Loading...
HomeMy WebLinkAboutNCS000348_Compliance Inspection_20180417STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. �jc<�-) oQo DOC TYPE ❑ FINAL PERMIT ❑ MONITORING REPORTS ❑ APPLICATION �I COMPLIANCE ❑ OTHER DOC DATE ❑ 2o�� �%� YYYYM M D D i Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY April 17, 2018 CPI USA North Carolina, LLC Attn: Virginia Grace 1281 Powerhouse Drive Southport, NC 28461 Subject: NPDES Stormwater Permit No. NCS000348 Representative Outfall Status Request CPI USA North Carolina LLC Southport Facility Brunswick County Dear Ms. Grace: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR, Interim Director The Wilmington Regional Office staff of the Division of Energy, Mineral, and Land Resources has reviewed your request received March 22, 2018 for determination that Outfall 1C be granted representative outfall status for Outfalls 1-6. Based on Mr. James and Mr. Lambe's site inspection on April 17, 2018, we are approving this request. In accordance with 40 CFR §122.21(g)(7), you are authorized to sample Outfall 1C as the representative outfall. This approval is effective with the next sampling event. However, this approval is contingent on the following requirements: (1) All outfalls, regardless of representative status, must have a cleared path and the right of way to the outfall must be properly maintained. (2) The permit still requires that Qualitative Monitoring be performed at all Stormwater Discharge Outfalls, regardless of representative status. (3) Revise the site map to accurately depict all sampling points. Sampling points should be defined with GPS data, pictures, and site labels. (4) Ensure that the Outfall 1C is within CPI USA North Carolina LLC leased property. Define leased area on site map. Please submit the site map for our files. In addition, please remember that any actions you initiate in response to benchmark exceedences as directed in the tiered response provisions of your permit must address all drainage areas represented by Outfall 1C, where appropriate. Please append this letter to your Stormwater Pollution Prevention Plan or permit to document that representative outfall status has been approved. If changes in drainage areas, structures, processes, storage practices, or other activities occur that significantly alter the basis of this approval, representative outfall status may no longer be valid. You should either resume sampling at all storm water discharge outfalls, or reapply to this office for representative outfall status based on updated information. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional. office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 721S 'Nl-Jvvv J'+O CPI USA :worth Carolina Southport Facility Page 2 of 2 If you have any questions or concerns concerning this letter and the attached report, please contact Brian Lambe or me at 910-796-7215. Sincerely, Trent James Environmental Specialist Land Quality Section Attachments: 1. BIMS Inspection Checklist) cc: WiRO Files — Land Quality Stormwater Permitting Unit DWR — Central Files, NPDES Permit NCS000348 Stake of Nortit L arolina 1rcrn'n orunentai C} rulii y j Energy. Miner al and Land Resources VVilrt ngton Reglona; Ofhac 1 127 Carrdinal Drive Extertsion i tVfl ninown. NC 28-105 910 7C)6 '7215 Permit: NCS000348 SOC: County: Brunswick Region: Wilminaton Compliance Inspection Report Effective: 05/01 /10 Effective: Contact Person: Virginia Grace Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Expiration: 04/30/15 Owner: CPI USA North Carolina LLC Expiration: Facility: Southport Power Plant 1281 Power House Dr SE Aka Cogentrix Dr Southport NC 28461 Title: Phone: 910-343-6711 Inspection Date: 04/17/2018 EntryTime: 10:OOAM Primary Inspector: Elsie C James r i Secondary Inspector(s): Brian P Lambe Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 12:OOPM Phone: Phone: Inspection Type: Compliance Evaluation Page: 1 a Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC Inspection Date: 04/17/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Trent James and Brian Lambe inspected the Southport Power Plant in response to a request for representative outfall status. The site is surrounded by a ditch on three sides with all outfalls 1-6 discharging at outfall 1C. Outfall 5 is not located as per submitted documents, rather outfall 5 has been sampled at the location of 1C. All outfalls should be clearly labeled on site and documented in the SWPPP. Please take pictures of the locations and take GPS data points to avoid any confusion in the future. Please provide details of all sampling points to this office. All sampling points did not have corresponding records, assumedly for no flow conditions. These must be documented for submitted sampling dates in the future. Representative Outfall Status (ROS) is granted. ALL outfalls