Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0020559_Pretreatment Compliance Inspection_20190723
ROY COOPER Gov.:"rrrr ,MICHAEL S. REGAN 5rrr, nary LINDA CULPEPPER Drr. L:vr NOPTH C-%rOLi*la Environmental Quality July 23, 2019 Mr. Lamont Allen Director of Water Reclamation Facility City of Henderson P.O. Box 1434 Henderson, NC 27536 Subject: Pretreatment Compliance Inspection City of Henderson Water Reclamation Facility NPDES Permit No. NCO020559 Vance County Dear Mr. Allen: On July 17, 2019, Cheng Zhang of the Raleigh Regional Office (RRO) conducted a Pretreatment Compliance Inspection of City of Henderson's pretreatment program. The assistance given by Mr. Darrel Johnson, Pretreatment Coordinator of the facility, was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: 1. There is only one Significant Industrial User (SIU) discharging to the POTW, which is not a Categorical Industrial User (CIU). It was noted that the SIU (Mars Petcare) was not in Significant Nan -Compliance (SNC) for the two most recent semi-annual periods. 2. The review of Long Tenn Monitoring Plan (LTINIP) data indicated that all locations were sampled with required frequencies and all samples analyzed with correct detection limits since last inspection. LTMP data were well maintained in spreadsheets. Dt ��i ?!)rtfrt.,•:3rr,,1t ,rrr e [ tiE.r :ri, f.[i?r,,s, V,-, itv� 1,-v 'I'llh1'. 3. A review of the files containing the pretreatment program elements was conducted. All elements were up to date. Files were available and well organized. The City may consider to update the Long Term Monitoring Plan (LTMP) since lower detection limits are required for some metals. 4. Mars Petcare's pretreatment file (Permit No. 001 1) was reviewed during the inspection. During the first semi-annual period of 2018, the SIU was in compliance. The City of Henderson's pretreatment program is very well managed. Thank you for your continued support of the Pretreatment Program. If you have questions regarding to the attached report or any of the findings, please contact Cheng Zhang at 919-791-4200 (or email: cheng.zhang( ncdenr.gov). Sincerely, 4 � Rick Bolich, L.G. Assistant Supervisor Division of Water Resources Raleigh Regional Office Enclosure: City of Henderson PCl Form CC: Monti Hassan, DWR - FPERCS Unit Cheng Zhang - RRO Central Files Darrel Johnson - City of Henderson (electronic copy only) NORTH CAROLINA DIVISION Or WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATIOti Wont lete Prior To PCI• Review Program Info Database Sheet S I. Control Authority (POTW) Name. Cih• of Ilendersou 2. Control Authority Representative(s): Darrel Johnson 1 Lantont Allen 3. Title(s): Pretreatment Coordinator i Director, «'RF 4- Last Inspection Date; May 24, 2017 Inspection Type (Check One): ❑ PCI ® Audit 5- Has Program Completed All Requirements from the Pr"-ious Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions"? ❑ YES ® NO Order Type, Number- Parameters: Are Milestone Dates Being filet? ❑ YES ❑ NO ICIS CODING Main Pr ram Permit number %1.%l DD YN' N I C 1 0 1 () 12 1 01 5 1 51 9 1 L-07 1 17 1 19 7. Current Number Of Significant Industrial Users (SI .-;)'? I 8. Number of SIUs With No IUP, or With an Expired IUP'? 0 9. Number of SIUs. Not Inspected.By POTW in the Last Calendar Year'? 0 10. Number of SIUs Not Sampled B POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations Durin<e Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Senhi-Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule'? 0 14. Number ofSlUs on Schedules" 0 15. Current Number Of Categorical Industrial Users (CI Us)? 0 16. Number ofClUs in SNC? 0 POTW INTERVIEW 17. Since the Last PC[, has the POTW had any NPDES Limits Violations`? ® YES ❑ NO If Yes, What are the Parameters and flow are these Problems Being Addressed? 3 19 ROD TSS; 119 pit: 4 18 BOD 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial ❑ YES ® NO Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for Limits: None either of the Last 2 Semi -Annual Periods? Not Been Published for S\C for Reporting: Now Public Notice?(May refer to PAR if Excessive SIUS in SNC) Not Published: None 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to [lie Division? None J 21. Are Any Permits or Civil Penalties Currently Under Adjudication? I f Yes, Which ❑ YES 0 NO Ones? LT,NIP/ST1IP FILE REVIEW: 22. Is LTIVIP.:STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ YO 23. Are Correct Detection Levels being used for all L-f MP1STNIP ivlonitoring? ® YES ❑ NO 24, Is LTNIP.;STIvIP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate'? ® YES ❑ NO 25. All LIMP/STIVIP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify- yourself? 26. If NO to 23 - 26, list violations 77• Should any Pollutants of Concern be Eliminated from or Added to LTNIP STNIV! ❑ VES ®NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Forts Updawd December 2016 Page 28. PRETREATMENT PROCRAINT ELEINlENTS REVIEW- Piease rev-ievv POZ W files,,.