HomeMy WebLinkAbout710012_Plan of Action_20180409L• o CA L PLAN OF.ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-12 Facility Name: Crooked Run Farm County: Pender Certified Operator Name: Joe Szaloky Operator Number: 999328 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 19 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached., Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of'waste to be pumped and hauled is reflected in section III tables. - Included within this plan is a list of the proposed sites with related facility numbers, .number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste 4/12/2018 I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the' information is accurate and correct. Bandit 3, LLC Phone: Facility Owner/Manager (print) Facility Owner/Manager (signature) Date 910-990-0062 4/9/2018 ;.. II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 57.6 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 57.6lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s remaining IRR t. TOTAL PAN u. application window' 2 PAN balance BALANCE FOR (lb/acre) FIELD (lbs.) column r x s unk all corn 84.60 125.00 10575.0 Feb 15-Jun JCd LC I;UI ICI II U VN CI IUII Iy dl.JPIlLoc-ILIU1I UdLC UI IIUAL GI Up dPP11 ;d LIV1I UCyII II III Iy UdIC IUI dVdI1d UIC receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 10575.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) = 57.6 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 10575.0 lb. PAN y. Overall PAN balance (w - x) _ -10517 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Lagoon reached 21"but recent rain has reduced freeboard to 19". Field conditions were too wet on POA expiration date so will return to pumping later this week. No hogs have been on this site for months nor any planned in the near future. PoA (30 Day) 2/21/00 e :. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 20.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 195570 ftZ e. line c/12 x line d x 7.48 gallons/ft3 121905 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 252548 ft3 h. current herd # 00 certified herd # 4200 actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design R. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 2/16/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 51333 ft3 63995 gallons 0.31 Ibs/1000 gal: 57.6 Ibs. PAN PoA (30 Day) 2/21/00