Loading...
HomeMy WebLinkAbout20190728 Ver 1_More Info Received_20190724Strickland, Bev From: Krissina Newcomb <Krissina@Halowensoil.com> Sent: Wednesday, July 24, 2019 10:20 AM To: Goss, Stephanie Subject: [External] Re: Meadow Bluffs Subdivision Phases 3-7 • Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to am nc. ov Stephanie, #2 The engineer listed grading of the road's shoulder slopes as a temporary buffer impact on the map. Its my understanding that grading and re -vegetating in the Zone 2 Buffer is "allowed" or "exempt". On a previous project, I was advised by DWR staff not to list this in the table of impacts. #3 You have an amazing eye for detail. This was a challenging bit of accounting. The amount of Zone 1 impact requiring mitigation at this location should be 1219 sqft. According to DWR Buffer Interpretation/Clarification #2010-001, if both the buffer impact and wetland impact require mitigation, then the wetland area should be subtracted from the buffer area prior to calculating the buffer mitigation. So the impact to the Zone 1 Buffer is 1341 sqft, minus the 122 sqft portion that is also wetland (buffer impact not requiring mitigation), leaves 1219 sqft of buffer impact that requires mitigation. This will cascade down to the buffer mitigation calculations in Section 6, and 366 sqft less buffer mitigation should be required. Let me know if you have any other questions. Thanks. Krissina Newcomb Hal Owen & Associates, Inc. PO Box 400, Li I I i ngton NC 27546 910-893-8743 www.halowensoil.com Find us on Facebook at www.facebook.com/halowensoil On 7/23/2019 10:57 AM, Goss, Stephanie wrote: Krissina, I am currently reviewing the above reference project and the following items require verification in order to complete the review process: 1. The Corps of Engineers must also verify the Nationwide Permit that is to be used to authorize this project. [15A NCAC 02H .0502(a)(7)] 2. 1 noticed one item listed on the impact maps that are not on the PCN: Impact B1, Zone 2, temporary impacts -1,894 square feet (Sheet EX -06) NEUSE RIVER BUFFER ZONE 2 PERM I KI PAOT = 700 OF �I ZONE 2 TEMPI IMPACT = 1.100 SF 81 2'onel 5517 sf or Jr d NEUSE RIVER BUFFER 00 2nNE 1 1 MPACT = 3,M SF B 1 • 2 , STREAM IMPACio T g1 NEUSE RIVER BUFFER L ZONE 1 IMPACT=2,491 SF B1 NE USE RAVER BUFFER ZONE 2 PERM IMPACT = 700 SF61 f 20NE2TEMPIMPACT =791 SF 3. On the PCN for B3, the wetland impact is listed on the buffer impact sheet (it is also listed as W2), this impact is listed twice on the PCN? Impacts W2 0.003 acre 53 Zone 1 1341 sf and Zone 7 891 sf No stream impact. Directional bora will bs 009000 used for installation of sewer Line. .s t Thanks in advance! Stephanie Z. Goss Environmental Senior Specialist Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 276o9 919-791-4256 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 2