are still subject to the qualitative monitoring requirements of the facility's permit. The ROS approval letter from DEQ must be kept on site with the facility's Stormwater Pollution Prevention Plan. The facility must notify DEQ in writing if any changes affect representative status. Please clarify the definition of the site in terms of lease agreements. The question arose if the outfall 1C is within the lease boundaries due to a November 24, 2014 map submitted with the ROS request. Submit a revised map indicating leased area. During the inspection, a concern was raised of the bottom ash being uncovered and able to drain to the stormwater system. This material should be undercover with containment. Greater attention to housekeeping regarding the TDF is needed. There is scrap TDF throughout the yard. The TDF stockpile is over the containment walls. The site is granted representative outfall status to sample at one location, Outfall 1C (formally named outfall 5). This is contingent on the concerns expressed previously. Page: 2 Permit: NCSOOC348 Owner - Facility: CPI USA North Carolina LLC Inspection Date: 04/17/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? M El 0 El # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? M El 0 El # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? M El 0 El # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? El El E R Comment: Analytical monitoring data must include all sampling points in all recorded events documenting no flow if applicable. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? M El F # Were all outfalls observed during the inspection? 0 El El R # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? R El Comment: Page: 3 Water Pollution Control System Operator Designation Form WPCSOCC NCAC 15A 8G .0201 Permittee Owner/Officer Name: Mailing Address: c t �`1-+-5 � � V City: -► Ac2,�—. State: � Zip: 2RWd- Phone #: (94a �6S7 6-7l'-S Email adds Signature: .................................................................................................................................................. Facility Name: Permit #: �� 1 SUBMIT A SEPARATE FORM FOR EACH TYPE SYSTEM! Facility Type/Grade: Biological WWTP Surface Irrigation Physical/Chemical G Land Application Collection System Operator in Responsible Charge (ORC) Print Full Name: Certificate Type / Grade / Number: ' j3ork Phone #: (.. ?10) Signature: Date: "I certify that I agree to my designation as the Operator in Responsible Charge for the facility noted. I understand and will abide by the rules and regulations pertaining to the responsibilities of the ORC as set forth in 15A NCAC 08G .0204 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission." ................................................................................................................................................. Back -Up Operator in Responsible Charge (BU ORC) Print Full Name: Certificate Type / Grade / Number: Signature: Work Phone #: Date: "I certify that I agree to my designation as a Back-up Operator in Responsible Charge for the facility noted. I understand and will abide by the rules and regulations pertaining to the responsibilities of the BU ORC as set forth in 15A NCAC 08G .0205 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission." .................................................................................................................................................. Mail or fax the original to: WPCSOCC, 1618 Mail Service Center, Raleigh, NC 27699-1618 Fax: 919.807.6492 Mail or fax a copy to the Asheville Fayetteville appropriate Regional Office: 2090 US Hwy 70 225 Green St Swannanoa 28778 Suite 714 Fax: 828.299.7043 Fayetteville 28301-5043 Phone:828.296.4500 Fax:910.486.0707 Phone: 910.433.3300 Washington Wilmington 943 Washington Sq Mail 127 Cardinal Dr Washington 27889 Wilmington 28405-2845 Fax:252.946.9215 Fax:910.350.2018 Phone:252.946.6481 Phone:910.796.7215 Mooresville 610 E Center Ave Suite 301 Mooresville 28115 Fax: 704.663.6040 Phone: 704.663.1699 Raleigh 3800 Barrett Dr Raleigh 27609 Fax: 919.571.4718 Phone:919.791.4200 Winston-S 585 Waugh��r wR Winston- Sal'eni 27107 Fax: 336.771.463 �#Y 1 2013 Phone: 336.Q.5 Revised 10-2012 Facility Name: Back -Up Operator in Responsible Charge (BU ORC) Print Full Name: Certificate Type / Grade / Number: Signature: Permit #: Work Phone #: "I certify that I agree to my designation as a Back-up Operator in Responsible Charge for the facility noted. I understand and will abide by the rules and regulations pertaining to the responsibilities of the BU ORC as set forth in 15A NCAC 08G .0205 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission." ................................................................................................................................................. Back -Up Operator in Responsible Charge (BU ORC) Print Full Name: Certificate Type / Grade / Number: Signature: Work Phone #: ( ) Date: "I certify that I agree to my designation as a Back-up Operator in Responsible Charge for the facility noted. I understand and will abide by the rules and regulations pertaining to the responsibilities of the BU ORC as set forth in 15A NCAC 08G .0205 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission." Back -Up Operator in Responsible Charge (BU ORC) Print Full Name: Certificate Type / Grade / Number: Signature: Work Phone #: ( ) Date: "I certify that I agree to my designation as a Back-up Operator in Responsible Charge for the facility noted. I understand and will abide by the rules and regulations pertaining to the responsibilities of the BU ORC as set forth in 15A NCAC 08G .0205 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission." ................................................................................................................................................. Back -Up Operator in Responsible Charge (BU ORC) Print Full Name: Certificate Type / Grade / Number: Signature: Work Phone #: "I certify that I agree to my designation as a Back-up Operator in Responsible Charge for the facility noted. I understand and will abide by the rules and regulations pertaining to the responsibilities of the BU ORC as set forth in 15A NCAC 08G .0205 and failing to do so can result in Disciplinary Actions by the Water Pollution Control System Operators Certification Commission." Revised 10-2012 Compliance Inspection Report Permit: NCS000348 Effective: 05/01/10 Expiration: 04/30/15 Owner: CPI USA North Carolina LLC - Southport SOC: Effective: Expiration: Facility: Southport Power Plant County: Brunswick 1281 Power House Dr SE Region: Wilmington Aka Cogentrix Dr Southport NC 28461 Contact Person: Rick Houser Title: EHS Coordinator Phone: 910-457-4527 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/24/2013 EntryTime: 10:00 AM Primary Inspector: Elsie C James Secondary Inspector(s): Carol N Miller Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: N Compliant Q Not Compliant Question Areas: Storm Water (See attachment summary) Exit Time: 11:40 AM Phone: Phone: Inspection Type: Compliance Evaluation Page: 1 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 09/24/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: It was evident at the inspection there had been a lot of recent housekeeping and some additional measures installed. The last Analytical Monitoring Data had slightly elevated levels, but that was prior to recent improvents. Since the semi-annual sampling has not been conducted, we discussed looking at the upcoming samples to see if recent changes would improve the sample results. If so great, if not then we would move on to Tier 1, as we talked about on site. Page: 2 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 09/24/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? n n n # Does the Plan include a General Location (USGS) map? n n n # Does the Plan include a "Narrative Description of Practices"? n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? n n n # Does the Plan include a list of significant spills occurring during the past 3 years? rl n # Has the facility evaluated feasible alternatives to current practices? n n n # Does the facility provide all necessary secondary containment? n Cl n # Does the Plan include a BMP summary? n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n n n # Does the facility provide and document Employee Training? n n n # Does the Plan include a list of Responsible Party(s)? n n n # Is the Plan reviewed and updated annually? n n n # Does the Plan include a Stormwater Facility Inspection Program? n Cl n Has the Stormwater Pollution Prevention Plan been implemented? n n n Comment: Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Yes No NA NE nnn Yes No NA NE Page: 3 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 09/24/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Represetative Outfall Status (ROS) was requested by the permittee but never granted or denied. All StormWater (SW) Outfalls will need to be sampled until ROS is granted or denied. If there is no flow from an outfall plesae note on sample report. For SW Outfalls 002,003 & 005 you may sample from the culvert under railroad track as the three outfalls combine discharge through one culvert. Page: 4 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 09/23/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? w n n n # Does the Plan include a General Location (USGS) map? 0 n n n # Does the Plan include a "Narrative Description of Practices"? �( n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? n n n # Does the Plan include a list of significant spills occurring during the past 3 years? n n # Has the facility evaluated feasible alternatives to current practices? ig n n n # Does the facility provide all necessary secondary containment? R n n n # Does the Plan include a BMP summary? f4 n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? E? n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? PA n n n # Does the facility provide and document Employee Training? 