From:Euliss, Amy
Sent:Thursday, July 25, 2019 5:17 PM
To:Roden Reynolds, Bryan K CIV (US); Wanucha, Dave
Cc:Tucker, Mezak; Marciniak, Katherine J; Braquet, Stephanie
Subject:Re: \[External\] Re: \[Non-DoD Source\] RE: Bridge Replacement on Bridge no 410
Greensboro St Ext Davidson
We typically pull up the silt fence to remove it. By cutting it at the ground, it will minimize the wetland soil
disturbance. We will still have to pull out the stakes.
Let me know if you have any further questions.
Get Outlook for iOS
From: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>
Sent: Thursday, July 25, 2019 4:22:53 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Euliss, Amy <aeuliss@ncdot.gov>
Cc: Tucker, Mezak <mtucker@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Braquet, Stephanie
<scbraquet@ncdot.gov>
Subject: \[External\] Re: \[Non-DoD Source\] RE: Bridge Replacement on Bridge no 410 Greensboro St Ext Davidson
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
I agree with Dave and have the same question/concern.
Sent from my Verizon, Samsung Galaxy smartphone
-------- Original message --------
From: "Wanucha, Dave" <dave.wanucha@ncdenr.gov>
Date: 7/25/19 3:39 PM (GMT-05:00)
To: "Euliss, Amy" <aeuliss@ncdot.gov>, "Roden Reynolds, Bryan K CIV (US)" <Bryan.K.RodenReynolds@usace.army.mil>
Cc: "Tucker, Mezak" <mtucker@ncdot.gov>, "Marciniak, Katherine J" <kjmarciniak@ncdot.gov>, "Braquet, Stephanie"
<scbraquet@ncdot.gov>
Subject: \[Non-DoD Source\] RE: Bridge Replacement on Bridge no 410 Greensboro St Ext Davidson
I have no problem with that unless the Corps objects. Is cutting it off at ground level a typical removal method?
Dave Wanucha
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
1
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Thursday, July 25, 2019 2:03 PM
To: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>; Wanucha, Dave
<dave.wanucha@ncdenr.gov>
Cc: Tucker, Mezak <mtucker@ncdot.gov>; Marciniak, Katherine J <kjmarciniak@ncdot.gov>; Braquet, Stephanie
<scbraquet@ncdot.gov>
Subject: Bridge Replacement on Bridge no 410 Greensboro St Ext Davidson
Bryan and Dave,
We are beginning to work on the bridge replacement on Greensboro St Ext in Davidson County. We permitted
temporary fill to sidecast the excavation area for the waterline installation. We installed silt fence along the perimeter
of the temporary impact area. I have attached a picture and a copy of the plans with the silt fence marked in red for
reference.
The need for the silt fence was an oversight on my part. However, its necessary to contain any temporary fills in the
area and prevent a sediment loss. Do you have any problems with us leaving it in place until the end of the project, and
cutting it off and ground level at the completion of the project?
The project numbers are as follows:
SAW-2018-01709
20191195 v2
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
2
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
3