PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
�(--10
VCC a� 5I2gl j�
Facility Number: 71-70 County: Pender
Facility Name: Pender 1&2
Certified Operator Name: Doug Atkins Operator Number: 985738
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: Pender 1 Pender 2
Spillway(Y or N): no no
Level(inches): 14 20
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another'permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 6/4/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of rn i knowledge and ability, the information is
accurate and correct.
AJ Linton
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone: 910-285-1357
Date: 5/29/2018
0
O
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Tender 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 14.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 1 inches
c. line b - line a (inches in red zone) = 5.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
336235 ft2
e. line c/12 x line d x 7.48 gallons/ft3
1047932 gallons
3: Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
90 days
•
g. volume of waste produced according to structural design
J
417300 ft3
h. current herd # 3-1-0-01 certified herd #1 3600
actual waste produced = current herd # x line g =
359342 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 5/16/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
1972251 ft3
1387706 gallons
1.85 Ibs/1000 gal.
4505.9 Ibs. PAN
PoA (30 Day) 2121 /00
c
a.
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD,
I: TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Pender2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 20.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) _ -1 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
338100
ft2
e. line c/12 x line d,x 7.48 gallons/ft3'
-210749 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
4:17300 ft3
h. current herd # 3100 certified herd #1 3600
actual waste produced = current herd # x line g =
359342 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 5/16/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE:
(Click on the next Structure tab shown below)
0 ft3
197225 ft3
693853 gallons
1.54 Ibs/1000 gal.
744.0 Ibs. PAN
PoA (30 Day) 2/21/00
1 4
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID. Pender 1
line m =
4505.9 lb PAN
2.
Structure ID: Pender 2
line m =
744.0 lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 5249.9lbPAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o tract #
p. field #
q. crop
r acres
s. remaining IRR
2 PAN balance
(Ib/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u applicabon vnndow'
Pivot 14
Bermuda
46
201 00
92460
March -Sept
Pivot 2
Bermuda
21
202.00
4242.0
March -Sept
Pivot 1
Bermuda
24.00
22200
5328.0
March -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 18816 0 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
I
w. Total PAN to be land applied (line n from section 11) = 5249.9, lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 18816.0 lb. PAN
y. Overall PAN balance (w - x) _ -13566 lb. PAN
ine y must show as a deficit If line y does not show as a deficit, list course of action here including pump and
aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
ased on new information. If new fields are to be included as an option for lowering lagoon level, add these
elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
:ceiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit.
PoA (30 Day) 2/21/00