Loading...
HomeMy WebLinkAbout310063_Inspection_20190523V/ Division of Water Resources Facility N,6mber - ® 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 0 Compliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: V Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: Z 9 County: Farm Name: Owner Name: Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: Title: / Onsite Representative: Qr-e '�- #00 Certified Operator: Back-up Operator: Location of Farm: Swine to Finish to Feeder r to Finish v to Wean v to Feeder v to Finish Gilts Other Other Latitude: Phone: Region: Integrator: ff q y Certification Number: 1 C ' 3 " , Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Cauacity Pon. Layers Non -Layers Pullets Turkeys Turke Pouets Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes ETNo ❑ NA ❑ NE ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes E-Iqo— ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Page I of 3 , r 21412015 Continued Ins Z7 I Facility Nupiber: Date of ection: I Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes eNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 1 IN, Spillway?: Designed Freeboard (in): Observed Freeboard (in): �Z / 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes EJ'No — NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes / No ❑ NA ❑ NE waste management or closure plan?, If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmentathreat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes - No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes io ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 7No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload' ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): / 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [%]K ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes YNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes l ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 0 No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: el_ 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes dNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �o ❑ NA ❑ NV 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA Page 2 of 3 21412015 Continued Facili Number: - Date of Inspection: 'L3 24. Did 'the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �Noo NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes / NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: / 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 6No ❑ A ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes ❑ No [ NA ❑ NE ❑ Yes / No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA Q­NE� 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes •f/ 6' ❑NA ❑NE fo ❑ NA ❑ NE o ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional paues as necessary). Reviewer/Inspector Name: CIA, Reviewer/Inspector Signature: Page 3 of 3 Phone: o -7 6 73 Date: 21412015