= 0 Al GRADEPOINT O O POINT Al GRADE Y 1 CD ==uuI—IIIIII-1uul -a y 2, 4% 2% 2% 2% 2% 2% 4% 4% 2% 2% 2% 4% 'LA IIIIII 111111=u11= 1 1111 IIIIIIIIIIII v NIIIIII IIIIII1II11 VAR 1 6. _ o..,;...,a. -._._. .._ .- ►_� ._....,3.Es. ... D-..-► -- _--.. ,.- .--.D>. .._; .-_,L,,_�`7 Q1 VAR0011101.. ulll IIIIII=IIIIII -o IIIIII=IIIIII1111- ® .4111111114, 11111—IIIIIIIIIIII SHO LDER K� 15.25" 15.25" C� SHOULDER O 0- DRAIN SHOULDER DRAIN •7 �L• ° F Cl DRAW Kl CD/ \Y V Z(n F J El z to m IN IIIIIIIIIIII= Oa U O J =IIIu1uNlnull co GRADE TO THIS LINE a Li w zO° 0K a I z O m 30' = 30' N m 7 TYPICAL SECTION NO. A-6 —L— 1-40 —L— STA. 175+41.24 TO 178+50.00 U / m H °,°m NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. 0\3u -0p3 PLd NOQ \/CL lD/o_ `` I LANE PROJECT 38/9B NO. SHEET NO. B OGFC 1-38/98 2A-5 SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS SHEET NO. C2 3" 89.5D RN✓ ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER D1 3" I19.0C E2 4" B25.00 Q -Y_S- -Y N- G1 8" CTB — K1 12" TYPE 1 48' 0-24" RS N.SINGLE FACED CONCRETE BARRIER VARIES VARIES I VARIES VARIES R7 CONCRETE MEDIAN 10' 6' 18' 14' 0'-12' 0'-12' 12' 12' 12' 24'MEDIAN 12' 12' 12' 0'-12' 0'-12' 14' 18' 6' 10' ► BARRIER 17'WGR 1 17'WGR z DOCUMENT NOT CONSIDERED FINAL T EARTH MATERIAL I— 12' �, 12' O? UNLESS ALL SIGNATURES COMPLETED MILLED RUMBLE Z CO a U Y STRIPS D_ U. occ U Z LL 12' 11' 11' 12 ZCD OLL FDPS -.PS 1 r PS FDPS y= /_ IIIIII111111-1111—_ 0 GRADE POINT POINT C2 0 O GRADE Y* 01111IIIIII-IIIIII C2 27 0 2% 2% 2% o 0 2% 2% . __ ti• IIIIII IIIIII1111= 0 4/0 4/ 4�0 1 4% =1111 IIIIIIIIIIII 1/AR v:_u_ti t_._r. - G O VAR 111111 111111=11111= -■ '"• - 111% 4•/ 6'. - ■'•"` - 1 1111 IIIIII IIIIII IIIIII=IIIIII11I11_ �.12" Dl E2 . ® ® Dl 12" =11111IIIIII111111 SHOULDER DRAIN SHOULDER SHOULDER 27 1;^ H (IF REQ.) 18.75' DRAIN 18.75" DRAIN • Z J (IF REQ.) (IF REQ.) H \/ IIIIII=111111=1111= a LL O J01111IIIIII 111111 w cc GRADE TO THIS LINE a LT z° itiiX 30' TYPICAL SECTION NO. A-7 = " 30' —Y— 1-77 —Y_S— STA. 111 +00.00 TO BRIDGE STA. 120+24.50 —Y_S— BRIDGE STA. 122+17.56 TO 129+98.98 —Y_N— STA. 151+13.82 TO 175+00.00 Q -Y_N- c_ -Y_LT- I Q -Y_RT- VARIES 56'-70' MEDIAN VARIES V ► 32'-46' 10' 6' 18' 14' 12' 12' 12' 11' VARIES 11' _ 12' _ 12' 12' 17'WGR 18' 6' 10' 17'WGR 10'-24' z co O~ z IG o U Oj / / / 11' 11' CW70 tW7 12' FDPS FDPS ' 14' ► = O y =O 1' I I _1' FDPS FDPS f IIIIII11111= m C2 GRADE O E 0 POINT Y* 0 -1111IIIIIIIIIIII POINT 27 4% 2% 2% F2%o 114% VARIES 4% 2% 2% 2% 4°/ 1,. IIIIII IIIIII=1111 VA 0 � ` __ __ r�rr..--jrrrrrrrr�l r- _ VAR_Ilu a 1111=a 11 u IIIIIIIIIIII1111= R 4'7 6:�..: - - --�-..: m __v-■•=�---' '-- "y .�-. ■ _. "'\—.7 A1 ,. =IIII IIIIIIIIIIII 6:1 6,� s„III c IIIIII111111-1111—_ vir 12" -0 1 HOULDER 18.75' 18.75" 12" =1111IIIIII-IIIIII Gl CONC.DITCH Gl Iri DRAIN Dl SHOULDER PAVEMENT SHOULDER D� K� ,2•7 a V DRAIN 4-� FO(Iz F REQ.) O EZ Kl (IF REQ.) (IF REQ.) O® SHOULD R z IIIIII=IIIIII_IIIIII- co (IF REQ.) _ —11111IIIIII—IIIIII a i GRADE TO THIS LINE O_, — m w D_ GRADE TO THIS LINE D_ L_ c x O Z O 30' 30' w N TYPICAL SECTION NO. A-8 7 co —Y— 1-77 —Y_LT— STA. 329+93.79 TO BRIDGE STA 341 +01.59 co —Y LT— BRIDGE STA. 343+54.59 TO —Y N— STA. 149+32.32 BRIDGE Y U NN. �N o,°m NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. b 0, `INSIDE EDGE OF MILLED RUMBLE STRIP SHALL BE 4"OFF O.G.F.C. -...-03 P N 00 CD \/CC lD/0_ `` I LANEPROJECTEFERENCE NO. A2 111‘ " PCCP SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS 1-38/98R 2A-6SHEETNO. A3 13" PCCP R/W SHEET NO. ROADWAY DESIGN PAVEMENT DESIGN Cl 11/4" S9.5B ENGINEER ENGINEER El 3" 1325.00 E2 4" B25.00 g -YRPAC-,-YRPCA,-YRPBD-,-YRPC-,-YRPD- E3 B25.00 VARIES K1 12" TYPE 1 NON-WOVEN 10' 6' 18' 12' 12' 12' 14' 18' 6' 10' Q. -YRPDB- N1 GEOTE%TILE .- . DRAINAGE LAYER INSIDE OUTSIDE 1- DOCUMENT NOT CONSIDERED FINAL R2 2'-6" C & G 1- 17'WGR 5 co F UNLESS ALL SIGNATURES COMPLETED SINGLE FACED Z CO a U RB CONCRETE BARRIER O Is w _ 10' 6' 18' 12' 12' 12' 14' 18' 6' 10' RE TYPE III/IV BARRIER W U Z u_ INSIDE OUTSIDE 1- ► 0 4' 4' _ = 17'WGR z H T EARTH MATERIAL I .I Jr z O FDPS FDPS Z_CO a U Iu111IIIIII11II111_ — O Is w O Q GRADE =11111IIIIII=IIIIII a U z `-7 POINT . cw7 oa �f 4 =w IIIIIIIIIIIIIIII V 4% 2% 2°/a 2% 2% 8% —11111IIIIIIIIIIII —• = w FDPS FDPS qR� J u1111=IIIIIIIIII 4• 6:1 VAR — O -IIII IIIIII=IIIIII IIIIIIIIIIII11111= 1 . > , - 6"1 p.1 A3 GRADE 6;1 ._:r_:.••,£ �,, —IIII=IIIIII-IIIIII ?7 POINT ,L'� IIIIIIIIIIII11111= �PQ` IIIIIIIIIIIIIIII= 4% 2�/0 2% 2% 2%$% —IIIIIIIII• I IIIIII O ' _ = IIIIIIIIIIII Vq - 2, n2.75�2, IIIIIIIIIIII—IIII- R 4"1 6.1 ® 6• 1 VAR ,� 2� `I/ 6.1 ,._.— :.,i�-1111 �.'. =11111IIIIIIIIIIII \/ ti Z El 1' Nl Cl 1' _ �r =1u11uu11uu ® IIIIII=IIIIII=lulls O III _ \ I III O IIIIIIIIIIII=IIII= O Z to — . . . a LT_ J =11111IIIIIIIIIIII 2, n14.25' 2, Ow a —GRADETO a L� 27 z O THIS LINE w ti 30' = L` USE TYPICAL SECTION NO.A-9 IIIIII=IIIIII11111= a d z co ► 30' Ir_ O J -IIIIIIIIIIIIIIII -YRPAC- STA.15+15.10 TO BRIDGE STA.27+50.00 0 Occ —GRADETO a L -YRPAC- BRIDGE STA.28+75.00 TO BRIDGE STA.38+55.25 z w THIS LINE 0w 0 -YRPAC- BRIDGE STA.43+20.00 TO BRIDGE 46+33.25 = z TYPICAL SECTION NO. A-9 -YRPAC- BRIDGE STA.47+78.80 TO BRIDGE 56+72.08 30' _� 30' ► -YRPAC- BRIDGE STA.79+60.58 TO 83+97.90 -YRPAC- RAMP AC -YRPCA- BRIDGE STA.41+03.25 TO 75+34.94 -YRPCA- RAMP CA -YRPC- STA.15+86.14 TO STA 26+70.50 TYPICAL SECTION NO. A-10 -YRPD- STA.13+50.01 TO STA 32+16.40 -YRPC- RAMP C -YRPDB- RAMP DB -YRPD- RAMP D -YRPDB- STA. 17+87.27 TO 52+20.68 Q -YRPA- c_ -YLPC- 10' 6' 18' 12' 4' 12' 14' 18' 6' 10' CL -YRPDB- 14' ,2' 12' , 6' , 12' __ 18' ,6' , 10' , c_ -YRPCA- 17'WGR Z Z z coO Isow a i( w V 14' =IIIIII__, 12' _ 12' - VAR. 2' 12' 12' ._ 12' 6.5 w U 4' 4' z Ow z O FDPS FDPS FDPS 2'-6" 4 = w 0 � z a FDPS GRADE FDPS ( C&G GRADE FDPS POINT 11111II Atk At At At -'711 IIIIIIIIIIIIIIII _ IIII IIIIII=IIIIII-1 ul— POINT 0 © Q IIIIIIIIIIIIIIII a Q� R$ IIIIII y IIIIII=IIII Vq 4% 2%2%D 2% 2%8% —11111IIIIII=1111u t 2% 2%2% 4%— �POINT1 11 6% 6% 6/0 2/o W IIIIII=IIIIII=IIII- IIII ®III ► III W1111IIIIIIIIIIII mI6% 6% 2% K ► =IIII=IIIIII-IIIIII m F 6% . 2 2, ms�._.n-:ram._�•r ® ti ► 12.75" 1 Cloo 11111111111111111= w LL GRADE TO a�_ — J IIIIIIIIIIIIIIII 0 ® aJ Kl z � —11111IIIIIIIIIIII ® ®1� zuJ a CD Cl ® ® O O p THIS LINE w I` GRADE TO a L_ N SHOULDER DRAIN z w C2 a w co —SHOULDER DRAIN 2 z_ THIS LINE Z O 30' 30' x w 30' co In ► TYPICAL SECTION DETAIL NO. A-9 & A-10 -YRPCA- WITH -YRPDB- UNDER -L- TYPICAL SECTION NO. A-11 TYPICAL SECTION NO. A-12 Y -YRPA- RAMP A -YLPC- LOOP C -YRPA- STA. 13+20.38 TO 26+12.05 -YLPC- STA. 13+25.31 TO 23+94.45 °,°m NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. 0 3U N 0, ,..-03 P Ld CV 00 \/CC lD/0_ `` I LANE PROJECT REFERENCE NO.I—38/98 SHEET NO. 2A-7 SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS RN✓ SHEET NO. A3 13" PCCP ROADWAY DESIGN PAVEMENT DESIGN Cl lie 89.5B ENGINEER ENGINEER 4' C2 3" S9.5D 10' 6' 18' 12' i 12' 14' 18' 6' 10' D1 3" I19.0C 17' I- Z W/GR co I- O co D2 4" I19.0C Z CO a U O~ w W El 3" 825.00 0-U 4 4 CC =O E2 a" 825.00 Z° PS GRADE pSI NT ``I// DOCUMENT NOT CONSIDERED FINAL G1 8" CTB IIIIII-IIIIII=11111 POIC3 1111IIIIII y IIIIII UNLESS ALL SIGNATURES COMPLETED K1 12" TYPE 1 N?; r\ NON-WOVEN N1 DRAINAGILE IIIIIIIIIIII= - 4% 2%2% 2% 2%8% = IIIIII=IIIIII DRAINAGE LAYER - -� _ - T EARTH MATERIAL „1„1=„1„1-11111-_ 4'J 6 =A VAR 1 VAR iV �1 d1 IIIIIIIIIIIIIIIII _1111111111111�IIr O12",� ® —I 12 =IIIIII-IIIIII-IIIIII 18 ?'—s 7 1,A• ~ 0 Z J IIIIII=IIIIII11111= o_ LT ® H O DI —III,=IIIIIIIIIIII w D_ -GRADE TO D- Li THIS LINE 0CC z_° LL 30' = 30' TYPICAL SECTION NO. A-13 -YRPB- RAMP B -YRPB- STA. 14+62.00 TO 15+03.54 CL -YRPB- CL -YRPDB- 14' EXIST. EXIST. EXIST. 10' 6' 18' 14' 12' 12' EXIST. ��9Q� INSIDE 12'MIN. 2j ,s1 7'WG i t zu CONC.DRAINAGE DITC "-JA 5 IS w � 4' XIST. RET.WALL GRADE z O FDPS POINT // 1„1„ II=IIII ,1,1 GRADE IST.%EX. EX. EX. el POINT CD ral —J / 1111111111111111= 0 EX. EX. -�-� -o ' \/ IIIIII=IIIIIIIIIII VAR 47 g:1 8%6°/u 67 — _ a 17.25" ° N. ® ti z v3' _ v GRADE TO tm TYPICAL SECTION NO. A-14 THIS LINE z Pi_ 1- -YRPB- RAMP B 30' . N -YRPB- STA. 25+56.64 TO 30+80.36 CO N E.10 TYPICAL SECTION NO. A-15 CO -YRPDB- RAMP DB 0, -YRPDB- STA. 52+20.68 TO 57+87.16 Y 0 / o,°m NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. O 3U N 0, ,-03 V N 00 TO \/CC lD/a `` I LANE PROJECT REFERENCE NO.1-38/98 SHEET NO. El 3" Bzs.oc 2A-8 R'W SHEET NO. ROADWAY DESIGN PAVEMENT DESIGN E2 4" E25.00 ENGINEER ENGINEER E3 B25.00 VARIES GRADED SHLDR. 14' (W/O GUARDRAIL) 14' J, B" ABC WIDTH+3' 3' 11.67' FDPS 3' 11.67' I FDPS J2 B" ABC 3' FDPS al� WIDTH I�0 R4 SBG VARIES 4% III 4' 4% R5 EXP GUTTER GUARDRAIL 1 4°/u -____ T EARTH MATERIAL I ORIGINAL \lr'O' O 1�S 1� ® ORIGINAL 4 O DOCUMENT NOT CONSIDERED FINAL 21M 0 GROUND Z• 6" GROUND Z1� ® UNLESS ALL SIGNATURES COMPLETED PAVEMENT TYPE VARIES 6" 18.0" SEE TYPICAL SECTIONS TYPICAL SECTION DETAIL NO. 1 TYPICAL SECTION DETAIL NO. 2 TYPICAL SECTION DETAIL NO. 3 GUARDRAIL DETAIL SHOULDER BERM GUTTER SHOULDER BERM GUTTER SEE PLANS FOR GUARDRAIL LOCATIONS SEE PLANS FOR LOCATIONS ALONG: SEE PLANS FOR LOCATIONS ALONG: -L- -Y S- -YRPCA- -Y RT- -YRPC- -Y LT- -YRPAC- -Y_N- -YRPDB- -YRPA- LANE LINES PAVED F SHOULDERS 0 GRADE 6%MAX W ORIGINAL ROLLOVER i � 3' 3' 12' POINT GROUND 2/ o FDPS ORIGINAL 3' 3' 12' 66% i ° GUARDRAIL GR• OUND FDPS•'NNII II GUARDRAIL 0 lt.` ® 4% 2% 2%� O 4% �� 1 sars�a 0/ 4%2* ORIGINAL I R„ ® 21 2% 4% GROUND f ORIGINAL 6 ®OR J1 GROUND TYPICAL SECTION DETAIL NO. 5 TYPICAL SECTION DETAIL NO. 6 HIGH SIDE SHOULDER SLOPE ROLLOVER EXPRESSWAY GUTTER W/GUARDRAIL EXPRESSWAY GUTTER W/G.R. FOR RAMPS AT 6% CROSS SLOPE & > 4' SHOULDERS SEE PLANS FOR LOCATIONS ALONG: SEE PLANS FOR LOCATIONS ALONG: SEE PLANS FOR LOCATION -YRPC- -Y_S- USE WITH -YRPC-, -YRPCA-, -YRPAC-, & -YRPDB- TYPICAL SECTIONS WITH 6% SUPERELEVATION SINGLE FACED BARRIER BOND BREAKER 14"OR 11.5"DOWELED W/MOMENT SLAB JOINTED CONCRETE (BARRIER DESIGN VARIES) 14"OR 11.5"PCCP JOINTED WITHOUT DOWELS NONWOVEN c GEOTEXTILE m #57 STONE aro 0 r , y 4"B25.0C Q C a ' - A A o- m co co co1'-0" •.\ I 4"PERFORATED PIPE 12"TYPE 1 m FABRIC -+ 1'-0"1 N m RETAINING WALL DETAIL OF SHOULDER DRAIN 10 CO LOW SIDE SHOULDER AT SINGLE FACED BARRIER W/MOMENT SLABS TO BE USED WITH TYPICAL SECTION A-1 THUR A-6, A-9, A-10,A-12, B-4 THRU B-7 Y U m A Om O 00 tV 0, ,.-03 NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. V LO_ NQn \/CC lD/o_ " I LANE PROJECT REFERENCE NO.38/98 SHEET NO. 2A-9 -�1„ R'W SHEET NO. DOUBLE FACED SINGLE FACED ROADWAY DESIGN PAVEMENT DESIGN BOND BREAKER(TYP.) CONCRETE BARRIER CONCRETE BARRIER ENGINEER ENGINEER 14"PCCP JOINTED RETAINING WALL 14"PCCP JOINTED OR NOISE WALLN 14"OR 11.5"DOWELED WITHOUT DOWELS WITHOUT DOWELS BOND BREAKER JOINTED CONCRETE NONWOVEN GEOTEXTILE CLASS B NONWOVEN GEOTEXTILE 14"OR 11.5"PCCP JOINTED NONWOVEN CONCRETE WITHOUT DOWELS GEOTEXTILE SHOULDER #57 STONE SHOULDER #57 STONE SHOULDER ' i POINT POINT POINT 6, -- 4"B25.0C Q 6. Q DOCUMENT NOT CONSIDERED FINAL mill ilif ' , �_. ALL SIGNATURESCOMPLETED p,-��ccacc6 I 1ya"S9.5B _prii•_���i�•tar• ���=�o�Q, r• �0�01♦0� � �A00��1 114 S9.5B 12"TYPE 1 \ 4"PERFORATED PIPE 12"TYPE 1 1-0" FABRIC \ I 4"PERFORATED PIPE 12"TYPE 1 _1-0" 1-0" FABRIC / _1-0"� DETAIL OF SHOULDER DRAIN DETAIL OF SHOULDER DRAIN MAINLINE MEDIAN SHOULDER LOW SIDE SHOULDER AT RETAINING WALLS TO BE USED WITH TYPICAL SECTION A-1 THRU A-6, B-5 & B-7 TO BE USED WITH TYPICAL SECTION A-1 THUR A-6, A-9,A-10,A-12, B-4 THRU B-7 DOUBLE FACED BOND BREAKER(TYP.) CONCRETE BARRIER SHOULDER 14"PCCP JOINTED POINT WITHOUT DOWELS EARTH 1 y4'S9.5B 3'-0" 3"119.00 1 SINGLE FACED 14"PCCP JOINTED CLASS B MATERIAL 1'-6" ~ 4"B25.00 CONCRETE BARRIER H.WITHOUT DOWELS CONCRETE 3"B25.00 .i RETAINING WALL 3"625.0C 111...... OR NOISE WALL 14"OR 11.5"DOWELED SHOULDER FABRIC SHOULDER I—�r,�moino BOND"OR BREAKER AKER JOINTED JOINTED CONCRETE POINT POINT WITHOUT DOWELS 3"B25.0C . , - OMMONa.-fro— *ruw A � � \ #57 STONE SHOULDER mom 0�0�0OI $„CTBC { POINT O O O O • • oT C'_. , 12"TYPE 1 ll 4"B25.00 3 0 , ' F L 1y4'S9.5B 1'-6" p'•.•.•.•�• 1/4'S9.5B 4"PERFORATED PIPE FABRIC r' D D M /. _I ' " 12"TYPE 1 #57 STONE I 4"PERFORATED PIPE 12"TYPE 1 1'-0" FABRIC DETAIL OF SHOULDER DRAIN o 0 0 iy4'S9.5B V 1 ° I TYP. �I MAINLINE SHOULDER 4"PERFORATED PIPE 12"TYPE 1 DETAIL OF SHOULDER DRAIN TO BE USED WITH TYPICAL SECTION A-7,A-8, B-12, & B-13 1'-0" FABRIC ,,_0„..] MAINLINE MEDIAN SHOULDER BONDBREAKER(TYP.) DETAIL OF SHOULDER DRAIN TO BE USED WITH TYPICAL SECTION A-1,A-2, & B-6 14"PCCP JOINTED LOW SIDE SHOULDER AT RETAINING WALLS WITHOUT DOWELS T1 MEDIAN BARRIER TO BE USED WITH TYPICAL SECTION A-14 14"PCCP JOINTED BOND BREAKER(TYP.) NONWOVEN GEOTEXTILE WITHOUT DOWELS #57 STONE 14"PCCP JOINTED CLASS B T1/T2 MEDIAN BARRIER WITHOUT DOWELS CONCRETE 3"E25.00 NONWOVEN GEOTEXTILE 14"PCCP JOINTED SHOULDER WITHOUT DOWELS a NONWOVEN GEOTEXTILE SHOULDER POINT #57 STONE BOND BREAKER(TYP.) EARTH POINT . SHOULDER NeLa MATERIAL POINT SHOULDER14"PCCP JOINTED WITHOUT DOWELS .T • • 3'-0" v NONWOVEN GEOTEXTILE L D o-' Q INN D 11/4"S9.56 .00000 0 _ 1 1-6 A POINT SHOULDER 12"TYPE 1 - - - 1 ya''S9.5B • / KO ' FABRICitleillbilie '. pZ�•�O�O�OA 1y4S9.513 O 1�• OOOOO ti �,v • - • • • .S�/ 12"TYPE 1OS �N �• •• - ,I FABRIC a'_ ' a \ 4 12"TYPE 1 1'-0" 1 O 12"TYPE 1 / .5 5 HE e�0 1y4'S9.5B N FABRIC PERFORATED PIPE FABRIC 0 FABRIC ai ,-•-' ' 1'-0" 1'_0"1 4"PERFORATED 1'-0"_ N PIPE EXTENDED T2 I 12"TYPE 1 67 BARRIER FOOTING [_1-0" 1'-0" DETAIL OF SHOULDER DRAIN DETAIL OF SHOULDER DRAIN 4"PERFORATED PIPE MAINLINE SHOULDER WITH T1 MEDIAN BARRIER 1-0 BE USED WITH TYPICAL SECTION A-1 THRU A-6 & B-4 THRU B-7 TO BE USED WITH TYPICAL SECTION A-3 THRU A-5 & B-7 DETAIL OF SHOULDER DRAIN WITH T1 /T2 MEDIAN BARRIER Z. o,m7) NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. TO BE USED WITH TYPICAL SECTION A-1 THRU A-2 & B-4 THRU B-6 O 3U N 2 -'03 P Ld N OL] (073 lD/D_ LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 2D-1 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 1 DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 5 LATERAL BASE DITCH STANDARD 'V'DITCH LATERAL'V'DITCH PIPE OUTLET CHANNEL STABILIZATION SPECIAL CUT DITCH vrHINGE DETAIL 6 DETAIL 7 (Not to Scale) b INaro sale) INotw spate) (Natu scat).) (Nano scold SPECIAL CUT DITCH SPECIAL CUT DITCH WHINGE Natural Naturol Bed (Nara Sale) INotto Scale) m- I Fill b Elevanon le Natural Front Groan I') TA 1ifl. Slope f- Daurol Ina geoteai 1 Ditch Natural Ip Natural Natuml Naturol \ Fill roan aw Ground ,� \°c Slope Ground e d 1 Ground z, \ Ground Ground .1 p lift. Slope Ground +6�y Natural A' *�'P. B Min.D= 1.5 H. ) D 1 Min.D= 1.0 H. d " q. A.\cc Ditch Ground \ F\fat oc Front Max.d= 1.5 Ft. Slope= 0.43% 1.5 / D F\ °c Slope p 9. -. Ditch 8= 5 F. PSRM= 82 SY Len91h= 116 H. Geotextile Goaepne r� Min.D= 0.5 Fr. ) D F\ °t Slope Min.D= 1.0 Ft. (honks only) Channel Bed 6.0' I- b= 5 FL FROM -YRPAC-STA.55+88 TO STA.55+27 Max.d= 1.0 Ft. Loop.- 22 IVadablel Min.D= 1.5 Ft. 6.0• Type of Liner= PERM Type of liner= B Rip-R°p b= 5 Ft. Type otUne,_H CL l R;p-nor- FROM -YRPD-STA.28+75 TO STA.29+66 Min.D= 1.0 F. Keyed-In -YRPD-FROM STA.28+00 TO STA.28+75 -L_WB-FROM STA.134+00 TO STA.136+50 -L-FROM STA.150+15 TO STA.152+00 FROM -LCDEB-STA.57+50 TO STA.62+81 FROM -YRPAC-STA.52+00 TO STA.53+84 -YRPC-STA.16+04 -L-FROM STA.133+12 TO STA.134+00 DOCUMENT NOT CONSIDERED FINAL -Y_N-STA.210+35 RT UNLESS ALL SIGNATURES COMPLETED DETAIL 8 DETAIL 9 DETAIL 10 DETAIL 11 DETAIL 12 DETAIL 13 DETAIL 14 DETAIL 15 BERM BASE DITCH BERM BASE DITCH BERM 'V'DITCH SPECIAL LATERAL'V'DITCH CHANNEL CHANGE RIP RAP AT EMBANKMENT STANDARD BASE DITCH CONCRETE DITCH 1 Nara scaled b (Norio Scale) (Notro Scale) (Nat to scale) BEHIND IRETAI LNG WALL ES 1 r-Li NM.Sale) Notro Smla) Not to Scale) Notto Scale) 10'min. Natural Natural RETAINING BOND N./ Natural \ Natural ,A.\ RDWY GNatural _V_round 7. \ I b 1 Naturol b Fill Ditch �J Ground 7:) ri,A Ground WALL BREAKER / Ground 7.) Tp/ RDWY- Groundd 7:) D ) D '1" RDWY A.\ 4.y D le.:‘ SFill lope Ground d ) D 1"ax - Slope Grade 1 I I +V M' D 15 D 81 �\ NATURAL + 1: .� 1.0'min. Min.D= 1.25 Ft. B_ GEOTEXTILE GEOTE%TILE ON exT a In. _ Ft. GROUND Min.D= 0.75 Fr. Max.d= 1.25 H. Natural GEOTEXTILE Min.D= 1 Ff. BANKS ONLY Min.D=4 Ft. Max.d= 1 Ft. B= 3 Fr. B= 3 H. b= 5 Fr. Ground Max. H. B= 5 H. b= 5 Ft. b= 5 Ft. Min.D= 1.0 H. 'When B is< 6.0' B=6 H. T f Liner= Class 2 Rip-Rap D= 1.0' Type o p-Rap Class BRip-Rap= 161 tons Slope= 4.17% 4" B= 1.0' Type of Liner= CLASS B Rip-Rap -L-FROM STA.166+50 TO STA.168+88 -YRPD-FROM STA.12+60 TO STA.13+14 Type of Liner= Class 2 Rip-Rap b=10 Ft. GEOTEXTILE= 270 SY Length= 193 Ft. __ -L-FROM STA.155+50 TO STA.158+32 -L-FROM STA.158+32 TO STA.160+00 -L-FROM STA.168+88 TO STA.171+00 -YRPAC-FROM STA.27+74 TO STA.33+50 -Y 5-STA.121+45 -Y S-FROM STA.119+50 TO STA.121+45 -YRPCA-FROM STA.41+00 TO STA.46+50 LT -YRPAC-27+86 RT -YRPDB-FROM STA.46+00 TO STA.47+50 LT -YRPDB-FROM STA.47+50 TO STA.49+75 LT -YRPAC-FROM STA.50+80 TO STA.52+50 RT -YRPAC-FROM STA.52+50 TO STA.55+30 RT DETAIL 16 DETAIL 17 DETAIL 18 DETAIL 19 DETAIL 20 DETAIL 21 DETAIL 22 DETAIL 23 SPECIAL CUT DITCH SPECIAL LATERAL'V'DITCH SPECIAL LATERAL'V'DITCH STANDARD BASE DITCH SPECIAL CUT BASE DITCH w4HINGE SPECIAL CUT DITCH SPECIAL LATERAL'V'DITCH SPECIAL LATERAL'V'DITCH (Naro sale) (Notto Scale) INC.Scale) (Nat to Scale) (Not to Scale) (Notto Scale) (Notto Scale) (Not to Scale) Natuml Front Natural Natural Front Ditch Ground GroundDitch Fill Naturol A'�o% Slope c t ?) T ,A\ roan \o't Front Front AA.] A�°tat STOP \°t t Slope Ground I�y F\Oo°t Natural A.\° Fill Natural A.\° Fill iu Min.D= 1.0 Ft. 4') A\°H° Slope Ditch �� F\6" Natural 1'.0 Natural A 3A°hoc Fill D Ground 7.) F\off°c Slope Ground 7.) \off°c Slope F Ditch Slope D Ground ?') F Ground )° OS Slope D D X B B= 3 Ff. d li' p F p F Min.D= 1.0 H. Slope= 2.62% Min.D= 1 H. ditif °7yaly PSRM= 160 SY Lengrh= 267 Ft. Goofs.` .0' Min.D= 1.5 Ft. Geotetile FROM -YRPCA-STA.63+00 TO STA.63+50 Min.D= 1.0 Ft. Min.D= 1.25 Ft. -L_WB-FROM STA.135+52 TO STA.138+08 -YRPCA-FROM STA.65+00 TO STA.66+00 Min.D= 1.0 H. Min.D= 1.0 H. Max.d= 1.5 H. Typeof Liner= Class BRip-Rap Max.d= 1.0 Ft. FROM -Y N-STA.156+20 TO STA.160+50 FROM -Y_N-STA.157+37 TO STA.161+97 B= 3.0 Ft. -Y9LPA-FROM STA.12+00 to 12+50 RT -YRPC-FROM STA.11+50 TO STA.15+50 LT Type of Liner= CLASS BRip-Rap -L-FROM STA.119+50 TO STA.122+00 RT -YRPC-FROM STA.22+00 TO STA.23+00 LT -YRPCA-FROM STA.53+49 TO STA.56+00 -Y RT-FROM STA.239+00 TO 240+50 LT -YRPC-FROM STA.23+00 TO STA.24+50 LT DETAIL 24 DETAIL 25 DETAIL 26 DETAIL 29 DETAIL 30 TYPICAL CUT DITCH TOE PROTECTION PIPE OUTLET CHANNEL STABILIZATION RIP RAP AT EMBANKMENT PIPE OUTLET CHANNEL STABILIZATION DETAIL 32 (Not.Sale) ?') I Not to Scale) IVA° (Nato Scale) Natural Bed (Notto Sale) (Not to Scale) Nowml Bed a \°` °m" Fy�s);%, 1`"RaV e moral Elevation 10'min. (do geotmtilel RIP-RAPPED ENERGY DISSIPATOR BASIN Natural dgoy°" D 5p\a\xe% slope '0e d t Groan Natural Ditch 1.0-mi t t G.o„n Natural 4 *NOTE A:IF EXIT VELOCITY OF BASIN IS SPECIFIED,EXTEND BASIN AS REQUIRED TO Dr SECTION OBTAIN SUFFICIENT CROSS SECTIONAL AREA AT SECTION A-A SUCH THAT Q GeotehnBe 15" In opo desiCROSS SECTION AREA AT SEC.A-A)= SPECIFIED VELOCITY. Geae.. Min.D= 1.0 Fr. d= 1.0 Ff. Geoteolile GEOTEXTILE e.o.m.ie Existing G H Max.d= 1.0 Ft. Channel Bed monk:only) Channel Bed Rip Rop DISSIPATOR POOL APRON °NOTE B:WARP BASIN TO CONFORM TO NATURAL STREAM CHANNEL.TOP OF RIP-RAP Type of Liner= Class BRip-Itap Mnioblel ble (Right Bonq TOP OF BERM NOTE A IN FLOOR OF BASIN SHOULD BE AT SAME ELEVATION OR LOWER THAN Length- 15 H. Type of Liner- Class 1 Rip-Rap length= 60 H. O'ono I TOP OF RIP-RAP NATURAL CHANNEL BOTTOM AT SEC.A-A.PROVIDE SMOOTH TRANSITION FROM -Y_RT-FROM STA.237+00 TO 239+00 LT Type of Liner= Class 1 Rip-Rap Type a Uner= CL 1 Rip-Rap-Keyed-In Type of Liner- CL 1 Rip-Rap-Keyed-In i NOTE B END OF APRON TO NATURAL CHANNEL WIDTH. -YRPC-FROM STA.15+50 TO STA.18+50 LT -L-STA.147+14 -Y 5-STA.121+45 -Y_N-STA.167+45 -YRPC-FROM STA.20+50 TO STA.22+00 LT - -YRPCA-FROM STA.58+25 TO STA.59+65 RT p, TOP OF NATURAL WM\�""`\"`?.,)1 //i CHANNEL NOTE A M1 NATURAL GROUND treomonloc iip `Nigt'LK�.�_iVt���i�ai•�.ii l co y, 1 A B B B DETAIL 27 - PREFORMED SCOUR HOLE DETAIL 28 - PREFORMED SCOUR HOLE DETAIL 31 GEOTEXTILE IA B T °NOT TO SCALE 'NOT TO SCALE TOE PROTECTION (Natro sale) C F C A-A PLAN VIEW PLAN VIEW 0. GEOTEXTILE INSTALL LEVEL AND FLUSH INSTALL LEVEL AND FLUSH 1'A.(RE' SLOPE HAI F PLAN B WITH NATURAL GROUND WITH NATURAL GROUND NATURAL /..♦..♦ .♦ 4t, ♦ GROUND d Q\Y' _ ... ',tr.' - . ... � � GEOTEXTILE TOP OF RIP_ppP /.. ��. , ��. d= 1.0 Fr. �9 BERM As REQUIRED D /- TO SUPPORT RIP-RAP C Pipe or Ditch . ..�.♦. Pipe or Ditch .. .�♦.♦. OE j j�=����A�a�libUt- Ul Outlet \ OVHa \ '�.A ^C��1 -O Type of Liner= Class B Rip-Rap �f► -- SFr R-R EXCAVATETO THIS LINE A. 0 m 1 1 /II -L-FROM STA.122+206 TO STA.123+25 D OTFXTILB BACKFILL wLIA53 RIP-RAP L L 1, , L 1 ...I J L- RIP RAP tip APPRO%.Eli'. OF WA E 1:1 _'I . _'I .� - FROM STA.141+40 TO STA.148+00 y, - B o_ -L-FROM STA.145+40 TO STA.146+00 __ __ -L-FROM STA.145+50 TO STA.147+10 CULVERT 39^' IS OnzONTALII Square Preformed Square Preformed P -YRPAC-FROM STA.32+50 TO 37+95 5-1 Scour Hole(PSH) �. soar Hole IPSHI � -Y S-FROM STA.46+15 TO STA.47+54 LT .fie a BERM AS RT REQUIRED .�.�.�. ' ._._._v./ -Y3-FROM STA.44+85 TO STA.46+50 RT To SUPPORT RIP-RAP C` (Rip Rap in basin (Rip Rap i' basin -Y S-FROM STA.125+50 TO STA.129+50 not Shawn for dadbl notehoWn for dadM -YRT-FROM STA.231+78 TO STA.238+00 SFr r-r EXCAVATE TO THIS LINE �, '♦ � y�Ayy,A ♦ '• ♦ -YN-FROM STA.151+64 TO STA.153+55 I DIM. RIP RAP BASIN# BASIN#LOCATION (AT OUTLET) GEOTF%TILE BACKFILL wCIA551RIP-FAP .♦�.♦♦=.� ..4444/ I 2 3 4 5 6 7 8 1 -YRPCA- 61,1421 LT RT / B= 3.75' '♦� ♦.♦ B= 4.5' -Y N-FROM STA.157+91 TO STA.160+00 W IS) A 30" 30" 2 -Y_S-47+61,142 LT N D= 1' D= 1.5' -YTI-FROM STA.162+19 TO STA.162+49 B 20" 20" 3 B ti' -Y-N-FROM STA.169+72 TO STA.171+30 C 16" 16" 4 N W= 4' W= 4' -YLPC-FROM STA.14+00 TO STA.16+55 tb D 1' 1.25' 5 NOTE: (NI SECTION A-A SECTION A-A E 3.5' 4' 6 BERM AS REOUIRrD Wo= DIAMETER OF PIPE, RIP-RAP PIPE(d= I5") PIPE(d= TEl F 6.3' 10' 7 To SUPPORTWIDTH OF BOX OR �44. / �49 G 10' 17' 8 GEOTE%TIUi SPAN OF PIPE-ARCH %OAF i D %OAF' 0 CV PSRM PSRM 6 SFr rl-R CULVERTS N / INFLOW ( INFLOW • NATURAL • NATURAL � GROUND - IL /� GROUND r�55 coin LINER:CLASS B RIPRAP B-.i 1` /// LINER:CLASS B RIPRAP B-Yi 1\ // FROM STA.TO STA. j WITH GEOTEXTILE ' MIN 1'TUCK WITH GEOTEXTILEil ' MIN.1'TUCK cn 308 1108 Y Y 5 STA.120+90 -LCDEB-STA.65+59 Y S STA.123+38 Y S STA.119+78 o Y S STA.125+00 Y S STA.122+18 Y N STA.164+35 -YRPC-STA.21+09 o -YRPC-STA.15+09 i m+a on O 3U N UV �-03 V Ld N00 Y..../CC UJ/0_ LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 20-2 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 33 DETAIL 34 DETAIL 35 DETAIL 36 DETAIL 37 DETAIL 38 When B is> 6.0' DETAIL 39 BERM BASE DITCH BERM BASE DITCH LATERAL BASE DITCH SPECIAL LATERAL BASE DITCH Std.No.876.01 SPECIAL LATERAL BASE DITCH ]Not to Scale) (Notto Scale) (Natter Scale) ]Not to Scale) SPECIAL LATER AL'V'DITCH STANDARD BASE DITCH (Not to Scale) b b (Not to Scale) (Not.Scale) b Natural Natural Natural Fill Ground Natural Natural \ RDWY Natural ♦ Natural r- Ground j� ♦ Fill Ground ?) ) •1;. y„,. Fill Ground '' A' slaps Natural P Fill dl ♦°t 1` Ground ? T 1' Ground j. T \ T \°t 1 e�°t .) D ry. Ground 3�) 0' M t Slope d( D d !D� slow �\�D F\mat \ Geotextile B d( D Y\a a d L Min.D= 1.5 FI. e�l Ground 4.) D 3'1°t slope Min.D= 2.0 Ff. Min.D= 1 H. B_ GEOTDRILE'2> Min.D= 1 H. B GEOTDRRE B Min.D= 1.5 H. Geotextile Max.d= 1 R. Max.d= 1 Ft. B= 2 F. B= 2 R. Max.d= 2.0 Ft. Min.D= 1 R. B= 2 Ft, B= 2 Ft. EXISTING b= 2 H. 8= 10 Ff. d= 1 Ft. b= 4 Ft. b= 4 Ft. SLOPE Max. Min.D= 1 Ft. Class 1 Rip-Rap=348 tons Slope= 3.15% 8= 5 Ft. (2:1 MAX) -L-FROM STA.26+50 TO STA.28+00 RT -L-FROM STA.28+00 TO STA.36+00 RT GEOTEXTILE=300 SY Length= 162 Ft. Type of Liner= Class 1 Rip-Rap Type of Liner= Class 1 Rip-Rap Type of Liner= Class 1 Rip-Rap -Y_RT-FROM STA.238+00 TO STA.237+00 -L-FROM STA.36+00 TO STA.37+00 RT -Y_S-FROM STA.60+00 TO STA.62+00 RT -Y_S-FROM STA.63+50 TO STA.65+00 RT -Y_N-FROM STA.199+75 TO STA.203+00 -Y_5-STA.71+10 RT DOCUMENT NOT CONSIDERED FINAL -Y_S-FROM $TA.35+50 TO STA.37+75 LT -Y_S-FROM STA.63+00 TO STA.63+50 RT -Y_N-FROM STA.213+25 TO STA.216+50 UNLESS ALL SIGNATURES COMPLETED -Y_S-FROM STA.65+00 TO STA.65+50 RT DETAIL 40 DETAIL 41 DETAIL 42 DETAIL 43 DETAIL 44 DETAIL 45 DETAIL 46 DETAIL 47 SPECIAL CUT DITCH SPECIAL CUT DITCH BERM 'V'DITCH STANDARD BASE DITCH SPECIAL CUT DITCH SPECIAL CUT DITCH vaHINGE LATERAL'V'DITCH LATERAL BASE DITCH (Not.Scale) (Notro Scale) I Not to Scale) ]Nam scale) Natural ,. (Notro Scale) (Not to Scale) (Not to Scale) (Notro Scale) Front Front b Groun Front b { Natural Natural ♦ Oikh t Ditch Naturol 1 1 Ground 3. ♦ Ground b' Ditch Naturol b Natural Natuml _L L Slope Natural 0° slope roan ) 3. Slope Ground Natural ♦ Ground ) � 1"iFt. j, \ '' Fill ?. Fill Ground d:) p Ground \p YA912' ) D �" RDWY dl d 4.) D 'G ♦oft Front Ground d ') D 1' 19Ft. Slope d I - D - Slope Geotextile n_ Min.D= 1.0 R. T" 44 p p'\e° Dikh Min.D= 1.0 F. Min.D= 0.5 Ff. Max,d= 1.0 Ff. Geotextile Q slope GEOTEXTILE 111 Min.D= 1.0 R. Min.D= 1.0 F. Geotextile Min.0= 1.0 Ft. be 5.0 R. DDE=3517 CY 8= 5 H. Type of Liner= CLASS B Rip-Rap Max.d= 1.0 Ft. 6D' � Min.D= 1.0 F. Min.D= 1.0 Ft. Max.d= 1.0 R. -L-FROM STA.178+00 TO STA.179+50 -L-FROM STA.181+50 TO STA.184+00 Class B Rip-Rap=401 tons Slope= 3.43% Max.d= 1.0 Ft. 'When B is< 6,0' B= 3 Ft. -Y11-FROM STA.23+23 TO STA.19+00 GEOTEXTILE=660 SY Length= 481 Ft. -Y_N-FROM ETA.178+60 TO ETA.180+00 RT -Y N-FROM STA.178+50 TO ETA.182+00 LT Typeb= 5 Ft. 6= 5 H, -L-FROM STA.208+50 TO STA.212+00 ofLiner= CLASS 1 Rip-Rap Type of Liner= CLASS 1 Rip-Rap -L-FROM STA.212+00 TO STA.212+50 -Y15RPB-FROM STA.18+45 TO STA.23+25 -YN-FROM STA.180+00 TO STA.186+00 RT Y- N-FROM TA.184+50 TO TA.186+50 LT -Y-S-FROM ST 50 TO STA.197+16 -Y_S-FROM STA.199+50 TO STA.202+60 -Y E E STA.38 N-FROM STA.190+50 TO STA.192+50 RT -YRPAC-FROM STA.38+00 TO STA.36+00 -YN-FROM STA.193+50 TO STA.194+50 RT -L-FROM STA.201+00 TO STA.207+50 _ -L-FROM STA.213+00 TO STA.215+50 PUCDAENT DERTH: DETAIL 48 DETAIL 49 DETAIL 50 DETAIL 51 DETAIL 52 DETAIL 53 CL1-26' CL 2-era' OUTLET CHANNEL STABILIZATION TAIL BASE DITCH INLET CHANNEL STABILIZATION CHANNEL CHANGE CULVERT CHANNEL IMPROVEMENTS Smooth-Faced CHANNEL CHANGE (Not to Scale) (Not to Scale) (Not to Scale) (Not to scale) ]Not to Scala) Retainin Wall ]Not to scale) fLOODPIAIN BENCH FLOODPLAIN BENCH b NATURAL GROUND 9 NG NG Natural Natural NG NGCLASS Ground j.) ,L.A Ground Natural f- _ EXCAVATION RIPRAP I(TYP) 2'at 1y� CL'll'RIPRAP dI CL'll'MPRAP Ground 7 D ` Slope D ?' 1h+. Fill DEPTH:24" 1"/Ft. 12-14' WITH GEOTFXTILE WITH pNOTf%iILE d ?, CLASS II RIPRAP ON BArvKS Geotextile Min.D= 2.0 H. ON e S j .7 4.5' ♦at lift. SLOPE PROTECTION CLRPIPRTMP CL'II'R P Geola,xle 'J MIN.2.5' WITH GEOTEXTILE WITH T , Max,d= 2,0 FL WITH L , ]banks only) Min.D= 1,5 R. ----" �" GEOTEXTILE BANKS CL'I'MPRM.J TK ON BANKS CL'I'RIPRM v✓ SLOPE PROTECTION CLASS II RIPRAP (BRIDGE ABUTMENT) I. NATIVE MATERIAL DDE=12 CY B= 4.0 Ft. ti NATNE MATERIAL Max.d= 1.5 Ff. GEOTEXTILE TYP O�Q' CFO ON 50P PLACED (TYP) CLASS II RIPRAP ON STREAM BED CL'X RIPRAP w I 8' ARIES 0-8' To L l0 Class 1 Rip-Rap= 38 tons Length= 33 Ft. To L VOIDS 0= 4 Ft '♦ 16' �I Iry <L'r RIPRAP W 5' I.e.-VARIES 0-d 'When B is< 6.0' ti WITH GEOTEXTILE (WITHOUT GEOTEXTILE) NATIVE MATERIAL GEOTEXTILE= 45 SY Slo e= 2.73% NATIVE MATERIAL b= 5 R. PV.COED ON TOP v PLACED UTO ON VOIDS Type of Liner= COss 1 Rip-Rap F N VOIDS SLOPE FROM INVERT TO NATURAL BED AT APPROX.5% -Y_S-STA.53+45 LT N29.0' -Y 5-STA.37+95 LT -Y 5-STA.37+05 RT -Y_S-FROM STA.68+38 TO STA.69+50 LT FILL WITH NATIV Slope=0.3% - - BED MATERIAL INLET CHANNEL -Y S-FROM STA.73+25 TO STA.74+65 RT VARIABLE WIDTH BENCH - 0-4'@ 12.1 VARIABLE WIDTH BENCH 0-4'@ 12:1 EXCAVATION NATURAL GROUND DETAIL 54 NOISE WALL DETAIL 55 NATURAL DETAIL 56 DETAIL 57 DETAIL 58 mar CONCRETE DITCH GROUND ?tl PIPE OUTLET CHANNEL STABILIZATION LATERAL BASE DITCH LATERAL BASE DITCH O F, LATERAL BASE DITCH I Not to Scale) Naarol Bea BEHIND NOISE WALL/BARRIER (Norm scale) (Na to scale) ry�� (Nana Scale) Elwaxon BOND(Not to Scale) VARIES b b GEOTEXTILE(TYP) /l F b aural (no geote.e) BREAKER Natural �- I Natural r- Natural I~- Groun Naturol �Ground j., T ♦ 1 Rt. Fill Ground j. ♦ CLASS II Gmuna \ 1V 2` �' M1' 1 ift. Fill BED:GLASS II RIPRA RIPRAP(TYP) Ground T •L.� EH, Fill .) rg1 •,.. D Slope \ Slope WITHOUT GEOTEXTILE OUTLET CHANNEL 1� Slope 2' I Min.D= 1.0 R. 1 e 1 Min.D= 1.0 Ft. (DEPTH-2') a I Min.D= 1.5 R. Geote.,ile Loop.= 22 H. a. B= 2.0 Ft. I'--I B= 5.0 R. I�•1 B= 5.0 Ft. (banks only) Chanel Bed b= 3.0 Ft. b= 5.0 Ft. -Y 5-STA.70+45 LT 5= 5.0 H. (Variable) 4, D= 1.0' -Y_S-STA.71+60 TO 73+25 RT ype of Liner= CL IIRI-Rap-Keyedan(Banks) B= 2.0' FROM STA.TO STA. -Y_S-FROM STA.117+00 TO STA.118+50 -Y_S-FROM STA.118+50 TO STA.120+80 ype of Liner= CL I Rip-Rap-Couaersunk(Bed) _ -Y S-STA.83+65 RT -YS-STA.94+40 RT DETAIL 59a 3 DETAIL 59b DETAIL 59c DETAIL 60 SXCBMIACTED f \ DETAIL 65 NEW STBE TREAT ACKFIto 5' FALSE SUMP FALSE SUMP FALSE SUMP STANDARD 'V'DITCH \ NEWSHALLS BE TREATED 5'Min. 1' 10' FINISH GRADE I Not to scale) c� (Not to Scale) �� (Not to Scale) ]Not to Scale) [pW, AS SPECIFIED IN PLANS Outside Ditch BLOCK Traffic Flow Median Ditch Natuml Natural p EroxD Ixv6RT FLOW ,,X,'" Outside Ditch pig. 2•I' Ground j.) 1.� Ground OF EXISTING CHANNEL fi�`�����^i'�, Traffic Flow 0.� 20;1 +'�2'�- 'I I` p _ GI (see Chan Below) 20' GI d Man.D= 0.67 Ff. B ixv[xrL ,,„,, ', . ,,'„ GI Geotextile Max.d= 0.67 H. `A,ik A��►�'►���'��'�LC,& tS- etc. �-5- etc. tS- et. .... C Proposed Ditch S=Ditch Slope Proposed Ditch Class B Rip-Rap= 13 tons Slope= 7.25% { CO�MPAGTEo IP DOE COMPACTED S=Ditch Slope pose S=Ditch Slope C Proposed Ditch pe 4 pose GEOTEXTILE= 21 SY Length= 62 Ft. GKFILL Mi x DKFILL -0 USE WHEN DITCH FLOWS IN Ditch Grade L Ditch Grade L SECTION A-A USE WHEN DITCH FLOWS IN OPPOSITE -Y10-FROM STA.24+00 TO STA.24+61 Mxx. MIN,.O'DEPTx 0 DIRECTION OF NEAREST TRAVEL LANE DIRECTION OF NEAREST TRAVEL LANE 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' ',\ LENGTH Ms]SroNE N Over 2.0% To 4.0% 30' Over 6.0% 50' m USE IN MEDIAN DITCHES uxcompacreD a i DETAIL 61 DETAIL 62 DETAIL 63 DETAIL 64 LATERAL BASE DITCH LATERAL'V' DITCHPIPE OUTLET CHANNEL STABILIZATION \<0 I]' (Nato Scale) FALSENo Scale ]Nat to BAISTINL (Not to Scale) Scale) Natural Bed COMPACTED NOTES: m y N.GIL.B. W Flevaxon CHANNEL p EMMET. 1)CHANNEL BLOCK SHALL BE INSTALLED IN ACCORDANCE WITH THE �_ b I I" '1 G (no geotextile) \ PROJECT SPECIFICATIONS. Natural 1. OK Carol 2 BLOCK SHOULD BE INSTALLED AT THE INTERFACE BETWEEN EXISTING B Ground ?') .♦ 1 Fill Natuml Fill A'1 t Fill roan aN )CHANNEL AND PROPOSED CHANNEL. D Slope Ground j. ♦ 1"fi,. / Slope Ground N •1.'. Slope j Off° 0 37 BOTTOM OF BLOCK SHOULD BE A MINIMUM OF 2.0'BELOW THE INVERT p" D '� ) 125, BLOCK 40 OF THE EXISTING CHANNEL. r GEOTEG1LEill Min.D= 1.0 FL LIMITS SECTION B-B 4)BLOCK SHOULD EXTEND A MINIMUM OF 3.0'BEYOND THE LIMITS OF THE O] Min.D= 1.5 Ft. 6= 5.0 H. Exist.Ditch Geom.!, �� OF EXISTING CHANNEL EXISTING STREAM CHANNEL. Max. 1.5 R. (honks only) Channel Bed PLAN VIEW 5)INSTALL EROSION CONTROL MATTING AND SEED IN ACCORDANCE WITH N Bed THE PROJECT SPECIFICATIONS IMMEDIATELY AFTER GRADING. (D B= 2 Ft. W = 5'Min. Length- 16 H. 10.2 PTI CHANNEL BLOCK 6)COMPACT BACKFILL TO EXTENT POSSIBLE OR AT THE DIRECTION OF N Type of Liner= B Rip-Rap b= 5 Ft. -YRPAC-FROM STA.36+00 TO STA.35+70 -YRPCA-FROM STA.49+75 TO STA.50+34 Type of Liner- Oct Rip-Rap-Keyed-In NOT TO SCALE THE ENGINEER. m -Y_RT-FROM STA.238+50 TO STA.238+00 -Y 5-STA.28+35 RT -Y-S-STA.98+12 RT N -Y11-STA.16+60 LT In In DETAIL 68 DETAIL 69 DETAIL 70 DETAIL 71 DETAIL 72 DETAIL 65 DETAIL 66 DETAIL 67 BERM 'V'DITCH BERM 'V'DITCH PIPE INLET CHANNEL STABILIZATION CHANNEL REPLACING EX.CULVERT(Not to Scaly) SPECIAL CUT DITCH SPECIAL CUT DITCH STANDARD 'V'DITCH STANDARD 'V'DITCH (Notro Scale) (Not to Scale) (Nato Scale) Natural Bed (Not ro Scale) 07 (Npt to Scale) I.b { b Elevation 1 Front L ]Nam Scale) (Not to Scale) Natural Natural aural (no geolMile) >s ,♦TJ' Ditch Front 7 5' ♦°t Slope t Ditch Gra. '21 ',,.N Groun j:) •''� Groun 13-25' 17-23' Natural B`rot D RDWY D RDWY Gound Ground 4� \O Natural A'�o Slope Naturol Natural N.A. Natural d I CLASS II RIPRAP 1 p F 3 Ground .24 p E\°Mat Ground Ground Ground \� Ground y 1.25' at1'iFt. S.I ♦ a}1iH. SLOPE PROTECTION 1 D ?) D 0', j') D 1, N Min.0= 1.0 R. N CLASS II RIPRAP TO EL.]9].0 Min.D= 1.0 R. Min.D= 1.0 F. Min.D= 0.5 Ft. Min.D= 1.0 H. b- 2.0 H. Geotexile � ON BANKS Min.D= 1.5 Ft. Slope= 2.5% Slope= 4.44% b= 2.0 Ft. Max.d= 1.0 FL (banks only) Channel Bed GEOTEXTILE Type of Liner- CL B Rip-Rap 13 Fh CLASS II RIPRAP 10' ON BANKS ONLY PSRM= 22 SY Length= 97 H. Length= t02 H. Length= 1:H EMBEDDED ON BOTTOM -Y_N-FROM STA.198+50 TO STA.199+75 Et. -Y_S-FROM STA.25+50 TO STA.26+00 -Y_5-FROM STA.58+55 TO STA.59+50 -Y_S-FROM STA.60+00 TO STA.61+00 -Y_S-FROM STA.109+00 TO STA.110+50 LT-Y 5-FROM STA.107+00 TO STA.109+00 LT Type of U°<`= 051 En-ca°-Key.rYm NO GEOTEXTILE -Y_N-FROM STA.216+50 TO STA.213+25 om -TS-FROM ETA.110+50 TO ETA.111+90 LT -Y_S-STA.93+79 LT -L-ETA.149+36 m.cn O 3U N 2 �-03 V N GO 0 \/CC LO/0_ LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 2D-3 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER aAFEMaNr DEPTH: DETAIL 73 DETAIL 74 DETAIL 75 DETAIL 76 DETAIL 77 DETAIL 78 OUTLET CHANNEL STABILIZATION SPECIAL LATERAL'V'DITCH SPECIAL LATERAL'V'DITCH BANK STABILIZATION TAIL'V'DITCH LATERAL'V'DITCH (Not to Scale) (Nolte Scale) (Net to Scale) (Nat to Scale) (Not to stole) (Nmro Scale) Pro osed FLOODPwN BENCH p e`e�d NG NG Fill Slope boa y Fill Fill Naura /G Il \°c slope \°c Slope Smooth-Faced Groundy Natural S\° Natural Fill Natural 3''.pec Naual 5'1:ax Retaining Wall Ground Ground I. \ liF. Ground `?•1 Q° Ground sx, E. _4\ 7.) DdOs .7 D 1. slept CL'I'RIPMP 1' dl D dl 0 1" ,MIN. Min.D= 1 Ft. WITH GEOTE%lllE Slope Protection Min.D= 1.0 Ft. b= 5 H. Geotextile Gemexlile pe Min.D= 1.0 H. Min.D= 1.0 Ff. Class II Riprop Exist.Channel -Y_N-FROM STA.205+00 TO STA.206+00 �{ e' 4-VARIES as' T f Liner= Class B Rip-Rap Ra Max.d= 1.0 Ff. T of Liner= Class 1 Rip-Rap Ra Max.d= 1.0 F. with Georexrile Bed to be Restored - -Y N-FROM STA.202+65 TO STA.204+00 Type° P- P Type P- P To Ex.Toe of ( -I_ N-Pre-project Conditions) LENGTH- bs• SLOPE FROM INVERT TO NATURAL BED AT APPROX.IN _Y N-FROM STA.211+00 TO STA.211+50 RT -Y_N-FROM STA.195+00 TO STA.197+35 RT Bang DOCUMENT NOT CONSIDERED FINAL —Y_N-STA.204+00 RT -Y_S-FROM STA.75+10 TO STA.84+00 RT UNLESS ALL SIGNATURES COMPLETED DETAIL 79 DETAIL 80 DETAIL 81 DETAIL 82 DETAIL 83 DETAIL 84 MEDIAN V DITCH oCONCRETE BEHIND GUARDRAIL STANDARD BASE DITCH SPECIAL CUT DITCH CONCRETE DITCH CONCRETE'V'DITCH RIP RAP BANK STABILIZATION (Non scale) INmro scale) INmro Scale) RETAINING WALL BEHIND RETAINING WALL (Novo scale) u Shoulder < Shoulder 1'\ E ShouPoint ?'1 A Point Natural Natural From RETAINING oBOND Scale) APR'/ Not to oat S/ See Fj o D 1'N°c Ground 7� \ Ground SIach WALL BREAKER WULNING BRENAKER / Ditch plan o e z F\o ! 1 Natural h�°c 1.0'mi d V Ground 4, 1.\ ,\ ,\ Grade CONCRETE D= 1.0 FT Geotemile B min. 2.5 Fr. D O B • NATURAL D � NATURAL When Biz> 6.0' Max.d= 2.5 H. Min.D= 0.5 Fr. GROUND GROUND GEOTEXTILE std.No.876.01- B= 10 Ff. °" Slope= 2.79% -Y N-FROM STA.166+50 TO STA.167+50 RT a• D= 1.0' a, D= 1.0' type of Liner- CL 1 or CL 2 Rip Rap(see plan) Class II Rip-RoP= 155 tons - B= 2.0' ' GEOTUTILE= 140 SY Length= 61 Ft. d=18"for CL 1 and 30"for CL 2 -Y N-FROM STA.208+40 TO STA.209+15 -Y_S-STA.71+70 RT -Y S-FROM STA.90+50 TO STA.92+00 LT -Y_S-FROM STA.104+00 TO STA.101+50 LT -YRPCA-STA.18+65 RT -Y_N-FROM STA.210+90 TO STA.211+65 -Y 3-FROM STA.105+80 TO STA.107+00 LT -YRPCA-STA.77+00 RT -YS-FROM STA.101+00 TO STA.105+50 LT —YS—FROM STA.110+50 TO STA.112+00 LT -Y FROM STA.192+00 TO STA.198+80 LT C al -o C N m L 0 L Q DJ N / N Q N co' N UJ N N N N IN f) I U]D L 0▪1 C Y 0 U / COO 0„m O 3U N 2 \-03 . N CD 110 \/CC lD/0- LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 22-4 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DRY DETENTION BASIN DRAWDOWN STRUCTURE 'NOT TO SCALE' ISEETPtf€tHN#4uu MR `"" Sal RE[slU OETAiu TOP ELEV. MIII ISEET PLAKMES •• Cass •^1.4s�EINDES Li 0B 1111 Bi .�. 5 '' AMIN.1111 BM0._ - . - /mom Io C,<sIR. gm.o DOCUMENT NOT CONSIDERED FINAL ID:9 'ao:bal 'iir II In9 oRR�'ao:fm UNLESS ALL SIGNATURES COMPLETED n aAslu eon !! ORSCE ron 4 Nil --- - - - � NFN_ - - U D� ,2.R'71 �- _ VP ;".0 SIDE 1 SIDE 2 SIDE 3 TRASH VARIES D. I.r:fF o u lx <�o�uNDE RACK F HOD RTIGHT SEAL PROVIDE ADEQUATE N CLEARANCE FOR GATE OPERATION AND FOR PROPER SEATING dd�♦i000i® o m OPENS FREELY AND WITHOUT INTERFERENCE 400�♦p000�♦p� - ? w WITH SLUICE GATE. w. p�♦�♦ppp�♦�♦pp� SHOWN IN TABLE FOR THAT r STRUCTURE IS FOR REFERENCE O♦00000000♦ o urtWc a o ml ONLY. DATA tcco oA N ♦♦' - WTa DETAIL ? ,�� ♦♦; ew xuN. SIDE 2 FOREBAY PLAN VIEW (Not to Scale) p,m NFN.I GRACE TRASH RACK NOT SHOWN FOR CUR!, ro INSET°A" MINIMUM DIMENSIONS FOR DRY DETENTION BASIN DRAWDOWN STRUCTURE TOP OF FILL OVER PIPE FOREBAY BOTTOM ELEVATION BASIN TOP MAX ORIFICE OUTLET -A TRANSITION WEIR CTL.STR. STRUCTURE S BOTTOM ELEVATION STORAGE INV.ELEV. DIAMETER ORIFICE PIPE STATION NUMBER (INCHES)fi MIN. ,.B II MINIMUM CONTROL DEPTH(D) CTL.STR. DIMENSIONS (0) INV.ELEV. DIAMETER(P) FLO.N.6"MSTRUCTUREGV x L x HI W FLOW ELEV. STRUCTURE FEET INCHES INCHES ,»`�^�^W, 122+50-L-LT 6" 6" 828.0' 829.5' 1.5 827.36' 3'x 3'x 2.35' 2" 828.0' 18" 156+00-Y N-RT 6" 6" 857.0' 858.5' 1.5 853.5' 3'x 3'x 4.05' 3 857.0' 24" FILTER Z 7 2::‘ -A 29+50-YRPD-LT B.(EXISTING'6•(EXISTING) 873.'IEq 801.2'EXI 4.2'IEXI 870.T5'(EX) 5'x 5'x 5.45'IEXI ,2.a IEp 873.0'IEXI 15"IEKt FABRIC .-- 40+00-Y S-RT 6" 6° 866.0' 868.5' 2.5' 863.0' 4'x 4'x 5.5' 1° 866.0' 18" d0+00-Y 5-LT 6" 6° 866.0' 868.5' 3.5' 863.0' d'x d'x ss r e66.o• le° CL.B RIP RAP VARIES 44+00-Y-S-RT 6" 6° 865.0' 867.5' 2.5' 862.0' 4'x 4'x 5.5' r 865.0' 24" THICKNESS= 1.0' (SEE PLANS) ' 66+00-Y_S-LT 6" 6" 799.0• 800.5' 1.5 796.3' 5.5'a 5.5'a 4.2' 3" 799.0' 36" 69+00-Y_S-RI 6" 6" 804.0' 805.50' 1.5' 802.0' 5'x 5'x 3.5' 2" 804.0' 24" 80+00-Y S-LT 6" 6" 794.5' 797.0' 2.5 791.8' 4'x 4'x 5.2' 2" 794.0' 24" PROFILE VIEW 92+00-Y_S-RT 6° 6" 281.0' 783.0' 2.0' 780.1' 4'x d'x 2.9' 2" 781' 30" TOP OF EMBANKMENT TRANSITION WEIR ELEVATION FREEBOARD d REMOVABLE ORIFICE TRASH RACK FILTER x, *it':‘ 'NOT TO SCALE' FABRIC #4 REBAR CL.B RIP RAP #4 REBAR WEIR LENGTH liiir............, THICKNESS= 1.0' (L( HINGEB• /// \.1.1.1.1.1.I.I.II.1.1.1.1 �,I''' MI,1® "TRANSITION SFBERM CROSS-SECTION" �,I,• I,I,I,IU I,I,II - MINIMUM DIMENSIONSWEIR FORLENGTH FOREBAYSLOPES """"""" FOREBAYBOTTOM TRANSITION TRANSITION WEIR SIDE d LOCATION RISER TRASH RACK NOTES: ELEV. WEIR ELEV. (L) (X:1) filiiiiiiiiii ' ISEE NOTES) SECTION p_p EYEB FOR OLT 1.ALL JOINTS SHALL BE FULLY WELDED AROUND SLUICE GATE OPENING ATTACHINGJOINT WITH A MINIMUM OF A V4"BEAD. ? ? ? 8 2 ? - CHAIN - 2.IF ARR ANCHOREDINN CONCRETE,FOLLOW STD. ? ? ? F T ? CLOSURE DWG.BOLTS.03 AND 862.04 FOR ANCHORING PROCEDURE. LI 3.EYEBOLT 86 FOR CHAIN CLOSURE SHALL BE INSTALLED ? F T ? **BEES BY THE SAME METHOD AS THE HINGE PLATE BOLTS. _ 4.RACK AND HARDWARE SHALL BE ALUMINUM OR REBAR P` 2 T P` 8 8 C AND GALVANIZED IN ACCORDANCE WITH ASTM A-153. 8 ? ? ? ? ? -0 * 5.PROVIDE OPENING IN TRASH RACK TO ACCOMODATE """"'"' 12° 11° 11" 12" 11" SLUICE GATE ON THE OUTLET PIPE.ENSURE TRASH RACK ? ? ? ? ? ? II Q i1___""_'��7 _ OPENS FREELY AND WITHOUT INTERFERENCE WITH SLUICE GATES. ? ? ? ? ? ? ',,,,,,,,,,,,' EYEBOLT _ IMI�IMIMIMIMIMIMIIMIMIMIMI A IMOVE AS NECESSARY) #4 REBAB IT A R� 45 REBAR b -�CO13 VARIES 19 HINGE • 0 B GONG GONG N WALL GC PLAN SECTION B-B �\...• NJ REBAR TRASH RACK (V NOT TO SCALE co N i N In 10 VARIES A 1"P"HOLE GRATE CO 1,2"HOLE GRATE HANDLE FRAME ORIFICE TRASH RACK NOTES: FRAME 1.ALL JOINTS SHALL BE FULLY WELDED AROUND 01 JOINT WITH A MINIMUM OF A'"BEAD. ti Y 2.IFG.06S ARE ANCHORED CONCRETE,GFOLLOWRO STD. DWG.VEABL AND 8E TRASH FOR ANCHORING PROCEDURE. 3 3.REMCONCR E ORIFICE TRASH RACK SHALL BE ATTACHED ai I. VARIES - TO CONCRETE BOX BY HINGE OR SLIDE RAIL SYSTEM. 4.RACK AND HARDWARE SHALL BE ALUMINUM OR 0 HANDL A GALVANIZED IN ACCORDANCE WITH ASTM A-153. i PLAN SECTION A-A m+a �Um O 3U N 2 �-09 V LIZ NJ 00 \/CC LO/IL LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 2E—1 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER -Y N- STA. 175 + 00 • DOCUMENT NOT CONSIDERED FINAL is,_.. UNLESS ALL SIGNATURES COMPLETED In SHEAR POINT DIAGRAM -Y ■ a -N- I. YRPCA- z Ma .Muirmaw Mu n Ird O mu •22 ��1 �_I ma -YRPA- r " � -YRPAC- -YRPB- ��'. Amm.i�.�� ,�, 1111111111111111111111111121111111111 eastotinon 1•111;,„).11,1111111 A% .■■�I■n■■■■f 111 � 10 iir�,�/ 17 tit Itak 1811111"tialliagaittla • -- ,raggist ■■■le ■■■■■ iglisi II; �1 .■■r011 • ■■■■���j�■■■■■■��..00 -YRPC- 40 DI ro ►. -Y RT- Q 40 ri -YLPC- -Y4RPD- � -Y-LT-= umwor Ilmie L Nal -ll lift 9 W ll �- / �- co _1a� liew CO 1 N ��__^'': -YRPDB- el a: Maw �: 0 0 350 700 Y � -Y S- U / 0, U Y S- STA. 111 + 00 \L, \/CC lfl/0_ Ii -.,. / .wi 1-38/98 xo. zxEflOxo. +: _ END RAM:W s NI. / rvo. -Y_LT- -YRPDB- coax o3oisae rc 3i�a annr -YRPDB +81J6 /% mG1u.x PxuxxR $o PI Stu 334+8661 Pis St0 337198.63 Pls Sto 344+9012 PI Sto 346+1710 Pls Sio 347+44J/ PI Sta 556+89.78 Pls Sia 58+3520 © _ W, A-629'438'(LT)es=234'4l9 es=2'57'489 A=219'17A'IRT1 es=257'489 A=18f 4235D'(LT)es-9'57'08.4 / ,eDo• D=f54'355. Ls=z70D0' Ls-240Dd 0=228'107• Ls-240, D=652417' Ls 144.ar -YRPDB-ST ESto.59+3I16 - /� // ®L 44482 L7=180AZ LT=160AZ L-94.00' LT=I60AZ L 2,64326' LT-9604' i // ,:r �\ 10i R=22282'3,000D ST=9002 ST-8002' R=47D0.ar ST=8002' T=52.74087' ST=4803' % �,'" Q �"\SE=05 SE=06 SE=806� / yam % F� /Vl \, 0 �. OS=60 MPH DS=60 MPH DS=50 MPH _ rc6 / �+P / O lj $ -Y_RT- -YRPB- % g - / '. // x� /'. VVV11 /3/;'..::;19::::::1111):::::.1'1-1":51-11: O ,/ 9El PlSfo 235+9232 Pls St0 239+2099 PIs Sfo 246+30J1 PI SYo 247+6/90 / 3 R \ // d y%a p=ldOM597'(Lrl Bs=f54359 Bs=Z57'03f0=2325IBlRTI Pls Sto 30+6810 PI Sta 34+2403 Pls SYa 3716624 t /g� '�//,"N \ uxuEss•u swxstuxes cox.uerEs D-154'355' !s=Y54'5' Ls=2.67' D=227'329 Bs-5'34'389 A=28'05'218'(RO es=O'zd187' m \/ \��</ 4 / O A �Z L=52534 LT=13334 LT=160A2 L=1036dLs'220Od D=504135' Bs=504159 '®zc5 _ _ LT-I4674' L=55398' Ls=200Ad ^ / /R=3F AY Sr 6661 ST=BO.OZ R=2330LK1' -Y99=- SHIFT+k: v =I /�.os us �OST=73.4d T=1130.0' LT=I2922 �� /II / (J0` SE=OS SE=D6R=1J30.(AY ST=IOSD' I� YPB- /j �I / \REALTY 1121/ST OS=60 MPH OS=60 MPH OS 50;PH ////// yll/ ®ofoe. oa,m3.G,3E-xo -rLPc- � _Pls 5t0/1+9837 Pls St024+80.77 PISfo 18+44D8 II ` / /,' onrea m men �- Bs=l5'4B 20b' Bs=1548'20B �=232Id524lRTI /�Ls=I60Ad Ls=160A0' D 1545'258' i Ien C--- % � -MATCHLINE- STA.Lr=1rna9 Lr=la�m9 c InSn' 1 O Av - ST=53.72' ST=5372' T 5922r r , _RE_200 j l % /+Gee ipa * flSEE SHE z47+00 -Y=3a MPH � �I � ,,, � // �/ , i�/�// `€+ la-- fl p��v�r "� ET NO.23 RT- A � a. // �w.,N,.,..x �/// fl fl/� r-cs flvv •1����� � `biaI .:w1DER1Nc / / / / Si,346 ♦ti•�1 ®1ry.;Ar1I � wDr� I � --e POS / � cox � / 9';'�' �� d•� ' ��;1� Ix. -rRPe-sc so.°wi36 /% // fl\�E�V` ILe111�1 €Ssumr•D w ccnE.uc / - %"a I l._ / /\� � Jv�z / �; /� /(' :} % onn 04�`.\ 1 11 girt HOLDINGSDe °'SP a r Isa \ j d'\1 /y �,o I ,� //// �,/ yPe /l/� ff j..,z,a.x..r sc �` E � � Ix n. Da D,3 PG"DpaaUR:o°x IN„�,) • i'fl 1 .- \__----- 1 ,14;4 -j� j i yy / sill 345+OJO Q\ 0 hi £ �� ,..° i bI W n --�� /r �. ° lllg,fl� flILII Y - �"�-e � 'EoGE s.cs / 1 / p /� // „m' r i i ® 1 1•_ J I u ,.. , `�� ��_ '� III I 1 % / / / zrox:, a/ 1 I I 4 ' nreuz / o/ °Fn c1.sz E urw �p/�/�/Fp,� ' 1 �� 1:. • _m_�-� %°,LCL%'B�PT sia.76+6992 / / / `� / 5 x ,` I'• ® NI / k U' 9 , ,row .. -.o- I 1 / wnQc,w > BEGIN APPROACH / °' (,ar in y I 1 I a o EOss,en E { e<°5' 9 a, :m LCONB :. eta.68+ tie Y II�N•Fi" I ��,.� "" / / f S A56+328 /��'' • 's.,e `8 ' 1 ` FIN rouwE-axs o I II: 1_I (( ,• wQncn ace wa.rv,s uo __ 1 i • `-- -5� a ppG aE 1 % ° ' I//� \ m END PPPROM j 1 I_YJiT TS G44+70A9 E psi s 6 �2 E- - �� ,- �a.fl D«n 41 'll '� x ,car _Er ax.N g �- ;/ �� ,�- : � 5®aW 1 ; 11 �\ •e (2). / / STA 56+72D8 r ur -Yl- t5+: 1]A I ...ROACH SLAB Ci CI' r -.fly . o YRPB-ICS - ®n F■JITJ - 243+99'33 \ oE ®`5 i x • A... .1aa`- - \ ;r. \ fl °®'� 1 «'� BRIDGE GEE DEraE, ,y _ �:� /�oE raG,rcDN ,roxa.FI \ '11� _• E, Iq-��F� J ., [i °O - xys c.. 1 _ L//®s ��� \ ) ®ec''a \ T it‘11.0111,par.64 ,;;;;Alik._..... l■s� RTI-243+75I7O . 5LzaT<ec1 in T z. J,� ?,,_ b mes<`\", �i� R$°& _ l szs� " / ®u. �� wvs o.r. 4 s \ Q E.BRIDG_ I� �.. In: �-�� w _\Z �- 1/ _ / r� des' ��61E"/ 'lv \ 7.'3 Z_ .a�2-'°� = "---,oT- -Gvx% _ yam ,i 0 _ n,.an \�r - 1 C ® 1 : / BEGIN WB SHIFT H ---"% w ,-_� - a: S T 1 / I.-RECONST ___ ___ / s rcw °::i� \\p Q -r1T- SYa.343+301( Itimm w .,aS„ a°w. a,D. a - ,„ _ - �' -leraraf .xm ® K.Y. o. \ ��a¢ - s+�'® ■Ili �I r;°a� fl� W Na- ,v>s,.n, .,' ,:,..���� . -•-r - - ®- - •rcw c roE FE°e u°i'i E, - se vcv, `2 r c �� �' """ 1 N on. _ w - - =, -' gi 6���' __-- ys..,. _E=ME, gl _ -_a w ' itiil ®•..rE • �il� ......./.. D!, -- r �i ,,. -- .>_A f,;l zc� 'na as. w __ o --- ----- - �, °- -.!>f>! ..,..�x� a sc� iiS� ,,.,.�..���Iwl���®I�� �I� .�Sa�� w z LCDWB _- � __ �i ■x■■■m CS-! o aE I -- - -x--- S.°WEEDED SrEx 9 Llili ���I ®®� J �FL'3T.�Id�WTS --a __ I ar uwc3n :it_ vwau ..• a.l 280 �� - ^0-L� --/ a O z �"" _ - - _ -__ _ _� - __ _ _MIIW �. _,_ _- - --- - -''rryF�iF'+7• .... ,5i �s�� Sr,m. o+coNc.aED.xaE a�� O - -wcr� � .o,G 3� � � - - '-" i'I� c - _ -�I■■I,.SS�C■■I n - MI N. • p __ -:« ,.E a' ° - w.,,; -._ �I/ - t^r'rs�x��a I■f■!■llil■■■■■I����®� O _ - _E•raSI -- - _ -,c� •,.lam --I■■■■■1►i1■■■■■li'� S._S O Ln ISIMM + ,- --MilEi „°ate ro® ® ® rcr,l W® N11��� 71 ���12. ■��■�I� ®� +o „▪• ,. --a/ �; +S " ..< t-b@■N� l'lJ I■yi�lv: ■■■■■11117 i1 Mi■�a■■ �- �7I���A�®Ai71i1 0 s1fHEA Il. I".`a�,'C�tZ7iiEiita =iti_�- .. !. � eeBe eD sra._n 3ss3_ _ �iffirm - EB/P Ga.79+15;j/ �ia�� �' �I QNr"'.iI � �� baN ' -IWPCA-PC Sia.2/+39• ® - - \F' I --F Sf ��� - IIIMI_ a_ IM �1�9 i ®m• - �fl \\ NGwa �ldp`q'IN W st 1 _.,.� � F / e - wxc z'-" F ® �,'' / i / - ®® .. ' BEGIN�B SH1FEi W_ ate �� _. ' ® o �ry n'nc � ® E-BEGIN BRDGE �t Y_.�Z ©LS ! i u' �»■!ii„®?t ■1 - __ .,,-0•�cS.a� 9AL= , // / yaT-34.019:� 1:; 1 B .� + ...o■PSINN/e+Hii�i - ------ R° rs_ �A�O° / .E �.,... 1 „anaSSr I EcIN e r 17 _ - i .;,: ,E . a � `,=r 1��11... cr® '-'', / / /F/ '6G 'BEGIN MPROACH ^ BEGIN PPPROACH SLAB24 =•- ._-•! ®�..; �y�;:, - jl P 11ec/,../ r -Y_LT-340177.4 In( -Y_RT-240+9800 16F�o w-�i / I 1 U • • H - . - m1 ® - - T 40POE . ----- llli-� �J, ;I b / / r T sr sro.3_ao k 1►{ •.•::••:-''.•' - •; �'.��1 3: •��I macw 1 E'N Yam+-ST Sto.z +5432a D urw E .�L p - '�C \ Q .� I rox,zr -Y a ��';� xs s}EN6za° aeurw3Rarw - ranz,•sr s raxz,a s 'V 1. I`-7'.. ,•,Sia 2/{B4Bl �,�'��. �' ♦I 1 II oof, , II - . . . �/+. r 4/1 • SILT) D�/lI ^,' 11 1 1\ ..... _ \_� _/ :,� a/I I 5- //E Ill ° ararh►.;iF1' ll t.. ®�®� e'r,.,, . n 1 \ ,., ,SAD. R w/ ,D3,��.°.,. :°f:.n°' \, � c� <o -rLPc-rs sfa.lo+vies°"a 1//'\� ��-D'MPRO• SLABC JtP°.aare St.122+0957 \�,. 0 �. 1 '.II l' Q 1:::.i- �" wf 1/ II von 4 I..-mil••• .••>:� - 1 '� 111:..DE,ar. rox s r .. i \\ ��3�/ :EE DEra ► 1 �roN°rSEE SHEE,37,33 roa-LLr -- �.. `• °cam a..ss D a x..PROFILE � • f'SEE SNEE,3,33 -1_ PROE •• 1 y \ � �� c /�;► flSEE SNEE,3,FOa Lw�Pao.Eee , .. • •\ L :�Leave- • \ \�, �' \ 15D Qfl _ Q* , 09� 4 �Ul)v n� ��' ��R t.23B+ Pl Sta 113+9169 PI Sto 121+7406 PI Sra 72+80.46 P1510 81+2521 ,\ s`a���\� SY fl (y 7.. ��1 - Iii "''"1,:'® �`432 fl SEE SHEET 3v FOR-LEE-PROFILE -. � • SEE SHEET a/•E FOR,Coca-PROFILE ,� SEE SHEET 56 n FOR v/,PROFILE m SEE exec,sa 53 FOR va,PROFILE =23B'I27/L71 -23B l2TfRT1 =Z38'l27'(LT)p=SOB'l27'(RTl �� •>E,�... _ � � PZ �l SEE exec,63 FOR raPnu PROFILE D=d 2!r 133' D=d zd l33' D-d 2d l85' D-d 42'W8' -YRPC-CS SYo./5+//92 c „/° x .�, flQ 5 -YLPC-SC Sta.12+5/88 .!� fl EE SHEET es FOR rani PROFILE R n2.37' R=82.37' T-389bd L-31.59' y l 1 \, P II ll I R I6928D0" R=8J60DO' \\ .8 �• \A\ 'a0♦\ 0„. y.. -,_CS I '+ vmil lI ,* 1 1,, ssE°na•a fl SEE SHEET is FOR rare-PROFILE SEE SHEET 33 FOR ERMA-PROFILE �y SEE SHEET 33 FOR vvF PROFILE SE NC SE NC SE NC SE-NC ®\ 1t �0�� L)fl S 3 * bl.L�•� .1 l/y SEE SHEET:o,oa..raecE onuxs - \ \ 1� � \ a.�,-i_���►►♦r `' �1 C) i �E� sEE sxEEr w r foa wnu 13 EPnELOPE OS=60 MPN OS 60 MPH DS-50 MPH DS-50 MPH w, '‘\ e( �` 1 \ �`' ` © © fl t � �. ram_•. �� � l/I' r LCDEe YRPAc YRPC- - ;;;::;:. 1�io•� a�j.�s p air i ' /� a4 p Sr 2384IZ78fLT1 p Sf 238?I2T lRTI PI Sfo 58+7499 PI Sfo/2+6433 Pi'Sfo 15+5995 we \\ �� �•Z,'��Civ=��v�i����t� ►��"�+/ 1I fl (1air .17,/ / �°".. D=O'20'082' D=d2d185' D 6524/.T D=6'52'417'fRT)Ls 14es 445Ad08.4 �� - \\ �1� ^G'' fl 4Vjo L 785.69' L 779.06' L 669258' - ;•:,,,is ��l q fl Q IM1F7.7 „ 4.a T=3929/' T=389bd T-1344Dd L-5/I92 LT-96D4' •M. I y 1°1'® fl C,�y T=26433' ST=48.03' r'E \\� // f•1 fl oxvr a.wuEE :IF: �..' ;rip s 0 1-77 R lIA72D(r R=I6928A(Y R=833.ar R=833Ad sEE ona,. A +/� Q! \\ • ) I I f3 �'' 0 4Z 0 \`\ OS-60 MPH Os -YRPCA 60 H OS 50 MPH DS=50 MPH 3v roxa✓ Y§PC 16+5592 io 1‘ktiN � •. \ ® l+r✓f I/ 11 r W YQ E} Q p (� �gR�/,� o PI Sla 25+4952 PIs Sio 29+7491 Pis Sfo 31+6693 - 'a • .mE 1 4 fl z \ 0A=3512'30.4(RT) Bs-3'35'140 es 457'08.4 .• _ .P00 ICS� b LI n D-458'S6J' Ls 144Ad Ls 144Ad oaigx mi ��� 15 ^r'� I ill �� R�/�. m 8300 T1 3000 L- 409.59 LT 96.02' L7 96.04 ::• •, \ - , ► CQ ■1 IlC49� 54W I40 ''''N.. T=40959' ST-49A2 ST=48A3' Pc eaan� a \ /N // g4, / �� 1 1 �r A �."..\■11■.1::. y 572(q �y 45.800 R'IJ50Ad ice �/x \ \I '� c ,�- l l�d,' I 1 I a - 725W 6/7fN1 \ DS=0 MPH / �� �y EEm.E 19.4C19 /33a0 - \ 1 y�%"� - I \�F'yfQ QG' \\ T yF Y��'Ea Iii, n SACS S>a'r4o a�zoo �6eoo LII\/EI x ,a�.n°n..o.,�»xr.rcxa.�Exl \ .''R .4 1 /i%x ': ,,00.0„• SEE s rA.235+ {��:' g , ET No 00 -Y 62700 \,, 11 �/ �', 9�`qX��G�� .2? RT 77,500 2040 OTT \�\\\ \� � ;:'•, . �� �I pAATCHLIN YRPAC-5.�P't��G`' GRAPHIC SCALE TEE D E„ °GM.a aE„ � \� \ �I s;•:• �. /0 66 SHO.00N 5 S 6o J8 q so qo DESIGNED GD..G N` \ - ST SEE EET O.22 PLANS® cxrcxD Dax3waa o E. 5-7-7019 E. Harr mncr , Eror 1-3819B ry snarlrvo. w 1 N srvurvsss xo sncrrvssr a 16, ��/- tip -MATCHLINE- SEE SHEET NO.23 ��:,•::':;// p. c 4 u 7 x M.FII.AFFY,..An�1�.1lr�rla Z 1 5 - �GN�o y�eQG ySP'�Qw - } yp•�� O 13 y. a�� En.:..: rQ f/ R^'w.m G `` a cuss w A AJ \ RPA PO 0 00 % J/ ...,, ' a P 5''(P 51 -\*.°C �`,'\-. ` �\ -YRPAC-ST S1a.38+78J // \ \` t\ \ \ \\ IN:--:r•H SLAB rim YRPA Sr St./2 3669v. :'�'.. f��'f ss osrus. fl ,Pi=u 9�n \\ssso \' �� `r \s '` YRPAC CS Shy.3�? 3 ��; 'ewr w:wE S '� r r 'J �p a�:"� 0 li ,'-`4 \ '2:. 1, VY.ipi WM. _�:� ro,<x \\ x; \ Ffl� a:.r. ` ice �. yr��� -�-J �`- 6� i ,;// rG � / 3 4 --\ -RPAC-PRC Sia.I8+2533 ' ', .) �® =�Mi `� 'ISl'a w i ril / Illi1 - � o srr xr=,:ro a. \ �_ ao »rn a r.. am -»7� nn' I / Ina ur •r", ry mica. x \ : �® STA38+5525 \\ ~ \\ F 30 w �' Y Yeol eo e c csx ----___ _ "7 �' rffo ur�, i:. \ c ..r.. �"\�a\ .