9 n n n # Does the Plan include a list of Responsible Party(s)? EA n n n # Is the Plan reviewed and updated annually? fl n n n # Does the Plan include a Stormwater Facility Inspection Program? n n n Has the Stormwater Pollution Prevention Plan been implemented? F n n n Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 910 n n Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE Rnnn Rnnn Yes No NA NE 0Annn r n n n V nlnn' n n n n Page: 3 General Questions for All NCGs and NCSs SW Facility Permits (October 2006) Site Plan and Permit Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention (or comparable) Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Quantitative (Analytical) monitoring? # Has the facility conducted its Analytical monitoring at all outfalls receiving runoff from Vehicle Maintenance areas (only for facilities using more than 55 gallons of new motor oil per month)? Comment: Permit: NCS000348 SOC: County: Brunswick Region: Wilmington Compliance Inspection Report Effective: 05/01 /10 Effective: Contact Person: Rick Houser Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/23/2013 Primary Inspector: Elsie C James Secondary Inspector(s): Expiration: 04/30/15 Owner: CPI USA North Carolina LLC - Southport Expiration: Facility: Southport Power Plant 1281 Power House Dr SE Aka Cogentrix Dr Southport NC 28461 Title: EHS Coordinator Phone: 910-457-4527 Certification: Phone: EntryTime: 10:00 AM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: 0 Compliant (=1 Not Compliant Question Areas: Storm Water (See attachment summary) Exit Time: 12:00 PM Phone: Inspection Type: Compliance Evaluation Page: 1 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 09/23/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: ( iOo I-Tic,r4- C),j t.-0S V'% t4 f1f�-vL-7 c4- ,-yYLw4IL-� TIcJi c- ✓v G-1 A-;�% �.. . Page: 2 STATE OF NORTH CAROLINA Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 FILE ACCESS RECORD SECTION DWO-SWP TIME/DATE 5-15-2012/10:00-12:00 NAME Elizabeth Newland REPRESENTING Bensinger & Garrison Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00am and 3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is 2.5 cents for ALL copies if you make more than 25 copies. There is no charge for 25 or less copies. Payment may be made by check, money order, or cash at the reception desk. Copies can also be invoiced for your convenience. 4. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases, large totes, etc. are permitted in the file review area. 5. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME PERMIT # COUNTY 1. CPI —Southport WW NCO065099 Brunswick 2. CPI —Southport SW 3. 5. NCS000348 Signature and Name o Firm/Business Date Time In Please attach a business card to this form Brunswick Time Out COPIES MADE PAID INVOICE Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality May 17, 2005 Cogentrix Energy Inc Sheryl G. Sawyer P.O. Box 10836 Southport, NC 28461 Subject: NPDES Compliance Inspection Report Cogentrix Energy Inc -Southport NPDES Permit No. NCS000348 Brunswick County Dear Ms. Sawyer: The North Carolina Division of Water Quality conducted a recent inspection of the Cogentrix Energy Inc Wastewater Treatment Facility on May 11, 2005. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES Permit No. NCS000348. A summary of the findings and comments noted during this inspection is provided in Section D on Page 2 of the attached copy of the complete inspection report entitled "Water Compliance Inspection Report". If you have any questions concerning this report, please contact me at (910) 395-3900 Ext. 215 in the Wilmington Regional Office. Sin rely, c�7 lyLq(n,,)4L_ L Linda L. Willis Environmental Chemist II Attachments Cc: Wilmington Regional Office — Yellow File Aisha Lau (DWQ / NPDES Stormwater Unit — Raleigh) 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-395-3900 / Fax: 910-350-2004 / Internet: h2o.enr.state.nc.us An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper NorthCaroina Naturally Section D: Summary of Findings/Comments (Attach additional sheets of narrative and checklists as necessary) 1. Permit: Your permit became effective May 1, 2002 and will not expire until April 30, 2007. The permittee is reminded to read, understand and comply with all of the terms and conditions contained in the permit. If you have questions concerning your responsibilities, call the Wilmington Regional Office to speak to a Division of Water Quality staff member. 