Loading...
HomeMy WebLinkAboutSW6190503_Supplemental_Stormwater_Form_2019-07-23_7/25/2019SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Kinder Care Learning Center, Spout Springs 2 Project Area (ac) 1.423 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet)77- 0 8 Will the vegetated setback remain vegetated? I No 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? I No 10 Is streambank stabilization proposed on this project? I No NUMBER AND TYPE OF SCMS: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 1 Name and Title: Stuart Anderson, P.E. NC Red. #040659 28 Organization: Interplan, LLC 29 Street address: 604 Courtland Street, Suite 100 30 City, State, Zip: Orlando, FL 32804 31 Phone number(s): 407 645-5008 32 Email: snderson@interplanllc.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. CAR 0, tssb*... -- .'1. _ ;Q SEAL 040659 IOUILI d :-1 7�ZA' Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED iDRAINAGE AREA INFORMATION c 4 Type of SCM Entire Site 1 Infiltration Basin 5 Total BUA in project (sq ft) 38404 sf j 6 New BUA on subdivided lots (subject to permitting) (sq ft) F 7 New BUA outside of subdivided lots (subject to permitting) (sf) 38404 sf 8 Offsite - total area (sq ft) 9 Offsite BUA (sq ft) i 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft) 22362 sf j - Sidewalk (sq ft) 4043 sf - Roof (sq ft) 11999 sf - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 62% 17 Design storm (inches) 1 in 18 Design volume of SCM (cu ft) 3183 cf 19 Calculation method for design volume Rational Method ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): INFILTRATION SYSTEM 1 Drainage area number 1 2 IDesign volume of SCM (cu ft) MDC FROM 02H .1050 1 Is the SCM sized to treat the SW from all surfaces at build -out? GENERAL yes 3 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Yes 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 1 uoes me maintenance access comply witn ueneral Muc (aye Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes INFILTRATION SYSTEM Mnr FROM n2H 1n51 18 Proposed slope of the subgrade surface (%) 0% 19 Are terraces or baffles provided? No 20 Type of pretreatment: For -bay I soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation (fmsl) <317ft 23 Depth to SHWT per soils report (in) >15ft 24 Ground elevation at boring in soils report (fmsl) 322.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 iSoil infiltration rate (inthr) 6.00 27 1 Factor of safety (FS) (2 is recommended): 2.00 Irrevanons 29 Bottom elevation (fmsl) 330 ft 30 Storage elevation (fTisl) 331. ft 31 Bypass elevation (fmsl) 335 ft For Basins unly 32 Bottom surface area, ft2: 1867 ft 33 Storage elevation surface area (ft2) 2148. ft For Trenches Only 34 Length (ft) 35 lWidth (ft) 39 Stone type, if applicable 40 Stone void ratio (%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 1 Has at least one infiltration port been provided? ITIONAL INFORMATION Please use this space to provide any additional information about the infiltration 46 Infiltration 3 11:33 AM 7/23/2019