�° o �11rY1 SYJI„;irnq � ---- ---__ �_. i�\ p © \ \ ® I\ ��w\^.�� \ �-� ��,ar -near Irrn �p - ... _ _____0 \ �� \��l -_ / ui y YRPAC-TS Sta.34+8874 BEGIN APPRO S - ,g - � � -_\\ ____- 'we ��\• O `� vM __E° - \ \\\\ n tom' IbII�nYV Ilrrina,w - rr .as v;4111ry vs o uy,. d > ra11111ar1 \ rvev a cuss r n urr sa oer i IFnIrr11 V I11111 Q -Lwe-Par 139$9.' ,; \ �I' "o.u.a. \��w__ - �a��ti-�-e / �� nrnru// !'Hurd! ��..,. Z ILL END RECONSTRU LON\ \ �wr r v ---.. -•` dnllll' dlm _ d BEGIN EX APPROACH ND eRIOGE ao, t�0fy,,,,, -„.....7i.1 L r a\ - a1 I r � � - __ __` ^ `^» „,__\, Z ©zrworao s ass LWB-POT I39+00,y` \ , [-adB-POT I40+3897 srt ossu:.r' YRPAC-SC Sta.36+32]4 ��s�`���lt��C�.:***41111114*...,,, .• uvsr IHI'a:V.,/ w 11 __ _ c L! -__ WC• ` ,.. _ sssos.ur i,rt-WB 'I Sto.l38•+rA i I ..V \1 •krt''''.. 111,11 v [END EXIS7 ECONST RU S ILOPBN vunn aci x�•u•�,a `•s♦•C♦� � _•k' __ BE.. BRIE 5 av� sss ac,.> •I FPOT 50+I630 lsss o a c ~ `: Nwii ern "} JlLZ �� /.. " I .,, 11 e L_WB PoT 140+62E3 reo sxxr END SHIFT . � yZ"+`-' _ �\__ _ • -_ WLWB-:r-'S! I45+60D7 Z � �� 1111 ',Yrj -I.. •, :� _ -- WiV a�i - -1�, r+:.r- ►�♦ �w _ n n urrul' F- - cuss a uvwu•rcrn L- q _ ""' .�����-'�'� s If. i I.rrl�r l n _L-POT 150093 W� crowsm_ s. � .w .- ro...orer,ory i' r! ? i Irrdr� m1•ii' _� �-,,,- -__-_-_ -_ • •'tea_ . . n II r.,E ° r ____--� •m� G �`��_ �� �7r4ove� - ----_-- � � - _ _ ____ _ �� 73...W� I !�_ - _ _ sarri IVIII 11 Ilr f!}Y rr _ ... -_+le l_ ;r.: J 111 ea[�9antas��hilla m_ - r impalaiii.___ / �� rrr VI Y r..1/.a.41. - -7.- wsu - -- �' --^ r -X yam-7 • .,x E' 0 `v®7���1144111��`�� ��� = =�g{ ...y Sri{!. �i.e '_- N ��_� +y_11�ys�■■:�'����111�- SirL �i �� i i�i i 0 ,�. i )mom - -- uru - - --- - -_I- 0• 5��� ��C111 ,�� l/ .Ir - ,,.• esG� a ---- Vie^- - N J { - .. .. _ a-� -_Mr .--- ��,�.�r.�.�PP.�>!_ .,rr+.�c�.r.,..r:o:,..„w�F��b�.'X{G- ...n.vg,, :S.Su _ ==_- AG .= r..:.ra_.,Iu..� -r..r!.,:,..:... �� I auiii ��-� - -� - .: --pa,,,_:_:_:_:_. _ I�xhllir22F .'f3F T_5F+:a.:.. --�-gym-a a--o :rn r..•_�Sr.:..���+:r..i.2lW-.:- :,..w:.w o �® i ii�4 ���11 ' r r las+a0 ��.r .. .. E rory ry ar xc. ..S zS --- L�illdZEL2GRMINN11M1�-L: • . -r+dr' '- S' ,r si .�Y �aMarE �a+,�- N �■ r■9�Y1'�1�1 I 6 war ', /unr "a 11rI�Ipp.. _ '_-___ - .arty + • ,� ►3MI�I_ - LCDEB ,� E - . ®.-� - . +•!� ■ � _ ® I MMI Pl Sfo.%+IDS Hi FA d1/�, Hid/' d _ - ;_.�. '� _ r 2 � Dig / v r sus n. ©•„•^, r .11 ��■■'�i iF- v_LCD£B-PI SIN.94+30.47 ° . �' Ild,,r�aj *- - m - vs - w -�� ■ ' / F ui�ii1°,rR�._ �3sw ��� � - "i„ :P: U s.orvs r r BEGIN RECONSTRUCTION END EB SHIFT `� Cl) \ _ END RECONSTRUCTION . F END EXIST.APPROACH SLAB -L_EB-POT Sta.145+60.07= r F.-- „ �•"� ®�"T1O_o srF_ _ _ .. _ - --._. a____ _-_ r ■■� c BEGIN£X.APPROACH SLAB / 4P9 I ! . -DEB-POT 140+6283 -L-POT Stu.1451-BODO f24'R71° ,---- �`h, - ■ ar: a.,.r� .rzn I It w ea4. /� y� -r£w- - _J _I r. .. __ __ ___F__-z�i soo® c __ __ '''-� ■" -LCDEB PI ..-92 p-I� ' END APPROACH SLAB a rcrvs>ar s.a+s io sr „'r _ !� i o -� t t t i - c T +ll pnniry t - -. ar uvw Z -' -LCDEB-Po 94 .05 sx.onsrvnory uvry f'_ i l .. .• - �; w I oinu.n tsars y.__ f �' ��'f y _:fit'O72 YRPD-CS Sla.38+8953 c •'-r. ..l �, sss osru.a : uni sc ory w -- BEGIN APPROACH SLAB END BRIDGE ] _ r,. .r.oErnr ory.rv ,.x / r -n ry DEPARTMENT of,a.rvsa,r , = y■ -LCDEB-POlI 92+q82?! ® • .,•.._.�LEB POT I40+3897, ® �' •! a cp ag M°B U ■ \ BEcrN ILGE .p I ®a ,.r wrvvox,..as>aaa �'�F / slY eo l/-,roan - s \ rvun- aB gI!I L�B-POT 1390447 ' . t j 4 ; /r '[ Q j/// i Eeca a c ry crrv \ aIF >ororv:>I I f/ ,Ao/ / m / _ i i -ew' ., .. Y/I o/ / oP30+ 57tS+O6BIPls S5+B4]6 Pls Sfo 37+82J6 PI Slo 36+83.49ffLT1 • 05'5IbLTI fRTI / / • 57'235• • 7.4B'1 srvo ssa w / /; I - . ENO APPROACH SLAB �.� - 'o u''"s �µ ST_46D3' T=5274087' T-3/9.07 T=434PY ST=48.02- ST=48.02' T=5074' 1■ msoar oo.ao wr°` /o c- j � � - ^ % 'r a - -LCDEB-POT 103+55.44 -_ eo...., R=B333DO" R=599011D' R=8J50DD R=/,CY.G.G40' ■ o/ /cauc .' / I/ % `� .t LCDEB-•r IOI+1998 SE=06 SE=RC SE-NC SE-06 r■•r 3g3 �I yr END BRIDGE - . DS=50 MPH DS=50 MPH DS=50 MPH DS=50 MPH ■I/�� / III// " / .�2/ '0� / as xr YRP//a yr LCDEB POT I03+2409 ��_`- -YRPCA- -YRPA- �/ / h �II•o j '�� An CIE FENCE z\` ['rfY�I r,]�: PI Sfa 4/+3283 PI SYa 48+6273 Pl Sfa 52+9836 Pls Sta 55+29,67 PI Sta 15+26.01 PI Sta 20+6/50 PH Sta II+8867 ■I f. v/ I / ♦4''�f % /7� •- r t1=95'33'153'RP A=29-00'00,7(LT)p=2223'55.4'(LT)Bs=4"20'32T p-32'16'41.4'WD A=3412'028'fRT)Bs=4'07'31.7 l■■ 9g /\/ // ./I�l•%/ �jYRPD-SC SIa.28+79.08 / / Yr"r-SC SYa.32+16.40 '�- D=6-52'417' 0=543'465' D=6-01'52P Ls=144.�' D-543'465' D-6'44'26.4' Ls-144D0'NCl/ 9• / -o i h ��,y�♦'i- 0 ✓ - T=9T8193r T=2%58l>2 T=IBBA9 57=4803' T-�9 T= 1501 sr=9%'OBD2' 1■/ o omr> / I�lIe I .-,, do% .e111� R=833LG" R=IAODAO' R=950A0" R-IDOODd R=850.(Xl' 0 ¢u� SE=06 SE=O6 5E=06 SE=06 5E=06 ■■ / cSo x6 / ���y��•y,�� Y,P / • ' OS 50 MPH OS 50 MPH OS 50 MPH DS=50 MPH DS=50 MPH 1 r- i 'I/rZ %���IC♦�•>•/// / ./' �rrsis m'"v0. °,yIP scwxo m,cr -YRPD 7 hsr- ���.y.�?•� / TS Sfa.27+35D8 - - Pl Ste 22+1/11 Pls Slo 28+3/1/ PI Ste 29+7E04 PH Ste 3/+3302 Pl Sta 35+09b/ PI Ste 38+4514 PH Sta 39+2954! g jE°""'"won ui /�*/���.'/ r //° a p=5l9'05D'(LT1 Bs-4-07'3Il' C,=1f 04'357•(RT1 Bs=f27'43.4' A-1f 52'192 LRT)p=232'393'fRT)Bs=f43'079 �•� 'Ille ' / ,I.�yi f f J/ ••/: °rws D-0-43'409 Ls 144Dd 0=543'465' Bs=407'34D' D=20Y 54.4" 0=25Y 532 Ls-120DO F%/ ui s d /�'� i // O •$9d' L=730.4/' LT=%D3' L=19332 Ls-144.(q" L 58432 L-888E LT=BOAd Fr, / �� 7 T 3655d ST=48D2' T %96' L7=83.49' T=2932Y T=44.4M ST=40g0's. / e'_ •! / /`// or sa rxEas,uc ,} R=7870Dd R=IDDGAd Sr=6062 R 2820D0" R=2,000.00'/ / uivnoe zaoss o SE=NC SE=06 SE=04 SE=05 //A .u,c.s OS=5U MPH OR =50 MPH OS=50 MPH OS=50 MPH , / e'.7/ / °�"�' / d.>E' -YRPD-PT Stu.25+7608 a / // PI SYe 35+6536 Pls Sta 36+6386 PI Sfa 37+68.40 Pls SYa 38+7956 / y/ ��� 0=f08'47.7 Os=f25'S66' 0=2.57532(RT1 Bs-f43'079 fir' # ' r� r - • L=f3647J' LT=I00g0' L0=25Y' Ls=I20g0' r,e �'/ T=31.83' ST=3334 7=722 ST=40.�' \' L-63b6' LT %ST' L-19237' LT-80LX)' F. I 05 )� Z 40 DS j50 M H DS 4 SE= MPH IsF SEE SHEET 40,41 FOR-L LT-PROFILE SEE SHEET 40,41 FOR-L Ri-PROFILE SEE SHEET 61 FOR-MA-PROF. 18);e6AC' E. LE ,Now,,,r coarvr.rra. SEE SHEET 60,70 FOR-TRPO-PROFILE _- ?�\ SEE SHEET 71,73 FOR-MOB-PROFILE SEE SHEET ro-r FOR DRAMA.DETAILS GRAPHIC SCALE 60 I6 Q 50 140 ® cxsaso ay. o.urvswonx onrt. �a-aow Pi PLANS LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. /2 kW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER In iaei Z O • i • • DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED THE REV. J. H. PRESSLY FARM PARTNERSHIP, LLP r DB 2124 PG 1726 -YRP C- POT Sta.10+0000= "FIRST TRACT" -L- PO Sta.168+87.22 (60'LT) O -YRPAC- PC Sta.114-87.85 0= 4°00'00" /E Z pER bgNENT 8R4/ W �2051> OR 2ZN E/6T9 ENT • EPSEME W - CLASS 6 RIP RAP CL B RIP RAP ' 2 TONS 7 SY 18"RCP-III pERMpNENT �W� \\\ --- _ 3 TONS 10 SY --- :, _... __- �- M(/� _ \F��\ ,�. — Wa. xlsnrvca 'C� X X �w�^""..... :- �- -__w-- L---- '_"� "-��i� r,A� _ _W VICrO- LN 23'GR--- --p-_--- ----- •-- • •, - -_____________________ - FW Ill 1B w9AHr F --- F --F- ::- V) . ®--- F F F----_F F _E---- F - -- -_ - _ --- - T - -FF F FFO E R 'i'nS 84°l2'5/5"W -MilitiriM - - -- -- _ W Ov %II� bm\,.A' III REMOVE 2(,I W O I'-' _ REMOVE 2G i- # W l() 2GI .5+00 u — �€Mev€ mMMH � LOB --201 .-'�VEMOVE` G1, r�TO"12 5/J5 --L MTL-'-—L---- -'- -1;'-2T5 '!_:Y._ ZGKi"=MTL ` -CIS"RC''r- i i -' -r--1--I�--r--r-= MT T �:n i __ d \o___- L 4 L 2GI<1212>,- 15"RCP-IV 2GI<1216> I i at -I. � --- _ T - - - - �_ 5 --� 'I l 20 r 8 1 _ CABLE <1213> P d o- -o Tr 7 -0 . 7-�- TT -,-1r- IL �1 0 r s--1T__.-ems -r TT T-Cr r-0-L_T-C9RIL:MEDSBAR V--0- -- - --lr ---IT F -0 -7--Ir �-� 2GI " 15" C V NI. 1 sosf a[•v_IV 0.: - ~ 4 0 m_ Z 8,, COLIC �� I END MEG, P -� x BAR+50 _--_-_-- - - __ /25+OO Ill REMOVE _— b _ __ Q -4?09>2G ole- —p 10-0O ---- =11. �— -- 4 <1214> IS R _ 0 1208>2GI "I '-REMOVE 2GI I -LCDEB-3' COLLAR = CI REMOVE •� ' O �� 0 (I) 1, -ry °I:.•Di i IF REMOVE 2GI I u O,,-, REMOVE 2GI A M lir �' 2GI W h ,L_ I= �� _-- .. .. .- .. .. AR <1215> ------ _ Z 2GI fREMOVE T] F$ 2GI _- C J 20 EIP �� ,.�,�C �� B'CHL C - .� ---0�ie IFO - REMOVE 2GI C C o• 7f/ r C - ---------- & BDO -------- C----- `M - W,E35BW- 77879"E 147 gp 6 Cry V m m �( BERM N'DITCH £ C `----- . <C ` xlsnNc 9 �' N 89 3.81 81 EIP R/ 37'S8'O REDft DB O9 PIf35 PG 33 CL SEE DETAIL 10 O C 97. _ V 89• _ 46° HW Ci��\\\ ---'--- �� <I207> LT. —_ : 65T W/35RW N TRACT 2" N C C BERM v'DITCH I� LCD, B PT Sta.128+92.1 = 8=E cR 4210> C 48•CHL 1° C - ------ `�' S , 288.36' SEE DETAIL 10 LCDEB- PRC Sta.1247 46.35 -L- 'OT Sta.175+41.24 (48. T) I I 3 LCDEB PC Sta.120+00.5/ >9CON o ` --- W m 61 m iI BST I - -------- II. I I❑ /7- BST GC a m COLIC 1 rnI �� J u i _ ISBKBUS 48"GONG ISMTLBUS \ o ~ J IR I NI r-- Im0 EXIST.FENCE v N � ma m JAMES RENTALS, L.L.C. z I -LF m m mGR I m 03 L t-a :Sr I --T Fo- (TRACT 3&4) \ N I m X - I UCGN° 4 GR \}" �I - ) fl m I a $ zl [ JIREDELL L�CPITALITY m :�EiP { I DB j935 NC 3 1 I �I TRACT 1 . i . 7 L ml /� \ . • I mgs I I1-1 m -YRPAC- -LCDEB- 55`00 N / Pl Sta 15+06.89 Pl Sta 1224-23.48 Pl Sta 126+69.32 " Ze9 a co A = 6 05'S1.6"(RT) A = 3°05'06.3"(LT) 0 = 3°05'06.3"(RT) / r Y"' w D = 0°57'23.5" D = 0°4/'3/.1" D = 0'4/'3/.1" esr L = 637.48' L = 445.83' L = 445.83' '0" T = 3/9.04' T = 222.97' T = 222.97' °' R = 5,990.00' R = 8,280.00' R = 8,280.00' EP 7 E = RC E = NC E = NC z 0 ,, DS = 50 MPH DS = 50 MPH DS = 50 MPH SEE SHEET 41,42 FOR-L LT-PROFILE �\ w� '6. o0 Di er___!_„6,9 lig \ SEE SHEET 41,42 FOR-L RT-PROFILE ��, om m SEE SHEET 49,50 FOR-LCDEB-PROFILE o 51 SEE SHEET 62 FOR-YRPAC-PROFILE �-0-. SEE SHEET 2D-1 FOR DRAINAGE DETAILS V 1_0 N m \/EL l9/d f '��1-38/9H rvo. sn�;o. (<,2�GG: ,r),y \ o. p,�GDO O O 10 ,�,• Ot, f��?� �C Erv°.rv.E. Ervwrv.E.`�'•JO p .� '„WTCN/, i -YR,POR-SC a ',(.x_06, 5 qx t�� +14:. ���h SESSTq 235+ �, A AFT �� S �' MENT NOT CONSIDERED FIN. fr , NEST 00 JF f" LINE �'<S p S��® ..: a ��t�H/ .1.1 NO• 10 -Y RT O YRPOB sRs Sta.29+•9l � ��AO 9\ TCH +Cs �10� I, / \ 4, 0.00 YRPAC ��, \\ ® %�a 0- / - �q �ry �.. „ge , °..a.«s,�..n...�o.. ..o STA. SHEET 0Art 10 Nt,N\\\ \ '1�h , aSEE SH \ ��� 9ua � �°E* I / -pig -YRPDe CS 5100.28 5591 m ���� ' C'''''! .. % .'F.t. A :�Op 11/I fill z.'Fil'i ^ it : .'\' -\ \ \ Tailtikbilita op til:itai-PI k i • ,,� :440010‘17#1*, -' - ' - o ti a u c, allik vv -YPRC-TS Sl°.5+29A0 \\ :102,7:2mifithitie„,....14010, ��$.� _ �_'��—� � 1PV��\ ap�{' [yCSG7• • D-P a f*LT. L.I 9� � n'hull / : `�i w g b��$€ � �f©tQ :'I.k 0 n i L_ -�li' \ .E...m \\ N \ t�7 1"l"1�1�j4d `\ �` *c7 es \ . poi �u��hdl x�, '��' da A fA<+ Q 44 r a s.,�y`.1 r.% `l, .. , Totev* ��j - END BRIDGE ,p 0 I ' g` ®� vy YRPCA POC x4IL+0325 q T\ �I1 : 4 al�fl �.. sl°.n+lzse \\ n 1L \ 11 1/ V N !l o �lN�—k II qr 16: i AO. 1,,,,, /.:\, . '''''--\ '.'. ''.:.':.:.:::.:,::'...•:-'.:'-::::.''':**:...;:.:r: it, \:::..•...:.:.:':•*'\* '':::::14:1110, ''I,ig I I 1' 41 / IR' :PA 11,Aw ' ' c -YRP �•Std.;]4+n3.2J••'• E� rss, •�.. SqJ ift*Atifir .- —9490Q p • -YRPD :il \�\ • \� • ¢II®' !1 // 11 / f• �' ''`'" 0 Pl Sto I4+2403 Pis Sta 23+7430 PI Sta 26++4397 Hs Sic 29+0394 Pls Ski 30+9594 x \ss aR\ `••••';. ••� YIONaS4 .r II 4 itt � 4J' ..a ') 0-0'38'023'(RTI Ls=4.05520-246'500•fRT)Ls=400552'Bs_*COO' �. tee +pk �t ..\ I • \: ,I / ,F ems• p D d38'll8 4s=144.(q' D=6'46'S00 Ls=I44DD' Ls-144A0" \\p, r�.•e+ :�.•,sly\ Y.• I I I l• i L=39280' LT=9604' T=433. LT_96A4' LT_96,04' n\ �\ ••. i�1 / I �.kr WAIT, -PO .229.:..L•- Q TR_%.43' ST=48.03' R=221.7K ST-4803' ST-48.03' o\ •::\• ' •'\.�•' ..•...7.:.; ....;•.' • • -,1 .-'b`° Y S-POT o.129+''' ''�. 1 SE=NCB SE=06 \�^' � \\\ 1 \ a •I I) 11 1 tit � � fL.,>arn L39 ( O _ _ _ _ DS=50 MPH DS=50 MPH _n^ _�\ �`\\ ?\ •• `t • ~, .''' •fie • • .•. Il''.i / 41/ I / �.t 14- + Pl Sfa l/1+68b3 PI Sta]4+0 2 PISia IB+44A8 \\ y • , 1 � - '✓ ro�ss sv p 6 0-5'2Mll.0.(R, p=IT Id 386'(RT1 0=23ZId524'070 I \\ • • \n .+•' • II • • t TS Sta.22+782P D O'29'538 D 2/4488 D l9'45'258 w • 1 i T A� T 2979Z T 5922Y 43'i$ p iICI if/ Lj x0 R IISL1O°°' 205450D°' R 23°87,y4 \\ .:4` �, '.•'.'.• �.. DS 60 MPH DS 50 MPH DS 30 MPH s i��,a. \ 't„ ...\• \\'- �, •. ..•. l�!� Qs'°a''' Y_.T r_T YRPC- \ 111-* ,•.•• . I IW� 0 Pls Stc 33/+7381 PI Sio 334+86b1 skis' Sta 232+6232 P/ft:a0,552 35+9232PlsSio 20+25A4PI St°24+6697I st Bs=Z34419 p 8'29'438 fLTl Bs=f54355' 00l'S9]'lLTI Bs 457'08.4 0=5037'249lRTI Pls5/0 28+57D3- P,,.. ..0 \ X.`\L7 �F,_ 'I 1�1� ©„ ! es-457'oB.4I '\\ I' �. • I. I sr + .r.. / Ls=27DA(Y0=f54355• Ls=ZOOAO" 04355' C5=I44A0' 0=6'S2'4l.]' �T-l\ Q O • L7=I80AZL 4948ZLT=13334L34LT=96D4L 736.00'__ f \$ \\ 6p a �� ST=900P' T 2228ZST=66b7' T334' S7=49A3' T33391' S7=ggA3'B�W \' \\© a [ 'II::� 11ICCCI / / £3 -YRPi�. S Sfa.10+3131 R3AOOD0' R .C1Y R 8GGA0' I li y5"' SE 05 SE OS 5E ,/ , \ \\\ \R •.I 710 IA& OS 60 MPH OS 60 MPH OS 50 MPH �' �\ `.\\\ '• Y^a •I �'�� 's� -YRPD- YRPCA \ 111 .•'. \ Pls Sto 11+9,335 PI St°I4+O7D8 IX Sta 16+1681 PI Sb 22+l5Jl Pls St'3/+6693 Pl Sto 4/+3283 :;\\Q. \;.':•;. ,''.'•': - YP C� � ' / ( Bs 457'08.4' p 2Z 30'364lRTI Bs=457'08.4 (LT) Bs 457'OH.4 p 9533'l53'fLTI 0 5'19050 fL D-6'52'41.7' ,4 �1' \\ '} ''• • ru t 5. I. 1 /rIi/I l /r LT 19966 i 327.27' LT=196 Q�47 LT I996 L 138922' \. *\\ _ 'F I 1' �I� �•I / I ,. a.s dub ST=48A3' T I65.71' Sr=48D3' T 36550 ST=99A3' T-9I193' R=833.00' '� F \ © • Q' 08'OP SE=80363A0' E=-7870.W' SE=C6 \\� \\\ xoq,, H ex.' '\ • o I t j �(y/�: / s w - OS=50 MPH OS=50 MPH DS=50 MPH — —m-„ \\\11 \' °N tru • -: CI (I.•I 1 �� l/},/� / 77 i a� O :. k\\wi \*\\` lkt �.1M"� �� 1 it / /F, / so o mncls N ROAD PARTNERS,��c ,0 I 4 if f x p�c p�^ V \ YRPAC-PT Sto.76+9635 1 1 Ij I M �E9 b axesiiiili Ittl t ", i /,,,If jj yyri PT , NIEND BRIE I I s0 e.\r � iiii f �,'\,� ` O�YRPOB-PT Si '} 1 s mn li 2'S O tier ♦ �,' G, END APPROACH SLPB \ . / un� c sE^ Is I g ;is i;,iti' '®ie®�f Atiiit ',4011" rS-POC Sic.l22+M.70 \ \ oil .i,,I�,i�E,E !♦,e�� i.� F. END APPROADH I'11ii il`�i1i i',` i ��\�fl�\iilllms -POTOSic.l22+T/56 \ \ ° �S 1 � � ' - -YRPAC PC Sfa.80+3 .• . ' I �® P: ''4b(ub�^ � 8 � �0'„I�ri.E� �. . ii1 ase 1� �\ SEE SHEET 55 FOR-Y_S-PROFILE AC— . "ab . STA.80+40.00 -YRP STq` TCHC/4��i���'i ; lt,' ECIN � �`�, � s \\ SEE SHUT 5)FOR-Y RT-PROFILE Le SEE SHEET NO.21 SEE 20�00 NE <.`.a, �r YS POT 6%120,42 �, �. SEE SHEET 69 FOR-YRP0.PROFILE GRAPHIC SCALE o SEE SHEET 61 FOR-YRPAC-PROFILE RP N. 9a °ox °� t. kr‘A NFET Y !�i� o. .:. O \ SEESEE SHEET za,FORSHEET 71 FOR owRA�E DETAILS RMA-PROFILE so zs p so qo Np :m. , \� ® HE�Eo orvry o�. o Pi •27 -- PLANS E. rro�1-38198 x sn23 o. a06. STq`16 TCHLINE_ E- aE II /h _.: 1 SEE SHEyE'/T' O.24 STA.70+80.00-MATCHLIN YRPCA DOCUMENT NOT- / aN. //,/ " I �V/ /.4r, SEE SHEET NO.24 CONSIDERED E..o -YRPA- $ u / it w / �� / s I / PISia 20+6I.50 Pls Sta 23+55.4/Pls Sfo 26+7022 PlSYa 28+23b5 Pls SYo 29+]695 'I e1BI / /e IA=34'12'02B/RT1 Bs=451'11b' Bs=d57'l77' L.=435'05.4(RT) Os=O'57'17.7' ` )1 /0=6'44'26.4' Ls=144.OY Ls=I00.Od D=F54'355' Ls=10.0' Il Y / \1 vs�.. I 114 n L=50738' LT=96.04' LT=6667' L=240.06' LT=6667' /// lI / —/ i icl r, `11111/1111W �I i l /8 to ', YRPC' POT Siap 55.66.12'R 11T=26/5d ST=48A3' ST=3333' T=120Ad ST=3333' I /I ' / / / S ° n-8 F w \ 1 IR-BOAd R-3AOOA0' II r: I E , DS 0 MPH DS 0 MPH I I / / / ,; 1YRPOB -Y1T- -YRPB- j(llP1SYa 234+2056 Pis Sla 34744411 Pls Sia 1/+3336 P15ro 16+4124 Pls Sra 21+3012 /�j/'�'I IcllI / lc �\A=17516'31.7(LT) Bs=257'489' Bs=3'22132 A=29'06'024(RD Bs=3'22/32' fl III / / I0=6'52'417' Ls=24000' Ls=201C4d D=522'l32' Ls=200D(Yl II I l / / °/x SL=254826' LT=I601)2' LT=/3336' L=863.43' LT=13336' lII T=20192bY ST-80D2' ST=66E9, T=44124' ST=6669' // l 1/l I l l / I .` \ R=833.00' R=1700A0' el1I DS=50 MPH 05-50 MPH /// JN ::,/,/,/ii/iii.g. /l// /l /l / / c I I \\ LI-YRPCA- -Y_RT- li (Pls SYa 60+4020 PISYa 62+70D4 Ply Sia 64+9812 P/SYo 241+6190 Pls Sla 248+93.]ld/ y/6d'c\// / / / / z �, '�: �\ $^�Bs=246'072' A=13'S5'Olf(RT) es_2'46'072' A=2'325/b'(RTl Bs=2'S7'03fLs_I%DO' D=3'50'433' Ls_'gip L=103 326' Ls_2 0,00' IIi1/II ///. / / I l l c �1NpIIF,,� $i,LT ST 98DY T=18185' ST=48AY T=5IbY ST 80D2' \ //lI �h c/ / l / l l zs'o„ue'i 'W \� `,\ �NR=1.4900d R=2.330.00' l II ;/ / eireuI �F OS=50 MPH OS=O MPH \ I� / I�� /,/ I/ I I / Y °I /I \ YR Sto 58+'499lLTl \ e AA l'( /I/'/ y ... / / / / I \ -YRPA-Sc Sfo.2]s556 1,1 • R=d3341 \ -Y--2' 'i+'/ua // ,///�/Q4////I /'1' n sl o Mee..o //� \ \\ SE=50 MPH I? \ V / /9 ✓/ j %// / / / l ' A`F,i® �� r l \� // // l z 1 FYRPCA Sa/"r 65+..J1 I I�` \9 ' ✓ //ro .gi �,.// �s �l? cam / \ o !s� / /i.e. / / / q II] l �, �ux / ;y / ,/I 5i / -YRPCA-CS SYo..4+_e ilI ' I I \ 1 RPA s sr°.24 si B l 'tii., �/ / ��// I / I r/c "11 I' -YRPA '0.2310738 `\ \\ / G I \ //z / /// /,�'1 / a. I END EXISTING ! I�° I. I^/ _= `_ _ s48 ,‘,/,'' /./ / i!v gra RAMP RECONSTRUCTION Il a/ji � I c QyJI POT FSio.150+46b7 \\\ \G, :„\ / //� BEOIN RAMP v/10ENTH cl " 1 9248'SY vnm \ \ -•\ s Yi a s osu.s z/ ,q•' /% `///// / -YRPOB-POC SYO.52+ZOb8 / I�•I \ \ Slop •CI �q Im,, \fl YRPCA-SC Sio.60+B819" 'sas \ 3p / I Er ®� / r ;0 ®YTI POT STAISO+03D1 LA LT1, , :pYl.\ "'PWn LL \au •�.':. �\\ ,c,v rlE EXIST APPROACH SLAB e°. �� ®� I �� ' ®A 'Y1T ST ST0.349+04A9 �� �' e �\,41% \\\ ,�, six"once s --\\ 1,* —4 \\ \.. ••• '•• \\ _I c f�tT ,..��: ENO APPROIvvW SLAB ��� �4 ue \ 1 \ - —r eworE ' 'G. e. Y1T-Por 349+ �RT® ". \ •+44J'„ \\ _, .'..Vie,.'.'••.•.• ,\ \ 8 S k >. x Nil,I/��� BEGIN BRIDGE \�. \� �'a��q'..,.x A • mob`•• _ _ > y pp -Oy "Ta'" e.wF ,ItlIHIH 11: _:o \ \�V \' Ql -MATCHLINE- SEE SHEET NO.11 - s --.. ,,,,,,,, • ' •-•,,,,,•, ' ,• i;St11,4\ .•,c•.• ••=••• 'N\ 44;is%,•\•, 1L t 'IDeg, F. / o.ilI I F P4e,v3%y'Bss moo\, �c \,_ gyp e`1_ C, 7, •�iC. le o E, *ENDOPPROACH \ \`a y,SPyl<G Fl �.,►��pZ.. `I • • ®1n 1° /.'� � SLAB �0\`� \\ \�� Q Qr" ,.a n �� ENO BRICGE V `1 x �� III I j \\\-SZA43+8/50 0Q -YRPAC-POT \.��\N� CX, ,,. G ti1ATCHLINE—STIA6.247 i►� la�.t* ./+r- D� �*` STA.;isF 5 � 1 �• o � :\ SEE SHEET 57 FOR-Y LT-PROFILE SEE SHEET SEE SHEET 57 FOR YE_RT-PROFILE NO 100 -Y RT- ��' „ox",. -, y=`` 4. SAP 5�k N�Oe��OSEE SHEET 58 FOR,J1-PROFILE o. 619' o° . IRRSIIL S•(P' S�S GRAPHIC SCALE -_ S - 60 IS Q 50 140 sFF sxFFn w-,a w-z FOR wnLL ENVFLo1F5 ® cxsaso ay. o.uxsvronx ons'. �a-a'w e.a PLANS S 03'39'46 W LANE `` I PROJECT REFERENCE NO SHEET NO. 0 "' 38/98 24 � 100 04'. RN✓ SHEET NO. -YRPCA- -YRP - ROADWAY ENGIN ERSIGN HYDRAULICSENGINEER B Pls Sta 74+96.43 Pl Sta 76+4/.07 Pls Sta 77+85.63 Pls Sta 11+33.36 es = 3°47'39.9" A = 5°54'5/.8"(PT) es = 3°47'39.9" es = 3°22'/3.2" Ls = 200.00' D = 3°47'39.9" Ls = 200.00' Ls = 200.00' LT = /33.36' L = 155.87' LT = 133.36' LT = /33.36' ST = 66.69' T = 78.00' ST = 66.69' ST = 66.69' o` R = 1,5/0.00' E = 06 _I--11••••--- DS = 50 MPH I NC GRID NAD 639 CONGRESS STATESVILLE, LLC DOCUMENT NOT CONSIDERED FINAL M 0 II II DB 1532 PG 1446 UNLESS ALL SIGNATURES COMPLETED N 1 1 1 • 1 ti . * 'v N, CLARK EQUIPMENT COMPANY W *'X* 0 DB 1906 PG 2178 W alp 1 1 W) I sUJI j s mi N W /ERIAL UTILITY EASEMENT o E DIP X X X x X—A AERIAL UTILITY EASEMENT 2421-0X 443U-El •• / — DB 2123 PG 13]I g EIP 48'W STING R 48.WW o 48'WW GB 2112 PG 163 E48"WW 48"WW .WW 48'WW N x x x x O T�— --T — TFtr—— , — T Fo-- --_ --T-- — _— _ F D—— --T F - — T F P—— I� —T F O—— T F O—— I SPECIAL LATERAL .-1 ---'® �� ZIFu1 --- Z SPECIAL CUT DITCHWHINGE QIIq F SEE S E . i MTA=6R 48I CHLLx T 1 )C SR 2I87CG1EMNAY DR 24'BTC46'CHL)C XT X -�XMTL T�„u,. 48 SN�?C""�JF�"uX-L� 2M1u'.L� V CHL�, :u�,?�nuf?Lrtir+l r!wr!:Zr!?v�L wr. !Lr�ir�wrE wrL"vr?4>tr!.. ) ) ) JB vMMH�II'v!!tis> r8,r,,,.,s...�r?4u+.�u! rtirNJ^tr?ter wr+��r rT..A..�.x48"CHL W _---- u W --—————-Y14PBT ST Sta.10+00.00 I O -Y1 N-1 POT Sto.l61+82.40 (48'LT) c c c c c c c C c c c 41 2GI-A nx c C n C ( t/') O -------- C _ . _ ._-- ------------ — — _ — — - c c' ------- —___ .. ._ _ .. _ ._ 2GI-D 41 �llikal 11�'t s. +26.4 <2416�FS I RCP-III f® - -' - 42"RCP-III 24"RCP-III 42 2GI-A W OIO TOE PROTECTIO p5 15"REP-Ill DI T 'A •"DIP 36"; GREU TL-3 2GI-D WITH CLASS B RIPRAP 41 �� _. � IFS <2419� FS LLB r — 8;1 SEE DETAIL 31 2GI-D JB`iMH 48"RCP-III AMP h 2GI-A N - :I_ 41 .' OVE SPRING SPRING BOX r _ --r-= COLLAR -o9/ OTCB�� ^. - —-- --PLUG/r- 6' �M FP �OWP.BLE FILL -- --�N,� ---- I ry - o 1.1 I Ali40 G _ RETA� a -Y-N- CONC ", _ 4�p 2Gl MTL -' AT! MT RE • 2GTI EL r- -' - r i 175® �f_ Sit�il// JI/ = - - - - wlv� 15"RCP-IV - - - _ - - _IV RCP __ - - - _ . . 2Gr— vo _ o AM§ 54p5> - / � a''M O U ,HW --- -_,°.' k Q ------- 1 C 15'RCP-III R1PRP 33.33' Inr" J --------- �40qAS JB -ililliiirat 1 I ®2GI l ) 24 RCP-III =i 2 �C - 2GI-D •- . �I FS / 42 2GI-A -- - TYP _ iti— c / PCA CS S c - - sus .. . ..r, x. . .. .. .. .. .. - -� � / � .__) "� - 333 C FA.E CUT RIPRAP 9j"Y��/Q lYR ..77+18.94 �-� .. LV C - L .ca - RPCA� .__ - .. G ZL--_ . SEE DEI IL63 ,P/..Z� --^---_ 1 MID i- .--' .� C ® - lE TO ExISLE NCE ` J1 m ��.. i -y "C END SBG .. .. ./...... 42 H - +k iR-Y- -_ 'C iin ��j- REMOVE DI +39.21 F , x - __ + i 'i' ✓' C i �r y JAMES FARMS, INC. m N i " + 1 i ,- '-_ DB 336 PG 412 r � i �.RPCA TS Sta.73+63.07AO /if` 4 ::,-:',:::::- / _rn ZcR v I PIPE OUTLET - --------- m rn CIA /- C \\ I // 30p LH DRO TAPER .. -. SEE ADETAIL 30NNEL BILIZATION L./POT �S"t0 469+50.42 (60'RT) ____ ___ _ -- I - a • 0 - F -YRPCA- SC S a.75+63.07 CL I RIP RAP N C - II i 4 10,TONS 1117 SY cn ro m R1P Rp �$F yam— + W \� 3 0 0 // n � Exlsr.cr+c FENCE O 1 -- a (TO REMAINI SEE SHEET 58 FOR-Y N-PROFILE O SEE SHEET 68 FOR-YRPB-PROFILE i SEE SHEET 68 FOR-YRPCA-PROFILE mw "om SEE SHEET 2D-1 FOR DRAIANGE DETAILS 0 3U ("a �003 V20 N 1]O T./CC lD/CL DO 11�1 NOT C SIDERE�L PROJECT REFERENCE NO. SHEET NO. UNL �` SIONA RES COMPLETED I-3819B 37 ROADWAY DESIGN HYDRAULICS LcD ENGINEER ENGINEER —L—(LT) 31 I #75: 1448255 131 I '2.92 870 1s R .1 I t , 86 .65 H ; I : Iau: L,L '+ T■ A 1R► R Y T ( T -YRP/C • a 7 lit WIN WALL , ira - 860 ® 860 HRuXIt P1= 128+86.4/ Y_LT STA.342/3259 850 EL = 840.96' VC = 500' -L- Si/JS' -90.6 7 III 850 L KTA,/2'--44.84= K = /5/ •Y_HT STA.242�.5.1 -1 MG( STA 5R+49 3? DS 60 MPH _--- - - 8403;11111�1�I����ii -As..., _ 840 EXIS7 1MG peoPor _- =GR1I1111i111 BEGIN GRA € . l/'MIN. G - ■■n�IIB�17����� L_L04'5' -� IIIIIIIIIIIIIIIE 830 ,se4�5' \__-- -------;"---- -_ -. #- P?GPOSED830 N 754788 E 14,478!• GRADE P1= 121+00.00 I I 11 - -� -L- STA.127+82.07 EL = 809.89' - 4.11'LT 820 VC = 2/0' ELEVA = SIDE 820 K = 138 _ .-- CH$END SQl Oi�i N SIDE Ill 111 DS = 60 MPH _ --- MF I AN OF t-40 II 810 810 __--- (+)G�4270� I SEE SHEET 10 FOR -L- PLAN 800 800 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 LIM 4/5 N 754730 E 1448255 870 113.08' RT 22.92 Q/860 ORIDCE 870 ELEVATION - 862.65 CH$FLED X ON THE SOUTHEAST CORNER -YRP/ I OF B2 DG_ WING WALL I „< h- 860 �H 06'': —L—(RT) -L- ST,413/-/23,/3= t 860 P1= 128+26.40 Y_Lr S7 A.342132 5,J 17'M/N. 850 EL = 83058 . 850 -L- STA./23-'4484- K = 152 _ - A _ ' - DS = 60 MPH - _ 840 ���������������������������������������������� IIIIIIIIIIIIIII ■■■■ _ - - _ _ 840 -. • __ . • iiiiiii i MIN. .. . ( - �-•�r .. ;1 : 11111830 11111 -— NE "" ""EN 830 -a - - __ r c -. ■■■ .... ■■■■ P1= /21+00.00 I IIII iJ - -- - 111 11111111111 EL = 809.89' - 11 LT uu 7 820 VC = 2/0' �- "''iATION = 825.57 ■ ■■■■ ■■■■ 820 m K = 138 -- - - 111. op., ■" IIS1.?IDE iOF DUN DS = 60 MPH ■■■■ ._ FDIAN OF I 40 1 _ - �e� ■ 810 -- �= 810 N - ——� - _ - r_. ■ oo ■■■■ v _ _- "-� 800 - J n.rc� 111111111111111111111111111111111111111111111111'llllllllllllllllllllllllllllll 800 - 11111111111111111!! •s-` ��T y� �i��____ .�""' 9 ,yu/_r_ EL.800.30' 790 'H EL, 793 9• 790 oT R S' IAL : U 'Da H SEE SHEET 10 FOR -L- PLAN E. PI STA 112+00 ' o O 780 L.792.20' 780 N OO 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 l9/dW70 o- PROJECT REFERENCE NO. SHEET NO. o, -3819B 38 -) RT- 870 t3kIUUt -L-(LT) ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 860 JXJTIN R /ND 850 DOCUMENT NOT CONSIDERED FINAL _— — UNLESS ALL SIGNATURES COMPLETED — _ (-00.642C% — --- 840 I n 3F..hL 840 830 c ADESFn� 830 _END 5P-EC.AL CUTCUT III PI STA 133+17 LT BEGIN (SPECIAL C EL.839.30' SEE PROFILE L'WQ 820 END GRADE I-Ok CONTINUA(( km. 820 LT- ST-.134 +10 00= P STA 134+00 LT E 844 32' 810 7-WB- STA Y34+"0®] I 9.64' 810 800 800 790 790 SEE SHEET 10 FOR -L- PLAN 780 780 132+00 133+00 134+00 IIIIIIIIIIIIIIIIIIIIII -Y RT- —L—(RT) 870 Bk/DU1870 860 EXIST INC 860 G OUND 850 850 (t)o�N22 840 —7840 -o END er UE a 830 PROPOSED /4. LT- STA.134+1 .0-U- 830 CRADE Z WB STA.'34 10.00 EL. : 4.32 820 co 820 co N 810 810 N / 800 800 -U m -U 790 790 SEE SHEET 10 FOR -L- PLAN a. 780 780 NOO 132+00 133+00 134+00 l9/dW70 C°, 1111 PROJECT REFERENCE NO. SHEET NO. I 3819B -L WB- ROADWAY DESIGN 39 DESIGN HYDRAULICS LCD 880 ENGINEER ENGINEER BEGIN EXIST. BRIDGE 'I""� END EXIST.BRIDG7 -L WB- STA.139+24.47 ■:=:== ice-WB-STA. IL0-� i.4: 870 BE DE , m■ m ■ I I W: STA.134+ _ 111111E1-_ END GRADE BEGIN GRADE L STA 134 F 0 00 h at J ..I" APPROACH SLAB : =:==�i MATCH EXIST.APPROACH SLAB El $ d 32" P1= 136+90.00 -+r, - STA.138+00.80 -■ -----. -L WB- STA.1".=a'efm n ■- 86O - �: moms EL - ■m DOCUMENT NOT CONSIDERED FINAL EL = 846.24' R. 841.82' _ mom �m���■ ■ffir ■� ' -VC = 42/' ■■ ■___I UNLESS ALL SIGNATURES COMPLETED 15/ NEN DS = 60 MPH 850 850_ 840 MEMENNEMEN=Ii2//litifEVA=MEMENNEW Jaz .1„ II ■iiiquoin.no.-- _ �m ��� rlII=saWanM�RNWzlu:TIV:r.M 4__�'=== _ U •I . _ -_ =MM 830 ��� y■�!: 11 ..-. i111 :���.���.� 830 .m.... ■��I�fi �1 1 mom- �1111 \ ___ �_.�■ ,- -_ — -o lera.. \ Sri._ _ �lyylrll9Pl Ell.I�� - 820 = •• ..T,O.p..•., 1 820 PI STA 134+0 a LT El 839 64' 1 i if 810 :77 810 i B_ -YRPC I -YRPDB- 800 800 SEE SHEET 10,11 FOR -L- PLAN- 790 790 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 IIIIIIIIIIIIIIIIIIIIII -L EB- 880 - 880 6EGIN XIS-.BRIDGE ND :X ST. •VD 870 L_EB- ST• 139+24.47 -L_E; : A. 40- „ 97 870 _w: StA.113 PE _ d+1OOb= . GRADE :EGIN GRAD -1.1_• S-A.134+10.00 MATCH E .AP''■•Cl- SLAB ' :ND D.APP°MACH SLAB EL.8.4.32' P1= 136+67.00 -L_:8- ST•.1:9-00.54 EB- STA.1•R+62.63 860 EL = 846.84' . .841.94 :L.83 .42' 860 K = / all K = /5/ DS = 60 MPH END GRADE 850 �1 . 1-&_LT- STA 145 f 60.00 850 _ _ �11111�1 P1= 141+83.66 �� 827.6 ' ° •z'?�3fY - -_ nT' �oo EL = 835.93' -- N ems- �� � .J■■y � ■ -•/00% NNEMEN K = 2043 P�GP�r • 840 III i y r 1 - - ` w„� DS > 80 MPH �I�nO 840 �/73e 830 ` 830 IIIII11IIIIII \\ 7' ■ ■■�� _ � �_ -- 'MIN. - 820 1111111111111 ` I� \ cx/ 1MC 820 i c \ i 1 810 - i'" 810 . • -YRPC•- - RPDE- 800 800 SEE SHEET 10,11 FOR -L- PLAN-_ E. 790 790 NOO 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 W70 /d l9 c°r 11111 11111 1 1 PROJECT REFERENCE NO. SHEET NO. — I-3819B 40 870LcD -L-(LT) ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 860 850 DOCUMENT NOT CONSIDERED FINAL BEGIN GRADE 11 UNLESS ALL SIGNATURES COMPLETED -L LT- STA.14`— -- END BRIDGE . ' Pl= 157+00.00 -LWB- STA.1.51-i17D0 _ -L-(LT)STA.150+16.30 EL = 83159 840 840 EL_827.•5' BEGIN BRIDGE EL.819.36' , -L-(LT)STA. 148+56.05 END APPROACH SLAB i•m •• K = 7/6 L-(LT)STA.150+60.93 II DS = 280 MPH ■ ► _Ii71:•_ . c _• ' III EL. 819.16' •• - - i 'J 830 -L-I in 1i r ...� ...�.. 11 'IA* 2i 830 .■ i iii� iiiiii 73;"III ■ 111■ ■■■►,1-��,"11 onam■11 -- r ,---_- . 111■C■■■�1 �i1Q ■Aii — - -_� 820 --- __ !!!!!...1.i "■iilll �� _- 820 � �J:! ( ✓?; ll)G/- //Y'J'TAT/IC DATA ----- - - --- -- 1111EILIMINH,® m _ . �� 'i aFsJ(�rl cLscl a - 1480 CFs 810 810 - - 1 -JEs,cr1 'RJ._.utNcr = 50 rR K�STING ■ DFS,GNI iVl ELE/AT/OA' = 753.1 FT CR°C'D : A .'PI ITSK : = 111■'MEE:�E11 E 14501 6 RACE DrcC?-IARGr = 180' Cr ■ dAS5 l-,�EOUB 0Y = 100 YM5 N 754895 E 14498'25 I ■ 800 -L- of,q 46-97,89 F1 71.26'RI PASS NWg!F'v4IT IOW = 753.8 Fr 800 21 7.6$'RT Ems, _ •. 81 + 0/ERTCPPIIIG DISCHARCE= /6000 �m e .I EVATION = 814.55 •1,` ,Ir CHISF FD k 0 - ,•RTHFAST CDRJFR Oc 01/ERTCPP.ING FREGLIENCY- ,> 500 (+l YRS. CHISELED X ON -HE NORTHWEST CORNER OF NC' E P I O ND 4AT+.i SIN 0/CR'rcr'Pi NG CLCVAT19K - 522.E F'r BRIDGE WING WALL !I' 1 790 rr DPI F ol- SURvt Y = Cl/14/ 019 790 •;{ ;i ` ELEVATION SEE SHEET 11 FOR -L- PLAN � , u , BE REM:1v AP AT DATE SF SUR'/FY = 784. FT 780 1 I 780 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 1 1 ' 870 -L-(RT) END 3'BASE BERM DITCH 870 W/CLASS B RIPRAP PI STA.158+32 RT \ 860 EL.837.52' \ 860 BEGIN 3'RASE BERM DITCH ENID 3'BASE BERM DITCH\ PI STA.155+50 RT PI STA.158+32 Rf 850 EL.840.99' \ EL.837.52' \ \ 850 BEGIN GRADE -1 EB- STA:145+60.00 -L - A.1 I+ 6. D 840 ,_' 4EGIN BR 6 0� ` •' \„ =_ 840 ° -L_IR?- A. 43-56 JJ EN* APP; •A H F,LAB ---------•-- -- \ l .3,I/42%.+, EL.821.27' + •+ • - +t_�� N BECAVmh 97w'd��� m ■■ mom -m �,, -L 11— A.1A$-1�42 i ��r �/ 830 - IEL.822.13' GRAD o �.3 830 _.,-, ■■m■■�■■m - -ME=MMEMENI— o� ' 0' - i J Oi - s`— P1= 157+00.00 820 -- 1 _ _ =off vC = 180' 820 m -- --_ _ - - -� __ -- ` K = 7/6 m -r- - - - `�- -_� _: _ Y — DS = 280MPH N n ® m (-K 97, (( 4 810 BM #? _ �- �0.5000� 810 N 754895 E 1.8 9$>Z - PR9F0-'0 ^a =/e / LT AR -L- STA.'46 S7.$9 t \ 5/025NG 217.68'RT \\ P07JND CILEVAT1ON - 814.35 i 800 • ••i, • - ,p, `,END SPECIAL CUT "P DITCH m - ARID a e WALL , PI STA. 150 A 15 RT \_BFC,IN SPECIAL CUT 'V`DITCH 800 — ,, E L. 812.08' BM #91 PI STA.153+00 R o NENNEmsso 'rswr 755105 �450186 EL.813.010'- — ���.�. 790 . , L- sTA -5as9-,66 790 T '1'•AI�J/ = El/ST,n� C ERT i ELEVATION &T SEE SHEET 11 FOR -L- PLAN E. VIEW TC _MN5D ■ 51 .02 • Cl-H;rELED X ON THE NOR-HEAST CORNER OF o3m 780 ■.'I (CONCRETE PAD AROUND CATCH—BASIN-- 780 Nm 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 W70 PROJECT REFERENCE NO. SHEET NO. 0 co I-3819B 41 ROADWAY DESIGN HYDRAULICS 920 ENGINEER ENGINEER LD -L-(LT) 910 900 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 890 890 cxi5TING iROLIr1D 880 880 870 870 PHJPUSL U 860 r-Ra._.€ 860 850 ®` 850 840 840 SEE SHEET 11,12 FOR —L— PLAN 830 830 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 920 -L-(RT) 920 910 910 900 PI S—A.170+00 RT END BERM 'V'DITCH 900 EL 877 53' _PI STA.171±on RT EL.882.36' BEGIN BERM 'V'DITCH END BERM V DITCH 890 R STA 166+. I RT 1 PI STA. 168 W 88 RI ` 890 EL.877.85' EL 8/5.17' 7,'- \ 880 h ---;��3�_ � — __— 880 r—),.uv X 870 GRArr --�' 870 . \, 860 +�!c '� � Cx r�c 860 BEGIN 3' BASE BERM DITCH �- -- W/CLASS B R1PRAP PI STA. 6a—Lu KI 850 EL.842.6v 850 840 c+13n7 i--- � __E�� 840 SEE SHEET 11,12 FOR —L— PLAN E. 830 830 NOO 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 l9/dW73 o- PROJECT REFERENCE NO. SHEET NO. . co I-3819B 42 ROADWAY DESIGN HYDRAULICS LO 940 ENGINEER ENGINEER -L-(LT) 930 11111111111111111111111111111111111111111111111111111111111111111111111111111111111 ••• =� PI= 183+82.00 EL = 914.04' -. ■ ■ VC = 1,580' 920 —1 18 DS >480 MPH DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ■ 1111 111111 11" ., .' 910 - 910 _ __ A �..• — _ -mommommorerstaissma 900 ■■ ■■ 900 NE ninsi, 890 ■■■ ter,-. — = ■■■ 890 880 '— IIII— 111111 111111 1111111 880 ■■ • ■ .n.•ii:nJ_—L'I.:f4•i4 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 870 Illr.WA-IM■ 870 11111.17111P- :. - 1 •�.11R!r# .. . ■ A FIRE B' 860 I 860 1 SEE SHEET 12,13 FOR -L- PLAN 850 850 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 940 -L-(RT) 940 930IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII EMI IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111 _ 'nun IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 930 11111111111111 ■■ P1= 183+82.00 111111111111111111111111111111111111111111111111111111 EL = 9/4.04' L, VC = 1,580' 920 K = 418 ■ �..ems, l. lil^:, 920 DS > 80 MPH -I EL. -I- a�si 910 - . _ -- _ P. -- 910 o, .. N -- v —I I - ■I■= �. —- ----"j IJ■� - z -_ =MENNEMEN=Er 900 _filii.r _ - - = 900 1p EN 890 �� .. c...nn. 890 -oo N. MENEMEN— =MN ■ - 42MCi!EUVI 880 ■ =II■--■ 880 Cco CV V11111111111111111.. nn #96 m,11 �E�Eli E 1452624 �■ �mm�� co �ei�. 776+02.27 ■ NEENNENNEN I S �■s:caiIwiiii� 870 , 153.28' LT --------------EL.89.:79'- Al 11111111111111111■ 870 m.ATION = 880.13 m CF'7JELh ) X 0 THE SOUTH FLANGE ,'O 5 IENNE y ' FIRE HYDRANT I ■m� o END SPECIAL DITCH - 1=1==-- 860 •••••. , _ ,...M'.T 1 .1. .. 111.1 860 E. MEII I II II SEE SHEET 12,13 FOR -L- PLAN 850 850 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 .70_ l9/d o- cr PROJECT REFERENCE NO. SHEET NO. ro I-3819B 47 ROADWAY DESIGN HYDRAULICS 850 ENGINEER ENGINEER —LCDEB- 840 830DOCUMENT NOT CONSIDERED FINAL ll — — -- - UNLESS ALL SIGNATURES COMPLETED �' tL _ _ 11111111 820 ii 820 i i -- - r ei iI E T,EX S , — • yl''OA S i►• _Ir • _ P1= 48+85.00 810 rally eiA.38+16.7Q - -__ EL = 797.14' ® IIIIIIII 810 EL.8320-6 VC = 280' i i- DS =l52 MPH '•�• . • IIIIII'I I - 800 4 - - - �11111111800 --_. 1 (-)0.5/. ' ----------- - --- 790 - N. t 790 ----' BEGIN GRADE �` - TIE TO EXIST APPROACH SLAB 780 -LCDEB- STA_47+28.6 780 i EL 8[12 D4 1 .-/ 770 770 SEE SHEET 9 FOR -LCDEB- PLAN 760 760 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 s3o —LCDEB— 830 820 820 810 810 P1= 60+55.00 EL = 791.07' PROPOSED C 800 K = 248� CHALK 800 DS ) 80 MPH N 7, ---` 790 ----—- - co 780 :,, ^'•' • 780 N 770 770 co 7 ;J_,..°TE'°L 5'BAS DITCH] aPI '. I'm5rl K l 760 f L°'78.. / 760 S END LATERAL 5'BASE DITCH / l o PI STA.62+81 RT ' 750 EL. 777.$0 750 SEE SHEET 9,10 FOR -LCDEB- PLAN E. 740 740 NOO 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 l9/dW70 o- cr PROJECT REFERENCE NO. SHEET NO. co -3819B 48 ROADWAY DESIGN HYDRAULICS 860 ENGINEER ENGINEER - RPAC 85o LCDEB- LCDEG STA.7G I C0.7 i -YFi'PAC- 2TA,_9+73 0/ 840 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 27'+/ 830 _=�; 830 820 —�- 820 810 PI= 70+20.00 810 EL = 795.81' K = 235 800 DS ao MPH �!� �' - 800 - -�� ,-JI16 - -- - -- 790 • _ ---- ---- 790 780 ` FX/5TtNC 780 6, UND SEE SHEET 10 FOR -LCDEB- PLAN 770 770 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 880 880 870 -r-LT2- Yam;2- -LCDEB- 870 RIF,,6E BRIDGE_ END UE 860 A P1= 90+39.12 BEAN APPROAC SLAB 860 L DLh Sl A.rS PA'.'6= EL = 845.54' LCDEB SSA.92 48.22 BR-DGE& APPEC.ACIIL,a ID`B Sa`�.8� 672= ROP07ED VC = 375' EL. 41.04rFF rONttJtriCtFO PI= 82+55.00 -Y_LT- ST4.3;74,60.30 T f�•39 PAD> A K = /27L ND RI EL = 839.18' 1 M1N. DS = 56 MPH 850 m 850 VC = 430' 7'MIN. -LCDED- S-A.` +84.06+ T DS =1560 MPH _�__- ----________ -- -----'-�� � ------ _ 08u % 2.1 840 - --- _ -- - - __ — -ia—� ____ `— 840 -iJ :_— -_ —— `— - > Cr A - -- ` ——_—- _—' i 830 g EXISTING / 830 R co \\ / 820 1REr''tN BRIP E \\ /7. /v. / 820 -LCDEB- STA.52+73.34+/- \� / / 810 `v, - / 810 T Y 800 800 SEE SHEET 10,11 FOR -LCDEB- PLAN E. 790 790 N.-0 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 \/0_ l9/d cr cr PROJECT REFERENCE NO. SHEET NO. -3819B 49 ROADWAY DESIGN HYDRAULICS Lo 870 ENGINEER ENGINEER r 860 BRIDGE & APPROACH -LC D E B- SLAB CONSTRUCTED ' 04 EB- 4 BRIDGE & APPROACH SLAB BEGIN GRADE CONSIRU(TED OFF L 850 v/ END APPROACH SLAB DOCUMENT NOT CONSIDERED FINAL -LCDEB=STA.9 +1T.O5 BFOIN BQIDG` END BRIDGE UNLESS ALL SIGNATURES COMPLETED 1 EL.8 7.5 ' -LCJtB- STA '01+66 1821. 8-8.72 IA. W3+14.C9 840 � 0'ED- PI= 98+25.00 _L EL = 828.79' END CRAOE/ 840 VC = 180' BEGI1�E TO A"ROeC-T SLAB ECIV GRADE K = 79/ -LCDEB- S-A Y41 t19.98 NL/iIE TO APPROACI• SLAB A DS = > 80 MPH -I M2 OS" L<C:EB— STA.103-55.24 ■ o L �_ r4 L. 318.49' PI= 106+70.00 830 830 EL = 816.19' - •-___ K = /36 - 4v-� r- DS = 60 MPH ___ 820 — ---- �� .1-7 , a —_ 820 \ -_-_--. --cy, EXIST'f,,l/6 Pl= 100+20.00 _ 0.7302% 810 CROL/NO EL = 824.22' ___ -_- _' -- 810 VC = 180' K = 883 DS = > 80 MPH 800 800 790 790 SEE SHEET 11 FOR -LCDEB- PLAN 780 780 94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 880 -LCDEB- 880 870 870 860 860 ���-- c 850 PrdUPOSt D— , —" 850 PI= ll1+00.00 CAE O 60/ - —�-- N EL = 832.58' ' E 840 vc = 180' �_ -- 840 K = 245 V -' Er,_' PI= 106+70.00 DS = > 80 MPH 4 EL = 816.19' _a7 1 '- ---' 2 VC = 618' 61 ' 830 K = 136 r� 830 7 DS = 60 MPH - a cX 1ST ING 820 yWOUND N 820 m N / 810 810 -U Y 800 800 SEE SHEET 11,12 FOR -LCDEB- PLAN E. 790 790 NOO 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 l9/dW70 0 PROJECT REFERENCE NO. SHEET NO. I-3819B 50 ROADWAY DESIGN HYDRAULICS 920 END GRADE • ENGINEER ENGINEER LCDEB— m••••••••••••••••••••••••• L 8D0—�,SrA.I 1211 J11,i111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 • 1 • 910 9001 ii - DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 890 890 " I' 1 1 _ 9 880 . 880 870 JIIIIIIIIIIIIIIIIIP11.11111111171!1' 870 r860 \ 860 1111$ I I I 1 I I I I I I I 850 850 840 840 SEE SHEET 12 FOR -LCDEB- PLAN I 830 830 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 PAGE INTENTIONALLY LEFT BLANK L a -a a, m N / N N n vN vm v N m N A- I i -U rn T Y Cl' / m H 1 0,9.m O 3U N 2 NOO V L 0_ \/0_ ,9/0_ o- PROJECT REFERENCE NO. SHEET NO. o, co I-3819B 51 ROADWAY DESIGN HYDRAULICS 870 ENGINEER ENGINEER -),RP - 6R E 860 LCDWB- ICNA- 4`A,8%754P5= 85O DOCUMENT NOT CONSIDERED FINAL _LI-/SAC_ Si A.58-189,26 UNLESS ALL SIGNATURES COMPLETED 840 840 2�' ,+12k 9%. 0552 — (+)4� 830 -- 830 = 80+50.00 _-__,_-_-_:---- PI P1= 86+50.00 EL = 8/0.80' -�— EL = 835.13' 820 c VC = 400' ---- VC = /50' BEG y GRADE, GROUND G \ K = 4/6 K = /07 820 i CDWR- S rA 73+7E31 \ DS > 80 MPH _ - DS = 50 MPH _EL.795,07 \ ---- 810 PI= 74+10.00 PI= 75+80.00 - PRnPO`,ED 810 EL = 795.24' EL = 796.25' ' l+4.0�52° GR4DE VC = 75' VC = 245' -- 1413. 945% DS >80 MPH DS =950 MPH =e— 800 s - --- _� 800 _ n --- 520% +0-925% '+)0 5�2 % +- 790 790 SEE SHEET 10 FOR -LCDWB- PLAN 780 780 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 I I I I I I I I I 1 I sso -LCDWB- 880 I 870 870 860 860 EXISTINC GROUND 850 fl END G�. a 850 -LCWR- ST'.87+I40.3 S EL_817 7 L 840 �, 840 -o �, +)2.6470S 830 830 N PROPOSEn S 1iR/Jt m 4 820 820 N CO CV P1= 86+50.00 a EL = 835.13' 810 VC = 150' 810 K = /07 S DS = 50 MPH m T Y 800 800 SEE SHEET 10 FOR -LCDWB- PLAN E. 790 790 NOO 87+00 88+00 89+00 l9/dW70 0- PROJECT REFERENCE NO. SHEET NO. 0 co A IIJ;G' IL ?A(NI' '7,ITA I-3819B 55 ROADWAY DESIGN HYDRAULICS to 850 —Y S— ENGINEER ENGINEER �1. �E� it SC`lPv4R` 7 9 �FS �_���� MEME=MMEMEMEN=�rz . L7J �: EL( U� Y1-5 =WE .. HW E i LVATd0N 785G 'TEmEmEmEmmoommommoffe , 1111 �� ►� D/SCHAh = 8557 FS 840 =ersaty FRL .LLN:,Y - (U YPS —E ' _ OW LLEV4T/A5 7d102 TT MPIIIIIIIMPIUMIIIIPPMIMM=MIMMU!!nll 20il,=W,Ir2r0•1_ _ ___rneraa OPT/Ad, D'SC''-7<.RG - fSD _.FT +� OPPItiC r5EOJEN 2 3)0 (4') (PS n� carom om rn�eryr ■a MIEVaSr' OPPIVC GFVAT'ON - 7,5D TT 830 �,-r■'r, DOCUMENT NOT CONSIDERED FINAL —_—� OF SUPVc Y = 0,,LS/20'0 UNLESS ALL SIGNATURES COMPLETED MEME=MMEMMENNI__— MEME=MMEMMENNIIM=i71 im �J.c EVATI�� D GRADE -Y Sr m h30+ 3,90E 11 85' - ����._ .:� 792 Ft820 820 r1N21 B2rTeI� E B GIN GRADE -Y RT- SETA 23 +6 .90 24'RT),EL $11.85 -Y S- Silt 120 1 24.5� END BRIDGE BFGIN GRA]E -Y=J- STA. 330+63 0 24'LT),EL 81185 EL.799.22 I YS- STA.122+17.57 EL_795.60' :14.31YT ii:tei tiimm____ mm� - PI= 124+52.4/ mm� 810 �.wa�Ar + m�� END APPROACH SLAB EL = 781.28' 810 a + -Y S- STA.122+41.70 VC = 1,220' ■•,,_ EL. 795.34' K = /37 PPOP � i______ - _ __ _ _ �mm� DS = 60 MPH GRfDF � 800 ill ���� 800 �f� BEGIN LATERAL 5' BASE ) _ _ K 753519 E I44819Y 780 STA. 19 I `� :f • l 3 y s 3.07/ Y_5 51A 129+-03.46 780 790.44' 'r ' \ 29.36'LT '31. 0 50% �' �- „ —`Y Sj�'O C��iIISELED X O THE SQ92. 4SIF3E OF I STA.118 1 50 RT J `� R EN'"' Oh 00NU CONCRETE PAD AROUND CA-CH BASIN . 776 50 F TRAIL 770 770 END v BASE LATERAL DT(,)-I f - "I STA 120+80 RT F , ZR K SEE SHEET 21,22 FOR -Y S- PLAN= EL.775.31 � 760 760 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 PAGE INTENTIONALLY LEFT BLANK U1 L a -a a m N / to N n N v m N- v N IN N v crn w i -U rn Y 0 / mCc 0,ON cn 0 30 N 0 V L d N00 \/IL l9/d PROJECT REFERENCE NO. SHEET NO. •_ '' "'E I-3819B 56 ROADWAY DESIGN HYDRAULICS 880 -Y LT- �• PI= 344+8/.34 - ENGINEER ENGINEER - EL = 882.72' VC = 880' _ = /5/ 870 • '��: • = 60 MPH860 / IIiiIVLlll1iiipiii!l! UNLESS ALL SIGNATURES COMPLETED I1 I �� ---- 1111111111111 N1! 1 !!]'Pi, iP!IIIIII -ram I ILE 1 Ph k f,, 830 ' I 830 820 820 810 - 810 800 - 800 SEE SHEET 22,10 FOR -Y LT- PLAN / /' I 790 1- 790 330+00 331+00 332+00 333+00 334+00 335+00 336+00 337+00 338+00 339+00 340+00 341+00 342+00 P1= 244+75.00- EL = 882.41' 880 -Y RT- VC = 880' 880 K = 153 BEGIN APPROACH SLAB DS = 60 MPH -Y RT- STA.240+98.00 870 EL. 863.43' 870 END SPECIAL LA I L. 'V'DITCH PI S'A.240 1 50 LT EL R56.10 m 860 Y7PCA START SPEC A_ JyTERAL 'V'DITCH 860 PR,f)G-E PI5 A 2..19+0R _LT EL:81/.65 850 ( 6 -i% -- BEGIN BRIDGE 850 -Y RT- STA.241+22.17" CD L.864.52 in A - 840 -r' PT- CPA %.'3 204P- --- 840 58PCA- 315.�1-`6./3 �� ,----' '� - -- BM #75 7MIN �/ - --- --- -' N 754730 E 1448255 830 i'/ 'f1P.44237' ) 2'L. -Y RT 5998�T+34.43 830 co BEGIN GRACE ,' - ELEVATION = 862.6-5 co -Y RI- ST4 230+6' 90= �. CHISELED X ON THE SOUTHEAST CORNER OF p EL. 811.85' ,--- BRIDGE WING WALL - \\\ m 820 ' : 4- -' 2'LATERAL BASE DITCH 820 PI ' A 238+50 RI EL :3 CV W 810 o ,- / PI S .. -38-00 RT 810 `-- EL.8••. 8 il 1 �/ AND 2'LATERAL D TCH 800 - PI STA, 237+00 Ri 800 _ / EL 818.14 S - - -, SEE SHEET 10,22 FOR -Y RT- PLAN EH 790 790 NOO 230+00 231+00 232+00 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00 241+00 242+00 l9/dW70 PROJECT REFERENCE NO. SHEET NO. 0 D, -Y LT- I-3819B 57 _ ROADWAY DESIGN HYDRAULICS 910 ENGINEER ENGINEER YR,'AC END BRIDGE PR,[)GE -1' _T- TA_341+54 59 900 EL.873.14' P1= 344+8/.34 ——1 EL = 882.72' END APPROACH SLAB VC = 880' 'Y_LI- .S A.34H,-E P4= 890 1' t_— STA.343+78.7 i DS =1560 MPH -YPPA - STA.'f7-'-SC.07 DOCUMENT NOT CONSIDERED FINAL -EL.873,83` UNLESS ALL SIGNATURES COMPLETED noo X ( 02 _. 880 J)2- �� 880 i 870 ���- - --------- - i - - _ 870 — / DE 860 — t TIE TO EX S- APPRONAfl�HGR 143 860 / ELT- 3TA 3 45+63 79 / cL.878.75 II'MIN. 850 i 850 -- _i,-- f -,. - -./ 840 840 830 830 SEE SHEET 10,23 FOR -Y LT- PLAN 820 820 342+00 343+00 344+00 345+00 346+00 347+00 348+00 349+00 350+00 351+00 352+00 353+00 354+00 -Y_RT- 910 910 i[: 900 t..;, Vill Pl= 244+75.00 900 � EL = 882.4/'II . VC= 880' . ,. .' ■ • K /53 . 890 Sbo PH .�� �, 890 11111 ,_.,1111111111111111 III � , � ,. 8801_1111111111111111IIIIIII��������iiiilllllillllllli I"'������������I!!!!!!!!IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 8809 s 111111111111111II iII 1 �011 1II1�1111111 ; llllliiiiiilliiiili1illllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll ll■11ll1llllllllllllll=lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll a 870 I j - w -I II1 I I111 111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ' 1111111111111111.11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 1870 co 860 01 1 11 1 1 ."■• - . '49+73.3 IIIIIIEIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 860 EL 878.73' a m N 850 850 N 840 840 Y 830 830 m. SEE SHEET 10,23 FOR -Y_RT- PLAN '9 820 820 NOO 242+00 243+00 244+00 245+00 246+00 247+00 248+00 249+00 250+00 251+00 252+00 253+00 254+00 W70 l9/0_ 0- PROJECT REFERENCE NO. SHEET NO. Q co I-3819B 58 ROADWAY DESIGN HYDRAULICS 910 —Y N— ENGINEER ENGINEER PI= 154+50.00 (LT) EL = 874.58' VC = 180' I K = 1133 900 DS > 80 MPH BEGIN GRADE ���� Y N- (LI STA.151 '' try- Pl= 156+84.00 EI+ 8 ..q ������������� EL = 872.11' PI= 160+78.00 VC = 250' EL = 869.80' 890 K = 533 VC = 180' DOCUMENT NOT CONSIDERED FINAL DS > 80 MPH K = 844 UNLESS ALL SIGNATURES COMPLETED DS > 80 MPH 880 - - 880 - ---� ZL-loo,V IN S' I. _✓�+1F�4 l_ IrJn I I -x- c7 �Jv PI S A.15/+i7 LT �0� c I 1 i _ /_"-TigmiI>riCiaC: mi* 1�1111� ." 1 ■ 870 i - 111411PONIME' r . - Mrm stcoe... ' vinr.J^ — `■ rai r iiiai1� 870 :EGIN B GRADE IIItee: �� Mu�s►u ������ BEGIN' G2Av ■ �■- , -------r+--1 860 ,' I , END NB & S: - 860 PI= 154+63.47 (RT) -- STA.155+59:O0= _•4 MIME / / EL 874.44' EL.87 .43' UGH. h'Un `` i VC = 180' I K = 1024 UCL 850 - - DS > 80 MPH BEG , 1 •i w'' V DIT+ / 850 P STA•1160+75 KT BM #82 - L.$60. 7` / N 755715 E 1448197 END LA V n TCH gill END SPECI4 LA I.' 'DTICH/ 840 -Y N- STA 151 08 27 ,• ., :... • 840 63.52'LT FOB C INLI• ION L 863.50' ELEVATION - 877.30 CHISELED X ON THE NORTHWEST BRIDGE PIS A 157+I+I RT 830 ABUTMENT El+8' ' 56' 830 SEE SHEET 24,10 FOR -Y_N- PLAN 820 820 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 920 —Y N— 920 910 910 900 BM #72 900 N 757382 E 1448157 -Y_N- S7A 167+69.8L 2C0.51'LT 890 ELEVATICN = 02 890 PT. S°IKE SET IN UTILITY OLE 1O:S5co Bn _��— 880 ------ 880 -o 'PI= 169+75.00 — -- EL = 862.62' _> .r: --- -..D S1-:4 i'maimDi�O•:n ��NE VC = 600' s 870 P STA.167+22 PT DS =1360 MPH ■■■■ - - - - 870 L.858 59 _� � ---- - N _ 860 r \ \ 860 /CV l �EE 1 T N9 w Aft-,IN SPECIAL CI DIP-- // / \ CROWD pi STA 166 BEGIN SPECIAL CUT DITCH WHINGE 850 m EL !328 65+ i END SPECIAL CUT DITCH W/HIyIGE / PI$TA,171+00 LT C 'I SIA.159+95 23 L1 Er: 8�3 37' y EL.c360, 8 840 840 0 BEd!\ SPECIAL CULT DITC- / =1 STA.157+50 6T SEE SHEET 24,25 FOR -Y_N- PLAN 0,mm EL.858.65 cn 830 830 CV no 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 W70 o- PROJECT REFERENCE NO. SHEET NO. o, co I-3819B 61 ROADWAY DESIGN HYDRAULICS 880 ENGINEER ENGINEER -YRPA- 870 P1= 14+60.00 EL = 856.49' VC = 6/0' K = 85 860 DS = 50 MPH El= 2/40.16O DOCUMENT NOT CONSIDERED FINAL V EL = 685''l6' UNLESS ALL SIGNATURES COMPLETED B:GIN I. DE 472� {1—I-)2.49 VC_= 1 2�� DS 960 MPH 83 4.. 850 `� � � � - ,, ELjj 850 ------ 840 (4-., 2i3% .___ - - t_ 2 �0—(.)� 409/ 840 9 0 ' _ _ -_- ----- BEGIN SPECIAL LA-ERAL 'V'DITCH ,V 830 PI= 10+75.00 - 830 EL = 838.3/' P1 STA 13+90 L! - -- VC = /50' EL.847.76' _- K = 8/8 DS 0 80 MPH - -----_- 820 L END END SPEC AL LATEKAI w DJTCH 820 -- - , P1 S-A.17 150 tT -• __EL836 32' 810 810 - ' ExiST NG , " cROUVD 800 ,' 800 /,- / SEE SHEET 11,23 FOR -YRPA- PLAN— 790 790 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 900 900 -YRPA- 890 890 ND GRADE 880 7YRPA- A.30 143.62'- EL.865.05 880 P1= 27+49.00 EL = 866.00' VC = 278' P1= 25+35.00 K = 84 c 870 EL = 859.65' DS = 50 MPH 870 o VC = 150' K = 90 36t9V (�-,0.3/!00/, DS = 50 MPH -- -- -' v %1028NX 860 v , - • 860 (+)4`0' PI= 29+50.00 o' I__ /—sue,,. ,-Po OSED VC = 100'32' 850 J C5-AD- K = 1938 850 cn - DS ) 80 MPH u. PI= 21+15.00 E715i ANC N EL = 840.16' pnuivn 4 VC = 685' K = 96 CV DS DS = 50 MPH 840 m N 01 V / 830 830 -U Y • 820 820 U SEE SHEET 23 FOR -YRPA- PLAN E H 2 a 810 810 NOO 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 l9/dW70 Cr PROJECT REFERENCE NO. SHEET NO. ' co I-3819B 62 ROADWAY DESIGN HYDRAULICS Lf) BEGIN GRADE ENGINEER ENGINEER 880 YRPAC- STA.10+00.00- EL 867.37' -YRPAC- 870 PHOHut t LJ 0. GRA,DF --____1 P1= 16+50.00 860 ,\ -____ EL = 846.43' DOCUMENT NOT CONSIDERED FINAL --____. VC = 200' UNLESS ALL SIGNATURES COMPLETED \ _ ) u K = 145 _ 0% DS = 59 MPH 850 ,,. '\\ - r- d 850 840 - _ ---__ 840 'Utr. (z 1- ` _- i�fl.rVl ■ 1 -`` - - --- �� 830 i 830 820 �� 820 P1= 25+50.00 ---_____-_,-�� EL = 805.02' 810 VC = 930' 810 K = 97 DS = 50 MPH 800 800 SEE SHEET 12,11 FOR -YRPAC- PLAN= 790 790 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 860 -YRPAC- 111111111111111111111111111111111 - 860 f11,r •w tea■ rr �r . • 850 ran�1•1-.I •M.ull+01 3r.1-- M1111M111■11111MM■ 1 y r: mow minim 850 �.�.,.� ■r■....a...=.....■w�■■ ./iR.' sL i7..m 'rims � ..., ,'.T.111■.....11111--7.IDIMN./IWW1 /1��� -. _!!1!!_r!!! ■■■■ ■■■m■■■■■��IPI:r:faiM`r l/�IIS_7u_ �i" �y�_I.M ny\1 M.11 MAT-r1.l 1 rr- ■ .1.' El Milltf 1111■111I11111■�!EliiiMMI _I• �l�nc `/r•r L I -- 840 ....a_ualyarr_air■I_IllI.I:�irri�rr�i■■■■�■■■0■■■■■����� ii 111111111111 840 MI=WhilliMagff 1 11 fM1111M111■11111M=M� :�IU�l....;�. .; MMININIIIIMINEI N,..�MI, = =■-I. :v.r. 4'1±1E. Er.`fwliVE.I NENN ■■■m■n■■ m..r471ii.• raid pm@ III: ii ., .',l.ar.. -0 �__I —__■■■■_■■■•■■■■■___ . .. " .1--.■I. EI = I ���••••N •••EN••••■ •moo.. �- J�flQ.7 1 / E N= ooMo■=oo■ ��� J� - ■■■■M 820 a 820 �.._. ..�iiii= •. - -- ���s/ pa INYMEMMEIFIIJ�J�\— �••••��=H_ •� /a / ����a� .' ••. �•••••■■■■■■ i� ■�/K.7191—!/PlIIIW I2 MI•3- .7 810 —.�... �...�...... .I..�. 810 F - . •�����••• •�•••••■■■■■• �� / •�I IEl'-6%.I,I Ivr1l��7��i7 -.� � ��1•••• �•••••■■■■■• �� a = __�������1•••• �■■■=••••■■ •� WiTOT T i,, ii7N!ENZIT Y= — —LnCl�—ism .11�—lCE.■■■ �o■muu■ ', �� r.•.•... .. .....-•..••• ai — N =iduT7I --.-_� I •• - -- • •••••••••••• �� - TPA v —� • — •� M.- /_l.}7%M76GTA( - l a —=-- �••••••■ ' •� ■ \ •'I�11a,.8JMIII/ �I 1' 800 �■■■=•■ •� ■ — 1 4 ■:• - 800 ---- , _■■■•■• ,, — • -2. _•.•TiIIlrir_i..r_J■ - n 3 1' �I,rfi11111 I. 111 ��MIIIMIIIIIIIIMIIIIIIIIMIIIIIIIIIIIIIIIIII�— —�•••r}°_. ��� ' i' L ~_-- F/ Ul ll:• 4, -- / I•I1.II11ir/P N'S�<I/// a _ __ n MMMMM _ n _ _ COONIVI �=�� ■l— EL 793 8R EL 3.FR MMMMM _ t-- l•�-J7I.l l m�Mq. ELMI/lMMN. MMMMMMM c _ � =■■■--'e. i- �. ■ I (I VI419) o —�— --' T T NE r =MEI- 780 �� �uR ■■ MA•STM.,'— 780 —■-- ul� .:►1;i-flits;tiati�E11111111111_ 111111 II I I n ' / r t1y�iW�/ ti •r _ —�--MENNEW- —T_ - ■■� ■ / —�---ENNE :J L9 I'WDLMI..•'1=MEN= ■■� 11•l I_li.fNG9.1I.;1 E. = ■1ii•-•i —= ■■� SEE SHEET 11 FOR -YRPAC- PLAN —=-- �vw om — —� ■■� 2 a 770 ■ � ••— 770 N-.On 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 \/0_ Lfl/d o-- ■gyp■-p�ppp■=p■ I MEN=MMEMEN PROJECT REFERENCE NO. SHEET NO. co I-3819B 63 =Et _ ROADWAY DESIGN HYDRAULICS 910 —YRPAC- -=- _ ENGINEER ENGINEER 1111111111111 11111 11111111111111 ■_... .■_ 11111 III I III11111111111111111 1 1111111 .—...—.._......._....— - - _ _�_ -- _ � - - 1=111 11:1111111:1111• Ile . . 900 _... IMIIWIIm1111 " NE 111•11111111111 ■ ... ■■ I..,.■■ ■■■-■■� lAE.� -.��IT7.r73 T77. 1`1�u►�il.Lil31-Jl +il' YYMT= •E■■ • ..�...I:1aICll0�d99[Jua•I�a1i9:J� -.�isiGnlkriammommummEmmEmmEmEmm e -d�%�-n•i%�e:i.i�n>!►��% �I�- i ���c.• - -I •� u-1 I ■ ■ ■ NE oou, e BRIDGE _ 890 DOCUMENT NOT CONSIDERED FINAL 1111 IIIIIIII� UNLESS ALL SIGNATURES COMPLETED ■■■� nn■■■■■ ■ ■■ ■ : ■ ii'rei ■ „Y,r� -YRPAC 5T•.irff $'r6. ',IAA bh l t i■■i �■ 11�111111111 �1 . '� ._r' ■■.� _aAa��,ITTaa 880 -- • '.- - - ■.� ��.��V�Ja 880 END BRIDGE ■■� �- .,._.«•s.......,. -YRPAC- STA.43+33.25 -11� EmEmEmmommm EL.894.18'u. ii� mmmmmmmmmmmmwmmmmmmmmmm ■ � 11�111111111 870 II=lIlIIIIII - �, 870 END APPROACH SLAB II IH HII _ \... YRPAC- STA.43+81.50 860 EL.896.41' '. I�IIIIIIIII r�t1)iCJ•L 860 immommomm1�=■ -- // - =MMEN k —JCai f- �WEAN/ .7ffbcdr■i.l:.. - IIIII1IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11111�IIIIIIIII' Y_LT s-a 348t .d1 -- ,,_ 850 / 'MIN. - 850 -YHI-DB- S'/�. ''+. .0l �/ PI= 47+45.00 7'A,JK. .' EL = 914.77' . VC = 840' K = 84 840 DS = 50 MPH 840 Yf'DAC STA,40100.19= I -YRFr 5 d- STA ,+7 f-,e \ { ,, i 830 i /I L 830 -, \... _ ___ _ _ SEE SHEET 24,10 FOR -Y_N- PLAN ---- ` I \ ,--i 820 \l 820 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 +50 ��-� "" """""" III III —YRPAC— SEE SHEET 23,10 FOR -YRPAC- PLAN 890 890 PI= 47+45.00 PROPOSFI) EL = 914.77' 6HALC 880 vc = 840' K = 84 880 DS = 50 MPH 870 PI= 59+44.50 870 EL = 854.80' i VC = 435' BEGIN APPROACH SLAB- K = 97 c 860 •YRPAC- STA. 56+33.28 J DS - 50 MPH 860 EL. 870.36' `` N BEGIN BRIDGE - �Q� • I. a e a 850 '- 90t1,V v -YRPAC- STA. EL6868 28 E 850 Cr / N CO i840 �� _I i F �i�, 840 r `, C.u. 7'rill. a �\ ,7'M N. CV 830 .\ / \\ 1'R�4C sra. - yr 830 ::: -�. ----� ��� _ -- -- 820 e� 1./" — '� �. 810 E. =YPP - STA,58i2S?