Loading...
HomeMy WebLinkAbout20190992 Ver 1_U-2719 Permit Tables_20190723Table 2. U-2719 Wetland Impacts Site No. Wetland Reason Impact Type Type of Wetland Forested Type of Jurisdiction Impact Area (ac) Name 2 WK Lateral Ditch Permanent Bottomland Hardwood Ycs Corps 0.01 Forest 6 WF Roadway Fill Permanent Bottomland Hardwood yes Corps 0.01 Forest 10 WJ Stabilization Permanent Non -tidal Freshwater No Corps <0.01 Marsh I I WI Stabilization Permanent Non -tidal Freshwater No Corps <0.01 Marsh Total Temporary Wetland Impact 0 Total Permanent Wetland Impact 0.04 TOTAL WETLAND IMPACT 0.04 Table 3. U-2719 Stream Impacts Permit Perennial Average Site Stream (P) or Type of Type of Impact Stream Impact Existing Channel Impacts Existing Channel Impacts No. Name Intermittent Jurisdiction width Type Permanent (ft) Temporary (ft) (I) (feet) 1 SAK I Both Rip Rap at 18" Outlet 3 P/T 7 10 Culvert Clean Out 9 41 3 SX P Both 13 P/T Bank Stabilization 93 97 4 SW P Both Rip Rap in Stream 10 T 0 112 7 ST P Both Outlet Stabilization 13 P/T 35 50 8 SV P Both Bank Stabilization 4 P 244 0 9 SU P Both Bank Stabilization 4 P 62 0 Channel 12 SS P Both Improvement/Bank 5 P/T 34 65 Stabilization 13 SR P Both Fill/Outlet 18 P/T 117 50 Stabilization Roadway Fill/Outlet 14 SO P Both Stabilization 6 P/T 388 40 Bank Stabilization 85 70 15 SP P Both 30" CSP 8 P 56 10 16 SN I Both 36" WSP and 36" 13 P/T 70 24 CSP 17 SC P Both 8' x 8' Culvert 8 P/T 97 40 Extension/Stab. 18 SAN P Both Lateral Ditch 8 P/T 31 39 19 SE I Both 48" RCP Extension 4 P/T 29 22 20 SW P Both 14' x 7' RCBC 10 P 92 20 Bank Stabilization P/T 50 9 Total Jurisdictional Ditch Impact in Square Feet 0 Total Permanent Stream Impacts 1,499 Total Temporary Stream Impacts 699 Total Stream and Ditch Impacts 2,198 Table 4. U-2719 Buffer Impacts Site No. Impact Type Per or Temp Stream name Buffer mitigation required? Zone 1 impact Zone 2 impact (ft2) (ft2) 1 Rip Rap at 18" Outlet, allowable P SAK No 1272 0 3 Culvert Clean Out, allowable P SX No 1,753 212 3 Bank Stabilization, allowable P SX No 3,612 1,923 4 Rip Rap in Stream, allowable P SW No 2,985 2,221 4 Rip Rap in Stream, allowable w/ P SW Yes 3,711 0 mitigation 7 Outlet Stabilization 24" CSP, p ST No 408 0 allowable 7 Outlet Stabilization 24" CSP, p ST Yes 1,052 871 allowable w/ mitigation 9 Bank Stabilization, allowable w/ P SU Yes 3,931 1,346 mitigation 12 Channel Imp./Bank Stab., p SS No 6,199 3,968 allowable Roadway Fill/Outlet 13 Stabilization, allowable w/ P SR Yes 8,902 7,738 mitigation 14 Roadway Fill, allowable P SO No 6,846 1,384 14 Roadway Fill, allowable w/ p SO Yes 14,827 7,423 mitigation 15 30" CSP, allowable P SP No 3,767 3,730 16 36" WSP & 36" CSP, allowable P SN No 3,379 367 16 36" WSP & 36" CSP, allowable p SN Yes 775 206 w/ mitigation 17 8'x8' Culvert Extension/Stab., P SC No 3,660 1,592 allowable 18 2' Base Lateral Ditch, allowable P SAN Yes 3,035 2,070 w/ mitigation 19 48" RCP Extension, allowable P SE No 2,179 926 20 14' x 7' RCBC, allowable P SW No 5,146 3,035 21 Bank Stabilization, allowable w/ P SC Yes 433 406 mitigation Site No. I Impact Type I Per or Temp I Stream name I Buffer mitigation required? Zone 1 impact I Zone 2 impact (ft2) 1 (ft2) Total Allowable Buffer Impact 419206 199358 Total Mitigable Buffer Impact 36,666 20,060 TOTAL COMBINED BUFFER IMPACT 77.872 39.418