Facility Number: 030001 Facility Status: Active
Inpsection Type: Technical Assistance
Reason for Visit: Other County: Alleghany
Date of Visit: 01/16/2018 Entry Time: 12:45 pm Exit Time: 1:15 pm
Farm Name: Gambill & Gambill Farm
Owner: David T Gambill
Mailing Address: 305 Gambill Rd
Physical Address: 305 Gambill Rd
Facility Status: 0Compliant ❑ Not Compliant
Location of Farm:
Permit: AWC030001 ❑ Denied Access
Inactive Or Closed Date:
Region: Winston-Salem
Incident #
Owner Email: Igambill@skybest.com
Phone: 336-372-2819
Sparta NC 28675
Sparta NC 28675
Integrator:
Latitude: 36° 33' 20" Longitude: 81 ° 10' 34"
From Sparta take 21 N to 221 S, then take right onto 93W to Elk Creek Church. Turn right on Farmers Fish Camp Road. Go about 2
1/2 miles. Turn right at Gambill Dairy sign.
Question Areas:
E Dischrge & Stream Impacts Waste Col, Stor, & Treat
Certified Operator: David T Gambill
Secondary OIC(s):
Operator Certification Number: 22600
On -Site Representative(s): Name Title Phone
24 hour contact name David Gambill Phone
On -site representative David Gambill Phone
Primary Inspector: Meliss Rosebrock Phone: �.330 -7-Ito ' ` 9
Inspector Signature: �(�I Adll►� 1_,& Date: Z G
Secondary Inspector(s):
Rebecca D Chandler
Inspection Summary:
Today's visit was to check on the construction progress of the new dry waste structure. The dry stack and barn are to be under roof
and constructed where the milk parlor and barn once stood. The area has been surveyed and graded. No other construction has
occurred. No animals are being kept on the concrete lot at this time. No water quality violations or concerns were observed.
Owner has over 100 beef cattle but they are on pasture until the barn and dry stack are built. Owner has been waiting on a revised
design from the contractor that will meet NRCS approval. Per Mr. Gambill the section where the waste is to be stored needs a
design with posts only 8 foot apart, rather than 12 foot as was in the original design. The rest of the barn (where cattle will
housed) will have posts 12 foot apart. Mr. Gambill stated that he had just been informed by the contractor that the revised design
had been sent to NRCS yesterday and that he has workers ready to begin construction immediately once given approval. If
weather conditions were ideal, Mr. Gambill said he was told by the contractor that the dry stack could be built in about 5 weeks.
page: 1
r
F,
Permit: `}AWC030001 Owner - Facility : David T Gambill Facility Number: 030001
Inspection Date: 01/16/18 Inpsection Type: Technical Assistance Reason for Visit: Other
�n
Regulated Operations Design Capacity Current promotions
Cattle
Cattle - Beef Feeder 200 0
Total Design Capacity: 200
Total SSLW: 160,000
Waste Structures
Disignated Observed
Type Identifier Closed Date Start Date Freeboard Freeboard
Waste Pond WASTE POND 07/22/17
Discharges & Stream Impacts
Yes No Na No
1. Is any discharge observed from any part of the operation?
❑
0 ❑
❑
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
1111
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
❑ ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
❑ ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑0
❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
❑M
❑
❑
State other than from a discharge?
Waste Collection. Storage & Treatment
Yes
No Na No
4. Is storage capacity less than adequate?
❑
❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ large
❑
❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
❑
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
❑
❑
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicable
❑
❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
01111
maintenance or improvement?
page: 2