-)- _____ ‘ m -YRPAC- TA, r.fco.Ss \‘- 0 3" 800 -L,OWP- STA eL/-54 95 T, ��, ` 800 N m +50 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 W70 o- PROJECT REFERENCE NO. SHEET NO. co I-3819B 64 N ;'-10`U�47 ROADWAY DESIGN HYDRAULICS 850 -�- -YRPAC- ENGINEER ENGINEER 2�77-i 1 ■ 840 P1= 65+30.00 I ,�SCb EL = 851.85' VC = 260' - 830 L'p;in K = 85 - DOCUMENT NOT CONSIDERED FINAL DS = 50 MPH `— UNLESS ALL SIGNATURES COMPLETED 820 820 810 ma, - 810 -;'RPAC- STA.SL-2,.4)- - -XRFAC- 5, 4,63'83.8� PCB 5 4./;T 9.a 3 800 ->RCCA- 6-4 28179.44 800 . IMMEMEMEM RCU,VD 790 f=- 790 \- - --------.i` _ 780 - 780 770 v 770 SEE SHEET 10,22 FOR -YRPAC- PLAN 760 1111111111111111111111111111111111111111 760 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 -YRPAC- $TA.88+97.1C=840 -YRPAC- EL.827.00• 840 END BRDGE - 830 -YRPAC-STA. 79+60.58 _ -f --- - 830 EL.804 86' / 1 2.GE61. :4 V 820 E'-D AP'FOACH SLAB ;.'��' [� 820 -YRPAC STA 79+90.66 _ / , E . P1= 86+50.00 P1= 87+94.98 EL = 82/.05' EL = 824.89' 810 — /' vc = /50' vc = /00' 810 " K = 115 K - /72 — _s DS = 55 MPH 1 DS = 55 MPH 800 800 , '-.'3.:F04 -394L 2' ' L,- i 790 �'�-,-- \ \\ nlDG NO Au LIC DATA 790 _- �� ' `' Ex/cTJ+YC 4)ESICP -,ISCHA,C� - 7578 CFS �' -' uG QUND i-) SJ.CN FRF.GFVCY - SC YRS 4 / 1 = DESICPJ ;SW ELEv AT/ = 755.8 FT 4 780 ,' B:+SE 1),'„SC1-14PGE = 8687 CFS 780 N PI= 80+55.00 _ '- j EL = 797.56' BAP-E FREQUEACY 100 YRS '' r I 1 i VC = 750' B4SE HW E SV Ar i0N = 75E.4 FT CREE/ WM,,1I I K = /00 ovrii Qi 0 /; Gii = LBD CEO 0:7770 I DS = 50 MPH ft TCPP:NG `REGUEVC1= > 50 0-.° YRS 770 -o l OV ER -iiiiiJJI EVAITI?K - TBD FT 7 =CURTH S CROEK DATE OF SUR/EY = 004/2C13 760 qv.S.U-EvAT.0I/ 760 A/ DAB t °I- sc, rY 77C.4 FT E. SEE SHEET 22,21 FOR -YRPAC- PLAN cn 2�y 750 1111111111111111111111111111111111111111 750 Nm 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 ,-. Cr PROJECT REFERENCE NO. SHEET NO Cr . cCi I-3819B 65 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 840 -YRPC- 830 GRADEED 1 5x '3'EQ 820 i DOCUMENT NOT CONSIDERED FINAL B GHd RADE P1= 13+42.00 --- UNLESS ALL SIGNATURES COMPLETED -Y" - 'A.10+00.00= EL = 803.46' —���� El• 745.9'I' K = 206' ��6 P1= 18+19.50 810 DS =950 MPH EL = 827.34' VC = 730' 810 . . DS = 50 MPH 800 "_ — T� — (T 9,311--�'I - _ --/ — _-- — - START SPECIAL LATERAL 'V'DITCH/� — 800 (#)10800� �(ri� � r," - - _ .—.- - �-- -/ � ` 790 — ---- '~-- __=--_—= ------ ---- ----- ------ /✓ E�am �r ,'x/ 790 START SPECIAL -..U1: 'V DITCy / I E K1)1[alp PI— 11+25.00 PL—S1 li+-5O--J r.. ;l'P/p 780 VC = 97.25' EL.790.51' ✓ 11111111111111 780 K = /09 EVD SPECIAL LATERAL 'V'DITCH/- DS = 53 MPH I TA 1' 50 LT 770 !al `: 70' 770 760 760 SEE SHEET 10,22 FOR -YRPC- PLAN 750 750 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 840 -YRPC- 840 830 830 820 820 • 810 P EI ROPO.D, D HI= 26+75.00 VIb GRADE 810 0, / GH'VJL EL = 796.19' -YRPC- STA.29+53.00 6, VC = 290' :L.794.19' - K = 99 DS = 50 MPH 800 _ _ 800 -o o _— cr �10 72170% e- 790 ,,--------— ____ ------ 790 ' CfROL1.D—1 m 4 780 780 N END SPECIAL LA-ERAL 'V DITCH a PIbl•.24-50 LT EL. 7'8.46 770 770 -o Y 760 760 U SEE SHEET 22 FOR -YRPC- PLAN .93 750 750 NOO 24+00 25+00 26+00 27+00 28+00 29+00 30+00 l9/dW70 0- o' PROJECT REFERENCE NO. SHEET NO. co I-3819B 66 ROADWAY DESIGN HYDRAULICS 830 YRPCA— ENGINEER ENGINEER 820 P1= 12+00.00 r . fiRU)13 SF B= IN (,RA EL = 790.26' -YR - T 63 z 7 0 jLTpF ! VC = 250' 792.94' EL. 791.42' K = 209 810 DS = 63 MPH E AF'F'1dOAGH SLAB DOCUMENT NOT CONSIDERED FINAL BEGIN APPROACH SLAB CA-STA.22 9.57 UNLESS ALL SIGNATURES COMPLETED -YRPCA- STA.16+10.5 PIA 0'SD EL 796.50' EL.792.79' r_ N d 800 -7 r A- A. +:4.:1 800 EL 796,33' IM - 0.616If 790 0------ — o — _ - 790 —II I - -- lil� \yl, --- _-- PI= 24115.00 780 -- - ---- _ EL = 797.75' ---- -- --- _` / - _--- -� K = 100 --- �� DS = 5/MPH 770 �E 1ST/Vf 770 005/18D 760 760 750 750 SEE SHEET 9,10 FOR -YRPCA- PLAN 740 740 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 PI= 38+00.00 EL = 867.00' BEGIN BADGE VC = 840' 870 -YRPCA- STA.36+16.25- K = 84 870 BEGIN—APPROACH SLAB 854 49' DS = 50 MPH —YRPCA EL— $60 YRPCA- STA.35+92.25 860 -✓RPAC EL.Eth.93' y� BRIDGE 850 �� 850 'P0EC SEA 840 — ,PAS 840 n CO r/'MIN. 17'MIN. 830 - 17`0N• 830 Y1RPAC ST4.S3 188.84 Cr ro 820 820 01 PI= 241-15.00 m K = 100 — ----' • 4- 810 DS = 5/MPH ' 'N 810 03 01 _" -- '--rt---� ✓ YRPCA S A.36 63.72 800 �� - __ - --t -Y /5- TA.338+0550 800 -off j r10/ _"-_-__- ----, '. E5l`TiNG -- s`• GHOUND Y/SPCA STA,371/6.79- 790 790 ----- ------ ___, o \ --- -Y_RT- STA.''_"_ , r / 1/ ma SEE SHEET 10,22 FOR -YRPCA- PLAN 780 780 NOO 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 l9/dW70 C •■ — CrPROJECT REFERENCE NO. SHEET NO. _ -3819B 67 N ROADWAY DESIGN HYDRAULICS Lc) ■___■■_■■___■_■_■ ■ ■■■_■__■■■■■_■ ■■■■_■ r ENGINEER ENGINEER 870 _If_ _ � l': 1� 11■_ IIIII I�I��IIIII�IIIL._. . ..�_,�_,■�_ I� __ I IIIIIIII W 11� T :• ��r■r�r ■1� ■IIIII : 1■1■■IIIII■1111 : r `ram ■ 1 11111111 860 �11�■ ►■�eL�1:] LS■IIIII■1:1::IIIII:IIIII■11■111111■11��1���■��:u1: 1 11111111 - _ I!I■! 111111111■IIIII■11111111111111111111111111111■■�■1�1 11 III — . I'll" 850 1I�ii110.1111�� 11i'1�1'1■■IIIII■1'1"1111111 IIIIIII■111111 1111 I ` — DOCUMENT NOT CONSIDERED FINAL ■1 � I^I I IIIII I I 1111111'111111111111111 I ' II����� :' ■ l llllllll UNLESS ALL SIGNATURES COMPLETED 11■1:...�1=M11111M1■1■■■11111 111111111111111 1111 1 1 11 1 11111111 E5 II■MM11"1'11 1I��1111.:■1■E11111■IIIIIIIIIIIIIII■1111■Vg � ■�1��� 11■ _ 1 11111111 840 1 1 1 1 i�..:_ _ Jl �"� 840 ■ _ _ __I _u1■■.e__���■��� ■■� _■ IIIII ____ ___ =_�■___i�■ _ ■ I/I IIIIIIII is 111 III Tr ,■ ■ I 830 4�v IYI�11�1 MMMMM"■!11� �Irr �r ■ 1 �iiiiii 830 III■■■(IIIIIIII■■IIIII��I�■I�IIIIIIIIIIIIIIII�IIIIII■IIIIIII . .1_ _ =ll� - I P - Si,414,0+1'i4 820 MIP _H• 1 11111111 . U /6. 820 I _ _ IIIIIIII_ 810 N'DAR�V''DIT ..1 i ■■■■ ■ ■■■■ ■ _ ■■ ■.■�r■IIrIr■.i.�1J= --_ 810 PI STA.44+98 RT '1 _ 111�1 _ �1n EL.820.93' uPHI err � /, � 11 lilliilI■■ _.�._��' PISTA. _ YpBo a ,r4.3 +4C.4)= I I EL 82 1.1 i' 1i3I F ivl_a J1 . CO 9 800 PP B c A.Z'+5/.42 ■ "1ST• 45+ ' + RT U ?�V 800 ■ b EL.S' .61' 790 790 ■ ■ SEE SHEET 22,11 FOR -YRPCA- PLAN ■ - - _ 780 - ■ - 780 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 K L l l ■ _ 1111111111111 ■ ■ ■ ■ PI= 66+83.09 B — — EL = 866.58' 880 I,, III dii —YRPCA— I■II1I� — _ IIiPiII . DS =8500MPH 880 11■■11■111111111■■■1■111111i■11■11111111111111111111■11111■■1■■111 _ - M�■_o.: bs ;11.. - �I••■■III= •11111111111111111111.111■1=•I•i1■■� ■� �� �••='••s• 870 1■mill■1111■111■1�1... �� . ••. 4i 870 11111)11111011111I11111b1111111111111 '— Li■111� �111111111111111111111111■I�1I�il■11 ■�_ ,I.J_auaeurl . DITCH uill 860 I . . . ► + 313°' 860 ■_ ■■ ■■ ■__■■■_■_•■■_■■■_.I _■■ ■■■■■_■■■■■■■■■� _■■�■■_■ _■ J• vA3. ILL•il•JIl_JILTI■1_ ie�- r-r- ■__ ■■■■■■__■■■_■_ ■ ■_■ ■ _�I_■■■■■ ■ ■■■ ■ ■■■_■■_ ■ ■ ■ ■_■■�■■_■■_ �1'��- �>—_� —G" �SOli.V■rlSl• 1■� 111111■■111■1� 1�1 ■■'■IIIII 1111111111111111111■ • UUU UU_ U U U �._..�. _. _ �.. ■I..Y■-- ---�_— ���iar- 850 ___ ■■■■■1.1 ■_■_■■■_■■. I1NN■OINNNN I I R �'■■;�;� =t2: ■■_ = _�E_ _�i::5:::m _ I s5o ��� IIIIII�I�HI�IH M .,. EL =5a 50.00 1:■-■gam■■-■�■-::'��� : '`■� ��_�rllllllll�r—/ ___■ ■. _ VC = 150' I_■_■■J=■■_ ■■_■_■,I■ _..,_._ , IIIIIIII s -_er __� ■■ •_ �_■_■■��■■_ ■■_■_■�■■ _■■ ■�■� __Ma 11 Cl 19''II■ 5+50 RT ■■:__ K = 1094 ice:■:i i�::■ ::■:■i i:: mu`:1�_■�� EL,65 8,50' DS > 80 MPH ■J. .II.�■Ii�. . . a 840 m I AN, 'EL.816.72' - N- 1111111111111. ■ ■■■■ . . i■l�lla■II�III�J!CHlll�l��ara■ . �=■■:: a� 840 _ IllIJill , ■■■■■■■_■__■_■., :.�r , ■■■■■■■_■__■_■■,_ ��e■I■H1se■i�u�� MI W BEGIN SPECIAL'S' :ASE ■____■___v_ca�mee■racaa ■ _err. ■ _■■�__■_ EL. '.0 I im ■_ �■ ni■__ ■ IIIIIIIIIIIIIIH1111111.o1■I�rll II I III I I ■ CUT DITCH W/HINGE IIIIIIIi!III11H��a / I11�111111111►PI STA.56+oo RT —_I • _ .I ■ 1--I , • ■ 830 i■ ■——1111�::::11111�111111 '. 1 �1 11 111 1 111 1 / 830 • €L.-818:46 �..- ■_ __ __� _ _ __ _ rJ1u �' 1U■■J11111■I111 1 11 1 ■■ i 1 ■ ■■ ■■■ ■ ■■■ ._ �e1... _.I - - _ WA- sr�14�+I�8R .. __ 11■ •••• ■••i Y ■ ■1---9■_I� •_ �IIIIIIII�� m 11' 141V, �.r��II��■H!l � Ails � __■_ C�� : �� ` r.Y �nnn■■�� 820 N Taw.820 111111■ IIIIIIIIIIIII 111111■1 ■ „�L - i-ii11 ■'■_UE imul_.Il' _■ ■__Jam__ elL•J'' I U'IUUNI-1 / ,,- -•,: -' ■■■ -. I■■■ _■_■__Jam__ Er MI.l:lam__ _E el ■�.� �~`-- 1' i END SPECIAL LATERAL 'V'DITCH J■■■ ��,1■■1� ■ 1111� r ■ _ 11111111 R cD _ II ■■ - _ __ _ _■810 _ _ IIIII PI sTA.56+5o RT 1■1111111■■ ■ ■ ■ , _ 810 ii a— EL.828.4 — _—l�P. . .'�M11111111111111 1 I1�M. ii1111111111111111 _ _ ,—.�= n �Pl= 5l+l0.00 - �y1H1111e11111111111111111 111■111■111 C4f4 it 800 EL - 80/.50' R ;jIR. I■.IIIHIIII.11111111111111111�111111■�11■1■1111111111■111111■1==1■=i■■ i MMMMi1E I �llllllll 800 m� DS = 50 MPH �T I PIT : e: me - - SEE SHEET 11,23 FOR -YRPCA- PLAN 790 EL 811 7 ■ ■ 1 p i — 790 NOO 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 \/IY l9/d 0 PROJECT REFERENCE NO. SHEET NO. I-3819B 68 ROADWAY DESIGN HYDRAULICS 900 ENGINEER ENGINEER YRPCA— 890 P1= 66+83.09 EL = 866.58' P1= 75+00.00 P1= 76+80.00 P1= 78+50.00 '■■ VC = 380' III EL = 863.75' EL = 862.94' EL = 864.12' K = 86 VC = 200' VC = 150' VC = 130' DS = 50MPH K = 1853 K = /3/ K = 387 880 DS > 80 MPH S = 55 MPH DS > 80 MPH DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 870 870 1N- ■■-1■1111= - - - cooaa - a a=i� - -- -i■i6i7 ]biiilEli �f I I Q n •=�i-- =-- - . , .,1�■_■- - ....■�����e:�->,- -■-.��;..111 .. ��:,01111111111111111D ■r � _ ,-_ - -- - - �:: P.Ti . �= "'..-.:��.,,��■11.:�■■■nnps��rye 111111111111111 860 1 "III Ill II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillllllll 1111llllli1111111111111llllllllllllllllll11111llll 1111lllllll 860 8501111 ■ ■fie !!1I I!!!1!! I I III 850 I 1 (r 840 I l Ili! M 4•' I 840 830 830 820 820 I SEE SHEET 23,24 FOR -YRPCA- PLAN 810 810 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 -YRPB- 890 1111 Pl= 1/+30.00 EL = 869.43' '' I _= "ill�� �i I �1 III I88O �11111.111111:11111 1111111 1111111111111111/111111111 .I 1 = DS 70 MPH rc . 88O 1111111 corn `b, 870 870 11111111 ��_�eeeeee,el. :l.1.111�.9.l. iiii�i �� `�i�1 1 1�� Illllililiiiiii�ilili.muii.. n,iiiliiiiiii■1.i.1:l�Jl1111 1 " III . �I III I ll 860 EL = 870.27 860 VC = 180' ° K = 120 b 3DS = 55MPH 2 , ,I 850 850 840 840 T Y 0 830 830 U m� SEE SHEET 23,24 FOR -YRPB- PLAN Dim 2�i 820 820 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 7PROJECT REFERENCE NO. SHEET NO. f. t_ co I-3819B 69 N to = ROADWAY DESIGN HYDRAULICS 850 t. t� ENGINEER ENGINEER ■ . f. t_ - - — f. -840 p i aiI!! MPH 830 00 ii ��� : DOCUMENT NOT CONSIDERED FINAL m riilr_7si�Cey7iJiD UNLESS ALL SIGNATURES COMPLETED D .I WITi D --i f. rrrrrt• _ ---- cilsai�---�ri r, �F�-�l 1� i ft• ft•fl.h� -- `` - - 82 O YSRttRliftft• — --i f. ft• 820 ft ft• —ft di f. ft• _ - - _- _- -- aI -_ __� _ —f. —ft fir f. ft• — i\.. - _ _____ ft - — !7i f. f_— ft - — L.11 M - ft•-"- ft - =MENEM= WIN f. .. — rrD-��=1•DAND rr� 81 tt—.. o as/�JiINLMINI 81 .�� forte�.••=ffirr�fDr--- .rrr� —f. -iflfiifl!.17aff.—f.f. ft• 9_701 MOM, ft f. 7Ii7w--- 1•S�— m m. •ft• -- ft =fi__ __ -- .r—NE --f.f. ft• ' rw�� s^aMililEMENNEMENE - r� _tea=tt- ININ �_�_-- r� 800 __ _ - .� �r_�_�_ �_�_-- .rrr� 800 t�—rr— �� ��-- r� t�—ram �� ��-- r� mm acliJf..iliiwr�f..WIfa;q_silAiniiw:f� ��-- .�L 1 ===' 790 i 780 780 - —ft•ft•ft•ft• s+ r-•.eAla JAII — —ft•ft•ft•ft• 770 770 SEE SHEET 22 FOR -YRPD- PLAN — 760 760 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 860 -YRPD- 860 850 850 840 80 00 840 PI= 38+60.00 EL = 8/7.69' VC = 220' K = /00 830 cn 0 ���� wf riliPe^--- DS = 5/MPH � �_ ��r�r— rm ., O N E wpongi Lin - - ��I7iWDi --ft•ft• f.— EMENNEMENINEEN= --ft•ft• f. 820 I���� 820 --- ._,��—� -fin T _ L1iir7%III'r WINEMENEM— ---- - r'. "'v°= - 0 f— — i--ft•ft• ft• -C� p- -`-- _ ft_ — lwf--ft•ft• ft• _ �aJ- --- - ft•ft•—f. .-. �__�, haft—_—Tar.. _ __ www 810mnI -a-r�NEE/MEii.3V ter•NNEN= n.EM .IPII r�r�• — 810 / - UM fi.T..f.i -.�szr. co PI- 20+50.00 �Ni alp .r�...tr�r�r— r�r� �x�-_ -- i��-- N EL - 828.16' r��t`�"NEENNENNEmEssaimrrrr - :�:�. ram r�r— r�r�rsanitrw or�' r VC = 875' N MEN=EMENNEN r�r�_Lyiiri•Gar v f— .�— --f� 1W-.77.r1�r—ram aJ=r_=RTTRl ./S m K = /60 �wl+ew. lls l l �� ic-^-A t�r� r�f.9lii A.7 t:Ut..7.a: 800 DS = 60 MPH an■Jrw2�a.ra�.nri�.._Jf.�l:r��—� �� rrsr=aasa_ra�a�a �— 800 ��� �� Mrsir��y�arau>. r�i liliaczui N •rir wmocr �1- rtarvan --f� .rr.T�S�.Z1if/sr_^ � I 1.f N J.-st. uJ_ r7MEMED,--� ! C ldR, 7llll•]GL. —f_l a f.-t MIA N t�f_ t�7_l --f� —f— —�.tr v f_ --f�f—f�--f— — N f�f—_ f v rENNE ��70 Tito,J;r/�f t.rsa r:Tin t.oii.I lLIs: — ��r�r�o -• - -.•- -•- - =�� 790 ��.`r,r.a. 790 rn f_ --f�f— —m wo s C NENNEN � � INelatILIMI o f_ --- 780 p __ �_�_p_p_ 780 mm E. ��E� mm SEE SHEET 22,11 FOR -YRPD- PLAN mom C o 770 mm 770 N OD. 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 \/ l9/U_ Lr PROJECT REFERENCE NO. SHEET NO. 0 co I-3819B 70 ROADWAY DESIGN HYDRAULICS to 860 -YRPD-. ENGINEER ENGINEER ; . YIP".rPl, .. :ILA 850 `I: , .I. j. - !Es 840 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 830 a 6,:g II \1 830 1) 820 _ ,i ;� C.iii uiiij 820 iiib.q--., n ,' 11.1111l!° (I E. I. 810 P1= 38+60.00 810 EL = 817.69' e VC 220' ;I , K = 100 DS = 5/MPH 800 800 790 790 780 780 SEE SHEET 11 FOR -YRPD- PLAN 770 770 38+00 39+00 -Y4 RPD— P1= 12+05.00 CND PECONDTPUCT;ON EL = 795.18' /4RFD- START VC = /00' F1.800J9 K = 4/8 DS = 80 MPH PI= 14+18.00 DEC/N SRAbE EL = 796.63' -/4RP0- STAl6±00.00— VC = /70' -ICDFH- ST,A.53-59.37, 24 2 P K = /52 c EL.= 791.20' DS = 60 MPH m RR`OPOSE D—\ N CRADE 7'_ \ ------__-a -L. -I I ---- a o (+)2517 % +)0 %"0.z r>— '�,--• — 1171 I I c'ro 7 ! m rn a PI= 11+00.00 �. 4 EL = 794.72' -----1 a VC = /00' f N K = 1285 \ 1 a DS = 80 MPH I 8 .�, i ��G FGU✓D C 7 -U c S Y U S SEE SHEET 9A FOR -Y4RPD- PLAN m. O 55 N 2 NOO 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 \/0_ l9/d 0- 0 PROJECT REFERENCE NO. SHEET NO. co I-3819B 71 ROADWAY DESIGN HYDRAULICS 850 -YRPDB- ENGINEER ENGINEER 840 BE IN GRADE ER1, A� -Y 8 STA.10+60.00 T 4 L�M SS ON EL.8812.17' AIL 830 DOCUMENT NOT CONSIDERED FINAL BEGIN GRAD UNLESS ALL SIGNATURES COMPLETED BEi5IN R'e A END/HE T H rJ AA,BBB PI= 11+00.00 -YRPDB q 1-Y+w •d� -YRPDB- ST . . +53 71 820 EL = 808.08' EL.703."9 EL.794.i74' 820 VC = 150' K = /999 END BRIDGE DS > 80 MPH CC,N� GRADJ NE .w RPDB- STA.15+39.08 BCGIN'1It Yb AP1 OACH SLLAA_ 1 N.795 01' 810 _ El 7996 81 810 Al= '5+63,59 Pl= 18+20.00 P1,6O1-°05'D 1 = - E'. - 734.5`-' EL = 79/.67' _t ��� 800 fa,,, d—� VC = 445' < 800 -� _---_ - DS = 50 MPH _ _./ --� �r - 790 - -- 790 J \1/4.L i!` Emmomm PF ,E n 4FFPUA_H ', — �. J..'"SLAB '0P` R .TCC OFt _r — 780 -Y S- PR)FIL AT 780 PI= 12+50.00 --- oS _LCPC , VC = 130'.06' y� I MU3-C4'4 I ----— J- -- - K = 147 ;��=AV/AY 770 DS = 62 MPH _ _ 770 n i1:NG FOJPT n�/1n -PEE?. SEE SHEET 21,22 FOR -YRPDB- PLAN 760 I I I I I I I I I I fl I I I I I I I I fl I I I I I I I I fl I I I I I I I 760 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 860 _YPPcI_ -YRPDB- 860 84/.CE 850 850 840 -YP 0B- STA 2 1.42= 41 840 -YPPTA- STA.39+4II0.49 PI= 40+12.50 EL = 804.68' 830 PI= 26+00.00 VC = 660' 830 m EL = 8/8.72' 4--N. K = 97 VC = 340' I 1 hSCPOSCD PI= 35+25.00 DS = 50 MPH K = 85 CAD-c EL = 813.58' A DS = 50 MPH VC = 150' K = 118 820 (f)3 4F�76 -10`564% DS = 55 MPH 820 ---- -T---- _-_ --- 8=53 - 810 m 800 �' . --` �---`� T H901'ND 800 m 4 .... 1' 01 / 790 790 -o Y L 780 780 E. 0 om SEE SHEET 22,11 FOR -YRPDB- PLAN 770 71111111111111111111111111111111111111 770 N OO 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 l9/dW70 Cr PROJECT REFERENCE NO. SHEET NO. CO CV I-3819B 72 -YRPDB- ROADWAY DESIGN HYDRAULICS -YRPL0- ENGIN EER ENGINEER HH )E 870 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 860 -YRPI)R- STA. 14-,RO1V= 850 YHP/C- Sl A 4, -I8.d9 +5. r U.72o6,; r ���� V L_CC L_WG i Of,. i� _-z PI= 40+12.50 P1= 49+65.00 840 I EL = 804.68' 840 VC = 660' EL = 852.3/' K _ 97 VC = 852. DS = 50 MPH PH PU�FD ��,mac K = 87 GRADE DS = 50 MPH , 830 / 830 Y17PD0 ;TA.39I55.24= -"RPD6- 41^g°0+'56.9 " L_ TAi39+6300 tiR S<A 39+5/JO �1-- , G�OUAD 820 /7I1/v, � �.— 820 810 ---"`� %� 810 r _x SEE SHEET 11,23 FOR -YRPDB- PLAN 800 800 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 870 870 END GRADE -YRPDB- 860 -YRPD.B- STA 52+20.68 - 860 EL.850.47 xI-71 850 Gn''GCP 850 �cl---- �---- 1\r J0.720/ -- ———— PI- 49+65.00 — - -__ 840 EL = 852.31' - _- _........ 840 of PPIPS-ai VC = 500' -_ GRADE K = 87 --- N - L DS = 50MPH — —�_- 830 ' —- -_ 830 820 ts 820 co CV 810 CO V WI CV800 800 -U Y 790 790 U m. SEE SHEET 23,10 FOR -YRPDB- PLAN 780 780 N OO 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 l9/d cr PROJECT REFERENCE NO. SHEET NO. co I-3819B 73 tn n:,s.�icnn�rr .... ROADWAY DESIGN HYDRAULICS 880 We/M:.MMli O'AMI U1.1911klCI ENGINEER ENGINEER O LIKEL...�, —YLPC— assM:.c`Mca 870 P1= 12+04.00 860 EL = 846.52' VC = 240' DOCUMENT NOT CONSIDERED FINAL MK = /5/ UNLESS ALL SIGNATURES COMPLETED oos_ _12_ _ DS = 60 MPH NM!850 _ 850 'M��-!Iigar. P1= 22+32.00 �MMc_rc: 840 P1= 14+40.00 EL = 8/9.93' 840 _ EL = 830.00' VC = 250' VC = 225' K = 39 K = 39 'MiiilriN.r: : DS = 30 MPH "�� ��. _� DS = 30 MPH !� 830 -.MM.__ -: 830 i7LV�13lM'C.. ��_ 11 820 -- -- - oaoa --- ln'ng.i�ll�! 820 -:-c�c�ca-!e!e _ -e-eee.e.ea_ _ MemMsiiselMM� E9722222!2l9Oea-a7ii Gil 810 810 ZMMEMOMOMMM I in s, 800 800 1MM SEE SHEET 10,22 FOR —YLPC— PLAN 1 790 790 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 mmmm 880 I —YLPC— 880 mi 870 870 memeuau_ II.I ril!ii Imlaemi[•iinZvl9li 860 860 c 850 11 850 a;.:1 �I»la n L n II Ebi 840 m 840 inoMa o =E n M 830 iuso _ NMM..- 830 m I.M.tMwpm I 820 vamp' 820 N CO i P1= 24+86.50 a i EL = 833.2/' w 810 M 130' MK = 50 810 rn iDS = 35 MPH Y 800 800 m-- SEE SHEET 10 FOR —YLPC— PLAN 790 790 24+00 25+00 gyp/ 0 PROJECT REFERENCE NO. SHEET NO. co 1-3819B W-/ u7 ROADWAY DESIGN HYDRAULICS 890 ENGINEER ENGINEER RETAINING WALL NO. 13 880 870 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I I N.T.S. II 860 i.—�.—......�....�I 1 1 PROPOSEDFINISHED TOPOOF 860 ■ I■ ■ ■ =■■■■� 111111MMIM■1=■■MM■1■M ■■■� 3 ��• • . ' 1111111111111111■1■11■ei■ee■■eie■■ GRADEWALL ■! ..■.■.—.!!�R!UI•.i -......■l....■! 2/ _ rr-r.�rrldi EW/W_..,,.�■wl.-_ -■■■■■■_■■■■_ 111111 I 111111.. 1 11. 1 1 ,,4X 14' ■! iYi-IIGI—IIIWri .ul■r7� -...... ....�.- n 850 nEll /MEM//u-IS■c7l..ririTlnu.�iil a■! ---MM MENN ■- ro r r P.S. - 850 -�, >.,t:v.AMT.A al 12l -_ -■■■■■■_■■-_■- 111111 1_Iee1111111i1■I' ■■mm■1■n�■■■m� PAVED _ ■! —■■!i■r �idZ�=i7.�1 —i -......i....i.- A -�iiiii ■ ---ice i .� � r. 1 ■■ ■ :�1 - ■" DITCH -_ = 2 =; an ii_ -■■■■■■i 1111111I�ee11i�11■I�nll rt er ■,rrt■■ter milimmimminimm m�-1■I ■� ■11111 -I■■■Il i.i ii�lll �1�1 " 1I PROPOSED 840 840 ---m • •=- - --- ■■�■il1■ - reee■� !l�s� oa ovaiiaMMMMMMoo]ZImall�-- e•U IIi�■ MilMIl um m■�lilrll-■7■i---i.i FINISHED - ■■■■i �_- —_ l--IOSSIMMM�1-■ MIi■i- \7■Y—!■1OII M-■7■i-- ! IYVl.ii11■i- !■--!■frail-■7■i--■—_ �� ■ -- -- - --'..■ �—i 1411M P lYMNIMU UUM"■ �:■■`i�1•U i 1 1 IM !SYflr l lr GRADE 830 i ■■■■i �� . ■ ■ a J.■.■v,.■PMR UUU r�■'••■�EmIii■••.w.....,,m w.mme w■w■I�r DETAINING WALL DETAIL - 830 -- — !■ ■■ —■ —ls. li■—■ lii/r/RhooTii7/JMiiP/.7 i ■■■■i !!—ITrN - - ---.����i-i-■i—S�r�lli■-■71.■�J�:J—.■l7��1!_ II_IIII_IIIIIIIII_I__IIIIIIII MEMEMEMENEEEEEEE �� ■ .�-.:5 11. = mI oralit■■i�. I ■ I I �■IirL'S� 11■1111■111111111m1■■11111111 ■ ■1■■_ - - I rl" ---:J IIIME�G! •_���■�--� I� I 1�6 ARREM= � ■■-■■■■-■■■■■■■■■� I ii■■■EI[t•• IG - ■ �71111■�■■■■■�� 11■ 11■111111111�1■■�1111111 i �■ -1• ■ -- i1(V---�AIW■■ - -■i-- Y■ u.71 ■ 820 . _I■■ la ---■■LIN• ■■.rlK 1\I.i, �.�_' 1`�-I 1 11 1 11 ■.1 I ! I.!!� 820 ib li7i!—i illaxi s iMob.■■ ■■ rGilllN 1 i ■■■■i■!! _ •■■.—■.. UUUU _ ■■li7—W'1...■-!7i■■M�7llfii-1�� = 1� ��-----�� ■.- ..-.........�■--■■■■■■■■ .. ■ Ei■■ '"�"�.■...■.. iii■ai�. . `•iiil�_•U .iie�■�:: -:�� ��w•� -------l= !•--........ -■ . '- r --- .- .. ;-. 5-l�9 ��■■■■■��� iiiiiiiiiiiiiiiiiiiiiiiiiiiii i �■II - ■Iii. I.Ir ■■ -• ■e8,0 ■_ i■■�ieie■iiiiiiiii■i���e��: ,,:;�III�II���!��h,l�l���ii■e!■���■e�� eeeee■■ 8,0 !!!!!!!!!!!eggEHlijillIllilr"FM! 11L�l1fllllll■errllilie�leell■el•..i■ele■M■eeeee■■� 11■1111■111•••••' ...■ I■■_ 1111111111�■■e111111e■Iee11■■1 r MM� 11■1111■IIIIIIii.i..111111ii 800 1m-r■i 1 ■ !!�70_0,..0..iii•••,..N..,,i,,,v...N.,9,! 800 ,,,ti,/,) \\\ \‘‘.\\\ :,,,,,, 0______ .L....1.,... ..,. .7,....,m,,,,,,,Ht.,_______,,,, .4: 10+00 11+00 12+00 13+00 14+00 15+00 1r,7 - 'lire" \ -\- rT —-—__ ficivi, ..--Ipy/ jiff mr......ww.. , NVilibll. .....-4). .41%--v , ,,, , \ .,,, \ \\\ , , , 4",- ,,,,.. : ,,,,f\ \ ----- F * Astor ......„,‘„,„,..„,„ ._L._ -,\ \ „,:,,.;„..... 0 ;10111,„„,00-47-0-N„ - 1,4„ews\... ..io, \\ NN0 ,,,,,N, ,,,, , , ,„,,s,0 , ,,, . , N. .,,, „ . , ii ,_____..______„eff, ,,. . ...„ __________ _ _______ / N NN N , , so,,,, 4.1 _ _____ _ 5., ....46....,.._ ........ . „ .„,,,,,.. „ „,,,, .„ ,N, „.., . ..,...„...„„ ___________ _____._ „„ �� A BEGIN RETAINING WALL N0.13 O 7\j: oMoo�,A __ ii ��� �I1 � N \V ' \�cr 7, �\ RETWALLI3- STA.10+00.00= Off' � - o ���/ \V L. \ A\\ \ -YRPDB- STA.55+92.45 x� iatft a ;, \ \\ \�dsa,m 4�\ ,4?c OFFSET = 27.50'LT. RPAC 5 \o, A °„\ �R,Go co PI Sto 11+13.7/ 55+00 �i a��a j A Vq,4 v A _ /6°04'12.6"(LTARDRAIL N '+- ENG STAINING WALL NO.13 / \ \L = 225.92' Ln ° N. o TWALLl3 STA./5+22.4 \N / ___ T = //3.7/' rn No 03 o i- / 'YRPDB- STA.59+3/.16�0 �\ \ dJas=_= R = 805.50' N M v v // OFFSET = 27.50'� \�\kW rsF i o------_---2— _ o d ° o o F 1d1 I..---- Q_ al oJa—ssro _ M_ aiNK _ 4 am..�wcr :.v.3e, .�una _ _ 8d N ,,i 1-- -- ---- SAWCLU q�y a°Q3 .3.L it Jioa 103 aJa.os ?YRPDBw ~ 1 I --�_ - 2 W•"► S 39°32'2/.5"W S 39 ='_ _ -- -- II YRPB....„.. ,...„.. ,...„, ,4 .,.1,1.,„_„,.... N.,,N,, 0 7, , , 0 __-- + .v� —� y/ . . ��—����--�=�-__�d1�0 N _�-- 2O O lltlM JNOJ --�J, �� LJ UU IIVM JNOJ //�/ _�lltlM N 30+00 NJ � '�-asq _/ \ \\ II LS8,SZ£80 At,MN370 LBO 85 //,dv �� _ t� --\ CS -INN,3N�' 11 T� -0' _�—��-- VO8.9 draaiajryJ �� ��� \�; Y dtladla J --\----_ — a -x=3 dyaala 777- dTJdla —."- ! evaala -A` JM _ e.. ���— �� dtl21dli1 F -- ---- dJ u8\ \ a�sl AZT \- dvaala a� aci e czlz ea r� r� � —— 3 3 3 PI StCI 1/+6/.7�J 3 —— dbadla dJ \ \\ 1N3N33 3 Alll.10U3V —M—__—_—_ \ � —�3 I 0 = 2°05'30.5"(LTl L �— M___ i��/ e° O °u��3— L = 73.64' \ �_ � Ja T/adla ANVdW00 1N3Wdlflb3 NaVlO T = 36.82' d�� _ o� R 2,0/7.00 �I �/� \ N no / / \ QI:' 1 �\� ' ' I PROJECT REFERENCE NO. SHEET NO. 2 38/98 W 2 I I I I I ROADWAY NGNEERSIGN YDRA ENGINEERS 890 _ RETAINING WALL NOI . 15A I I RETAINING WALL NO. 15B . . • ■ ■ ■m I`1 I�����1III■1II■1■f■I i I INE 1 I _ 2,aim ■ um ii� � 1 • .. Fli ? ■ ■ ■ ■ I I m: rn UNLESS ALL SIGNATURES COMPLETED NE ■��ii ■���'��ii o - END RST Auminyinirni�rm n.,: RL=Al vl tiC WALL ^:. / ,. = w C DT CT A N'PlG WALL NO 51 NEE ■�--■���sl��o - w WALL!.€' Si 4 0 (A Aifr�W�_ ` -RF NA✓i[`'B S. ,& 2fi9.5I- 860 :.1 ■�--���1MJ ■■INII o m • -RETWALLL5A- , Ae/3+ I:I': _ RPDfl STA IMMW - - - - �� __ r - - _ _ — '-_M��min II -■ -YRPDB STA._4 50■■ 00,_ Lra�a�r �' — — �.iJaiv�r�■ir ■ ��■�■1 = — k ■■■=r1=e -- OFFSET -■.'. 'r ••-- :■arc In.- M,M MAIMUI� ■tea YMU l► r�li • ��Iiii•LCINERNMESONEWiliMMEMMEMEMEMMODBM ■� ■ "��� EL 849.50' . �••MMINEMENEM - All—_1:11111a_mrrrr_i 1 N.T.S. - NEEEE c•mrtemmpsn•am1airmr•.•spp1•rmsr ■11 • • Ar ■ mow-. 1Millnii■�r�—RIIi e•wl'I EW4E■i �i= •■• •■ — �� PROPOSED PROP. 850 • �.■ ■��.,_ . ■ ■ FINISHED TOP OF= �imil� ��� ._.� GRADE WALL = r- •i I r1111111141111111 r=�■ii �i= J� — ----- _■_yam--- —..Rc—• —�� s_ ■■■. :40 =P"L" 1/l/.T- - .■. rirrara qX 4'nomommEmEmEmEmEm _ 840 cL. 834,5U' Egli- � t[S/ B ? bR/'Ut P.S. LDG4 0; PSI✓LIALN; Ar vi� � PAVED �EDC '0' PAVE DITCH ADO 0- PAVE 830 •o��, ■■■ ■■■ = 830 )(1ST. 'B 91 PROPOSED — I AT WA L FINISHED = • GRADE . I 820 RETAINING WALL DETAIL — 820 N0,l5A AND NO.158 810 ■ ■■■��■ 810 800 ■ ■■■��■ 800 10+00 11+00 12+00 13+00 14+00 10+00 11+00 12+00 13+00 IS 1111 \��,♦ \ A���, N; '4 _ Zi \ .'.._�=== eo \�1 �.��"' PI S10 /1+10.44 0 c, 0,e//o/ / / ` P I rt ,1 M a�Q ��. A ..�. .� F� e: �.,� e o ��d ����� ���; � 0 /5'36'49.0"(LT) �' / `/ / ,?/'-'-'. / f . 01 ' / \ �` N \N , e-ats`„ \\ XOp K .900 .'0:.1610 ^ L =219.44' �/ // /`// �/ � atiZ1 ��•;�, \�\. � °�a'd•'.•`. y h ;�.A ►�s: R = 805.50 / / // c a/ i, , I, vi �1/1; `� �''°Fa \ \ \,„`��.,i.r; \ S ���5/ �■®��-. -. 4101.0.-- ( j �/0 z •ill / / /'� l/ �.���� rtik _� 7. IIIIII 'fi 1 W` .,,''a'', , ` \ ` S M��Y����e_�\\�.wa} =jam ���_=_�.:.o L9g,nN$ _`1 '.'/ // . v // // //�- // // ' �'- a wf� _�.�� .I� �� Ate-o —— -- 'A , / / ___----kkk..: \--....1&--11- ., - 1 t RI I i r s„..--•s i - ..,--; .`: fra, N 81° • \4 7 �� NN :. , ;\=�_ iai'y� ��� �" 20 g/ /l /l /l / - \ \\� • l \ a �0✓I..••••S��', / \° OTC\ �/ // // // /// -a —N .,��v :,,,j° - o vv� - -- —� 50 00 ��0***00� �I as a,5�,,,, /A-� w,,c' // / �/ // / �QQ ____-_=___________,_____ \\� •£y9`8' /� \ P=B'—ANN��i„ .•.• 11.11111 \ i 5,,5-- w // // / / // am, \ 8r 5• \ 1S810N00 9 / \ ro, •-nw � --__ __ — � �1 ^' I END RETAINING WALL NO! B l / I —\����\�� s N _ avaala__ avadIN \ \\ l RETWALLl58 STA./2+ .5/= / / // _ __' \ ——— —�— _ ———— — YRPDB STA.52+30.0 / II l b°zzg°w �a" e \�� \ �\ RETWALLl5A —� dVaaa 0la03daaHe�Yg �\J OFFSET = 27.50'LT./ / I 1 /l / S BEGIN RETAINIeWALL NO.15A c ' \ PISto 11+77.83 �\ �\ L\\ \ / 0 X`rl,,h /� l in`n RETWALLl5A STA.10+00.00= �\ PA • 0 = 24°53'57.3"(LT) 6£e=�a°'6£0'0 m p �A -YRPDB- STA.45+88.00 \�� D = 7°06'47.1" 0<""0 "\ \\\ avaala m , /I wy-, / /�1 IFFSET 27.50'LT. \� so L =350.05' 55- ( \ w / / / / ° =:. / x \ � R 805.50' avaala� \ye-apt � 1� N� N I �� /�N / . END RETAINING WALL NO.15A `'° l a0Na�� / ' 'sl / A jRETWALLl5A STA.13+50.05 = k' 3 / I� I ° 3Y_ -YRPDB- STA.49+50.00, �" , Az I // // I I L9Zg8.nw mt ----- q OFFSET = 27.50'LT. \ �s ��� /1 l �� j / Q e� 3a,ro 1 � � dtl21.{ b 1 .93 F `.,, BEGIN RETAINING WALL NO.158 a0s I N ,I i OD oia o a RETWALLl58 STA.10+00.00= 6a �o' l ,:I, 85's s9a�N\s, N I // I N oo YRPDB STA.50+03.00 •�� �� v 1' � �53a,Mp��� OFFSET = 27.50'LT. A rtit v 1 v s See Sheet 1-A For Index of Sheets STATE STATE PROJECT REFERENCE NO. NO. SHEETS o- / 1 i See Sheet 1-B For Conventional Symbols STATE OF NORTH CAROLINA SHEET TOTAL 'sad sa N.,DI,-,VISION OF HIGHWAYS I-38196�U— 039 M STATB PROl.N0. P.APROl.N0. DESCRR�l•ION O �� O7 ,� BEGIN PROJECT .., sz <-O� / 34192.1.2 IMS-40-2(124) P.E. Mi °�'e 34192.3.2 WA DESIGN BUILD 40 S 1 e' STATESVILLE IREDELL COUNTY 4ii ,„, 7/^ \,41 m,m, 21 SULLIVAN RD . \ 27 LIMIT tm �: �; sO''' LOCATION: I-40/I--77 INTERCHANGE INCLUDING 1-40 FROM WEST OF g SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & 1-77 FROM SOUTH OF t1I 1' °<y� �e-11�� SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERE RD.) 1 Z' ® `,,,, ao 64 � ,f°� TYPE OF WORK: GRADING,DRAINAGE,PAVING, STRUCTURES, ^141 '1 (/f��� // lik 40 Nor/Wk,,SV--__% N / i RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL I END PROJECT �/ /l \ - EIIIIIII "; , ` ,1.\ \I' t F Vance \ �' 4 ,�'�``� BEGIN TIP PROJECT I-3819B V ..4� :fit 64 ray -L- STA. 7+83.00 L'IT4 4,'7 O VICINITY MAP P° THIS PROJECT IS WITHIN THE MUNICIPAL ���' � /114141 BOUNDARIES OF THE CITY OF STATESVILLE o AND THE TOWNSHIP OF BETHANY Q y= ti �� A`� 4� ti .y1 i= 1 /� tioo gv r� a ,s 1 G C" SSl9l o 4.4-.Ly,„ �il o tib r � I LCDWB- /:\11:1\:::'-17' i,o' `1 % �'�"4 , A4 io ti RIGHT OF WAY PLANS SUBMITTAL B4� — � 2� SUBMITTED: 06-17-19 Ar -�;.� ,�� SUBMITTAL # L-050 DAI'IEAID i j'.'9 s, rya '� �.>> ,... ,. 88R R 2321y9I3S a �'cBEGIN BRIDGE 1-o -Y9- STA 25+37.33 . yyti S1J mEND BRIDGE -4. s�i� m Sa GOVt �. •/� END BRIDGE 21 O ■�■� Wlcn -Y9- STA 28+45.58 M �� ►�Lr�b\ 32 ��?6 Y10- STA 28+16.85lk 0 *�j���N s "ea. /0; ��°'. i BEGIN BRIDGE END TIP PROJECT I-3819B r ll jrL lf.�italeatJ�� lir� LI e ���1� �A -Y10- STA 25+77.48 ` ,, —L— STA.219+50.00 �� 114j ��.- 40,c CLEARING ON THIS PROJECT SHALL BE PERFORMED i !'7 CZ TO THE LIMITS ESTABLISHED BY METHOD III.o ��,,� 40 it - CV THIS IS A CONTROLLED ACCESS PROJECT Q`y • ySTON( 1 WITH ACCESS BEING LIMITED TO INTERCHANGES ono sq4gy " S I LANE 0 GD v N c • • DESIGN DATA Prepared in the Office of: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS V GRAPHIC SCALES 1-40 1-77 PROJECT LENGTH WSP STATE OF NORTH CAROLINA `o ADT 2018 = 57,300 62,900 1001 Morehead Square Dr.,Suite 610, Charlotte,NC 28203 Go NC LIC NO.F-0165 50 25 0 50 100 �®Nr C ■L ■J 2040 = 72,500 77,500 LENGTH ROADWAY TIP PROJECT I-3819B = 3.885v. ■ 1■ 1120I8 STANDARD SPECIFICATIONSPLANS LENGTH STRUCTURES TIP PROJECT I-3819B = 0.124o DHV = 5,800 6,200 PESIGNATURE: .co Eill4 50 25 0 50 100 D = 55 % 55 % RIGHT OF WAY DATE: CHRISTOPHER D. DAVIS,P.E. 'o * o ** TOTAL LENGTH OF TIP PROJECT I-3819B = 4.009 PROJECT ENGINEER ROADWAY DESIGN` � ��� � � T = 16 /° 19 /D OCTOBER 30,2018�� PROFILE (HORIZONTAL) V = 60 MPH 60 MPH 47 ENGINEER10 5 0 10 20]a-ADT * TTST 13 + DUAL 3 (1-40) LETTING DATE: ERIC W.SECKINGER, P.E. ND� `i lii i — ** TTST 16 + DUAL 3 (1-77) OCTOBER 30,2018 PROJECT DESIGN ENGINEER N1°on PROFILE (VERTICAL) CLASSIFICATION: INTERSTATE PE P.E7.IY fSIGNATURE: STATE HIGHWAY DESIGN ENGINEER t9/d LANE `` I PROJECT REFERENCE NO.38/9B SHEET NO I—A R,W SHEET NO. ROADWAY DESIGN INDEX OF SUBMITTAL 'B'ROADWAY SHEETS GENERAL NOTES ENGINEER 1 TITLE SHEET GENERAL NOTES: 2018 SPECIFICATIONS EFFECTIVE: 01-16-2018 1-A INDEX OF SHEETS AND GENERAL NOTES REVISED: GRADING AND SURFACING OR RESURFACING AND WIDENING: 1-B CONVENTIONAL SYMBOLS THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED 2B-1 THRU 2B-16 TYPICAL SECTIONS,PAVEMENT SCHEDULE & DETAILS SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES DOCUMENT NOT CONSIDERED FINAL ARE SHOWN,THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE UNLESS ALL SIGNATURES COMPLETED 2D-1 THRU 2D-4 DRAINAGE DETAILS PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. 4 THRU 9A;13 THRU 21;25 THRU 32 PLAN SHEETS CLEARING: 33 THRU 36;42 THRU 47;52 THRU 54;58 THRU 60;74 THRU 89 PROFILE SHEETS CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. W-3 THRU W-7 RETAINING WALL ENVELOPES SUPERELEVATION: CROSS SECTIONS TITLE SHEET XB-0 ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH -L- (LT)CROSS SECTIONS STD.NO.225.05 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS. XA-1 THRU XA-9 SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. -L- (RT)CROSS SECTIONS XA-64 THRU XA-72 SHOULDER CONSTRUCTION: -Y_S- (LT)CROSS SECTIONS XA-128 THRU XA-132 ASPHALT,EARTH,AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD.NO.560.02 -Y_S- (RT)CROSS SECTIONS XA-142 THRU XA-146 SIDE ROADS: THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE XB-1 THRU XB-177 -L- SUITABLE CONNECTIONS WITH ALL ROADS,STREETS,AND DRIVES ENTERING THIS PROJECT. THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS XB-178 THRU XB-281 -Y S- INVOLVED. XB-282 THRU XB-315 -Y N- BERM DITCHES: BERM DITCHES SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.240.01 XB-316 THRU XB-343 -Y9- (-Y9A-,-Y9B-,-Y9C-,-Y9D-,-Y9E-,-Y9G-,& -Y9H-) AT LOCATIONS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. XB-344 THRU XB-355 -Y10- SUBSURFACE DRAINS: XB-356 THRU XB-357 -Y10DR1- SUBSURFACE DRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.815.02 AT LOCATIONS DIRECTED BY THE ENGINEER. XB-358 THRU XB-359 -Yll- UNDERDRAINS: XB-360 -Y9LPA- UNDERDRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.815.03 AT LOCATIONS DIRECTED BY THE ENGINEER. XB-361 THRU XB-362 -Y9LPC- SHOULDER DRAINS: XB-363 THRU XB-368 -Y9RPA- SHOULDER DRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.816.03 XB-369 THRU XB-372 -Y9RPC- AND DETAILS IN PLANS AT LOCATIONS DIRECTED BY THE ENGINEER. XB-373 THRU XB-374 -Y15RPC- DRIVEWAYS: DRIVEWAYS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.848.03 AT LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY THE ENGINEER. STREET TURNOUT: STREET RETURNS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD.NO.848.04 USING THE RADII NOTED ON PLANS. GUARDRAIL: THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL. END BENTS: THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS,DETAILS,AND CROSS- SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION APPROACHING A BRIDGE. C a UTILITIES: = UTILITY OWNERS ON THIS PROJECT ARE cn AT&T CITY OF STATESVILLE POWER CITY OF STATESVILLE WATER/SEWER A DUKE ENERGY DISTRIBUTION DUKE ENERGY TRANSMISSION ENERGY UNITED A IREDELL WATER CORP PSNC GAS SPECTRUM /TWC A � ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS,EXCEPT AS SHOWN ON THE PLANS. A RIGHT-OF-WAY MARKERS: A ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT. CURB RAMPS CURB RAMPS ARE SHOWN ON THE PLANS AT APPROXIMATE LOCATIONS. CONSTRUCT ALL CURB RAMPS ACCORDANCE WITH STD 848.05 and/or 848.06. oQ �63 pia PROJECT REFERENCE NO. SHEET NO. STATE OF NORTH C RO LINA, DIVISION OF HIGHWAYS 38158 e CONVENTIONAL PLAN SHEET SYMBOLS BOUNDARIES AND PROPERTY: Note:Not to Scale *S.U.E = Subsurface Utility Engineering WATER: RAILROADS: State Line Water Manhole Standard Gauge 1 1 1 1 1 1 1 1 Hedge g TRANSPORTATION CSX TRA County Line 0 W W W W Water Meter o RR Signal Milepost MILEPOST 3s Woods Line Township Line Water Valve Switch 1 I Orchard O O O O City Line SWITCH Water Hydrant O RR Abandoned — — — — Vineyard eyerd Reservation Line U/G Water Line LOS B (S.U.E*) w Property Line RR Dismantled EXISTING STRUCTURES: P Y U/G Water Line LOS C (S.U.E*) Existing Iron Pin 0 GIG MAJOR: U/G Water Line LOS D (S.U.E*) RIGHT OF WAY & PROJECT CONTROL: Bridge,Tunnel or Box Culvert CoGC P/C water Computed Property Corner Above Ground Water Line 0 Secondary Horiz and Vert Control Point • Bridge Wing Wall, Head Wall and End Wall ) NW Property Monument ECM TV: Parcel/Sequence Number ® Primary Horiz Control Point U MINOR: Primary Horiz and Vert Control Point a Head and End Wall / CONC HO / Existing Fence Line TV Pedestal Proposed Woven Wire Fence o Exist Permanent Easment Pin and Cap 0 Pipe Culvert TV Tower U/G TV Cable Hand Hole El New Permanent Easement Pin and CapO Footbridge Proposed Chain Link FenceU/G TV Cable LOS B (S.U.E.*) TV Proposed Barbed Wire Fence O Vertical Benchmark I Drainage Box: Catch Basin, DI or JB I C6 p U/G TV Cable LOS C (S.U.E.*) - —- Existing Wetland Boundary w e- Existing Right of Way Marker 0 Paved Ditch Gutter U/G TV Cable LOS D (S.U.E.*) TV Proposed Wetland Boundary WLe Existing Right of Way Line Storm Sewer Manhole g * o__ New Right of WayLine U/G Fiber Optic Cable LOS B (S.U.E.*) TV Existing Endangered Animal Boundary EAB g O Storm Sewer U/G Fiber Optic Cable LOS C (S.U.E.*) o— Existing Endangered Plant Boundary EPB New Right of Way Line with Pin and Cap W A UTILITIES: U/G Fiber Optic Cable LOS D (S.U.E.*) TV F° Existing Historic Property Boundary "Pa New Right of Way Line with ® w R POWER: 46 GAS: Known Contamination Area: Soil ;� s Concrete or Granite RM/ Marker @; Existing Power PoleGas Valve 0 Potential Contamination Area: Soil s New Control of Access Line with ® Proposed Power Pole Concrete C/A Marker A p b 0 Known Contamination Area: Water -;9, W '.�. Gas Meter Existing Control of Access ,\c,, Existing Joint Use Pole U/G Gas Line LOS B (S.U.E.*) A Potential Contamination Area: Water -M w Proposed Joint Use Pole New Control of Access CO U/G * Contaminated Site: Known or Potential 7 U/G Gas Line LOS C (S.U.E.*) - - Power Manhole Existing Easement Line c U/G Gas Line LOS D (S.U.E.*) BUILDINGS AND OTHER CULTURE: New Temporary Construction Easement E Power Line Tower Above Ground Gas Line Aic Gas Gas Pump Vent or U/G Tank Cap 0 Power Transformer E New Temporary Drainage Easement TDE o SANITARY SEWER: Sign U/G Power Cable Hand Hole New Permanent Drainage Easement PDE Well ° H-Frame Pole •—• Sanitary Sewer Manhole OO New Permanent Drainage /Utility Easement DUE P Sanitary Sewer Cleanout CD Mine /X' U/G Power Line LOS B (S.U.E.*) New Permanent Utility Easement PUE Foundation I U/G Power Line LOS C (S.U.E.*) --P-- U/G Sanitary Sewer Line Gs New Temporary Utility Easement Aic 50 ,e y sewer Area Outline r I U/G Power Line LOS D (S.U.E.*) PAbove Ground Sanitary Sewer New Aerial Utility Easement AUE Cemetery SS Forced Main Line LOS B (S.U.E.*) FEE TELEPHONE: SS Forced Main Line LOS C (S.U.E.*) --Fss-- Building ROADS AND RELATED FEATURES: Existing Telephone Pole SS Forced Main Line LOS D (S.U.E.*) School � Existing Edge of Pavement F55 Church 11 Proposed Telephone Pole Existing Curb MISCELLANEOUS: Telephone Manhole OO Dam Proposed Slope Stakes Cut Utility Pole • HYDROLOGY. Telephone Pedestal IIIProposed Slope Stakes Fill F Utility Pole with Base n Stream or Body of Water — Telephone Cell Tower Proposed Curb Ramp 0-Cr.R UtilityLocated Object O Hydro, Pool or Reservoir 7 U/G Telephone Cable Hand Hole El I Existing Metal Guardrail T T TUtility Traffic Signal Box ❑s Jurisdictional Stream — — U/G Telephone Cable LOS B (S.U.E.*) T �s Proposed Guardrail T T T TUtility Unknown U/G Line LOS B (S.U.E.*) ,MTL Buffer Zone 1 Bz 1 U/G Telephone Cable LOS C (S.U.E.*) -—T—— Existing Cable Guiderail U/G Tank;Water, Gas, Oil Buffer Zone 2 BZ 2 U/G Telephone Cable LOS D (S.U.E.*) Proposed Cable Guiderail nnnnUnderground Storage Tank,Approx. Loc. En Flow Arrow - U/G Telephone Conduit LOS B (S.U.E.*) T Equality Symbol A/G Tank;Water, Gas, Oil Disappearing Stream U/G Telephone Conduit LOS C (S.U.E.*) - - S Tin �_,� Pavement Removal �� Spring U/G Telephone Conduit LOS D (S.U.E.*) Geoenvironmental Boring VEGETATION: Test Hole LOS A (S.U.E.*) m U/G Fiber Optics Cable LOS B (S.U.E.*) o_ Single Tree O Abandoned According to Utility Records AATUR Proposed Lateral,Tail, Head Ditch >> > > U/G Fiber Optics Cable LOS C (S.U.E.*) -—T Fo—— False Sump — m Single Shrub ° U/G Fiber Optics Cable LOS D (S.U.E.*) F Fa End of Information E.O.I. PROPOSED SIGNAL I ) LANE PROJECT REFERENCE NO. 38/98 SHEET NO. 2B—1 RAY SHEET NO. ROADWAY DESIGN PAVEMENT DESIGN PAVEMENT SCHEDULE ENGINEER ENGINEER Al 14" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITH DOWELS) P1 PRIME COAT. AT AVERAGE RATE OF 0.35 GAL. PER SQ. YD. A2 111/2" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITH DOWELS) R1 1'-6" CONCRETE CURB AND GUTTER. A3 13" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITH DOWELS) R2 2'-6" CONCRETE CURB AND GUTTER. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED A4 14" PORTLAND CEMENT CONCRETE PAVEMENT (JOINTED WITHOUT DOWELS) R3 5" MONOLITHIC CONCRETE ISLAND (KEYED IN). PROP. APPROX. %" OPEN-GRADED ASPHALT FRICTION COURSE, B TYPE FC-1 MODIFIED, AT AN AVERAGE RATE OF 90 LBS. PER SQ. YD. R4 PROPOSED SHOULDER BERM GUTTER (SBG) EXTENDED 1-FT. BEYOND EDGE OF TRAVEL LANE Cl PROP. APPROX. 114" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, R5 CONCRETE EXPRESSWAY GUTTER. AT AN AVERAGE RATE OF 138 LBS. PER SQ. YD. C2 PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5D, R6 SINGLE FACED CONCRETE BARRIER (SFB) AT AN AVERAGE RATE OF 336 LBS. PER SQ. YD. C3 PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, R7 CONCRETE MEDIAN BARRIER (T, T1, T2) AT AN AVERAGE RATE OF 330 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE,. TYPE S9.5B C4 AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. PER 1 DEPTH. TO BE S 4" CONCRETE SIDEWALK. PLACED IN LAYERS AT A MINIMUM LIFT OF 1" NOT TO EXCEED 2" IN DEPTH. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE,. TYPE S9.5D, C5 BE PLACEDR INE LAYERSRATEOATI Al2MINIMUME LIFTT OFD 1.5ER NOT TOP EXCEED T EARTH MATERIAL. 2" IN DEPTH. PROP. 1.5" DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5D, C6 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. U EXISTING PAVEMENT. D1 PROP. APPROX. 3" ASPHALT CONCRETE INTERMEDIATE COURSE, V MILLING BITUMINUOS PAVEMENT (DEPTH VARIES) TYPE I19.00, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. D2 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE,TYPE I19.00, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. W VARIABLE DEPTH ASPHALT PAVEMENT (SEE STANDARD WEDGING DETAILS) D3 PROP. APPROX. 21, " ASPHALT CONCRETE INTERMEDIATE COURSE, Y MILLED RUMBLE STRIPS TYPE I19.00, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, D4 TYPE I19.0C, AT AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS AT A MINIMUM LIFT OF 21,9" NOT TO EXCEED 4" IN DEPTH. El PROP. APPROX. 3" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, -Y15RPB-,-YI5RPC- AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. PROP. AVERAGE 4" ASPHALT CONCRETE BASECOURSE, TYPE B25.00, ID a E2 AT AN AVERAGE RATE OF 456 ONCE PER AS.. CD. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE B25.0C, E3 AT AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH. TO BE PLACED 11=1•11=1=11' IN LAYERS AT A MINIMUM LIFT OF 3" NOT TO EXCEED 5 1/2" IN DEPTH. „WA/IW% �, /_ PROP. APPROX. 12.5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, _ — E4 AT AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH. TO BE PLACED IN LAYERS AT A MININUM LIFT OF 3" NOT TO EXCEED 5 1/2" IN DEPTH. _---- ji;N''''' Tr:dllIllh'-gillijillIllIlliillIlIl____3"MIN. 2.5"MIN. 2.5"MIN. c U' PROP. APPROX. 13.5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, 3"MIN. E5 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED 0 IN LAYERS AT A MININUM LIFT OF 3" NOT TO EXCEED 5 1/2" IN DEPTH. Detail Showing Method of Wedging co N 0_ G1 PROP. 8" CEMENT TREATED BASE COURSE. T °' Jl PROP. 6" AGGREGATE BASE COURSE. C -Y9-,-Y9A-,-Y9B-,-Y9C-,-Y9RPA-,-Y9RPC-, 'OS -Y2Y9LPA-3_Y9Y5C,,Y6-OB-,-Y10-,-Y11-,-Y1-, ro J2 PROP. 8" AGGREGATE BASE COURSE. a G, NJ3 PROP. VAR. DEPTH AGGREGATE BASE COURSE. -- ��f1! —� 7 M J4 PROP. 6" #57 STONE _ —_ In 3"MIN. 2.5"MIN. 2.5"MIN. -o 3"MIN. D1 K1 12" TYPE 1 AGGREGATE SUBGRADE. Detail Showing Method of Wedging M3 MILING 3" C "om N1 NON-WOVEN GEOTEXTILE DRAINAGE LAYER Vi"U cn L.303 Moo \/CC lD/D- I ) LANE PROJECT REFERENCE NO. SHEET NO. C2 3" S9.5D I-3819B 2B-2 C5 VAR. S9.5D " -L- RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS C6 1.5" S9.5D 1 ENGINEER ENGINEER 10' 6' 18' 14' 12' 12' 12' 36'+/-MEDIAN 12' 12' 10' D1 3" I19.0C 17'WGF{ 1 / +- Ir D4 VAR. I19.00 FDPS P-L-WBL& EBL E3 VAR. B25.0C Z CO E4 12.5" B25.0C v O , C2 O*1 POINT peso O t t O R7 MEDIAN 9 ID IIIIII IIIIII1111= 2.7 w 4% 2/0 2% 2% EXIST. EXIST. EXIST. CD 0 CONCRETE BARRIER 0 __ - + — 6.7 Z 1 I DOCUMENT NOT CONSIDERED FINAL T EARTH MATERIAL IIIIII=IIIIII=1111= x 6, ���r r J L ___— —J—_JM I 2 �'�'h UNLESS ALL SIGNATURES COMPLETED U EX PAVEMENT // CD O /„"'--, / ` � I 61 18.5" IIIIII11_1 _ -- W WEDGING IIIIII IIIIIIIIIIII= 'y^ 2.5"MIN. 2.5"MIN. Y MILLED RUMBLE U 3"MIN. STRIPS \ F 3"MIN. 111111=IIIIII1111= p J Detail Showing Method of Wedging w w GRADE TO THIS LINE "1.5"MIN.OF S9.5D 30, _ ° TYPICAL SECTION NO. B-1 -L- 1-40 -L- STA. 7+83 TO 24+00 WBL -L- STA. 18+77.41 TO 24+00 EBL 1-L- MEDIAN VAR. 24'-48' ,� 10' �,_6' 18' _,_ 14' �,_VAR.�,_ 12' .,_ 12' _8' 8' VAR.y 12' VAR. 14' �� 18' _ 6,� 10' 17'WGR 0'-12' 0'-12' 0'-12' 17'WGR HO / /FDPS FDPS C/ L FDPS FDPS Z x H F POINT .0 G !DER' L 9% W GRADE Y O� `O POINT ED O 111111 1111111111= 2. 4°0 GRA?% 12% .o/� 40/ 2% 2% 4% .5 =IIIIIIIII 111111 IIIIII_11111111111= 6:7ittlit686.6._. 6!\��L JV \185 185' 18518.5 6 7 V� IIIIIIIIIIII11110= ti‘ Cb ?'7 =11111IIIIIIIIIIII �I / F U x \t V IIIIII111111=11110_ Q J p 0 01111=111111-IIIIII w LT (4 73 GRADE TO THIS LINE -n v 0 p — GRADE TO THIS LINE F O — w u)2 30' *MAX.6:1 SLOPE 30' CL -L- TYPICAL SECTION NO. B-2 1 48' ' -L- 1-40 I VARIES VARIES -L- STA. 24+00.00 TO 2 8+70.00 - 10' ,6' 18' 14' 12' _ 12' _ 12' 24'MEDIAN 0'-12'__ 12'_ 12' 0122' 14' _ 18' 6'_ 10' T -0 17'WGR 17'WGR F m z V) O F a,1,1 5 15 )I( )1( / t At At At U LLI D_ Z Ow 12' _ 11' ® 11' 12' FDPS P FDPS 7 I C2 Y • POINT O ED L E DC2IIIIII IIIIII11 = 2•, 2% 2% % O A B % 2% 2% O�/0 r 21 -I11IIIIII IIIIII m 111111=111111 1111— 6.1 6��� L J "�� �L--- ---J����� - �6. 6'� -1111IIIIIIIIIIII cfp N I e'` O Dl \0 Dl Dl iNHI 6 7 01 1111 1uu1=1113 110— ti° 18.5' 4 ?', —11muouuou In p E4 " 4 ::1 \ F 18.5 F m IIIIII-IIIIII=IIIIIIIII= z J TOTAL PAVT DEPTH O J 1111IIIIIIIIIIII y w ix GRADE TO THIS LINE w u- Z O Z O 30' TYPICAL SECTION NO. B-3 = , 30' - -L- 1-40 cn s Q -L- STA. 28+70.00 TO 30+11.51 --03 ,..0, N r LD/O 14" PCCP " S I / LANE PROJECT REFERENCE NO. SHEET NO. Al 38/98 28-3 W/ DOWELS A4 14" PCCP JOINTED RN✓ SHEET NO. WITHOUT DOWELS ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Cl 14" SF9.5B El 3" B25.00 /r� E3 VAR. DEPTH Y -L B25.00 K1 12" TYPE 1 48 NON-WOVEN VARIES N1 GEOTEXT I LE 14' 12' 12' 12' 12' 12' 24'MEDIAN 12' 12' 12' 12' 0'- ' S' 10' DRAINAGE LAYER -- -- �_ �_ ►� ►� ►. ►� ►. 12►. 14' 18'►� _ _� RS SINGLE FACED 17'WGR F R7Z CO DOCUMENT NOT CONSIDERED FINAL CONCRETE d UNLESS ALL SIGNATURES COMPLETED CONCRETE BARRIER Li i^ Pi / t )1t 111 MEDIAN (O T EARTH MATERIAL Z _ 12t t )11t ' LL U EX PAVEMENT 11' 11' FDPS 1 Y MILLED RUMBLE PS PS \J STRIPS CROWN GRADE POINT ()CD m0 POINT Al CD V 61IIIIIIIIIIII III•\ 2% q/ 40� 2% 2% I 2% 4/o o Q7 V / // ®® SHOULDER 1T— 0 `If. - III111111IIIIII 18.25"p 15.25" MIN. 2•7 / i 'I SHOULDER ® co F / DRAIN —toO J =111111IIIIIIIIIIII GRADE TO THIS LINE a LL UJ CC O O Z LL = 30' TYPICAL SECTION NO. B-4 —L— 1-40 —L— STA. 30+11.51 TO 56+50.00 CL -L- 48' Q. -LCDWB- 24'MEDIAN -LCDEB- 14' 14' _ 12 __ 12 __ 10'_2'_ 12' __12' 12 12 12' — 12' 12' VARIES _ 12' 12' FDPS, 0'-24' Pi Pi / t t t t t • 11' 11' (FDPS FDPS CROWN Al Y GRADE Al GRADE Al1 I POINT Om A4 O POINT O POINT a fl v2% 6 j 4% 2% 2% 1,2% VARIES 2% EXIST.I OR T.WALL L�— r — REMAIN) m y ��� A � (TO IN) 0 CD cr / LJ LJ I SHOULDER 3/ SHOULDERN 15.25" ero / 18.25 re.--,. DRAIN DRAIN ro // K COl 111) K/ ill 15.25" v is, GRADE TO THIS LINE GRADE TO THIS LINE a v N CO N 00 TYPICAL SECTION NO. B-5 c —L— 1-40 —L— STA. 56+50 TO 62+99.78 U N� oN Um 303 lD/o_L073 I ) LANE PROJECT REFERENCE NO. SHEET NO. Al ,a^ PCCP I-3819B 2B-4 AA 14" PCCP JOINTED RN✓ SHEET NO. WITHOUT DOWELS ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Cl 11%" SF9.5B El 3" B25.00 KI 12" TYPE 1 NON-WOVEN N, GEOTEXTILE DRAINAGE LAYER A_, MEDIAN CONCRETE BARRIER T EARTH MATERIAL DOCUMENT NOT CONSIDERED FINAL U EX PAVEMENT UNLESS ALL SIGNATURES COMPLETED Y MILLED RUMBLE STRIPS Q -L- L. 48 ► c_ -LCDWB- 24'MEDIAN Q -LCDEB- 12' 12' 12' 10' 2' 12' 12' 12' 12' 12' 12' 12' 12' 10' 12' 12' 14' FDPS i I' iI I i1 i� ‘,"1 14 ',‘I ail \'I it 1,1 14t frt O R7 L L 11' 11' 12' 10' FDPS FDPS FDPS FDPS POINT O A4 C� 0 GRADE Pe A4 GRADE Al O A4 POINT f POINT A4 e Gil �/, El 18.25"1 SHOULDER I DRAIN z- / 18.25'' ® SHOULDER ® Or,-,., I EXIST // i U U W O DRAIN Cl O SHOULD R O lRET.WALL Kl Kl DRAIN Kl Kl I (TO REMAIN) 15.25" I GRADE TO THIS LINE GRADE TO THIS LINE TYPICAL SECTION NO. B-6 -L- 1-40 -L- STA. 62+99.78 TO BEGIN APPROACH SLAB STA. 84+86.64 m -o 4 m N -o 00 CO Is CO N 7 00 10 7 00 ii N U N� ON Um m..CO 303 ,Do 7,/CC LANE PROJECT REFERENCE NO. SHEET NO. Al 14" PCCP W/ 38/98 28-5 DOWELS A4 14" PCCP JOINTED R'W SHEET NO. WITHOUT DOWELS ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER C1 14" SF9.5B C2 3" S9.5D D1 3" I19.0C Y -L- E2 4" B25.0C 48' E4 12.5" B25.DC VARIES I VARIES VARIES 10' 6' 18' 14' 0'-12' 12' 12' 12' 12' 24'MEDIAN 12' 12' 12' 0'-12' 0'-12' 14' 18' 6' 10' K1 12" TYPE 1 H 17'WGR 17'WGR H NON-WOVEN Z_ H 12' — 12' Z_ H DOCUMENT NOT CONSIDERED FINAL NiB DRAINAGE L O=O O O UNLESS ALL SIGNATURES COMPLETED DRAINAGE LAYER 0_ if 1 )I( ir D_ MEDIAN W W CONCRETE BARRIER U' U' T EARTH MATERIAL // = LL 12 11' 11'► 12' = LL U EX. PAVEMENT I V FDPS FDPS FDPS FDPS V 1u MILLED IIIIIIII\I-�IIII II= RA 111111 11111 = Y RUMBLE V 2.J A4 O 0G POINTDE CNDGRADE Y POINT Al O A4 STRIPS CD .N IIII Hill-11111111111= 61 r 4_°/u 2%r 2% 2% % 4% 2% 2% 2% 2% 2% 4% 61 =11111IIIIIIII IIII <-Q Dom- D D D D _, 4� /illagal �, -_,�_��-.- -,�� - --ter_ .. ■__ - - - .�.a s.Q�CI u \ a1( 61 O ® \\ 0 s 1 111111IIIIIIIIII= Q' L =IIIIIIIIII-IIIIII '� JP SHDRAINER ® 15.25" SHOULDER 15.25" C� SHOULDER ��Q 2 1 �' C� DRAIN \I,\\ K� N� J V H O H V V Z111111 111111-1111I= O J O J _0 1111-111111—0 1111 o L� GRADE TO THIS LINE o_ LL CL-SR_Y15- EXIST. 12' 12' Lu Z O Z O LL r' 6.75'-11.4' 30' _ = 30' )1( Atk TYPICAL SECTION NO. B-7 —L— 1-40 —L— STA. 178+50 TO 210+50 © 0 CHAIN LINK EXIST EXIST 2%/o C/A FENCE --� ..kinf -'-. SEE TYP.B-7 O • UIDI ®O RET.WALL l Q -L- TYPICAL SECTION DETAIL NO. B-7A VAR. 48'-57.2' ► VARIES VARIES VARIES —SR Y15— WILSON PARK ROAD —10' 6'_ _ 18' 14' 0-12' 12' 12' 0-12' MEDIAN 12' _ 12' 0-12' 14' 18' 6' 10' —SR_Y15— STA. 13+91.65 TO 24+49.83 Z (0 17'WGR VAR.24'-33.2' 17'WGR Z In a U o W z w 12'_ " 12' 11-17'R11-14.2' = m IV FDPS PS PS FDPS rn - -0 11111=111111111111= — �� 2 C2 O GRADE C2 �r C2 C2 Y GRADE C2 O C2 ^ IIII-I IIII-II III m \/ i POINT POINT N 111111=111111-111111= 67 1 4o/ v 2% 2% 2% r2% �/ V �,4`/° 2% 2% 1 2% 4% 1 61 -IIII 111111=111111 it- Artirair"- \ 1"ir-nrillik Nv,......._ 1 6.1 E4 CD Dl Dl s m 1111 11 11 0 111111 11= V-Q` O Dl 0 =11111111111111111 I tit Dl E4 18.5" E4 018.5" E4 d7 oo co I- co H I v 111111=111111W111= -J 5 J =IIII=111111 11 0 11 D v w u_ GRADE TO THIS LINE W U S z ° ow co 30' _ = 30' co ► ' ro TYPICAL SECTION NO. B-8 y —L— 1-40 —L— STA. 210+50 TO 212+10 U �m 2 O p �0- Cl lU \/CC lD/0_ I ) LANE PROJECT REFERENCE NO. 38/98 SHEET NO. 2B-6 SHEET NO. C2 3" S9.5D RN✓ ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 01 3" I19.0C E4 12.5" B25.0C T EARTH MATERIAL Y MILLED RUMBLE STRIPS DOCUMENT NOT CONSIDERED FINAL c_ -L- UNLESS ALL SIGNATURES COMPLETED MEDIAN VAR. ' ► 7 10' 6'� 18' 14' VAR., 12' �, 12 8 33.2'-54,8' 12' _ 12' _VAR. .._ 14' 18' 6' 10► i- 17'WGR 0'-12' 0-12' 17'WGR H- zF zF av av w PROP. DLL CC z° CABLE z_O° x 12' 4' GGR 4' 12' x \/ FDPS FDPS? H ______ FDPS FDPS \/ III II_IIIIII III11= GRADE GRADE ,� =11111—IIIIII_IIIII \/ ?. O POINT NSET O 0 POINT O `1 111111IIIIII-1111—_ 67 4%� 2% 2% o/ 40� 4 4%20/ 2°/u 2% 2°/u 4% 61 —1111—IIIII1-11111 ( V 6..1 7 \ 185i0 \ / 0 1 18.5 67 IIIIIi-IIIII IIIIICI% \ O / 42O /. =11111111111-IIIIII co 4 r x —11111111111111111= 5 71 p 0 =1111=IIIIIIIIII11 D- tL 'D m w GRADE TO THIS LINE GRADE TO THIS LINE T - r O ZO co 30' _ 30' TYPICAL SECTION NO. B-9 -L- 1-40 -L- STA. 212+10.00 TO 219+35.97 (WESTBOUND) -L- STA. 212+10.00 TO 219+02.76 (EASTBOUND) MEDIAN VARIES 6'-11' 50'-54' 6'-11' TRAVEL _ :I-RAVEL FDPS FDPS LANES c cn 0 10 m°I - C2 Y Es m cd 4% -ROP.GR— " > 4% JP C) CD p p CD E4 oo oo co INSET TO TYPICAL SECTION NO. B-9 00 -L- STA. 216+87.00 TO 219+35.97 N N N CO LO -o 01 U m+H .m cn,- 3 L.R. 03 00 9 \/CC lD/o_ B OGFC N S I ) LANE PROJECT REFERENCE1-38/98 NO. SHEET NO. 28-7 SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS SHEET NO. C2 3" S9.5D RN✓ ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 01 3" I19.0C Q-Y_S- Es 13.5" Bzs.oc 10' 6' _ 18' 14' 12' 12' 12' 30' 12' 12' EX. T EARTH MATERIAL ' - 17'WGF' 1'(TYP) H 12' 1'(TYP) 1'(TYP) U EX PAVEMENT Z fn FLI �FDP) 7' MILLED RUMBLE \I \7 a O 1'(TYP) Y STRIPS a 111111111)IIIII 2� z p C2 e GRADE O Y* Gio DPS O LL IIIIII-IIIIII11111= 6 7 2 o POINT '� DOCUMENT NOT CONSIDERED FINAL 4% 2/0 2% 2% 2°/ V EX. EX. EX. UNLESS ALL SIGNATURES COMPLETED 6'1 E5\o ' A L .G I- _ -J IIIIII=111111=1111= O Dl 20.25" SHOULDER SHOULDER DRAIN \I/ `L� DRAIN IIIIII IIIIII-11110= 0 J a LL w w GRADE TO THIS LINE O O ZLL 30' _ TYPICAL SECTION NO. B-10 -Y- 1-77 -Y S- STA. 25+00.49 TO 31+25.48 Q-Y-S- 1 VAR. 48'-54' MEDIAN VAR. 24'-30' 10' 6'..., 18' 14' , VAR. 12' ._ 12' 9'-1,,, 9'-11' _ 12' __ 12' VAR. 14' , 18' _6'_ 10' H 17'WGR 0'-12' 0'-12' 17'WGR I- z 0 z co 5's o j D- O 1' 1' a 0 z1'(TYP) ytpTYP) x 12' 4y1' 1' , ' J = 11 \/ FDPS FDPS I 1 FDPS FDPS V 11111i11111-11111= 2 p GRADE Y* ROP. o� Y* GRADE -IIIIIIIIII=II III � n POINT I °� S _ . POINT O,,m 1 IIIIIIIIIIII=1111 S1 4% �/ 2% 2% o �/ GR +1 2% 2% 4/ rot 1111IIIIIIIIIIII _ 4/0 4/a _ �ilanik`�P/�f�k� R /r° IIIIIIIIIIII=1111= 1 20.25". 