Loading...
HomeMy WebLinkAboutSW6190503_2017.0643 Stormwater Round 2 CRL_7/25/2019INTERPLANJ Over 40 years and 40,000 projects July 24, 2019 Corey Anen North Carolina Department of Environmental Quality- DEMLR 512 North Salisbury Street -1612 Mail Service Center Raleigh, NC 27699-1612 919.707.3649 Corey.Anen@ncdenr.gov Reference: KinderCare Learning Center - Spout Springs Stormwater Permit # SW6190503 I P # 2017.0643 Response to: Request for Additional Information Dear Mr. Anen, Please accept the following in response to comments dated July 16, 2019: 604 COURTLAND STREET SUITE 1DO ORLANDO, FL 32804 ph: 407,645.5008 fx: 407.629.9124 AA 003420 1 CA 8660 www.interplantic.com 1. Comment: The infiltration basin must have sufficient volume below the first outlet to store the water quality design volume. The outlet should be elevated to provide the required volume in the basin. (General MDC 1) Response: Page 5 of Appendix E of the previously submitted stormwater report summarizes the total system storage in the infiltration basin and underground storage. The total system capacity below the water quality orifice is 3,183 cf; which exceeds the required water quality volume of 3,139 cf. Only the bottom area of the infiltration basin is used to calculate the recovery time. Full water quality and infiltration calculations are provided in Appendix F of the previously submitted stormwater report. 2. Comment: Please submit a signed and notarized operation and maintenance plan and agreement for the infiltration system. (General MDCs 1 1 and 12). Response: A notarized O&M plan and agreement for the infiltration system are included with this submittal. ORLANDO CHICAGO DALLA5IFOAT WORTH ARCHITECTURE ENGINEERING INTERIOR DESIGN PERMITTING PHILADELPHIA MIAMI PERMITTING ENTITLEMENTS DUE DILIGENCE INTERPLAW, KinderCare Learning Center - Spout Springs July 24, 2019 Page 2 of 2 3. Comment: The easement for inspection and maintenance access must include the SCM. (General MDC 9) Response: The access and maintenance easement on Sheet C1 is revised to include the entire infiltration basin in addition to the 10' access berm. 4. Comment: On the Supplement Form: a) The design storm was indicated as 6 inches rather than 1 inch. (Row 18) b) The design volume for the SCM does not reflect the actual provided volume in the calculations. (Row 18) c) The calculation method should reflect the method for calculating the design runoff volume (i.e., Simple Method or Discrete NRCS Method). (Row 19) Response: The Supplement Form is revised as requested. The SCM design volume is listed as the provided water quality volume from the previously submitted stormwater report. 5. Comment: Drainage structure 17 on Sheet C3.1 should be lowered to be even with the ground elevation to prevent standing water. Response: Drainage Structure 17 is revised to be even with the bottom of the swale as requested. 6. Comment: Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW Project Submittal Response: Acknowledged, pdfs have been uploaded and 2 hardcopies are provided. Please feel free to contact me if you have any questions or require additional information. If I am not available, George Georgy is the Project Manager and will be able to answer your questions. Sincerely, INTERPLAN LLC Stuart Anderson, PE, LEED AP Director of Civil Engineering