Loading...
HomeMy WebLinkAboutNCC191073_ESC Approval Submitted_20190726BUNCOMBE COUNTY GOVERNMENT `NORTH CAROLINA- Buncombe County Planning and Development Nathan Pennington, CFM Planning Director LAND DISTURBING PERMIT NUMBER: ER02019-00044 NCG01 COC#: PROJECT NAME: Hyde Park -Phase 2 & 3 LOCATION: Hyde Park Place RESPONSIBLE PERSON: Scott Street THIS CERTIFIES THAT A LAND DISTURBING PERMIT HAS BEEN ISSUED FOR THE CONSTRUCTION WORK SET OUT ABOVE. Doug Sh Erosion Control Officer Erosion and Sedimentation Control Tele: (828) 250-4848 THIS CERTIFICATE MUST BE POSTED AT THE CONSTRUCTION SITE IN A SECURE PLACE FROM THE TIME WORK IS COMMENCED UNTIL EROSION CONTROL INSPECTOR GIVES FINAL APPROVAL, A COPY OF THE EROSION CONTROL PLANS AND APPROVAL LETTER MUST BE AVAILABLE FOR THE INSPECTORS USE AT ALL TIMES. Issued: July 25, 2019 Permit expires: July 25, 2024 BUNCOMBE COUNTY GOVERNMENT —NORTH CAROLINA— Buncombe County Planning and Development Nathan Pennington, CFM 111mmirrg 0ir'ef-ha LETTER OF APPROVAL WITH MODIFICATIONS AND/OR PERFORMANCE RESERVATIONS July 25, 2019 Windsor Built Homes, Inc. Mr. Scott Street 40 West Broad Street Suite 500 Greenville, SC 29601 Mr. Street, This office has reviewed the Erosion and Sedimentation Control Plan submitted for the project listed below. We find the plan to be acceptable with the attached modifications and/or performance reservations and hereby issue this Letter of Approval. Please be advised that Section 26-228 requires that a copy of the approved Soil Erosion Control Plan be on file at the job site. The Buncombe County Soil Erosion and Sedimentation Control Ordinance is a performance oriented program requiring protection of the natural resources and adjoining properties. If, following commencement of this project it is determined that the plan is inadequate, this office may require revisions to the plan and its implementation. The approval for this project isgood for the time frame stated oil the original land disturbing permit. This permit shall become null and void if you have not fnade progress to begin construction activities on the site within six months after the date of approval. Renewal of the land disturbing permit will require a new plait revieiv submittal ivith associated fees. The approval of an erosion plan is conditioned on the applicant's compliance with federal and state water quality laws, regulations, and rules. A copy of the erosion control plan for any land disturbing activity that involves the utilization of ditches for the purpose of de -watering or lowering the water table must be forwarded to the director of water quality. "As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NO]) for requesting a Certificate of Coverage (COQ under the NCG01000 Construction Stormwater General Permit. This form MUST be submitted prior to the comntencentent of any land disturbing activity oil the below named project. The N01 form Bray be accessed at deg.nc.zov/IVCG01. Please direct all questions about the N01 forin or the process to Annette Lucas at A►t►rette.lrtcas@itc„•,,,,de►trxov or Paul Clark at Prur1.c1ark(a)ncdenr.eov. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stor►►nvater Central Office staff in Raleigh an d is itot collected by this local prog rant. O►tce the NCG01 perntit It as beet) completed and approved by DEMLR, a project permit number )Pill be given for this project that ►►rust be )vritten oil the Buncombe County Land Disturbing Permit, which ►nest be oil site throughout the construction phase of the project. When the project is complete, the financially responsible party or their representative will contact Buncombe County Erosion and Sedimentation Control Office to close out the Erosion and Sedimentation Control Plait. A Certificate of Compliance will be issued for the project once the site ineets the requirement as stated in the original Letter of Approval and standards stated in the Buncombe County Soll Erosion and Sedimentation Control Ordinance. The responsible party )Pill their be instructed to visit deg nc gov/NCG01 to submit an a -NOT (electronic Notice of Ter►ttination) form for closing out the NCG01 perinii. Please refer to the rtitached NCG01 Fact Sheet. A Combined Self -Monitoring and Self -Inspection Form for the NCGO1 is enclosed. Please review all pertinent documents prior to starting construction. We look forward to working with you on this project, Sine , Doug Sharp Erosion Control Officer Erosion and Sedimentation Control Tole: (828) 250-4848 cc: Mr. Gary Davis, PE -Davis Civil Solutions, PA Project name: Hyde Park -Phase 2 & 3 (ERO2019-00044) Location: Hyde Park Place Date received: July 17, 20I9 Date approved: July 25, 2019 Permitted Disturbance: 6.94 Acres Person financially responsible: Mr. Scott Street MODIFICATIONS AND/OR PERFORMANCE RESERVATIONS FOR 'Prior to scheduling the pre -construction meeting, the financially responsible party or authorized agent mast submit an electronic copy of the Letter of Approval with Modifications and/or Performance Reservations for requesting a Certificate of Coverage (COQ under the NCG01000 Construction Storrnwater General Permit to DEMLR. Once the NCG01 COC# has been obtained, the contractor, authorized agent or oiviier must contact Buncombe County Erosion Control Office to schedule an on -site pre -construction meeting before beginning any grading activity. Contractor must have a copy of the latest set of plans marked "Construction Documents" and showing any revisions and/or details. Approved plans must be available at the construction site at all times for inspection by inspectors and any other governing regulatory agent. A copy of the Erosion Control Permit, a copy of the Letter of Approval with Modification and/or Performance Reservations, and a copy of the Combined Self - Monitoring and Self -Inspection Form must be available on -site in a job box or contractor's trailer at all times. These documents must be reviewed and understood by all parties involved prior to any land disturbing activities. A worldng rain gauge must also he present and installed at the site for monitoring. Contractor to insure that any import or export material be from a permitted site. Erosion control measures must be installed in accordance with the approved engineering plans and maintained at all times. Alternate measures must first be approved with the engineer of record and regulatory site inspector prior to installation. Clearing limits for grading must be clearly delineated in the field as shown on the approved engineering plans. Any additional clearing or land disturbing activity that disturbs the ground surface outside of those limits will constitute a violation of the County's Ordinance and will be subject to penalties. Additional erosion control measures and BMP devices will be required if approved measures are not sufficient to contain and control sediment and runoff oil the project site. Additional measures to help control and reduce on -site runoff during construction will be discussed at pre -construction meeting. Areas of construction left bare for more than 15 days without temporary ground cover could delay building construction inspections and cause possible delays in issuance of building occupancy letters. Any deviations in the original approved construction plans or design changes to land clearing to the overall site must first be submitted for review to this regulatory office and approved prior to continuation of construction. Failure to resubmit could result in possible issuance of stop work orders, holding of any building inspections, or issuance of certificates of occupancy. Erosion control measures must be inspected and repaired if needed on a regular basis and maintained at all times. Failure to maintain erosion control measures can result in delayed building inspections, revocation of permits or possible civil penalties. Notification must be given to this office for inspection at the completion of site stabilization of the project prior to the removal of any perimeter/pertinent erosion control measures at the site. Approval of this project is in accordance with the requh•enients set forth by the Biinconbe County Soil Erosion and Sedinientation Control Ordinance and infoi-oration provided in the approved construction plans, construction sequence, construction details, and docrunenlation. Any modification of this approval in regards to soil erosion and sediniemalion control mast be made aware to the Buncombe Count) Erosion Control Office prior to any changes.