0CA 20.25" q� =1111IIIIIIIIIIII 1:° 04,1 1:11 27 \ H x IIIIII=IIIIIIIIIIII= 0 J p 0 —11111IIIIII_IIIIII CL LT_ GRADE TO THIS LINE GRADE TO THIS LINE T - r m Z co Z m 30' H 30' N a TYPICAL SECTION NO. B-11 -Y-S- 1-77 -Y S- STA. 31+25.48 TO 34+00.00 co Iq N 00 N N 01 CO LO i -o 01 U m+H om cn-U � a NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. Do *INSIDE EDGE OF MILLED RUMBLE STRIP SHALL BE 4"OFF O.G.F.C. LDVO ,ova SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS " S I / LANE PROJECT REFERENCE NO. SHEET NO. B OGFC 1-38/98 28-8 Y_S,-Y_N- C2 3" S9.5D R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 01 3" I19.0C 48' _ E2 a" 825.00 VARIES VARIES ' I VARIES VARIES G1 a" CTB 10' _ 6' 18' 14' _ 0'-12' _0'-12' _ 12' _ 12' _ 12' 24'MEDIAN 12' 12' 12' _0'-12' _0'-12' 14' 18' 6' 10 K1 12" TYPE 1 I- 17'WGR � 17'WGR I- R7 MEDIAN D-U D_U CONCRETE BARRIER z D_ T EARTH MATERIAL Z OLL 12' Z OLL x 12' _ 11' 11' I DOCUMENT NOT CONSIDERED FINAL U EX PAVEMENT ( 'FDPS FOPS FDPS FDPS \/ ) UNLESS ALL SIGNATURES COMPLETED W WEDGING ill=IIIIII=IIIII_ GRADE Y* GRADE ,� =IIIIIIIIIII=IIIII MILLED RUMBLE V ?7 Q 0 C2 POINT - . POINT 0 0 �' / Y STRIPS IIIIII=IIIIIIIIII= 67 0 aL�/o/o 2% 2% 2% 2% 4/ 4% 20/u 2% 2% 2% 4/0 O 61 IIIIIIIIIIIIIIII '141 6:1 irr 6" Dl E2 ®— 0 E2 . Dl 6 , 6 r III / -IIII-IIIIIIIIIIII SHOULDER ,L!� SHOULDERDRAIN 18.75 DRAIN SHOULDER 18.75" SHOULDER 2'� 1 ( (IF REQ.) (IF REQ.) DRAIN DRAIN F (IF REQ.) (IF REQ.) I- -IIIIII\=IIIIIIIIIIII= O J O J =IIIIIIIIIIIIIIIII w GRADE TO THIS LINE w ce zO z0 30' _ 30' TYPICAL SECTION NO. B-12 -Y_N- —Y— 1-77 VAR. —Y_S— STA. 34+00.00 TO 111+00.00 a8-sa' —Y N— STA. 175+00.00 TO 197+95.43 MEDIAN VAR. - 24'-34' V R. 10' 6' 18' 14' VAR. , 12' _ 12' �9''A14' 13' 12' 12' 12' 23.3'-27.6)3' 18' 6' 10' 0'-12' VAR. Z 1-In 17'WGR 24.33'-30.63' z co O 6'-11' W/GR O o_ O i o_ c> z0 VAR ZO I 12' 4''y1' 10' 21.33'-25.83' _ \ v �FDPS' FDPS t FDPS FDPS V I IIIIIIIIIII=IIIII= 2 GRADE Y* 8j 6% GRADE ^ =IIIIIIIIIIIIRIII mO al POINT O 0 B POINT 00 ti / ___r.,... IIIIIIIIIIIIIIII- sl 0 4% 11610- 2% , %- ;I ,,r/— � .�I� ° 2% ®� IL. 0 01 = IIIIIIIIIIII -Y_N- rq o /0 2/o IIIIII IIIIIIIIIII_ 6.1 vr,2, � 6, 1® L 187s " O Gl \18.75 ' -'41411tIpr 6 r -IIIIIIIIIII IIIIII 19' Is 0\ 2 13' 12' 12' 12' 24.33'WGR 18' 6' 10' SHOULDER SHOULDER SHOULDER SHOULDE' 7 '� - - - - �' ( F DRAIN U DRAIN �® DRAIN DRAIN = 1 1- IIIIIIIIIIIIIIII= 5 J ® 0 z =IIIIIIIIIIIIIIII I I II O 0 0- Li 'DITI \1 wV w GRADE TO THIS LINE -n -u \/ t (7 o (, GRADE TO THIS LINE pilk z O c z LL cn z 10' 21.33' = 1 -o 30' _ H 30' FOPS �FDPS \/ j 1 _ GRADE -IIIIIIIIIuIIIII TYPICAL SECTION NO. B-13 aI 8°%� ° B POINT ® 4°0I 0 ti^ — / V EXIST. EXIST. 4{j 114% 2/0 2% 4/ I 6' =IIIIIIIIII=IIIIII —Y— 1-77 T _.<..._.�- .. —Y N— STA. 197+95.43 TO 205+15.43 `� L--- -' J JP - -- - - p1 L m s2, .. 0 ' s'r 6\18.75" l'qR =_IIIIIIIIII-IIIIII 03 rii SHOULDER 2') a DRAIN v m GP-Y-SBL U SHOULDER I -, ® DRAIN 0 Z —IIIIIIIIIIIIIIIIII m xim N GRADE TO THIS LINE • IDO LO 30' c ►0, FMAINIITrimimmimimmillAM7 / WTI. TYPICAL SECTION NO. B-13A _ — U —Y— 1-77 ° 3"MIN. 2.5"MIN. 2.5"MIN. —Y N— STA. 205+15.43 TO 209+50.00 i 3"MIN. mw om Detail Showing Method of Wedging cn-U �03 NOTE:PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. i9 0, *INSIDE EDGE OF MILLED RUMBLE STRIP SHALL BE 4"OFF O.G.F.C. Diu uia I ) LANE PROJECT REFERENCE NO. SHEET NO. B OGFC I-3819B 2B-9 SEE SHEET 2A-8 & 2A-9 FOR SPECIAL DETAILS C2 3" S9.5D RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER C3 3" S9.5B -Y_N- D1 3" I19.CC VAR., - D2 4" I19.CC -'15'-19' D3 21/2" I19.0C VAR. E2 4" E25.0C VAR. 12' 12' VAR. 14'-26.75' 18' 6' 10' II 01 a° CTB 'b'-131' 0'-12' 1T-27.75' I- FI t W/GR 5 co DOCUMENT NOT CONSIDERED FINAL J1 6" ABC \I j \% 6'-10' w U UNLESS ALL SIGNATURES COMPLETED J2 a" AEC \/ \/ FDPS f i 11'(TYP.) Z o K1 12" TYPE 1 3' H 1'(TYP.) 12'-24.75' 2 w FDPS \7 T EARTH MATERIAL 8% Y GRADE —IIIII—IIIIII11�111- POINT �O0 ti^ - U EX PAVEMENT EXIST. EXIST. j 11:4° 2% 2% ® 4i% O 61 -IIIIIIIIIIIIIIII W WEDGING _ ——————— —1- • _ _ .-.- - _ \\ ice/ L--- �_.r�. MILLED RUMBLE r I J _ ,, 1 Y STRIPS ����' L- -1 • 1 © J ® A s'2 s. 7 O 1 18.75" 8.75 IIIIIIIIIIIIIIII I L) 2o® aSHDINERHOIDNER-G 7 ® _ xi m - -✓ 11111 IIIIII I IIIII GRADE TO THIS LINE -n -o E O GP-Y-NU co 2 H 30' TYPICAL SECTION NO. B-13B ® m m m m —Y— 1-77 ������� —Y_N— STA. 209+50.00 TO 216+70.00 I//LIIT�//272' �— _ ��\��WWM Ill11111111111111-1111r1 _ uIIIIIIIIIIIIp _ 3"MIN. 2.5"MIN. 2.5"MIN. 3"MIN. Detail Showing Method of Wedging Q -Y15RPB- Q -Y15RPC- 10' 6' 18' 12' 12' , 4' 12' , 18' , 16' ,_ z CO z_1n 5 O VARIES VARIES a c=j w v 16' 18' 12' 4'-12' 12' 0'-12' _ 14'__ 18' 6' 10' 0 4 CO _ _ -4 z I-~ - - - ._ _1TWGR I- F FDPS GRADE PS o-v o ( POINT w w ?�� © Z o Oz 0 0 •27 _ w FDPS GRADE FDPS = w m 4/ 8% 2% 2% 2%4% 1 -,Fa-.'. POINT 1 �((� =i.1.1=111 Got 6 JJ,, u M on- 6.1 �O ' _iFm 1�i� ony� c 111fL co 27 m LilC7 LL / 12' —' - C Ueat �, z0 .. ,.. zvI 12' . ZN _8a m 80' _ 30' O �_ -r N w LT_ L. WIDTH cL E m (D VARIES►Ce tr z w SEE z O 30' PLANS = 30' -o r. -. ► m c Y TYPICAL SECTION NO. B-14 TYPICAL SECTION NO. B-15 m� —Y15RPB— RAMP B —Y15RPC— RAMP C cn —Y15RPB— STA. 14+79.70 TO 18+00.00 —Y15RPC— STA. 14+94.43 TO 23+99.24 "-oa NOTE PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. i9 00 *INSIDE EDGE OF MILLED RUMBLE STRIP SHALL BE 4"OFF O.G.F.C. LDiO ,0ia I ) LANE PROJECT REFERENCE NO. SHEET NO. C3 3" ss.se 38/98 2B-10 SHEET NO. D2 4" I19.OC RN✓ ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER J1 6" ABC J2 8" ABC K1 12" TYPE 1 _yg_ R2 2'-6" C & G R3 5" MCI VARIES VARIES 24'-44' 24'-44' S SIDEWALK 10'** 2' 12' 12' 4'_4'_ 8' 12' 12' _2,' 10' _ 14' 14' DOCUMENT NOT CONSIDERED FINAL T EARTH MATERIAL W/GR W/GR UNLESS ALL SIGNATURES COMPLETED U EX PAVEMENT W WEDGING 22'6" ...._....4 if 1 tC&G ) (�qR 6" 5' 5' 6" .0O'• T02. MIN. " I © I GRADE I~ MIN.�PF.. /' POINT ,{�..: S p21 o 0 0 qR T JP�-c Q j6 15" U 15' — Q 0?7'* 1 CtoIN I" GRADE TO WIDTH&LOCATION VAR. 1 )\_THIS LINE SEE PLANS GRADE TO THIS LINE TYPICAL SECTION NO. B-16 —Y9— BROAD STREET —Y9— STA. 14+41.60 TO BRIDGE STA. 25+37.33 —Y9— BRIDGE STA 28+45.58 TO 50+00.00 *4:1 MAX SIDE SLOPE WITHIN INTERCHANGE AREA **12'WHEN SIDE SLOPE IS 2:1(FROM STA.34+64.70 TO STA.35+67.70) q -Y9LPA-,-Y9LPC- c_ —VARIES 6'-9' VAR. 4'-12' 1 ►. _' ' ►' .. ►' 14' 2' 12' 12' 18' 6' 10' 16' 18' 12'_�__ VAR. 14' 18' S 10' I- 1224 W/GR17' Z � COz O zF Is o� av O a 0re o. W w 0 0 w 4 z O 0 4' 12' z 0 ( GRADE PS = u- = OLL PS )GRADE DPS = ,,,, POINT POINT 4•7 C3 n-a i..ii � %4 2/u2% 2%4% c I 7 Nil�m a 4% 2%2% 2% 4% 1 4.A - .. ...= 6: I el A.\ VPR ...Al*On i �i� Q .pie_ _. a - A, 6 6:i t 012 ._ 13 q.' _i� Fi o,' .. 12"► 13" _ 12" 2•.� D2 Kl it,etVIV K1�F Z cn 7 z N Z 1n - GRADE TO- Oa L aN.. D_ LI -GRADE TO CL IJ-i THIS LINE 0 v °Lu THIS LINE m z� z0 30' N 30 _� 30' m N CV TYPICAL SECTION NO. B-18 LO CO TYPICAL SECTION NO. B-17 —Y9LPA— LOOP A -o —Y9RPA— RAMP A —Y9LPA— STA. 11+75.47 TO 18+11.27 c —Y9RPA— STA. 17+13.86 TO 27+70.95 —Y9LPC— LOOP C —Y9RPC— RAMP C —Y9LPC— STA. 11+87.87 TO 18+91.43 —Y9RPC— STA. 13+98.24 TO 24+52.47 cn,-U Cn 303 Lon o \/CC lD/EL I ) LANE PROJECT REFERENCE NO. SHEET NO. C3 3" ss.se I-3819B 2B—II D2 4" I19.OC R,W SHEET NO. ROADWAY DESIGN HYDRAULICS J2 8" AEC % -Y9A- % -Y9B- ENGINEER ENGINEER K1 12" TYPE 1 R2 2'-6" C & G 8.0'11. 2'--. 16.5 16.5►2''.0' 10',2' 18' 18' 2' 10'► R3 5" MCI S SIDEWALK T EARTH MATERIAL 2'-6 �2'-6" 2'-6 ► 2'-6" DOCUMENT NOT CONSIDERED FINAL U EX PAVEMENT C&G GRADE C&G C&G GRADE C&G 1 UNLESS ALL SIGNATURES COMPLETED W WEDGING 4Q,4' V•9R TO POINT 6' 02� w\L■e.:° 4�..��. l�,yR T POINT ,L1 + 1 m. =m.i ?' �I �► JP�� 02.7 C3 JP��O 2%` 2% 2% `�— 2 - 2% 2% 2% 2% IS 7y R� 2:1 T�11 "m611 VAR TO APR 102:1 O i t0 VAR• T021 20 um VP 1 O . © _4f R2 J2 CDWIDTH , J2 15" VARIES GRADE TO— SEE PLANS THIS LINE TYPICAL SECTION NO. B-19 TYPICAL SECTION NO. B-20 -Y9B- BEECHWOOD ROAD -Y9A- KNOX ROAD -Y9B- STA. 11+90.00 TO 14+98 -Y9A- STA. 10+32.49 TO 11+56.68 % -Y9C- -Y9B- 10' 2' 12' 12' 12' 18' 2' 10' 8' 6' VAR. VAR. 6'_ 8'► 10'-18' 10'-18' _1,1.o t 1.- GRDE POINT : I/ r / 1 t Vq'TO2' C) GRADE POINT 0 JPR(021 7 VA o C 2% 2%� o CZ- IIIIII IIIIII ii„�11-' VPR. -- ,. . --____' TO2'1 ol 2% 2% 2% 1� 2% O �0 R. m IIIIII—lull)—I R '�� /1 -' \ .-2 ',C,1#,,, 8/0 4:1 �P Q 6„4 15" ►\. 6„O .oi-m \j J2 WIDTH VARIES U J2 R T 6 6 O !/ SEE PLANS D21 4 GRADE TO ( JP J2 15" qR ( THIS LINE ro / IIIIIIIIIIII= GRADE TO— IIIIIIIIIIII=I THIS LINE cq , TYPICAL SECTION NO. B-21 N TYPICAL SECTION NO. B-20A -Y9C- SHOPPING CENTER ENTRANCE 00 CV -Y9B- BEECHWOOD ROAD -Y9C- STA. 10+32.03 TO 11 +69.41 to -Y9B- STA. 10+05.00 TO 11 +90.00 -o c 0 U / '1',':-.' .m -U 303 k9 \/CC lD/a_ I ) LANE PROJECT REFERENCE NO. SHEET NO. C3 3" ss.se I-3819B 28-12 SHEET NO. D2 4" I19.SC RN✓ ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER J2 8" ABC M3 MILLING Q Y9D- Q -Y9D- R2 2'-6" C & G S 4" SIDEWALK M.16.5' __ VARIES 16.5'-38.5' T EARTH MATERIAL 8' 2' VAR L VAR VAR 2' 8' 8' 2' 11' 5.5' S.5'_VAR__ 11 __VAR_2._ 8' U EX PAVEMENT 10.5-11' 0'-11' 10.5'-11' 0'-11' 0'-11' DOCUMENT NOT CONSIDERED FINAL w WEDGINGAt I( I r UNLESS ALL SIGNATURES COMPLETED 1 t 4 -/ . ) ..,LoNic. ) Tin..- m—° am_m 2'7 21 2 7 GRADE Z1 0 GRADE POINT POINT O 22°/ 2% 2% 2% 22% 92% 2% C3 2% 1� if Al 6„ irS 5„ 1 .eh ' NO 4•7 Q O�'A15' J2 `15" D2 ©O 41 1,11M II 1111,11, GRADE TO WIDTH VAR. THIS LINE ' SEE PLANS GRADE TO GRADE TO THIS LINE THIS LINE TYPICAL SECTION NO. B-22 TYPICAL SECTION NO. B-23 -Y9D- EASTSIDE DRIVE -Y9D- EASTSIDE DRIVE -Y9D- STA. 18+04.04 TO STA. 18+50.00 -Y9D- STA. 18+50.00 TO STA. 24+01.02 Q -Y9D- VAR VAR �L -Y9E- 22'-27.5' 22'-27.5 VAR 2' 11' 11' VAR 11' 11' 2' 8' 8'-14'* 0'-11' -il:.&•i5 VAR 2' VAR VAR VAR 2' 8' [34'-g' 10'-11' 0'-11' 10'-11' I 2'-6IL 2'-6" 2.5',I 1 t V C&G C&G I i 1 IIIIII-11UA1111111— f5►' H1=IIIIII-IIIIII 7 4) © GRADE 2� �/ -Y9E- IIIIII=IIIIIIIIIIII— ` 2°/ C3 2/0 1012% F 2%/0 27 ® L1 _� O GRADE O7.._, — g.POINTS 2�/0 2°/u 2% 2% 2 ?y ( yi J2 15" 15' ,O© \✓ 1 H.8'..2' 11' _ 11' 11' 2'_ 8' 1 �✓1� , ,. 11u11M1111_ GRADE TOD2 J2 © 11u=IIIIII111111 4' ©�j i t ( \ 5„ 1 111-..—.§ 0 v7 THIS LINE 2.5....j - IIIIII IIIIII 1111= �® ® F =�-����=��� WIDTH&LOCATION VAR. GRADE TO c SEE PLANS THIS LINE \ GRADE TO p1 _ \/ V I THIS LINE WIDTH VAR. GRADE TO _IIIIIIIIIIII— SEE PLANS THIS LINE '7 2•7 T. 11111IIIIIIIIIIII NGRADE TYPICAL SECTION NO. B-24 % m2% POINT 2% —Y9D— SIGNAL HILL DRIVE .__ Aar, TYPICAL SECTION NO. B-25A ero ro -Y9D- STA. 24+77.37 TO STA. 33+90.38 a` ©� 5„ 4, -Y9E- CAROLINA STREET SEE PLAN FOR SIDEWALK LOCATION \/ O©6„ ® V 1 -Y9E- STA. 11 +35.00 TO STA. 13+89.11 CV r� "USE 14'BERM BETWEEN-Y9D-STA.25+15 TO STA.32+84 IIIIII=111111=1111- D2 =1111IIIIII IIIIII SEE PLAN FOR SIDEWALK LOCATION GRADE TO *MILLING BETWEEN 13+00 TO 13+89.11 m THIS LINE N CO N 7 TYPICAL SECTION NO. B-25 -Y9E- CAROLINA STREET -Y9E- STA. 10+16.50 TO STA. 11+35.00 SEE PLAN FOR SIDEWALK LOCATION U N� ON Um 303 , ,--CC lD/o_ NNSI ) LANE PROJECT I-3819B NO. SHEET NO. C3 s" ss.se 28-13 SHEET NO. D2 4" I19.0C RN✓ ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER J2 8" ABC R2 2'-6" C & G T EARTH MATERIAL U EX PAVEMENT Q. -Y9 G- Q -Y9 H- W WEDGING 8' 2' 12'-15' 12'-15' 2' 8' 4.5'2' 12'-15' 12'-15' 2.4.5' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1 At 2,-6„ . / t 2,-6„ GRADE C&G GRADE C&G rl-limit POI ou n / - POINT -„ii1 ?7 C3eaD ?� 2'` a 21 VAR 2% 2% 2% 2% _4 VAR VAR 2% 2% 2% 2% VAR �1� . �� I. m ®rsom, Ark 2:1 ,,,.,III i�,�„� N.A � � �� r�� 4 1 ��,..,,, ©." _ Ey 6,0 S.. 6"O GRADE TO h GRADE TO THIS LINE 5 WIDTH15 THIS LINE -15" r VAT. GRADE TO GRADE TO SEE PLANS THIS LINE THIS LINE TYPICAL SECTION NO. B-26 TYPICAL SECTION NO. B-26A —Y9G— DALE STREET —Y9H— (DRIVEWAY) —Y9G— STA. 10+20 TO STA. 11 +00.00 —Y9H— STA. 10+20 TO STA. 11 +22.68 Q -Y10- Q -Y10- 8' 10' 6' _ 12' 11'WGR 12' 12' 11'WGR 30' 10' 6' 12' 11'WGR 12' 12' 11'WGR 30' H . . Z co H H Z co z J 5 IS 1 At 0_5il EL et tk W O z 0 O O O O 1 GRADE J- W U = W z D- 4' POINT 4' O D GRADE = FDPS O FDPS z 4' POINT . 4' ( W = FDPS FDPS c _ r%� co r% 15' C3 c IIIIII IIIIII=IIIIII= 2•,� 8% 2% 22% 8% ii„I n-, o 0 0 ✓ 2,7 8/0 2/0 2/o r 8% '� IIIII=IIIIII=IIII- 41 0�RiIS- -- w ,,,I,,,- 4: 61 T IIII II-IIIIII=IIII 1= 6.1 ...._-_ ���. ,,,.�„-��_ 6:1 a1►l 6. -0 0 el CIIM 0 m 15" 15" GRADE TO =IIIII=IIIIII=IIIIII ?7 co THIS LINE D2 J2 GRADE TO =IIIIIIIIIIII IIIIII oo 22' / THIS LINE N. LOCATION _IIIIIIIIIIIIIIII v =IIIIIIIIIIIIIIII a VARIES (SEE PLANS) v N m CV N TYPICAL SECTION NO. B-27 TYPICAL SECTION NO. B-28 CO LO Y10 US 64 (DAVIE AVENUE) —Y10— US 64 (DAVIE AVENUE) —Y10— STA. 17+82.00 TO 21+20.00 —Y10— STA. 21+20.00 TO BRIDGE STA. 25+75.79 c Y U m+H 0m 0,-En U 303 0, � ,..,CC lD/o_ I ) LANE PROJECT 3819B NO. SHEET NO. ca 3" ss.se 38/98 28-14 D2 4" I19.OC R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER J2 8" ABC M3 MILLING (3") R2 2'-6" C & G -Y10- S SIDEWALK Q -Y10- T EARTH MATERIAL 8' U EX PAVEMENT 8' 10' 6' 12' 11'WGR 12' 12' 2' 10'► 10' 6' _ 12' 11'WGR 12' 12' 2' 10'► DOCUMENT NOT CONSIDERED FINAL W WEDGING Z U) UNLESS ALL SIGNATURES COMPLETED ~ a Is / t Z w Is w v5 is if 1 Z u_ GRADE 5' Z 4' POINT �✓_ 4' POINT © 1 =pl IIIIII=IIIIII = FDPS _ 2\.*-IIIIIIIIII IIIIII / FDPS Q ,�02 15 ® �P�CO I - C) ED JP� mil, 111111-IIII1- 2, 8% 2% 2% 2%/0 111111 IIIIIIIIIII= 2, 6% 2% 2% 2% 7 - . III IIIIIIIIIIII- 4:1' 61 i � �qR III IIIIIIIIIIII- 6:1 b. ENVi 1 O frgR r0 6:1 fl�1.T.� y TO IIIIIIIIIIII=IIIII= �' �il 2� 1 IIIIII-IIIIIIIIIII- ""��_ 0 I p �•' 1 6"® \� 6" \✓ i ( 6' JP O J2 IIIIIIIIIII=111111 IIII—IIIIIIIIIIIIIIIII V ti\ Z 015" U 15" asIIIIII=IIIIIIIIII- p El TO ® GRADE TO / o THIS LINE THIS LINE \I 22' IIIIIIIIIIII=IIII- Z U LOCATION 30' VARIES TYPICAL SECTION NO. B-29 (SEE PLANS) Y10- US 64 (DAVIE AVENUE) TYPICAL SECTION NO. B-30 -Y10- BRIDGE STA. 28+19.04 TO 31+50.00 -Y10- US 64 (DAVIE AVENUE) -Y10- STA. 31+50.00 TO 33+97.20 Q -Y11- 1V W8'GR 12' VAR. 11'W8'GR 8' F 12'-17' 1- Z co Z co -Y10- a LT_ a v l / w - w � zo zO = GRADE _ 30' 11' 12' 12' 2'PS_ _ POINT 2'PS Z J C3� 5 El 11 LT_ W 8°/u 2�/0 2% 8% .B�-in�ir -a = O_ 6\%MEIN - 7 21 8' ��4 m FDPS 0 ®� CD O VAR 8°/ Ii / ^ J2GRADE TO � EXIST. ��� ��� � ti 15" 15" ��� �' J U THIS LINE 8 6 �S .. N. a 6' J ®� U LOCATION l VARIES m "-"" GRADE TO 15 (SEE PLANS) N THIS LINE m N VARIES 1 mil m (SEE PLANS) TYPICAL SECTION NO. B-31 LO 7 -Y11- SIMONTON ROAD -Y11- STA. 19+00.00 TO 19+60.00 TYPICAL SECTION NO. B-30A -Y10- US 64 (DAVIE AVENUE) )� -Y10- STA. 33+97.2 0 TO 36+88.00 L. -En 303 l0ND \/CC l0/0_ I ) LANE PROJECT REFERENCE NO. SHEET NO. Cl 1.25" s9.5B I-3819B 28-15 C3 3" S9.58 q -Y11- R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER D2 4" I19.0C JI 6" ABC VARIES 10' r 8'-10' 2' 12' 12' 0'-12' 2' MIN. J2 8" ABC _ R2 2'-6" C & 6 S SIDEWALK T EARTH MATERIAL / / 1' \/ 9.5'-10'2' DOCUMENT NOT CONSIDERED FINAL U EX PAVEMENT 1111 111111=1111- �4R�•0 GRADE 5 ~ OQ;1 =1111=111111111111 UNLESS ALL SIGNATURES COMPLETED W WEDGING 27 POINT JP�� 2% , 2% 2% R-c 214 r'�l• F- �qR ( o i ,► 0H. lei to 111111----111111=1111 0= _ NITO -1111-11111IIIIIII I� CHAIN LINK J2 D2 ® C/A FENCE 2% 2% ■--� Vr VARIES y �J - SEE PLANS I RET.WALL TYPICAL SECTION NO. B-32 TYPICAL SECTION DETAIL NO. B-32A —Y11— SIMONTON ROAD —Y11— SIMONTON ROAD —Y11— STA. 19+60.00 TO 31+50.00 —Y11— STA. 23+77.05 TO 26+91.92 *SIDEWALK LOCATION VARIES (SEE PLANS) -Y11- 10' 2' VARIES 12'-24' 12' 2' 10' gY10DR1- 10'_2_ 15' 15' _2'_10' ► ( / t , V I 111111-111111111I11- '9R : =III11=111111-Hill r0 . GRADE '(02 ?7 i POINT JPR' ( I/P1' t 2% 2% 2% 2% \( \ V IIID 111111IIIIII- =11111111111111111 TOP—r�. ` VqR r 27 GRADE 21 - m ( 0 / i 0® • O W JP� 15"� ?'7 \/ 1 POINT " 2% 2% 2_% 2% m 111111=11111111111= -6 ® =111111=111111=IIIIII a • L_-- ---_- \ 0 12 D2 •GRADE TO 0 ( V 21 O 6 1 �O 2•• Q! THIS LINE ©/ G U © -_1111111111IIIIII II1II11111111111 4m GRADE TO WIDTH VAR. THIS LINE SEE PLANS ► o- N. co v m v oo TYPICAL SECTION NO. B-33 TYPICAL SECTION NO. B-34 01 —Y11— SIMONTON ROAD —YIODRI DRIVEWAY LO —Y11— STA. 31+50.00 TO 33+13.85 —Y10DR1— STA. 10+12.80 TO STA. 12+34.54 c *SIDEWALK LOCATION VARIES (SEE PLANS) Y U m+H om cn,-cn 3 U 03 k_o00 \.--CC lD/a_ I ) LANE PROJECT REFERENCE819BNO. SHEET NO. B OGFC 1-38/98 28-16 C2 3" S9.5D R,W SHEET NO. ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER C3 3" S9.5B D1 3" I19.0C D2 4" I19.0C 4' 4' FDPS w w D3 21/2^ I19.0c 14' w 14' w ,1 O_E FDPS wz FDPS Wz �II �wO E3 VAR. DEPTH 1.5' 1i p5 1.5' 1, p5 ❑Q 825.0C WJ �{ WJ wK ES 13.5" B25.0C 1"I w>>O 1 � jO 4% I I— 2% SINGLE FACED ___ - DOCUMENT NOT CONSIDERED FINAL 01 8" CTB NOISE WALL �I ao/O 2% NOISE WALL o 4°/O w� 2% �� 7 BARRIER �_s-� a UNLESS ALL SIGNATURES COMPLETED J1 6" ABC 5 - --_ -- \ 2/0 � _ (SEE WALL PLANS) P�\� w®ISM �P��G c_.-s a a_rar.:.. ®0 0 4' J3 VAR. DEPTH ABC ® IN K1 12" TYPE 1 ® VIIIV •cal ®, Ra sec ® P��S 02 RETAINING WALL Q (TYPE VARIES) R5 EXPY. GUTTER SINGLE FACED TYPICAL SECTION DETAIL NO. 1A TYPICAL SECTION DETAIL NO. 1B TYPICAL SECTION DETAIL NO. 2 Rs BARRIER T EARTH MATERIAL NOISE WALL W/BARRIER WALL NOISE WALL W/BARRIER WALL RETAINING WALL AT FILL MILLED RUMBLE SEE PLANS FOR LOCATIONS ALONG: SEE PLANS FOR LOCATIONS ALONG:Y STRIPS SEE PLANS FOR LOCATIONS ALONG: —Y_S— —Y_S— —Y_S— CHAIN LINK C/A FENCE (SEE PLANS FOR LOCATION) 'LJ 4' 4' VARIES w \.JA NOISE WALL SEE PLANS zz 14' z NOISE WALL W VAR 11/A w MIN O J w CONC.DITCH 1.5' FDPS pg VAR �fA 14, w 1 �w FDPS LLOg CONC.DITCH 1.5' 14' Og NOISE WALL 4' 3' FDPS ❑D_ 1„ ❑ 0 CONC.DITCH 1.5' Oct RETAINING WALL 0 W,- 1' W� • wH- (TYPE VARIES) Ili 4% 2% 1"I 1 U'W 0 FDPS W W ORIGINAL > 1"� oi GROUND j 0 - -._ -,.;�_z._;. RETAINING WALL 0 w� RETAINING WALL w II GUARDRAIL 1' (TYPE VARIES) 4% 2°/u (TYPE VARIES) �I 4% I- 2"/o a I 4% 0 WO ® ®0 0 0 0 ® -0 a, 12" I ICP ® s 00 cp TYPICAL SECTION DETAIL NO. 3 TYPICAL SECTION DETAIL NO. 4A TYPICAL SECTION DETAIL NO. 4B TYPICAL SECTION DETAIL NO. 5 RETAINING WALL IN CUT RETAINING WALL WITH NOISE WALL RETAINING WALL WITH NOISE WALL EXPRESSWAY GUTTER W/GUARDRAIL SEE PLANS FOR LOCATIONS ALONG —Y_S— SEE PLANS FOR LOCATIONS ALONG —Y_S— SEE PLANS FOR LOCATIONS ALONG —Y9RPA— SEE PLANS FOR LOCATIONS ALONG: —Y_S- 0 2 N o W W W - z z aD OW pg ORIGINAL CLEAR ZONE pW En I�> cW7 GROUND 28'(RAMP) 12' p¢ N co 3 F. FDPS -'wH 3' L 12' �iw� ' FDPS Iwo I_ FDPS Ilm 00 1' �im 00 1' m N 4% NNI* 00 eili — N 'A c00 o ORIGINAL JP M ® ® ORIGINAL \iPR '� 0 12 '�I LO GROUND 21 6„ GROUND 21 6" ®� ®� ® � e® ol 1 12 0 0 0 -o c 3 TYPICAL SECTION DETAIL NO. 6A TYPICAL SECTION DETAIL NO. 6B TYPICAL SECTION DETAIL NO. 7 SHOULDER BERM GUTTER SHOULDER BERM GUTTER EXPRESSWAY GUTTER W/O GUARDRAIL m'' SEE PLANS FOR LOCATIONS ALONG —Y_S— SEE PLANS FOR LOCATIONS ALONG —Y S— SEE PLANS FOR LOCATIONS ALONG: 3a —Y9RPC- 3-03 ,_0 0, \/CL lD/._ LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 2D-1 RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 1 DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 5 LATERAL BASE DITCH STANDARD 'V'DITCH LATERAL'V'DITCH PIPE OUTLET CHANNEL STABILIZATION SPECIAL CUT DITCH vrHINGE DETAIL b DETAIL 7 (Not.Scale) SPECIAL CUT DITCH SPECIAL CUT DITCH ye b (Naro Scale) I Not w Scale) (Nato Scale) (Norio Scale) HINGE Natural 1 f_ Natural Bed (Nat°Scale) (Not to Scale) Fill 6 Demotion Natural Front Groan I.y \ IVY,. Slope f- Gauml Nowrcl Ditch Natural d p Nowrol Natural Natuml Z) ftFill oan Ground Ground Natural V A',at t 1 Ground ?, \ Ground Ground p Slope +6y Slope Ground B Min.D= 1.5 Ft. ) D 1` d ^' 4. A.\of Ditch Ground \D F\�° \of Front Max.d= 1.5 Ft. Q Slope 4.) p \diet Dike Min.D= 1.0 Ff. Geotemile Min.D= 0.5 Ft. F Slope 8= 5 F. Min.D= 1.0 H. Geamdile r� 6.0' b= 5 F. Moo.d= 1.0 Ft Channel Bed Min.D= 1.5 Ft. 6.p• FROM -YRPAC-STA.55+88 TO STA.55+27 4ng�h= 33 ryoriablel FROM -YRPD-STA.28+75 TO STA.29+66 Min.D= 1.0 F. Type of Liner= PSRM Type of Liner= B Rip-Rap 6= 5 Ft. Typo aLiner--H CL Rip-Rap-Keyed-1n -YRPD-FROM STA.28+00 TO STA.28+75 -L WB-FROM STA.134+00 TO STA.136+50 -L-FROM STA.150+15 TO STA.152+00 FROM -LCDEB-STA.57+50 TO STA.62+81 FROM -YRPAC-STA.52+00 TO STA.53+84 -YRPC-STA.16+04 =L-FROM STA.133+12 TO STA.134+00 DOCUMENT NOT CONSIDERED FINAL -Y_N-STA.210+35 RT UNLESS ALL SIGNATURES COMPLETED DETAIL 8 DETAIL 9 DETAIL 10 DETAIL 11 DETAIL 12 DETAIL 13 DETAIL 14 DETAIL 15 BERM BASE DITCH BERM BASE DITCH BERM 'V'DITCH SPECIAL LATERAL'V'DITCH CHANNEL CHANGE RIP RAP AT EMBANKMENT STANDARD BASE DITCH CONCRETE DITCH (Nara Scaled b (Not to Scale) (Naro Scale) (Nato Scale) BEHIND(RETAIN Not to ING NG WALL ES 1 (Naro Scalel (Not to Scale) (Not to Scale) cc�� b { b 101min. Naural Natural RETAINING BOND JP'/ Natural \ Natural \ RDWY Natural i 1 Natural I-0-- Ground ?:) .11:\ Ground WALL BREAKER I ) D Ground 7.) D 'L', RDWY b'� Fill Ground ?:) 1,; 1Ft. Slope Grade D Ground ?. Tip / RDWY- Ground d ?; �' A.\ 4.y� Slope d I p Pe Ditch 1.0'mi I D B I. + _ 1.1 ‘73 D Geo..rileMin.D= 1.5 H. NATURAL Min.D= 1.25 Ft. B GEOTEXTILE GEOTEXTILE ONril GROUND Min.D= 0.75 Ff. Max.d= 1.25 H. Min.D= 1 Ff. 1 Natural SIDES ONLY Min.D=4 Ft. GEOTEXTILE Max.d= 1 Ft. b= 5 Ff. Ground Max.d=4 H. B= 5 H. B= 3 Ft. B= 3 Ft. Min.D= 1.0 H. 'When B is< 6.0' B=6 H. Type of Liner= Clues 2 Rip-Rap 4^ B= 1.0' b= 5 H. 6= 5 Ft.Lin b=10 Ft. Typeof Liner= Class B Rip-Rap R Type of Liner= CLASS B Rip-Rap -L-FROM STA.166+50 TO STA.168+88 -YRPD-FROM STA.12+60 TO STA.13+14 Type of Liner= Class 2 Rip-Rap p-alp -L-FROM STA.155+50 TO STA.158+32 -L-FROM STA.158+32 TO STA.160+00 -L-FROM STA.168+88 TO STA.171+00 -YRPAC-FROM STA.27+74 TO STA.33+50 -Y S-STA.121+45 -Y_S-FROM STA.119+50 TO STA.121+45 -YRPCA-FROM STA.41+00 TO STA.46+50 LT -YRPAC-27+86 RT -YRPDB-FROM STA.45+20 TO STA.52+52 LT -YRPAC-FROM STA.50+50 TO STA.55+50 RT DETAIL 16 DETAIL 17 DETAIL 18 DETAIL 19 DETAIL 20 DETAIL 21 DETAIL 22 DETAIL 23 SPECIAL CUT DITCH SPECIAL LATERAL'V'DITCH SPECIAL LATERAL'V'DITCH STANDARD BASE DITCH SPECIAL CUT BASE DITCH v4-IINGE SPECIAL CUT DITCH SPECIAL LATERAL'V'DITCH SPECIAL LATERAL'V'DITCH (Naro Scale) (Not to Scale) (Naro Scale) (Not.Scalel (Not to Scale) (Not to Scale) (Nato Scale) (Not to Scale) Front Natural Front Ditch Natural Natural Ground 4, Ditch Natural A'�°t Slope t t Ground \ Groun \°t t Front AZ! A,:\°tot Slope Fill Ground ?� \O�°t Natural \°t Fill Natural \°t Fill ?') D �" 4.) A'\aka Front /°a°x R \mot Slope �_ F A'" A' Slope Ditch \ Natural ti Natural '\°t Fill D Ground ''''''"?..,,,,,,,D F\off° Slope Ground 7.)� F\o"° Slope ��� dI _„ D f Ditch slope D Ground ?') D E Ground ?�)o p R\O\\ot Slope Min.D= 1.0 H. Min.D= 1.0 H. Min.D= 1 H. d °%a; B= 3 H. Geotere` Min.D= 1.0 FE Min.D= 1.25 Ft. .0' Min.D= 1.5 Ft. Geol.. Min.D= 1.0 Ft. Min.D= 1.0 Ft. FROM -YRPCA-STA.63+00 TO STA.63+50 -L_WB-FROM STA.135+52 TO STA.138+08 Max.d= 1.5 H. -YRPCA-FROM STA.65+00 TO STA.66+00 Max.d= 1.0 Fr. B= 3.0 H. -Y9LPA-FROM STA.12+00 to 12+50 RT Type of Liner= Class B Rip-Rap FROM -Y_N-STA.156+20 TO STA.160+50 FROM -Y_N-STA.157+37 TO STA.161+97 Type of Liner= CLASS BRip-Rap -YRPC-FROM STA.11+50 TO STA.15+50 LT -L-FROM STA.119+50 TO STA.122+00 RT -YRPC-FROM STA.22+00 TO STA.23+00 LT -YRPCA-FROM STA.53+49 TO STA.56+00 -Y_RT-FROM STA.239+00 TO 240+50 LT -YRPC-FROM STA.23+00 TO STA.24+50 LT DETAIL 24 DETAIL 25 DETAIL 26 DETAIL 29 DETAIL 30 TYPICAL CUT DITCH TOE PROTECTION PIPE OUTLET CHANNEL STABILIZATION RIP RAP AT EMBANKMENT PIPE OUTLET CHANNEL STABILIZATION DETAIL 32 (Nate scale) ?') (Nato Scale) F\re (Nato Scale) Scale) (N(N Natural Bed ato Not.Scalel Nauwl Bed Natural 3]a \°< Ditch F7jS%0ya 1.\0`',9° aural Elevation 10'min.- mural Ele.aPon RIP-RAPPED ENERGY DISSIPATOR BASIN ural Groans dF)Oh. D 5F\aK'ot slop. '0o d F G'^a^ Natural Grade tD m�p� t�f Graan Ground 4 *NOTE A:IF EXIT VELOCITY OF BASIN IS SPECIFIED,EXTEND BASIN AS REQUIRED TO f SECTION OBTAIN SUFFICIENT CROSS SECTIONAL AREA AT SECTION A-A SUCH THAT Q Geotexfile 15" 1.2v dev)CROSS SECTION AREA AT SEC.A-A)= SPECIFIED VELOCITY. Georoaile Min.D= 1.0 Ft. d= 1.0 Ft. Geateaile GEOTEXTILE Geoteaile DISSIPATOR POOL APRON *NOTE B:WARP BASIN TO CONFORM TO NATURAL STREAM CHANNEL TOP OF RIP-RAP Max.d= 1.0 Ft. Channel Bed Channeeed Type aLiner= Class BRip-(tap (Variable) hle TOP OF BERM NOS A IN FLOOR OF BASIN SHOULD BE AT SAME ELEVATION OR LOWER THAN Length- 15 H. Type of Class 1 Rip-Rap Legth= 60 FL ry.t. 1 TOP OF RIP-RAP NATURAL CHANNEL BOTTOM AT SEC.A-A.PROVIDE SMOOTH TRANSITION FROM -Y_RT-FROM STA.237+00 TO 239+00 LT Type of Liner= Class 1 Rip-Rap Type of Liner= CL 1 Rip-Rap-Keyed-In Type or liner= CL I NreRap-Keyed-la NOTE B END OF APRON TO NATURAL CHANNEL WIDTH. -YRPC-FROM STA.15+50 TO STA.18+50 LT -L-STA.147+14 -Y S-STA.121+45 -Y N-STA.167+45 -YRPC-FROM STA.20+50 TO STA.22+00 LT - -YRPCA-FROM STA.58+25 TO STA.59+65 RT TOP OF NATURAL , MI/Mk "`N'' ...� ,,,CHANNEL / NATURAL GROUND NOTE A 'br B B e DETAIL 27 - PREFORMED SCOUR HOLE DETAIL 28 - PREFORMED SCOUR HOLE DETAIL 31 GEOTEXTILE B T *NOT TO SCALE °NOT TO SCALE TOE PROTECTION (Not.Scale) SEC A-A PLAN VIEW PLAN VIEW 0. GEOTEXTILE INSTALL LEVEL AND FLUSH INSTALL LEVEL AND FLUSH '1;:‘ 'B. SLOPE HALF PLAN B 1:' WITH NATURAL GROUND WITH NATURAL GROUND NATURAL /..♦..� ♦ ♦ GROUND d F\E _I --- . - . � . . �' GEOTE%nll: v TOP OF RIP-RAP��. '� , ��. d= 1.0 Ff. `\ ��9 BERM AS REQUIRED D (' TO SUPPORT RIP-RAP Pipe or Ditch . ..�.♦. Pipe or Ditch . .♦.♦. 0E�'rRj j�=������al),��'�- Outlet DVfla �'* Type of Liner= Class BRip-Rap �V•+F)I - '�, CFf IOTR TO UI A •♦♦. A A •♦. A L- RIP RAP N• •+t [ 'rv� -- G OTFXTILE BACKFILLEwCU5511 R PJIAP / ®, } ..♦, } - FROM STA.112+00 TO STA.115+50 APPRO%.ED® LJI JI -L-FROM STA.122+26 TO STA.123+25 OF WATE -11111 _�I -L-FROM STA.141+00 TO STA.144+00 I B '� -L-FROM STA.145+40 TO STA.148+00 Lin . t� -L-FROM STA.145+50 TO STA.147+10 CULVERT AN �HORIXONTALMI a Square Preformed Square Preformed A/i0�N 7 -YRPAC-FROM STA.32+50 TO 37+95 BERM As Scour Hole(PSH) . Sour Hole IPSHI - . -Y S-FROM STA.46+15 TO STA.47+54 LT .�c a REQUIRED -D -Y-S-FROM STA.44+85 TO STA.46+50 RT �a To SUPPORT RIP-RAP (Rip Rap in basin .�.�.�.�♦, (Rip Rap in basin .��.��., -Y S-FROM STA.125+50 TO STA.129+50 rotsho=n forlid not shown for dadtyl -Y RT-FROM STA.231+78 TO STA.238+00 SFr r-r EXCAVATE To THIS LINE '♦ � ♦ '♦ ♦ -Y N-FROM STA.151+64 TO STA.153+55 RIP RAP BASIN# BASIN#LOCATION (AT OUTLET) Q' y'Ayy,A DIM. GEOTEXTILE BACKFILL=CLASS I RIP-RAP .♦� ♦=.� ♦� �/ 1 2 3 4 5 6 7 8 1 -YRPCA- 61,1421 LT RT B= 3.75' '♦��♦.♦ B= 4.5' -Y N-FROM STA.157+91 TO STA.160+00 W (`"1 -Y H-FROM STA.162+19 TO STA.162+49 A 30" 30" 2 -Y_5-4]+61,142 LT D= 1' D= 1.5' -Y-N-FROM STA.169+72 TO STA.171+30 B 20" 20" 3 e ti' to W= 4' W= 4' -YLPC-FROM STA.14+00 TO STA.16+55 C 16" 16" 4 -- 0 D 1' 1.25' 5 NOTE: SECTION A-A SECTION A-A NE 3.5' 4' 6 BERM AS REQUIRED S Wo= DIAMETER OF PIPE, F 6.3' 10' 7�4 PIPE(d= 15"1 64 PIPE(d= 181 G 10' 17' 8 To SUPPORT RIP-RAP WIDTH OF BOX OR S S GEOTE%TILE SPAN OF PIPE-ARCH 0 6pAF R/ D PSRM 6OAF' R/ D PSRM H 5 6 GFf n-R CULVERTS / INFLOW ( INFLOW NATURAL • NATURAL m � GROUND - L /� GROUND ra,9rJ CO in LINER:CLASS B RIPRAP I B-.i 1`�/// LINER:CLASS B RIPRAP I B-.i 1\ // FROM STA.TO STA. / WITH GEOTEXTILE '�MIN 1'TUCK WITH GEOTEXTILE MIN.1'TUCK ccn 308 308 C Y Y S STA.120+90 -LCDEB-STA.65+59 Y_S STA.123+38 Y S STA.119+78 o Y S STA.125+00 Y S STA.122+18 Y N STA.164+35 -YRPC-STA.21+09 o -YRPC-STA.15+09 i m+a "I001 303 ,clo .7/CC U)/0_ LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 2D-2 RoW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DETAIL 33 DETAIL 34 DETAIL 35 DETAIL 36 DETAIL 37 DETAIL 38 DETAIL 39 SPECIAL LATERAL BASE DITCH BERM BASE DITCH BERM BASE DITCH LATERAL BASE DITCH SPECIAL LATERAL BASE DITCH SPECIAL LATERAL'V'DITCH STANDARD BASE DITCH (Not to Scale) I Not ro scale) (Nat to Stele) I Not ro Scale) Not to Scale) ]Not to Scale) (Not to Scale) btu, b 6 NaluraI : .. d) dM1HBOTEXTILE BMD= 15H."" B- 2F Max d= Min.D= 1 H. EXISTING b= 2 R. When B is. 6.0' B= 10 Ft. B= 2 Ft. B= 2 Ft. Min.D= 1 Ft. Std.Na.876.01 Slope= 3.15% Max.d= 1 Ft. b= 4 Ft. b= 4 Ft. SLOPE B= 5 Ft. 12:1 MAXI -L-FROM STA.26+50 TO STA.28+00 RT -L-FROM STA.28+00 TO STA.36+00 RT Type of Liner= Class 1 Rip-Rap Type of Liner= Class 1 Rip-Rap Type of Liner= Class 1 Rip-Rap Type of Liner= Class 1 Rip-Rap -Y_RT-FROM STA.238+00 TO STA.237+00 -L-FROM STA.36+00 TO STA.37+00 RT -Y_N-FROM STA.199+75 TO STA.203+00 -Y_S-STA.71+10 RT -Y_S-FROM STA.60+00 TO STA.62+00 RT -Y_S-FROM STA.63+50 TO STA.65+00 RT DOCUMENT NOT CONSIDERED FINAL -Y_S-FROM STA.35+50 TO STA.37+75 LT -Y_S-FROM STA.63+00 TO STA.63+50 RT -Y_N-FROM STA.213+25 TO STA.216+50 UNLESS ALL SIGNATURES COMPLETED -Y_S-FROM STA.65+00 TO STA.65+50 RT DETAIL 40 DETAIL 41 DETAIL 42 DETAIL 43 DETAIL 44 DETAIL 45 DETAIL 46 DETAIL 47 SPECIAL CUT DITCH SPECIAL CUT DITCH BERM 'V'DITCH STANDARD BASE DITCH SPECIAL CUT DITCH SPECIAL CUT DITCH wtlINGE LATERAL'V'DITCH LATERAL BASE DITCH (Not to Scale) (Not.Scale) (Not.Scale) (Nato Scale) Natural (Notro Scale) (Not to Scale) (Not.Scale) (Not ro Scale) Front From b { Natuwl Natural Groun \ Front b \ Ditch \°t SlaDit°P° Naual 1 Ground 3. \ Ground ,. b' Ditch Natuwl b Natural Natuwl J_ b' Slope Natural !' roan j; \ 7 D 3 Slope Ground Natural Fill j. Fill Ground d;) Ground j) Y\het ) D �" RDWY dl ?') D T$ Ground ? '\ 15' Ground ) ,� 1"iFt, \D \D d '4F Ground d D Slope d I D - Slope Min.D= 1.0 F. Min.D= 0.5 Ft. Geo.xtile gel Min.D= 1.0 Ft. 9.) D Q\tea Ditch slope GEOTEXTRE In Min.D= 1.0 H. 11 Max.d= 1.0 H. Geo.., Min.D= 1.0 H. Geo.xtile Min.D= 1.0 H. b= 5.0 R. DDE=3517 CY B= 5 Ft. Type of Liner= CLASS B Rip-Rap Max.d= 1.0 Ft. I 6.0' Min.D= 1.0 F. Min.D= 1.0 F1. Max.d= 1.0 Ft. -L-FROM STA.178+00 TO STA.179+50 -L-FROM STA.181+50 TO STA.184+00 Class B Rip-Rap=290 tons Max.d= 1.0 Ft. ^when B is< 6.0' B= 3 Ft. -Y11-FROM STA.23+23 TO STA.19+00 GEOTEXTILE=590 SY -Y_N-FROM STA.178+60 TO STA.180+00 RT -Y N-FROM $TA.178+50 TO STA.182+00 LT Typeb= 5 Ft. b- 5 H. -L-FROM STA.208+50 TO STA.212+00 ofLiner= CLASS 1 Rip-Rap Type of Liner= CLASS 1 Rip-Rap -L-FROM STA.212+00 TO STA.212+50 -Y15RPB-FROM STA.18+45 TO STA.23+25 -YN-FROM STA.180+00 TO STA.186+00 RT Y- N-FROM STA.184+50 TO STA.186+50 LT -Y-S-FROM STA.196+50 TO STA.197+16 -Y_S-FROM STA.199+50 TO STA.202+60 -YN-FROM STA.190+50 TO STA.192+50 RT -YRPAC-FROM STA.38+00 TO STA.36+00 -YN-FROM STA.193+50 TO STA.194+50 RT -L-FROM STA.201+00 TO STA.207+50 _ -L-FROM STA.213+00 TO STA.215+50 PIACFMENT DEPM: DETAIL 48 DETAIL 49 DETAIL 50 DETAIL 51 DETAIL 52 DETAIL 53 CL1-26' a 2-D°" OUTLET CHANNEL STABILIZATION TAIL BASE DITCH INLET CHANNEL STABILIZATION CHANNEL CHANGE CULVERT CHANNEL IMPROVEMENTS Smooth-Faced CHANNEL CHANGE (Not to Scale) (Not to Scale) (Not to Scale) I Not to Scale) fLOODPUIN BENCH FLOODPUIN BENCH b NATURAL GROUND (Not to Scale) Retaining Wall Not to ate NG NG Natuwl ♦ Ground NG NG - EXCAVATION RIPRAP II TMP 2 of 15� Ground j:) e),' Natural f- ry CL'll'RIPRAP Fill D ry Ground ?'7 D '� lift. Slope i0%. DEPTH:24" 1"/Ft. 12-14' WITH GEOTEXTILE CL'II'FULMAR d � CLASS II RIPRAP ON BANKS ...OM Min.D= 2.0 H. /A ,�'lIl0' .P7 4.5' at 1"/R. SLOPE PROTECTION WITHCLGEOTEXTILERIPRAP 1' 1 CL II RlppppJ f 1' GEOTEXTILE •) .,N N. _-- _ MIN.2.5' le'N WITH GEOTEXTILE Max.d= 2.0 Ft. Min.D= 1.5 H. ,ir e:O ON AHK CL'I'RIPRAP vd CL'I'RIPRAP w ON SIDES ';,���' . ' SLOPE PROTECTION CV35 II RIPRAP (BRIDGE ABUTMENT) NATIVE MATERIAL DDE=12 CY B= 4.0 H. NATIVE MATERIAL Max.d= 1.5 Ft. , ♦t� 'i'Q'Q. PLACED ON TOP PucFli ONLY GEOTEXTILE(TYP) ";`�I. i7 O�r�, CUSS II RIPRAP ON STREAM BED Class 1 Rip-Rap= 15 Ions Length= 33 H. Ho-VARIES Ds To L VOIDS *When B is< 6.0' B= 4 H. ';�r��® '1�` 16 CL'I'RIPRAP W B' �VARIEs Oa' To L to CL'I'RIPRAP W 5' VAR •1 i1; WITH GEOTEXTILE (WITHOUT GEOTEXTILE) NATIVE MATERIAL GEOTEXTILE=31 SY Slope= 2.73% NATIVE MATERIAL b= 5 F. 217041 1704 PLACED ON TOP PLACED ON VOIDS OP Type of Liner= Class 1 Rip-Rap F TO N VOIDS SLOPE FROM INVERT TO NATURAL BED AT APPROX.5% -Y_S-STA.53+45 LT N29.0' -Y 5-STA.37+95 LT -Y 5-STA.37+05 RT -Y_S-FROM STA.68+38 TO STA.69+50 LT FILL WITH NATIV Slope=0.3% - - BED MATERIAL INLET CHANNEL -Y S-FROM STA.73+25 TO STA.74+65 RT VARIABLE WIDTH BENCH - 0-4'@ 12:1 VARIABLE WIDTH BENCH 0-4 @ 12:1 EXCAVATION NATURAL GROUND DETAIL 54 NOISE WALL DETAIL 55 NATURAL DETAIL 56 DETAIL 57 DETAIL 58 iBARRIER CONCRETE DITCH GROUND LATERAL BASE DITCH LATERAL BASE DITCH O,<K(cL' LATERAL BASE DITCH PIPE OUTLET CHANNEL STABILIZATION BEHIND NOISE WALL/BARRIER Not to Scale) (Nato scale) rys� INotro scale) I No.Scale) 1 Natural Bed (Not to Scale) ES Election BOND vAH b b GEOTEXTILE(TYP) � F b aural Natural BREAKER Natural r- I Natural I o-- I Natural I-*- Groun Ground - Ground j; \ rift. Fill Ground j. ♦ CLASS II D M1. ) p 1 lift. Fin BED:GLASS II RIPRA RIPRAP(TYP) Groan, jy D 1.., l ht. Fill ;7 rBl 1J D \� slope slope WITHOUT GEOTEXTILE OUTLET CHANNEL slope Y o Min.D= 1.0 F. ,. Min.D= 1.0 Ft. (DEPTH=2') a Min.D= 1.5 F. Geaeaile Length- 22 H. Imo•! B= 2.0 Ft. •�- B= 5.0 F. �• B= 5.0 F. Banks Only Channel Bed b= 3.0 Ft. b= 5.0 Ft. -Y$-STA.70+45 LT 5= 5.0 H. (Variable) , D= 1.0' -Y_S-STA.71+60 TO 73+25 RT ype Ler= eL II �Rap-Keyedan(Banks) B= 2.0' FROM STA.TO STA. -Y$-FROM $TA.117+00 TO STA.118+50 -Y_S-FROM STA.118+50 TO STA.120+80 ype aLner= CL I Rip-Rap-Countersunk(Bed) _ -Y S-STA.83+65 RT -YS-STA.94+40 RT DETAIL 59a 3 DETAIL 596 �� DETAIL 59c DETAIL 60 \ � DETAIL 65 NEW STREAMBANK axcl°TFILLTED t 5' FALSE SUMP o FALSE SUMP �'4 FALSE SUMP STANDARD 'V'DITCH \ SHALL BE TREATED s'Min. r A to' FINISX GRADE (Not to scale) c (Not to Scale) Y (Not to Scale) 1 Notto scale) car AS SPECIFIED IN PLANS Outside Ditch BLOCK O hide Ditch Traffic Flow Median Ditch D of EXISTING CHANNEL INVERT ;�������'� ,Natural Natural P FLOW v♦ 7 -�2.0'I.e- 12'� Ground j.) ,L.1 Grouts ��' ' � Traffic Flow �0.;\ 20,12' •i ` iFivFniL GI GI (See Chan Below)-T- 20'-y GI Geotenile SIoPe= 7.25% _,,. L�����`'''���j,'�'�, t5- au -o S eta. `$ etc' Min.D= 0.67 Ft. COMPACTED S=Ditch Slope ¢ Proposed DitchS=Ditch Slope 4 Proposed Ditcho�MPncTEO IP-RAP BACKFILL $=Ditch Slope F} Proposed Ditch Type of Liner= Class BRip-Rap Max.M d= 0.67 Ft GKFILL �uBB I USE WHEN DITCH FLOWS IN USE WHEN DITCH FLOWS IN OPPOSITE Ditch Grade L Ditch Grade L -Y10-FROM STA.24+00 TO STA.24+61 MIN. MIN 1.0'DEPTH SECTION A-A DIRECTION OF NEAREST TRAVEL LANE 0.0% To 2.0% 20' Over To 6.0% 40' '• LEXGTX Ms7 STONE InDIRECTION OF NEAREST TRAVEL LONE -D Over 2.0% To 4.0% 30' Over 6.0% 50' o USE IN MEDIAN DITCHES N L BACKFILL m 8 a DETAIL 61 DETAIL 62 DETAIL 63 DETAIL 64 LATERAL BASE DITCH LATERAL'V' DITCH PIPE OUTLET CHANNEL STABILIZATION \'R0 0-1 (Nato scale) FALSE CUT L (Not to Scale) (Not to Scale) (Nat to Scale) BACKFIEXISTING COMPACTED NOTES: N.GIF.B. \\\`� Natural Bed BACKFILL 1 CHANNEL BLOCK SHALL BE INSTALLED IN ACCORDANCE WITH THE b Elevation aro CHANNEL 0' ) O' I r- b f h' W 'I G \ PROJECT SPECIFICATIONS. • Natural IT t rural r°1 2)BLOCK SHOULD BE INSTALLED AT THE INTERFACE BETWEEN EXISTING CO j. ♦ Fill Natural Fill '\ t Fill routs Ground CHANNEL AND PROPOSED CHANNEL.Ground ) D " 1"ifl. Slope A' a _ Ground j.) �,� 1"ift. Slope 2. Off° Slo B 3)BOTTOM OF BLOCK SHOULD BE A MINIMUM OF 2.0'BELOW THE INVERT / D / I p 125, BLOCK) *0 OF THE EXISTING CHANNEL. !h GEOTEXTILEill Min.D= 1.0 Ft. MITS SECTION B-B 4)BLOCK SHOULD EXTEND A MINIMUM OF 3.0'BEYOND THE LIMITS OF THE LO Min.D= 1.5 Ft. OF EXISTING CHANNEL EXISTING STREAM CHANNEL. 6= 50 H. Exist.Ditch GeaeAle PLAN VIEW 5)INSTALL EROSION CONTROL MATTING AND SEED IN ACCORDANCE WITH . Max.d= 1.5 F. Bed Channel Bed THE PROJECT SPECIFICATIONS IMMEDIATELY AFTER GRADING. N B= 2 Ft W = 5'Min. Length- 16 H. 10. n CHANNEL BLOCK 6)COMPACT BACKFILL TO ExTENT POSSIBLE OR AT THE DIRECTION OF Type of Liner= B Rip-Rap b= 5 Ft. -YRPAC-FROM STA.36+00 TO STA.35+70 -YRPCA-FROM STA.49+75 TO STA.50+34 Type of Liner- Oct Rip-Rap-Keyed-In NOT TO SCALE THE ENGINEER. O�'1 -Y_RT-FROM STA.238+50 TO STA.238+00 -Y$-STA.28+35 RT -YS-STA.98+12 RT m -Y11-STA.16+60 LT LO DETAIL 68 DETAIL 69 DETAIL 70 DETAIL 71 DETAIL 72 DETAIL 65 DETAIL 66 DETAIL 67 BERM 'V'DITCH BERM 'V'DITCH PIPE INLET CHANNEL STABILIZATION CHANNEL REPLACING EX.CULVERT(Not.Scale) SPECIAL CUT DITCH SPECIAL CUT DITCH STANDARD 'V'DITCH STANDARD 'V'DITCH (Notro scale) (Nato scale) (Nato Scale) Natural Bed (Nara scale) m (Not to Scale) b b Elevation 1 Front O (Not.Scale) (Not to Scale) Natural I Natural aural Natural ?S N. Dads Front ) 5' ♦°t Slope Y t Ditch Groun j;) D �'1 RDWY Groun j;l D1:\ ��, Groun Ground 13-25' 17-23' N°t°'°I n'rot • Natural b'�° Slope Natuwl Natural Natuwl Natural d I CLASS II PROTECTION Ground 4.) F\O 1.25' atl"iFt. S') \5'� a}liFt. SLOPE PROTECTION D Ground j.7 D E\aM°t Ground j,7 D rL.\ Ground Ground j,) D ,L.;\ Ground N Min.D= 1.0 Ft.N SLOPE PROTECTION TO EL.797.0 Min.D= 1.0 F. VI Min.D= 1.0 H. + b= 2.0 H. Geotextile CLASS II RIPRAP Min.D= 1.5 Ft. Min.D=1.0 H. Min.D=0.5 Ft. 6= 2.0 Ft. Max.A= 1.0 Ft. Chanel Bed GEOTEXTILE / Slope= 2.5% Slope= 4.44% Type of Liner- CL B Rip-Rap Length- 12 H. 13 Fn CLASS II RIPRAP 10' ON SIDES ONLY -Y N-FROM STA.198+50 TO STA.199+75 m a -Y_S-FROM STA.25+50 TO STA.26+00 -Y_S-FROM STA.58+55 TO STA.59+50 -Y_S-FROM STA.60+00 TO STA.61+00 -Y_S-FROM STA.109+00 TO STA.110+50 LT-Y$-FROM STA.107+00 TO STA.1 + TYPe of Liner- CL 1 Rip-Rap-Keyed-In EMBEDDED ON BOTTOM -Y_N-FROM STA.216+50 TO STA.213+25 LT -L-STA.149+36 om -Y S-FROM STA.110+50 TO STA.111+90 LT -Y_S-STA.93+79 LT m-(D 303 tiO] \/CC LO/CI_ LANE `` I PROJECT REFERENCE NO.I-3819B SHEET NO. 20-3 RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER artcEMeer DEP1N DETAIL 73 DETAIL 74 DETAIL 75 DETAIL 76 DETAIL 77 DETAIL 78 OUTLET CHANNEL STABILIZATION SPECIAL LATERAL'V'DITCH SPECIAL LATERAL'V'DITCH BANK STABILIZATION TAIL'V'DITCH LATERAL'V'DITCH (Not to Scale) (Nolte Scale) (Nat to Scale) (Nat fa Scale) (Not to Scale) (Norro Scale) Pro osed FLOODHUN BENCH p e�°ia b NG NG Fill Slope ?,00° Fill Fill Naural /G Il ♦°c slope 1°c Slope Smooth-Faced Ground /l Narorul S\° Natural �— Fill Natuml 3' lac Natural 3'lac Retaining Wall Ground N" Ground I. '\ 1 ht. Ground 37 F° Ground u'..7 V' —4\ / 7.7 D des .7 D 1. Slope CL'I'RI% 1• dl D dl D 1. ,MIN.2.5' / Min.D= 1 H. WITH GEOTE%rllE Slope Protection Min.D= 1.0 FI. b= 5 Ft. Geotentile Geotenile pe Min.D= 1.0 H. Min.D= 1.0 Fr. Class B Riprap Exist.Channel -Y_N-FROM STA.205+00 TO STA.206+00 �{ e' Imo-VARIES as' Type of Liner= Class B Rip-Rap Max.d= 1.0 Ft. Type of Liner= Class 1 Rip-Rap Max.d= 1.0 F. with Georextile (Bed to be Restored - -Y N-FROM STA.202+65 TO STA.204+00 To Ex.Toe of to Pre-project Conditions) - LENGTH- ns• SLOPE FROM INVERT TO NATURAL BED AT APPROX.aw _y N-FROM STA.211+00 TO STA.211+50 RT -Y_N-FROM STA.195+00 TO STA.197+35 RT Bong DOCUMENT NOT CONSIDERED FINAL —Y_N-STA.204+00 RT -Y_S-FROM STA.75+10 TO STA.84+00 RT UNLESS ALL SIGNATURES COMPLETED DETAIL 79 DETAIL 80 DETAIL 81 DETAIL 82 DETAIL 83 MEDIAN V DITCH voCONCRETE BEHIND GUARDRAIL STANDARD BASE DITCH SPECIAL CUT DITCH CONCRETE DITCH CONCRETE'V'DITCH (Non scale) INmro scale) INo+ro style) BEHIND RETAINING WALL BEHIND RETAINING WALL u Shoulder < Shoulder (Not to Scale) \�� INolro Style) \ES/� Point 7'1 A° point Noturol Natural From RETAINING BOND 4pY'/ A2 o D 'L 01 Ground 1 1 Ground Ditch µALL BREAKER WULNING BRENAKER %/ °ems^ Q\ +D 2' Natural _L 0 ac slope d Ground 4.7 Q\ et ,\ CONCRETE D= 1.0 FT Geotextile B Min. 2.5 Ft. D D B� NATURAL D7 NATURAL Max.d= 2.5 Fr. Min.D= 0.5 Fr. GROUND GROUND When B is> 6.0' B= 10 H. d^ Std.No.876.01 Slope= 2.79% -Y_N-FROM STA.166+50 TO STA.167+50 RT a• D= 1.0' . D= 1.0' Type of Liner= Class 2 Rip-Rap B= 2.0' -Y N-FROM STA.208+40 TO STA.209+15 -Y_S-STA.71+70 RT -Y S-FROM STA.90+50 TO STA.92+00 LT -Y_S-FROM STA.104+00 TO STA.101+50 LT -Y_N-FROM STA.210+90 TO STA.211+65 -Y S-FROM STA.105+80 TO STA,107+00 LT -YS-FROM STA.101+00 TO STA.105+50 LT -YS-FROM STA.110+50 TO STA.112+00 LT -Y-S-FROM STA.192+00 TO STA.198+80 LT L rn OM 0 N m L 0 L Q cJ 70 / ('0 (D 2 (D ('0 m n (D L 07 C Y 0 U / 1 H Um 303 ti tao \/CC lD/EL LANE `` I PROJECT REFERENCE NO.I-3819B SHEET NO. 2D-4 RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DRY DETENTION BASIN DRAWDOWN STRUCTURE 'NOT TO SCALE' 1sEETIFFt1.Pb`l4au W? 9x,F 9x.E ISET NCI"e"L oET.iu ISEFIMNMf5.,L •• « • AAS;T15 sD EiNs �B IIII B� .�. s 4 u IIII BMA_ . ' /��� Io mDB, gm.o DOCUMENT NOT CONSIDERED FINAL 1nD:o1c'aaeal BF 1n9 o1�wd"ao:e m UNLESS ALL SIGNATURES COMPLETED eLSIu eon !! o1 EFE.cw80n V Il 43 ' , D= N.R ::oar �D� _ SIDE 1 SIDE 2 SIDE 3 TxHINGE r TE S f.=o�4 z AND CLOSED .= ' m OPERATION AND FOR PROPER ill � � LNDwoN E E 71 WITH SLUICE GATE. IN IiiiitI1J .• SHOWN 1N TABLE FOR THAT STRUCTURE 1e OR REFERENCE s 6 ow.wx. LAl I e �. w wN. � SIDE 2 .... PLAN VIEW ' TRASH RAO(NOT SHOWN FOR COSY INSET°A" MINIMUM DIMENSIONS FOR DRY DETENTION BASIN DRAWDOWN STRUCTURE BASIN TOP MAX ORIFICE OUTLET CTL.STR. STRUCTURE S B BOTTOM ELEVATION STORAGE INV.ELEV. DIAMETER ORIFICE PIPE STATION NUMBER (4.m,) (INCHES) MINIMUM CONTROL DEPTH(D) CTL.STR. DIMENSIONS (0) INV.ELEV. DIAMETER(P) fi MIN. 6"MIN. ELEV. STRUCTURE FEET G'T x L x H) INCHES INCHES 127+50-L-LT 6" 6° 828.0' 829.5' 1.5' 827.36' 3'x 3'x 2.35' 2" 828.0' 18" 156+00-Y N-RT 6" 6' 857.0' 858.5' 1.5' 853.5' 3'x 3'x 4.05' 3" 857.0' 24" 29+00-YRPD-LT B.(EXISTING'6'(EXISTING)T9.T6'IRS I 801.2'IBIS 4.2'(EX) 792.75'(EX) 5'x 5'x 8.45'01 2°(EX) 797.0'(EXI 48"IED 37+50-Y 5-RT 6" 6" 873.0' 875.5' 2.5' 870.0' 4'x 4'x 5.5' 2° 873.0' 15" 40+00-Y 5-LT 6" 6" 866.0' 868.5' 2.5' 863.0' 4'x 4'x 5.5' 2° 866.0' 18" 44+00-Y S-RT 6" 6° 865.0' 867.5' 2.5' 862.0' 4'x 4'x 5.5' 2° 865.0' 24' 66+00-Y_S-LT 6" 6" 799.0' 800.5' 1.5' 796.3' 5.5'x 5.5'x 4.2' 3" 799.0' 36' 69+00-1'S-LT 6" 6" 804.0' 805.50' 1.5' 802.0' 5'x 5'x 3.5' 2" 804.0' 24" 80+00-Y 5-LT 6" 6" 794.5' 797.0' 2.5' 791.8' 4'x 4'x 5.2' 2" 794.0' 24" 92+00-Y 5-RT 6" 6" 781.0' 783.0' 2.0' 780.1' 4'x 4'x 2.9' 2" 781' 30" REMOVABLE ORIFICE TRASH RACK "NOT TO SCALE` #4 REBAR #4 REBAR B HINGE • IMIMIMIMIMIMIMIMIIMIMIMIMI .IIIf f�1'111111i, IIIIIIIIIOIIIII Y" " RISER TRASH RACK NOTES: I1111111111111 BEE NOTES) SECTION A-A EYEB FOR OLT PALL JOINTS SHALL BE FULLY WELDED AROUND SLUICE GATE OPENING ATTACHING JOINT WITH A MINIMUM OF A V4"BEAD. CHAIN 2.IF BOLTS ARE ANCHORED IN CONCRETE,FOLLOW STD. - CLOSURE - DWG.862.03 AND 862.04 FOR ANCHORING PROCEDURE. 3.EYEBOLT FOR CHAIN CLOSURE SHALL BE INSTALLED VARIES BY THE SAME METHOD AS THE HINGE PLATE BOLTS. ta 4.RACK AND HARDWARE SHALL BE ALUMINUM OR REBAR 111111111 I11 AND GALVANIZED IN ACCORDANCE WITH ASTM A-153. 5.PROVIDE OPENING IN TRASH RACK TO ACCOMODATE C 12^ 11" 11" 12" 11° 11" 12" SLUICE GATE ON THE OUTLET PIPE.ENSURE TRASH RACK OPENS FREELY AND WITHOUT INTERFERENCE WITH SLUICE GATES. 111111111111! d 1111111110111111 EYEBOLT M 1 IMBO AS NECESSARY) e� I T AA}1 IMIMIMIMIMIMIMIMIIMIMIMIMI 1}A #4 REBAR #S_REBAR �. Q1 -` -J VARIES CO HINGE B CONC CONC CO WALL co PLAN SECTION B-B �\-, (N REBAR TRASH RACK co NOT TO SCALE IT IT / m co VARIES A 1,N"HOLE GRATE 1•2"HOLE GRATE HANDLE FRAME ORIFICE TRASH RACK NOTES: -0 FRAME 1.ALL JOINTS SHALL BE FULLY WELDED AROUND 01 JOINT WITH A MINIMUM OF A`"BEAD. ti 12 2.IF BOLTS ARE ANCHORED IN CONCRETE,FOLLOW STD. DWG.862.03 AND 862.04 FOR ANCHORING PROCEDURE. V CONCRETE 3.REMOVEABLE ORIFICE TRASH RACK SHALL BE ATTACHED ai VARIES - TO CONCRETE BOX BY HINGE OR SLIDE RAIL SYSTEM. 4.RACK AND HARDWARE SHALL BE ALUMINUM OR 0 HANDL A GALVANIZED IN ACCORDANCE WITH ASTM A-153. / PLAN SECTION A-A m+a "Dm ol 303 00 ti 7---CC LD/a \ SDMH I LANE `` I PROJECT REFERENCE NO. SHEET NO. 1-38/9B 4 RN✓ SHEET NO. 0 ,QO gti a yl ROADWAY ENGINEER DESIGN HYDRAULICS m.s. QQO' PSDE PB 52 PG 92 16 Q% y sqo�, \ �� \ \\ \ - e yATHEABER f m 5' \0 PARTNERSHIP \� s s ,a DB 1515 PG 1601 TH \\ \\\ DB 834 PG 676 "' se \\ PB 52 PG 92 ARTS / DOCUMENT NOT CONSIDERED FINAL \ so o\ os\\DMMON SPACE 2 UNLESS ALL SIGNATURES COMPLETED \\ P \\ THE ABSHER PARTNERSHIP N},f��,p�.� e. \\per /�s, SDMH DB 834 PG 8676 84-7 18"C&G Ji EMEN#"(.�y-, � \� F \ �9 \\\ MB 59 PG 88�7 I ��— \ SWl \ ro, f �I\ \`.,.-., ' \\ �J/If c`xi BST ,a �I `1 P` PSOE P_�_ aK\\ 8'C&G B'C&G JJ /'v \_. -, \=xrsnNCR \6^RCp �^\\ THE ABSHER DB 84 PARTNERSHIPG 676 IL, L7N II*LT LT \ THE ABSHER BH834 PGR6N6 PARTNERSHIP N 73'S5'36"•E • :v .n'o ♦�" MB 59 PG 88 W p gg O II MB 59 PG 88 55'36' — II \ Y 30�WO� rn �" _I_ -- \ +SS CO 36""RCP ----P m \ s ��� _ III �II • \ SS CO— ��1 P 1� --- \\� .— — —— �` P_—— O —\ /TOE PROTECTI\ ' . ABSHER PARK RD 32'BST _��_� �"�C P a C> / W/CL45S B RIPRA` _ IIABSHER PARK RD 32'BST — _ 24 RCP ,,,�,g \8"RAP�61 O+ExlsnNc R w 3�& © \\ ss Wig__ B 60"C°61" -C3L.,lam '>F9 k7F__ IB'IRCP S8 WW—/saw__ 30'C&G s9 8"DI �'�80'—��,_ -�_ — =w_ y v, —P—�—*LT_——— =r=z__ ��'RCPSEE DETAIL 31 'If' IB'RCP W/FE$ // w ---�� �0'L&G 30'C&G 30'C&&G w 01u /�� 1�X� \\ 48'WW ISBwp _—w—--__ �—_--- --- ss ss 8"DI ss ss ABSHER PARK RD 32'857 ABSHER PARK RD 32'BST ' / PROP CHL FENCE THE _ _ 30^cac E L E !I ��Wc, N m ABS O TIE TO EXIST.FENCE HER — 0 a. +83 z DB 1515 PGA 60NERSHIP E0sEx�STING-- —— 30'COG EXISTING 20'WATER LINE EASEMENT DEED BOOK 1459 PAGE 1195 w 30"COG "5� Pa 59 PG w---------- _ II - 8 48'WW BW �C� w 48•WW ISBW 48' ISBW ___ EI7 !R( MI5 Z -._ - s II MM w 48' W ISBW .. - \• ,. .' . PROP CHL FENCE SBG N +00 F F F F I'll F F F F C C C C C C C C C C C C + W 0231'49"E 1.30' —_ FS 2GI 4 ' dil,„„..,,,,,..,,,,,,,,,........ 2 _ / +11.05 II GREU TL-3 +84 SBG W/G.R. _---- / 8:1 T T T T T T T T T T R m.1 1 1 , 8:1 w �— T T _. MTL -. .. .L4 RAUP as,, - 3' W = o Z II ----- ----- -- — -- ---- --- 8 ♦W�/ w o w 1-40 WB 375'DOT v _ ` /0+00 1 I' 15+00 0.. 20+00 cABLEr = z �.0 C y F �aeL������nnnnnnF T �I a .w F w u .IF . . y� ------w F u wl u FHu u II w FI w w F U Fw U III F p�[ (CIF` .I .F I. . F _ F . +.I Baer€------------ -. '^ II ,. u u u u u �I�—TT— — �A@[ a u�. I ul I�A$t�-----u TV I�il 1I .� . . . . .� -A F u '"FIlg F N 73'S3'18.3°E L a .F FII 5 F F. F F vs 1 4 �// RETAIN RETAIN u _✓,ry g 11 II- // 40EH39BST mVk,�I = "�- I EB RAMP BST11 -- - /O� MTL T� MTL/// _-� M l-,",_RESE 1 �1r. . BEGIN OVERLAY GEND OVERLAY N BEGIN WIDENING L P0r STA.2/+14.89 �y a L P0� S�A.18+77.4/ F m z 48 WW 7EIP EXISTING R/W \^/ - _� ExlsTwc R/w - .. - a PROP CHL FENCE • TIE TO EXIST.FENCE .- E%15nNG Rn n BEGIN PROJECT I-3819 w _'' BEGIN CONSTRUCTION Z } -L- POT 7+83.00 �� J • o- / y/ \. • THE S. J. HOLLAND. Jr. FAMILY �� I 1 Q / LIMITED PARTNERSHIP .. ' I �f f CONC f d4 DB 1422 PG 1417 ; II ' M 4 / I)) I % N 8/. ,rN2 02839"\ O Me p- ISFBUS p / IE �2 .w I i flp m Y \0 ti / N 363 30 5 W mw \ SEE SHEET 33,34 FOR-L-(LT)PROFILE 0, , i 03 / \.--CC lD/EL \\,, PROJECT REFERENCE NO. SHEET NO. / LANE " � I 38/98 5 \ RN✓ SHEET NO.ROADWAY DESIGNHYDRAULIC$ if ENGINEER ENGINEER `"sSTATESVILLE CHRISTIAN ', Bova, i+P _-__ DBC 31133 PGN 383 P __ t.',. \ \ \ DOCUMENT NOT CONSIDERED FINAL \ _ / UNLESS ALL SIGNATURES COMPLETED • I I F- J / �co. ARTS AND SCIENCE '\ MUSEUM, INC. I*- DB 812 PG 66 • \\ \ / II I I- LT t I \ TOE PROTECTION - `` .fir \ W/CL455 B RIPRAP II I \I BALL FIELD // I I ''I \ SEE DETAIL 31 >' T�. / \ I c � yYpe \ \\\ • ARTS AND SCIENCE ;'1I IIOIL-' L 1\ I /// • N II BST ILA • �- ` \ \ . MUSEUM, INC. / 1 \ / / \ RIP AP AO CH \\ �, r_ DB 812 PG 66 IX\\ \ / NNE I /'/�/ .,!\ I\�I\ GFo�\\\<\ _ _ .. .. .. x // I m O -P\�\\ —�// ///e // i �N ��,�, SCta. 3+, '�,\ I I I H IP RAP PRpP iMPI'\\ e \w� x II \k— a L� TS Sta.31+/1.38 // I^ I � �J //�' \ �� CITY OF STATESVILLE 72'CH ��II,,T 1,I X \ NOPy q8° :- 1 TON 5 SY �/ RIPR)AP EFi ND \\� DB 22 PG 419 �l�I'I X— e X / Q lF 1 w\ O g0,p5 53 Ors ea ► \ • - -. .. 3 7 cHL �x----xx—x— 7z�--- __ - - _ x 3 I I I Z W F '4. - --- " - J z-wN 1 e�K x 4'BST k X C �B-X EIP �.. 1 s 305'95T E.\ C\ TS CMP �T Fo- IS"RC s x • _ AND-SBG- w — Ex ST rvG R/w FILx I .. ° .r. I a RP5-�r\ BEGIN EXP. --- w --- 22. - � - 'zzr- �Ai 4 -MTL i�� \ GUTTER o "" HD MUSEUM RD 5 BST _ W Pf RIPR +50.00 R w T ro- i TIE TO EXIST. T r� � F ---_ FdQIzBADE- EXP.GUTTER __ _ T w T W W 15"RCP-III AF -xrt---- _ — -- — - ---- ---- —�— r z-r- ---L NC SOUND LU \\ Li __ \ --- 9S y� - _ -`_w ---- -—-r MTL q--T�EN- BENfiN r--w-------------- -------- w DI I chi\I I`rl T L P00 STA.3O 11.51 'C w CONE SOUND BARRIER WALL DI N ' \I hI 2GI 53 '. IIHDPE �` D .. BARRIER WA ---- ---_ -�6831__ _--_-- —_---__IP RCP RETAIN CONC 5 Y \ I 15"RCP-IV 50 SBG W/G.R. Adj.MH --- -- I�H IPE F F 2GI 9� aidia• • _ C i--�L_----- -- v - — W -- - - - ie. of W LJJ _ +7� i s -s aIFI .i Tift- d D111 ------- — — a—IIIRMR W N N� ' \\ I I D - - _MT P U RETAIN 7 EXIST.TO REMAIN• „_� do z u+ N. _ IAI IZ \ nm av II 2GI iv=� I ro G~ 0 1\ 2.5+00 G�`\- ' --_ 30/��- REMOVE 2GI - Il �05144� - 'I ±UO J I '^ • \ 14:7 CGA Bg2 U- 15"RCP-IV CABLE /ri CABLE S I ^ RESET CABLE GUIDERAIL �p- O � dj.DI ' 15"RCP,III .3 (S. 53 2GI IAU TL ' o_ 0 - - — a_ S, �_ CONC.MED.BAR. .519 - O :II ® _ l} j \T o ! - - MED:$ARRIHt In O 1,,, ^ ro eld 10 �� 2GI +70.00 2GI5 - v, 0 o N _ o - Oo 2GI Aq o ko o --- --- --- ---� 1.51120-E: _V J MTL MTL -- ---- II - --+503 TL I IMiW•Pl _ ARw -� - 15"RCP-IV _rwe e" -.. -- - tiW � . 7/.. .'. Fes%-2GY�RAIL Ln B 1 _.BE B 2GI Q 15"RCP-III LATERAL BASE DITCH I wN +49 D \•P� r SU is RI •57^DygSSBG RIP1tAP SEE DETAIL 36 u/C CAT-1 L // ,�F \a A7 dj.I \y ITMPI + N-- r RSA- �Qw F RIIPRAP RIPRAP + 1118"RCP-III RETAIN� RETAIN �� 6ETN - 30'HDP � - CL B RI RAP RI AP MI � " ._ 4E•C I I gp•NDPE% JB voMH 4_ AI �— 3 TONSPIO SY / o RIP AP :C-8--LIA--\- --_0 N )•- �\ -- I __HDPE R` ,\DL X�_ �``-� �— 48'CHL X X BARFIIER�'E!A{-- _ -_-f- ---------------r--_COC SOLIND-BkRRPt 44ALt"-- ,��.(- C '�- W '3 Wes"' _- R I RETAIN Fr. TIE TO EX.DITCH r- EXISTING R/w - L B RIP"�,+�,��`� re"— N 50'WW ./ E O•F t'1 AT NW \ 51 IIFT TAPBB-RP-r� X X X X X ��ECM 3 TONS 10 5Y +84.31-L-� \\ 30"C&G �' o i I 126.90'RT ii r 0 48'CHL 7 \\ +49.76-L- r \� +91.31-L- 140'� TAPER RT MED.&LT MED. X IREDELL PROPERTY GROUP, LLC L W Q��A 141.19'RT \\ . 138.47'RT ' +2 -L- '., -+ SP.LATERAL BASE DITCH- DB 1885 PG 1824 Z 5/a 6'CURB `0• 127is RT m \ BST PLAYGROUND J N11a 1�R °ao TIE EXIST.FENCE QI SEE DETAIL 37P • �, U ___30'csc \ •\+47 J ' /55 `—`\ �\ \x x X48'CHL X x x X- x x I p ro 0 = .. / -) %x�RIP RAP J$ I) `}LTA 7 �— oN to co • `/ o d N 'pdro �'AV/lp �`�j \ \�Pxx US IIi-// D S�7N END NOT a I II 29' 6 CUR�*�`*� \��� \ \ e I j� FOUND a BST �. Y.. PggK MCP \� ODI Cm 17 J q III/` .i� III �'.NRB a0 v \� \�� ' • O� h\ l ss \ \ \;� LT III8m II II _ Ov 41 oM II I 30•C&C��\_Ii I\\ EONN99z3'3 W u W 7. Ian III 1 U / JOSEPHEAPNOd it A, SASHAY N. SMYTH N a CITY OF STATESVILLE , a 5 DB 2467 PG 378 N 33 ,00 -L- (1-40) DB 22 PG 419 w ,oz N S.800.0- W 3q m EIRLIEY,, Jr. 0 Pls Sta 32+44.72 PI Sta 38+68.72 o z DB 1310 Pc 1629 N II 6s = 0'28'53.3" A = 5`2/'46.6"(RTI B'333,..W O.oD. E/P CRYSTAL W. DRUM BE/ 11 Ls = 200.00' D = 0`28'53.3" C 11 LT = /33.33' L = 1,113.85' ks SU R w De 2107 PC 26/ -H ST = 66.67' T = 557.33' a o c 5' II R = 11,900.0O' ,° o m DITCHPAVED SE = NC DITCH DI \ M 601PpveD DS = 60 MPH � � 0 2 = m H " SEE SHEET 34,35 FOR-L-(LT)PROFILE -- �o,a I SEE SHEET 34,35 FOR-L-(RT)PROFILE 00 lice //` LANE " I PROJECT REFERENCE NO. SHEET NO. -L- (l 40) �\ 1111 \\� �\0\\.