Loading...
HomeMy WebLinkAboutSW6190503_NCDENR OM Agreement_Spout Springs NC_Recorded 7.23.19_7/25/2019B3717 - P 980 For Registration Kimberly S. Hargrove Register of Deeds Harnett County, NC Electronically Recorded 2019 Jul 23 01:44 PM NC Rev Stamp: $ 0.00 Book: 3717 Page:980 - 982 Fee: $ 26.00 Instrument Number: 2019010080 10P[4�7ZA HARNETT COUNTY REGISTRY Operation and Maintenance Agreement by and between EIG14T RCCC 213 NC -Spout Springs LLC We North Carolina Department of Environment and Natural Resources (NCDENR) Recording Requested by; EIG14T RCCC 213 NC -Spout Springs LLC Attn: Legal Counsel 3221 W Big Beaver Rd, Suite 111 submitted electronically by "EIG14T Development" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Harnett county Register of Deeds. Project Name:I Kin jerCare Learning Center Project Location:195 Cbntennial Parkway, Spout Springs, NC Maintenance records shall be kept on the folloiing BMP(s). This maintenance record shall be kept in a log in a known set locatio Any deficient BMP elements noted in the inspction will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (;check all Bioretention Cell Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level Spreader/VFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter Stormwater Wetland Wet Detention Basin Disconnected Impervious Area User Defined BMP at apply & cc Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Present Present nding O&M tables Location Location Location Location Location Location Location Location Location Location Location Location _ Location 1 Location 1 Location I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: I, County of personally appeared before me this acknowledge the due execution of the Witness my hand and official seal, Seal Reed Fenton Prin¢i al, EIG14T RCCC 213 NC a Spout Springs LLC 32211 W.. ig Beaver Rd., Suite 111 Troy, 0148084 (248) 519-9281 reed ,814cre.com , a Notary Public for the , do hearby certify that day of ns and Mai ntWance Agreement. Nota(V Public, State of Michigan County of Macomh My CorrImissiam Expires 10-1,2 My commission xpires Date: ho e of and STORM-EZ 7/1912019 Version 1.4 O&M Manual Page 1 of 3 5T Ve Important maintenance procedures; The drainage area will be carefully managed to reduce The sediment load to The infiltration basin.. Immediately after the infiltration basii I t is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin wi l be fertilized after the initial fertilization that is required to establish the vegetation. The vegetation in and around the ba in will be maintained at a height of approximately six inches. After the infiltration basin is established, it shaill be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Costal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as folI� s. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a infiltration basin erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application.: The inlet device: pipe or The pipe is clog ed (if Unclog the pipe. Dispose of the sediment off -site. Swale applicable}. The pipe is cracked or Replace the pipe, otherwise dama�ed (if applicable). Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale (if applicable). control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced thq depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. Erosion has occurred or riprap Provide additional erosion protection such as reinforced turf matting or is displaced. riprap If needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants ratherthan spraying. The main treatment area. A visible layer of sediment has Search for the source of the sediment and remedy the problem if accumulated. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BM P. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than 5 Replace the top few inches of filter media and see if this corrects the days after a storm event, standing water problem. ;If so, revegetate immediately. If not, consult an appropriate professional far a more extensive repair, Weeds and noxious plants are Remove the plants by hand or by wiping them with pesticide (do not growing in the amain treatment spray). area. The embankment Shrubs or trees have started Remove shrubs or trees immediately. to grow on the embankment. An annual inspection by an Make all needed repairs.' appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device, Dispose of the sediment off -site. The outlet device is damaged I Repair or replace the outlet device. The receiving water Erosion or other; signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. RM-EZ outlet. '19/2019 jo2of3