•crify I'OTW has copy ofProbram Element in their files, complete with supporting documents and cony of FRCS rknnroval Letter. and dates cansislent with Prnirrnni Infn- Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Ileadworks Analysis (I1WA) 3/23/2017 Yes 0 No 6115/2017 0 Yes CTNO 4/1/2022 Industrial Waste Survey (RVS) 5/112017 Yes 0 No 6114/2017 El Yes 0 No 4/30/2022 Sewer Use Ordinance (SUO) 1 I/T2012 Yes No 11119/2012 Ye., No Enforcement Response Plan (ERP) 10120.-2008 Yes No 1111912008 Yes No Long Term Monitoring Plan (LEN]. 1130.2017 Z Yes L1 No 4124/2017 Yes U No INDUSTRIAL USER PERMIT (IUP) FILE REVIENV (3 IUP FILE REVIEWS OR I FILL REVILW AND l IU INSPECTION) 29. User Name 1. Mars Peteare IF 2 IF 30. IUP Number 0011 IF 31. Does File Contain Current Permit'? Yes No1. Z Yes No 11 0 Yes Lj No 32. Permit Expiration Date 4i3/2022 33. Categorical Standard Applied (LE. 40 CFR. Etc,) Or N A 34. Does File Contain Pertnit Application Completed Within One Year Prior ® Yes NoFs"s No Yes No to Permit Issue Date`? 35. Does File Contain an Inspection Completed Within Last Calendar Year? Yes No Z Yes Q No IFE Yes 0 No 36, a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes ❑No a. ®Yes ❑No a. ®Yes QNo b. If No, is One Needed'? (See Inspection Fonn from POTNV) b. ❑1'es ❑No b. ❑Yes ❑No b. ❑Yes ❑No 37, For 40 CFR 413 and 433 TFO Certification, Does File Contain a Toxic ❑Yeti❑NoE 3 ❑YccE)No®N A71 ❑Yus❑NOON A Organie Management Plan (TOMP)`? 38. a. Does File Contain Original Permit Review Letter from the Div ision? a. ®Yes ON o a. ®Yes ❑No a. ®Yes ❑No b. All Issues Resolved? b.❑Yip❑�u❑� A b ❑N uti❑`u❑N A bzwoONo❑N A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete No ti"es No Yes No its Sampling as Required b IUP, including flovy? L��'e., 40. Does File Contain POTW Sam limy Chain -Of -Custody Form;? ® Yes ❑ No 1'cs El No Yes El No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its l7Yuw❑No❑N Ycs❑No❑` A Sam ling as Required b [UP, including flow? PE' 7�oON-'A 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑ ®Yes❑No❑N A ®Yes❑NOON-A on time'? 42a. For categorical IUs with Combined Wastestream 1=ortuula (C1\'1-), does ❑N'LNONoON A ®Yes❑No❑` A ®1'es❑No❑N A file include rocessldifution flows as Required by IL1P? 1[ 42b. For categorical IUs with Production based limits, does file include ❑) 4:,0tio®N-A BYcs❑No❑N A ON'es❑No❑N'-A roduction rates and:or flows as Required by IUP:' 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑tins❑No©N A ❑Yes❑No®N A ❑1'es❑N'oON A All Limits Non -Compliance from Both POTW and SIU Sampling" 43h. During the Most Recent Semi -Annual Period, Did the POTW Identify 0Ye4❑NuE1N A ❑Yes❑No®N' r1 pYcs❑Na®N A All Re ortin r Non -Compliance from SIU Sampling! 44. a. Was (lie POTW Notified by SIU (Within 24 1fours) of -All Self- a-0Yea0Not7\ A a.❑N-es❑`oON A a.❑Yes❑NoGN A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days'' b.❑Yes❑`'oON A b.❑Yeti❑'wMN A b ❑Yes❑NnON A c. If applicable, Did POT W resample within 30 days of becoming a\%arc g of SIU limit violations in the POTW's sampling of the SIU'? c ❑yes❑Noov A r.❑�-`❑�����.� c ❑1'cs❑NomN �� 46. During the Most Recent Semi -Annual Period. Was the SIU in SNC? ❑ Yes ® No 11 ❑ Yes ® No11 ❑ Yes ®No 47. During the Most Recent Semi -Annual Period, Was Enforcement Faken ❑5'es❑No®N A I[ ❑Yes❑NoO* ❑Yes❑No®N'A as Specified in the POTW's ERP (NOVs, Penalties, timing*. etc-):' 48. Does the File Contain Penalty Assessment Notices'? ❑Yes❑NOON A 01'cs❑NOON -A 49. Does The File Contain Proof Of Penalty Collection' ❑l'es❑vo®N A 0Yes0NoM1 A 01'cs0No0N-A 50. a. Does the File Contain Any Current Enforcement Orders! a-❑Yeti❑NoGN A a.❑Yes❑`umN A I a.❑Yes❑No®N A b. Is SIU in Com liance with Order'? b.❑Yes❑NtMN A b.❑Yes❑tio®N � b ❑Yes❑NaMN A 51. Did the POTW Representative Ilave Difficulty in Obtaining Any of l his D Yes ®No ❑ Ye, MNo Yes ED No Requested Information For You'? 11 NC DWR Pretreatment Compliance Inspection (PQ Font Updated Ducember 2016 Pa-C 2 FILE REVIEW COMMENTS: INDUSTRYINSPECTION ICIS CODING: Main Program Permit Number 1. Industry Inspected: ?. Industry Address: 3. Type of Industry Product; 4. Industry Contact; Title; MINI DD )')' Phone; rax: 5. Does the POTW Use the Division Model Inspection Font or Equi%alent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of -tic Industrial Inspection 'I'huroughly! Comments: A. Initial Interview ❑ YES (IN 0 R. Plant -four ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: The Protaram is well managed. Requirements; lone Recommendations; LT�IP might need to he updated detection limits for several metals since new \ PDES vertnitivasrecently issued NOD: ❑ YES 0 NO NOV: ❑ YES ®NO QNCR: ❑ YES ®NO POTw Racine: ® Satisfactory ❑ Marginal ❑ UnSatisfactory PCI COMPLETED BI': Chen Zhan Ralei,h Re *ional Office DA'I*E: J_alv I7. Zt119 NC DWR Pretreatment Compliance; Inspection (PCI) Form Updated December 2016 I'aiw 3