// RAN SHEET NO. B 6 'p+' ROADWAY DESIGN HYDRAULICS PI= 38+68.726 Ps Sta 44+91.90 \ \ / / /,P /' ENGINEER ENGINEER A = 0°28'53."(RT) L s = 00.00'3.3" /\ \DI \ /� ��� /�e` D = 0°28'S3.3" Ls 200.00' w /�S �p \ /5 L = 1,113.85' LT = 133.33' // / /s` \ ��� r/ co T = 557.33' ST = 66.6T // /. /�° � 5 /�/ / / t R = 11,900.00' ./ ° / d ti SE = NC D� / / / o �Q/wb er // �r 2 DS = 60 MPH = L /______ / 0:� / // 1/// / o /�// IS'RCP / _� // //� i \\\�/// BST / l�// +// / DOCUMENT NOT CONSIDERED FINAL �\ / // /// / UNLESS ALL SIGNATURES COMPLETED I I � Q \\ v //„� BST WESTERN BVE582 PA903T CHURCH /// /W I \ // /� \ "TRACT I" / / / STATESVILLE CHRISTIAN SCHOOL, INC. / LT // / DB 1535 PG 1904 I \ / // �/ /�� //� -4. X \ EXISTING R/W I / / \ / - / / /-�-- T ( // (\RIPRAP �� // II ____ _ !r!:/i . I 1 ,q,,,, ( \----- __----- ___--_---,-„,;-__------------ --- ____ )i'\\) I /a,,/_, I \ /R51�/ �Pa / ����� RIPRAP —w 3 _� / \\I -- -- ram��-sue-�_ E 5 0 �� `_ 'CAD ` ___ — _� Rip RA �' �yo�iC I o U ) - -�`\ /w- /30 �\ m�'T`�_ RA \ // wi RIPRAP C/ \ -Lw- \C---w---- �g---w- _- _ �-s�� / /� "L 4g,cH�s RCP/7/ �s��c h - IQ Q 0 I j ', /1 j/ / _ - l l l' �1 _ __�e'cHL w I %w 5� �R 0/ / n h '8'cR r'. 4e'cHL C, 85 :/5EM / w/ .� / 'T / a LT Q� M/// 4/l l 0.;,,..."'"1""hilkaill 0_ ' / Z w E / -- cN �/ _ - / RETAIN EX.BRIDGE I' / � CONC SOUND BARRIER WALL / / LLI LLI lJJ - __ — ------p1 DI EXPRESSWAY / --_1.—_-48"fXPRE35`Ai'-EURB-_�l `_--- —__� N DI. [ __ IS°RCP _ / ------ ----- ------ ----------- .ARRIER WALL , IS'RCP l L- 1` N HOPE RIPRAP --------------------------- DI — LLI — / ��_----- III 9owesas'cowc _� 15°NDPE -.RB- ---___ -------- 15"RCP-II( DES �� J LL L'gy-S'L?J/e _ - _ I� W ------- Z r COT ,R / -] ry i I / 1: 3jsFDEM:11,s• N — /-qp WB 525 BST 2GI REMOVE 2GI RE OVE JB WiMH _-N - - off O J +b�--is ' ■ � rIi un _ - _ <o51z -2a RCPav EMO-0111111111 AIKEININOMPIN METWIE -,._ - _ a'-- REMOVE 2GI -- �1 • ,TW-IB�� u�ru.0 --- REMOV, iO :►t..-- -tppo m �- ---------- //�1/ / / L\/-L- CS 44+25.23 BEGIN EXPWY GUTTER +50 _-- �\ H N1—r8:1 -- F - -__-_— ---� F_ _. F____F _ ,/�// ��.,tL �l�k C-k 98•C 300'TAPER RT o 15�P�---- — FwRv1-: NM +o GREU TL-3 BEGIN EXPWY GUTTE'----- �, --- �lk -- \--- - Cm c \ 06191 - - ST 25.2 REMFF F 48HL /// -- o SOU R WALL REM Eto CONC SOUND BARRIER WALL /\J,'%\ LiP ,. OVE 2GI Bvx_ K0 $ EXISTINGR/W // lr / NL - G - C cONC SOUNDCBARRIER WALL F E/p �/ END EXP.GUTTER / ��,./ / ,yr - x C,+/ , �,� OV9/ND BARRIE M, � ' WENT ROBERT W. EXIS a - SCOTT JACKSON, Jr. BEce ZIN0T 9FB RT) o// y//// // \( // ODBRNC D20550PGM 372°N aAo DB NDERSO 176��i� ._1: 8, - Y . HIX Xx T yrB�95 I B 11ER_ i. WALT Ong FM R/w , ZLATERAL'V'DITCH / / / CHL W, — I 0,n, SEE DETAIL 38 DB 720 PG 911 / / o R 958 '�"�L. Wt:Y \ o / // / ENr' SFB �,yr ,n, DB 638 G .,k C/F Via"' LJ5- NANCY S. GOFORTH,fe zMV ZIREDELL PROPERTY GROUP, LLC / �l // / tR ,� yz-0 m % 7 .E IN EXPWY GUTTER E/P c.n �/�' # :/m DB 188E PG 1824 * / /e /+•9.75 0�,°/ O 15iDPK Dv " DB2168�G 1387 ,kr. waam J / _,A /// / M. `^' ` � sv fYll R �' I36 "*+FI Y �� l �rn b Q \,R Q / / //� / H.c 8 I 3 CONC yrtI1+F{F I,54,a e° / 4/7/ 4 Sss'. Sego ^ oNcIIoa� ai moo N Im s s //�9• \\ IN 4/� •EIP 223�8?6..0/ kCN( . LJ I/ \ l�l ll/l l"' l G \ /9.5' I 0I I/ #M'41, S*a e '�°� \ —cows EIP a ►A LTm� �( s/ ` ''\ Et'cue T �� l EIP lN I AR-----AVT ! Wl v/99 GEE' � � � �� \ C�6�U� � EKISIING R / m ss �� 8'VCP A'32'BST i.. B•-CUR�U/K / w _ ---_ 6 0 - oss to 0 6^CURB m C Y U / T/P om SEE SHEET 35,36 FOR-L-�T)PROFILE �03 ti ,..,CC lD/o_ 384.14' LANE " S I PROJECT REFERENCE NO. SHEET NO. N 76'53'47" RN✓ SHEET NO. / {-� I-38I98 7 LTP o SEE SHEET 46 FOR-LCDEB-PROFILE lQ M SEE SHEET 36 FOR-L RT-PROFILE ROADWAY DESIGN HYDRAULICS ��N v - ENGINEER ENGINEER O e hQQ Q�� M a ry I `•'� 0 8, "�' I BST ! yo�`, ic.‘1 DOCUMENT NOT CONSIDERED FINAL z BST /' I UNLESS ALL SIGNATURES COMPLETED KBUS . I N3I o / �/. L t- 1 1 o f / xNG R Y srnTEsvIOO cHRISTIAN qrn1Tr—/ \ °6 LCDWB PT Sta.18+9/.67L\______________srVISTI� SCHOOL, INC. RocK 1 -LCDWB PRC {a,14+45.83 q `` DB 1535 PG 1904 Ng / ��� RIPRAPJ -- ' \\ j ' I czUi ,/S,J ❑LT �T BST (]LT T � - w ' � �n, j 2-3'CONC WW 18°CMP �/ .. • / sR 66$=-�� 24'ROLL , L\ tiY 3'CONC tlw �-�/ S + N ENTERPRISES OF / CO A?HER RD p4'BS— _ E H� - BST ❑_IB_CMP =_--DI n / / STATES VILLE, LLC _ / DB 2151 PG 741 / THE HOWARD FAMILY / • _G--- _— ) == --i\ n�— BST • MB 11, PG. 57 INVESTMENTS 62N PG952LLC / • O _ _ -- _ �� Y - .. .- .. .. 1,./ 505'BST i 7 -_ / Z tifEIP0 -_- __�� o LT❑XISDNG R/W L []--L I� y .. T LT LTA LT LTA LTD'___ LL- �T - Z — — — — — 48"HLc'''— ❑ —- _ — _ _—==i==� Ted= G ry — EIP X ---- 48"CHL �/--TT, - W W *-1"-- •S - l r, / 'moo- moo_�s J —�_—__ --I — —RETAIN u(AT�IJr------ �—� MTL = O • - LCD OT Sta.SI+10.00o(48'41T) ,.ftAP 3 CO WW - 6QG /�\� Bs —X=RETAIN J��L �o=J (- — G RIB'RCP MT ti< 36' XPRESOSrWAY C CHL ��-1'TV FO- t -TV r -� �i W R 3' - i _ -rI.AIT EIP - HW 48'CHL H N N T MTLr T L 36�XPRESSWAY CURB �L L - �L __ =CP�_ MTL EXPRES AY CU���ETAIN T--s- L s RETAIN CURB ^¢�—�1-40 WB g5'BST 48"CHL _ 1- x LLIDI 15'HDPE / PEs_ _- �� --- --- W W - -- �i L,L-J TITL 23%C��x` IS R --- ---- RETAIN --- �'�"� RETAIN RETAIN RETAIN 'ZO fOO N --- -- --- — — -- ----- -4------ -- 15+00 m -LCDWB 1 a I N 80°12'5/.5"E N v= E 8.RCP _ J „_] // DI IS"RCP —❑I I I - P/// EXIST.TO REMAIN 1-40iWB-j0'BST v ] // �15"RCP-IV 55*0O 713 60+00- - 2G �I , - O ' S00 04 -361 4�— 2GI O O 1.-' U, ®j �Adj. H 0714 L 15"RCP-IV 75 R25:1(TYP) 15"RCP-III 15"RCP-IV <0716> 15"RCP-III <0718>A 2, 0 - - - - - ONn' ..BAR <0715> x 3S CABLE 15 -1G" 1 ir " 15"RCP-III "° +ffi, AINIONIk 2GI 15"RCP-III-- RA-ElP - - - p .Y 2, - --- COLLAR -- - - 7> 2 I a ' t) III REMOVE _� -= ----„-- — -- -- d - CDWB -- — --_ BS�S CONC�2 C) O� - y__ --z—r_ ��--r--I- --r -x a- -1 a- .r r _ r ———— aREMOV w 5ar __ I�sa... IS tU -- i/ REMOVE ® N 82 30 5/5 E • • ' 1 'OLLAR ° IMMEMEll5'CPP D'�IQI�2� 9 _ � C SOUND BARRIER WALL / IS'HDPE -- 12G1 _ �� _ _ _ - - 72 vd N (� /// !! EXIST.SOUND WALL TO REMAIN �i0 p X 'L�� - - - - - - - - - - - - - - - OF- - - - - - 1-11 �// III P RAIN EXIST.RET.WALL TO REMAIN X X X X CONE SOUND BARRIER WALL ./ ¢ -'"P� RETAIN CONC SOUND BARRIER WA L W j NBpF�'p //% !! C—FIPRAP -I i� SOT " i. I+OI°0��� C' •EI it EXISTIN. _ •°•T� CO fJ CD �p EIP CONE_ - " RETAIN �' // RETAIN _v CONCRETE DIT ♦ x-, /G L P���a°� 50. 8'RTl J q] LCDWB PC Sta.l .,.82 Z Z � y/ -- _ - - � 70 � i/,' � RANDY H WILCOX cc ,�T, C i \�/_ CL B RIP RAP %NA- 2°/8' ww DB 2360 PG 1576 X ; JOHN M $ W �a " �- ti'' J -o II 24'RO,,' 2 TONS 7 S 3 GREGORY GRETCHEN M. FRIES x` ww o ER E T m T • - ,n, Xq8• •CHL 1,,,� PARKER GRANDCHILDREN . - DB 821 PG 920 /p r�uaN rv / y \ �. EXISTING RIW LJ m F DB 2384 PG 837 X` -I II 230EMPG TI00011 — n TRUST ,,nr�, �6 I FIADi" / U r`"7 S ° Q 5 - DB 2381 PG 2453 m "' L:f KEITH S. r us (> lir ❑ �I N `x wX • BEGI WI,IENI . ". RAINWATER, .I .'°6 +99°7t m ~ w O Q '.1 'Pool' a'.-. - f) Q n fD ET. ALS. Lc x Q _ ¢ DB 1083 PG 795'�_ �II\MIIp, BEVERLY THOMPSON ROBERT L. KAUFFMAN DOMINIQUE FILS-RIME=XU .\rF?/ *— cam' ICONS©* Mn, F BST _, al7 <\\\>' DB 2474 PG 2087 [DECK I DB 2224 PG 859 U CHL i o o*, :w 'o�,"�+;� J 1 ro II so 7 2SBKD 2SBKD ;:� AND CLAIRE SEME QX rwp � / 2SBKD GLENN 0* ISOLD 'o,*j ISBKD z ' _I o MELVINA S. C�n - '_< DB 2484 PG 399 2SBKD o CARROLL * 2SBKD �*t' .* o* ISBKD Q a it m c IJAMES r„t `� LINDA MORACK 2SBKD 2SBKD o e * - zs6Ko JORDAN, SR. * p.j DB 1718 PG 054p o DB 2249 PG 82 N t..Y m I • DB 482 PG 165 'k'k'R* N " - 1�=� 2 o R +Ip [*+! aHi f -\ * I' 3 - - Co # +J. 9g. .R.* -,Mfi+g X. case _ ,,nn,, a �T `D.5 �fA.q.P„! //��,, ��f. ( h I •* 4e. ie .w S' a 1 c, l 11� Q, tiii PIGY 36 CONC � ,n \`= o 48"COFfC / a L.Y .,""2..Y' c�i (� i:,f 42'CKNC - i CLi f3�6'CONC a m w 0.27•• o GY 48'CONC 36'CONC i I I a I mv' r'y7, 3 I _ N 3 Q fi, (� 1�C ryC ,r ,,nn,, 42',,CnnO,,NC i z c2Ui 3 /�, o "'cJ�'?� ,o p o n 3 4Y �, /.- - % —�84uQM-851,33' oEIP L;Y I EIP-R/W I 8 al L;1 A o \,�nl,, I / \ L,f I W a \ 20 o rc - ow $� a X /� /tn 6-L(Igg _ �^-' -IEIP EIP a, EXISTINGLI"I �+ EIPin o� L:f GTI EIP ^EIP I EIP EIP EIP E%ISTING R W o EIP "' EIP 4 HL q t.1// Kt f���U�,111 L 'CHL �� �`\ 67' -_- IS"RCP ONL S H _ _ I I{�'" F 48° l� 48'CONC LT 48°COh�'�� �L 11 /�I = �' I5"RCP LP II Q • "\ Kt 8°VCP L II © �ss \� 5_SS SS ® SS 8'VCP SS 0 CUR ss e'VCP ss 8•VCP ss R v 1 6'CURB JIIL m B EIPj o o __ N _ EIP / NC BOTTOM=85200$¢� s N 37• _!STING R/W EIP EIP EIP EXISDNG R/w __ ,m I 5 34.09'37" 40'34'• MURRAY MAYER JOHNATHAN M. EIP EIP an, __ n �w LCDWB EB CHORD_37 g6, EIP CgRRD78./3. NANCY ELIZABETH YOPP a RAMS MURIEL KERLEY, re ARTHUR GLAND fg to COLLECTOR-DISTRIBUTOR -LCDWB- WB COLLECTOR-DISTRIBUTOR roa RADIU542.06 RADIUS.20�00, HUNTER POWELL DB 2025 PG 2368 DB 995 PG 688 DB 2RAPG 510 DB 1679 PG 1708 A DONgLp PI Sta 15+98.03 - 27.10' DB 650 PG 120 PHYLLIS ELDER o E SI PI Sta 12+22.97 PI Sta 16+68.80 APRIL srewART E O1 DB 1Ds3 A = 2°18'00.0"(LT) A = 3°05'06.3"(LT) A = 3°05'06.3"(RT) 'RMAN, ET AL BILLY H. DOBBINS 3 10 w a DB 786 PG 771 PG Y �; D = 0°41'31.1" D = 0°41'31.1" D = 0°4/'31.1" 348 PG 1034 DB 368 PG 337 , o s L = 332.38' L = 445.83' L = 445.83' 3 w 5� T = /66.2/' T = 222.97' T = 222.97' / o R = 8,280.00' R = 8,280.00' R = 8,280.00' z �h z SE = NC SE = NC SE = NC o - m'. DS = 50 MPH DS = 50 MPH DS = 50 MPH 2 - EIP N 89.4r n 3 N8 z 50"E o.rm 8.78'48"E 1— ry ry �Q 175.2— N 88'78' -,n p S 86 50�00' W EIP p\'^a 48" m ��d 114.77'— 6% 4-Y S 86.47'00"W I.EIP 10 8818'48"E rvtia EIP 96.99' N 79'59'03'E N 79'59'03"E N 79'59'03"E LANE " S I ) PROJECT REFERENCE NO. SHEET NO. 1-38/98 8 P,W SHEET NO. Elp ROADWAY DESIGN HYDRAULICS h ENGINEER ENGINEER co co w*CI i �V Im t. ' f DOCUMENT NOT CONSIDERED FINAL f UNLESS ALL SIGNATURES COMPLETED — B57 \ g•VCP V C // \ \ ISMTLBUS I ELT KKK \ i L xISMTLBUL 9'�a'.1,* *�k��ty V r-1 � I X / � W I�' �S \SF BU I. ` fi'AR 3nk'fx�"G� �W�I I I I F m 5 \ •LT •LT ,� F LT dYL LT B57 `I'P N \ I _ / I 48-CHL I j I I \ I PI\ I , Si .. I L--- \ I r POOL 1JJ�N 4 A P 52 \ •m BST BST DAWN PROPERTIES, LLC �° , W or _ \.., I J 62 • DB 2312 PG 2353 X p -LCDWB- PR`4, to.34+76.00 ? 1 IcCONC O +R **, DAWN PROPERTIES, LLC I zz< * DB 2459 PG 1127 - I \ o vc - ,IllI, __ __ JP HOSPITALITY, LLC T I AERIAL UTILITY EASEMENT ,____A___ u W BST \ a Q )+!;*' G//EIP i O BST TV —— - G B'CMP LT r ———————EXISTING R W— G`_—___:`,Z fR — — _ -r I I AERIAL UTILITY EASE nit E * G +F+tMtf�trRdk LT LT —�L"' --� T oa 2lcs ac s2r ¢ __ 36'RCP -F 4w '1 ;+q## • - _ ____ -- 'o1-X DB 2404 PG 528 .1. _ I 44'BS7_ _ c / - Z 355 SS H c IB"CMP -- 2 T - 3' �X�X� oa 2z3la _ 5i �C - y --- c f - 1- cSOIk---- ---- T--- 48"CHLX�X_X -MwJ -15�P � J� W — �__ �_=-x -_- -- - LT EXISTING R/W _ NCP %� W W ---- I E01---- -- -- --- --- I I �' --w- --- ---- - -- �_ o- W -Z-- --Tv ro-- -z--rMTL� F� -r�N- T -'i6J20L IRR -all----- --- +-- - -r- _ ----G-----T-- Crs-1�\�IXi �/! 2 r 7 _ --- i-,ENS _ X W vim- �•�-9LLEDL RBry Eo ---- 7�� _ — ---==— �_� T IS'RCP ' MTL 48'CHL 36'EXPRESSWAY-CURB i^^'y^' 7 --- 48' HL 0Aipp -�35P -r M RIPRA 36"EXPRESSWAY CURB n _ -r- M LT - D1 • �-----i E01 Tl P -s- t/) MTL 4s'cHL r� —�— - _= —_. If -LCDWB- PC Sto.26+90.3/ ^�— --- ==zs_.=z _ _- -__-- -- :e.c;BT ,c'<!ra; • SS cuR— W SDI — — ------=11 _ -- — — -TV F�—--- — — —,_--- _ cn W ------ r N •• Z 7- ---- -- 11-40 WB RAMP CONC VARIES _ t/) Ih _' -LCDWB- I _' /P' — —4-- J poi N 80°12'5/.5"E __ A _ _ I I '_j 35+Q 47' / O 15"RCP ZY"I 24"RCP - ' !P—-- I l� LCDWB J /? "-, � - EXIST.TO REMAIN Iv ---- — --T-----_ O O a o Y ro �00= _ 2cl L-PC 6'/+yy.88 70*00 E RCP III ■'1 L- PR O. IAn O N 80°l2'S1.5"E 5"RCP-III 'fir -- '` O •i A'JI I _ -wit- -L- N -- ® r - �2/ CONC.MED.BAR. EXIST.TO REMAIN - - - _ - - - � e - -- _ _ - . __ 15 RCP-IV� ,//.o I-ao Ee coNc vARie� �+'1 — • u15"RCP-III 2GI 4280p -- ---25:1 2GIcroo, 4 ; LCDEB --- _— ��w74i�i zGl A era NT :I�� • ^:�� ^ - _ ____-___ _ _ ________15-RCP-JR___ • 1 „' I zc13�+00 N Q N 80°12'5/.5'E a ---___ - - _ _ _ Mil fzlr'z�m�-,a �JI REMOVE REM, _ ---_-- Z a Cl) ❑❑ 15"RCP-III �� _N ------��� I54",IBIT - - _ EXIST.REJAB41N6-- PERUA >=� , AIN 'K=PROP.SFB ,� _ • 83°0' P 0E1P . ��a RE OWE -----ICI__ 1KT -- W = ¢ - �� CM ,•E •' mow REMOVE Z +�4.2� DRAINAGE �L[14mnenl• �_ ----1111111L �� i5` _ T -WHO REMAIN BST _ _ _ _�Yi--T{ HDPE y mi L B' BEGIN PROP. L�- --— • =111-1-1 - _2n•Ou,G---- R a.. ARRIER TO REMAIN _ / F _�p'f'ONG— ��� \ LT• u� CONC RE7A � - n V fD C3 tJ ? g -- 1 s ms,.. /CITY OF STATESVILLE7 , N ., \ :".* E�snNc- �'� 1 _ I13 HDPE.* 0 �� �s 9 BOARD OF EDUCATION HAM B. NORTH VIEW PR ESS ONAL /w AL m \�22�c P DB 3 p �7�� 0 - HAITHCOR AND PARK CONDO INIUMS ,� 55.76. CITY OF STATESVILLE /T / fJ1 �Fesic?NN CT a %'' • :2,1 DB 541 PG 57 wc>.J \Elp_P/W RETAIN t PC Q 9 2\ \ TO EXIST. ^ -"� 'AMELA H. STONE DB 693 PG 809 *it* n aERMAIUENT — m `L BOARD OF EDUCATION G o p sm RB 2228 PG 1393 ;o �' 13 unurr BEG.MED.BAR. E SEMENi +0.35 w s / +50 °�^ `OB 69 2 PG 836 L ¢�co• oe zlTy\\ _ DB 323 PG 272 3� �\ S s / ❑ ,n, f5 m a 'RPC 'OT Sta.10+00.�6 / L _ a— ARc r3o EXIST.SOUND WALL AND •pp 4s - �, 2 B 6 PG 783 Q[.el BST vim, ¢w,� r DI I _ RETAINING WALL TO REMAIN v vs — •• / ^'' z 1 in 30°C/G a JI I DEB- • Sto.23+00.00 (/4' ' `=T I / �g IO \I \ I c4I�m V r, b31f_,'- PR Sto.;9+29.38: J * 8' �ry 6O`� ili*** * 25BLKBUS z Z N yr" sr GAWP 'fro,,,,,, //// l Q 'ss—Y4 mow."C- PPS to.lln.'r. 6 \.i-.1 SBLKBus 0 I-, o m' I a N. DEPARTMENT c,- • L\ * 4 c r1 Q+ `'F�so4. //� ,.7 /�////// / ✓ Q S— \� 3 \ -Y4RPC- PT Sta.lF� lO.34 I� 1 ``�—' �'; s. \\ of�'{1I�A04P°c ss3ioN -, `,,-.�� y„,,o, �O / i [-�, T, SB '� * * +►',, *o- {t - I 48'CONC \ I,^ 30'r/G cD ��\ 4/*o=`4y***4 ti�o� * * SBGS� /�o/� / C�'Q /SFD 2 ��o\\ \ \�Nw I..,,,,\ 24 a \ II II ��• �.V���C� * �� m//I / I OZ�O fff��+11T���VV\\m V _ IP CONC 7- '1 1 - -- _-I CONC Rt --PEN IS"RCP C� �Ela°. ICI},, `�" // l =O O, ."CCW� c TC/G 30'C&G �0°C& col; EIP R/W r I'�III ss II �Q m // Q7am ® 8"VCP ° e°vcP II f \ / 0 ECM Pi o 71 // EIP rA BST A Os\p5 A'>g3g EIP EIP 3 EXISTING R/w r50.06W DON OSCAR SUAREZDIAZLARRY J.EIP DB 2D429R PGE1303 - DB 534 PG 26216/P AND DIANA VANESSA ORTIZ EIF\ �� -ola -L- (1-40) -LCDWB- WB COLLECTOR-DISTRIBUTOR -LCDEB- EB COLLECTOR-DISTRIBUTOR -Y4RPC- RAMP C VILLAMIL PI Sta 7/+9/.14 PI Sta 30+83.22 PI Sta 38+65.60 PI Sta 15+98.03 PI Sta 25+39.92 PI Sta 33+22.29 PI Sta 13+02.86 / DB 2294 PG 1567 w 3 o r N A = 2°38'12.7"(PT) p = 2°38'12.7"(RTI A = 2°38'12.7"(LT) A = 2°I8'00.0"(LT) A = 2°38'12.7"(RT) A = 2°38'12.7"(LT) A = 2°03'/0.3"(RT) m D = 0°20'/3.3" D = 0'20'08.2" D = 0°20'I8.5" D = 0°41'31.1" D = 0°20'I8.5" D = 0°20'08.2" D = 0°57'17.7" / g NILLIAM L. XI L = 782.37' L = 785.69' L = 779.06' L = 332.38' L = 779.06' L = 785.69' L = 214.98' oa DB 154E PG 2: T = 391.26' T = 392.91' T = 389.60' T = 166.2/' T = 389.60' T = 392.9/' T = 107.50' m,,, R = 17,000.00' R = 17,072.00' R = 16,928.00' R = 8,280.00' R = 16,928.00' R = 17,072.00' R = 6,000.00' ECM r,m SE = NC SE = NC SE = NC SE = NC SE = NC SE = NC SE = RC 0�c, DS = 60 MPH DS = 50 MPH DS = 50 MPH DS = 50 MPH DS = 50 MPH DS = 50 MPH DS = 50 MPH sG45 4,3� SEE SHEET 46 FOR-LCDEB-PROFILE �� / \ \ss \ / l N B W s jp5 SEE SHEET 86 FOR-Y4RPC-PROFILE Loin 101 i0' 1427a / \ / >3q ag, 5 70'54'38'W El JST _- ` I II3o'C&G ==- EXISTING a/w 71'IB'C& �l� I' �-- _--_ LANE " I PROJECT NO. SHEET9 O. .�� • 71 20 �I I 1 -- fr -D , IAL UTILITY EASEMENT = It 1'"`\ • -!" '. n o^� ECT REFERENCE N 5 71.20' 7'W EIP 5 76'33/51"W / a� NPDE / + 3oW SHEET _ BST t Yl D - 12'CMP cPSE.ME_/ ; IIOI l _ 96,46' \\ 1$, cc^^�� � _ * PSEMEN/Y // /O I i- RN✓ SHEET NO. DANIEL DWIGHTI RC `1t ----- -LT .-_- 8'vCP_ off„ / / /! °' -•,o6s c' 4 I I PERMANENT LL::f� r I U/C \�/\" 3, Q ROADWAY DESIGN HYDRAULICS BELLINGHAM oll 11 I II� E{M q62 I END {'I tm' / 'E" Li / / //� / ��; / • ��`� 'O ENGINEER ENGINEER nd wife, SUSS 1 ,o�l °' De S ,I�. 6 w� 2 114 i w�\ w62 n, D. BELLINGHAMI�1 I I\ \ U� I I 1); 28?"E * BI\ / / �!' / /:Q / /l 2 N 855$gY 3,' Q,�,O' •DB 2102 PG 1646 I 7.sB iU / /v," / °° Vy - .. '` I ml1II - I SEE SHEET 46,47 FOR-LCDEB-PROFILE 1' / ,--/ // /, a /I // e W,W,M.D. �� a i'�`� BST \\___ I I / SEE SHEET 66 FOR-YRPCA-PROFILE �I 'c �' \ n '" F, �/ PROPERTIES \ I=. \\ Q = I FII II \ I Ia �, / I SEE SHEET 86 FOR-Y4RPD-PROFILE �1:I / r f, _ / m // /�� DB 950 PG 481 �1�u (b ,0 `�� I T J I Idyl I I £ I II i. i1 / J h�//HOPE \�7 \w /� �Y o 0 / .�/��\b�r .'y 5 �M' \ I� \ A �����^� Ty � �// �� �/ ��� /pip` ISeLKB�s o w -��-!�1:'''''' No m ` \I"III r f t / I = // 1 0 // / l Il/'moo, v 18.c R T r\ t•.Y z w N \ I r^ II I� I If m +k/ / Qwp f / s,• // 7/ �/1,5 jg•SyTg7•_W___ _- i� ,r�,r\ DOCUMENT NOT CONSIDERED FINAL o. gWEST & FINCH CORPORATION I, 4N / //.� __ ^/^ � ,.✓ UNLESS ALL SIGNATURES COMPLETED OI \ , °J\aOo\ II wl II , DB311PG10II - __ ••11/ Om " '// / y -18593 24\CC&G\\� � �V f '� q -J� N Qa 4'�.`r IS"RCP c� 6 �LT G � U� /0 '' N In 9°r F 'I'-' '� \ •�\N va �. II\ I BST I ' ' •R. 'kT+14#if'� ]I I O //� / <�4 �/ /^i/am /y�\v�r 7V \' ,� p,_; i,,o.. n \J��� J� \N • m\ LL M II�I 1� �'e'' L� I BST_ c- 2 \ //l v- Fi• roll `� C \ N '� o'a \ 'CO Jy0 �a o \orw1 m • \ I-o I I i-1---- _ \ 11 G S I- 8"VCP ' / / c, 6 c, \ Om \ ••• 3 \ w -I ��- I\\ O - BST --- So �� -/ � ol m�o� ^'/l S KB :), ��c+\ \ N\'.\ CONC`y�, MPEPSEMENt O �� \ I Tj i . O ,. . // (/S 'r w�: L�. i_ PER p, i �'i-- TBST N II DFAINPGE %i w - >. T S "� / X ( * o In. HOLDINGLA ' o S OryA \ ' . 00' OP 799''''' EMENT3 \ O '' ,,,STING R W30C& / ^er- L\ - IIf 1' - \ _BST % / �C` ExlsnNc R/w I 1PDE .'I F �q i_�%/ /____ _Z ' /'' / / `C . 2p° ?,& y: 1 day w�,�W L 0` N�/ // TL � 4/ p CW6y,, G\\NC 'p/ /I' '• �.� C ss�i�f4B•CNL _ U/C ��/ lo-/ y l b -- \ C_ �.,R,�rl g.NCP /i!� �d� i�` I I�1 ; -P-- c $\^'c GEORGE L v N mm�,Z ` o ,/ !MSL s LCDWB PT Sto.42+55.06 �/ / I y/ iwwL HAMeERs, "�, mac°'� , o/ \ 4E UR. A,' 9 ir, O s �� -q''>'\R1PR•P DIkj e\ 'So/ h 35.6\c+\\p �` PG 330 ETA( 5 I 0. //� CHL � - "\ �� ----- ---- 9C'° IS"RCP \ �Br 'lam /BST / IS"RCP ��EL �� \ �P �. W //%Tv eo -- \ �� --_ --- --= II ST / /l'/ //,_.., p¢ \ CS -¢ MTL C�<T� -��i^ £�m ' �--- l 40 WB RAMP 28'BST d ///s� p / �` II-- ` , / W - MILL - ---- -- � ? �/a ���__ 6. =_�_ cr.L s,-- -� ��1. - - -- h o° / /Q o� Ih EXP Ess�W�Y �H_.. `-\ _ l � mlT L 1 (� i� ���� � I8'HDPE r �yr °J / 1., /\ c, -� IIv =_ RIPRAP\ I ?�s=� S.0 2/' / /95' /-40 WB -____1 RIPRAPI RIPR ts ��� _� _col a°HOPE II _WMT-L- - _ --_ Rq 1DI -- ���\8sr \ 1 /P' / 1 ,� BST ----RAMP BST VARIES ', �\ - --- '� _ _ p 3�65T _��_ IS'HOPE �p F. / / / / 5R0 TLT15`3e- -- - \ W w--RNA I il'o, l / e - 98"_ I_q0 _=� II / \ / 6J// E RE55 Y - CO5BRIDGE \ "' _ rl 11 / 1- II �1111II /E° li 1P/, f ff - I MTL II Sr IF III / /'�r ❑LT RIPRAP \I \\ -� LL __, -_ XPRESSWAY€R$-T-DI s_ MTL _z 36"EXPRCUSSWAY,CURBATL II E• y MTL 6'C RB MTL T RIP 4�B f T T mDl U DI T r -r r D1 \\ �� \- - ;ET�IN RETAIN - �, - - / -- \ W ----- 40+00 11 ---� // N -- a III All �\ 50+00 e W --------- - --- RETAIN RETAIN - Jr,' / / �•+0O RETAIN EXi/// / //¢ O -LCDWB- I-40 WB 46'CONS / '"// / 1 / /BRIDGE / A �(/ I-40 WB 455'CONC = \ N '/� Iv,RZ`P -IS"RRCP --- -- -- -- - ---� / / / / / /// p --- 1D� -- --- _ I d _ IS'RCP / // $r6NC BRID'.E / I// \ CONC BRIDGE W RETAIN u _ RETAIN // / % /� / / II / _ \ \ EXIST.TO REMAIN 1-40 WB 395'OONC - / / �?// \�� W -. • :, Z.4., / / /, / / // / \\ �DI ; V) _ vi�I7�:1LS1:��.'Ir tmrn l 11 l / /'" l / l l 4ll 11= I-90 WB 58'CONC '.`_i \(s o• r� d8r�6 - ls'RCP-Iv :5+00 % ll l l ll l l 90+00 \\ limmi11 rl / : /h ll / 90 2GI 15"RCP-I : •• - - - - - - - - _ - - - - - - - - - - --- , _ _ _ _- '� --- .. II CD 0 Q 2GI 92 r o": - r '� ��_� M T L r a- 'ill l L 11/l L POT TA.86+06.00 = , �► \V� + I„_ W Z � L- CONC.MED.BAR. j / // / / ONC BRPGE/ / ll/ l Y4- POa�/ STA.26+83.1-40 EB 61.5'CONC E=a \ IICNI L-, r=; EXIST.TO REMAIN n / �/ / / / // / a I \� \ II .'1 a // �_; \\ II CONC BRIDGE V` 4 / 2GI r�90) 18"RCP-III 15"RCP-Ill 35+ _-_- 15"RCP-II -CnnIC2-/ �^// / / c. ( /// \ 15"RCP III •®' G1� �// / / / I • -'°_rinDI OI -- --- VI - \II 45+00 LLI 90. 2GI-A Cq :- - -' _ �� M / / I 4Ur:,0 /lam I - � i --- \\ -� I J Z IIFillf*I ^`" 2GI / E0T I //5 --_1R Ia \\=__\\ J REMOVE '� • --',..,,,DI "' / / / / RETAIIII EX. ,� / -Y4- /SOT Sta.25+0/.84 = r=� \\ \ 90 2GI ?i EXIST.BARRIER TO REMAIN EI'.2GI,/ Q,,,/� -05/� - O�BRIDGE r AV / -Y4RP�- POT .Sta.I s*59.26 11 T=: Q �E fj _ I� E,610VE __ q"•Cp -r / I! ' , DI CONS RETAINER WALL M L w MTL DI MTL .-1 RAP I - Cl) C v R_ pie �- CONC RRETAIN.WALL - _ / A T r_ -�=--1 T --�e--- --T A\\ GRIP V O NV�"' 2a=1cr',_IIf _ -nETA�N --- 1 -�� s•RCP CC PT Sta.37+15.06 / I \ 0 p o •' �b�R`�`- r_- 48'�.7�ii� EO (0 1 1E--- Q 1Ee RAMP BST-VARIES 85 4_o c ME o,Rc- _ _� I / �L/ S 82°0/'49.7"W O L T 1� r -EIP RETAIN ��f(JfZ� 25.7,E s __% .�'8+16.78 /� / l -`:,� / / A� \ -C--P URaL /I/ll m I¢ h11�,�Q� �� -�- -P- - -- .I` ' SSWA I '� �1_ZI W -Y4RPC- --/f-- 3Ts, l l O t 37s \ �,°„T _----R- O _ ��jii�;n oNc Z r • RAIN CONC RETAIN. /-40 ES R ca-�'P„ BST / l G-1 / \ ,�\/ BST / �_�18 Ram- 18'RCP 36"Ex- CURB MT. pi END M e•BAR.m N� WALL .� RAMP 595'B T to a " / / "h1-\- 2- / --- i. I-40 EB RAMP BST -IE5 \r� =_- MTL __ 1/ J m ]�NECT TO 'vt!•. I 2 = _ �S �/ EllCURB RIP RA I �5 �`q� 96'BLK WALL c, EIP 5 r rr�- -_i' � �y 25-/-*-<��j� / �O'G, � P/, _�� 7\--2,-+._._.-..E„ESS''''s ,L_a WANG FAMILY R/ ;, � , ,/ ��25' -- MTLm �-1q TRUST, U.D.T. 8sliM`7Y -r 3��O30 � (i � . B / ll /BST C&G �� -i - �15;RCP ��a \I DB 1560 PG 456 ----3 ,r� EIPii EXISTING R _' �i\\ 2 / III ���0 -z-- L b L;Y n RAW _ //��/ l v / - i z:71- ::::°4721-77 r MTLiN pl 54.41'mII _--- r-°0� .J "� -'T y✓/' /�1 l �� \ - MTLEIP_R/Wo0J LTA r--_ '.Y-T- 24"C/G4-PO. :.-�A. �+89.34 = �- 36_ -�/ - SOS.pNE _IL r RCP /- -/_ S �`c'Vo ml r w lA j- {i �� ESNG_I y I f `�q -Y4RP1- -0 se..26+04.97 y :_; ---- _r. �,i W� ,FC7G s � l1E' __ / _ W �'7 PERMANE T DRAINAGE EASEMEN N o \. _DT _rIn F o r \ BST I._ - *• E j*o� �Q�M� Y4RPDN.C. DEPARTMEI T m 1,L \ ' o' ��C �" - 'I / _ / �A / / �l�� L 1 I / J9� a OF TRANSPORTS ION 4I 7 \ *' i'DI C QP Q m ,' pp 404 PG 531 .e '-v I U/c4 m Ia 1 BKe9� i31 y BST s' / // O 1 1 Ia DI GAYATRIMA t (/ ` / / 11N Ia �I KN.' �, CANOPY \ HOPITLITY, LLC / //aP`A��'�^^c 3 N a / / / L_ - m uI DB 1952 PG 1303 - = 00 'vim /���Il l�u l S lII II Icil I J -LCDEB- EB -LCDWB- WB / 1/ /l // f �cA J Y 4Pf' Pl St .19+48.70 n L 40 COLLECTOR-DISTRIBUTOR COLLECTOR-DISTRIBUTOR Y4RPD RAMP D / / g•vcP / S -I r----7 �./ DER Pl Sta 7/+9/.14 PI Sta 79+73.5/ Ft Sta 33+22.29 PI Sta 38+65.60 PI Sta 21+28.55 /// / / A = 2°38'12.7""(RT) A = 2°38'12.7"(LT) A. = 2°38'/2.7""(LT) A = 2°38'12.7"(LT) 8'11'49.6"(RT) // // =01 / r ��� END u/c j_______________�� D = 0°20'13.3" D = 0°20'13.3" D = 0°20'08.2" D = 0'20'18.5" D = 2°/6'57.7" i/ / - y L = 782.37' L = 782.37' L = 785.69' L = 779.06' L = 359.10' / / K// / \��_,_ T = 391.26' T = 39/.26' T = 392.91' T = 389.60' T = 179.86' I �� /�ar L / I NCL ExcH a rEsvlLLe RE= 17,0 0.00' SE =1 ,0NC 0.00' SE _l,0C 2.00' RSE= 16�28.00' R = 2,5/0.00'C SE = 04 2)/ N / /f SB Zaa4 PNGa47 / ul m� DS = 60 MPH DS = 60 MPH DS = 50 MPH DS = 50 MPH DS = 50 MPH / / I l / � �) ^6 _ 4 / / 7 n 1 55L3 I I II \\ I4. �M�Li Q\\\\F U J 082129EP ENTITY �/ l J�]p�/�/( l l �'%/pp�, l� �\ l �l � tiO0 I _II I \\ P-5 �5°a Pp.�� 6'CURB 6GONC9pGePCe'\ / - l �� I�OEIPI II 2�9 -Ll-� / 18"RCP - m • _ XISTNG R/W 9 5 /1 / 1;2_ �%a III CON ��_�,+� H- - ,,. -IL.,. W ,�/ /�� / 18`RCP--_-- .\ \��AL "sJ O/� �6 L "�G PROJECT REFERENCE NO. SHEET NO. �, N .\ \p� Oti zo`000.s� LANE i' S I ) 38/98 9A PN•\\-R \\ \\\ \ do *1� s R/W SHEET NO. >N S♦��� 0k kkb aK' '/# , ROADWAY DESIGN HYDRAULICS + \� '+Y� \ \\\ ��.� G y>P�+��� ENGINEER ENGINEER GF.6S ` 11( �� �y N,/. \ \ F�ti II LT( \ SEE SHEET 46,47 FOR-LCDEB-PROFILE 4 • \•'\ \\\ T GC�,ti\,e. \ os ;'1 c,/.`'�� SEE SHEET 66 FOR-YRPCA-PROFILE Lr -" "\ Fsp PQ�pe r ,co? 4SE ,,%e ye*'7 SEE SHEET 86 FOR-Y4RPD-PROFILE Op ' BST %C -‘\ \ \ , I- v', V G Pm c'' G/ \ m r o s s,,o. /r,''y4,Ay 9,c Q �s 6 po' P`"c a°& epm \\ �\ \\\ft, m n 4.4.:,` / ;7'/ j a SS CENTRO NP HOLDINGS 1 SPE, LLC o Z \�F1, �" DB 1877 PG 2169 G�e \\ '''P'' \ \\ </ r\ P e o'9 DOCUMENT NOT CONSIDERED FINAL p��/y� p\\ 3 \\\ \\so,� p�LT%/ /c% 0S� Pj ��P s�2jF '�^ UNLESS ALL SIGNATURES COMPLETED '\\ �������2 i �J�i\\ dys \ \ / / �P,,"(� N$Q'iQ3�E_- N 80'10'30"E 2.50.00'n N 80°I0'30'E IP . V •� -\) \d 2 o*,� BST +�, o s sa c°' `v/ 7, P 4z•cMP 133.03 zs3.Tr N ao•.44' E CENTRO NP HOLDINGS 1 SPE, LLC OYd pp0\(��, \ / K e� T ,., EIP l 2.44' o DB 1877 PG 2169 \-d p,b'O�\', 5.03' �/// Bss % c F, G�, p (LT a g U // BSr (� `�JLi�O EIP-R/W // \\EIP S� r k� p2p T ✓ \J O Z LT N 8050.00' O� \OJ 9p p� IP \ \ \\ 9p� / y0 ,_',A, Cp BST CONC 00 fl 3 LT c'' -�/ 24•C&G ((�J�� 24•C&.G \ (" \ ��� p \\ \\ '7Pg \9A CONC CURB cJ�e- 'CON TEND CONC/ - \ ❑LT = v_' - Z$'rm l ANK J2/ �� \ ' B,T D� q8�w VOLT / I ez' esr / \'X \ ,� �'L t - � o \ P x ° I 1 ps. l/ ,�,�. / //A Il 'F £A5 ' I CONC C �m K \ BST rn BST m q,I I a e s /ce Q L rJ p\ Pa\ ■ 1 I �I- 4 e71.1 \ 03-V- • a' V>0,51 // EoPa1 \ \ „c / 4'C�TR- GJ m '!.{ "�. '� m "`�C� ISFBUS 1 I I 5,V. "�m)b �`b / AG&� \-G9 tOr I C` / ��� ` \ ,jO ml 'I:h oA BET ISBKBUS `s �*, I�e r,/ 'c * \a ti� \ \\\ pN /...`cGNc\ 1 i 1 Bs/ y y m es I O el a'A �..•/ / .':k O'C�QG �4. \ \ �C C \ 4ERiA /CT C[/R� / -h w ISFBUS - I v OCT b o / �w G N, 'p Eks �qB L Nn4r u o lm I I �41 1 M ,) °''s 2 �`, '� / �I,rb , O 0, ,1 5 \ nN� °8 zzaop EAs �` I z *., CRACKER BARREL OLD J "� /I I "' Oy `%/ ..iit 0 m� // `i \ \\\\\R \ /8° 449a,Nr -P A' COUNTRY STORE INC. h'. T y': // L G ms oy "' �� �,S l\�Rc Ss I 7 DB 834 PG 214 #CON OLT CI LT 7 R&M PROPERTIES I ✓v �/- _ \ �� I ✓ter/ -- l`^-7 CONC CURB N _ e DB 877 PG 1533 I/ L— G6'� O � �►--r r WWII' / I CMAC PROPERTIES N f — J., //N \ �\ \E RETAIN #•i/. rtin"kr1A •I�+''aII' ra �/ t 208, LLC _ 24'C&G I CONC 1 05/1 o AERIAL \ \ \ CO C 1 RETAIN GONG CURB i* 11 I X I - 5 ,` \ N _ pSG 0 , :GP I' unurr s Ir v � I DB 1912 PG 472 I/ �// i - I� EASENENr MT g2igj ��� CNRB � n �l'\e•CgC BST r1), 1- I S I5'C&G �� 1 35'BSTN�6 r„m LT 11 BST lO __ =., ),,"- DB 02i Gam- _ `I/I,/ \ LT CONC CURB 48'CHL LT L J'^U �I— I5'C&G J / >5 PG Iosz Azyv, \ e•R / ce cork cuRa I l Is•RCP 1 >� r,l_., DI \ oq _ T i11[ � T 2RET6 ��-L 24'C&G CP RETAIN �% 6'CURB\ -Z • 6 \ \\ (RETAIN �B' 't� ". EXISTING RAW m 0 c� V Mi �_ _ _ - - _ _ __ _ u"•- :'RCP r i __ _ ,,,,1 k --� CPss RETAIN DI\\ Fs B� � _ --_— •-- _ �S_-- - _ -.,..-. --- —�c�%-C&� ---_RE'^`�` JB RIPRq �Q d ss _," -'�'`ID 5 RCP MTL is.RC. A .r-zTL IN 0°-- O RETAIN ' — .:..I ourL Eol-----_-_- --w — , 1 w W 0 \CK \ a �i.. �_ _ o _ --� e"VCP •ess \A v&6 �� E01 B'VCP u- aur.tO� 54� -1� ss ss _--- _ --- W \ /IN - 'T-- I MTL�`�r'—i 8'TC EOICs RETAIN 8'TC 8.TC 8'VCP SR 2/87 GLENWAY C - BEGIN WIDENING 4B7--=--- - P �_�—z______=__________M --�,_-=_—= — ---- -- — - _ �� /- POT STA.93+40.14 --- RETAIN RETAIN - o, r-L� 30'c& -- -- - - -- -- ---- —�&s-- =- _, -= -,E,L i - -- --il� ,^ W'I•m P\ \ RI IR MT CURB -'IDI -MTL I� RETAIN RETAIN — ��-- RETAIN CONC WALL � v, W - MTL ---- RETAIN RETAIN \\ ----- --------- _ RETAIN — __ \� RETAIN =p W N 55+00 all RETAIN 5 60+00 Dl l a ,,-p 4O-w6 595'�,•C OG W 3 \ RETAIN RETAIN \ RETAIN Z = N 1 '8 A\ ill -- I I IN Rn°12'5/5"1 P -LGDWB- V U/C I RETAIN\ " i W STAIN ll — M's } o'� — -- N \ N 1 -L-rPOT $TA.93+57°03 RETAIN — — — R�RETAIN . J °, <:l - SAWCUT a RETAIN EXIST.TO REMAIN O\� 97 ADJUST 2GI p u`RETAIN „_ SAWCUT 1-40 WB 40'COOT CONC.MED.BAR. ADJUST 2GI 4 -- ru lW \'a 0 i ,_ i_ -�- �• .II- �96Y 2GI — III — -- 0 - - -FOO-- —�-- 100+00 _-�,r— o — +00----- - O O \ Mial2EMEI 24"RCP-I I -L -s 2GI ' AR' alb ®d O �SII+ 8 II �, T �SFFi d \ ADJUT zGl ® N 80°l2 51.5E _T 2GI 2G1 e � MTL r_ --r--,--may 3 ' E=A ADJUST 2GI °° CONE.MED.BAR. ^' d E_ A \ �1VAy^ SAWCUT ,'''.1" SAWCUT-i I¢ Yl \ ,.. r-; J"II✓ +96, EXIST.TO REMAIN Z�,Ro _ r-; �0 1-40 EB 28'CONC _ 2GI 25: 2GI z4" -LL-- J 95 15"RCP-III d 50f00 ---- - - - - 1/_ .2 YQ970� ' .•, 2GI 97 `r d -- l65'BST -- d6Q+G0 0 \ \Q� d ��' 1 R801� OCT vsDEB y—- _2GI TiZ ——--__=_____ p.M e d— -W.6 \_ 2GI 1 AA --F� 2'51.5"D -- \ I 8- �_—E•_ - —__ REMOVE I•ii 10+00 Q --- • Q 9 \9t► -_-_-_ 1p98 �JII ' As o N \ s RIP RAP\40953 + S7�iT� _-- r 36 S.. _ REMOVE DI I YRP N \ \R1 RA" • 2GI 5 00 0 4f7Pr()._ �> s - - r sBc wr,;,... r, m ry N o SIP P p`` k61kJ�ST�� 95 o�IIP �� -i -_�•' n z v1 --� r-- ..,.,. M 'SBG W/G.R --- -ir - •2GI �$ 0 in RIP R P s e_ G_�� ' �_. - - �� - - __ i W _________, _\--- �_ _ k IF _ �_ 4„RCP-III ��'a - ^24"RCPIII --- i---_---- --- - a__- -- MTL___ LLJ eGUR: IY6 2GI 1� - -_- - ----- --- Z CONC e DGE '`_... \• 6 XP• F - �c F F F F 1� C sl l -- I� � � ZII m  R - F p©2J_,�F_x—x—x x 7�r �k P 'AIL, �F ii`i��i -_ - J -� �tP �\ x x--x-x�x-_ ,I RI® s F•�•• A� _. ..� 4 = ✓ 5 `�•9• .. Nlg_• CONSTRUINJ,R _. II x 96 r 0 S \ C,L B RIP ' •-vim -- -' ) I CL B LATERAL 5'BASE DITCH m // 1 TON 5 SY sr•' '� -Y''� �STA./6• 7 \/ 'I I 5 TONS SY 7--� s.W/BERM IL PSRM �/ N " ' .ra L ]..- e�l'Q• gcA/Z'r• 0I 24•R--�_j 01 RIP RAP'• I C -r�ir=iggistaay��/�5:/1J11�Q E .>• B RIP I E6000 R/w S. AIL1 o4..'i�..` • DEB ef S 47+28.66 j l �_J YI�l7'— x 2 TON 7 sY tik ✓S_-,' Y,..p + �/ ®®8°DIP �D \... ��� �LIDEBn SPOT Sta.53+5 .'L �T) .'--- x >< IA At RIP RAP e + ETx Y4RPD RAMP D L s i STATESVILLE m = _ GR CITY OF YR•CA POT $to '+9. i7 0 PED g•511‘ ' s + -` ' _-_ -� ------ -EIP`.,I,-. DBzoe7Pc24s1 w x PlSta 13+34.45 -Lt'DEB- POT •6.58+105 (24'RT) B°HD Exlsnrvc R/w = 6°22'S1.4"(LT) W j .- \-�.. - .. .- - ISFBUS . 0= °57'00" ✓f ' I o L4JY' x (CONSTRUCTION OFFICE) J L m D - �°57'17.7" , N m ❑ L-f x T = 334.45' o 10•\ a OF PG 1337LE I R = 6.000.00' Lj '.\ \ \ x SE = RC NORTH OFCTR�NSPOR DEPARTMENT SITING R/w / s\INi.\' �`:\ IBETCITY OF �ATESVILOMPHDB 2083 PG 826 ,,A\\\ \\ < I DB 2464 PG 1337 L \ \ S 42'43' . m \` / 19.6 22 E 41 FN '�`\ L— / .., .XiSnN R DUKE ENER y \I-1 J G V� --�W �_,\\ - 1 i2�v`._ U '\ / p x x x \//;_/ F p \ m __�/�/ FREE NPNCY AVE 40'BST Og �v� .- .. / . \ ,, �J• 2 BST %j E aEIP \/ ���— 65G07 G3696 ro '// r)-6 •• 5.sq# '1" \\ 3f-1 • �� p y. 00 �,/ /,p,.G 30 ,� :UKE ENERGY__ .. -. a \ A \ \ lg.C&G 0 &V ��3D° > C&G 6: R E .- .. .. .. 'a3 - VI� n,'1 1,..f / // S \:. DUKF F EIP\ `t. t: %,G a / r�"L . .. .. _ \/CC \ uro�„ / / u/ 96 CONe w Eli') N Q /// /// oNC LANE V S I ) PROJECT REFERENCE NO. SHEET NO. i \ �!1\\J����t u'D 0 /a r l ,n, �j � /-38/98 /3 �. CAROLIIy ��\ L I. EE - . `^' , E RM/ SHEET NO. /e• '"RED/ A F 96• ELT IB• / // m ROADWAY DESIGN I HYDRAULICS 11 EDIT ARM 50-. �!/HOP i—LTA \ 7502470 A a ��/ E4Y ,,nn,, \ / ENGINEER ENGINEER 8/1/ ,n, / L;1 / �// 2Q 6j��� \ l\�/ 411'Lr '//��,, CAROLINA FARM BST / l f Q . .p® \ 24"C&C DBR16D 7 PGIT 0 271 cL B RIP 1,' �� LT \ � o lit/ // _Il'GR ________, ` -- - TON514,'Y 29.RCAFII // � //y REVERSE FLOW- i --- BST / F\\ _ \� vv�l DOUBLE CHECKED / LL.1 ) B'''-'''''�_ ��= Fq�� UI `K` - LJ i� L 1BST N INV=890.51 --r-- I - / �_ / / i L7// „.',rPqe ryti .NN 1'71 5--l�_ \. ---p =/ 32'BST$ IS'RCP SEI /m/ 4 zq C&0\\\\/" q°°o F, Lr \ s_HDPP ———w—1 L HD '\------ __ _ /\�l //\ 1���� cs9O9 m �Si \ -W �r—�-- ti/ F+s / DOCUMENT NOT CONSIDERED FINAL THE REV. J. H. •RESS Y a o� 11 / B ��-�� - / nA'c .R FARM PARTNER IP, L = `� o/ el v w�'/ r-' _ ���� ��- Q /B'ig N 11 aWr MUNLESS ALL SIGNATURES COMPLETED DB 2124 PG 1726 'ia „;a =,tN ��,, // ��--r-- sP --_ --- � - sr �.� / a. HED -- l �Q„FIRST TRA^ „ w Ei M �� s /r 7° e s RC // Yl\C/ ta.19+83.6 oe sso PG Rc a / E\P jai 11 i �— " CR 4a•ww_� ���\ 1 P l Sto.lO h00.00 \� / 1 / 112i k i l • F, ,Y ` j% /i11,�' ,w - ' ����;5 K • k --r r�-cam r� \ \ l "� y n iiip -•.' / / MTL _--- it".' * �- \\ Sq 24 \ CMP EIP / 111 /� / ' .w;. x - - \\ 3j,icr0N�r 1,M's �O - / rj -1 111111 i —���� / GR , -^ 3 -- \ Y 23,8 •\ Nfik \ Ell. %/ Jl� E 6// / 98. ���/ /j �/ 97'B� k,'!L / 11Z CO --��� }' t W c �\\ I \\0-__ ///// N\ NC 4 \ \ TIE1 EXIST.FENCE -. .. .- - ,! `v .c\\\ ��'�/3 "_-�__ a N - \ / +95.0GmI- - -- - BEG SBG 2GI-D�1313> TOE P'c CTION f• �! I • Y/,j - �.F _ +75 WITH CIA' : "RAP TOP=891.7311 SEE DETAIL 31 .^ '� 7- MTL • . ' DI - - F F 18"RCP III F 1311 ~i _� O 'C` _ - ... .. ---2GI-D F �Ai F If F Z F F ---- - --_ F F F .a -- TOE :ROTE i• ,FEND o Z • I F WIT CLASS B R P'w-'o lj I +CAT-1 SEE DETAIL 31 -._ REMOVE EXISTING BRIDGE /V 111 - 8:1 2GI e-- Q`� . 15�TRCP T W -'�' SB� .R. 16"RCP-I 2GIIII 2GI<1315> ^,,1d 50:1 LU W a u �1314� - - _ a - W 4"TYPE IJ/K II N L Mrs „��",-, •;_.�-•�, .., `7�� t/Y T - — — ZII u 3— — — - - L-J _ — N - o �> ---- --- - W o � °w REMOVE 2GI II- -REMOVE 2GI,„,_ 140 WO RAMP 37'5 Qi7 \ ��^c'ONC B'IDGE o 1TZr �.r CO lC N W W --� IF----{g"C-/-CO �� o N W N ' z-a — MRCP-IV 2GI 309 N 80°l2'5I5 — MTL C N • a -- -�--V - -°-- -�V1�3®16 -�- 3S�C -�-mac L I ��_ CONC.MED.BAR. GI fIID II -L- �,� - ABLE - -- -�5"RCP�IV 131 2GI7CABLEiT =Q-- --iT-- - -- -- - -_�--(r-�CABLE� --z--L- - i r .MTL -_ � P1�� �� 1 MIL N _, o.E, N N n ~ II I --- l 10 CC RAC.,,^57-PC-NC �R .= rz•C BRIDGE --a— - __ -r-�- MTL LT 6� ONA --- - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 N N 'N 8: 15"RCP-IV 1 1 B:1 in '^ GREU TL-3 <1317>2GI �1318�2GI SBG W/G.R. CAT-1 ---- L IRQ307� `v END SBG - F 0 T < ____ ----___ Conv.DI TO JB vrMFt _ - +00 F ---F \F- 00 _ C � ��� C C / -- - C C F F F F F _- F----�� --� C� C SPECIAL CUT'V'DITCH C 30 C C SPECIAL CUT'V'DITCH 4� SPECIAL CUT DITCH II 2GI SEE DETAIL 41 �' •'-`' -� + W/HINGE SEE DETAIL 41 - IIZ 300'LANE TAPER -IN r 1.Q 'HL III ------ 48° HL Q __- ='l'_.EIP a TTTII_ CN-Re 193° , it PRCLFNCE \ a e / LU pR \ TIE TO EXIST.FENCE - � rc —�� ��--'----- ----.-_-----.- I ����oNc_ �� Z °' J JVOg1 _ +49.04 -L- / /// / -_ =w--------------_- ��— ��� o -yam =BST Il 64 WB J / / _ • - _-- ��COO/ A'��S'/_- _ / I. E coin ( M \ �I m I O� /// /�—i�� 48'CABLE �_�E v- - EIP �N��� II 0�� CSI V - ¢ / \ / � j \/S. /���� �— r - rv---r X X -_w__ ��� Bsrl ���I 4 AAA BST • 4 „ET 1 z,I/, \ / ��// / / w' - 0°8L\W�Cb - - ---- ��— - E __-__ —_ ���_ aI B K� \ ,• `Zo / / DI / / - - \IS71N\R7W -- rV r C -_ II E 'N /L[E 2 0\ / / ..`j P // I -X n _II7'27'CONC U Y / 0�gos / i 5 / / // e I _ w -m- ' _�� —4a' E _- `lam _ ♦ BST -®-_ BST _�� X CABL T / \ \5 6� !i tic 3 BSl /j�� ,I�� 7`j _ - --G- - EIP �� a ,,CO' v*'/ o / /a\ S�Ge ' ////ilk 5 %-i ,--, o�� 'l LT /ii Irw �\ �� - XTvr� r�6-��x r��__ I \ , o\\.s / 6/MOca0 ' qa,p0— �5 / B ___ .- J \.., sSo =w Wi,nt,, \) (f��� // 1 / r \ // * -��_•- L II-2aery AC -as Ei 'Sz,'M I IL.Y \ /' �7\qg / e ,� / E\P 1+ 6'HDPE - D' / 3 \ CONC- I.'11 S 845'B� �I I ---� Tll �\ .� Ian I* X \ / / / V:,, ( -- G'BDPE /Lr N 7 ' a04 r- I a \.. v �' L/ \ B5� ? / / % % %�e' I* o� *�' -______ \ l,n, I L ,fin{, -_-rNr��_ \ a T, / / /,•/� i�iP a 11 SS \� I CONC - _N BST I**T / LJ -"t��--•-��-- rs I I B°PV \ �/ j iS\//�O'\\ NPG \\m\ Z ' ISBLKBUS -_ •ID C I ilc, I _i:A \ Fi1 9 OCT4 1vI 6"GONG *1 ISB �bN I z CO'NLKBLI NEIP I q ST 8 I / eSN�\ m \ PpSJP\\P/ /v // ' °o£ \ -' I 8Si m I -J 0 ! �' \ \n \q ''/r9 `..�/B �� *\ RE��q\\ V-��� EIP I NG AD . i — p I y• \ \,•pG\O I HAAS / CARTERC LO CORPORA RACING m p w �'`i� c\ �w/m, \ ^C //„ \ .1,,,\--(,689 REAL ESTAGE 2105 DB 2390 PO ON I �yNOC ekrsrrN: il rn / // �" <` q A � m A�\ 9 ��n DB 1148 P I "° / " ' /. SRR \+s —SR_Yl5— y E\e / / ,\ ��� Pl Sto 25+32.96 Q o �/ 'Pan2/' v elW �'" ���,4 A = 36`39'10.6"(LT) //s- ,,,sm'G Qoa D 9'32'57.5" / K::N,, \ \'\\\' T = 198.74' LE m6 j 8 PRo ::P •ram* c F\ SE =6EXI T. oa ��a 7•:. ppRP\J,pN\4\ f A\ �`�`***v 80 \\ SEE SHEET 42,43 FOR-L-(RT)PROFILE ,,0. E NPR a s DS = EXIST. .. y// p958,n, p0.\1U \ *, , \ .l EIP e/,'Iv1N 0a\q 60 W eG �F , \ w ' J• \\\ Na\ \�'`'2-% --\ ; ------ .i:• r�i+Ys .,.tJ_ *\ 4. \ w\ �s _ \ E,. Z rn LANE `` ■\7 I ) _ PROJECT REFERENCE NO. SHEET NO. /-3819B ENGINEERRAN 4 SHEET NO. ROADWAY DESIGN HYDRAULICS I/I 7 I, ,�,o'" m ENGINEER �� I� al o iii° o ze ‘/ ri 2 N 1; , . i ,,nr�,, _ c; / I� ' t,Y J DOCUMENT NOT CONSIDERED FINAL I ( SOKBus ' FORT KNOX STATESVILLE, LLC U / / UNLESS ALL SIGNATURES COMPLETED / DB 2388 PG 2270 tL r. J ae^co co„,, 3 / / / / // G.L. WILSON BUILDING COMPANY ttJJ ss / oo 1, I j I (- q / DB 793001 30 PG 522 1111; ,,nn,, ARrN -Yl5Rl�B CS ,.iq+�jO��O = I J 0LIMITEDpBFAMIL U J '!< `1n MGM i r,‹ cR cR ^F °B,.TRgC PG 1854 SHIP es \ we -L- C Sta.2,1+311 2/1(6O'LT) p 6pPC I \ 211 z � 1--�Bsr / m /I G.EXP.GUTTER z� Q rseKeus I I�, / +75.00 ss�� BIG TOP, LLC I I I I /$ // �i. BEG°'ESURFACING LT+ ',I DB 1828 PG 2309 I �I I 11 /�ii/i I -SR,;0:"- POC Sto./3+9/.6T I SMTLBuS Q * -L- TS Sta.202+94.O/ -L- SC a. 04+ 4.0/ \ ,\„_, -� ` BEGIN 2'6" I I S .' / i� / ND RESUf� ,�,••11I `� f<l:� i IB�\ e isn +, 5 ' o vtO�N'(S�RETE TCH 9 HIND_ , s 1 I 3 CpN�<-�_ I C .� /v Q RC. NG R/W V W E * / lit. 0 L3 z-- - POC Jtal.�• M \. _ I R ININ WALL S v 6 r \ \`L �° ALL -7 -IB'R P SEE DETAIL 15 m P Eol *�-ry bs- IB° 4'C&G CRG' G/ ' __ BEGIN RE-1 I v O� ND 2 4 / gJ r 1�1 w .G� r -_-- RCP 2 57 - F�isnNc a/w 7 _IS RAP E �,� ,1 �iI �y 8"VCP 'S _ ° ° - �a -w- 7 ii-- --- :r 651�Y11�(�_ --_-�� -_ r" - _ - j 2�j-I'� �y I .r I� r 0 111 MT �y - - - __ -: - _ - --.Fo-- c =Trir= -- - "_ �+'- � -w O l �� T' - . r -aJriE - '�. c`'_ •RCP CaL 1. _-- *hhl� - w- ,� .� L - x O " La .,...,.._ ,A.," 5R 2437 WILS• _••• •• 1 1 :I° 15"RCP IV r� [� �. � 18"RCP-III Z � = �a , �pVd r� 2'. 1423� 426 rc o1B f• H H UJ i .,� t _w 15'RCP-I d �; c SE& 1M! ;� ifi=, .._ _ __- 2" R PROP.GUARDRAIL _'g27S84; TL - 1 MTL G GRADE •I S�� gie k,�eZ+���7i�ssaeW �-`r�--t �'>i ���-�g� >���_��r�.� .--�•� r �" �� W W 50:1 d B 77 I�� 26I �) „_ ^ 'T 4 R ,� „.- _. W - a END EXP.GUM' _ 1 •_;.. I 15"R P-IV _ _ _. `� r �' W �� 2G( 43 18"R 15 c - _ BEGIN S.F.B. 2GI PROP C NCE GNU RB • ---_T - n in I COLLAR cow-. (WALL �- o MT ��iL W L I 4- -__- - �0���- N V7 -. - - - _ - -Z{I s e 44'CONS c. o - LI4 . e o ENDDo S.F.B. 40W-- - o - W I W_ al_ 4. -4_i N 2GI rMT MTL r MTL l5"RCP-IV 3s CARE• �� • IR,L4f�1GI 3S CI -- � � - ^ - - '° - - - ----�5 rngRETAIN _i I5"RCP ---_--_ ._ - --- =mow' 15"R P-It T �-- ON �i/2G1 -L- REMOVE 2GI ;, 2GI d415� _ _-_ GI d428 -•v e. r• N BEE N�8O 72 57.E F r D r b5 *CPSI 2GI :II' v a v i s u' J --I- - - - - aLE - IN EXISTING BRIDGE N mO, 1 ZIIn_ I /-a9 E 'CONE , ~ o O \ I <II� S- s s N. cell - -- - -- Yl5f C=--+-- ~ --1-- y�i E O -- - - -- = ---! --- - - - - O O _ 1V�v r��1.5"E Frd ` * I # - 10+00 :r O ON. d. B. o * 8:,;� L[) u Du I B 9 > 100' m GREU TL-3 Q431> cp_iii L \ � �, ". `�. 1M F.---- I / 44097I N--- ...,,.d; ,_ �- - RYPI ° £.1 � 7I ls"775) T \\ \\,I / -- F ..� F I \�� d408�I��' ..,...F ---__________------ - FS CV r Nc F FI C C _ \ \' / I "-el' TOE PROTECTION C C C ------------------ -- CC -------- - - _. O r \\ �\ �r, / = GY% W/CLASS B RIPRAP C C S' Al DITCH C C C - CV �\ 0 /�W I see DETAIL 31 -Yl5RPC- POT •fa.7+93.34 _ W/HI -- Y 5RPC TS Sta.IS+68.26 c \ �` F / SEE DETAIL 4. Q - F- - - - EXISTING e w .d�t Q .L TS Sta. ,� + 4 5/(4:'RT) -- Q • Fo • �a// �.a�WY��..a ��i �-_ 4e°ww �_T= i._a��E x x- N \ _ // i O o.Ai -•Re�= - e.., ► EXIS '^ + ill: Epl V, ri, // . 11L g I `` 1 °I - Iz cR PROP CH FENCE o\©F -o W �.- / . BDO� / s `'�� % MTL MT/k7 ) •'ktea p�R N`° :9,:; \. ° p L J/q �jr` 6p• L 48�-- // ..e / TIE TO IJ`- , ,'+ <k MT/ AlL ry N m J �\ /7 e �;,: +42°S-L / X��k ''/ k o '. JPCP I k k� /\ •8 oN (_�N = ^�== - / �_ REMOVE 2G, / �I 875.90 .. / / dGP�/ k �Sl J '' z_v *.- UiCU( ) BST �- ,� - �._ p���GI-A�� f , :\: P, `��-coroc ��- / - i _ IIsilil °�` "s <8� BCACKWfCD esr ems" 0I:N \ _ I B===_c./ `_ RETAIN A CQ �. I , I OCDI LLC Qmfi •_._ ^c/�*A w Q/,`4j -� �\- z sDB 188 N°, Gx <- L ` I - �-/ \�� CONC -�\ g, \ FXS ``i �/ z pG 185q ,•!�'•�� * o ;__ / `` , g�1``- ,GQ / PCP ps hNGR a` k J,I�J ISFgBLK W O GNiI /- I+l.M a -- / \= // -\ S9,'1, RIF8 F/ / \ W 9 . k % \l BUS �� ic- in ik�k -• yam-` --- ,,./ -` oRAss - `- --`-` ss \�\1/ esr ACL /p m / i_ ���_ / v �\ �x�`- =sic\ /j \- -\\� / \�-_ -� - -� \ / ' +r. v \ m \\�� -0�\k\alb• �w�\__--\\ \�� \ \-\�\Jam=\``- 8°vcp • �\sg.- \�F esr\ J Lui co Eol \ " *c_ \- \--\• � --\ -`- -\\- ss tip' a/ �\ _ LO c.Q/ �� 2A9iPE-qC \\ND�'®\�_ H �-A�rc \\ \ \ \\ -\_ \\\ /w/Bw ATV\ \\il W\ I UiC i 'S''�// \\ \Ref RO..„ \\� �k\ -- DI - \� \\\\� -\_ os�= \\\\\ ss l ExShNc\ I R -a Riw B i \\ �w OSEROCK H Yl5RPC Yl5RP8 L SR_Yl5 \\ \�\ OLDINc, LLc 3 Pls Sta 12+01.6I Pls Sta 11+23.95 Pls Sto 204+27.35 PI Sta 2/4+8/.5/ PI Sta 12+97.83 PI Sto 25+32.96 ; esr _ \�\ \��c\ o 4g.ww DB 21s3 Pr. o._ F 0 '� es = 2°29'28.0" es = 0°29'34.4" 6s = 0"29'26.0" A = 9°39'55.0"(LT) A = 20'39'52.2"(LT1 A = 36'39'10.6"(LT) -\ 1 -_\ 6q\\ C ��MR Sew L Pes = 2°59'59.9" Ls = 200.00' D = 0°29'26.0" D = 4°52'34.5" D = 9°32'57.5" R Ls = 200.00' \_ \�\ w Mai�\ss 71J ° o N LT = /33.35' Ls = 200.00' LT = /33.33' L = 1,970.3/' L = 423.78' L = 383.83' \ \\ \�\ u��\ Jc m� • ST = 66°68' LT = 123.95' ST = 66.67' T = 987.50' T = 214.22' T = 198.74' r\ \ \\ \- l 3j'coo\�\ oNC om Q,�a o I ST = 76.10' R = 11,680.00' R = 1,175.0O' R = 600.00' � \\� ��\ \ I '(I SEE SHEET 43,44 FOR-L-(LT)PROFILE SE = 02 SE = EXIST. SE = EXIST. \\ l \\ SEE SHEET 43,44 FOR-L-(RT)PROFILE o a �s �� \\ \� SEE SHEET 87 FOR-Y15RPB-PROFILE N-o3 3,, DS = 60 MPH DS = EXIST. DS = EXIST. _ �w\ \\ l - r`� s�2?�° u rcrc v �J ��(jw �s -� =c \ sr ca --`�\�k _ �_ R 64fe\\� SEE SHEET 88 FOR-Yl5RPC-PROFILE �on e. 7Y C 413 PG 3301LL ~ ne (C)„�' >�17 „"\F ,ti, f� w �/c-�\\�\�\\ \11 FOl `i:.\k \cam \ M�KSI{i�\\ - Y'� 7K LANE " � I ) PROJECT REFERENCE NO. SHEET NO. G ry + OJ\�o� / pe�� \ �RREVOMARGIE G /-.3S/9B /.S Or\fit` + \I` 2� CABLE LIVIN7 RM/ SHEET NO. v �\��00 / /+/ --"-- Ss ,,+n�, WILL O7E PG 117 kl'' Ev.\sz\NG Fr.„.1 ROADWAY ENGINEER HYDRAULICS ENGINEERS s, F\. �. i;J ; •_ II •Pc,„ •• 7,v.•••,'`- / -FC - w- 0 41," G / co-F + W 11 / -SR_Yl5- POT Sta.30+07.88 �� e i i*' ,. END RLSURFACING aEd�ecP /f /�--- ®� s��G / i/• /` +�: J. DONALD CLINE Yl5RPB POTS. 8+OO.00 // - �"� /-% �+ / DB 2397 PG 355E `, ' ,/y,0 EXIST.FENCE \ / /j%/ ;Sy III DOCUMENT NOT CONSIDERED FINAL / � %,// Fo/ % `4., -- / UNLESS ALL SIGNATURES COMPLETED e \c) i ,g i // HW II 40//// //// , .,+.Y RETAIN, - "✓ // /�-/ J•• �E1 / i// a4 �`'. ,a� Yl5RPB ST Sta.17+45.68 R/: , .i g."- x �`�' �p 2 E /i 151a> � h .xSTMG \ � /�/ lb ////G co / v\/ �$' K7�' i�' /// N 62// 1111". III RETAIN / /� Fo /ji y\�e� z!l� JET'S +45.68 ..8%W �-Q ��/ ��48 FAP:-Sta. t` NR z4 ��i/ / :4K * -L-POC STA.219+35.97 FI Z / 4. :1111t /' / _RYI:; / PROP CHL FENCE C �WW 40 WB p F //\ F ' • ���48 0 // ��// �,� ` STANDARD 5'BASE DITCH / _/L Nr '° / 2GI 1 <1515� F// =_ / � ,_ �� C X+ / W/CLASS B RIPRAP II ,.«il ,.� O C �- 1+ F SEE DETAIL 43 _ -- F -- - G :RD II // D + yE .-/ 1 REMO ----- FS P•� c �/ CON RIDG�// i/ C �►� RAI ,: � � �� �� C -- N CAT-1 =�_ x 00.00 w 8,7 11. . O - yY� %�fsZa`C a. s Rce- cF i c___- c . a T - Q yyB 35 GONC � s"• A/ /' L 33.33' "e TL-3 __ - - 30"WELDED STEEL // // GREU �. •8:1 '--- 414 + m a w .p'LANE TAPER B INSIDE AND OUTSIDE LN :ead��0 _ � ' MIL v P 0 /-__71 ____7 6 1O r rrId W "CGAU AT-1 // ' -___r, ,,coNc ir m. REMOVE 2GI - -Q a _�--� - _' ,�--. ti�/ ~� , 1,- , ,i, W ®_r��' - __ Y-TEY -- 7 ®Np W _ '''�a.�r '2GI REMOVE- _ ___-- - - - _-- - �___- -��� Gf1 �� 24"RCP III --- - -- ,+� �--� 0 T d50a�2G1 ' RCP�: - y�iw o + 140 W::: ''emu r �i,- -, -u2G7® y 4 �I-ACID • se a.. END MED.BAR. REMOVE " S 1 I GREU TL- GI !D o F \ toll //1 S�Nidl� .�'�� f. _ 5�_ __- L F END EB RECONSTRUCTION "'ll / / Omoi MATCH EXIST.APPROACH - '-\ // p q/// N., --POC STA.21 .7 p // ki 720'EB MEDIAN TRANSDIOR N (RTC -C C • RETAIN \v Ill /// A/ //I// I ®AIIIIIIIIIIIIIIIIIIIIIIII c 'S NMI- O �� 2GI a IEICUT0TCH UT172 �D E LAN /� //S/i �� /B: • I '^ CAT-1 7 _ 2 TONS 7 SY :t.// % O /I L I I PI '' REMOVE 2GI -_�.__^_� 40• II / / ° / p RI CazGI-:x��► Ca t� �i c n n END �I PROJECTl �8/98�: �// /\\ Y a NV + ® 00 p 15"RCP-III _ \�Z;>:\ C L:Y // / \� O / O - ? r� ra +00 JB aMH ,�` ` j L POD STA.2/9+50.00 // 1 \O�2 d539 15"RCPI/l01 _ �r ` \,4_C // / XO\\ ;/ C C C :--: --° .. INV,88g.2 �����\ I/ 11 I // I RETAIN Q :tee_ y EMovE 4 Fe q ��� / z�/ I vc a/w X _ k ._ 2GI-D 'c" �' aNv zA'esr �� l St /l \\ I I �\ co',x a.12+68.26` v`�+-nw �k k �Fs\ 8°Rc \�� St // \ / I 0 cii - S•, e'S BERM 'V'DITCH , \ \ M \ -- C ¢/// / \ // �1/ �/ � SEE DETAIL 42 � kp � \ �� c, // u a.Hi PROP.CHL FENC JM � Um \F __ \\\ \\ \\ c �//I till l\\\ /I s W CZ R 750. 75", a-- ''_1-0, ��\ -, c '// l ,'l� - VA I ZJ a,,nn,, ui�SEROCK HOLDI TURN_(ANF T ''m\k:._.. '.� _•.P�U l v, \\- �� // l l \�o /� 3 4Y DB NC, LLC APER (T: ^+� -----4W �881.99 °'<�\ +�ys h c // l l l 4/ \c' // \ES N J 2193 Pg 2474 _ i C eh"\ REMOVE/2,Nwaeti 'i, \�\ ;,„ \ �n 3p' REMOVE DI 7 / hi f/ /I\ �OWGJ���/ In �' C , GI a cMP '3j - \\ \�\ 24"RCP-III GI-D .iJ /7,/ l I \\ P�� 3.57/ s\0 a m f� a * � - ..�7ce ��'.67 ���RF,H�\ / v_s /h' I v-aJ � o� i 0_ -Y`RF6- ST 5 22.* /Apr""'m-k\\\k410. \\ JS"RCP U7\ a�Rc� ��`� j �D Cri l; eION Yl PC CS Sta.l #22.14 I� c _ c ` �-.. k REMOVE 2GI \� / Y RP/ '"0 'to +99.24 m 7..'' "' ./ Fa'"' �-P F A* F�, '' C 'X� �� Y"7 :P - LJt -`' ,, -,---, 0 / POT Sta.24+L�"a- ito n -Y/5RPB- Q Q c e j lS- POT Sta.18+15.2/ BAND AND EXTEND 'awn' `' f °w SR_Yl5 { �' of �c, a Pls Sta 11+23.95 PI Sta 13+73.3/ Pls Sta 16+12.37 PI Sta 25+32.96 * s°�e // // m 9s = 0'29'34.4" 0 = /0°22'10.8"(LT) 9s = 2°59'59.2" A = 36'39'10.6"(LT) o 1/ / /�� N 9s = 2'59'59.9" D = 2°59'59.2" Ls = 200.00' D = 9°32'S7.5" �� ,6°a^p // 7 Q Ls = 200.00' L = 345.68' LT = 133.35' L = 383.83' "° S •c / / 1 LT = 76.10'' T = 173.3/' ST = 66.68' T = 198.74' Q u,-c To IST.F'EN. / l I /4. /N /III{ ST = 76.10' R = 1,9/0.00' R = 600.00' ROSEROCK {} .y k w' jll / j3 SE = 06 SE = EXIST. Da HOLDING, LLc / / ��%// DS = 50 MPH DS = EXIST. / 2/g3 PG 2474 lX /// // /// c -YISRPC- L - % y ,-/ 11 Pls Sta 12+0/.6/ Pl Sta 14+95.94 Pls Sta 17+88.82 Pl Sta 2/4+8/.5/ Pls Sta 225+30.99 { + /. ��ll// / ° 9s = 2°29'28.0" A = //'/8'24.2"(RT) es = 2°29'28.0" A = 9°39'55.0"(LT) es = 0'29'26.0" Q / //�/a Ls 200.00' D 2°29'28.O" Ls = 200.00' D = 0°29'26,O" Ls = 200.00' ? ( ) / /I l/Il ;_ LT 133.35' L = 453.88' LT = /33.35' L = 1,970.3/' LT = /33.33' x �/l//l ST = 66.68' T = 227.68' ST 66.68' T = 987.50' ST = 66.67' SEE SHEET 44,45 FOR-L-(LT)PROFILE / / / // I11 om R = 2,300.00' R = 11,680.00' ui MM c SEE SHEET 44,45 FOR-L-(RT)PROFILE / /// \* o L SE = O5 02 - _\ SEE SHEET 87 FOR-Y75RPB-PROFILE / / / //Ø/ /DS 50MPH DS = 60MPH �r� SEESHEET88FOR-Y15RPC-PROFILE / l/ \ m C/� o/a - t 797 LANE PROJECT REFERENCE NO. SHEET NO. I ) 38/98 16 R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER -_________7 ANC GRID N 8 5 / / / / / / x DOCUMENT NOT CONSIDERED FINAL / /, / / / • o I I UNLESS ALL SIGNATURES COMPLETED / .I ,'� l I l l / / / 1 / f / / I I N'm ' I I I l" I h I l / l"� x ���� 011111 / 4, xii lU I I IIWill ) x II o II 0 • 70 II �ULIA A. BUTTON FAMILY TRUST II 7 I\ II DB 1303 PG 7480 L __ I LI8 I I IBERTOLAMI ,FALTONCE 179 PG g11 I I rlo. EOALL l I I I 0 /_____________________ D94 T � E x 'C' o Z�jba __ E SPECIAL CUT H i�` E PROP CHL FENCE = •A �___ a°� N ^�M'�_ •3. -�.r_ = EE DETAIL 65 'i iinirj HW = �C` r- _ - _ _ _ - _ -.y' ee EXISTING R�.�A ` 4a'CHL _el+_- E r E ; - - �' +��—� r: x! x 48 ° .. . . �fr' • � 48 HL, X • / - " h! _ 'F—s3s - IZjt12Gl-D AWES 46'CHL T.y,...i' e"CHL W j. w �+�, 30�`"•'- BEG NOISE WALL cy 3,4, FS N " -Y_S-28+00 1 RCP-III I C �%.� A '''''VP 24, �� �✓ $ 100' _ REMOVE HW y� r,° EMOVE HWBJ H:EG D.BAR. 2GI-�"�'TTZRIA S �� ----- PLOWABLE FILL -- ---- -- ��� I o ����-- - � 'o n se 39 BST 30+00 �. - - -_-- ��j�_ I 'OMB ..ram --- -ems' minum_ aa_� -- �uaitr. -.! T—- --i _ vim` ®l Tit�s17P�:.T:LtI! 7�aF�� ��es_��sxz��.�m___ - __ T� « �� ,•rilusr an 7llf*eUfSS]�.�i>7�� ,_n SB 39'85T --rMTL r - I�ri��x + • �_I Q = �-r�y -T�-—IL-Nil' •18 RCP_MTL s-�_48TPAVE A u'..--- REMOVE 2GI 48 PAVED ---- ,e IME 0 ����r - - MTL i_-T- �. 1-77 NB 43'BST _ *MI! ^ _'� iV y N � N� -�- +911 r gPAVMI �� a c"Z v iv •• 1� W �� MILS-- -- _ -- .6 -- �y Cvl — \\ MTL SBG W/G R �� __ h/ , ................................................f . ms; f 1_n wg 385'BBT��---- -- -+ /\\ \\ \ r ff f f fii f fff f r — — /� Y �� RESET GUARDRAIL h BEG SBG 100'SHLD TAP _f• -S a.;f'✓ .-.f. ' •. f f; �. fi' f f!.. +25 48 ER�T / / -o n X x x - x48 WW.8. ISBw Q607> 100 f F f F F 1. ' F.! �% BEGIN CONSTRUCTION j j/ ' &\SOW =-_ .• X 5f ll�pA�i / .•_/ x W/CLAS , -_ - Sf R Sf 51- ="�-$¢ ROCK PLATING Sf �f SEE�pp���NNNOT CMp `„�� � ��-- •^� W/1.5:1 SLOPE / 5� BEGIN NB RESURFACING ,// // 48 W PIPE OUTLETFCHA�NEL STABILIZATION 100' SEE DETAIL�3 Sf BEGIN SB RECONSTRUCTION / ��� END NOT q. 360'MEDIA8. TRANSITION F RI) ryP I 1— ' FOUND / $I RIPRAP �1601� I\Ai X�x 8-Q WISBW �, 48'WW58� ' _ WW & ISBW N�� S SEE DETAIL 64E--_ _Z x —Y S— POC 25+00.49 / / G p �P FF�tl ---_ —' PROP HL F �j �� END NOT ./°Q% --- P - --- - /// FOU�p °' ---RETAIN IS.RCP __b\S0'`R ,o%//i FOLGER DR 25.5'BST IV g _ 0 P / �� // /8 / / �/ 18� RIP RAPURB RA IS_RCPIPRA6 ����t�C7RB--IB'RCP 2d B57 4�� - -�-- S _G --- -- —_ B R13 _ �e SS aaesr N ss 8'NfP cac EIP °III S.EIP T9t� Y_ Cis Sta.33+4357 _ y-- / RCP E%ISTING R W 5S 8'VCP 55 RIP C 4 \��\ � / // // ///% 6°CJ/ 4d BST c+ VCP I o II 00 128,B � r Jr N/° 7 -\ \ ExiSnuG a/w Px I � 25 V m —Y_S— SC Sta.21 j/ / // /""''''., ss,alW I /9, il m Q \\ �I\_ \__� % u es \ /73 � //// //• xs,N o� END NOT - -"�I I n LT tiµ - \ - + �Q FOUND �— �-� --� j w. —U��_ LL'1 // °J / 9� / III -� \ / DI m1\�q I -la'RCP �7 / ,, / RANDY MARION FORD FLOW 1003 FOLGER LLC // M / FJ/�/q�� /� �-II LINCOLN, NC 4 RCG i A DB 2291 PG 898 _II m /� / ///% C j// // //�s n•\ �/ -8 DB 2489 PG 1332 BST BST DI -- ' I�a �� +a// r �� a / / Owe, / 2A acP IIW a I rO ❑ Bn // /� / / +// / // *.,�°G n/ v BST i' II I ❑ //-' a i W/FES //�// V � "D / // /eG,\ f _B' - _ I I /i — _ �� I ❑ Il u: DIB S / / y5 �/ p ❑ oo m ❑ri m ❑ / �/ ��` ' �� III co //// / �/ /APO, d� • i/ ;, / moo, °as A- ATI III G m➢ Ih a .e'' A� III II ten_ w 6 I IS/ / FLOW 1015 FOLGER, LLC 8o w� o S DB 2233 PG 1213 N 03'02'01"E S 03°02'00.W II N 6�� X 49.14' 226.13' ' to —Y_S C 0 _ -o Pis Sta 20+35.76 PI Sta 27+24.08 Pls Sta 34+10.24 N 02.31'10'E O eS = 0°39'58.4" p = 8°16'07.9"(RT) es = 0`39'58.4" 9.93' y Ls = 200.00' D = 0°39'58.4" Ls = 200.00' I LT = 133.33' L = 1,24/.14' LT = /33.33' ST = 66.67' T = 62/.65' ST = 66.67' o' R = 8,600.00' m. , SE = RC om DS = 60 MPH� � SEE SHEET 52A FOR-Y_S-PROFILE 5oa - SEE SHEET 52A FOR-Y_S-PROFILE 1 ti ,..--EC LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. /7 R,W SHEET NO. ROADWAY DESIGN HYDRAULICS / ENGINEER ENGINEER Q o G 5"P// 9NGe � � / / g395 /� GRID NAD \,/ / NC of r /NAG V m �O \\\ 5 ?'\5 ti�°° DOCUMENT NOT CONSIDERED FINAL C< z N UNLESS ALL SIGNATURES COMPLETED C & P PROPERTIES 9 Av%m z352"vg•• OF STATESVILLE, LP apo$R 75./g• £ /67 �rr� \ , 6 J' DB 2439 PG 433 �i- Sy DB 1833 PG 329 N mN= 6'CONC CURB CON�E = / / o V ti � �* ©�F y� o e. ((�!�}} Sf sy Ste. ROMAN CATHOLIC DIOCESE o o G^CONC.4° /S �". // '�,S.