2. Facility Site Review: The overall condition of the plant site was satisfactory. The appearance of the facility was in acceptable condition indicating that the current housekeeping practices are very good. 3. Adequacy of Stormwater Pollution Prevention Plan (SWPPP): The Stormwater Pollution Prevention Plan appeared to be thorough and complete in providing all of the required elements of the plan. 4. Vehicle/Equipment Maintenance Area: Not Applicable.; 5. Vehicle/Equipment Wash Area: Not Applicable.,, 6. Temporary Storage of Waste Materials: The plan provides for secondary containment for any areas that could pose a potential for contamination. 7. Outdoor Storage of Materials: The plan provides for secondary containment for any areas that could pose a potential for contamination. 8. Spill Response -and Cleanup Program: Spill response is adequately addressed. It describes actions to be taken as well as team members in charge of training and response to spill events. 9. Erosion Control on Site: There are areas that require some erosion control planning. Any attempts taken to control erosion on the site should be included in the Stormwater Pollution Prevention Plan. 10. Illicit Discharge Elimination: Not Applicable. 11. Wastewater Treatment Facilities: Wastewater treatment is not required. 12. Stream Impacts/Results of Sampling: Each stormwater discharge point was inspected. There did not appear to be any impacts to the ditches or receiving stream for any of the stormwater discharge outfalls. The permittee has been conducting all qualitative and quantitative inspections/sampling as required by the permit. Summary: Overall, the SWPPP is complete and thorough in all areas required by Permit # NCS000348. A few comments for SWPPP improvement should be considered: It would be beneficial to include a list in the SWPPP of all chemicals stored in the cooling tower storage area. MSDS sheets should also be provided for each chemical listed. Any erosion control efforts on site should be documented in the SWPPP. Name and Signature of Inspectors: A i LLi a L. Willis Surface Water Protection Section Wilmington Regional Office Vz2 I cc) - ate Compliance Inspection Report Permit: NCS000348 Effective: 05/01/02 Expiration: 04/30/07 SOC: Effective: Expiration: County: Brunswick Region: Wilmington Contact Person: Darcy Trufyn Title: SR VP Operations Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/11/2010 Primary Inspector: Linda Willis Secondary Inspector(s): Entry Time: 01:00 PM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Certification: Owner: CPI USA North Carolina LLC - Southport Facility: Southport Power Plant 1281 Power House Dr SE Aka Cogentrix Dr Southport NC 28461 Phone: 780-392-5373 Exit Time: 04:00 PM Phone: Phone: 910-796-7396 Inspection Type: Compliance Evaluation Page: 1 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Due to construction activities on site, the NCG010000 permit applies to the site in the vicinity of the land disturbing activities. Please be sure to follow the requirements of the NPDES General Construction Stormwater permit. Page: 2 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n Cl n # Does the Plan include a General Location (USGS) map? ■ n n Cl # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ■ n n n # Has the facility evaluated feasible alternatives to current practices? ■ n n n # Does the facility provide all necessary secondary containment? ■ [I n n # Does the Plan include a BMP summary? ■ n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ Cl n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n n # Does the facility provide and document Employee Training? ■ n n n # Does the Plan include a list of Responsible Party(s)? ■ n n n # Is the Plan reviewed and updated annually? ■ n Ci n # Does the Plan include a Stormwater Facility Inspection Program? ■ n n n Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment: Please include a better map (such as that in your SPCC) for the SWP3. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ n n n Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ n Cl n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ■ n Cl n Comment: This facility is exercising representative outfall status. The outfall monitored is the outfall with the most significant potential for pollutant discharge with stormwater. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ n n n # Were all outfalls observed during the inspection? ■ n n n # If the facility has representative outfall status, is it properly documented by the Division? ■ n n n # Has the facility evaluated all illicit (non stormwater) discharges? ■ n n n Page: 3 Permit: NCS000348 Owner - Facility: CPI USA North Carolina LLC - Southport Inspection Date: 02/11/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Page: 4