�o•. OF CHARLOTTE, NC ISMLi&BK / F DB 2439 PG 431 �' Al.:, x'1 .444o, , STATEsvIL JULIA A. BUTTON FAMILY TRUST o •xe H. o J MONTESSORE ' SCHOOL 'x / DB 1303 PG 1480 N 10'37'3 m \ BST ¢°' l � # 2 05 DB 1179 PG 811 �.. �z E / +� _ o DI +Xi I /S m s �m // ROMAN CATHOLIC DIOCESE l BST i \cam \ l�} * - �� IQ �,0 03. 1 y OFCHARLOTTE, N / r *• • �o rnADB 2439 PG 431 THE MAN CATHOLIC -�' #. _ : 32_ (,` �zo m+11 -Y �, ST?PHILIPRIP 18695?LTY_S �C)D coin• i 69 DIOCESE F CHARLOTTE *� HEAPOSTLE DIS'IPP•REBASIN #2 159 : 430 PG 2283 �mO © GR /p 198.06'LT m ROMAN CATHOLIC OF CHAROTTEDIOCESE 51PG523 'oo`�J° CATHOLIC CHURCH CL '' RAP NN>o �Am DB 2439 PG 431 / NC�y*i SE .`TAIL 32 y65LTY 5 `'-+ �. �� \ ��� x,� , �= N LP N 720 a R R L rr��,, - �Mil'� iG<l_H .. • T No ., . OP TAPE W ..#'' + "• •� O +:.0' _y - T4 v +:7.1-Y + o o \\ DIT'@E PRO o. mo LU • 133.40'LT / +42. Y r +z AL LATERAL ya i� 121.96'LT E m ti 165.6T LT W W BASE DITCH OUTLET CHANNEL A ax WITS��•SS B RIP' �s.�� o BEGIN _ �E 5Tq�1LIZAAON - //j _ \ SEE > L 1 I ni CL. RI RA LU . SEE DET1 _ SEE DETAIL 48 ` y e,, - GUTTER AO 1 TONSP SY - 1 TO85P5 S T- C yam✓ rI� c �'.a:....: r. .r y r. y a._ _71La/.'_ 1011111• 72 N NOISE WABEG SFB LL/ 54"RCP'HT 17°5>HW qy rrr if > H \' k' LL, // 9 . EXISTING ISM f*1 • _H• G" ' � i -- - �—+ N .�sir yr � v/LBOwS F LL! � LI ///i HW 72- CSP • - - �-----48"CHL .. X X ® x. X4a"CHL x X L96YCHL X G// X _1 X48'CH- L N 15" E LLI N \ -11709> - --- IIEFCOVE1IWIVED - // mph�� -I L B RIP RAP + /O OVEN EXP.GUTTER W/G.R� i, __Aii& ,rv'• _ TB� 15"RCP-III TB N LAR --L^6�-- --L--,- .- r' " 4 7iME-� TB 2GIWWHWI �� -- - _-_ �r - 1 --s--L--,ems-L � �- ��� /0 // 0 . VA // _ 0 0 o 0/ •W //2' END SFB W/NOISE WALL I o ,.: / O njU,�Q BEGIN EXP.GUTTER O ''AA REMOVE 2GI // �m 15".4014612. 15"aCCP-ll > �S�R�P -r--rod --r-• �3 -- -=' 2(31 �_ _0�00 --+00.48 _ ,--=2. ®2GI r B9 -,�,- _ a� O .v r_- - 0 _ c 3-- d MTL T---� ---'ti•niMED.BA-R. REMOVE rr � r r Tr zr � z iz--r- et-� - r TL 7 v . CD - _ _ � _ i-- �: - - - - - - - --= -.d732�,2-- _,- -s - --i-- --T- - MTL M T MIL - - - - -- - - MTi - _s_ a Ar - 2 1MTL i ' Mil 1 GI 7R 15S RSP IV • M "€ MTL 3�'1?AVED_� 'GI 6 O ^0 , � c ?%/o� t ,// REMOVE2OE REMOVE `\\fg /// --- 15"RCP- o s _ _ ,y fie// • �[�/� \\�' REMOVE RETAIN��/ REMOVE CB I� ► O REMOVE HW // ."' _--_ --r . -- -\\ -- -- /// - -- LLLiii SBG W/G.R.�707�COLLAR rc // _ MTLr T MTL` MT _�' .rra . t73 JB A-m .....� G M .1 ,..rf(f, . -. P jif .NC 2'GI 15"RCP-III A END SBG +20 IMMUNE d <1731> \ 7\ `'� // �"5 Nr (f f W NW o �0 117391> N �/' 39 REMOVE HW 4 CONC HW!. r 2! o n�® 'LANE TAPER R • j - Q _�Sr Sf K'...u,r_ff--.._.. 7c!irri :- .:f'+.. 'S w i.d,,i fNr�� `\. �e FORE Y W/ o b 0.Cp-\\\ //Fx^\�X \ B w/MHX T`\ X X X ��++,,,�:r`" X48°WW .ISBW X .OX_ e ^ + gg X 48'WW ISBW W . S OPE _� ___f a S.. V r .. Ov il�X .. CLASSAB P/RA � 18"'�iVT J`,• CP r'-' Fes.::, S� C __ -O'3 - x :•: ''� DRY DETENTION BASIN'" "C+i`� - 'ONO... A'-/" R Y/ i y V - /J II11�11p --- N i-,48'WW & ISBW 70 .,m H \` WQV 2,562 CF 48 w & 6 C a,i a �X`� / i 2 A C ------ ��. BASIN VOLUME-2,462 CF - C 1 R ,_,.,,,.. /j pVEM '' .'> `' 11738>OTCB TOE PROT ION •iINLET CHANNEL ,- .r.0 TOP OF BASIN 877.5' • : � // 36`P // 24"RCP-III WITH CLAS'B RIPRAP _� $EELDE7ATION <//. ,/ ?j S"-SE DETAIL 3 W L- T--s-SEB DETAB 50 m_ MTL_ T 4yT� 50 YR WSEL=875.7' p G u c RETAIN W '-- R- --- y./ irr(' --- ,C` L..L....„._ s:,, -.�i ����� L t �� ...�^^ .,.^^,�._tom+; s _ nh r D PROP CHL NCE _ L cn Z mil--------- - ,�,� GREU T-2 EL„,, Z -Y_S- ST St0..S5+ ❑. 7-DETE�JTIOTTODTLET- IAAT___ _ e=r1l1J7.1011Wl�t_n/Gf►� - - =j -RESET GUARDRAIL -�---- ___ __ 158AZ NO 0307 --- m TJ ss �� --- STRUCTURE � 0 ) �� DRY DETENTION BASINE�- DETENTION OUTLET CONNECT T /�- GREU -2 _�- 2 r D_ s 0 -�_ WQV=63o1 CF STRUCTURE EXIST.GUARD RA� FOLDER OR l95'BST TL -- - T 2 -Ic}- ---- 8'VCP� SEE DETAIL-ON _ END __--- �3V5 -- (-Y , -\ BASI --4Fr"�" —— _ m U ? 54 El 335'BST °P% - I F._ - 5°CO C e' / 8'VCR 30'C&G ss _ - __ 55•CONC �5 "CO �� 30' &G�s—� V R/ yd Er 6e.o' g ))) al"-�� eft } • Q - - IS'RCP — r EXISTING R wn-.,_ - 5l COUTN ,�+, r+�, O .�1 / II ciL: s ` -I III I ''. II -� I5"C&G �- n'' -r '� x � —_r_c;f DI PSI I II Ii j// W/FES bLF, N EXISTING R/W Yv: I l I2'RCP 15"C&G E ISTNG R/W \ EXISTING R/W4/ U 0_ I J mlf: r BERTOLAMI FAMILY I--24"c&G�1 ��,II �� II BLK I / 48"RCP ^ II II �' 0 ^:I LIMITED PARTNERSHIP G I RISER _ BST CLEAN J� Get `\-- '� ;> � 24' ^ I _,_ 24'C&G 1 -0 c°i Il 1 I DB 1894 PG 1214 OUT �3 0ll u BST N cs -I ^. f2Y;..Sa.'� C&G `= I II - II © „ • _— ➢1I mIIInl IIII —__„1 - *~ �I N �r�� ����z4'C&� o III m 0� �❑ w II �?F ISFBus p �� I z4'c&i i �fi 4. ,' III III r ABsr �� GO N II ~I hw �❑ �.� ❑O a 47,4 �'CJ, 24'COG a°I E I II A I-%II I, In Gd a�j BST `I'xIT•LxI). ISFBus I II I IN z4" /� III FF�/ �'I w c I' c G FOLDER DRIVE PROPERTIES, L.L.C. i`• DT INVESTMENTS �l ro n w I) DB 1189 PG 884 24"C&G I a II II I Iup I OF PDB 1793SPG STATESVILLE, i III \\�I 14-.7,.., 24'C&G �II p ,Illy �II�III� 11 '�____—====c&O II II B II All III Dc II Az•�Ge -n II x Br O !! i RAY LACKEY ENTERPRISES, INC. II N4.4 8 q o 1 m II y \i, DB 2211 PG 41 - DI O DI o pr°+' I o mI I II -- 18"RCP 18"RCP co m II END NOT to * z11 III I r II FOUND i CO END NOT N 1104 II ❑ FOUND N II c -�'-S- 12"RCP I II II y Pls Sto 34+10.24 s END NOT Ilm ° ° ' " z FOUND 6s = 0 39 58.4 1 Ih — L' Ls = 200.00' p I I I LT = /33.33' ❑ . ST = 66.67' III -_ II m "om I END NOTII TI o ISEE SHEET 52 FOR-Y_S-PROFILE m gQ II PB ~Do 1' II d \/CC 5 02'S9'22"W I I II �/rL m,. �5].4 x 39.50' LANE NN S I ) PROJECT REFERENCE NO. SHEET NO. f A 38/98 8 N O5'29'48"E R/W SHEET NO. 175.00' _ ROADWAY DESIGN HYDRAULICS MP IN / 1571,39.. ENGINEER ENGINEER e ae C w I� II 64 15Z N 192.77— To CONC /jC O I[n m II / q1 S.LO - HW / .Ini II M CONC m NC GRID NAD ww II > "N ' 5 N 02°34'36"E spa°'. 176.48' 2.14' 1,1,1; D^'N I -R/ ii B'B-• I N N U I o m�� P vyOs6' m pc DOCUMENT NOT CONSIDERED FINAL v'P PO's' A UNLESS ALL SIGNATURES COMPLETED \ MELVIN • B. KELLY SHANNON B. CARVER G�x2 686 PG 585 AND DAYLEN W. CURRY D1 s<'�s F ELIZABETH W. BURNS THE AGNES SCHNEIDER OTIP TRUST TIMOTHY KER WIN GARBER \ JOE BAILY STEPHENS :- DBDB 2482 PG 1274 ���.`'�• DB1382P340 DB 2453 PG 2191 B 22 g/a D 52 PG 343 / DB 1871 PG 761 EXISTING R WII SO• / E%ISTING R/W H 4 A* �SZ \ \ EIP .. . ( --- 0OULD-- y y 9 n T EXISTING R/w N. 0,1 o I_ 9 / t:J' 'i '�� o I 6r7RLW00D RD 8/,�CL57 I II f-- __ I_ ti EPRLW000 RD 18'BS7 —_� �� E// /\• // -. .- - -_ - �+- -`moo >E EIP 8"VC• + v rR. EIP .. •� _ - _ __ �► - .. •�N. /l_ .. .. ..� 12'RCP •v BK / s�� o- / EXISTING R/W#T*;r4 j.' 1 r - .. .. .. T. -EXISTING R ` o m - °r.�- .r- plo. W 06 ps •iF 40 Q .7 I ,. I P- o I `/% I JUSTIN CARROLL Y I > p C'— - `� + ;No, I x EXISTING%W HW I, `I� / �S6 / * o m I I m� m z DONNA M. EAGLE DB 2394 PG 980 �' I 99+ R BERT A. C LLIE Jr. •+o r DB 2138 PG 2117 I _ � i p '^ *1I _ L^ � J \ 0 n D \ DB 32 17 5 '�'\ ° tO a / 4#** ,at e°, BRAD MOFFITT ELEAN OR B. McMILLAN *RIM: '6.--' I /o,,,,k * I m yI I A • `k _fa..x 48^ 0NC*;* }_ FDB 2461 PG 1752 DB 1544 PG 2006 WN 0 . t*,1, * * F *** 4' y 44 " *7 O ° / fl,.• xrx- ♦°%YI T • ©�E�v1 z 'mz **4 Lna-x♦ 12 144!* a�.* +F!' I m ROBERT A. COLLIER, Jr. . MAYRA FABIOLA ) 4i+L'wir €R20// \ �E01 1� I N FAYE M. GOFORTH DB 524 PG 209 -\r T`$ ara iy* 0 Z �. r Q3 A.. DB 879 PG 1820 IIM��� 300'TAPER LT p PEREZ ISBKD 2 * 1i. I�4 I ISBKD .tY° �xlk*, �J ti DB 2186 PG 1374 chi IN * n # ISBKD I- * I *8 I, ISBKD © .}} o N L -'EGGY ym,yo� w * TAIL DITCH • - 0 �— AL* + I. JB 676 P• L m 2SBKD `" W/4'BASE& ?� N. OK .. J 0' STANDARD 'V'DITCH �' *.i41E** C • W/CLASS I RIPRAP • \ x �N' .- .- SEE DETAIL 67 �_ W W END W ,*dF �'*wit F*i �'�' END PWY ER 1� SEE DETAIL 49 4 <, „i• = r` /// _ = BEGIN GUTTER 5. CL B RIP RA' lQ mr i o C� C C W 05 464 /1: v ��� <1801�5 7 5 1 . �._ BEG.EXP:GUTTER Fro �``�? *'� -) R $/_ e x ID m C / ` i N N � T •���� . o �x�c `x' �.5 O\50� c604_, GTD � NOISE_WALL 0 GTD W NOISE WALLC 7!�.'44r F ` ♦.S d8o4 HW , lA m GTD' ., m GTDwea W C 48'CHL . 48 CHL L; 72.CHL 191 O - • - \\ 2'CHL • �. .x x c�x--. _ x °. , x x - x 2GI x - x x x Z x x-� Cn - P ND 27 CH 2GI<1816> Cr) •- EXPWY GUTTER W/G R - -,1 BURIED 8 __ - - - GUTTER W/G°R° „� < � GRE TL 3 :°7 V) w ,1 B-77 80 2GI 15"RCP-IV na4LA'/ ' C .• ALL B-77 E tn .-� .. EXPWY ?_- =s T _- --- - 6"CURB _� -REMOVE _ O I TREN HLE S TALLATION _ _ C, _ NE—_ 1 _ 42"WELDlD STEEL `L. I M—; a//p 'II d809>2G1 REMOVE 2GI m ..—RRET>GI $W—RETAIN I _ +00— REMOVE 2GI a//F mll 55-/-()Q __ ___ \\ <1813>2GI O - d ---r- xr ' MTL --r--i- --' MTL -�- � •--M--r—� ��---- --- T �`— -- — --r--i - 0 Qr _—i .. C_ _ - - T-15"RCP •-L =z--r---L--= _ _ _ _r--,,�p --48"RCR,IV- --r--i---L -_' DI :I ItYP.. _ -r- MTL 24'RCP'= _ _ _ - _ - - - - -_ --z L-r-- MTlz--t z r s z r � - a•a I ° -_ i--L � iMTLLr -sLrMTLs . . __ s� ----_i--ram <1a1ai�.,I ,�//�0 REMOVE 2GI �SI�°....-... . =F__o - 0 O REMOVE 2GI- -"'/O O N ' 0 T I- - ^��— - _ • --- -- _ mII REM• E CB' -_ -REMOVE CB _ _ 'URA FL11.11MIN REMOVE HW cirn1 6"CURB 6"CURB 24"C&G -- Ir1� __ IIII ,,.- �^�• '� - .� REMOVE HW �— .. T -. 42"RCP-II A ONC Hr. � r� SRC° CONS REMOVE HW •• GREU TLC X CAT 1 ' =. dao7�2G1x 111 H, —x x x • x x— + —x-48•ww261468 _ X� - %' �--- _ (n �' _i _// -NC F��� 196.56 TAPER d82 5 RCP III -- - _ - ,__- 2•�>+-= a,-II W 36 C0c , + I s�-- -- C 4 d80572G1-A -x f 18"CSP' 8"RCP 1a W xr, C ----C zc -C ----C --- PI x: C GTD x X G,,a,3e v/ELBOWS Ill --- W c d822� MN Z -- --- <182317 a _ CI LPROP.0 L ., . .. IIzPR.O.P CNL E LC • -- - `� -- ii - -o J .. -- .. - -. - -- - .. _ _ _ _____-- __ _ REMOVFG XISTING DITCH _ BDO ti - --_ �D�TrE•.y�i •� - ss- m _ ___ _ _ GR _ _ _ __ GR _ _ _ AND_SL PE TO-CU_TSLOPE___ __ _-__ _ _ 4, •-� ', _ @ 2 GR 8'VCP . - .. .. S .. - •- �� X _ �- T. - EE DETAIL 35 \\ .i- - - - - �ri6TIll R7 'y COcD / 1 �_�_T,T. ��:. z - M MTL T MTL x - .. 4 • .. E ., `�\ V 8'VP m X _ II HEAD DITCH s. Q' CONC 5' II CONC GONE BERM BASE DITCH -- R m L-. II 36• 2-3' SEE DETAIL 66 i' •R - PUE \ ` P xl- ��� CONC WW /' / ' SEE DETAIL 34 r EXISTING R/W 3 �F - �� �—' RICHARD K. MARTIN 202.29'RT +. -.•RP U�7F co 1 EXISTING R/W • g MELODY P. FLOUTON r Cr,II WAYNE 792 PG 503MARTIN DB 1705 PG 1908 ^m DB 1230 PG 785 \e `1' PB 6 PG 8 LOT 5 vim z •� I I © 0 0-.PUF. EXISTING R/W I ' • EXISTING RAY gall i I f Y•''PC TO Sta.11+50.O4 -Y9RPC- POT Sta.10+00.00 ol, __ _ .._..____ _ __ _ _ _ _____ _____ Y_S POT Sta.60+10.39 (60'RT) El_ coroc 0- I ---- GRlri; a II A= 3°30'0.0, EXISTING R/W x x EXISTING R/W Y EXISTING R/W EXISTING R/W / w v / RICHARD K. MARTIN RICHARD K. MARTIN RICHARD K. MARTIN (RICHARD K. MARTIN N RICHARD K. MARTIN RICHARD K. MARTIN RICHARD K. MARTIN S' GC WAYNE K. MARTIN WAYNE K. MARTIN WAYNE K. MARTIN WAYNE K. MARTIN WAYNE K. MARTIN o N WAYNE K. MARTIN DB 792 PG 503 DB 792 PG 503 DB 792 PG 503 WAYNE K. MARTIN o S 9.61'15••W DB 792 PG 503 DB 792 PG 503 DB 792 PG 503 DB 792 PG 503 N 29.61' m DB 1705 PG 1908 DB 1705 PG 1908 DB 1705 PG 1908 DB 1705 PG 1908 DB 1705 PG 1908 DB 1705 PG 1908 DB 1705 PG 1908 _ PB 6 PG 8 LOT 16 -co PB 6 PG 8 LOT 31 PB 6 PG 8 LOT 32 PB 6 PG 8 LOT 37 PB 6 PG 8 LOT 38 PB 6 PG 8 LOT 39 PB 6 PG 8 LOT 4 z I - - - Y9RPC 0 _ -o a N - - Li SEE SHEET 52,53 FOR-Y PROFILEzlcr, es Sto 12+83.44 f p aN os z9'33 9s = 7°09'43.1" _ £ £ SEE SHEET 77 FOR-Y9RPC-PROFILE y 186.20' Ls = 200.00' N 05'29'33"E N 05°29'33"E o LT = 133.44' x 179.40' 69.83' _—9••W I ST = 66.77' 128.86' E',,,,m S 05.40'58"W S 05'39'44"W S 05°28'S1'W S 252.90� W II ^� 99.49' 100.14' 99.71' v IIN 5pUI ll ,oa ti d lD/o_ 1-3819B s:-• -MATCHLINE STA- 19+50.00 -Y9- SEE SHEET NO.28 `\`‘‘...mmp„.,L,'-': .'''.-1-“'"?." _.,..,100"., (1)1119;g$11111/17114 ' f f ill 13W SlIFF NO BEG BRIDGE END BRIDGE -Y9-Sta.25,37,33 ' --'"2.2. of ox -Y9-Stq(4558 A r9 o ,,,,,,, - . -c' ‘, i,i-,..,..--Atk ' . ,- :„. 4-, • ,,, . .. it- 19800 ' ,44. 4 '.44-0A1Vikt., e •,, •1 ,l'_,3 Al..AB RONALD W HAWKINS Jr . a/. '5'0 ,* k \ 4,,,d,,,, q=. , • - 9. s . 'N + '-‘ .‘3\---;4(a;le44-V-N.' "":0*-7-°7-''s'-'°Y.54°PC S,rg,'.3i • 1111 11' a3Lf-? 2,op04-, - DOCUMENT NOT CONSIDERED FIN. .., , .--- •:'. \ 10SIGLAS RALSTON 'r komi. -168___24,„____&,.,,_. ____,,,_•:_1 ' —2-----;--. --------'-'-- "...-.H7.......luizufr....-AINIIIMMIlmi."1.1.1.11- 1111111.11mirVidr .0,11Eiwit•,44141tivm, © ... ,,,_..,.. ...A1,ffiS,r2.-=----- ---. - ,-----'---,- -------- 1 UNLESS ALL SIONATURES COMPLETED s C 33:372)00 ,.,:.3.._.3.000,900 , -;-1- ' ENIEWIAMINEW ---. - S 8ZajW.E 674,0;00, 67P÷g I - N*.k two". . - .V rm:2,2.2k4zusinAMIIRE, ipir.a..„ . A 1 1 c #007) (L'±g <4,0,,s, *, ',74.4,„„t-ik\;:0":11.,,,V, 1„.*#-.ivir......3 - pit,i, 1 t14,_,, y..._!_217F.0____,...._.,,,,Nicav 1-77 6,400 ':1"-- I_.,,,b.' „.,,, • ' z,•.,.. ,,.,:\•N .HogNer,„,TH4,..,-•,,e 1-zi 10,01t,,_ N'irA_,. t! mil,".•es :, •?';'°'.- W '* TRATI ow Z i . L I, " iiiii UM • '.,,:-,_ .N,-- *10•4.--" •-.610.1‘,4 ...2,;._•,,,, g -I:,;v ')A/,'-.I.1.l ZA1 N'=m=-•-I.,'--'1l-'A'*-1'1 4-='.2.-.. \—N-i.,%','.-'w'1W.kr\.,,E-s•,.i gm'Ai,l-s.E;i,iig,--'e AMVI.m.t-M0(I.„..,,r•:-"•,-N,,-..,.7,.--..,.,.v,_-.,..Mi.:I,.„..;.;...Y x:F9„N:,L.„...„.:._..-.x-'.-.- .1m2:2,:21p i.0ar0.:i4,.1Ir'l.7'0:),Ah,,,LAaoF_ AS7mDw4De.T- t z.\,_.Ai,t C-1.l.o,'.i(.'.\..•\.1.:.-,,.N.,1.:t,.,.. N. r.',\-,_,.,',.•'_,—.\-\,a.__,•.;,k‘.•..z.,„•'a.•a,,.•,QL:•,_:_-,,.g42,:m_iY.I,N_i.59 ..'l 0C4'A,9,_l.,(_.--"h.,pM—,lr,,-,,i:4,'.,,_"w'CI0 cLk10X,,e_,-'_,,S,.04,,„,;O:(O&.,'',,'./(.'1_..g..'':'.4._1.—f_','-4'iA'"''-,'.Ak_:.\'-..1.'..,u_F".e.1;.,.l,.,•,-;A 27_°7\14r,,1,7.,A n01,\,I,1tc,1,...*7,".--,T_s4-,.'o'7YT Aci_=,"e1l it9:-.,u•-"'et•L oB Fi"L z).49ir.i1-4I..“i•v,p1',S I,km,e"p-2.1dP,M°,k J--,,A%,PT21•.lA1--.4t.mo&u-IL-tSe.:k..,-o4,'tmoIt4,la44i,r4,1,.=l4-°,I-li.1.Y-4.,3 l9l,.o'cI+-6.e-.t'N83"EC Rii t.to07.,%p Pe21,..:"-O..s0 2,•.s4p0cC•.,1 i*A A*•E.4.gA,-t-zAfrSAto,-'n•t.E.‘,-,4a,Ni'.',s,a4..-'„n:_M<.,...w*.,-'2.-.l.,-.;,,•;3l'1i-,..k_)-,-;:+,..,his'.71..,,.2-P l-,_,-,l,,'.,5.•-_r,,,,Ie-',"',,9 4.',f•,1"F'I.m,,.-Nt,„..i='-"—"'.,.,...1.,,•1_A..7._•.iI...._I,,1i'.,,I,wwp1 9r4I.m..,,5.I..'irI1.I_-..e'L,-1.--.L.i.,.-.,,A714,..12-1,1TIM E'oM7,I%i1m.1rI J04 iI/1-4MI1m-c11F1A1=.ni a1_,'cl_.A1..,.I1 m-LcE#m1EN4 AM1Mo imoIil!1.tW.-.'6,aP P1AM'7,I,3LI pL_,1l1IwLmmt iN11Ii..71i nl'10I i_h,IlaIU1'I1.f4 I 1 1t!o i m11 I IrI:W r11I•,EN.N11.m'l:tv0o,I:iAA,1i41i,3,S.a1t",RR,-U,1V ,141'w1I M41umI7.5zi,i.iE1t muR7,E'l2ii,‘1,4-'—ffilI..I.-S Ei1a,1pIT.I4ra4n.mE1I-mn1.NI1111n-,r0a,.1=1i1I.1u11ni,I1IeIoO1t1HI1t 1w.l.4kI 1-l1NIt ',.4',,•2 •-.-"M1 P5 0.'6O-Pa_`C-.TiP-v:I-,So.o,7 fA7:'I aI.vhLt'.,T,0r,,-,.4:,.2It6.i0i•-,,3 Vi-F4lL+2.r2.1,"58,5=.'e 2i ; -u•,N'm-'''AH 4,m-EiI_-lX l..1FEP•L,_-',4.M_-_.p2r)1PmaP,.kOm kT.III"mm,„ffl.r-aa7i_,I-r-,,•II•cma-SA-I._.-i 7u2m.-,-Irti=-amWe,-s.o,4 o'77-1.m","a-1 r8- ,p...0..,i,.,,p._6a..\cTe•''j,,.„l"o,A,._-t,•,1c1a',,u ms._, •"-m\,,,.,4-,.-I.\-',h-\‘-1)1A:4-‘,.*1E1-.3.1'1-•7 1/'0.,1-._7,.i6„'3..'•_.-./\.,,.1-,1i\k'1 1''."a Th i•'L,1--,l:&i'•i.l•-.t•.iI-0 c-,-i.4l 4,a''\,:•1,,t..•'l',,%?'t'_(''-i;:„a',,,-1 F'k-,.- ,'4''"42-'t.-€`'a,--,1.-„.,:r,.:,:,i.'....l,.'.Lidr.,L_.i,.,.„,„o N i4,,,A,A i•„,4,,5c:,g„:k•',. 'nAS.,.„,i.C.,.,tr.,.',,=,.',S.l,,.;2.ik'l,p,,.t,-b,,,,O.S..'•,tN,'`mt,,,21.: ,,'2,,2"':,,-%1_,.),.1-6)„•lI1:.iw;,4,L4 i,,i i,t,i%k,,,9.,.i,,.I...„4.lt-71Vlt'-,.h'.m k,;.,4t_,tz,,.'t,e.'.....„..'`,c4.,o-'-,--L 4--;4L',4-:,-,-4--):w-,,y'.YPLm..ic.9,,S.i',_-7,,,aR,.:4•._..,.„P.r:-„'.,E'-...'vA,-,.‘, ,4.. , SKETCH SHOWING166'- PAVEMENT/BRIDGE9 7a-6i.R ..l'm.E.'.Li._,.aT.L'-TT..I._m.'ONe.-1.0 .S 91,_,1RH G7e1"P.I'P"rA6ao? 7..-1 4.+•-1c31,2,-.:.7\5L.. :.'-.\.- \‘- K BROAD ST -Y9-)OVER 177(-YS 5 . ° a - ;- L4 __-‘v, _ g A 41i - 'M71ua*51-"2M - - MEHR M - mmE - -- . _ rfl Al 11-,_4,-:''V'.'4.M:_0 1i1,,i-i1.,E.4A._9.hg_.INa..7.S'1..-4:,I M,-m1 t.PAil_L.ag"jA:6 ee,aW,S td l0scili-rdL1Ai 9P.io0M.1iw:-i.Ii zcnM=.,-.4i"l.i:.*'w6_,,5,.A.,'a.°'.07."_-:,-.e,'ik,.,1•-,„.74 C9, 6II-' ,I/ u0iZc0'ciwwit0."00- .Asd.sEl1..ii .,:. -.,,-111-:1,16,MM....,..,„„,,,„:..,„:...„,,.....„....,,00;....0g.,,,,,,o.ip;,;Li0,;;::0:::•,,0.•=,g0ffiM001Fqigrrng:::ihiPF,' ,,q;P.:M:Fal,000M;0,1::0r::7':'!,!!,!P.::::,:..:,:-... .•:::,...”.:'';'::.;;,...,,," '''' '''.401 --..' -- AT0i, -- ""`"' NAM 0 g* -.."74,......'••••00_,-..-..-.0. ' ".- -- ' '''''',,,, Irl 1 C------ 1-<--!----.3115 - ........"4"..„4- -----''''''------T.'i;, IT--7,,,,l'IL'..444 -4:1*441::%'13/3.5-7:77-7,,.147,,,,=------7--)' 74-7,a'.1/4'1,j,r4...174414::'":*4‘;:7::',.;11,:,,,::,ii,111r:iiiekL,FL,1i.;,'i.,011ifiliettiiitiiieitilittl4r215114: 44".44-4-4,, iiii64-1:"..1),4:',-,-: - -.41-, - ji_ i!ii- '''.-. :0111XWillf44 --r•DE-1';'-->, D'-'—„--'-'F-- ''''d'°". ''''='' /* ' s IltLI.." "M ''k44:1:414:41'('1"IikA11i11:11gf !;;'!!:5;:;iii!)11:1iNii!ii!ziii,MiRill!iigiai,!,1001001rHictiMp4 , ''''' mt. 11111 4- ... •....: ,. -- - \\ , ,. . • • •• `ni ',... -... ,--- , 4r iswoNT! 1,4,r;-.4 c.'',.,3, 0,, - •••••c,,:,,,...tz.....:„,••••:::,....,,,:•,,,,g.$:••4•A::•;:zs:•,,,:*:•::::::,..,:,::::0:,;:,:,,kt:•;::••:,:w.„. .41,. z-----'1444 . ---•,,' '•• 0 k L''': ?:1W4:I 4----- - -- . - \b.p.„=.,-)1,4,17.D.,,,,,,,,,...,..,..,....,,,,40.44,1•4,40:::,4g,g,,,vt,,,,,,,,,...,,,,w,,, --,,.....:.,-.41,,,r.'..-',,---.-.=- ,---..-i-o.;-,-•-.--' ''''.."-:r. .-. oll '- 0 4 r vcarrE70:„,,f,34 ..':.:25. Ar;1111111:122(i.041,V11,:.:1 :,.:.11::I11., :: LI L i I li .. i esam.4121311-- --- --,..,,,,„,..,„,„ .. ,, ......_,.....--___ ,,,p,*/ g st.'+99 4 0:,ii::!,it::::::::::::::::::::::::**W iiiioirootwoff .,\:.'i°,,..ii',c ....1,iglea.c000 i /, , __,-- / .,•*t.,f1IF —___ ___4\\;,, '\ 4 ...... ,,,... 111110_0-0.--._,.... -......i,..h.•-wo_---- 4,.* -,..., "t!, ND BRIDGE , 11.1..PF,..1 IF,Ving-4N1 SVPItENT , WI',,,,.A i,I V 1.' g '4, ''. /i '. )1 1 /----- ,•,-„,,,,, , i m,,1:, _,,, 41t„ -,,, i r it1-w.,• - ,i, . , .,„ .,,,,4,,k„ pedi,i, vik,\_„,.,. _0,1114: E,,,pyrou42 , itt-k4,14I.Ly.,:•°,,:w1.„?...-....- ,,..r -,1 ' ' 1 ,', K.,,:- 4111.4, '-,- ---y:F46,,71 Iv uo far AL,,,,,,.. .-...,,,,_ ,t„. ,,A!... \ti, r .-- , * 11 -Y9RPC- tic-.., ‘i .7'47 71 4. / ",-. -.N.,,- 400r. - .,,:::r , _,,,_gra,g 2,8 , - .. OPMEICC LLC *di c c,.5.. I. c, i / A \ • o IL' A'ZN \A Wr .,11 io voly% ii ,,,1 :0 ii, - v # '...yr N.., ,i,lik0.., '-‘1i,“% *'L, • T?ac. A,_.,. ,.414 . ,• - ''''''' 9 '., RPC-CS SM16,1048 t4140.4te- , N'* -.' \:•747"*.: N440' ;20414111. --Y9-APIPANiii,rillglit rprik,-wt: :1,5 4.1 /, \ . .:,, ,„..„,./. N, 441,„, ,,, \••••..„ 41„, . .• - .7.7 ,511 l'g'' F•74., wae.,. n ,,,1 . , .",.• PISta 12+50.05 Pis S-1Yo9R16P+1 2-'7.70 PI Si°17+8266 Pils Stot 12+83.44 PISta 14+81.40 Pls Sic 16,7724 BJ_:=77.0.2740'...,74,4254; PTLD::/64,28'87,5:232.6„:(RT) is:=.7:36,0 79'44:43.1. .c,,,,.7_.:.fir R-8500.0d ST-7253' R-800D0' R-800D0' \S l' V\``' . N,,,', , '' , ii'&04,1,44,....,' '''''' ,,,10011M4tr---------____ ,Aak . r.a• POT Sta ,6.39 / _. . ° ----.e SE=NC SE=08 SE=08 gm.vwx."3..c -... .,,.... ,. . . ,vot,• ''v, . gRo-•••• ,--z,, .......•...tame ,...--1- 6„ a.ligisv, / ,„ ,_._ _ _______— DS-50 MPH DS-50 MPH DS-50 MPH 1 ‘.' ...,-W0,,...-T-t--,,.Q, §t•It'' 614W-41,t1. 11....--iief-' '''" Pis St 19,44.09 PI St 20+92.04 1 fi f 4, ,,,,,,, ..„,.., „,,, ,,,,,,, ,,,,,,,,,..:,.. it. , --------------*****/ ---ftib..4--i-6"'"----- - ------ ------7'_:._.-•--- 10 l'iikiNg,m ,,_;;;!---..-#.... - .- ,,.. '-',,, --'4•,,, „„..------,_„ --m..itaffinia,lemic -3/a,ki.4„„ moi. A ,r:ALLEMZIEZIR gjA' -/ ,'L.. Pis Sic 19+3158 Pls Sto 21+98.42 PI Sta 23+5920 es-1127'33.0. A=18.31'43.9•(LT) as=TO9'43.P f9s=If 27'33.0. ,n,-2r23'05.9.(LTI Ls=2oo.oa 0=If 27'33.0. ' Ls=200D0' Ls=200Dd 0-11'27'33D• LT=133.61' L=161.69' 4 :N.. -.. . ,..,,.",...,...,.....- ,- ,....,tgprw,„.„, . ,......> END cumi:41kr,..q,, _ . - LT=133.44' LT=I33.61' L=18662' ST-66.77' ST-6692' T R-500D0' \ I * -Y•RP-SRS Sio.18+10.47 $' ,.. ,,,'....t. 711Fill 4113" -1-1''''.24101111Plig-Ik4CIALA,- -E.- Ime..,.'`- 2 '`'''. . .", M..., •\ ,%'.., 2:,4:41*. -- "936.110 .&07,41.1 - a...,„.'',.,,•- \S.70141; "1-74P.IIVEWL" --4f:. ------' 1 R=500Dd SE=06 SE=06 DS=25 MPH 1 ''. , .*•. -,, C LA.. 104111r.mi,,,...„ ,,,, ,. lifit..5...--c-14.1. V74,111111,17 er4.11M0416. 1•••••, , 1m, LI -Y9LPC- -YOLPA- 00 \ t I TC....--7,„tOry '4,_3„14. P, // . .."- Wil-- IN sTATE' 1 i ' '.44111TI11)liV I IIIP I''''‘, ' A L. _ tA !,.,-- ,11,41d il II 1.-, ;1,, 1 - r\l,, ,, \ ------0--,,,, -,--== __? ..--,-% I • • 7,., '' *.`'''1 V441116 r z ''' ° ° 4, ..- \ ...11-‘ .,.' \:. .), E'li',1 - - -:1•,,,N iiNc tit ---41 6,PCsTri;:=7531.4:51 1%3307554 9' !Pi:=Sit Oil 112:359 9..4.(L T)OsTL,PSTI if c.:(36 9,54 155,6,.9 6:7:H.57 45.9. i_L,6,PTif::c,0:47,501:.,,,l7,3'83445.2. A,RTLDP::=::jlEi 08,5 45;2622 0,2'43:53723g(LT) SE-08 DS-20 MPH ?) I 0 V" VA, ,,T 00. Ilk it • @ DS-25 MPH a -Y9- es, Fi -s„,... .....f.„,-_ -,I I,-• `."-,e, ' 1,-,1!, 7.1 2 *''4,-,_ I.,'"1-1 PI Sto 21+5798 PISta 24+13,33 PISto 30.09.40 PISto 33,44.72 I ;11 .s•?..N k'-'k ..- /,,,,,, - :1 ,,. II ,-,.. ..:4'' *1 -et....- ,-,•1 .,f• . .,„ , tir 0 %\.- 1111 ,,,,, i ri,# //'4•4k,,,..' ' 's 4°. L° ' MiNkaill 0,i'.'r i. --,'_1. ,,TL,,._:531.1,52047?5,0,z2.0.(RD:LB_:=5,7370,50,,„(LT) f.:=31,237,5 29'73:2.27(LT) ATLD_:=3:93,82,0 1.737'47,7.5.(RT) .6.1.554;3*/.3 0-7.6.0,7Y 20'+:378 18,,,..5.(LT) R=4770.0d R=4770.00' R=4770.00' R=4.770.00, '.f , 'RFC-PT Sta.21.72.16 SE=04 SE=NC SE-NC SE=NC 2.C SE=NC A - .7 %„,,v \, , . ..g ..:,*,, \\ .- ..:-._ _. -riww.,.-..),.,,,....___ . A 41 .•- .. -r--- --- LL-, 6 ;q -MATCHLINE- STA 34+00.00 -Y9- SEE SHEET NO.29 - ,f__, DS=40 MPH DS-40 MPH DS=40 MPH OS-40 MPH DS 20 MPH LOGSDON E77 AT E ROOD HAFH SEE SHEET 53 54 FOR-11_3-PROFILE SEE SHEET 74 FOR-99-PROFILE SEE SHEET 75 FOR-PPRP0.-PROFILE SEE SHEET 77 FOR-T9RPC.-PROFILE ,,,,,,,,,,,, 00000 MOM SEE SHEET PP FOR-VP,PROFILE fp :::IT;0 2:f4t-Ziat GRAPHIC SCALE 5611: 0 og PLANS Y; o ' I z _ A. A m g P ao>°al PROJECT REFERENCE NO. SHEET NO. N 2237 m �X m w m m PR, LANE N N SI ) 1-38I9B 20 =N 3q., ' ^' .' �^' o ti zN O 776.97, E 3 ;- Jo m 01 m DI 5 15 54' E _ NO. u o N c -'n ft Si _'o 84'23'S7" RN✓ SHEET 1 24'VCp y N 08'22'13" > a ao o R DWAY DES N HYDRAULICS SB 77.66' S`` q fNirgR '® O o D IS"RCP //� /m o ROADWAY IG ENGINEER �jFN - mp.N 04°I2'S9'E o m> ao t �i \ p6.5, d \ 9I iO ;1. 1 I� 4'12 07"E I8"RCP DIIh I5'RCP II ti 4D BICCROADW® 5 ) lu^ 4?f" 72o!wCIO mB'7 ASf Y I .p37••Wm3 �; !m I w_ 5 ���¢rN0 1 wS 72'09'S0'E aQ sp 9� t. '� j PVC_ u' Np D $�$il' I Is C&G No41300'Eo vwnN oR 5 zz'Bs 8VCP N \xr e ° J mNC GRID NA71.15' �' jOPss8°VCP 12.52' �� tf. 6o/ \.. m �RC� �2Q P 15'C&G -�I-C&s _-�` F + I853"E / �`Yi 1 0&i - -- }V 2 //8- F 7z'PVC ~ z 5 5 09•�OY • �/./a� y ��- y ��►,ao aR VATS VVV J z N 2SFAPT- �J Z 30 RCP �B.R o\ x04'1 00_i /'1, cQ `L�� I`^, r-w...r' S �iFY*Ro R/W ® ��L �yl J/� I K' i�cNp cn wo°% 'c>;Ca'--- 9= _ c.G m�� : �. C � /��/� �.ar^' li►4' ys2� ":m`:Y'1 6//m I f'.0'-�2'PVC WILLIAM R AXLEI+a A / DI S 'As�,� 15% pP 07'6 r�\ q� `^���-c, U O) u e ti c,wA 73•s• o `' V �' 3p. RCP c�S+C 1 \,59,'#0 As `\�J/ °' 0 /,!`�1 02 -AN. Os, -� w o r / ; 116,IX o e•\7263s, B & o 44 FD a (♦'t\\4.., r ,,,y `t• c.. e. ' n W// oll „ �'o ''\s D 1526 PG 1©0 • \5, iv Ate 2a. Po A.4 .w.z• •.* TODD ELLIS BUILDERS, INC �/ oti e 6°j 2,oA I� �� '72'Pvc o. o��, D�1526 A,1952 �� Now g C @,o o"Y 'v��co B� � e++11),. ' DB 2053 PG 10894 ° #e Q %, C e, Z"J O CHESNUT COMMONS �o✓S s7-�� �'�%+1•ti �'�c s" O��' ,1'Y' '\�� N o ho/�''a`ti 5` oA, 9 I "'® --__ DOCUMENT NOT CONSIDERED FINAL •ry '� \ T w 2 pc'I ov/�_ BST h w© ti o/ oNc�;/& a•vcP\�° " ° ,�.-__ UNLESS ALL SIGNATURES COMPLETED m 'HOMEOWNERS ASSOCIATION �p > yh°' O 24>p 22 a�'• •> `�� Co4'c �2�,•* � x ti `' :),'N' /oP J��- m7r PVC 4''' X--- - cR --_ --------- _ DB 1969 PG 2284 2B 0 <S j w1 II rn - ' �. CpNgr, m i�,•�A.Vy/. 2G O 2♦y � 98 CON 1•7.„ 2,0 c„ti,,. .1 a. A 'f' 1t N C_R Y. �-i -i -'.. BEGIN NOISE "' OI2 C s O'r d i "L_ N �'* 62• o 0 0 °O°NNN yyy��� 48'w0 X O 24 2�� O�. 022. >>. 12 55=5 E c, G ti h / BST f 5 x RAIL X� WALL W/SFB +00 . C70,R 2 03 379�74"A\'0 •,,,, © 4 +t! e S3 N_ o '"� C&G =J_ rn X_� 48'WDXRAIL o'o. N N _ `\ 11F wr° `O �2 �'� CpNC52 O O • � SqN o.� O�B4O 5 �rtatk/ 5-'i Miil 9�00�2 ti°y RETAIN Ge / ��_ - co w N7�FvF ,� .. .. -. - y END NOISE WALL m 72;�. C z . Sp4p ip 2q7 Ry ssyo,: e 2473' '2 v 6 •F/ O+ o: N:SII�;.� y A_ -a r 2 t'�'A ��•• 4 27.03 xi y' 4 ''f J / J J \ ^' W CN�`1 2'y a•�li'3, 9 g 33 e sf s 4* O �,W /� O 2O 24.25 330 2"CND I N 04°I2'49'E ps 59 00� W 9 \,-Y-STA.92+30.55 SEE .i... ; 7 o ti' rn 27 95' O 5''',./ 48'CONE I04.00' DI LLB 95.5'LT SEE D .30 2• •' e• O 4 p c 0 72'yC 72^PVC 0 O k TO P OTErr 258ARN l X 70"WD X- e 1.' I L I RIP RA'. 29 �'/. 2y 7 m SfyNz' N 27 0'CONC3 2S74p ,..C.o'T 4' w r kEN } /µ END NOISE O X X- ��� ONCRETE e T �A WIT 'CLASS B RIP..P f..* EXISTING R/w = m e \ , TONS 18 ` .S \N' • Cp 7, g ONC 24.64' 1 F' x d \ G , \��C CONE H ND NOISEDWAL N �'� CONC CONC T•�w00 � s,��� J II SEE_DrVAIL 31 I +3', .7.50' CON ' RET TE ININ• V7 L + 28 - • - O , pP�J� 2p ,Nc oST n o I.J �04.00',Lr�I " 15"RCP-III ,EE 112.69'LT }1V IsnNc R/ _ Q00 - 2"CHL S EE DETA�.g�L�_ !-O S I2°5'05' ._I * 5 04'1300 W I� 5.88' -. f�la !! W WM `'' F _ 4HW - X X �,.-:�.-. �_-.v.. I' L AI,r' %--- �= ' niinnn+i - -. -. -. - 'c6 BA 21P-R/w -. .. .. .. .. -. v 42GI-A 24 RCP-III.� mit�, I. --J` 014C �_-_ • __- - I -C Y 'RCP-III ................ --- I :._ �� 1� I-� - � 17 nn �omnnnu .. •.,., .. .., t�92GI� 02 2GI � C- -q� W I� - - - -"f2�� 1Bw/MH nn amnnmim ,. .. - ` C C C C x ... " N 009)I:tl!�//1 ' Y•1.SII 1 _•.. - SFB W/NOISE WALL < < - - - " W d SFB OISE WALL... �" �8"�C� F� _- - - ET.WALL W/SFB< CP�V�aQ04�2G1 A W _. `. �T; - r,`�G#:2.�'L. 1 R('P-III RCP-IV 2 fln _ _s-_. 911111 .. --.., -- - T-- - - - - - I di/_11AA./11 - --- -- -.- -•- -.- T "•' N k:' T I B'CON R � /• 1444iem' _ y REMO E HW •or° +SD , M _ EMOVE HW 9• L `T o •0.0 ,,7 24"RCP-IV 1..., �• w" ��' -' ---- r-77stl37a'esr 02 2GI REMOVE 2. � "• Wa\\° �>7GI m// ._ 6,-4 2GI<204 4y05+00 W - \ +P9 • 9+nn 4 4 . _ rvV. 0 •• -1.--r-- --1 -- -=1--'---#-5-'- -I--��MTL T- I T R6P-E - r MTL -R-L -T- r- -MILT • i' - --r-�7'l r�1-< 'MTL'- - � .1 .� '__2$"TFCP-III - - - v' 0 I ME TMTL --- --T--+}_-i-. -�EMOVi2Gl-�'PAVEi--T--�-- ONC. ED. // a •AVEDT - / �8 REMOVE 2GI s � --W- -�- ---� ' MTL I e - - MTLL MTL 2GIL0' s r z i(iiiiitiiiii �zm 2Gn- � �iri�La��i �+ y N I 0 �+��-' � -�-<2011>2GI 7- � a i Y-J�S/U°��2•�- REMOVE DI ��/ . � I 0 ®�� m Z a," a PLOWABLE FILLis�. ! nmm NWT, ga// ry ` N -r- E BEGIN G.R.W/ O BEGIN SFB I 1-77 NB 375'BS7 c-- - ACRE - ..nd-.� +50 MTL * i �� r�5"RCP III T M I I r i -r Tl OZ��L -r � �� -... ••r. IWY II 58Za W/GUARDRAIL fir //46251 vn �1s^aEd� 0 <2010�1B w.MH L L 1 _ REMOVE : I I I. •�_'_- �y���� 'l ..___ A. �•- _- 48 ww ... o_� F__ X 4814,.. IES_ - a. - '' _ �\ _ _ � �P ki4 � 75 � ' -..., F :n ..i --- . _ �� ^�� _E Imp RAP • 9'!fT>r wr - 0 1 4 S OLD No HWQ00$� - F--� F F T REMOVE--' \I 'i$S -- 'z�. �_ � `-" x ��I o-rR-- J E3 PROP CHL FEN E_ ' M-5 SY -� F iS- i _5 P III Ia\Rc� A RETAIIT" 111.. 1*-M114) L "" CLASS II RIP'.' `A�-0 PROP CHL FENL`� rill - R ___ ____ ____ t Y r •I REMOVE�i R ( DRY DETENTION BASIN _ �. 15"RCP-III 15"RCP III EASEMENT 61 A A n IN W -• H•E - .. -. _ 5_ ♦ De zIDIPc saz /� F -_- 0 WQV=13�580 CF f•. _ E - E. �� i �F$F E ..�_. Mt ��� 'F W Ire A E • •f:ASIN 783.0' G 4d PUE .. - P. �: d:'i' .�.s - ---� -.�. .-. --- - UE � _A - PIPE OUTLET CHANNEL - - y CjICi/ 4I�:7•. rim 50 YR WSEL 781.8' PIPE OUTLET STABILIZATION :G d' am Q Z STABILIZATION 41►4kW Ia SEE DETAIL 64 03 1 ,r SEE DETAIL 54 2 65 �7BEGIN'.5' A Qoo� II 9 1v rn N •A A CL I RIP RAP +55.52 Y� CL I RIP RAP INTERSTATE DEVELOPMENT COMPANY Go / ' 32 TONS 115.01'RT 26 TONS 30 S DB 1273 PG 511 +58.94-Y15- Y,O 'v END 2'PS GR E i l��; i 24"RCP III P CL II RIP RAP 11501' RT "TRACT PG 1•' 145.00'RT F BEGIN 2'-6"C&G CL B RIP RAP ` I V A A QD02 - 16 ,� ' 2 C / r I 55 TONS +1 4-V G'S ' �'!!" , REMOVE A• , +50 / 5 TONS 14 SV W 75 SY 115.00'RT y�.. N1 145.00'RT J � .. X/ 4D _ 4 _ _ _' SPECIAL CUT'V'DITCH ., ,y q FC REBAY SATC� ti� SEE DETAIL 41 &STING R/w �Ai DETENTION OU L 0'. Q03� STRUCTURE / WILLIAM R. AXLEY, ET.AL. -YII- PT Sta.22 I SEE DETAIL ON //fir +•0.64-Y11 r // �Q. DB 2125 PG 5 SHEET 2A-11 / 30.00'LT ,V' - tr Sf- /.qj4 • / \ NS5SY a PCC Sta,/9+67.47 of ". m \ END RESURFACING/ BEGIN GRADE -Y11- POC Sta.19+00.00 m N r } -Y II- PC Sta.17+55.94 N INTERSTATE DEVELOPMENT COMPANY / a DB 1273 PG 511 71 "TRACT No. 1" a'c73' OS .. 05 / PERMANENT \ DRAINAGE '' \\\ EASEMENT .424, cr5A CI 08 2151 Pc sa w` � // s N PIPE OUTLET STABILIZATION W/CLASS I RIPRAP x / toLC SEE DETAIL 64 \/ I Q rA / i -Y//- -Y_S- / O L. PI Sta 12+82.67 PI Sta 18+66.65 PI Sta 21+31.23 PI Sta 107+16.73 ' / A = 16°28'00.0"(RT) = 4r 46'38.6"(RT) A = 36°23'21.4"(RT) A = I°47'49.0"(LT) `o D = 4°30'00.0" D = 19'45'00.0" D = ll°30'00.0" D = 0°10'28.9" I ' L = 365.93' L = 2/1.53' L = 3/6.43' L = 1,028.69' I o' T = 184.23' T = 110.71' T = 163.76' T = 514.39' I o --I 1EGIN CONSTRUC m" R = /,273.24' R = 290.1/' R = 498.22' R = 32,800.00' "---N, �' ° BEGIN RESURFACING SEE SHEET 54 FOR-Y S-PROFILE SE = EXIST. SE = EXIST. SE = 06 SE = NC "2 a I -Y11- STA.I5+14°36 SEE SHEET 89 FOR-Y11-PROFILE °�� DS = EXIST. DS = EXIST. DS = 40 MPH DS = 60 MPH \sr / N'I oa ' 5--'•. • I .�� PT Sta.14+64.36 -30,- PROJECT REFERENCE NO. SHEET NO. 1 BsT1 LANE I ) ,-38/98 2/ �O/ ,B/ 0�:, -,F / �� II • **i •'�x ..,..oe r� RN✓ SHEET NO. OO I NIID I/ "FOURTH CREEK OFFICE„ ROADWAY DESIGN HYDRAULICS s COMPANY CONDOMINIUMS ENGINEER ENGINEER ^ >C \�o-iIg w I DC' G. KOGUT, ET. ALS. r�.1 V' JO � \\\-U. cr-, DB 724 PG 861 CO 1 1 pg 724 PG 813 ISBKBOS �( DB 1651 PG 10745 CI �O II \\ F C. L WILSON BUILDING COMPANY NC GRID NAD V� Aill.,\\\ \II _ ".'y'T :IF 152 NII DB 642 PG 315 C/ ` RETAIN Ay'ri•[_..`�-7• \ c / ns RETAIN DB 724 PG 861 N ‘\ CDN ' , \ \\c'E;2 ill )8i Pii'l- PC Sta.11+78.73 `P. \ .,,,\ ;�o � m �� I I w {} PI Sta 10+75.76 Pl Sta //+65.63 �1` \° ° `-� S 'h = 25°06'54.6°(RTJ 0 = /0°/4'48.2°(LT) DOCUMENT NOT CONSIDERED FINAL \• \a°"° �\�Y IIDRI PT $t0.11+1 ,I ODRI PT Sta.//+96.62 D = 63°39'43./° D = 57°lT 44.8" UNLESS ALL SIGNATURES COMPLETED �.\ �: v.:::N '� / • 2°50'54.3"E L = 39.45' L = 17.88' PROP.CHL FENCE \ +©�o I� T = 20.05' T = 8.9T 57.81'RT 45 \ to�'<T� ST '+A ‘'''=-- �� I R = 90.00' R = 100.00' V 1 M P & F ASSOCIATES, LL.P. \- i C°.HEAD 'v 'L +°c&G �\ $E = NC $E = NC aCN2s DB 1205 PG 199 \- \ ° EELAS : 04,P QVE MI -YIODRI- POT Sta.104-00.00 = \ \ TAIL;J RETAIN /� D 2'-6 C&G es l END CONSTRUCTION E OA Y10 POT Sta.24+77.5' '°s\\ \ipM �:`\, RETAIN (�!Ilo �, YIODRI POT Sta./2+34.54 F� m 00 O •} +: 1-n `-'• I PROP CHL FE - •:Y 40.95'RT \ Q� �.-/1 -• MP 30' &G� 'gym 3 i:� 6 � �� - .T w B -Y_S- POC Sta.1134-43.23 = �E O N S 04'O5'46' /0- PT $ta.25+40.06 C �.�i6a/w \ bL �\ F 15"RCPCIV 9//•N�r : H - • _. .. - - / - +02 52 a RPAC- ,FIEF* �- x 456.66 ° \ v •y\�� �_, 1/ °MIli -Y10- PO '.° 1s.a7 'a �T� • 'ENZ 0+:,.68-YRPAC- (J BEGIN APPROACH SLAB '�� �/ .; A = /2 E sEMV. O o "' / - � A <2136� PUE PV 3v✓ 18 99'RT Yl0 PT B 25+52.05 s` E - \ 1 Q15/7 �' �` w °"` Ss a rt.' O .. .. _ ?',s y:�'�_ 'r 15 1CPr YR C- :/ 3 PE0.M Npe z232 Pc Z BEGIN BRIDGE i2IIk` `� `�� , 0��t� R -IV YRPAC- J c I �.I y RETAI PUE • 4 O Yl0 POT Sto.25+75.79 411044,♦ r R`\ 13 ��: 119.11'RT C c c c D c�' _ --F O Cirri _-'- a CONCRETE DITCHI \`Y' aa. \ C _ _ -- -- CAT-1 F" Sff -- BEHIND RETAINING WALL �� - w 15 .. . SEE DETAIL IS G e F1 \.R 3 _Q 3a- -_7-_- - f� . 4► w _ ..,_lho31s.•:+97.1� w` ��r:, �� • • �i J c , �T i REMOVE CB p END EXPY GUTTER �1 `, /"WILLIAM R. AXLEY - - IC, a ll1+42� � e �: F. o - 2 7 RM 'V'DITCH I� 0 , a 2q•lM OV RCP ���.���,� DB 1526 PG 1960 r � A�` '�'�# S���F EM E v1 / +00,111.75'LT a"cP 18" -111 � �� (n DB 1526 PG 1952 ;E. T PROP C ,-FEN. � , -SEE DET \� �\ C`' \ 6 D� R C/ 2 -•- 7C�� + "VATOA'/ 29 v - 7rA� ■ a - -_ f DETAIL -• . Ex Nc R/w ��� �'� E+50 LT r'TTE / JB v MH ��- /_ N N C� _ sn impoimmopoolowe / RM V'DITCH 120.10'RT +58 54 Y S- s, -. ss ' -----: - DETAIL 68 147.10 LT \\� �':7.\ _ -_---_ y _YRPAC _- _ • /SF: 2GI<2131> _IIIM _ _ _ / "-" • _ - C g C RET.WALLSE Imo\ N _ c - - - - - _- 15"RCP III 2GI�� _WM'ta `��� llir 85 OO cn _� � __ _ -� _ -- 00 LANE TAPER "17 " \��Q % REMOVE �� 2GI �� MEE I O - �0 _ �� "' - 11 BO ��� a" O .. -r- - - -- - + _ �,. - ...�:.L; 4 _ • MTL-s -� •._ • II. -'? --1 - -MTL��T 4Z o 0 MTL L , s -LCON_G-MED.BARMTL r_ I �`F 'CI• M F��tTiilT -- N END EXPY GUTTER^ 0 • WE CONCR O\ �0� O o is �i _ " f, - _ - SEE Da WAtt -^ �- i�� V • �j _ ___ M 1". �$� c \��5�- REMOVE • � IYIW. --- -2GT<lI_ �r. /�'++IllAw�1 :� \ °9 .{ viiiii _ iv...9 - /�d • w _ 15 RCP-III GI �Zt7 �x - BEND SFB •i�,:. \ 5 RCP-I 5„R-.IV 1 - - _ _ �Gimm. -� ���r� W I 401 �N7ON RD r'a a' HEMIMM■ EN ---- .�. _�_. cy. %i7 d, X X 48'�flW®_ 1��y�.�,Y�,+, _ • �. :4gGIN EXPY .- ® r _ _ _ (/! C`204 -C8 - \�"siox SR 2322 S/M w N 58 00.0 a \ ' s_�-7NC^!,E' -- PR.P . .. _ i _ \`�� .% �'� 5 BASE'DITCH^.. ' �,;Rh? I N y ROP SB �i 1 48"WW Z �.. 1S'RCf TV v.rn _ Y•] a^. i �� a �i I �C, --X m �i 6��. �FPI W �T.,; - a d CL 1 RIP RAP C Sta./2+27.60 !j Z J GY F - - '- �' ' •JI'M -- - - �e1 � � '.c oe a3 - b+ ONS 7 \ ..�-�: W ttt = REMOVE DI F F ' �,� 1smair - a 0� �• S /xkS `y� ®o /.." �c13�`�� ......60 ' J N -ce,G 30+ �d 0-,ii ` o "Rr raw s =��e��ems- ��G'. V + SULLIVAN ROAD J , ai2jR - o m �. , ��r ,G W '"' $jJ'�Ie'C& Ll a 18 C'G - \ 1 �_�F i Erb+, �' �" .:� - - � ° \\ � � _ � P�' 6-FENCE -- BASE DITCH ��:(�) �i I I PARTNERS, LLC 1�1 * W �� -. 9 \ ♦ " - -- - CL 1 RIP v a i .. E �� oN \ o L of ETAIL 58 " TRACT a Dllol m III' R cK + 21 �, � h o� �E p : 5+y YRPDB POT $ta.,0+02.00=,� 1 DB 2055 PG 1750 �`I _ - \ �4I Xl 4' d TONS 10 rn''� 100'RT.TAPER 1 I m - I 1 A I . COL 1 I •• \� �` EM Y_S- POC Sta.116+50.00 (48'RTJ z I Ii.. R K ALL +86.51-Y11- '' ,��•r 8J� ! �.` N, GR 1 �15.a6'T - OL 35.00'R7 + - -_-- -• '•`e\G�Tl,• III03` 4IP SUPERIOR PRO- -TIES OF IREDELL m III m + 29 96 Rr + . -Yll- -�- �_ ♦ \ LIMITED PARTNERSHIP m 0 ,72 a�I I 1-� 34.02'RT 34.56'RT .' A�• ��Y \ � Y�Q-BPO�G$t0.28+19.G4 JOYCE R�JOHNOSONND YII- Pt Sta.264-44.38 oily C, - I Il IL( O 320'LT.EOP TAPER +46.00-Y11- A 0 ° �... \5t\� ss I AN UNDDIIVIDEDB 1610 PG 1INTERES S I8" G J I 69.32'RT o G \P\ ♦`RE E 2GI B 730PG 770 NMTL Q �j - =Yll P ,�r.2.•; ,,.6/ F T ��, �, v�^� 291 .I END APPROACH SLAB°o,.G -i, e�flR�l� L PUE � !,6 • \ \ -Y10- POT Sta.28+42.62 SKETCH SHOWING PAVEMENTBRIDGE RELATIONSHIP 12 Yll PC Sta'.32+56./9 zsao-Yla °L= - \. `' *\ -aSULLIVAN ROAD PARTNERS, LLC <2105� p'\�.• ♦\ 37.30 - V *` - -Y,O- PC Sta.28+80.22 MOCKSVILLE RD. -Y10- OVER 1-77 -Y S- t+ vs, DB 2055 PG 1750 +36.96 YIO- A\� p-1 Q // 25.00'RT t0 ` Q y TRACT 4 y// POC Sta.33+27.0/_ �\, hx 0� -YIO- POC Sto.29+55.40 28.83'RT R y f I �\ .Zi 7 /I#4i +oaDo e��, "k F+!�Q° • N BEGIN BRIDGE r 2P -YRPDB- -YRPAC- -Y_S- �\ Oi O �, PROP: L 7 -Y10 POT tie, �� Pl Sto 14+24.03 Pl Sta 84+65.54 PI Sta 107+16.73 Pl Sto 117+68.63 vv vSta.25+75.79 ; 0 = 2°30"02.3"(RTI 0 = 8°4/'33.5"(RT) 0 = r 47'49.0"(LT) A = 5°2/'11.0"(RT) F \ ��\ FENCE y m ; * D = 0°38'11.8" D = l°00'18.7" D = 0°10"28.9" D = 0°29'53.6" \\ \ �'�\ `,� Q �* END BRIDGE �\\� I r` i L = 392.80' L = 864.78' L = 1,028.69' L = 1,074.43' �A �? 7i 1 * Yl0 POT Sta.28+19.04 T = 196.43' T = 433.22' T = 5/4.39' T = 537.6/' REMo \ T X 141�`A fi�• R = 9,000.00' R = 5,700.00' R = 32,800.00' R = 11,500.00' CB \\ ' \\* \\ na �� 25+00 �-7/�%%%% //r SE = NC SE = RC SE = NC SE = NC 0,:_ o • S I ef /0'0•. VDS = 50 MPH DS = 50 MPH DS = 60 MPH DS = 60 MPH 5z. + .` ,( Y / %6 4217,7 _ 30+00 -Yll- -YIO- \ �♦tl , ` SEE SHEET 54,55 FOR-Y5-PROFILE , ,� , � /,1 " R - PI Sta 27+55.78 PI Sta 32+92.27 PI Sta 23+34.74 PI Sta 31+03.88 \ \ \ <`/ SEE SHEET 64 FOR-YRPAC-PROFILE 1 1 A = 10°00'00.0"(RT) A = 27°02'54.5"(LT) A = 4°2/'03.6"(LT) p = 4°44'04.7"(LT) \ x� � C� SEE SHEET 71 FOR-YRPDB PROFILE o / I; / SEE SHEET 84 FOR-Y70-PROFILE D = 4°30'00.0" D = 38°11'49.9" D = /°03'32.7" D = /°03'32.7" P~ /'°s ttr 41/ � 3N i +5.-.: .,0- F �, G• t� SEE SHEET 85 FOR-YIODRI-PROFILE m� „ L = 222.22' L = 70.8/' L = 4/0.83' L = 447.06' S1 4'R7 V V SEE SHEET 89 FOR-Yll-PROFILE im �Q ` �ri2c 7y -#-/ T = 111.39' T = 36.08' T = 205.52' T = 223.65' `A� �' o�/ ®• /� �o 7* • e i R = 1,273.24' R = 150.00' R = 5,4/0.00' R = 5,4/0.00' `.�` �$3 �A'� �� f I `?� ;// 7** `';' SE = 05 SE = 03 SE = NC SE = NC on ,5 �'3'„ ?,�./ DS = 40 MPH DS = 30 MPH DS = 40 MPH DS = 40 MPH a LANE `` S I / PROJECT REFERENCE NO. SHEET NO. oo• 1-58/98 25 R,W SHEET NO. I I ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER CONGRESS STATESVILLE, LLC I I NC GRID NADa3/95 DB 1532 PG 1446 I 3 I DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 cR lA • . .. . '' ;�/ ),' `,P,\ W,,J 7•j ''CiY, •\\m\\ II BST illt g /' / , , . i / / ® 0:0\ \ I RED 9 6 p0UN282 / o rr�..,, ,„, CONGRESS STATESVILLE, LLC A 3 __ N // / W DB 1532 PG 1450 \\ N L- O� O N 48"WE EXIST G R * �x46'ww i" •x>`0 DO NOT DISTURB x;�'.'�1 -T - �' �S�Oo `l SIG �7� ? � o — __ r . W+00.00-Y N- REMOVE SIGN �, —_ Z /� S..„, I,, 138.34 LT 4.67'L \ --15 __-_ SR 2l87 GLENWAY DR 24'BST Pkg I— �� '�1��,�9 11 ` ` i�� .. .. GR _____ __ ___ P I- ��PHE 25 BST W -----TIRO EXEXIST.cR ans��,\ a �. --- SP-' L CUT DITCH �� o� LLI W ae^cBL o --_ __ � ALL�`- _�--. - ��- - "W-Y .,,HINGE o -__ _ G=� ;'S'I - SEED TAIL 45 C n ' '-.An..� _ __ _ -_-_ f'`27.50'LI N ik vow; .�aill C _ P C C_ C` W - T 2 i - ---' .. -_--C ----�----•----- DITCH------- ------------- N c c c c c x _ w --- _ c c x N — — — — — W . .. .. .. .. . -- ----- --- "'•""" ,, ,,w- x-.- x x < x x x x ' • 4......° "• .. • ---- - W SEE IL 45 N - 4a•.yam x x x x -x 4ec�,1r--"_ 46'ww X W FS 51 +CAT-1 GREU - - W REMOVE DI -. - - -- N .. .- 15"RCP-III ��' ::1 ° A 8:1 V) ^6 imam: a �• 4 I S DI LLAR__ r P, C ,�// - —//—--- - — --- _ Z N 50 [GI Oc //�� �� > 1, N 414 a ▪ o Q'//a REMOVE 2GI RETAIN 18"RCP 180 f00 - /�a 18"RCP-III - cOn ^ c;!. t75�OB r -� 48 CONC coNcr M r =� 1 T0> °�10 W9 r -,- TL' -z '- -z MT-r -' r .- -' t_- a"R91BCe-� 1 �GI T T M M O - 4. --- 15"-RC-P-N-- --MIL -- - - _- - - - - IG'RCP MTL('ftNf.MED. --DL C�NCL L MJTI- LTsL_ iMTI L- --ii ' = i- 0 O -- -e pll �501+TGTA ' - - tee LAs ▪ o zp - �� ^ O - ~ I_ --- ---- -- __ REMOVE DI -_ - - - ^ o r n•- . --- - < < < N - .. . c c --------- _ N I _ X x x x x X X x x x__ x r— y— x x xc x Tx-_ E%ISTING R/WY V-��------ -- ,.- ----- ---- -x x x-x- c (. i. ,,I, CE DO NOT DISTURB -o o o SPECIAL CUT DITCH J SIGN SPECIAL CUT DITCH J m c 300'LANE DROP TAPER 0 0: W/HINGE 6 CLASS B RIPRAP PROP.CHL FENCE W/HINGE t m ,ten SEE DETAIL 44 t SEE DETAIL 45 m • - �R } GR _______________________________________ CI I JAMES FARMS, INC. DB 336 PG 412 -o o- m i CC c2 ID 1 v m v v N m N (C CC CU ID i -o m Y U M+H i)m "� SEE SHEET 58,59 FOR-Y_N-PROFILE 503 ,Do \/CC lD/o_ LANE " S I 38/98 PROJECT REFERENCE NO. SHEET NO. 26 R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER NC GRID NAD 8395 1 li it 11 DOCUMENT NOT CONSIDERED FINAL III^ UNLESS ALL SIGNATURES COMPLETED li II I ` REASE TRAPO'/ 0 /I Iw II II r IIb o I I o I m-R CONC Iof w n I I ISBK IIIo III II� \\ `,II CLOVER LEAF ELEVATION SCHOOLS I • I _-_ �I ILJI III I s :. BST % oII I I BST c'I w I GYIIo \ CONC r 1 .,„ O f I �i, BST - I II III DB 1926 PG IIe'GONG NB, \I� \ I I ri\n L �i,, I � DB 1926 PG 1 '�1IJ I 1 „ I/j 0 �4' ///� / /1 _J II o�` Iwo9R 7� ICONCRETE DITCH V I I\ C \ I BEHIND NOISE WALL N II; II II 3® II III JIB Izp �� // I SEE DETAIL 55 GOFORTH, GOFORTH & CLINE, LLC r. J L �J / /'�I. / \ — I \' C��/ /// I DB 1903 PG 104N Z _ so'Ll �� �� ��a a p \ PO° __ BST A c + 8 +12 11-Y ^CEO 30"CEG BS +Q" -Y Po�� 24"R P D \ 0 / AERIAL UTILITY EASEMENT 142710'L BST 75 7 50'LT/ w- \ '� 'C1^�� �y- I LATERAL 3'BASE DITCH 0 30"CE.G fy/ 142.50 1---- 151.0T LT \ �� �/ E �.- 3 0 ` \ F---, • W/CLASS 1 RIPRAP DI''f�ey- " PUE rr+��,,/ �� Mr�,, I SEE DETAIL 47 Z W - " a, `� <i r-✓I ��Q� ^o. L.�' ? 300'LN ADD.TAPER ILTI 720'SHIFT(LI) _ .- W _(II _ •icy •A,y �� a I / _ a +70.43-Y N- _ < END NOISE WALL r 300'LANE ADD.TAP : '• �_ r+ 120 0 T N 115 003 Y N .• . � - .0 L + 120.00'LT- .LT 1 I A R L + CL 1 RIP RAP W SsEMENr n T C - _ --_- �_ +80.00 -Y_N- FENCE 18 TONS 30 SY �; . t �,� 0 i N, PROP.CHL W T T=-- C = • I 15"RCP-III W x •46'WW • X uT ■� X"o w. X- X • X X X,.. X15'R X • X - -•� �'3�_ V� .. .. .. .. .. .. .. .. .. .. i� "' - BEG SBG -- 48"RCP-111 _ - 2GI-D -- - REM!ti.HW 2GI 62 2GI i� 18"RCP-III - -- r1>s -_,3 -- - +n - - - -- +20 0(67.96'LT) COLLAR 62 W NWIT FS -0.7'LT - - -� s _IA. _® rLLJ -- \m ---- ��� i M=Mri-_T-_ _i1MTL L s -T v' CA Z g - - _ _T �BENCHLESS INSTALLATION v %\\ _ 42"WELDED STEEL ® \\ ZL\ r'•GI Ann, REMOVE EX. Z nI ,o _1.q�-+�.1 2GI<2601> <.;' REMOVE DI 1�j+QO REMOVE DI \\ 2GI 60 iv ---- __== `ZQQ-I-QQ --CONCRETE CHANNEL-- =- --I -RCF-W- - .,(iy�I� �l 71 Z5iRCP7tr ' �- 1 1 1 1 },^ lip CO _MTL '1 lam, Tim 1L r��¢ - --r�-.-� r--i MTL T--i--�- \ IMTL MOVE �PJE '�R9� /9 IY !i Al• -_T O w C NGTM BAR IER�'^ -� � .is--LCONCTs--L--T--s--z--T-- 7yr7.)-15_'4gCP-IVT_i -_2GI - - - -,- tea.-z--T--_ 3--i--T--9T. �L'60, ,_ �GI L �_ LI'NS M QTV- "- k �� END •GONG.MED. CONTRACTOR TO CONFIRM EXISTING r 0 P . o RF�543 PIPE INVFRT MIRING CONSTRIICTION p\\ ' ~� _�_o--. ___ • - m CD AND CONFIRM WITH ENGINEER _�\\ COL^..� ���_ 0 Z\\ CO -d d All° tm•^\\ A01.11111., a. r w _ _ 911 Co GREU TL-3 -V G1:. .: .. /G.'. - - s _ t, Q. •c._.c. s_�_ _ - L L L L L L L L L L L—X—X— .. .. . r+�_ .. -- III •\ BEG SBG 15"RCP-III Q -. .. 18"RCP- +50 48^WW x—X—X x >r s X_ ++e " EIP +00 GL B RIP RAP • I- - 48'WW X--X X �X X X X X �'- X610� ._ _ _ N - x �--x x x X_ --/`,- - M - -4- _ _ x x x �� _ __ x _ ,. _ N C 1riIR .r f .r Q b -� 48'WW X :.o... /�J�/ C C 48 WW - 48.VOW ` .` _ ---Lr _ _ _ _ , 4 _J \1 � �� �FS �w• - ROD. HL FENCE a a PROP.CHL FENCE �� C 1_-' C W _. _ +. - - SPEC !(.'V'DITCH '� -_ ++I.n YN- rn Z 130.00'RT y 1 RIPRAP 'GR • 120.00'RT SPECIAL LATERAL'V'DITCH I ETAIL 75 SPECIAL CUT DITCH t SPECIAL CUT DITCH +++•+ _Y - SEE DETAIL 72 SEE DETAIL 38 W SPECIAL CUT DITCH - 13III RT 7 _____________________ __________W/HINGE L T SEE DETAIL 45 W/HINGE REMOVE SIGN _________________________________ SEE DETAIL 45__ a ____ w U rn 300'LN DROP TAPER --------_ 500'SHIFT(RT) } / / W 300'OUTSIDE SHOULDER TAPER 50,0 • TSIDE SHOULD :TAPER GOFORTH FAMILY REVOCABLE TRUST DB 1607 PG 197 s JAMES FARMS, INC. a DB 336 PG 412 ° - I m cy` i LB • 10 SO. 8W MTL 19 .MTL ..�. c v N 0 � 1 \ O Co \�\ \+ f+TC O \\ q y O-61 \yT< I. m� M. mw a'<� `N - V SEE SHEET 59 FOR-Y_N-PROFILE -0 m Rim �,,` \��� s \� \ o ,Ld \ V\\o \ m \� I S'I�- • \\\FS,. \•. -i D/D A LANE `` S I ) PROJECT REFERENCE NO. SHEET NO. 1-38/98 27 RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER ND NAD 8395 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DO17 'WfN 1O4155N SQ1 ; \ 1,, r • S( ;SF `V // (N //f . rh GOFORTH, GOFORTH & CLINE, LLC // DB 1903 PG 104 sr-- Z " .- END SB WIDENING/RESURF. ----7 i— 4 \ • W 720'MEDIAN WIDTH TRANSITION (LT) _N —Y N— POT STA. 205+15.43 W 300'LANE ADD.TAPER r \ . I IATERAL'V'DITCH TIE+TO EXIST.FENCE ___../-- S( .. N c SEE DETAIL 78 +15.43 -Y_N- TIE TO EX.DITCH W/TAIL'V'DITCH SEE DETAIL 77 EXISTING a/W w r �� X ram__s'Ww —n n Er D'W R CON UCTIC►N X48'WW n X X X X- s� END CONSTRUCTION " V) �� ��� BEG. NB WIDENING REBUKE. REPLACE CONCRETE DITCH 4a �. END NBA WIDENING & RESURF. 15"RCP-III. ,ae...1:i... .. -. .. r !�. .. .- - •.A !•. .!!I,w.. .. .. .. .. .. sLo E cov RS /,/= -1 '^ 1 1. W 4„ i�+� Hw —Y N— 'O T l WHERE FILL P E - ,.G NR4 ,1 — SEE DETAIL 79 /L—�—M o I " Z 2GI 72 ?d —GREU TL RETAIN�[ REPLACE CONCRETE DITCH RETAIN�I /. .\ MTL L T sl ` ———— ——— REFILL SLOPS Cu4MMb _ ---- ---- \ . N1 V x TIE TO EXISTING"" j RETAIN RETAIN �ffINVERT DURING CONSTRUXCTI NC o N EX.CONCRETE All P� / �� PIPE INVERT DURING CONSTRUCTION 0CI, - GUARDRAIL SEE DETAIL 79 66�� PAVED DITCH AND CONFIRM WITH ENGINEER RETAIN CONCRETE CHANNEL � o � 2OJc+� — ---���� — = ���L-- 1-51E1- -- -- —_ ____ FULL OF DEBRI$\\ ___ _ET _ _ T �XISTJNCr FT rCO,. i MTL �MTL � �r��-/M1��� 7 7�—TIE �DARD�RAIL 'Lr 40 VG., «'C :�.� 1, E'0 - Ci NC ONC / MTL r MIL FS C, Oar P .,((Ls - -- _— Iv ——— .1 4; -- — (NA 4ilatittLMillir*Allir -- o IL—SET. ._ c g\,b� 11,: o CONTRACTOR TO CONFIRM EXISTING irk o / ASSUMED 18"RCP LOCATION o J\; q E N ERT DURI�Ny,, CONSTRUQ Oti TO BE RETAINED CO �� r——� III --RETAIN W wH w I— _ — _ a `v r y _ AND CONFIRM ITH ENGINEER II _Z TO .i II 15"RCP-III -I ' Q L L L 2 '� L L L L L L L INW=86R 1 1 1 L i i i 1 1 151 RC 1 2G 271 -� `— `— -I I ..48 RCP III <`17047 < RCP-IV 15"RCP IV ..3+R7 TIE TO EXIST FENCE 48'WW 4E'WW n - e66: 4*31El +0 _ a .. _ 7— N 'i'I '•�' �' - — x „ = X x X ---- ---- X c _ x— -RCi ...•,T - - - s. �_'�" - - _��\ . ."' ��� •may _——_ — CL B/RIP RAP F — F——ExsTRacw�— 7 F F F ��t �710� 48"W 1B wMH --•w - 9 r 7= ;- ,. >.a� �,W .0 1 TONS 5 SY _ _ PROP.CHL FENCE o �\ .•E� � �\ Q o - o Alit; • wigivrew 15"CSP �S 72 3 TONS 10 SY r r r `' �illll ' +50.00-Y N- SEE DETAIL 72 W +74.17-Y N- O 20.00'RT 120.00'RT- 98.86'RT Z +2 2• -Y - 120.00'RT- o 120.00'RT ��'= o _ 18"ASP vdELB•1':F m J PIPE OUTLET 5 TONSPI4 SY PIPE OU ET + -Y N- 0 520'OUTSIDE SHOULDER TAPER o CHANNEL STABIL - ION 152.89'RT e + CHANNEL STABILIZATION SE , AIL 4 TOE PROTECT!r. N 2 SEE DETAIL 73 1 RIP RAP - WITH CLASS : RIP','P +•4.. -Y N- ( 1 CL 1 RIP RAP - X TONS X SY SEE DETAIL 31 SPECIAL LATERAL'V'DITCH 120..00'RT rEtV 60 TONS 70 SY W/CLASS B RIPRAP SEE DETAIL 74 / o 720'SHIFT & 720'INSIDE SHOULDER TAPER Nm TOE PROTECTION j5 n 720'LANE DROP TAPER " , WITH CLASS B RIPRAP _ ` SEE DETAIL 31 /j5/ + , a IS CI- CO W CP7 CD P%RETAIN GOFORTH FAMILY REVOCABLE TRUST co L// DB 1607 PG 197 m In v S( e 9- v N m N (C co co In i -o C Y o SEE SHEET 59,60 FOR-Y_N-PROFILE i "om c, oQ ti \/CC lD/o_ / _ LANE `` S I ) PROJECT REFERENCE NO. SHEET NO. 1-38/9B 28 RN✓ SHEET NO. 'I' ROADWAY DESIGN HYDRAULICS CH ARCLES MICHAELI I ENGINEER ENGINEER FRANCISCO AND WIFESUZANNAQFLORENCIO MMACHOADO S. FRANCISCOm ` AND TRINIDAD 456pg 1455 PG 1400� so, m-Y9 DB 1738 PG 258KD mPl Sta 11+90.5/ Pl Sta 16+46.47 \ ` o \I0 = 7°3/'0/.7"(RT) T = 20°/3'29.9"(RT) 1-L - D = l°58'32.6" D = 5°/2'3/.3" SBKD —X L = 380.48' L = 388.29' r \/ *** *�` 215, -1 __� "nEIP T = 190.5/' T = 196.19' 9 94. , w CONC - N SS 24'59"E 5 84 4fi37"R = 2,900.00' R = 1,100.00' t<\ s I 4,,, ,)„„,„ �� • — �s�.77' �� `r PAUL H. MAY I 5' 28 98 s r EIP DOCUMENT NOT CONSIDERED FINAL SE = EXIST SE = O33 9 • sc \ ALICE K. MA N1 _ EIP �2a.19' UNLESS ALL SIGNATURES COMPLETED 4 O Z AND w o\ \ i/R' 17 -LOCH - w 01 11, EIP DS = EXIST DS = 40 MPH O F 3- r£ DB 1958 PG 2405 ENDhhhl`_ r AVE 185'B�-�" EIP EIP 3" N S8'29'47"E BEUE X X N 87'37'11"E N 82910 fit.COO / < --I / '4. X 49.48' G`FO��F` /� \ —- x�♦ \ ',' I C3 lN0 GAS L ii. / QF2 P //� --_�1 Nc alw Q svc cou Dl w 2/� %/.Sec. - 1 \ 2sBKD -gHANNON; '1 I L,* 3 II w /� �_ L,g4 // 1 \ D. HOLE • f \ 8 :{:k 258KD !`V r 4' \ / WE'2 1 E01 pB 2266 .k*m M �� / G snss26 .o- \yetE�A w� �� y 1 1 �� PG 668 h MANIRAC a ' \ _%%\\ �� Oa PBS 1 `4 K- '1 DB 1030 / EIP NNSN .t2es6 = , /p,3'\�- %+E v\�G \\ 1 \\ 11 5g2.5'52�w Z� 2SBK0 0 PG 1927 I ,I rLik o- o JOGS o -_ `��g\ )'s S6. KEITH L. MILSTEAD o 1' THOMASI- /QtJ Zo' NO n�z�s DOTTIE F JOHNSON. HEIRS Go \s>' \\�JI 1 \I pB 2213 PG 2124 �. CLENDENIN, x \ \ N S Qp01,k No\�oN •esS G p8 116 PG 6 L4 4. N\ o \ ET. AL. 5 85'42'38"E.. / 258KD \ DOTTIE F JOHNSON.Z\ , DB 1540 zB.93' GLgt \ oN �\S sn a HEIRS op PG 2332 I ` * O ss `N\�p,NNB ssDf..�z h0 �� DB 247 PG 400 '.- \ \ O J°-R\pe,o gg = 'o::::NNN\\4 q �R t/l ���X I 5 853914 E RON I`µ� ram. R*\ EVELYNJOHNSON `\�1\,1 y 1 ,N ga9 85 D hhwwP EIPPG se00 20 ae ww'NOON \-9n `a-' EVELYN JOHNSONam HUGHEY �i EIP ~!�. 8EP491,5', ALD WH• KI JDB 960 26DB 960 •e 26Ip,6 SSG0p0h 1 R DEP .e-0, .; DBHUGHPG 361 DB 608 PG 361 1 1 z_ 5 - B 441 ...G 17z WR 608 a \ \ Q S 85 K`^VR \SR „ ''ea,'" •,E,,_NO `sa o` .. { \ - 1a6. roK 28.G .. _ W MP\SP MP \\� 1 •P, zos4°00'34 wXIP F� I N I,P \P \-E\,,,,C11 OE2 s �r o' 32.00 \ \s * KEITH L. 2 �,SS oFZG °�4 `\ \�,\ �Zo - �N. \R \ h .. 6 • 8 41'40'33"E 60`gT0' \ �', I / MILSTEAD z, 72.30'LT 2v) FPS 1_ PG2 >\ 0 ,n.„,,• 9 P 33.03' EIP S 6 ate• \ G C&G DB 2213 PG 2124 m\F1�1 \6\\ �R 5�9 • D'!` •o / ASP\ `N �'PA 626 `N i 60°g9 S o\ I-- •611, CO \:., 7=1 T.25�4- #' 25BKD # �' • +• 4 Y` PNO 00 a \ WOV o O s2p WOODS 20 •A6 S 110' \%m X +70.85-Y•- x 42.88' ° - °_ W �\ \\ P \S0y,0 ;n \5���h61'L S S 5 68520° \ ._ 'F © ,3 f i \g *I•iE, I��.. +1`# 1 r S n.E6'Lr 511 r W G S�i..9T LT + +56.16 Y• (/� O -: \\ \• �S \ \► 26 Vl / v\ GON C3© Q <?' "O 50.95'L 43.53'LT 0'h a+ p SP ", 2. �ND CaGAz" C? �`� ,0 a y ,o 4 20 .. + 5.52 LT .V�O y\\:\\,..„;_::::::.4.....,. .H.,:Ad2..........2_....i.,0.7. + ._ 13'G \\ \ \ 4•` `' .- �,00 90-X / BST \ rl �� I t..S 53.22'LTON \ ssdO 5 J 8 \ <� ET' 45.03' �R x 41.16 CB/\��Sj\NS G \ \ \ �J \ �'m`7�moo° og • y oSP „zd,W5 G 8$ * /^ 9. FOS 'b .t g\ C3 E aaRr+dr _47 IIr..• K' , O,N N �,.'R M S P G R 5�4y FP 0 � \\� ,� a.Ks,Z��\ `a . I� a � _ _ �l �K $LL,.G JN \�� „ ` :m N SPN000sO QG y oe GS e a: * \seK° m81 I * �a. �,rsY �- � �, 's 69 6?" 9 t \ sp � � e �BSR N ° R No° * © P:,� , s _3 Zo �SN 5 ,. `�Oy�.i9y y P�0 \,,F12 Og © *yi: �_�_�_��'.n, \ • S/\ 0�(72,\�9 \\ \\ e.\' �>�, o/. S PNS g09 .WW25 © \ .�, <2812> �t, %i :•.:._ '®r� '�T.f l'�®mWoo° / ,S0y,0 ,r,, / \ '\ oyr / 9V ♦8,,N >> -o ff��-,, * # \ .`� AD ST MH zc�0 _ ��� .��.�\ / \Sa \ '� EIP.�o`�,� >V+ 20-f's O Ys3 / *.It* #* Adj.C * , .,�-�. __ T- �IR5,a211.-ir'71....77.------- ; 4/+13 V� `sp\ `� / v ,.. s 60 o o {3 ### \ ** D r .:�-_-_ os .Ts. s�.�s�/ ;, / \ hea wo oho Z�odL o s9 \\ 40 it Wrw �' �� _ c _ ,o,,a `ti<�/ `^' o \ 569 'I,0P rZ Uo. m rn s �, 6y CONSN �.i ym _45'CONC E-r IJI��� "G, 6 ti pK c'. 1 EIP OS LG � � - �E\>-'o, 39�" oNG / .\\ \\\ F P+��\ �0)�, o s BEGIN CONSTRUCTION o5 EI _ �aO Q,794: � �L a. i�� ��N 60� hoz •}d o //%=. ��\\\ M PN�A4 Z\ ao m Y�o o Y9 POT Sto.l4'4/.60 AIN ��y�v i��" s+ �.^.tom> E� - "vim i;.OAS\, " \ 50�' \Y �, \ \ og/.,\g6 o n2� 62 37 Y \ �.✓T "" .�® 0 • � �R, ,* + r.r. Y• •\ F _ ,y,.,,,�PG "Y�O HW NC �-� 47.,0'RT99 \ iP / rN o Zd _ \0 'LT \ \ - 1 +•4 1• Y rG 1 0 .;.. *. "CSRR 55 > 'i C \\ \\ \• \ ` ' 62.39'LT o '-'' - .;o` N s' p- 6" '7 I Q'' 45.00'RT 0 T 57. RN; '# GP _ sk 5 r \• Y ® ` ems 9 � \c �# --� UE ,,. .4 + 1, _Y._ .>51,J o! 011 ZO .= 698zl oN\ ^ dm. \ ! .�, O ,, 48._ LT // �\ \ g/ 6i TUP \ `�i_'i RCI'la`sP f��' � I�-�$ E.63'RTS 2 s $ *�OWy OQG 2'V' :v -s.A-5• Fz. A\ Y''m s O •\ 8' �� ,5 T 51 30'CON J FFR��.$FENCER o�oaI,,0-6, '5'\� .,.9 • S „\ \\5 0 \5J+ y, - rN9N1 �br D - ` DIAN� N „rl!CONC DB 2418 PG 6:. w ,^ UrnF. o \ ('G 1� / p F // _° //�� c P .0 \ .� T L'a..i +0.43 Y• .n oEIPZo RT Oft o�. \•.=i \ �' wl '.a5'RT /92, / '.0 29 s, e PN \,\-eG \\ \ ,B 6,\ \ �I \\ / ate O'03 o 1 �+m 2" ITE .51'RT \` s9 F. 9h9 X `=G� `9� 10\ \ \ '-----\ yy yjy� xU`� �j'V a Q E __�� . 'M o j.Wr - R 1821 * .1 " ..i. ae 2 \P 9592'I 6SNSF p\A o 08Z � C \\ LSA� `>`\.. r � Gr %.coNG 1,_ +�r ,� (ya7•1�,4 '3 '*•• X �F--,i w N� WYa' \. 'S°+\ 0 ,0j09gj S�N�pB j3 \/ oN \£ t �\�'�/a� A�Jy \ ��D SSI D93 PG L. U2 ..6'aiL.k�1fi[R °'TA LC• d. 7.�w X 30 609 L P $ if 5*�©o Q *0 z 6 ':6' CON 69 °N\ a 00 'I, G G \ ) �1r i o G\ P 8 __ __ _ �... a tif�j m •(N N /0 q0• jjNN` r P `O N J! A -- // m © o` 5 89'511 __ - l p\-S�N\FF" o • m sp o /L / .- \ e.: .. \ \ .* ° r 5F0 .x 24288' ..- �i •�.. © J o' iE P c G \\ ON TZ ,. \ \\ ' R \ � 'EIP.:P '.GH - -- PNO N2 +� GOS Ba \ oos 24% Eo\ m. QUE 4"�1 0°••" X. 60 g ,. m PR. 9 I N�o m'� _\ 0 P�� 0 \\\\ \\� wo / 1 /:�� SE >� \ MARGARET THOMAS\ m P o 6, Se 1,99�. W �t s0 /\ / �� 2 PNS NS 32�01� � � l3 .#© U \ \- S i . ESTATE FILE 2007 0 m \P �>pG `pOGV• G /,CON N \ �+ / 0-V,0°\ �� o �� LPG\N 58� .. +.`j11 0, \`r / _8 c PG 332 {'� ASP 3 T' Oa GO' >' I �" \ �� \ y `i // w�\ y 8 \3 {:'k 3 2 S ,rn '> V.. ` f0 ` 01®\d �'oe s/,/Y�\ 49.68'RT n .00 chi-� /\ \ 0,_ 4* ,n� `�'p � �BR \S .0'.0. c�y 9 i �.1.1 / +01.14 Y• m `I 50A0 ' '! - PCI .•9II . \ S0\'0 t,.s m L \ \ . 2. 3 z o\ i f\ \\�i s 60.43 RT �� •s+�, i k CFO > ::A / tt \ • m zY., I � \. \S 0 \\ o\,-, ���® �;3 \\off' .% ,r a EIS �,50 >�� +!M \\ B�coNG/ ` - - v (j a \� e a OW ` a/�/ r�" a\ / i f s \ \\' / f� - —�// .oy >�a. S�� ),,,,\\ # - IP a \ j e ` O \,,l0/®®� s \ \I qz1 8°., f80.'o' �i o- mo Ill `de.� �� \SFO \�`i We P� i /® .p �>:\� / sP s d,m , �6,09 w s 0S•2S -v4• .6\J,` >O72 �E \ \ z i y+ Q` 6 d •G,,,,,CV" °P > f`" y. ���`<2. 69 T9'_ 'S°, 6- 9 \\\ �` M. r I I -s S 4 gd -." \,� �i 4a4 yff��,, \ O�"�\ \'^> o .w % \\ s N r ti - 69 so* \ \ ti 6t,.s � o, l \o 5 .� TG \ � o\\ `r,\ N \ (tyPgO '�,� s , s qN \ d6 '`hi9it \\\� � + In ;,\. / " 5 /®/ \ \.cDN'• � / \ \ �`°sP�' © OPJ\04'Se wqH/� #+ti* !C \ �/�`� EIP / ss o EIP \-y \N\\A IC3 �. .sF° © <wooP Q oe FF Cq RRiCNq �,.s* * • a * om �P \, GONa j I i Op,O \, / o\yo\ \m ,pGo 0 Q ;...�d og zF C RCSO _s o o \ , m w $ /% r `; /coNG \\\ \N o� [3 „ 8j ps/QNgR,gNO 4'13* Z a o{'3 se o _ s0io N s N�w N \ � • C�i ,Ls \ Qj w' © \ sF�' so 2 r z © �\ / �"3 <s ro �2 \,i \\ / lg 4 -' �\�, 4 a \\\ \ \ J�c°" -Y9- Pe Sta.lI ,,# W •l C3 \\�J o �s © E �-' ♦ *#** �' \/i SC \ � / a Bs 7 `\ \ 50\'0 \ \ a\ • \'t © 2 +r* 3�0.* O 0 05 G° *y /� �90 %� \ \ \\\ m�,:F'' y##a y\F {3\ # '' o►'!r ccLOZ mo° 6 h d C\\'-(P,. �/~ E( /,y� \ \ GONGS� l \\ r\ ' PNO k\rE,7 L3 k o..#. 0�6cs, N he8 \ c\A yS 9 01 ®i 0ao� q l�s%o / �/ ® `, w �\� ;\\\\\ �\\ "'` GPN GP \ z� �h- C3 / .�N! "� ,arQ , \ G�S%NSy Gti6\ E %/1...` ✓ > \ Fo LPN ��c°N° �,".nJ \\ \\o� N,OR MOR2\� / \ K' �� t OSRO�\el`°Nry°g e a \s a2 {1�, r\\`. EIP P O PG \ V s \A ° Ess�Gw/.I \-sp / // ,,,,,,, am \., .., ? pP�`S E\ -,8� �\\\\��\\ Jp,MES�o0 P6oN 0S005., •d, ro 9G 0 \ 4 / / \\ , // A \ � og /i° i�6"w \ / SFO 3�. V�Gh Qg` o.C/*�;i� \ fN Igo Pr flEIP� / mw i� \ 1 2 y,Srn G )Gc%•,g6 0 69%OS� \\ \\ 0 W \ p -- ST - - _��/ \ir JONATHAN E FRAZIER AND )( / om EIP`s\ / / •^ C. g8T EIP/ 00� ,r�, \\ \\ \\\ \ \2 R - 0 1 _ �•es, c^EIP WIFE EMILY A FRAZIER o L.R. �5P \\/ z� \ o OB 2 // SAA/ 0 \\\\ \\\ / wig— O�-/ DB 2226 PG 1095 �-oa \ /0s'cN J� //IN\ •� � f l \\ N\SS \\\ \\\ _,��,,� BST / / \\ SEE SHEET 74 FOR-Y9-PROFILE C� �\ � % C \I \ I ss�`�N /- / t \ "'\. 92?0,,.; - \ ,n R�a2 \,\\\\\ \. "..{'..2 QF'HYT' f.„ .,,ap a5�i�/ , .,-....I\\ pia - IIIIIIIs I. LANE "S I PROJECT REFERENCE NO. SHEET NO. IL al ' 1,'r R HOLLAND, III` • BA.'•_ 38t9B 29 W r,ESTA This 20 2!.• / OFFS. I'•• n;.,: I -Y9D- RAN SHEET NO. n/ I!+06.66- -- I DB 2366 "'I,•R471 I�i'AR HE'L/CAPITAL T' - - ROADWAY DESIGN HYDRAULICS LU 59.13'LT N � I i /0 i . LLC ,� a ��' I WE HI Sto 19+99.53 PI Sta 23 /0.66 PI Sta 25+33.87 ENGINEER ENGINEER 36.55'LT Cam• •r /o p8 1F1 PG 286 _ti �+'�'O 142.5'EO TRANSITION .I I,,IA = 35°08'37.5'(RT) p = 30°28'18.6"(LT) A = 6°04'0/.3"(LT) LNO <1, I I ygi, I l/ ISBKBu• D = 15°26'37.0" D = 15°26'37.0" D = 7°3/'08.9" t/) ���Dib"" E ESP L 6. OPE , L = 227.56' L = 197.31' L = 80.69' + F 1 .too 1 T 117.49' T = 10/.05' T = 40.38' �• t_irti In l r I/^.� F 3'71i. .., + 1n' ��� ._s. . �E-D 1�/ Exisn c R/w _ EIP R - 371.00' R = 371.00' R = 762.00' �} SE = 0.04 SE = 0.02 SE = 0.02 20' 2 Adpi4, .O+Z oB6T &r. DS = 35 MPH DS STOP.COND. DS = STOP.COND. /�A T I !'�""��W� j o -'---- -Y9- -Y9E- �"1Q 1 C ..- ,- PI Sta 33+44.72 PI Sta 10+55.26 N`- DOCUMENT NOT CONSIDERED FINAL �iai�ri� �' -r - - 4°03'47.5"(RT) STA Z N ip - �~ w 3O°OS'46°2°(LT) 7 GO _� UNLESS ALL SIGNATURES COMPLETED J I �� ■ .. -I a i5' _ /°/2'04.2" - w J 2e es�a csc` D D 28°56'/4./" �'' 9D_Bs o L 338.2T L 153.3 ici 7 • ter•■ .t n:" 11c o j T 69.2/' T 53.32' �'' S o• V >- in •I •71 N 070 Qq. J q EXISTING R/w lift�� II �� N P 44 99'RT PU .�1 5�.4E5 R !1 ° - ,Ia,TRUCTION R = 4,770.00' R = 198.00' D ..YYY `� f-- I U u/c As __ .,,,. SE = NCSE = 04 �1 EE7- N' 23 .75'EOP TAPER R•\\ \ L Y 11 +00,00 , O 11#s'EOP + !,ANK ��} DS = 40 MPH DS = 25 MPH is I 1 ' I�.� ' O' 32 TRANSITION (RXJ \ / CP\C 1n's 2 �i hw INTERSTATE DEVEL ENT CI I '(• �AU TOBELL CAR o., >\.A SUPERIOR PROPERTIES`' / r, J Z „ DB 393 PG OS 09 WASH INC OF IREDELL SBKB U W 4 ' 25FDBU5 I DB 1105 PG 706 "' `� C & J ASSOCIATES Z m ! • :1;111,1,:t PEQLEHILL MP LC` \ i y DB 1610 PG 1304 /I- - _O I �T� '!i _ 1r DB 602 PG 347 /d /rll� �� Zx� B 2436 PG 97 ---�r ` Ar �3iCHC_W RCp� C 2R RCP BST DI IB"VCP �I8'VCP/ " BS7 / 45 . • y+•�jt_ �,•r 177 93'�ss \ _f S 83'49 43'E lBST w4r/! .s ak:M#N. 39 IS +12.24-Y•- 20.00' I +74.18-Y•D- 1 tl� �+lr Y_ 2R. O�c- 111 / I38.00'LT SPECIAL Ij'I� �� ,--__CO C1 P-!B^2B000N. 102.00'LT /-- N / 07 -Y9D- PT Sto°25+74.18OFFSETCBBE DB�880 RPGOT0201NC. �_, / II: B� J,ry� +41.34 Y• DI I I .'1Tip ofW �: no.49Atreus m J 11 = I - O <29311> ♦ �►r •-a Ce. 5-�19f5.TRANSITION L _ _ 8 0 G"Y. N ,,i,`� 73.88'1LTy E i 1 •. EXIST C&G Orvd 104.13'LT /�+62.67 Y•• %% '' '" , ���111 iiiOr YE I F I I "' _Y+ rm1 ,ISB :�:'LT mE 'm105 4TLT }-. .Y9D- PC Sta.24+93.49 3B.oiv 67 RT r• !'`I ��� wQ'" 9 RT I'_. J�o �„ I,,IIP - 90 m `:I�m5+88.71-Y• ISBKBUS EMOVF/ .1 �r p R P IV 3�or m +00.00 Y•- +81.37 Y• ' 1//��I ti \ + a_ u 0.95'LT R `OS 1# 8"X 18 CURB I \ I 60.0200 LT 41.95'LT -..�I, - 0 75.00 + 50.00 LT -Y9D- POTSta.24+40.38 = ABANDON '1n'L- fur �a I � ° 6024 ainft D- ~-wia0.00 Y•- 15 m�I{1IIii#�-BEa-OVE cB I. 1I I • I iq�R',.&c +41.41 esr 7s.o T ESta. E ��� ����f 1��� oN. �, J.I Ill/A� A8"X •"CURBY +8 f•: ior)f1a �,1"9 PO 44 / + z „p'%k1 ,G,, stYcaN AYI F\ / , %[A►, G" art"g9RBry 4 a c , ' c �� so 0o LT xis culls j 1,. ° '^ r oM5"RCP ,, 7 rc F wkok r _ 8" 5i3 PRE - 1 rr '"� �, -• __ �� sa�Yrs.-� 4� 1 '�'. �/� ,��y`tS� . I I- O BL� MOYEA'• .: • _times, - .. -- -- I1 .l =� .�'Q �•L/ IGD !t *, N$JTION L V)O � - - - fad _3� 1�y �!7 L ' f � �s h r �a�ws:°t i J.� ► F i���� *. j-- iti Via..:..,� 'fin:, _. Ii ��,�aa,,� �� 'E��BRO 6°'BST c1�1�, 5„RCP'V �"- a REMOVE CB G �� �fi• �:rJevwc1wlw• cP -a DIc • -- 41+00 n - 4915Y ' r co it3�:7vTN]/0_Lia�r�'�M`- -�_ ;._nrr.^ '"- ONO.CONC ISLAND - _ J¢vrMH 4s.�°:P �•� �'y 7��'�=- O MNO CONCI R� l-- '� =�O illirEEZIENINI -- -MONO.CONC75LAMtl 73C�Tirav� Y9 " - � •�- "�� �7 CNI 7747:7•1 T c700`TAPEI�- - . r - _ _b n 171 4 k. • ila_BE' � ,7:,_..• L .-_ I�'. - + .CI • ABAN I/F� '�.. .� �►�...� r. _ ENT � "'i rS�82°ram:.*i, irva�iiu� / I •a�f+"^ v+ . „E - �lia I 9t6 --M �� E 7�7 `,..1\ Q/(`. u� ? Iy��h�IF,M 71�ik.l � / r _ � � " -�� ,TB JB wMH�. f' W1 • - �! a 3j'•--�L,, 7wrre , - r7dif. 1 Y 1 '� -- :� _ ems'I,rflt° ' �3ID i`it'S1F3a-. z _ I - �:E:I �� Is^ - 1(p+ r -- - .,✓,a . �'rC +R► > --='-e = W Q &G��EX. EX i �� CB Srr o•R o./,c; e� \ el E �[V2. �°���y�4��1�':y-" - �.�i'ta�-"'"'i, �'�����/,Yu "L!f'tS�� �`le aw. •'�Ir+s. � _ .,.. o .. I N ' ■ � ?fin � �� B„X rB" - O •. y �' N =-`, 'O'RT . mir E o 50.00'RT �' cl I ��11��w �.� RETAIN O§ °s i RETAIJ� �,'� E /W - _ ! I rnw:,�„� �_aifuN,� s..� Z N ## E01 I to �! 4��� Do 0 45"GONG \ I q 3 54.65 Y =ST E *I I - ��1�d' � ® Larwww■:r.�PT ..,www � �- ,II I � \6 .5'RT ��PYf 3za2-v•- �j1 ► i 4 �►•'�}{{ StoF2: 6.92 N #R I 111� �I�, 60'CONC/ 45'CONC rop -�5 '+►' 'I' �� � �7 �N�"i 1 �z.0 f 20'C&G :.J u I !iiiii$1:/**k wa _s_ - f 53.93'RT ,I�11.87 Y•I .62'RT rv,I III 1-`57.2 P j: I 1150.00' ,A A1'- i S.I�""' ll1 cn.� F 50 I I 00, +„. BST a, a 100'+,.(; vY•.i _"IIII . . A 6.1miAslf_i•:. _ ow75 nRT #• I �+� A� Pmay; I o� -1%# I ISB # LT // I ��� O'TRANSITION R66.1 T I IIIal II # oolko L �I#. I24'C&G / Q.1 y 07/ • e4,4 APER 5p 5 '`'.34'R F'f H� I ISBKBus z +r Y' 17� w°- �� I 8� THE S.J. HOLLAND,„ I W 75 '►- I ,`� .11[.�.1 1I 71 6'RT 0g9-Y9D- Z I y # maN is of I I m III III Jr. FAMILY LIMITED �I I III III�o r #•� 11rP �I,^': 'R#..i. �:o t##rV'Ri�. ..II,�///I�����i v: ISF�% .., `.�@!a� 4'RT o w � Obi A PARTNERSHIP °� o DB 2467 PG 673 ' S' / JB•vuMH• +: 000 I N I III DB 1063 Pc o0 LEI I I III a�z� � � hi I �L 9D� lbll�'J�(��� 6/ 5 i i U R II# r�0 I m TRACT IV II O�a SBKBUS I CP- O �/ 98.50'RTP " I :. I o ti 'I If I a� I I I 4 Z r, _ w II �3 -�h I ���i'A?'� ,ba.- 92 15 9 . ,/ aJ I + 5T Y•0. W IP ti a F o I. 4 Tr V �11# m p y a II k ■'I �ir o]�°Q m LT' T'vm i �5 LT I� 2v5✓3lls 'IT Sto.3�1 •7� ' d 65 I I 6 QOQ�, �[1i 18 C& ��� �� �'�- •- 'IRSf�;S1��E.�,. • D� , +5,.13 Y•D '~n CCCC - N J a; C3 i o + Q50'L TU' TAPERIli Cg I II v'/ RT I® 4 o I'SI J I O4 #1 .. 200'EOP T'. / a! /.o ISB °�srcoNc I U I,FVV �� o /o;/ I *alI { /*� r {': I., J NI 4. ollml I I yl� �r a = �/ ; .m ���� �` �' ,� _ I ---- 'q, yi BROAD SII NAL HILL LLC m 4 I /5�s 1 lo'4 " 7 I It ��g +#f`#lo BST -Y9D �T �t0.�4'1+1I'u� ,�����rd 3p. � / `�%� 'o r21� '�zYJ 47•I RT Dk31.97 PG 1087 / 1 1 4rl I III I aca z 3 I I II � I I 3 1 e*w NII�o I Q ©G�\ N 5e6'1 .7„ �t� /._�h..I��I6: �Cb % ���%3�1� �V 7gl Wlo I II I N II 1-v.w���l/ ,3 �� - .-n, �,v���#44;70A•oyI�y F �c��• / F ♦ 4 BI L- e :.II +Iq Imo,IW __ r_ L} LT xo11 ll I li c t; III I �N #j1 II' om - P /0'�y/�q\�+•6.57-Y I ...����� • o �yII, / ��•/ ' WOODS /�CMPIDIN 82'004�13. ±•rrIJ \F:5 �� W LI I '� ' "tW 42.76'RT LT '�I�J'.y�f. ) '� �. 15. wD 18.. ED I 11 I d 'I W f ► , , . ,, 5 8'04'12"E/ - WD:. ; _ I ^' 299.6'RT, _ _ EO i; 298.92'-'T I +04.01 Y•E \\' r'N 5. ''RT �' I m I •III 299.34'RT I J '-� -r" 40.58'RT '�',:31 6_-Y•E_ + '�,�.•I/ �Y� l .j,•�.•.1 Y D77' EIPP N gsj 9'44'W I1 �# ■r: 1 TRA 5 3'1\,',11 451 1I.., �• 41�� ,' �+ � .00'RT N 71'20 33"W M lit'3 C&G PUE r 27'RT /1 r YYSS ii]]ff�� 6.94• • ! PUE P171= dl' 9/• ,; E + ( !3PUE yya�pp ExlsnNc R/w pU; - p r RT TROUT • AN ' EIP C'�• PG 46 a• I I I I':, ' O�in,� "►•err . MITED -�- E°D\ V2450 O I 225' II 24.5 A P 1 __ PUE & j , 47.00'RT F Y IP EIP 5'00'312,3• W /ICr! T1�� ��r.� 2e'esr s'esr•` 3 „, `Y�r ' .� C _� F �11�� � i� NE' _ • _ #. 3e.ao 0 N / I IP ��.....,30.G&la,n.. i ��4- 4 11 tiI� .� / '" 0.di rDK D81 N o ». �aL�a -l7/ y. a � 15"RCP-III g t.-'^_,n .[Fk� » .tn�f ... /►reI. F O� 67.00'RT PG a _ CAROLINA Sr 33'B57 CAROLIN-S 24'. 9 .d�m �®� CB N. , T • __ II: ® ` 'l`VS CHL k �1 wtfl7' .LT = sr es �i3 ° 30'c&C y c c`192 _ �W�"�r ,� �- :�16%r I� ' RCP-iir,�o < 7z• /9.,,E. n� ` TN P .F.xISTING R/W �_ I1K:"AEXSiNGR�..9 I`• ���_. - --' 5 � ♦�4�� O Q�= 184.E 9D ' •I C �rUU[[ - 7J +44.r: Y•D h (�j Jf/y,C T PUE E 359. % 20 i 5 tisb ,-/I �°I! vo ���'an OLLETT BRANS V ' I` \' / Y. iiI _ V/. -yT ,'�'Y Y .."�..\, 'Ti :•�' 38.11'R, z ' G_'n q. i PENDING APPROVAL OF A CUSTOM DETAIL,THE +16.40- //'-\ Sr Y f I' 7 •' 'A' W.-8 LA,ND PTNRSHP 1 "SPECIAL OFFSET CB"WILL BE UTILIZED.THE CUSTOM +61.5 - - 379.99'RT 1 ' >�` � �I co O>-2 STRUCTURE OFFSET ALLOW FOR USE OF EXISTING PIPES, 3-8114 Rf - - e. 46.71 Y•E mCc \1/ 0 j,� +� "RT S 7.57, _�QQ ISBKD �B 916 PG 33 90 N ALONG NEWLY WIDENED SHOULDERS•CURBS. 72 z 39+4L,1-Y•E a 4 •4 -�_ � g0.08 E �Q4 rnh •OI/->•' L ' 8.0'LT i v END CONSTRUCTlO * N 8z•z..:Y9w- l' •11,`�' � SEL M BROAD STREET STATION Y9E POT Sta.13+89/l ens 3' ST �. s7. , . 'EXISTING CATCH BASINS ALONG BROAD STREET Y9 IMP 0'•E - M�Or`� +51+ _00 HAVE TOPS CAST INTO THE ( 1 SHOPPING CENTER, LLC #� - -- ,f. '4 , I �0 77 _ ' '"II 'I` +� •t-vE ��-- ^an•wr. , l� Y9E- POT St. ��:1 z On x, s.00' -� s�.g'7i(Yesr•{/ �� Q ° #N SIDEWALK,MAKING IT IMPOSSIBLE TO ASCERTAIN 5'LT M/V i 1 l J I • slob ID N EXISTING PIPE SIZES,INVERTS,AND DIRECTIONS DB 916 PG 036 -e• �Il ♦ a J "a�.9F �' •. I in c0 WITHOUT DESTRUCTIVE EXPLORATION. CONTRACTOR 58.51' + - _ 1 --..-'''/ 0 2 9�' , G� i SHALL INVESTIGATE SIZE,CLASS,DIRECTION,AND n \ 18.50'LT - IQl;�'' ` •i C�,o s 57.40'S3g'W lI I - 41 /� 26.''_.. �/� ELEVATION OF EXISTING STORM DRAIN PIPES ALONG - - 62 w �,'� _ m I,� / z UQs. 158KD CHORD= �n)^VJ //e ///! _ 23 85' �►•• <, 7/ -Y9-TO DETERMINE IF ANY EXISTING PIPES CAN BE 28.50'LT O _ `•2. -Y E •./I��rr. 1•w•.7 c ,/ 4 -`/A ,� 3.98'LT I ,7 4. 4 a1 ARC=37.32' I . }jjj ' rn UTILIZED IN LIEU OF REPLACMENT. a ,' , *. RADIUS- �/ r3y MIJIN BAE + a. _Y•0. M � I' 'ram , Y � L x 1 Y911 PC Sta.l8 `:25 L s E , 4 zz.so / (I i JB DB 2205 PG 2123 I;�-m +66�rgqag0A77 Yz. I .r, q.C7257'0g„ , 7r DCSuy.L,AS ALLE1 (� �� II /7s.oa - +• _., . //V- ,,,._ z� HA L r_u5 hal eft /�\ HO {AND PROPERTIE7,tRI P - - 2658 `` / • -_Px •o e/ \ W WOODS '•0 -_ /I I\ l - o // DB`2�3 <v yY �t lM y... I PARTNER.HIP�/ Mry p�1"� '� 11 I'JQ_ o SEE SHEET 74,75 FOR-Y9-PROFILE 4 i �'? + a �� 1�/ .I���111 , �� .16 PG„12••ems ra ��c' 15.27' G�1i:Jk .Stg �{}J' S SEE SHEET 81 FOR-Y9D-PROFILEEXISTING STORM SYSTEMS AND STRUCTURES WERE FOUND TO BE -� `^' 1,Q8 L >.' ^��, �� 4QSp 8'Gq �� g.3T 9 1 r Q 67N+ASEE SHEET 82 FOR-Y9E-PROFILE INACCESSIBLE DURING INITIAL AND SUPPLEMENTAL SURVEY FIELD CHLI Q- �1 /yI'_. y •- � , _ 15 Q "' A " U�, 15BK0 • --VISITS.CONTRACTOR TO ASCERTAIN DIRECTION AND INVERT$OF F 5H z m ."� �� '/.. EXISTING STORM DRAIN SYSTEM DURING CONSTRUCTION.ALL �" TH &Z5•f1i ' !J/ "�. � �po °/EomO II1 - a INVERTS,SIZES,AND STRUCTURE TYPES SHALL BE REVIEWED ANDs. 9 III. F _ _ _ / oSTRET STATION I 1 N78'089g• kRELEA ED BY PR E EN INEER PRI R T MPLETI N F D �+ . 1. '`�"r- • -- z" 14S 7. LLC / R'_ S Ol CT G O O CO O O ST SHEE ./ �: ._ ,,. zyiR �_�. �, zsr° I G CENTER, I' I11so.84' a.�oaCONSTRUCTION. T _ 1 w 775.00'= g16G036 / / I IbA• i,+ 90 wf ��3Y4 •a -= ' ' / I /I EROLD K YANG, JERR pia y .. - -•'- 7LS� � :°'� Iv _�� Fcl•,. l - I I WIFE MOUC H. Y LANE `` I PROJECT REFERENCE NO.38/98 SHEET NO. 30 R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER If DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I— I • 57°03'17"E T I I 0 W� ISFD ,N 510015' I /N 57°04'14'E 5 4'14" in W I °03'24' 159.70' O N 57°03'17"E T I102.74 �I s ••I ANOPY �{3 ISM / 100.05' m s N 57°03'24 E 93'WD �y r j''� I L.48 CHL p•. F/A N 57°03'24'E N 57°03'4'E N 5 " 100.67' vx 'v' '`r W - X. X48'WD 78'WD.99' _ ,C 'N`'48"CHL '4 99.93' h-�+i. 69.46 .. _. 9.11' . � �-� / N 5°Ol' L I —_0 1'4 .'24'BK WALL ��t11 a_. N� _ cn fP�j —18'c&� 96.4r c&�� M S PIEDMONT MUTUAL d,� W III BE N C�NSTRU T WILLIAM EAR / N 32'56'36"W N 32'56.36"W 181 & WCSK, LLCM S I ,, MOORE, II - / INSURANCE COMPANY/ - /� GARY R. a BST 129.39' 129.3T EXISTING R/K+ DB 2413 PG 2281 I w� BST c�.1 AND TERRY •�v' W BST BST OTT �, .°, DB 2246 PG 1494 / `" �/a, "' i KOCH AND �R / , / 18.c&G IS'C&G I`n TRACT 4 ` •sr \ �A �� I�• JOJ w�I, c DONALD ."' B. MOORE/ J Q LLJ �� m o BST 45' / 3 m * . 'fxza•1•k&� fit° ISBKBUS DB 1830 4� ce/ 3'C&G -- -==W A - -' r-- G CONC `a * v = 7w.G STAFORD L m�JOHN F ;10 L DUNCAN°;:^ PG 2249 0 ^ c�7 _ ,� `i` e i "r r� '�"' QJ"Y JOm '*�'� ,, V PG 002 It DB 1837 M / ' '�,�.� 4,4p0 4'�'� ��4.' .. �+n r J 1 ��n cd. RICHARD E.i I z DB 1166 N N G 2° z I I o'h � �•U�D �"f s i. 60 CONCH if zi; m PNr�m ZJ� .w '°'�� FALLS if I% WW PG 854 n. * iF JJ / 2 OOOpQ U o JG FAM LY TRUST z " +i * "•t'F :' -m P- L. DB 1934 _ __? 4Y CON o � GFO b',/ DB 1569 PG 506 SPAS PROPERTIES, WADB FAMILY TRUSTu i1, ry ',* w Im owa ,� PG i934 l•y 1^ w ISBKD -X_ *" ** * coNc / 'rytia^ LLC DB 1569 PG 506 * z'CQ .�1� U i• *3© A C �$ 1 h/ W "TRACT 2" m DB 1559 PG 643 K "TRACT 3 i. N•;?, �iN ISBKBUS Z' � iF o°' �: • 3 ' ISBKD * I /,�+ OJP00 `o/ ISBKBUS f.. r. ISBKBUS O'CONC E ISBKBUS 0 A *s _ _ ' z�� >waN ** ISBKBUS *�' ISBKBUS i+• II ***Lr III ISBKD t.II ?/ ¢e ,�g�O Op�� LlJ it p*r1 r - m m .4€J O �q rx F w ,^c: OP i A, r >r11; ii ' ti--4. itr * o *>a j is ♦1**r BST 9 8'C&G Z K m Wir CO'— �^ 3C6.3L-— I I 50'TAPER ' C7 a - _ p / •G &G & z it 60. '/ 42.C. O �'y 36'CONC , C NC BST CONC ,1 CONC Nm 11, C C 0. y orlo �� / �M I1 I ¢ TO EXIST. ', c o I ', * 4 0 /• �^ 0 // BST BST 8I L Citi1 STEPS -_ I I t) - / Exls* 11wT. __ ��C may' i C r _ k'•' i Q EXISTING R/W A" s - 'lam—•�--" ) I s* —— —— I �N . .,, m m I m o R/w �1,, soo� T1�IP �� c G / * 4T f EIP86 * Fj D ,..I G IB'C&G '^-V. JV IS 18 RCP /8' _ /A :* 0£'tuTL/45 I j 57 RCP �ur�-P=_i 8 CP P •� ss X o� \ _ r-xQc� -- -� -- 12'RCP-// RCP °'G \ 4 BS I e _ 8"VC tr 01' _Prim SVT, ' w o I' EIP DICE 6� - xuru /55'� DI 35� �_ P *x N _ -IB'RCP _ �. �asf - ii IN - - e°vcP1 t g SS ss ` .. c - �-`.y � t d$l 17-1 G =F - - - .US 64 zz'es --I� _ f� -, N 57P -- -I — ssus Ba zrs' s B. _,,.,-€9 s,,, w- - w _ ��ya-..i P'-� ��� w � O _ T , r W VCP (1# *• T •" F ICJ * \ 41. Soh -asp- BST `,' �U � IS OFi V 4 �+y S v�I_ INS J 8'VCP \ /// LT 23 BST rws �\ .v,n '� 1,0 I A, MIA - f�� rF/A f7-' -36" 36' A • '-v' 0 / \ 5 1 / �I -.y LT 9 LT ,r• 4 C ----C 4 IKp ---. ♦* ONG / \ CONC BLK r+� ~ J s I I CONC I�� ••z WA aR `W `I �1� (Y1 oe CJ 0 f`0 *t� ©CJ ,s1 'M ..S IB_&G iA" 47'f,ONC Y��+�f� C �� __. N z-ISTONE PATH/ I 3 IB'C&G Ie'C&G 18'COG 18"COG '*�ii ROSHNARA SINGH AND IDS y�1� x>, t # / •7 ,� Ex snl4c R w I o CRAIG ROMEO I O a / HST / _ (PROPERTIES/ I m I t�.,1� L' `� 0 C I 2SF08US w: •,,i,, DB 2092 PG 765 I ISFOBUS ro/h / �—2%z8F8U5 PGLL844// m W I '�I '0� ti BST BST u i'"!�u III BST „Gj�I B ml+I k � 0 / / /. �+y\ / :1. -Y C. !� L I DIa O BST NmI 'm i � -Y/b I I ._ • ' 6.45�' B 47.n5'RT (/) • III o s'c&G m {t• �_ I �. o m gm I CAROL E. KING / // [� >I -� *°' * / �I / o ., DB 1176 PG 516 l" I L�'J -- - CONC / �1 I DB 915 PG 106711 IB' � I8"C&G -' _^, / ui' II / N LT '�m �I 'IB'C&G/J� VC&G� I8'C&G 1, SLUNG /' 57'CONr /S_K 6 NC I A I Iw I "' I BST 3 --1 •`� I m I �- �� v DI yi1. ' �F�'+::11�s*,.....`A ws.\ 11. O O ,o � ++�`' _1/:.T,&GB57I//� W e� J. / DI '^ L "U % iC•+11".f1...'_T 4`� w a: ItIT Z DEIDRA B. ol.r- ;r -c-I, r+*+''x .c r a//WANG FAMILY KB to II II ►•� * owo / o / it * / PICKENS Q +E,r *I �"* w // 'n ELT a J �� /�� BEGIN CHL FENCE J DB 1910 ki E. * TRUST PROPERTIES, DAME AVE MEDICAL M II r r� c 3 o" / e } ,`r;I p:a *I1 I CENTER TOWNHOUSES _ I I Itit� o'm / •� W +50 -Y10- PG 1960 9 ke "' DB 159 PG 506 LLC 1r i ISBKBUS s m �; ■ BST z 'TACT 1' DB 2333 • DB 2092 PG 765 ,^o'•wy m II i1 ISBKDBUS �K m ao / 4. Jy 1Y1-*7 , x m / /f 0 I , ;K,.7a, I iu / PG 1250 DB 768 PG 563 U if * _ m / �o w7F,iliei. `0—L ow DB 1125 PG 1884 g I * 0 +.� ISBKDBUS * I " n� ,� 5 1 i DB 779 PG 186 u, o sBKD J �* 1 DB 79s Pc 294 ti N II ;,;; F/M, ./ e ` Y O PRC Sto.2/+29.22 f" 25FD/ROCKBUS�. - 2SFDBUS ,; J° X C7'FJ o „�n LE A' o, `�' 0 e �_ � .a — —�--� v--1 0 I1 o 0 �i III _ q w --- F — _ "DEED GAP" ^O M P & F ASSOCIATES, L.L.P. N - II ry0. e S 57'03'24"W Q S 57'03'24"W S 56'S5'43"W 124"22 9I 14 g DB 1205 PG 199 m 62.98' F/A 63.09' S2' II II O.. S \ 86, 0 33q° O �"� a ti m S 57103'17"W Fip j 3 °„Fjp 2 _z a S 57°03'17"W o ry SB o -a 4 323,* 5 FiA ,6 Cr S 57'03'19"W b B 57'02'43"W \/o m 132.02' 0,A 103.89' .3, CC h LLC / N , Q' 0 w- e Kt N -Y10- co P1 Sla 19+79.91 Pb Sto 23+34.74 / n A = 4°/8'43.2"(RT) A = 4°2/'03.6"(LT) D = r 26'35.6" D = 7 03'32.7" to L L = 298.78' L = 410.83' N . T = 149 RT = 205.52' / m R = 3,970.00' R = 5,410.00' SE = RC SE = NC DS = 40 MPH DS = 40 MPH 0 t a -T',' °c, m 81/Ca SEE SHEET 84 FOR-Y10-PROFILE oa o / ,03 00 S \/CC L7/D_ LANE `` I PROJECT REFERENCE NO. 38/98 SHEET NO. 3/ R,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 0 2Q� �� DOCUMENT NOT CONSIDERED FINAL O UNLESS ALL SIGNATURES COMPLETED r N ''PER,�, S F0 N�"�l"nF a -Y10- PT Sta.33+27.28 �� s IJJLLI N 52°16'04.9"E ° \\ s e,96. pq. W LLI .O NOT DISTURB 'p"e V .. -T1G SIGN eT\\ s \ \ END G'•IL END CONS CT ION', \., BEGIN MILL & 's.s ''\ 3p° END -Y10- STA.33+97.20 D RESUR • ING F� \\°�A \ o Y i _TA 36+:-,.00 \ \ o\ �' 190 APER(LTlurarzawa. N� \\\se ti °/ R T - + �� OM 35+0 c., it i �', ppRr O\ > ,„ w__- --_M81.&RESUI r _ h �� "u6' Jy �, (� smighwat_ ...., N RETAIN RETAIN— ���� eJ••F \ 4 ••e� Sta.39+76.09 • �T �� °I�NI�O'C&�' 18.RCP 7 §�7` ��� `�° END 2'�"C&G \ c11 18.E RR ` /`o __ /8 - US sq Zr L� \'; ,1 c + 40.02'RT i 1 i,. °F pro ——_V RCP "UN -� =\,. \ es, \�a�- 4 Z. '-1Y1�` \ 'I / Q v Evsp,vc �: \/P�._...,I� �R'.�q8°CHC NC , G cr J -Y1O- PC Sta.33++3.3 \ III\ I ' \ \`\ 1 s - 121 I i I s a.\ '' WI \s, SULLIVAN ROAD PARTNERS, LLC /8` 2U, ("1 DB 2055 PG 1750 _ DI RCp \ I I a o �yF s O® s TRACT 4 18'RCP - —-� 1 1 0 -Y/0- PT Sta.37+"0.30 N oo. F\ a � UNABLE TO LOCATE I /8.� 18'RCP `�y RCp h � —— Dlo _ 18"RCP_ D/ IB_RCP _ .. .- _- c To 's _ o mRETAIN SYSTEM 1`` ED -u— 'PF� Fb\ SULLIVAN ROAD PARTNERS 6.co DB 2055 PG 1750 $. 0m 6 P 4in ,, \ .6 B \ X\ \ V N co, N co 62. / I /co to 239.6 qW -Y10- ��o S PI Sta 31+03.88 PI Sto 35+48.42 55 9 y A = 4°44'04.7"(LT) A = 18`55'55.1"(RT) Po o D = 1°03'32.7" D = 5`27'24.3" eon e o L = 447.06' L = 346.95' �P+-ti° T = 223.65' T = 175.07' 0O mc. R = 5,4/0.00' R = 1,050.00' 61-m DS = 50 MPH DS = 50 MPH SEE SHEET 84 FOR-Y10-PROFILE '' pQ oo 03 N d LANE `` I PROJECT 5819B NO. SHEET NO. I 38/98 32 R'W SHEET NO. ' ENGINEER ; ROADWAY SIGN HYDRAULICS C II `'I 83A5 !G�I 'D log) EXISTING STORM SYSTEMS AND STRUCTURES WERE FOUND TO BE \ INACCESSIBLE DURING INITIAL AND SUPPLEMENTAL SURVEY FIELD VISITS. CONTRACTOR TO ASCERTAIN DIRECTION AND INVERTS OF I \ EXISTING STORM DRAIN SYSTEM DURING CONSTRUCTION.ALL INVERTS,SIZES,AND STRUCTURE TYPES SHALL BE REVIEWED AND �'� - �I DOCUMENT NOT CONSIDERED FINAL RELEASED BY PROJECT ENGINEER PRIOR TO COMPLETION OF --F- CONSTRUCTION. 1 A\ I UNLESS ALL SIGNATURES COMPLETED 1 I 1 I v 1 - D I 4 1\ fLft?LfY9 \ n , /C & DB602 PG 347 /I� I I +34.01-Y•., 48.57'LT I a Z I ,�b / C C 65.31 LT Y9w 11 if rn -Y9H- PO ,.Sto.ll+ L/ o a - Y9G POT Sta.10+00.00 I 94.62'LT 1 0 E01 _ • w+35.91->)9D- ill Y9F1 POT Sta.10+00.00 C�NC� o \ \• N _ E _ �°�l 7s.z4'gLT F ��_ -Y9D- POT Sta.33+/0.47 8 m II �' F 'O F _-- _- I+90.14-Y9D- I _y p_ +64.55-Y•D- IF__� -"- /86.03-Y9D- -w- F 94.33'LT I , T��E E�E-iF 48.50' 27.a1'LT * IIy ®UE <i2012� 58 00_LT - 200'TAPER(LT& RT) 1 +50.28Y9DIn .CB COLLAIC -PUEPUE L _- 47.92'LTN ASSU.15" CP37.99'L�._ REMOVE PUE PUE / 48.45'LT El1�D l $Uf�FQGIN�iI ,n h/ I`ill e-rakr.Y�co-� '3223S9 ..z-Y.T PUE PUE am -Y9D- POT Sto.33+90.38 I II , 2�,RT +1303Tv9D- � ✓ E PUE __ I�• � �a.•� - w � G. dN 4a•cl1 > K � � 11 PU= n:_578sT___ _:>_____.0---.7.::) r_ - , .w�, BST. L�� RETAIN �_ i Ig� ��rJ - 25' AINGSIR - � :., / �•f.Yl.e.1 ° 7� � `�` C.,sue 4. Co 3a e5T S•- WI lRylwwaiiir=_ 4 30"R 3 .'��� - _- 7w •QNigysinisimirm w �'i ., It*i �i"Pr- D 36-RCP— � EXISTING er1 � U I'Oe- - -- W CONC w4'LR=— _—RETAIN c Nail I ii f1:+1.i[TY7 - I 4ID kW _ - 8'TC _ `L7 -30.L& COONC rr - �~�1i '•"'?I-am_ - --o----- 8'TC ss SR 2422 5/GNAL HILL DR 40'BSI - �s: JB wAAHs 8 X 18"CURB ` �V F •'8 X 1• y F,g __ 20117 : 1.. o ET6ilC1; FY.D •T 3T\o\i •F5- f Z,I w> 47 ° C120> t,�J o 15=4'RT p SIGNAL HILLS MALL LLC 0 " II Ir ono ` / ° i PROPETES C ' { n/ OO " ° DB 102: PG 128 DB 1685 PG 841 N (/') - O 1 - CEM GROUP LLC 1 I BEG C&G y • II I�,II �o CONC� '� I De 2394 Pc 126 J7 _ • �� ° ."��1+oo - ° 'm� o o • I) �I P = 1 m 1 19,62'RT F • Q • r p I I I v MCDDN7FLDS j82 32) - -�_�, s1s•n'a9"w DB 625 PG 626 ' L' I 1It 16.88'RT I o I —172.._4' 20.00' o I I = pl rn Imo' +3e.ao-v9G- ° �P11 • f38.8O A c>o —1 rn � _ U cow /- 1 I X X 1 30WD c o _ -� 1 I wr Lea KENT DALE FELL--9NB -- I �� )_ Z--ir7Gt ii -t^ 'I CAN I III WIFE�A ARTHA SUE BELL t'�./w�-•_' of DB 1688 PG 352 c�i= IyI I _ oo.00' - I II X�� N I i1Z!II w = L o - ---_- - - -5 11 '09'29" 72" . -� ._--_ , - - - B TG X' X =sue — - T. I �� ti� gym, - i2 6. c+ co 54'CONC i� l- �: "R_-,' / \ / Z w�OK C� 'I ,® / CONC 68 ry0 m N ry '" •R I. • -_ �+.>\ � 3'CONC F, 'I .._ -- J_— w �- — STEPS � «_ I y of Q� ii*:::::__N:91.772_8,71____--c-1_: I ;Ia �. T rn - - y/ I N 73'34'11'W 1�Ntin' l� /� I \ r f I1702 I 'jo/ Q � A W II' N m a1�I• Cam}!�,. �� ay \ // 1 _°Q N 1 oa.s8„Eo m I i10 11 N ,NC i/ V // \ , ", z"� 00 a , o N 73'15'39"W // o=1 A D- -o N Fes`�e* -_ _W._=e _ J - .. 59 50' .. 00 O? V' o ,i,z,.l p? eJ 00" 1 c zss.aa o p A a) o II p- z,y - - -- TO S 16'27'36"W o 167.79' ➢ N V C m n o? I0-w- S i6'27'36"W ciA v m A •�11E`7 AA m v�Nn awn m vA �m 1 r Z oh m m 1 DL—w� N 5A N �� � � s x �tD l p ,,-‘',,',1''' sod 80.19' ?+ S 17.02,42 'd . w 4 r In -2 W i m 1 :1 ' o ° 1 I—emr - ) )j; m+a ��v N � o m SEE SHEET 81 FOR-Y9D-PROFILE m Iz b a SEE SHEET 82 FOR-Y9G-PROFILE �/ SEE SHEET 83 FOR-Y9H-PROFILE cr PROJECT REFERENCE NO. SHEET NO. a' I-3819B 33 ROADWAY DESIGN HYDRAULICS 930 „ �� �1! 4riii A I -L-(LT) ENGINEER ENGINEER 920 PI= 8+65.00 910 p = DOCUMENT NOT CONSIDERED FINAL ° VC _= 800.68' EL =11 896.75' UNLESS ALL SIGNATURES COMPLETED ii K = 250 VC = 450' II DS = 70 MPH K = 304 900 II IIII1�1,c IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII DS = 74 MPH . . _ 900 _ _ _i I_-_-_•=I h;i�I II��IIIi�� ii IIIIIIIIIIIIIIIIIIIII1111IIIII " " . IIIII _ - _III i f i i IIIIII 1111111111111111111890IIII�II�IIIIII IIIIIIIIIIIIIII�I,I�I�IIIII�IIIIIIIIII�IIIII11111II1IIIIIiIIIIIII�����I�lllllll�,.rn■..irr.� . _ 890 _ IPI= 22+55.00 11111111111111111111111111111111111111111111111111111111111111111111111�111111I1I 1111111111111111111111111111111111111111111111111111111111111111 IIIIIIIii IIII�I�� IIIIIIIII��r........__-_ VC EL - 872;42' INN 880 IIIIIIIIIIIIIII:IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�1111iIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1II11111II11111IIIIIII,r■■.■..-_ _ -- LS '60�MPH 880 870 870 ��•111F111/111114 PII11i!I D 860 860 850 850 SEE SHEET 4 FOR -L- PLAN 840 840 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 900 -L-(RT) 900 890 I I I I I I I I 111111 III I I II 11111 II 1 1 i i I I Ili II ■ . 890 880 II I I I I I I I IIIIIIiii III I IIIiII11ii1HHII111IIIIIiII!!1IIIIIIIIIIIIIIIIIIIIIIIIII 880 °� ``iIEl���I!l�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIAIIfIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiIlliiiiiiili 8 70 111111111111111111111 9AiA�flL.uu111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 8 70 IIIIII1I,IiiIIIIIIHh A AT. EPI !!HHHHHHIHIHHHIHHHIHIIHHHIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIHHHHIOHHIHIHIHHOIHHHHHHHHHHHHHHHHHIIIIHIIIIIIIIHIIIIIIIIHIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII N IIIIII�iiii111111F:r. A � _I�I�. 860 860 a m 2 850 850 UNIFORAY FROM STA./8++77.1 TOOVERLSTA.21 14.89 (EASTBOUND) v m N 840 840 S N 830 830 -T m Y 820 820 m: SEE SHEET 4 FOR -L- PLAN 810 810 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 cr cr PROJECT REFERENCE NO. SHEET NO. N I-3819B 34 ROADWAY DESIGN HYDRAULICS 920 ENGINEER ENGINEER -L-(LT) _ _ III I •il� 'CrEP'1 .�l' e 910 ,.1$r.... 900 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 890 `��; IS ■ 890 P1= 22+55.00 EL = 872.42' .-:■ Y■ ' 1 fl 11' if it III II VC = 480' �. . I+I-F r+ti►i 1 1 i i ii i 1 1 1 iiiim 1 1 miiiiiiim 1 1 1 iiim 1 1 1 1iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii 880 DS =1360 MPH _ _ -- �=■:ram III IIIIIIIIIIIIIIIIIIIIIIIII►1111111111111111111111111111111111111111111111111111111111111111111111111111111 880 - =----,-_=....■ - - U. 45EMG9 .Bclaaiiail iiiiiiiiiiiiiiHililililllll 11111111111111 III II L. _ IIIIII III II Ipip; EXISTING CONCRETE 870 1�,FP 111Fat. II ' IiST i ' • (WESTBOUND) 870 860 !Pt4.ip" , 860 11 , , ! HI 1 11 [: 1 11 850 „ 1,11.,1 850 840 SEE SHEET 4,5 O. 840 830 830 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 920 -L-(RT) 920 II •! •I; 1:i,: • I I�,.I 910 1� .1914 7 . Fe „ „„ 910 :IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ..I..1 .!II II... •IuIri, a. 1111.111 �,1 �■ i., 900 PI= 38+63.00 900 EL = 894.71' 890 1 - 00■■ EL =879.7 00 �',y1fi'-.:it DS =2 60 MPH 890 VC a 40 1 K - 1168 III _ • 1 1 ■ 1 DS > 80 MPH I' - _ +e _wIli iIiiGii iiiiihIIiiIIIIiIIIIIIII 1 i'� rr u V I I ■ 1 _! -=. ■ .III\■[1fI.l [�1 a1" L 11-l�e�e:: ;I iiiiiIIIllllIIiIIiIIIIIIIIIIIIIIIII!HI!I �■irez III�IlIIf7Il11�a16bdd1liillEll T !hhhhhhhhhhhhhhhhhhhhh1 0 111111111111111111111111I80 11Ianr_•ii■Iz■ •��2-12 ■P■■■■■■■■■■'11q�r ~ IIIII1-�IIOVI f'1.s�PC7C7G7=■irit,�Grr��{�JIID/IIG'r1.f11iii���11 eSSiiiiiillibl ili1111111111111111111111111111111111111111111111.'IIIIIIIIIIIIIIIIIl�lll��ll�llllllll Iplllllppl�.iti�IIII�IIIII,II IIIIIIIIIIIi�I�■�•Y�r ,��■■■ I!!IIIIIIIIk! �'rE'���!!!!liilll u111111AA1 171111 A CPPPPPP■■nnnn■innn■IIn nnnn�� moor.,rm.nn1n�■r��nmm�nnn■�■•nnnnnnnnnnnnnndoonnn �IIIIIIIIIIIIIIIIIIINIIIi �� i�IIIIIIl11 nnii11111111111111111111111111111111111111111 I1I1111111u,■■■■■■■■■ IIIIIII IIIIIIiii11111 IIIii1111111111111 r■ 1.11 c 'ril.l7.,.■:G70... . TERAL BASE DITCH r��11111111111I11A Ii111IIII1ul!IPIII IIIIIIIIIIIIIIIIIIIIIIIiiii111111111111`iliiiiiiill111111 111111111111111111111111111111111111870 1111111111111111111111111111111111111��'l�IIIII. 1111111111111111111111111111111111 = ... v.. ■■■■■■■■■■■■■�■■■■■■■■■�■■■■■■■■■■ v PI STA.26+51 RT '� 2586-- E 14382•ro 860 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII EL. 868.67 �iim P4-L- S 28+63.20 I 860 N IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII BEGIN S .LATERAL BASE DITCH innUuuuUu�'�I VATIONbO_RT873.63 II1I�II��� �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 111111111111111111111111111111111111111111111111111111111111111111i1 PI STA. 2 +80701,.R4T1 r:I I !I IRn n ■!lI...1■ ,i- TAINNOR .:11I:Ey4■ PP:PPPPPPPPP■PP■■■■■■■■■■■■■■■■■■■■■■■■■■■P■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■P■■■■■■■■■■■■■■■■■■n■850 850 Y 840 SEE SHEET 4,5 FOR -L- PLAN 840 m: 830 830 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 PROJECT REFERENCE NO. SHEET NO. a- I-3819B 35 ROADWAY DESIGN HYDRAULICS 930 ENGINEER ENGINEER I -L-(LT) 920 91 O DOCUMENT NOT CONSIDERED FINAL IJiiiI!111i:L1 �i UNLESS ALL SIGNATURES COMPLETED jIiiIIiIIIIIIP !'F1uiII!!a!i!!iIIOI� I,9 MTA 30+15570 A084 8E64 (WESIB•WNG 900 890 890 _ r ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ iiii ■■■ ■ ■ r a_ - - - 880 880 1111u1I1r11i1ikPi1ilIU I iiiii ��hl!IIiI!IIHIII. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I I I 1111 IIIliiiiiliGIIII!IililiilliI!1I _ 870 870 860 860 850 850 SEE SHEET 5,6 FOR -L- PLAN I 840 840 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 920 -L-(RT) 920 910 910 P1= 38+63.00 II EL = 894.7/' BM .89 VC = 960' N 753460 E t439531 900 K = 277 -Ir STA +10.44 900 0S = 72 MPH ,, ■ (#)I�®�! EVATION - 908.i4 .05_z CI-IIS=_=D X ON HE' ''.' HWEST CORNER OF 890 ---_- BRIDGE W G WALL - ------ - -- — - n 890 a _ ---- PRHPOSF a RT(____)160� --- - _ 880 NN NENQ SP LATERAL 'V'DITCH „ ��---�_w 880 PI STA 37+00 Fri °EXISTING' I I roLI-.000.1U ROUE ■■■■■■■ 870 , �� 870 N BEGIN SP.LATERAL 'V' DITCH a - P1 S"A.36+00 IZT EL.884.66 N 860 860 a- N Ca 850 850 -o Y 840 840 SEE SHEET 5,6 FOR -L- PLAN It o,9 sa 830 830 W7cL 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 Q PROJECT REFERENCE NO. SHEET NO. co -3819B 36 ROADWAY DESIGN HYDRAULICS 930 ENGINEER ENGINEER -L-(LT) 920 910 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 900 900 MATCH EXISTING CONCRETE FROM STA.30+11.5I TO STA.84+86.64 (WESTBOUND) 890 __ _ 890 880 - .�u __-------_ 880 870 -- 870 \mLXiET,NG :.POUND BM #6 860 N 753367 E 1441566 860 -L- STA,62+97,75 319.39'RT ELEVATION = 856 78 850 CHISFI Fr) SQUARE IN CON4MTE SIDEWALK 850 840 840 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 900 -L-(RT) 900 890 880 890 END EB GRADE 880 PI= 53+59.00 EL = 863.91' • + VC = 430' L.851.85' K = 553 �"� r_ DS 0 80 MPH c 870 870 - �____ ______= _-_ PROPOSFD 0 ___ --- GP4OC 860 i=,3�5� 2� -- ---- -Ei 860 a -- -a m 850 \ - 850 \--, , T,NC O PvD 3M #6 m V 840 N 753367 E 1441E66 --- - --- -L- TA.6 +297.75_ 840 co 319.39'PT I ELEVA-IONT 856.2E CHISELED_SaLIARE IN"CONCRETE SIDEWALK cn 830 830 -T Y 820 820 SEE SHEET 6,7 FOR -L- PLAN m. 0- GE, sQ 810 810 W70 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 Cr CrPROJECT REFERENCE NO. SHEET NO. co I-3819B 42 ROADWAY DESIGN HYDRAULICS 940 ENGINEER ENGINEER —L—(LT) 930 P1= 183+82.00 EL = 9/4.04' VC = 1,580' 920 K = 418 DOCUMENT NOT CONSIDERED FINAL DS 2 8O MPH UNLESS ALL SIGNATURES COMPLETED - / +) . , i 910 910 �— _ -- HY,t-,NC _ — — ;Puc�vu - 900 ` - --- -- —-- - 900 ' - —� _I P-R DE� 890 �� -- 890 880 a� 880 BM *95 N 75575 -L- 54A 1:6+E 114 4 5209 t 870 0N�- r3L 870 REVAT 880. CHLS,RED X ON THE spot! I-LANGE BOL1 O= A FIRE -IThRA T 860 860 SEE SHEET 12,13 FOR -L- PLAN 850 850 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 940 —L—(RT) 940 930 930 P1= 183+82.00 EL = 9/4.04' ■ .rrsNwrrsmrs- r r VC = l 580' ' 1,11 1kM6 ii�rvsl. uiR■MrA_Ell K = 418 920 ieri••7•Renu�ra�� DS 80 MPH 920 I :- I.. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII •—•-- ■_ -,••••R■■■_ - . • ■■■■■ ■■■■■■■■� EI iA■Yr■�-- —__ 910 I ■■■=2 ■= - - 910 r ■ _ — ..... ■ :-- ■■l■■■■■■■.Ism N - - E -- N C� SAIIMINIUILINI 890 : „■. 890 �...� — N -- � • —�■■■_■■..IlI r,f.LDPI M1R1'i ■■■■■■■� N —� I ■■■■■■■■\.6----_----. 4..IM ■■■■■■■E - i—■■■■=■■■-IDS ■■■� ■■■■■■■� ■■1 V . ' I--■■■■■■■■■■— �_ ■■■■■■■� m - ■■ ■■ ■ ■■III■■— _■■■■■■■■■■■■��■ 880 ■ ■■ • ■■� ■■■■■■■■■■■■■ ■ 880 �i •— ■■■■■.■■■■— ■■■� ■■■■■■■� N -- ••••m••••— —IIIIIIIIIIIIIM rn ur/0071N2 E 1452624 �� IIIIIIIIIIII .5 4.176+02.2 7 'I STAI 178+'-•4�•••i= I nnnn■■n•!■ io 7 870 153.28' LT --- = ■_ innnmi:■ 870 0 o ai TION = 880.13 - • .— . �nnnn� o, relw a-. .."M =1 .1� , = SOUTH FLANGE s+.� E ■ ■■� •� �My1' HYDRANT IIII�IIIIIM I� IIIIIIIIIIIIIMI 3 'i��� END SPECIAL CU LATCH ••••�•••• •� •� 860 • 860 NI • 1111/1111 III1- 111111111111111 SEE SHEET 12,13 FOR -L- PLAN E'. om sa 850 850 ,7. 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 PROJECT REFERENCE NO. SHEET NO. o- co —3819B 43 ROADWAY DESIGN HYDRAULICS 950 ENGINEER ENGINEER -L-(LT) 940 930 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PI= 183+82.00 920 EL = 9/4.04' 920 VC = 1,580' K = 4/8 PHOP ,0 DS 2 80 MPH GRADE 910 910 ' -- 900 /, B REMOVE #11 ` 900 \J BRIDGE i� N 755861 E 1454467 �i —L— STA.19 49 \ 54.63' t 890 i ELEVATION 906.38' 890 �� —,—\ r� CHISELED X' ON SE CORNER OF WW \\ ,- --- / \ 880 Lx, ,,8G 880 - 0 111 870 870 SEE SHEET 13,14 FOR —L— PLAN 860 860 187+00 188+00 189+00 190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00 199+00 200+00 201+00 950 -L-(RT) 950 940 940 930 930 Pl= 183+82.00 c 920 EL = 914.04' 920 m VC = 1,580' K = 4/8 DS 2 80 MPH N' FUSED r,RAD_E a 910 910 0. 1 r N 900 !� REMOVE / BM 7.11 900 \\ � rn BRIDGE 1 N 7-5861 1454467 / —L— S—A.194+36.49 54.63'RT co 890 ��� r 4ILSELED X rouse CODER Of WW890 N m 880 880 \—L XIRI IVL GR fiD Y 870 870 SEE SHEET 13,14 FOR —L— PLAN m. om sQ 860 860 W70 187+00 188+00 189+00 190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00 199+00 200+00 201+00 cr cr PROJECT REFERENCE NO. SHEET NO. co I-3819B 44 to ROADWAY DESIGN HYDRAULICS 940 ENGINEER ENGINEER -L-(LT) 930 920 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 910 rRu ,ED 910 q /cT/Nc OUW) 900 V 900 111111 r (174X — 890 — 890 880 880 870 870 860 860 SEE SHEET 43,44 FOR —L— PLAN 850 850 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 940 -L-(RT) 940 930 930 920 920 c 910 910 PI STA 201+50 RT END SPECIAL CU1 DITCH PR'/PO T)—\ , /LL.896.I1' rrlS TA_ � .207J-00 RT GP -- • c--� tT DITCH 900 FL TA P►STA.213+00 RT 900 00 I BEGIN SPECIAL CUT DITCH 7 890 PI-STA. R1' �! 890 N EL.897.61' 2R�di 0.3000/. PM STA. 206+5D RT LAISI1NG GRGI1N;� m EL.894.2 4' 880 PI STA.213+ RT 880 N EL.889.18' co 870 870 -U Y 860 860 SEE SHEET 43,44 FOR —L— PLAN m. om sa 850 850 W70 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 PROJECT REFERENCE NO. SHEET NO. o- op I-3819B 45 ROADWAY DESIGN HYDRAULICS 930 ENGINEER ENGINEER -L-(LT) l END PROJECT I— 819B 920 TIE:TO-EXISTING APPROACH 3SLAB f 1L (LT)STA,219+35.97= ' EL.888.63' 910 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PROPnSj_D PI= 2/6+06.00 900 GRAD[ VC = 300'3 900 K = 3749 DS > 80 MPH �✓ ( )270742 i- ,lio/4°' 890 890 � � - i i i i i i i i t 1 -- ----- _ 880 :BM #12__� ` ' - 880 N 756426 E 1456861 t / -L— STA.218+95.24 \ / 1.02' RT t / I ELEVATION = 887.09 870 Cl#ISELE X ON SW CORNER tt 87O OF CONC PAD FOR DI / mmommommomc BM #/8 860 755159 I. 1156901 860 XISI ..0 291'9L T1 49.71 EL TI N — 81. 3H[AST 850850 OS d ODGWNG WALL SEE SHEET 15 FOR —L— PLAN 840 840 214+00 215+00 216+00 217+00 218+00 219+00 930 930 -L-(RT) rPND PR,3JECT Ira 920 TIE • EXISTNG A •AC- 920 -L-(R-)STA.219+C2. EL_ 910 910 PROP SFD PI= 2/6+06.00 WOOL EL = 891.23' 900 VC = 300' 7 900 K = 29953 DS > 80 MPH 890 r� ter. 4 HI 890 / —UM #12 1: /----- - __ _______ cTd N 75E426 E1.42546861 / --- 880 � —L—,STA.218+95 t 880 �Vlp SPECIAL Q T DITCH/ --1:02' RT t PI STA.2 5+50 RT FYLST NG ELEVATION = 887.09 / 888 35el ' GPOUVD C-I1 D X ON SW CORNER. \ m 0- CON[ PAD FOR DI t / 4 870 870 N IIII 11111111 `„--- — / Cn el BM 478 co in N 756459 E 1456907 % 860 _ —L— STA.219+49.71 IIII 860 -0 17.09' LT O1 ELEVATION = 888.83 S CHISELED X ON THE SOUTHEAST 0 850 CORNER OF BRIDGE WING WALL 850 SEE SHEET 15 FOR —L— PLAN m. om sa 840 840 W70 214+00 215+00 216+00 217+00 218+00 219+00 L. 111111 cr PROJECT REFERENCE NO. SHEET NO. co I-3819B 46 IC' C' —LC D E B— ROADWAY DESIGN HYDRAULICS 890 ilk, 1 1, \ I 1 II ENGINEER ENGINEER 880 870 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 860 860 ■■■ ■ 1, .....;I,I1 1 1850 850 [11111III I I lili�11111111111111111111111111111111111111111 (IIIIIIIIIIIIII iI�I iiiiIiIC IIIIIIIIIn :1_I■_lel,;I- IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIi1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111�IIIIIIIIIIIIIiiiiiiil aiiiiii.r..:., 840 '"IP, .1� �, - ■ns 840 : 1 830 830 820 820 810 810 SEE SHEET 7,8 FOR —LCDEB— PLAN 800 800 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 880 —LCDEB— 880 870 870 860 860 850 850 P PO�iSED� EL = 832.0 P1= 36+45.00 VC = 220' EL = 834.43' VC = 275' 840 '7 840 (-) K = 125i K = /65 I DS = 57 MPH -.-___ ■;aRln.0 = 6/M P,H I :IIIIIIIIIIIIIIII .. . -gr-.resmuI11I11i1'• -' 72 ,Td — — —= T� __ ———— .ems:■�eoer�l�s= - In 830 1-�1.2 °% -` ( )0 G40� 830 N Ih XtS'INC' 820 N 6000'0 820 a- N 810 810 In Y 800 800 SEE SHEET 8,9 FOR —LCDEB— PLAN m. om sa 790 790 ---. 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 0 PROJECT REFERENCE NO. SHEET NO. I-3819B 47 ROADWAY DESIGN HYDRAULICS 850 ENGINEER ENGINEER -LCDEB- 840 830 - --- • DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ice— _ 1171t1 820 ii _ 820 ENQ E J CX'ST Hv _ —_ E 1(D A #'I;OACH SLA3 m _ P1= 48+85.00 810 LCDE� A.38+16.7Q -�- ___ EL = 797.14' 810 EL.832y36 i VC 280' PR®��SED �� DS =107 52 MPH ORS 800 i k\ --- ___ a 'e ° 800 _— i �— ( )H.5rx6, 790 J , t 790 \ , - ' B e IN GRADE 780 \\ i ^ Ti TO EXIST APPROACH SLAB r -L E6- ST,4 47+28.6 780 r EL a, A4 r r 770 770 SEE SHEET 9 FOR -LCDEB- PLAN - 760 760 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 11111111111111111111 830 -LCDEB- 830 820 820 810 810 P1= 60+55.00 EL = 791.07' PROPOSED 800 VC 248 50 c�nDL 800 DS > 80 MPH 790 80 780 N 770 00000000000000000000000000000111000 1 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 770 ew>< -E L 5'8 'C DITCH 5 tl 760 EL.778.07' / 760 END LATERAL 5'BASE DITC. I PI STA.62+81 RT ' 750 EL. 777.$0 750 SEE SHEET 9,10 FOR -LCDEB- PLAN om 6. sQ 740 740 W70 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 cr PROJECT REFERENCE NO. SHEET NO. co I-3819B 52 Lc) -Y S— ROADWAY DESIGN HYDRAULICS 960 — ENGINEER ENGINEER ENNYMNNME 950 BEGIN SB GRADE I, sARRARRARRERAssm 940 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 930 °'° Z 930 ZZZ 920 - : _ =- =- COML. -... 920 - wakin- 910 0.....:- =- =— 910 7n- __ MNIMEMENKSMN Apareumnnomwmin 890 ;:fituAm ramalti:,.: r: :,,ma..,a,. _.: 890 • i•i..iTi AGSI. ..IiiOm..C6l .I.C9.JS 880 880 SEE SHEET 16 FOR -Y_S- PLAN 870 870 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 WEN- N — — _ PAGE INTENTIONALLY LEFT BLANK6-3 - m N Q N m CC N co 10 cn N 7 O L• L4� gyp/ 0 PROJECT REFERENCE NO. SHEET NO. I-3819B 52A LiD 920 -Y S- ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 910 UIIILUJ1jIII1IJIH!I1IIIIIIIIIIIIlP111II � •1 31 I:::U N I�1 �� LII_II M= -,: 1i111ir!i rr1• �1ie .11 i11Miiiiiiii111i DESIGN DISC,HAR I IIIII!IIIIIII1111111II1IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 900 .. Y $ SB) IIIIIIIIII DESIGNHWEiLEAT�1IIIII� I� 1III 11111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII UMALLNONATNSEDERE•.� 37+56./0r a. r.■■■ u�r :,r V 85533 111111111PtAAAVHIFLIECA7N IIIII I iIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII r�,���, � Y � .���IIIIIIII��I890I iliiii11i11n s 1111__ ,III 1' IIII os =1665 MPH 11111111111V�RTOPP/NGDSCHAR An' !1 11111111 hlylllllllinnillllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllmin 890 IIIIIIIInhIihI! - ■■ 'ItiluwI�II � I1 V RI GPP/N•1 h-GUL -- ..�■; 1�111i� ",� i ; ��-_ IIIp� OVERTOPP/Ns■■ EV� iiu■:■■in i�oi .1 ' `I1I:._1-11IIIIII111IIIIIIIIIIIIIIIIIIII�1 1tZ��ltPPIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII i1111111111111111 11��11; !1`-�= "'Ji_I ^Ip - ___ ■ - III IIIIIIIIIIIIIIIIIIIIIIJI11111111�1 ;-� : .�I IE , 880 I 1 1 111...i..111.1!!!Iml_1?ie-yi!IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIlllllii11111iiii11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 880 IIL ] �� I !° �■ 1►��9',,7 1 -- ..■ 1111111111111111111"- 1 1 11111 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111�IAII�I� 1 1 111111_1�_�■■■ 1 '°"�■■■■■�11111111111;11111111�1 IIIIIIIIIII11 III�Q�4�'�870 ; �:,i� ,ur; _�;. .n;��:�:�,i■ ,�,., �I ; i ., - , .��■ ■ 11 1 � 11 1-1 1 1 1 1 - 'ri��lllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 870-1 1I ,., 1II 1 1 1 1 1 11 - ■■■■■■■■�1111 1111111111 r ' I111 111111111��■■nn■■■■II —1�l��l�91�����fi���IiII�I�iI�III 1 s n: �, � LI.L_I I I IIIIIIIIiliiilil��,ililillliliilill�iiiili�i�i�illlli IIIIIII�III�Ililli��1�1:1�I�IIIII .�.:.1.1�111■a:==■= 111111111111111111111111111111111IIIIIIIIIII!�1MIWIII_IIIIIIi111111111111111111 III -Fiiiiiiiiiaiiiiisiliiiiiiiiiiii1i1111111111111111111111111►1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 860 IIIIIIIIIIIIIIIIII -r s- rnl8 1111111111111111111111111111111i 1111i11111111 - II - ■��■■�"�'�� L 860 PI= 371-52.16 r i I M. :�rAdELNA% i ■ 3u►a�' EL = 879.3T H■■■■■o�na■raamrr��ann■rs�a-■racza - TRENCHLESS INSTALLATIvN VC = 450' i 'y'J`!1■fL•i1lSL�L'fL•L.1Je■ u' : 42" WELDED STEEL 10000000015 16085 = 65 MPH 1111111111111111111111111. 1'111111111111111111 0 850 l� •��r it 840 840 SEE SHEET 16,17 FOR -Y_S- PLAN 1 830 830 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 890 -Y S- 890 880 880 P1= 53+60.00 EL = 860.88' VC = 560' K = 287 870 DS = 73 MPH 870 I _ 1lIIII'IIII11111111 I i ;;iiI 1111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIiG1111111�1I1I1�1�����l�l■L111■��11111111111111iI11111�■n -- m■.■■n■■rlvtill■' ■ ql� 860 .. 1„ 1 860 � r m 1 � I� I ■ 1■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIili1i11111111111.11111■111111111111■■....i...____ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII a 11111111111111111111111111111 111111111111111111!IIAII!!ltllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllliiiiilli:ilLri1i111 1 11 i"""�I;!!!IIIIIII 1� II:,,�I.,, 111 � 3' � �� : ^� - . . I' IIIIIIIIIIIIII11IIIIIII111IIIIIIIIIIIIIh1Iaiililllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll 850 850 11 1 1 �1111111 III i U �i ,� �11� � L , �■U'�i 11 i- - -III,�I 1 IIIII �!.Ir840 II I II I I 1111IIIII II ' �SIIII ' I 111 III 840 R TRENCHLESS :i I 1 1111■1 -___ BM #36 42" WELDED h m1 Ill N 746047 E 1447202 , III . 1 1 1 1, 830 -Y_S- STA.53+69.49 h A; 830 I I I! 265.68' LT I171 N ELEVATION = 837.77 8" NAIL IN BASE OF 30" OAK.' 820 � 820 -T Y 810 810 SEE SHEET 17,18 FOR -Y_S- PLAN 11 800 800 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 0 PROJECT REFERENCE NO. SHEET NO. I-3819B 53 LcD O60 -Y S- ROADWAY DESIGN HYDRAULICS O ENGINEER ENGINEER 850 BM #93 CuLVEPT VDP/\t LIC t AITAI N 747584 E 1447702 BM #$1 840 -Y S- STA.69+47.89 Ot SI6M DiS(.,hl RG 900 N 748118 ; 144 825 CFS DOCUMENT NOT CONSIDERED FINAL CHISELED DES G' FREOI[P �7 ��� Y STA16 96'R 73 81.9' i- 84.66' RT - - - UNLESS ALL SIGNATURES COMPLETED ELEVATION 807.67 , DES/6 , ELE7.',-',TAt = . _ F't . �uc - - d X ON THE NORTHEAST CORNER OF zw.r tTr.��rtre=.r +�+�__, IN THi� I CONCRETE DITCH �•lr �� ���� 830 RA, 'FF.r0FNy - too YP.S SO CORNER OF :/ e,: I IIII 830 .i - - - PL7i�G%MMIWIIIIIIII /IL7- 'IgfIiOiMEI _ �0L“7�.\ MirilllailA7iv •••• --_- _ lIl _ - _/-_ I�PADD OVERTO-'ING DIS• h,wRCE = >3.91 CFS n _ OIIFPTOPPMC FP'(YIFNCY= >') >PS ® I `- OVt iu,-'i'to tLFVA'(ON = d './ :. 820 • 804 820 -- - �- '• .I• 0 ■ Y S SLA.%4.U57-- IIII 810 , - - i■ IIII 1111 810 I§M #93 — IIII N 747584 E 1447702 ® ------ _���_ -Y S- STA.69+47.89 ----! _ �____ �� _� oo T/ ITt . 800 HISELED 'X O ELEVATIONHE NORTHEAST7CORNER OF NC X MEN 59"RCBC�` � �� '!!I! 800 CONCRETE DITCH !L 7;3,35' END CHANNEL CHA It - --- 790 --- - I PI STA.75+1' '' \ EL 78 ',' 790 BEGIN LATERAL 4'BASE :ND LATERAL .'BASE TUX:------- 780 PI STA.68+3B LT FI S A.69+50 _T F-n30 780 EL. 794.00 fL.791.00 SEE SHEET 18,19 FOR -Y_S- PLAN I bEGI CHA •r.,y c PI S 770 FI 7RA - ' 770 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 840 -Y S- 840 830 830 820 820 810 810 0 PAPSFCY� PDC Ikl G 800 W 800 - --- .-----7 ---- ----- ---- ------------------- 790 \ \ 790 N F Yi ST'NG m CPOLJ'D 4 780 780 N N 770 770 -o 760 760 SEE SHEET 19 FOR -Y S- PLAN m. om sa 750 750 W70 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 o- 0 PROJECT REFERENCE NO. SHEET NO. co I-3819B 54 O60 -Y S- ROADWAY DESIGN HYDRAULICS O ENGINEER ENGINEER 850 840 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED c 830 �c 830 820 ��� _---_———— 820 PR�IjsF __— —— GRASP —— 810 P/= 93+80.00 ---- - 810 EL = 793.95' VC = 650' P1= 107+40.00 K = /46 —tee - —— \ EL = 848.25' DS = 62 MPH __ ——• ' — \ VC = 1,670' 800 r 800 _— --- ' \ K = 2// __ _ �+ f �— Pl O�MDC DS 66 MPH 790 ----- —————— ——— n. 'rnn-° 790 780 780 SEE SHEET 19,20 FOR -Y_S- PLAN 770 770 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 880 -Y_S- 880 BM #81 N 792n37 F. "44R1L3 BM #99 -Y S- STA.114+19_01 870 II 75.91L E 1447v26 86.25' R- Y S- S-A 11�*82 .8 ELEVATI0N — 840.41 870 91 4R'LT CH SE_ED-R-ITS THE TOP I FI FVAT1OP = 8Z6 09 OF THE SOUTHWEST CORNER I I ,r7I ELED X 01N--THE SOUTHVY:ST OF BRIDGE WING WALL P1= 107+40.00 1 1 -.7NE,1 OF BRJDGE WING WALL EL = 848.25' 1 1 1 860 860 BEGIN BERM 'V'DITCH ■ VC = 1,670' ■ ■ K = 2/1 PI S-IA. IIU+bU L \ ' ' I US 7-' DS = 66 MPH EL.852.13' ■ ■ 850 III 0 850 .>. I �/ III 111111111111111 IIIIIIIIIIIIIIIIII - =Jj® .r- 1- ■'. �RiUOt II ■ �' N 5 '4 144812 840 BM #100 a 840 --� rRO.-CSEr, _ - - - FN) PFTch. 'V'4D-8.("M , �� iII►,i _ _ ... 1111111111 1"' ••�� '' 1U`_ :°•■�` PI STA.111+90 LT ��a�auellliii c -a _ = 40 4.'i r � �, 0 ,M Y —0- STA 2740,79 NCGS DEBBY 830lo ,i MI1111111111111111111 830 820 \ ■ 820 CO el i ORC N 810 _—,GROUND'' — r—J3.9ui 810 _ ii Y 800 800 m� I SEE SHEET 20,21 FOR —Y_S— PLAN om sa 790 790 W70 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 Q. PROJECT REFERENCE NO. SHEET NO. I-3819B 58 ROADWAY DESIGN HYDRAULICS ,n 910 —Y N— ENGINEER ENGINEER P1= 154+50.00 (LT) EL = 874.58' VKCIIIIIIIIIIIIII /80' ==//33 900 Illlllllllllllllllllllllllllllllllllr6c, 010 rirlii illl MINIlllllllllllllllllllllllllllllllllll iiiiiiiiiiiiiiiiiiiillllllllllllllllll - - .. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII .I,I..�/Jr...,1: IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIf pi= 160+78.. 1111111111111111111111 8 9DOCUMENT NOT CONSIDERED FINAL IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII " :" 1111111111111111111111111111111111111111111111111111 �" IIIIIIIIIIIIIIIIIIIIIIII UNLESS ALL SIGNATURES COMPLETED . . iIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII" IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111 . . ram,.' . IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIinguinur 3��_�ILr.57g CIO'a[cuQ_-•00111111111111111111111111 '' -"=7e°' h' 1�11111111111111111111111111111111 -- IIIIIIIY IIiI � 1:11a11I"• ', ►��.`"Dnnnnnn...... !!1 111111111lNy�nlli!I!i�llllllllllllllllllllllllllll 1111 1 1 !.!_ �_IL iiiilll'lllllllllllllllllllllllllll a it ��• -_ :�� - srm r.rl:.e_so:ea_ee�e`�� --% - i EiiiIIIIle1 a :silllllili e!!!!! nnnnnnnnn. i nnnnnnnnnminnnnnnnnnnnnm 11 ...11 nmcr.,�a-. !11111A1111111111111111111111111111111111111111111 870 11 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIu i"iiiG■1■111r -:- :-: r. ■ ■ .....r_,_.,, {JIII J J� 311111..2. 870 111111iiii 111111111111111111111l11111 I�Illllllllllllllillllllllllllllllllllllllllllllllllllii� JiilfYflf l'llllllll...al 1 - 11111..111111111. . _ ..1_____... - ::. ...........L...................rS...rr.• _IICIIiJ...l„1.lp, III, 11 ;� - i ��!!i1��i��i��li�ii�P1111111111111111111111111111111111111 niiiiiiiihNiliiiIII11111iiiiiiii�Ti.I:IIra,'A lLl 4\.II'H•U L'IF1Lt1 II.., 1111111111111�111111111111111111111111111'9:!!11.;1�!1"a�iilfllii1i1161f111111111111111111111111111111111111111111111111111111111111Ei�ii�IlllAtiiEiiiVlinlailll1A1111 - 860 - - ...�Ii•[ •E .. 860 IIIIIIIIIIIIICIIIIIIIIIIIIIIIyllllllllllllllllllllllllllllllllllllllllllllllllllllllllll - qr»� . I •• IA 1 IIIIIIFIIIi�lllllllllllllllllllllllllllllll HHHHHHHHH1HiiiiII!HII!!IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII"4t 1850 . .,]y�7IIL:1. SIN1c/:, . 1, ► • 850 1I1IIIIII1 IIII�iI!IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIuIilllI!Ii11111I1I!11III111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII!iIllII!111II1i11u11IP!P!1!II11IIIIIIIIIIIIIIIIIII11111111111111111111 840 IIIIIIIIIIIIIIIIIII!�lE!!I �Z�il�l:I�tlliyllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllili�'1!1!i�' IIIEfl1'�' 1`°..�„ `�`L' °�'�"L 840 III lip ! TN( 7,pqmimplimmilimmilimmimmimmimmimmimm,oliorphommo IIIIIIIIIIIIIIIIIIi�! ICI• !ii���r�i'7h11111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�1111111A�� L ����1111111111111111111111111111111111111111 i ial:u i.li 1n : i u.. Ala nl830 830 SEE SHEET 24,10 FOR -Y N- PLAN I 820 820 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 920 .1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 920 910 910 900 Rm #72 900 1 75 ;r. E ..t; Y_N 0 - 9.81 ELEVAT/ON' i ::5.02 N 890 0 .�rrrc� :.r_-- IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIHHIHIIitIliU11l1I1IIl iU1ll1I1I m lIiIlUIlliIIlIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII!!!!!!!!HILiiiiiIiii !iiiiuIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII!!!!!_IIIi_IIIii�IIill11III�1 sso 1111111111111111IIIIIIIIIIIIIilllililll111111111111111111111111111111111111111111111111111111111111111111111111111111111 ; , . . 880P1= 169+75.00 �,�r IrR■Ilililili1111111111111111111111001000010000100001000010000100000000000001 11 IIII 1 1I 1 11 ail EL = 862.62' e '�� aL1II IIIIII1I"II11 III�Ilr! EIIL'lLL� �1JY L'11l'�■ ,, KC= /380 1I III IIIIIIIIIII I I II I I87o IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1I���II���IIII�Iw11i111111111111111111111111111111111111111111111111I os = 6o MPH III `�____ =-II 11111111_1i_ �I���I�I!I�I11111I11 III1I 870 N it111illllll1111 IIIIII11111...•....!!!!!IIIIIIIIIIIIIIi�ifiiiilil11111111111111111111111111111111111111 Illllll�llliiii� 1111111+!!!l;;;;;�or 1'-�1 ' ' ' - - 860 1 1111111111111111111111--------i-,1111� ��^�.'■■ v r[r.-- , r;: \I 860 IELLE ► y,GAI 'JillAi Alii Ili :+_1- �r_�_ .. -II!. 1,1 �__ �_ 850 �, 850 II, :1.IIILr II 1` `IVI , 1 yl,•. '.,it l :� NCII ��fflQ 840 111111111111111111111111111111111111.7PI 1r r .r r _ /�ll III �� .' II I II li 840 11111111111111111111111Nor 111111 lir Illllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll 830 830 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 tD U- 0 PROJECT REFERENCE NO. SHEET NO. I-3819B 59 960 -Y N- ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 950 940 BEGIN SPEC Al CUT DITCH PI= 188 /J.00 DOCUMENT NOT CONSIDERED FINAL END SPECIAL CUT DI-CH 1.GE a CLASS 8 RIKAPW HHINGE CLASS B RIPRAP EL = 928.07' UNLESS ALL SIGNATURES COMPLETED PI i77-h0 RT PI STA 180+03 I vC = 1,875'930 EL.886.07' !/Mt EL,4�4.80' PI$TA•31TCH W/H NGE DS =26 8 MPH "86-50 LT930 EL.906.63' - PI STA,178+00 RT / BEGIN SPECIAL CUT DI - - �L = i EL. MII 886.85' PI STA.186+CO RT �_i 1- bND SPECIAL CUT DITCH W/HINGE ••m-•� ■• •• - colic ■■■■ .r, ,. r41■• ■ ir -ce. 920 EL.9Q6.38' - I GRADE PI STA.184+50 LT �Gj�' 3 a [ EL.904.6T , ENS SP•> A_ C T DI /HIN �IIIfIF ��Ir I+00 LT --1>_ -N ■ I 910 as 178+So I- � MI■�11111M1� I� _ �� .7. 1♦1M111111•' ■� - _ i. r • - . . �� ��1 LE __ .■1>.11' = 11f� •I■ o 0 01I1i-a���m}� MI �i I 1 Ill i LMMA '•`°(-'n73a,v i i1�6-A��■_!_U lie _ ■ -� .11t�JI47:f1 ■-� ��M-- 11 ' I 11. I LX1S1/NO I F,W PISTA;182+5J RT GeXI I/N » -L 890 .commemitimiiim . ■I. EL.900.32' IM11111.1111.1111 _ 890 Y f 1)/.95X -<� • STA 1$9 50 RT EL. 'Ob 4 a)--i+)347 D' El HOS. 5 --- 1,11 • #94 . PI STA. 179 100 LT . 05. '� 880 N /5835-6 E I I I89oli EL 891.11' 880 Y N SIA. 1/f I .-. 9 BEGIN SPEC AL CUT DITCH W NCE 77."1'RT ELEVALLION 7 885.47 P NIA. I; +00 LT SEE SHEET 25,26 FOR -Y N- PLAN CH,SELE X ON -IE NOITHWEST CORNER OF : .889.931 870 CONCRETE PAD AROU\ID CATCH BASIN 870 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00 189+00 190+00 191+00 CUL✓EHl HYUHAUJ, JAI A 930 , �'• D/s / \/7 r = '� C`5 -Y N- 930 I' , _-I - 1 I = I' . - ■■■■- �..�� I .II 11111 I II Fl c' DlSCH4RGE4T10h = 3.6 CFS I 11111 IlIlIllIllUlIll 920 Il= -114r`:-V:= ::-."::a:a = = 111111�1a; :1-3Inisulimv�taiu:�atttttttttttm� r IIIIlr''i1 �1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 920 EJEMI • �I _ yl7�Iip 1. I III Ei]I!1IIIII. I1.= EL.90h.03' T ea U �� r/ �eyT �i� s� t\Tr r, °°�� �7!7T7����7 {iw I ]■]� ■ ■■ ■■� _ i _ s..1ima�m�= =' i,i t�[�1W.2ee 1■i 1� ,��JS■B'Ji/ � l ��S�7iN E7i�■ o�aP��7nsi:� 910 - Z1111J\I�7�T -i-i , 71•- - - �T: • �� �.a1-.,...,I; �IlI.. i II PP i��1����IIII1I1�11�11 910 it�S7iT7'R7�11iL7.rss_ �■ ■umirar�Jr.�•ie:- ..vim �■�N ..-..---,-..<. - --- - _ - . 9 aim.1•_111111_1�irer.�y: "•':L� •�`:.r.� .. :3. �' ■ 111 ■■ 1 1 1111 - ■�ii: -- -■-- ■ --- ++ 9. IN 1I1>. �mo■mmm-oocrrrl�rrreo..�. -� �■� orEv ci■a. I. I:o �fia•� ��■ ■■■■c1u:JIh LIL•17! L.��iL Ifl -- �■- -n■llz:ranl�m■Irt7r7r�eJla 900 • �+� ■■■■:: -I-�\ �.�I:� 1'. �IuI . ..I11o110. 900 O ■ - I N �E�J■. •1 1I. I�y\I�.�II K�•�1 if^71.I.•JI1 ill■-�7- ■■...�. -r•1��1- rn .:/d .A �■� _...■■■�■ ��I-ii ■rII,J■GIr-■■r1.K!•7111I'i'i-C-J11=�G- I. Iie iI!!A•@•■rr.■�• • 1. L1I-II.YI:I:Il■- ■■■■rWil■r11Y■11■�i.ri-f7nl��a /��51• 1I-.Z� :� _,.-! II[iI�••'kiEi2111■�■G.11>.1>.1:� -Q� m@-i.155.. , - �• i•- ••'"- .1.51I-.l:f\101a-1:1\Ii1i i/■■■■ -r11M 0 _ Imm mo ■-@ �����- - '17l11��-01:7a\I01■"-J'1■171■iI■■■■■ -!1■IC 890 :=��C : �■�=- l Ii l77 .�alrmoisvm rnlnl•1m____' N- (SBl 1�,- I 890 a .IlurIV AM m-/m1l�mo �1=� 1� 1�■1�1�1��. �- '����'�r�i- s 1:1.ii_rlvr. - pi- 2.. -/7. 00IN = . c - /1l-mm--� �@ • o • _. 1�r>t!-__ 11• 11•�11• EL = 877.14' I■ F p- NM � mUJ m--- - - • =1�i-�- - - 1>_�1>_ - VC = l80' ram'y\I■ .1J7r rI-.I■Iel■l I IS!-VJIcU1 rM J/f/MEN _-11• 1�fi �' 1'1�-11i7L' .7iE> _�i@7� 11•�11• �� I�S- m -T raawrs.ric �� - -� = --� -- �MEM -- - Ws== K = 642 IN ek - 880 IL•J.•INIVAL i1•l,iINEMEN 111 KsS@. = . ftI1-MIAN DS > 80 MPH N�-■• 880 7■■.11•Li'7Nmm m- m 111� 1'11•--=i73111aZ54A•.. rltiTiiE•i� 11.71iMii.�.CZ1V/ . a�-r '4)0009 n r1I1�.r+_mm--� !- ��--�OL77r--. �Z -iiL-FT;�••L•liJl�l- _■■■■■-■-_-E ,f' ■m-�gym- m MI 1'11•- Ir 1I1I1I•G1177dI11i■IS lI/5Ih2t:Jt7/•# 11•--■-■-11•-n -11• 1L■ - ••N - -11•-•• J' -- ■ -- 1 �. it 1 o� .-■---■■m . 1lo v 870 . • a 0r IMF•. PI STA.197+00 RT/ - ■��- I/;1 Cl/ 1■drA1T1 :dl�1107 �p ■■■r■ !•!:■■:■. 1u ■��■ ■■ 870 ■ ■ om m-.-' IN- r =- N Ti7iT.GiR3t EL. 885.28' ■■■�� m���7erll•1-Sw Yawroncr Irl�rm��■i �m�.m -■rnr� - N�.,�1-�,- J- m�-MENI1.R71CWF••:�aq-a.n' -- MEN �m_�■ �. ■I■■air.r.■1i-- -m..I.•!1l7Tlr r•J�.T.LrCn---■�f-7 ■..■■■'JQ.i o F $4�55' m���1l.char_.-i1 r�rwi Ii>•rc-ur��tiar1���■--�� ■■-� ■ - -�■oi�-irs7•Ie1c�--� m END SP CIAL LATERAL 'V'DITCH _---illi - • - ■■ = my 860 PI STA.197+35 RT ■� FMNIW . �� _ EEL orr vrr. a #'..IMEN .� 860 ■- iM._7ilil6i.PM.IN r0C 0•.r, �OW�II1:I�-rrlrr1LSa'1- 77r11rlrrLl EL::883.00' ■� -iol�o■cA..1 inn.,-■■7 -miuu S.11.Ju -p - ■NE 17o.7/.iiiT7•- W�t-.�■■■■mil G1 20 C7Di.r7• y - IIII iIII , W.7'R=liif i. o 11111111 I I , •/ �.■■■w%i:UZ1:11M1 0 _ S. 6' 850 11�-�mals■f:79r.7■1I�u■110 UTILITY PO■=r7= 850 ai 7i1ri\i■Yii m-■mmm- �■ ■� ■m■mm■m�- ��■..Ili■• ' TALLATION NENNEN - mom■ ■��TlryrsT.--o• s ex•lrt-. eT7.1•rs 71z_ncaa�a\1-on:1:7:■■rI SEE SHEET 26,27 FOR -Y N- PLAN NENNEN - �■ ■� uau:J�r_�1a;�_u7--._ w.-n. �Nrr.IoI:1 mE0 - MENNEN �■ ■- 7Tr■ 7='I �ILG�9n'JI:11111➢71u1■1:7 EE_ �:u +. -EX 111 °m cn o a 840 EL 86•.00 840 192+00 193+00 194+00 195+00 196+00 197+00 198+00 199+00 200+00 201+00 202+00 203+00 204+00 205+00 \/Ir CrCr ; iI PROJECT REFERENCE NO. SHEET NO. ro i n I-3819B 60 CN Pr�P\rnnron''NU:mr pLi18 I ROADWAY DESIGN HYDRAULICS II ENGINEER ENGINEER -Y N— .LL\R'R'uI'ImagiZ.II:4km4rrrrrrrGrrlL7lrrrrrrrrrmlllrrll — :,;ILi ,liiY6ai d:.U/.,rmrR " _I 1-I:+ I: Iri3CCninillnir3rrilrram111iiieri �\ipiiiiiir_iil INCOMPLETE PLANS IL•c7G" iri'7'7::' - IMI .. II - DO NOT USE FOR RAW ACQUISITION I II /izumm Er7/Jr'L:�II.rJ III/I .dim ICAIIiP_O97ri7i1rCi111'OI J1111 IC'L'!II ^r\P ILLi E� irillrrrrl y\I I J•I I I iII.-cl lv U�l Ir_i.I.�ii_lcrryicill//_.IGiiMirrrr!•ri7'�rf7rrrrrr6�iill 7^ IL•riJLriiiLL-ir=•• • 'S'JS" II IaCliiJr11CP111g71\MG111711 rl//i'i7/lll/.MWi/I/rlifrlM/1LIlG,C:/iilM'irCiid:.i R,ii.7II i1r�'l9ll r_OIIf lC7I111111i1111rIl II/r1:�lE=II mIIII'/;71m,71rI1611711umma71m'7_IIIiRII/i4Erri9irl IiTI.I Pll ■7 rrr:f:/III ' II Iiar=1:amman nrTiirammmmairilir!•ria9rrarrroiria•II II 910 ILAEEMi'lll'rM'liMEHEMJ'J•rii[ilrEMMiMHUME" II 11 I II II DOCUMENT NOT CONSIDERED FIGAIO • I' II UNLESS ALL SIGNATURES COMPLETED i�MA i� icil�li➢n.iir II al�in"I1-_ i 900 mlrrrmrrruu PI STA.21Ki11,'v o! ii 900 - MEWL.867. G\iiI Ii _ rrrrrrrrrrrrrrromliiiiiiiiriiiiiiiiiriiiiirrrrrrrrGf.LaR\il(rGL7,.l\7\r:nll.:rQTarowla II WiYYiYYi �I �LL\irCUL''J'7L�1Jr�7:'J II " 'III\r%II:\.:Iilllrl:a.Il II Eiii 890 END NB RECONSTRUCTIO iiI ``s'I`Q!IA �! II _ . - - $90 -BEG. NB RESURFACING-- r r BEGIN NB PGL SHIFT I Il II _ - . -Y N- (NB) Y N- STA.209+50.00 (31'': �1rv_G+ P1= 209+02.50 me 866.02' li 61 ''-EM- _:_ 880 EL = 856.42' nr r = _-: _-G arre 880 mIIMM rn_s;Ir.iIicle4Iiee_ n ii MOVrrrrr ( MA n I l I: Il1r11\Ilrr!/r111lbrlalrl11 K /37 I I iuioriioCsir',1! . irnraaarcTanr\rc. DS = 60 MPH u u REM II_ II \II _ �� Eli U... Ill:ilrr:l'.�li\II:� 11 IIUUU Fe - .�_V11U' ' r 870 1 II _ —=_:... ==-= G 870 --- - _ -�_ G FI �iiGi7C7!•9ii.-�_ __ - . - - _ Tammmaa=iifi ' : '. '.�. rifiG Ff _ 0 ---- - i /1.::/Il/RIHIIr0 1 rlli.l:mmimi_'^ir s_ -CG mmmmn - _ !P_C7C7C7Gi-i-i1Wa - - R8i' - --860 --- - - -_-- _ 0 -= 6 860 _ 11_11P 1 ANI7rrl=C-_ • IP 7i%1'HD\GL. I eIE 8� IIii.IIIIiF7N17\IG•IIr11/9Ii:�S11\r7r1111lliliil� I ' 850 I,7 4MMEp .Tirlr 1i; UM b1UII„7._, I SEE SHEET 27 FOR -Y N- PLAN 840 840 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00 219+00 irrrrrrrr 1 PAGE INTENTIONALLY LEFT BLANK - .. .... -a N m CI lC N Cl I' m v N N m N / N Cl CO 10 i rn 1 1 C O 2 N-, \/ 00 PROJECT REFERENCE NO. SHEET NO. I-3819B 74 ROADWAY DESIGN HYDRAULICS 880 -Y9- ENGINEER ENGINEER IIIIIIIIf 870III 1111 HI II P1= 17+15.00 � t IN GRADE EL = 310.66' 9- STA.14+41.60- K = 3/ I EL 847.36'' DS = 35 MPH 860 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 850 - I�' PROPOSE p 850 �' OR UL 840 - --- - --- \--u,ST,N6 `\\`�, Pl= 23+43.75 840 .-P0 b-D EL = 825.08' 111111iiiiii iiiiiiii IIIIIIIIIIII �� KC_655425' 830 \ �i Ds = 40 MPH = 830 820 820 810 810 800 800 SEE SHEET 28 FOR -Y9- PLAN 790 790 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 N KO CH SLAB END A°FROACH SLAB 860 S .25+12.96 Y9-STA.28+69.83 860 =- 826 9 ' EL.826.29' -Y9- B N BRIDGE END BR DGE �II II ��I-Y9 CTA.25+3733 -Y9- STA.28-45.67 , 850 EL. 27.)4' EL.82'¢.�i ' 850 Pl= 39+95.00 � EL = 869.75' A • VC = 501' 1 840 P1= 26+86.00 ."EL = DS =l154 MPH $40 �� Pl= 23+43.75 ........II..................... VC = /20'S0 PI= 32+30.00 .. EL = 821.97' • 11 EL = 825.08' l.......II....................0 K = 55 VC = 56/' a'' .. VC = 425' n DS = 43 MPH 830 .. K 65 IIIIIIIIIIIIIIIIIIIIIIIII!! I�� _---'-_ 4 K = 75 ���, i `' _ ,,,. ,: 11 I, DS = 43 MPH 1 Ci` .; .CIAO 830 i! DSO_, 11 'I _ � 'r�e��::..... ... i-�- _ -.e: aiiiGiiii�l�1.nllllll1lll1111l�III � 1!Iele!l�IIII�IIIIIIIIIIIIII- �III�������IIIIII�II�������������������.�.��:�.�.:.l���m 1::11 - - 3 -_..._e7CICiiijiiiiiiiiil II ,I;I1�.., ,III,. a 820 II-11/1111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIII 180_ - - - _....LLAi 111111111111111111111111111111111111111 1 r , . .. . 820 11 N 810 IIII rf Sri. 810 11�11■■ �. r'111 11 ......:047 11111111111111111111111111111111111111111111111111111111■IIII;IIIIIC... ., ...� �1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 v .. �1. .n rno�m�... .. SIB A .. 1 - 11.....=IZ...Yi•.I... .. 4 800 •• ������11 ��1 ���i�n icN �+ HARGE - �' 800 .� noo�..or;.o�n�� 00o ' 6! �E D SRH�RGEGI l0 _- 790NCLVL HW L,LLVAI,UN /N �p m I__-- " III 0 ERTOPP/NG DISCHA,GE= >77000 780 II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1IIIIIIIIIIIIh' ER""1G ERE°1ONY- "r. III 780 11 A 1111111111111111111111111111 11111111AmOF SURVEY - '%" SEE SHEET 28,19,29 FOR -Y9- PLAN OE N 770 DATE.OF. �111����! 770 s a AT-DATE- OF SURVEY (07)0 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 PROJECT REFERENCE NO. SHEET NO. CO I-3819B 75 ROADWAY DESIGN HYDRAULICS 910 ENGINEER ENGINEER c� Y9 ST\.50+00 00- —Y9— EL.887.W 900 • Pp')PpSr n 890 G1 i 4r E DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED P1= 39+95.00 _ _ -_ 880 EL = 869.78' -- -- - - ` 880 VC = 501' K = Ill _- DS = 54 MPH - - -- - 870 _— — 870 — ,afA_ - • 860 860 850 850 840 840 830 830 SEE SHEET 29 FOR -Y9- PLAN • 820 820 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 PAGE INTENTIONALLY LEFT BLANK K S W CO 10 C n !h N N N N 10 ti m 0 0 mC) Om O p,U. Nay 0 io_ 700 \/(0 l9/0_ o- PROJECT REFERENCE NO. SHEET NO. o- -3819B 76 ROADWAY DESIGN HYDRAULICS 850 ENGINEER ENGINEER -Y9RPA- 840 830 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SECIIIINE GRADE1 I I 820 9RPA- STA 10+00.00= 820 EL 794.74' Pl- 14+95.00 EXIST/NC --- 810 PI- 12+75.00 EL = 796.35' / Gk D - 810 PI= 10+60.00 = 7+75.0 VC = 140' r _- EL - --- `_,- - �� EL = 794.48' K = l35 / / VC = 120' VC = 100' DS = 57 MPH ____-- ---- _- ____ K = 142 K = 2457iimm -----__ 800 DS = 60 MPH DS > 80 MPH _ 800 __---- 0 +bdA5o®2 0 )0.5d35i� _____....;cc! �� orrnnor Q�. c r�AM..'• "- -- ;.-. °. .-.< 1 - ( . R 5� -. POSEb r V 790 790 PI= /9+46.25 -)0 EL = 793.72' VC = 650' K = 136 780 780 DS = 60 MPH III II 770 770 SEE SHEET 19 FOR -Y9RPA- PLAN 760 760 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 860 860 END GRADE -Y9RPA1 STA.27-70.95 ' -Y9RPA- 850 El,828.18' 850 840 840 830 830 PROPorED co ;R, E a 820 —__ _3 �' - \ 820 —EX/S WC in 810 Gk 0 810 N rn rn 4 800 800 N CO N Cn 790 790 -o Y 780 780 SEE SHEET 19 FOR -Y9RPA- PLAN m. om sa 770 770 W70 24+00 25+00 26+00 27+00 28+00 N PROJECT REFERENCE NO. SHEET NO. o- -3819B 77 ROADWAY DESIGN HYDRAULICS 870 ENGINEER ENGINEER BEGIN RADE -Y9RPC- +TA.10+00.00= -Y9 RPC- EI.840.0 I' 860 850 P1= 11+50.00 DOCUMENT NOT CONSIDERED FINAL EL = 835.17' VC = 120, UNLESS ALL SIGNATURES COMPLETED K = 3/3 DS = 75 MPH 840 —_ -- 840 830 Pn POSED 830 P1= 18+60.00 GRADE \ EL = 809.62' VC = 980' K 159 a".5g81/. = � -- 820 \ �� DS = 65 MPH \/ —�_ _ 820 810 ,_ 810 20) 15 � 800 800 790 790 SEE SHEET 18,19 FOR -Y9RPC- PLAN 780 780 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 860 860 -Y9RPC- 850 850 PROPOSED 840 GRADE 840 END GRADE -Y9RPG-STA.74+59 47= EL.84..71' 830 830 - 820 i d2.548rf 820 810 GCA/NCIE I� 810 N N 800 800 CO N 790 790 —o Y 780 780 SEE SHEET 19 FOR -Y9RPC- PLAN m* om sa 770 770 70 24+00 25+00 0' PROJECT REFERENCE NO. SHEET NO. 0 co I-3819B 78 ROADWAY DESIGN HYDRAULICS 870 ENGINEER ENGINEER Y9LPA- 860 END GRADE — STA.'8+11:12= 850 I E- DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED /I 840 :..6 840 i 830 BEGIN GRADE OrOUV� 830 EL.8—Y9LC1.I9' .'010a. 6s I -- -- EL.dC1.19' PI= 12+50.00 __ EL =820 VC = 75'S0' — ;- — 820 — _--- Pl= 10+85.00 K = 20 — 3.0 C % EL = 800.82' DS = 2/MPH VC = 100' l K = 63 H�'i' 810 DS = 45 MPH i �/ 810 i / 800 G.-- x��1o%= �� 'sue ��y _ GOAD En 800 790 790 SEE SHEET 19 FOR —Y9LPA— PLAN 780 780 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 870 870 860 -Y9LPC- 860 850 Erlp ,4RrADE pa, 18+91.43= 850 =L29' 840 840 co PI= 18+00.00 S ,BEGIN GRADE EL = 82/.09' PR P .DED-- 830 I-Y9ipc_ STA 9+9�98-- VC = 100' GRADE ' 830 -o EL.804.66' , D = 76 - DS = 35 MPH c EL =1807.4�� 820 820 PI= 11+06.00 `�° EL = 806.66' I VC = 100' _ +) ,300 co VC = 100' DS =640 MPH �" � K = 90 m 810 ( DS = 5/MPH �� f 810 10 800 \ 800 S FXI�T/NI O1 040UND Y 790 790 SEE SHEET 19 FOR —Y9LPC— PLAN m. om sa 780 780 7. W70 Loop 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 0 PROJECT REFERENCE NO. SHEET NO. o, -3819B 79 ROADWAY DESIGN HYDRAULICS 890 ENGINEER ENGINEER -Y9A- 880 870 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 860 li L i.tit$I �� a �� 860 P1= 10+76.00 IJu: = 1 w .q 771, EL = 839.59' I�7•! 1 A� VC = 85' P, . ' K = 65 I 850 DS = 40 MPH i 850 411•I' ,11 31 I 840 I !.i c,-- 840 __ 1� �� 830 I 830 ,..II ,1 820 820 810 810 SEE SHEET 19 FOR -Y9A- PLAN 800 800 10+00 11+00 12+00 870 870 -Y9B- 860 860 END GRADE -Y9B- STA. 14 98 61 = 850 EL.828.28' 850 B:GIN GRADE -Y9B- STA.10+05.00- EL. 82 2,04' 840 840 PP0P9SED a`` 830 P1= 11+62.50 05/Dc 830 EL = 814.95' VC = 3/5' � — 6 -�_ K = 37 i" -- 820 DS = 30 MPH ,� 820 In a 1 N 810 810 c N \ 10 800 _ m .�fr. 30i --L/1.. 800 m END 2'BASE LATERAL DITCH i I l l i PI STA.13+25 RT ,- y EL. 801.14'/ U 790 BEGIN 2'BASE LATERAL DITCH_,- 790 PI STA.14+00 RT SEE SHEET 19 FOR -Y9A- PLAN m. EL. 801.36' sa 780 780 W70 10+00 11+00 12+00 13+00 14+00 15+00 16+00 o- o, PROJECT REFERENCE NO. SHEET NO. co I-3819B 80 ROADWAY DESIGN HYDRAULICS 870 ENGINEER ENGINEER -Y9C- 860 RE 850 � N T 1- 7 03= DOCUMENT NOT CONSIDERED FINAL tL.!24./I' UNLESS ALL SIGNATURES COMPLETED ENO GRADE 840 EL =1823.74� . $ 11+69 41= 840 VC = 50' I DS = 32 MPH ■ ■ ■ ■ ■ 830 111111111111111111111111111111111111 ; 51P III 830 820 7 ,�, I 820 ffm T/NG T- 4 810 PI= 11+27.00 810 EL = 8/9.44' VC = 84' K = 49 DS = 35 MPH 800 800 790 1111 790 SEE SHEET 19 FOR —Y9C— PLAN 780 780 10+00 11+00 12+00 PAGE INTENTIONALLY LEFT BLANK 0 CO C, CC N CO CO CO U1 7 0 me Um i cn 2 G LO L4 00 \/0_ ,9/0_ cr cr PROJECT REFERENCE NO. SHEET NO. 03 I-3819B 81 ROADWAY DESIGN HYDRAULICS to 910 ENGINEER ENGINEER -Y9D- 900 890 BRAN GRADE UNLESS ALL SIGNATU ES COMPLETED P/= 20+31.00YD STA.184.04 PR(P0 FDEL = 873.94EL.861.46' GPADEVC = 220' K = 44 880 DS = 40 MPH ::: T870 - ��i P1= 23+20.00 � v EL = 875.38' GROU'D'C VC = 126' 860 • - ___��' sMOu'D K = 66 860 DS = 40 MPH 850 850 840 840 830 830 SEE SHEET 29 FOR —Y9D— PLAN 820 820 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 910 910 -Y9 D- 900 END GRADE 900 Y9D—S—A.24+01.02= EL.877.33 BtG1N GRADE EVD GRADE 890 Y9D S IA.24+77.37— —Y9D— STA.33- 90 38= 890 EL.877.72 P1= 28+00.00 EL. 865.20' DR0F0SED- EL = 875.68' P1= 29+85.00 ,l'i�D- VC = /20' EL = 873.37' P1= 31+50.00 K = 17/ VC = /20' EL = 869.24' PI= 32+92.75 I 880 DS = 62 MPH K = 96 VC = /20' 880 I DS = 52 MPH K = 343 EL = 866.1T _� I a $7 - ---- _ _'�,055®0� (-E25r.10. (_, DS > 80 MPH KC= 1040 s 1-)U.557b% __ _ ��_� �_2_S8-. )U✓ DS = 52 MPH a1 870 P1= 25+50.00 �'j��0U0 - � � 870 -o EL = 877.05' �-7`l5 o' VC = 145' V -,G.; l-/PUU 0I' AID b 7 860 DS > 804 MPH �' G 860 o- N v m 4 850 850 N N N • 840 840 -T Y 830 830 SEE SHEET 29,32 FOR —Y9D— PLAN m. om sa 820 820 W70 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 o- o, PROJECT REFERENCE NO. SHEET NO. co I-3819B 82 ROADWAY DESIGN HYDRAULICS 930 ENGINEER ENGINEER -Y9E- 920 910 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 900 BEG N 900 -Y9E- SH 0+16.500= EL2'1 ' I 890 fD 890 GP= S P1= 10+94.00 END GRADE EL = 872.49' PI= /2+15.00 -Y9E- STA.13+08.39= 880 VC = /07' EL = 866.59' EL.859.21' K = /9 VC = /35' 880 DS = 30 MPH K = 45 DS = 40 MPH 870 48> 870 II I mill' 0000, 860 860 LYIS//NO ';ROUNf 850 850 SEE SHEET 29 FOR -Y9E- PLAN 840 840 10+00 11+00 12+00 13+00 920 920 -Y9G- 910 910 900 900 BEGIN C',RA]P -Y9G- STA. 0+91100= iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii -E 890 L 865.68 890 03 �k � a 880 -Y9G- 5T ,1' 00.00= 880 -o EL 86A 88 870 870 860 860 P1= 10+20.0000 EL = 865.68' S /80 MO ) 7 850 850 -T 840 840 SEE SHEET 32 FOR -Y9G- PLAN om sa 830 830 W70 10+00 11+00 12+00 13+00 o- PROJECT REFERENCE NO. SHEET NO. o, —3819B 83 ROADWAY DESIGN HYDRAULICS 920 ENGINEER ENGINEER —Y9H- 910 900 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BEGIN::GRADE 890 -Y9H-:STA.:10+20.00 890 �r 845.67' P1= 10+40.00 ND GRADE 880 EL = 864.87' Y9H 1TH 2268- 880 VC = 22' L.855.37' K = 2 DS < /5 MPH 870 FP0P CFA_r 870 4000'"607,i0 860 860 F/1(7,1"f;—r •+ GPOUV`D Z9noux 850 P/= 11+00.39 850 EL = 855.81' VC = 44' K = 3 DS < /5 MPH 840 840 SEE SHEET 32 FOR -Y9H- PLAN 830 830 10+00 11+00 12+00 PAGE INTENTIONALLY LEFT BLANK C, d U W ("J CO N CJ N N co N CJ CJ CO ID Um 2 G LO �00 \/0_ C9/0_ Q PROJECT REFERENCE NO. SHEET NO. co -3819B 84 ROADWAY DESIGN HYDRAULICS 930 ENGINEER ENGINEER —Y1 0- 920 910 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I 4 IN GRAD 900 II- s-A 17+a4 S= 900 I 874,84 890 890 P1= 20+87.50 EL = 873.93' VC = 375' 880 ----- -- K = 72 ----- -—-- — DS = 47 MPH --- - - __ I', _�����_ - ip 3 -'1 Lis _. = �� OPAI E 870 870 860 Eris >> >> 860 P1= 24+70.00 850 EL = 852.80' 850 VC = 240' SEE SHEET 30,21 FOR -Y10- PLAN K = 64 DS = 40 MPH 840 840 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 GIN BRIDGE BRIDGE - TA 25+77.48 EL.850.91' IS45 870 BEGIN APPRO bLAB OAGH —Y10— 870 Y10 STA. 5+52. 28+4116SLAB3. 851 EL 844 hR 860 860 P1= 29+24.30 EL = 844.62' � ; VC = 500' 0 - K - 100 850 850 - J° 07 Pj -- OS = 52 MPH END RARE ‘� — _,��j -Y9- slAI 33+92.70- > --(��, EL 313.27' 840 P1= 24+70.00 �� �-- -� �--� oEL = 852.80' �"f>>__ - �`�\ � 840 VC = 240' ��._____ �� S K = 64 1 _ �� P1= 33+30.00 a 830 DS = 40 MPH 11 I7'M/14/ _ �� VC = 120' 830 I� �t DS = 68 MPH 1` I �� 820 \.,' \--)476 /d 820 " 4-0 6' , s7 ° 810 N > 810 P r 30 00 800 800 y ii 790 - _ 790 U m� SEE SHEET 21,31 FOR -Y10- PLAN c'm sa 780 780 ...-cc24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 cr PROJECT REFERENCE NO. SHEET NO. I-3819B 85 ROADWAY DESIGN HYDRAULICS -Y10DRI- 890 ENGINEER ENGINEER y 880 BED. GRAD Y1 BET c EL. 52.76' 870 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED P1= 10+64.97 P1= 12+02.50 --Y'ODRD R-TA.12+34.54-860 EL = 850.63' EL = 840.94' EL 837,74 860 VC = 90' VC = 60' K = 44 K = 20 DS = 40 MPH DS = 30 MPH 850 ° r',S�oos ::::�:� 850 lllll�llrlllll�i �ll■1111111111 840 1111 liii _�1414111 III1 840 I, 9 ., 0. 830 830 820 820 810 810 SEE SHEET 21 FOR —Y10DR1— PLAN 800 800 10+00 11+00 12+00 13+00 PAGE INTENTIONALLY LEFT BLANK C C' '1 Q C- C C CC n CJ CC N CC N CJ CJ U1 C C 3 O gyp/ oo- I I I I I 1 1 1 1 1 1 PROJECT REFERENCE NO. SHEET NO. —Y4RPC- I-3819B 86 ROADWAY DESIGN HYDRAULICS 880 ENGINEER ENGINEER 870 B-GIN GRAB �vu vItAL Y4RPC SiT . 0- 00- 1F4 RPC ST 18+`5 00= L EL.842.32' :_ P29.49' 860 DOCUMENT NOT CONSIDERED FINAL I P1= /1 f02,00 UNLESS ALL SIGNATURES COMPLETED EL = 840.93' P1= 17+30.00 VC = /00' EL = 832.77' K = 1677 VP1 P®�1=U C= 0 850 DS > 80 MPH P,�4f3E K 89 850 SSD = 598' DS = 50 MPH 840 „________, Il840 ••• •• .. ./ ou 830 \ is _ -,405i N _ _ 830 �xtsl,nu ,Pow^ 820 820 810 -� 810 800 800 SEE SHEET 8,9 FOR -Y4RPC- PLAN 790 790 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 IIIIIIIIIIIIIIIIIIIII -Y4RPD- 850 850 840 840 830 -YY B etA 4A-11 12 Ni J 830 EL 800.12 c 820 B= IN GRADE 820 o -Y PD- STA.17--C®. - EL. 794.20' 11 co a 810 PI= 14f/8.00 PROPOSED P1= /1+00.00 P1= 12f05.00 EL = 796.63' iiiiiiiiiiiiiiiiiiiii 1 810 -o EL = 794.72' =Ems= EL = 795.18' VC = /70' - - --- --- - VC = /00' __ VC = /00' K = /52 DS >l 805MPH 8 � DS >80 MPH DS = 63 MPH - 800 � �� ®_T 1 - - 800 v (+)7 178% - �- - - 4=0 1 I '004'' % _c a x% -_ 4 �. I\-_7+I0.140 (f)06/92/, �C6'92� i co" \ I - a_�aa� 790 \ I 790 c ‘ , /- - S 780 P ° ,N / 780 cm e� Y1........I 770 770 U m. inom SEE SHEET 9 FOR -Y4RPD- PLAN W70 76 10+00 11+00 12+00 13+00 14+00 15+00 161+00 17+00 18+00 19+00 20+00 21+00 22+0011I 23+001II 24+0060 PROJECT REFERENCE NO. SHEET NO. 0 -Y15RPB- I-3819B 87 ROADWAY DESIGN HYDRAULICS 930 ENGINEER ENGINEER BEGIN GRADE -Y15R11B- STA.10+00.00— 920 EL,898.12' END ODE Y'5 R'B- S-A.18+00.00= EL.386.53 910 PI= 11+40.00 DOCUMENT NOT CONSIDERED FINAL EL = 897.13' UNLESS ALL SIGNATURES COMPLETED VC = /50' P1= 16+25.00 K = 50/ EL = 892.25' 900 DS > 80 MPH C= 132 0 K 900 o_.. 7.77111101 60 )1.�0`3 DS = 78 MPH _ I I 890 890 PROPOCED -- 880 OPADE — - 880 870 FXLsr;NG -_ __ 870 GROUND -_ 860 860 850 850 SEE SHEET 14,15 FOR -Y15RPB- PLAN 840 840 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 930 PAGE INTENTIONALLY LEFT BLANK 920 910 900 03 890 -a m ::: i nvvmN CO N 03 CO 10 860 -T m 850 Um 840 sQ �Ld BOO W70 l9/0_ PROJECT REFERENCE NO. SHEET NO. cr 0 co I-3819B 88 -Y15 RPC- ROADWAY DESIGN HYDRAULICS 930 ENGINEER ENGINEER LID BEGIN GR4DE -+Y15RPC- STA.7+93.30= EL.9XC.51 920 P1= 10+00.00 EL = 899.55' P1= 11+75.00 VC = /07' EL = 898.22' 910 K = 357 VC = 128' P/= /5+60.00 P1= /7+00.00 DOCUMENT NOT CONSIDERED FINAL DS = 78 MPH K = 729 - EL = 894.6/' VC l20' EL = 894.15' PI= 18+25.00 UNLESS ALL SIGNATURES COMPLETED P GPO b - = EL = 892.00' DS ) 80 MPH 6 d M VC /00'E I ` - K = 163 K = 86 VC = 130' DS = 66 MPH DS = 50 MPH K = 289 900 =•4�F29 I G•76'27 nJE97i DS = 73 MPH P1= 20+90.00 900 o' J5 84°, I VC = /80'EL = 25' u _ ; 10 526.4 K = 768 890 \` `10.9_'84K '-l0.<2622 1 2�lzz �Q;r r_.Y2169 DS 0 80 MPH 890 cXISI/KG - r l2.59-/° a 5Lq_C,V= 880 880 870 870 860 860 850 850 SEE SHEET 14,15 FOR -Y15RPC- PLAN 840 840 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 IIIIIIIIIIIIIIIIIIIII -Y15RPC- 920 920 20 DIV GRADE 910 - "5RPC- STA.23-99.24= 910 EL.880.16' 900 P1= 22+45.00 900 EL = 883.25' S VC = /30' GRADE 1 K = 232 890 DS = 68 MPH 890 m L 00 °' r5/. (-U.9 95 �S% - ( 2 4957), 880 \ 880 -o P1= 20+90.00 2 1?5J% % ^ EL = 886.25' \ — VC = 180' P1= 23+60.00 7 870 — K = 768 —L7,S,;N G EL = 880.38' 870 co DS S 80 MPH 9G�iD VC = 78' co K = 4/ a DS = 3/MPH v m 4 860 860 N co N 10 7 850 850 Y 840 840 SEE SHEET 15 FOR -Y15RPC- PLAN m. om sQ 830 830 Nay W70 21+00 22+00 23+00 24+00 25+00 o- cr PROJECT REFERENCE NO. SHEET NO. —3819B 89 to ROADWAY DESIGN HYDRAULICS 860 ENGINEER ENGINEER -Y11- 850 PI= 22+05.00 EL = 822.33' 840 VC = 500 DOCUMENT NOT CONSIDERED FINAL K = 270 DS = 70 MPH UNLESS ALL SIGNATURES COMPLETED CULVERT HYDRAU'-l: DATA 830 BtN CRAKE 830 OEil0N-Z °tEI 1-1_,L - 45 CI-S I - STA.19 60.60 gam= HilI DEi/GN CPEO CP✓.,Y — OC rr' 04 03' _ I DE IGA -,W_ELEVATION = 79C.O3 Fr F,-;4.OU� 820 a " 9GE - 45 CFs 820 BA C P°HLICNCY - '08 y'rs ''HOPCSLR 0- BASE HW ELEVATION = - c' OVEKOPPINC DISCHARGE- 4 CFC OVE:RTOPEtWG FREQUENT- >590 rPS ��810 810 , . y r . ,sue' 800 _- ---" 800 - 790 _------- 790 --- ---_- SX,S;,NC 780 ,---- POUND 780 i \ i SEE SHEET 20 FOR —Y11— PLAN 3&' RCP—II 770 770 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 880 880 -Y11- 870 BAD OWE = 27+50.00 —Y11— STA.S3+13.85= 870 EL = 844.13' EL 84C.LT VC = 420' K = 80 860 PI= 22+05.00 DS = 49 MPH 8b0 EL = 822.33' VC = 500' K = 250 PI= 31+75.00 DS = 70 MPH EL = 838.82' 850 VC = 260' 850 K = 119 nROSED +> �a ( 1'= DS = 55 MPH • 840 A11 AD _�_ =---- Q ( ,C.31 3/ 840 ---- - r-)7 '-�- 9 ��z - - - ---- 830 �- 830 `v - \`EYiS7 NG m SPOII ND 4 820 820 N N i, 810 810 -T Y 800 800 U m. SEE SHEET 20,21 FOR —Y11— PLAN om sa 790 790 W70 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 0- ■■ ■■ ■J• ■J■■■_■ ��■■■■■ PROJECT REFERENCE NO. SHEET NO. ■■ ■■ ■■_ ■■■■■_■ ■_■_■■■■■ 38/98 W 3 CM MEN= ■■ ■ ■■■■■_ P,S• _■■■■■ ROADWAY DESIGN HYDRAULICS 840 ■■ ■■_ MIN ■■■■■_ _■■■■■ ENGINEER ENGINEER ... ■7_ ■7■■■_ _■■■■■ ■■ ■■_ ■■ ■■■■■_ PROPOSED _■■■■■ .. RET. WALL 1 .- .. ....._ _■■■■■ r■ ■' ■7 ■■_■_ FINISHED _■■_■ • •7 •8. •.•••_ GRADE •••••. ■■ 7 ■7_ ■8. ■■■■■_ 4' _■■■■■ ■■ ■7 ■7_ ■7 ■■■■■_ MIN. _■■■■■ ■■ ■7 ■7_ ■7 ■■■■■_ _■■■■■ 830 •• •• mom mom ■...._ _■■■■■ 7 7■■■_ PROPOSED_■■■■H ■■ ■■ ■7 ■7■■■_ FINISHED_■■■.■ ■■ ■■ ■■ ■■■■■_ GRADE _■■■■■ ■■ ■ N ■ N ■7■■■_ /:/ _■■■■■ ■■ ■7 = ■7 ■■■■■_ ■■ ■7 EEN ■7 ■■■■■_ ■ EEN _ _ mom •mom ■■■•■ RETAINING WA/I DFTAII ■ rrnm_a� i.a ■nn ■o — ■o ■___ 820 ■■■■m •.. ...... ■ DOCUMENT NOT CONSIDERED FINAL • •'r,°••• a J• •• ••E •NNE • •- UNLESS ALL SIGNATURES COMPLETED �r.71sOCSi■■■■■■■■■1■■■■77■_7■■, ■_ ■. ■7■__. ■7 7■ ______ill■iE Au_a■iIIa._■ ■■■■■■■■■a'IC■■■.]G_II►.f r ■_ ■ERAGA ■■■■■7_■_U ■7 i e■r�■ern_ ■•____■___■ ■ ■■■r: . -.7■ill■M EL ... ME • •'•••>:■• I■■■•Erik/IIIL] ■_ ■7■■■■■■■■■■■■■_■ ■__■____■ IMU S7■L•■■■YI SIMAILII■Li_■Y 7 U•■ _ MIN MEN MINEMEMENMEN■IN ■■_ ■INEME INMEN ■■■■_■ ■__■_■■■■■■■■■G1■■lei �77�����71110004.01 ■U■ _ ME 810 ....................0 U 7 •UlI 1A MUSlerld J■_■■■■■■_ U.U 0 810 ■■_ ■■■■■■■■■■■■■■■_■ ■_ L[.■aU_ ■■■■1 ■■■ _ 777i■J1'a■■117■■.IB7:EPIr:Si■111191■' _■_■ ■■_ ■7■■■.■■■■■7■■■_■ ■_ ■_ ■■■■1 ■■■ _ ■ ■_:G■last.■a.^■■afl■r.■n.r._ari�i:_a■.-.r.1i_rae ■7__7_____■ ■_ •. u ■■■� ■■_ IG ■_ ■LU■9!LSJ■■■■L±■■�L■■9■GiLL�■e�■■a■■■lJ�'L'L'•lT•J■■_■■■■■■■7■■■■■■■■■■■■■_■ • ■_ •7 ■■_ ■7■■■■■■■■■■■■■_■ ■_ ■■_ 800 __ it■i Gari■:In•: U . WWI ■IN■_■__■IN_■_ a eAslII.17R seas ■■_ ni�arrISOMMOL 7_hrnnrir�l/�MPAIIVIIII, MEM= __■..... ..� .._ _ ■■_ U■ - ii� _ • , ■ ■■■■1 ■INEME ■■■■■■■■■�i - ■_ - _ _■■_ ` ME■ '.a■Y■■W■ I W_ ■■■■1 ■INEME ■■■■■■■■■_■ ■__■tart//ERFION ' IBI1t MOIA 'J■■■■_ ■■■■1 ■7■■■■■■■A.■■■■_■ ■__■■■_■■Y■_■■■■■■■iL`1TWL7 WI■■■■■_ .�■ NE :• - - A■tGiiC ■■■■1 ■7■■■■■N■�i3■■_■ ■_ ■■■■1 ■■_ 790 ■■ MEM li7_we7_7=■._- ■■le •EMO VLDL� •.o■■■■i� C7C7GiGimiC■7r1� _■7■.a,NU■■■■■■■a ial7 ■_ ■■■■1�■C9e ■a7f1■■■■■■_ II .. a ••piL`!a_RBC7C7Ci: o = , .�_U U r........._...._aC ._..�._......a..,C76a� - - 7.■9C7=i_ 790 ■___■ -•H •a - I .0 -. M INI ■■■ ■1iii�i `■_■■—M■___■_Li I 11■■■■■■_ r_n.r■ o�. .. c.. CO° o I `- �_____co i.....n_■ ■____■■_■■__■_r.■■___■____■t1t__■� I ■__r■_ r■ Cu. '-• C. O L 1 ram.■ •.' a■■■■7rxxe■■ ■___■ 11C ■■_■_■■■■■■■■GWIT■■■■� 11■■_r■_ ME■ _ in I. =." CO CO - y, a•.• ■■■■1■■■■■■_■■AJICI■■■■7■:Isa■ ■■■■■_■ ' C:_■■_■_■■■■■■■LIMNM■■■■■■■1 17/31F 11■■■■■■_ r_!■■■■ ._ ...G • .. R.,'O O O - O _ ■■■■1 ■7C.lGC1■ ■■■■■_■ o W. ■■_■_■■■■■■■l■•� ■■■■1 11■■■■■■_ ■r■■■■■■ __ ..7 y. _ (Of-, . - •' ■■■■1■■■■■■_■■■■GU■■■■INF 1!■■ ■■■■■_■■■■_■■■■■■■_Ell■]_ ■■■■FM1'■114'_■_■■II■■■■■■_ ■■ r, r.Snit._•r.■■a'i■rta■it■salsa_____■■■■■1■■■■■■_■■G115■■■■■7OBIENE ■■■■■_■ .T_■■_■_■■■■■■_MeAMME■ ■■ZFIEEMME Sl•11•�l 11 ■_ ■■■■_r■ . - i II - ■■AIA.■l•JS■■rl■GL2r ■7■■l)7■ ■■■■■_■ \IS_■■_■_■■■■■■_•11e■■■■ ■ - _ ■_ 780 ■■■_■■ ..• _■rill ■W r■i7,.•• ■7■JII\■ ■7■■■_■■■■_■■■■■■■■■01■7 ■■7/1■EE■II7.■IP■r_iliiiiiillINNIME ■_ 780 tl�M VIMEmmEN mom■■ ■■■__■Nomm l� �■■■■■■■■■_■■■■■ mmi _ ■_ r■ - . f�■11 = ■INI.A I■ ■■■■■_■ - _■ �■■■■■■■■■_■■■■■_ ■_ ■■ mmEm misommmism ■■■■■_■ _■ mom■■■■■■■■■_ _■■■■■ ■_ r■ 7 7■ ■■■ ■___■ _■ mom____■_■___ ■_ r■ mmEm ■7■■■U ■ ■ _■ ■ _■_■■■■■■■■ ■r_ 770 .�... ..___..._. _. �■■■■■■■■■.......... 770 ■-■ ■■ MIIIII ■...._. _■ M ■■■■ ■■■■■■■■■_ ■_ 760 •• ■■ ■■■■._. .. . ........._....._ 760 ■■ ■■■■■■_ ■■ ■■■■■_■ ■■ ■ ears r.■■t■■■_ZWAME■r.G i i ��■ i i i iiii�i i U-�i�■V■CS■J�L■■�. 750 1lAWIWA MENIMUi_ii■MOE■_sG:MMA/1'!J 750 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 ;�N > rml 1 r I i I "1;�e-A �+±�, c� °9�� 2 \ 2°A + 4.14-Y I rI \ I / cry \, 4i Qx ` . 178.29'LT PROP CHL �- I r I II I \ r0�,/ \\�A v\�\ �O a � X J /i\ _Q FENCE ISTws aiw„ I ��I DI lb I \ 0I �\ss.T C + i III I z. n . 90.00'lei.- IIeg -5 11 II 4 mac_-- - C C C�> , / \\ \\ 2 3 C C H L114711M......., -TYPE-III 1 �►e■l�11 �®11��IN ., C • �\- cONC N 8,8 i i i. l \, C 3o�/ !\i h 1. 6. Il . %_Ii: W / l \ HW N.`\ ` WOO, �i irl• F P - ---� .� Mil . -.�4111111116 Ilk 'El) C/ C C C _--�- C A� ��� -tin, -. x X x x x x x— � yV -1141111 s'R n ..• _ __Ialleilikiai •VP s Oa• \ AA lilts• PIF IME111 _ I�MIMNir� � Y9LPA —— _ / _ v M� r T I '- z4•cac L4^ I� �� _ - -0 i \ \ MTL �.�- ` T MTL i I' _ - �: _� - T- r--i--z--r--i zMIL-x --i-z--r--���--r--i-�-- - _- 91 �-MT_L T -z--r MTLi --r--'--- M r ♦ r ---:3-i —11 \\\\\ \ ®\\ ~ BANK STABILIZATION \\ T — 1-77 NB 38'BST MTL T L z--7--s _ _ MTLs-- MTL - 77 sa — -- SEE DETAIL 76 _-.-�.\ - *E-'� IIIIII1 BANK STABILIZATION I % \ \ \ \ _____— _ IliMMEW -- - aq /�'N\\— --. 1�af--� ____ F4'-C&G 2• .• SEE�EfAIz T6 11 i J. W r'7- .`T . . ° r mow}..n.. '. . .� U..n.in • .•.n .. n.n r . •r•. J• a ........-..v_ - • • n . ...,... }..:W r..""_ —_ ��. 5`f1. 'i�' / ^ f �� I. / •r .,• ..,.. .. •. _•_�. ,- - , - - -*>"-.__ .. i iP n i G .- in.fiunnnRn ..4.. EEg e.iil..n i•it bii.ilG.f . ..._. _ I ° - i . $its . )� r ••m I ?� _ c � . .. ...ie�..... _ -!� �. ],...-�. P,. G SCSn.Cia _ 1 nn.nC r�Si.m - A...6.3i� "-E.� R.!! :¢2 - .... i.$ i. . . :•: r ._>,...._ .. G � lid a`•' i d�Z�+� .e�.,14's i.� IS es�'�Ee..... � m C'..nn• .i ...fS'-�.. .c,�I � :_.u. {�i�i .►iniii ii{' e , :-, Ii .,.. -r .i:n n �r, �l ap .eri Y �>rise..:>,.•. �N ... L3igR _ - �`°i.•ai.e x --- ._ .__.. g�......,..._. . e_ ��q ,�ue.�...._ r 7i n nrsea tl rr p4< _> '�\� � - �• � wrF � ,�..as ,�_,..... �..._.. . ;._;'Du., �,.,::.it�r.__.��.,h• •�a 55. • _... r ....... �c i°�-2C •e��'I��'-I�DGI��.� ...�r, !t �i � � �n .:r I r _ - i '7 W/' iy�risi. - - " ... p I g .A.-- - -1°r,;- .-- -- - . _ _ _ __--- "�`�_*.•,i"r i Y ie @^ ..... , �::: ,.- .::n1�iM n -sn grul.W 1F ( - rkzil�7 m � l i� •i� bi . ozeaac � �t � .�tg;S � xPoSEU IN CREE exlsnec R� �-SI �� - � 4.- �''.nRl,7r�!�..•.. � 5f __ .e -Ji . ' � __- to F •4imia• • `•-w- - i D'i &i EA._ S k;a". _-ry - 1.—V •I +e -- fl cc:�� i'. __BSI' PDE --��51 PDEE, • . •1E_- ��E •° c4_•. � .PDE --- • i i _ N ._ Aa`>,°• i *{:;•"•' I 'i we a.-«�..,ttA r. SEE .ETAIL 5' /I�SK..:- • .>.srn ir'w „� _ ,• re --- -_ � Y __ r� ��J .J 9i.=/ .V1 a� z zi _ R /+2 •2-Y•_ v, :-� ,. :5 III �ir�`-siii - II �� •• - - • .. 94.52'LT '•,� MOCNY REVOCABLE N 865659"IIw Ih I -.. 07 C r•Np0110A-SIO: - TRUST, RALPH MOCNY& v - i .' i � �:ai.c- aiaiiii,.n►, s ll. .� . i.?� , = -•Ply - I�- __ .. .. .. I - -- - _!'�`E --- Ihi. c0 / G k �i•if•�������� �\pi♦ii ��I Ate •14429.EMTLZ'&L-\ y.CURB N 04'4619 E 6'CURB O 0mlmIn •• ��Qj�j�Qj�j�j�j�j�j�j®� •`:.+i it I- a,a �1 11' -—� ls_cac ° 356.07' o�' // "' I■Ir I a F `z� 1( 751 r M INTERSTATE DEVELOPMENT COMPANY r nn. - ,.,s t.•,•!•,5..• i a..... y �°�Y Ca `j'. I� 15: d % r ., rI ������� i► gaA�tll� u ;•tzar=an+tlri far— II II coNc .;S. I J 0 #17 p i r ��� ������AO��O�iw�*���i �,��{ V IF.' 'Ii"3I I*, Izrn ISFBUS I` S od I � z II' SB MOTEL STATESVILLE CORP. I�Rco +50 86.00'R — i• �®iiiiii•-• ,•i4." I�,�1 6���, +L_ 11�'°' II y � eire:•�j����' III �1I,•� IIr', - �, � � B 81°i 45"E !rip��• a �� =�30'..&G - ,/I li II. f I a•:a PIPE OUTLET CHANNEL rn ��A� I z I �.r, •59'8 " Ih �I / NII STABILIZATION I �, l ., '° 30'C&G 1 //�E �0' BS/ ISEE�DETAIL 54 �L] Z 9CONC #y o� I o�� ��_,2CONG �Ij" Blip GAG u a �- END RET.WALL l pu1I f �JI ;-Y pn1p �u I °a IMPS r , �i�- \� SUMMIT REALTY I �Gn'��1,'�a'• �VF wl �, 8 II//aI Iw / liI�'' II CJT 100.00 (J0.00'RT �`�AND DEVELOPMENT l�\\ 4F, II h --,Yuctnn .RET.WALL l I +Jm I� h ,al'�m o I! �( I fi n COMPANY, LLC I II esT 16•N,. n p/'`///'��1 i s ( I 's Io°3�' esr III all I I� I wI �� \mMj� ll +50.00,86N0 IT II • 12.1630 W I BLK IS'C&G �c N01 o N s>rL. -' .�n '/ III 1C�o mmmum, I I I ' a �Ol esr I wnu�yc I, *. II :s I ..q� IIh NA .7v 95 I I ~ °R e figitif l -- III ,�, __ +� LI5_("AG =was— °r ' o fm �13G_cac�oNC �o 2 1% D 'II. i I At' 64'c 50`' 0' S0' 100' T 3 w`, •• l IF I I i-•1 .I.EI *° --.r 1; I � •xar.<:¢i I� I t0��E I I /�3 N / / I °8 CON` _ .- `�nn I I I ,11 15.c&G Ai WAL 48'CO C N N 08'35 08 - n '" , II 7,.wy• `!E,v,.. w I I I 1!_Ir{ we �r -_•ranLTwaLL „ MOW - _ =I I I � POOL 70�� III e.m •' SUMMIT REALTY AND nl I� i II 25' Cr Cr PROJECT REFERENCE NO. SHEET NO. co /-38/9B W-4 El IDW Y Y!!!!!!!! i!!!!!!! ROADWAY DESIGN HYDRAULICS I ENGINEER ENGINEER - RET. WALL 3 1 5-a �. . II • .I.I AlME •.� .=; .7..E.. EINE II.: III 7MM -I II19• I�i.il.Ni7iGrLL�.. .,ylpTlME .-II._ nllil.n•J% nI.. • DOCUMENT NOT CONSIDERED FINAL Ilia . .m ,n. UNLESS ALL SIGNATURES COMPLETED II II...iE--- .n I.,_- II ea .I..RWIOGGlllii-MMMJGiGi=omM0mmmmmIl mimmG.iSiOeDDilg7 111 !!!PW_>INVIIAI.7.i111/Illlll - �► II ! . !n5 11lR a _ MEI lour.n• LIIT.JgI>/ Omit / MEIlni MEI.-MMEMOME.l- ��.y II in !!. •' ` '!!!^: ten. NEI . II 111 "ipol I II _ MEI .11l..i• M 11 '➢MMI9 ' !!G_. , ID!!!!II!!I�'IllE71I.1' •... - 11 _, ' 11 _ it _ - - _ '_ —- -- ^� !!. 'moil .. 11 .\..li' II .II.VI%lr/%ll/i_I!' __ `�!!UI MNomEI - I •1..4f. 11 I _ __ of M..l! !!. IIGNEI �: III 19i - ..:o ... 11 _S...Nom II ................. :�. 5..i 'I 1... . ..I Ell _ _ _ _ _ lr. ..I . 1111 - -. iil.R!5 E - - - ��p:�!■,�--,= - - _ - -- Ii_ "' ' I r ' ._. 1•!!`_ ~ II: to+; - iii -' ..I II ai2571.::_ f• IN lo. 11MEI II n ,n MEI 1 - 5 _ _ I� n u NEL :is MEII • II ��• MEM _ _-. '.yS u 1 , �i '\ Pm - •11 - miriii.i0i..31%I.VIUl. ...I 11 `Ii c n1lPIII ';. ...li =�I•E� .II .\.mill 9.!' [7]I_•n 11..IIEltil MEET ►i T 'II ilonn s�' • -_Y.._ _ - • '�!!_' EMI II.El.fi•� IIIIIII�I�..IIIIIIIIIla9� . ''MEMmmmmmME & '� .\ 111-71111Y111______ .. 7..� .I ...MI MEM" E.Idl EMM PM MM II i • I-, - -1�f1.f1�.R71T•...fu�l.. . ... ,L Mill M, =MEMMoc- ....�. ..lin '.� - - - -:. I..an IIIIIIiGi:7.�7 rtil 9.4 PI WAIEMMIMI=MMEMII II n uuStl �.ig' 'E..:i' .... .ntirla.nr..1.7.n.96iGSidi•1.Fi7�1nl..lSnT..77L11..^.cr..annn. o njpn-II a :.1..L6Lf1.LLl..1.IIIIIIIII.I.I IIIII.lI•J1.9.... 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 Mar PA \d a�� \\ \ eo m era„9e - i ��r NI�I�1�1011 1.1 III-d7a„SL O... - - - - - - - a•5(... ' � � 0 0 - RI-d a„f31 8/ �`' -- 3 3 - -- 7"."."""4"444\44...a0l,s \ � \\ IR 0 I iw_�, 11.pL: is ,O. _ •..- .. gni ``` I� ` �g 62\�\�\ / / ////�• /'�441' 0 0 0 __ _.kl ��I1�.�7���lib 30N33 - .... 1Ho _ '�` �'- \ \ o� s _ �o� .,-..,� �°J X- 4 `` fsm / j -. - \ - III] o111 Qa 3- �'c `.Stiy\Jg ` 20x00 \ \fib \\j\\ c / I I I 0 i .- ..• \Iq n III ill m •9b Od £8£ 80 `� >• •4Z` + s \ 1111 .gym I b'Z Od LS£ 00 y2 I a \\� n\`� \\ � \ j 1. I I w� i N011`OnU3 30 U?JV08 a�� s `•t •. \\ \\ �' I `1 1 I - 0o i 3331 S31V1S 30 A110 \�=\ no.` \ `� v' \\ \ o �-Q o\\ I /II h zy 0 d of is d d0n.•. �\ .., \\\ \\\ \\li V j \ - - f /il I. ` 0 J Q ?' °\ L� \g (VD 0l0 3 3LiW BEG.RET.WALL #3 I \\�\ 'B \\ j �� �, 14+13.38,28.00 RT o� 0 � _,.bz �— �� Li 16I _ I. ,Iri \'� �d�•„� \ \\\ayd2 °�.r � 15+00 oo.b � � �.. , s \ 2 drroa as Y9LA 4 25 - -11 o dons d > \ - ` �`` \�\ _\R��_J` ...:a�.. �y - - - - 1:111_;‘,P �irIflvM�93' w9a onw �'0e q_N.T.S. - scaoe Jno nm \\ �.,yt ` -y,`y \\`� ise ez drrva as�t r —_--� —�' /��Am DITCH GRADE ROP.i BEHIND WALL TOP OF �� - b99b0�d £88£880la'9oa NI n it uN7H.7 .c•'(d \ �, r.. - - - y — — :=wo1 ��®�//�I III ~WALL .. •bo'lla-d.. �_ - — _ _ - - - —_ — - - - - - r' "����� �' I�SL sEN sssl as �2i �. ; Nolivona3 Jo aaeoe II > -1n0' - _ _ - - - - - - - - _ _ z - _ 4 i 1im((f li ql- /q' 333IAS31V1S 30 A110 1 YrI�1,IoossvDrc° Ps. asHbl II 9964 .. w _ �� � ��y; lllIE [kll�el 03WOH - M,ll O S lH�.ab .. M.,ll,£S.O 8 T-T °W © ` zlb Gd OOZI as I • © an i. s9 u . 1nNS3H �d d � �- ��M a-dG 3 FINISHED NNnO .0 02JVM03 0 .'w 3111111811111 io n 1...!;.ii,i1 - GRADE - ` L. .- m 1Y i • 't ON00 �M£SOl J•• 99£�Bdv 406 Jd ObOZ :. . III-eDa ��p'"� ii RETAINING WALL DETAIL • o I zb9 awd • N i* nh o � a- 8 1100. .` P C N 3Z661 , ' 00 No a �*.�.7ti...1J1, � �'�VD "fir . ALL #3XW°1 , -IH - / /it N WVIVONBSI L£bl Od •OO.'I 40.00 RT= a I1 808Z Jd Z8Zl 80•,- 031�> Z '7*j. 101113�NBSI {.iy„ Zi o / R 49I b311nH it * S VUN3b83 s(' x, 'H S3l?JVHO '* . S6l Od S9b •. * *# .*,.7I I ! 09901 �I��i 8395 o III a Jsz I 9 4.4,X*:x S_ 1 ***1iiti*uz r 0 '0 aawc•>t t g l a / rat•xt l.,�m' �, NCD NABNC LA E I -\ * moNoo Hc;p I. .!oC. �n W ce3 II ai ON00• .NO a 9Nlislx% .f.miler, .. ��� 1 !' o a z - Ii [V� n - 0N0.� ONO.) 4 ,'.. . 1,,NO i 2 c �f -.. ISN•I .- w 1 D.)RldC1� �. morn, eana.9 > nl a0a.sl [1l'IL�j�� < 1 1•iPi!ry7li.r1..7rn17:ra• �� A• 11 l ss 1 , ll M/a'JNus9 �W,; �ylplr• lR �l'' �� ® 158.5'£M XONX .�1 �i.. ..9",. ,OH'LS' N la W i,do 0 1 • I / d0A.8 I O ss_— o� Q r• I�■ , :;►/ �i. 80Z-V6A8 8•sza doHH ss a 0- PROJECT REFERENCE NO. SHEET NO. 0- I-5819B W-5 r., ROADWAY DESIGN HYDRAULICS to ENGINEER ENGINEER 960 OF WALL /G 4_5' 1 I I , PROP. ":NM Ei E MM Jim_a_I MA•m g 4'N lRk. I -;-.„Lr,' I1I1I1I1I1I1I1I1 r 11 m. 11111 ,. 4,3, II TOWPA ;OF7 4 11 - :M, 1I,/I M_I'M/JWE:950 RET. WALL 7 3 D 940 IM EMMIAM MIMM MM DOCUMENT NOT CONSIDERED FINAL uNssAuSIGNATURESCOMPLETED RETAINING WAII DFTAII 930 i!i L ' .: .. 111/IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII930 920 ! IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIm iilimm . _I ! 920 tM 1:::::comoommunmom /I - '-,MMMEMMOKMMMIMMMTMWMIMMMAMMEM*Zt: ;" M '10 M Ir 111111111111111411111111111111111111111111111M111111111111111111111111111111111111111111111 1611111111111111111;;;;;;;;;;;;;Eiiiiiiiiiiiiiiiiiiiiiiiiii 910 910 12 • immimmiminimminimm ; r NEM (f) NOWNWEEMMI 1115,111111Ir'551911M1113:111111111111111111111111111. m / MMMM----''- _.._- .. MM IIIIII11111111021,3i1111111111111111111111111111111111111111110111111111P111111111111111111111111111111111111111111111111 =MENEM= „ 47:7=• NriigiNEGM;MZC7G7MSCM-1::M E - E M EM;M M•E=L7MST . 711 .. -- ZEZEN M• iii M• ;.W.E o -- 900 :::::::::::::::::::::::::::4P _ M ALIM -- . , OVJ mmmmmmmmm iiiMM EXIST 71E .. -----. .. _ : .AiiiMAUAMOMC:;::::::::::::::::::11111bigkir111111111111111111111111111111111111111111111111 1601 900 111111111111111111111q11114r11110291111111011,111111119M1111111MINIIIIIIIIIIIIII TiV, • .. lame . t• CD C) :::::::::::::: ::::::::L. eil ..- ' -: I c-, -.2 ::::::::::::::::::: RMEMiMMEMMIIIIII1111101411111WILIMMMAM m:, :7 ; 'I mm!! '"mammm ' m... ,.. _ ....s..... 1111111111111111111111110111491111i11111111111111111110111111111111111111i111111111111 ot: •11- gr • aMMEM • - et ._. h. MI mmmmm MEM M ''1- St_ MEM _ - 890 • m a mmm P.I. ' m' " 2"2"..A7an.k 0-, 1-11111R11111111141111111111111111114111911111.1111111111111611111111i10111110111111111111-11111111111111111111111111111111111111111111111111111111111 890 :" -11 --.1"1 ro 7 -7•Rimolpiimirrimm.D..in .11E ..i. n: 1: 11: E '- :,- ti :- mm :m :_ r :A;m r7 ;. ..;. :: t' !:•Amilinliimiiingpmmimmimmimmimmimmmin 1111111111111111111111111111111111111111111111111111111111inin '''mm!.. "-= 4 . P.!. ..! - '-'r 1 - ..! _ - 7-- - . . ..:::::::::::::::::::::::mmmm .1..., c i',. : 880 1111111111111111111111111111111111111111111111111111111111111111111111111111111111""" mum 1111111111iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii111111111111111111111i11111111111111111111111iiiiiiiiiiiiiiiiiiiiiii 880 87011111111111 I 11111111111 11111111111 11111111111 11111111111,„7 ro--, u -9, AI r i;IF • 'V . ' 1:"., ' - 870 194 00 195+00 196+00 197+00 198+00 199+00 200+00 201+00 202+00 203+00 204+00 205+ Si ''r ' lir I erl, i G.L. WILSON BUILDING COMPANY ,. u/c ____. _ -- -__ _8.\/CP Tv EXISTI / BST ___2_,-- , 1 r• ,P-G2--- 46 -1----- , -- - .., - ..•00411111.1111‘ ------,-- --_i:- _--,, _Tv 15n R 14,_ k - II ,, _ ' r-- :',/P 001 i7•AMIM.--,v>,,,,---- 87ms -_________ ___ '.-'- :SF? Y/5 a ;Jr , •-,, ---.4 ---- Niiiim.. --____,- - - ''. I .... .-- . .''''..-.."2.1r." 7 R-2437 WIL 5°M PAR111111RD 21RMIMMM14111.11.11.11101MM'' ' 'MEW 1 2' .'''- . . ,/IIMIMM 1.. 111=MMEMMIIIII=IN...4 T L G R “C 1.1111111WOMMII.1.111111111111116r C,L -.,..' - '' ..4 '' l't , ti.117 "IRJ__ GRA1... . :.,..i -L-__'. Mis-W.a./..--F—. -, --. —imism•s7 -wr,.-WW.AWjelWra ' . —.7: =7. riralilaffilli ' in 111111 - W ' PROP CHL FENCE _c a -------------- (1 ------ s_ ill, MINIM illffillal MMIII. =I SECT 03 -nhab. - - 0--0-- 0-- Er--0-- 0- 0- 0- 7 0-- 0---, 2 ol MillEMJKlitin 11.11HEMMEM--n---3 °.G.BI [I-- 1) Er IF At,80 12 57:FE . M (,1 /40 EB 37'CONC 1 --- ---Ir-8u 7z 5/.-5-E---- MAME W.— i "M r 111,1"6-1 '1111M. 1- MIMI l_ii_ r0+00 -.Emil -• to 0 o No4E 1 CAT-1 N. ',.1.4,,. , * ,/±" ---T -7--" F -, // I--- / - F I --- F —----mmmmmmmmm--_ ------ 0 Fl C C'IN / / _.,013-__-_,--,...„F C C c ..„..,.. I TOE PROTECTION N I -, / W/CLASS B RIPRAP C c . . c— :,,, , tr,-.),,,fc,-g-!- 1 c c, -„F N N I SEE DETAIL 31 a . / I d "---—..,..:: \______F --- Fy ,..,,!' / <:<c, // I •48 vow EXISTNG R/W - - ..:.• ••.,r.Z.W.'nn'Wd -, .ir .W.411411.11rents, 111.111W I3'GR EXISTING , 0 _-- __ - f2iGf_------- - ---,PROP CH FENCE ----- / A S\ - _ ' 44;1' st ts c' __ - , 4• • 11 t 'IRt -----_____ 1 - --- -65-4T-',' '.' ----------.-__ --•)( ?04 / ,/),/- 4 t ,,,,0 0 li, / TIE TO F F-,,,._ , ,,,, , al k PROJECT REFERENCE NO. SHEET NO. /-38/9B W-6 ROADWAY DESIGN HYDRAULICS Lc 880 ENGINEER ENGINEER RET. WALL 8 870 860 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 850 .,� � ■■��,I,��_.;,:� .. ,'; .� .,,I �=�I,,,`.,,■�i IIIII � � � F• � I ��� 850 11111111111.Iflyil11■1■1■1■!'l11.1.1_���!!!!!!!!!!IIIIIIIIIIIIIIII!!!! .I■!!!I_yIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIiII�i� 'INN l�llhilllllllllllllllllllllllll I�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIh 1111111111111111111111111111 ,_■, 1 111111111111111111/111IMIIIIII i� E11111111111111111111111111�11`IIIIIII�1111i1i.111111111.1L�17.1111A�i111�111�1��1��1111�1111111111 """""W'" NI ' i .,I "''�'� ' ■ IIIII 11111111111�1111111111 ' ,1 I - !l����IIlIf1i�IJ.i1�1Js�! 4 i 1111����� 4 8 0 ■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■ ���. :■■■,■.��,G■1■i�i111111I1!J.��tI11111111111111111►111111111111111111111111111111111111111111111111111116E 1.J.. ■■■.I fll� 8 0 -;;;IIIII;;IIIIIIIIIIIIIIIIIII IP111111111111111111111111111111111111I'1IIAIIIih.i:iuuuuI IIII 11 IIIIIIIIIIIIIIIII11111111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111l11111a 830 II ■7.11■Y•'E3�p . ,/%Iq■:NI`IIl■�:,..,,n.■==- .�...�I IIIIIIIIIIIIIIIII 830 1IIIIIIIIIIIIIIIIIIIIIIII111%111iiii11111111111111111111111_11111111111.mn:IIIII ■■i ■■■■■ II6■IIIIIII — . ._-___ 1■ ;;;;;;;;;;;;; IIIIIIIIIIIIIIIIIIIIIIII RII''I111111IIIIIiii1II1111m: :I __ L.-aw =.■ _.- --= ; ■■:, �'S■■un■■■■i�■■a ... - � x _ -a-- _1, iii;;; ■■■■■■■■■:■■■E�y�:=Grp n '---": -- 7 ' - - ■■:in■■■■ri=■■■a■■■■r-iirn■■■■ri-Ilt �JI"i" R■■►A■■■■■L■■■p■■■■6i■■i,. _ ■ 820 ■■■■■■■■■■SGii■.......11111111111111111111111111111 .. a _ - ■■� ■■■.. - :a■■ro __- 820 I111111111111111111111111111111111111I.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiii11111IIIrIIIIII•IIIIIIIIII:IIIIIIII*11111111111111111111a1111101IIIIIIR111I11111111111111I11I111111IIIIIIII,1i11111414111114114IIIIIP .......::::...........::: 1 11 I I 1 I I yl _ ;� 11 a, r I I 9 I ► ■ IIIIIII�iIIIIIIIIi� IP1111 11.1111111 II IIIIII�II IIIII PIMMI.IIIIIN ll■ MIS,II!IM111111111111111111111111111110111111101IIIIII1M11IIIIII�IIIIIIIII IIIIIIIII11d1IIIhIIIIIIMINIIIII IIIIIIII NIIIII II ;IIIII IIIilll1151lllliJiiillllliiiiiiiiiiii.' .. n -'I. •` ■' :! . - n.■■gll 810 - - �... 810 11111111 11I 11111I110111 11 :111111111111111I11.11111 G '"° ' 1' "'"' ' ■ n■• " ' IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIi1111111Illlllil - n ■■ �■■z"""1 1111111111111 IIIIIIIi111111Y111111111i11i111111 I1111111II111111111111111111111111111111111 1111111111111111111111111111111 111111111111111111111111111111111111111111111111111111111111111 11111111111111111111111111111111111111111111111111111111111 11111111g1111 111111 111111111111111111111 soo IIIIIIo IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiIIIIiiiiii - 800.....i..li.l...............................................................................................IIIIIIIIIIIIIIIIIIIL. ....................11111111111111111111111111111111111111111111111111111111l . 61 21161111111111111111111 790 • IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiIIIIIiIIIIIIIIIIIIIIIIIIIIIIiiIIiIIiIIIiIIIIIIIIIIIIIIIIII 790 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 05900•,RI WF �-<s so<Z C� �\ .\\ s\\ \ q\\ m\\ - Ste T \ ` \ Nr\ ° P N.T.S. 9SS "�' ��o. ��. '\\Ohl I FA 0 c" \ \ m \\\off o\ I (4 F I J DITCH GRADE PROP. �� 2oF ,o \ c ' I . S 84.23'S7"E - BEHIND WALL - :''s" `�' i Fr� 01 2'50'54.3"E 1ss4 /�; �X NC GRID NAD By95 TOP OF vT , r �o - o �2./ WALL S` PROP.CHL FENCE \�\ e / c+ �'=_z�° #8 �OFi'.',0 z" NIA PAVED PS. �� \ ■F`d \\a HEASTADVIry s�30:C —1 � II :0.R0E0Tio.vvilLoz; L1 . - 72'PVC_' U p * DITCH M P & F ASSOCIATES, L.L.P. �\. \s // SEE DES B `P �: o � N * - iX G� \ oc�EE NAIL ^? 4 -72 PVC !N d © d FINISHED ♦ s\ \ c,��s !�J B� v APT�1 ' �Z �I ...tr d GRADE \ \,\�'i� "� °v II-1q .�� U cNo - I'i S,' 14 \ `\. •°\t -2--�0•C&G_�J w `f6 B ' - 7r Pvc � WILLIAM R. AXLEY RETAINING WALL DETAIL G \� sa/W' \ p\\� F�� C' �•N w C� I H a o •w 0 N > u oo © e 04'O5'46"W A 1G a \ \� - a D o o �.� �,\ x 456.66' EIP � �•• i> __ _ _/;pA � / 0/ i i c o fy :iNJ W ........ __ SFr �' , C 01-72"PVN_` P9C X X Cq _ - _ _�t �� _ <.} ;'sue -. 48'W - \ �� .1 • iF D RAIL �X X .. - ., �� _ X ;��"• � OK PUE ,2 7(PVC' a �� :p` �X_�X 48'WQ RAIL 1 _______ '` \��_ '��1 s ,5 ,4'3DD W 9 EG.R .WALL 8 ,--- . �y f" tt �` ' ,D. �_ ,; p.. D /0/+50.00 : ei .\ .. ��t \\• *.�" 2 9 . WILLIAM R. AXLEY m Q EXISTING R/W /'� \ 0 \ / CAU`� t(.� 2SBARN PROP C>-FEN• R "i C C - C ,`♦\ \♦ ♦E�� \\ \ asp C C/ 3 ._ .. A'� -EXITING R/W __ _ �,`- �j\ - -oillig see' ,I �.‘j-_ '..._ -_ - _ ''C ---- - --_ ` a°vcP _ = iNfr peri, it �.i' Ly �EIIP R/ 1' ` — � r ---- C C 1� -- iiimmiiiiiiiid / ~r 4-05+00 - \W ann _ _ __ _ — — — —= s m W __ la - i ' - - - - - - _ - - - - - - - - - - - Ir r T i I MTL r i r- r- 1 MT - - -r i MTr - - - u. �� _ -- - - —Z r i i T � � T ti -- aJ .0"PAe iMTL MTL i--L i MTLL i L T s _L- -_ MTLL-_ - �\ 13 �\ itlilli PM �� ;� _ i_ O —► 111117.ftftWftaft"j"""V.°1""1114.4111: . immi ..- ... 11 —...._.._ "..r... 48"NON y _ _ _ •�� y - -- -- SR 2322 SIM A70N RD,,-H57�C` r44widist-717‘::98.n,�� !F - f B RIR RAP — -- N 4 - 4D15 _ � w_ 5a'oo.�yE N �'oo.o° _ __ -parffit � �.� aiiii' �• � 1 .� ------- » --_- _ __-W� -_ 2g - . N SY v - :.�.y. n'T7GP— ---fB- _�y -Y�L SR 2322 S/— _•'• • _ 7/.� �- CB _ - - - - 1(bq - N R BST �` �) ML 0 PROJECT REFERENCE NO. SHEET NO. 1-38/9B W-7 ROADWAY DESIGN HYDRAULICS LcD 880 OF WALL ENGINEER ENGINEER RET. WALL 10P I PROP. IIIIII TOP OF I WALL 1 2% 870 FINISHED GRADE 860 DOCUMENT NOT CONSIDERED FINAL 000 1 RETAINING WAI L I)FTAII UNLESS ALL SIGNATURES COMPLETED 850 ''JN r.. :Ju.i ■"I id•,: I:, iS_� 850 III MIRO • • ` r- 1"1w 1:ZW�� ��111111111111111111111111111111111111111111111111111111iii11 111111111111�11Iiiiiilili'iiii11111111111111111111111111111111111111111 iiii11111111111111111111111111111111 ■ .■■ ° ' 1 3 ' ■■ uin_i ,r - . ,i- r ■■■■■11111111111111111111111111111111111111111111111111111111111111111111111 11111111G11111 1=111111111111111111111111111111111111111111111111111111111111111111111EIIII11111131M1/111111 1I.1■ •J--E". ■��.�II■■��--,�:,,■:■. ■,.7■'.."'..:"■■■ 1111111111111111111 111 1111111111111111111111111111111111111111111111111111111111 111111111 11111111111111111111111111111111111111111111111111111111111 840 • 1 1111111111111111111111111111111111111111111111111111111111111111II1c 11E1111 -:_ ��� m"iii � __ ■■ _ ■j� -__ ri■■I. ,ii,■er awramr' nn■nnnnn■ noon■ nnnnn■■■■■■■■■■■■■■■■nnnnnnn■m■nnnn :: nnnnn ■�•--'■'■- ■■■ ■■■■■■■ ■ ■d■ ■ ■ 111111111111111111111111111111111111111111111 111111111111111111111111111111 !- -- . .MMMMMMMMME......... I I111IIIIIIII.. 11111111111111111 830 IIIIIIIII'lllllllll111111111111111111111111111111111111P �€,11111111111111111gF11111111�1111111111_` .■11 � � •••••IILL■■■1111■111111■11■11C1111�..:.-�=�..:11111111i111111111111111111111111111111111111111111111111111111111111111 830 _ 1 ;�. .� .�� I d1� 'gym No s1 _= - _ - _= _= _- - 1 1 1 I T 27 ;ro o 11111111111111111111111111111111111111111111111111111111111iiIIIE 11111111111111111111111111111111111111111111111111111111111111111111111111111111111 ' � 1 810 ■■■■■■■■■■■■■■■■■■■■ ................::IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII- IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII n:.am El°848387:1�...:::1111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ............................n 1111111111111111111111111111111 ............................................................................ :1 1 111111111111111111111111111111111111111111111111111111111111111 11�111111 E1111111111111111111111111111111111111111111111111 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 800 1111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIII ■ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■'■■■■■■........................................................................................111111111111111111 790 . ........................................................... 1111111111111111111111111111111111I11111111151II111111ia1111IO1111rillF;rMM1 790 106+00 107+00 108+00 109+00 110+00 111+00 X x X- X 48'WD ITAIL -'�-- -__ NC GRID NAD 83�15 C �� r�� �le\\ ` e -- , J,- :S-"- fiFt- Nfib....3::_ctiTok ;,,- : 4';- 4111114 ht All' WILLIAM R. AXLEY �� V I� \ 2q„ �' P'OP C , algtaitOM - . 0 c SW ____ -,...".•_.-_-._._______ Willit&CV '-> \ ----'.-''-----&- ' --------- .TL_L ___ 4. pl � -T--r-�-_T--r-- - -- --y �--r--y-�_- -MTL}�-51- -- -�-- _ _= a- ___ •!� ��^ i 7-'41---------„i: __ _; ....„..,,- m- ----,-- A _ il � �3� OSE�``_�\�_\\ --ima ' iram- .- '�] J-__. _ O .``3.- - /C� Miro m5���m :� �[7SR2322 SIM NrON RD1��-�'t]m1=1�_ Fs�R,-`� / - ' ::1 �' N 9DIJr8�OO.O�� c®�:� . . .41114H- 4/411r � i,_,,, �G, pg. __L__---,77R — -- O \-N, r�- cP % �i F F •6 • . --��-_,� -w-1, 1114111 - 0 4 n `� Villik.4;W RT i? WIEWNW e.F -mo =c,, -+ T ++ -� 1 / --- -`30f ��a►•aiti�! I\ %�F c yFic3 it.�"`.. _, �:�IQr�.... r m omBh i . �`. •JIB"C&�G� - ------ -- _ • __ In SULLIVAN ROAD J \ �•Ir --- �� / \\ -p 1.51111 PROP f�`i�Ff -t4 ■ co / _ I _ PARTNERS, LLC 1,I •It. W ��► ::,,,,,, 'gyps -� - 5 BASEGR s.� DIA<� T i,■,#X `M•� E_ ON70N_ \12\'''\4:4:\**1.> S ,, O PMp�P�S - ETn n I ��T .r i ROC WALL + T) �� eE.ESE` GR Io1 1 ''I T ROCK L a A4SUPERIOR PROPE' nLIMIT P1 c� ;'� 11 x �Za+n� ALEN EC.RJO :i1 �i AT. ALL #l0 1 Ili, it I I END RET.WALL #l0 o � v� # § 1 JOYCE R�_ I NIp mov• - AN UNDIVIDED 10• �'%MT10 `-. .50'RT ��II -Y_S- ll0F8/.64,75.50'RT ofws� . . .e'e s 7s --le'c&c I I I �-PUE .µ .11 ■m s 2 )M a I`" PU ��h s. 1 gll 12 t7�y� O o.. L�l! GR GR I1A1 I o I ' � � 1,� o� N•v y c, --te a I SULLIVAN ROAD PARTNERS, LLC N� A\14Vv F� L• _ 18'C&G IB C&G --' ( TRACT 4 t��a \ s' \/ `q N. 03• 26'WI5'R •DI i i�rrop •;,e ��p�Gyi�'��f� ry l9/. N o! 264.20'_ ��yT_k•........--�.y�.�m3G:.j'1�1�1 "L