HomeMy WebLinkAboutWQ0035658_Permit (Modification)_20190725DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
MME
ROY COOPER'
Governor
MICHAEL S. REGAN
Secretary
•t
LINDA CULPEPPER
NORTH CARCLINA
En vrrvnmerttdr Qf9orrty
Director
July 25, 2019
John Day, Town Manager
Town of Beaufort
701 Front Street
Beaufort, North Carolina 28516
Subject: Permit No. WQ0035658 AMENDMENT
Town of Beaufort
Front Street Village
Wastewater Collection System Extension
Carteret County
Dear Mr. Day:
In accordance with your request received July 9, 2019 we are forwarding herewith Permit No. WQ0035658
dated July 25, 2019 to the Town of Beaufort (Permittee) for the construction and operation upon
certification of the subject wastewater collection system extension. This permit shall be effective from
the date of issuance until rescinded, shall void Permit No. WQ0035658 issued May 21, 2019, and shall be
subject to the conditions and limitations as specified therein. This cover letter shall be considered a part
of this permit and is therefore incorporated therein by reference.
This amendment corrects the system descriptions to match the installed infrastructure as completed
for certification. It also removes the last version's Special Condition 1.3 as it has been met.
Please pay particular attention to the following conditions contained within this permit:
Special Conditions:
Condition 1.1: Contains requirements of a variance approved pursuant to the variance request received
July 16th, 2014 from the Town of Beaufort. [15A NCAC 02T .0105(n)]
Condition 1.2: Each pump station shall be clearly and conspicuously posted using a weatherproof sign
with the address, a pump station identifying name/number, 24-Hour Emergency
telephone number, and name of the owner/operator of the sewer system/pump station
and instructions to call the number in the event of alarm activation or other emergency.
Simplex pump stations or vacuum sewer pits serving a single-family residence may have
a placard or sticker without the address placed on the control panel in lieu of a sign. [15A
NCAC 02T .0305(h)(2)]
Standard Conditions:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Division of Water Resources —Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
Phone: 910-796-7215\ Internet: www.deg.nc.gov
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system
permit issued to the Permittee.
Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities, the
completed Engineering Certification form with checklist attached to this permit shall be
submitted with the required supporting documents to the address provided on the form.
Permit modifications are required for any changes resulting in non-compliance with
this permit, regulations, or the Minimum Design Criteria. [15A NCAC 02T.0116]
Condition 11.13: If the Permittee/Applicant holds a system -side collection system operation,
maintenance and management permit (WQCS-prefix) from the Division, then the
following applies: For all newly constructed, modified and rehabilitated pump stations,
all equipment and components shall be sealed within a corrosion -resistant coating or
encasement to the extent practicable and equivalent to the minimum design criteria
unless the permittee can demonstrate it is not practicable or another form of corrosion
resistance is employed. [15A NCAC 02T .0108 (b)]
It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Dean Hunkele at (910) 796-7215
or via e-mail at Dean.Hunkele@ncdenr.gov.
Sincerely,
EDocuSigned by:
t01 5-�7 6,4
E3ABA14AC7DC434_
Morella Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
Cc: James Forman, Arendell Engineering (Laserfiche info via email)
Upload to Laserfiche
Permit No. WQ0035658 July 25, 2019 Page 2 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
TOWN OF BEAUFORT
CARTERET COUNTY
Pursuant to the amendment request received July 9, 2019 and application received April 16, 2019 and
additional information received May 13, 2019 for modifications to Phase 2 of the project, the following is
hereby approved:
For the construction and operation upon certification of approximately 1,278 linear feet of 10-inch gravity
sewer that will be tributary to a 172—gallon per minute pump station (#3) with duplex pumps, on -site
audible and visual high water alarms, telemetry, and an on -site permanent generator with automatic
transfer switch or an on -site automatically activated stand-by bypass pump as well as approximately 1,390
linear feet of 4-inch force main. This station will serve a majority of the project with direct service for 7
two/three-bedroom condominium units (2,040 gpd), restaurant space with 146-seats & a 55-seat bar
(7,240 gpd), meeting/multipurpose space (3,830 gpd), welcome center (150 gpd), and a 310-boat dry stack
(3,100 gpd) for a total of 16,360 gpd.
Upon completion, the interim PS#3 in Phase 1 below will be abandoned.
And for the construction and operation upon certification of approximately 189 linear feet of 8-inch
gravity sewer; a 54—gallon per minute pump station (#2) with duplex pumps, on -site audible and visual
high water alarms, telemetry, and connected to a permanent generator with automatic transfer switch as
well as approximately 33 linear feet of 2-inch and 185 linear feet of 2.5-inch force main to serve a 129-
room hotel/pool complex with 15,905 gallons per day of allocation. This system is tributary to pump
station #3 above.
Upon completion, the interim PS#2 in Phase 1 below will be abandoned.
February 20, 2017 MODIFICATION Version 1.3 (VOIDED)
Pursuant to the application received January 25, 2017;
Phase 2
Permit No. WQ0035658 July 25, 2019 Page 3 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
October 13, 2016 MODIFICATION Version 1.2
PhacP 1
Continued operation of 45-gallon per minute pump station (#1) as well as approximately 515 linear feet
of 2-inch force main with duplex pumps, on -site audible and visual high water alarms, telemetry, and
connected to a permanent generator with automatic transfer switch to serve the boat house complex
with a 213-boat dry stack, store, and a 20-slip marina with 9,508 gallons per day of allocation pursuant to
the application received August 31, 2016, and additional information received on October 13, 2016. This
pump station directs flow in a different direction and to a different Town sewer drainage basin than PS #3
listed above in Phase 2.
Until abandoned, continued operation of gravity sewer already installed and tributary to an interim 44-
gallon per minute pump station (#3) as well as approximately 896 linear feet of 2.5-inch force main with
on -site audible and visual high water alarms, telemetry, and a portable generator connection with manual
transfer to serve condominium buildings A-D with 2,080 gpd of allocation currently tributary to PS #1.
Until abandoned, continued operation of an interim 62- gallon per minute pump station (#2) as well as
approximately 253 linear feet of 2-inch force main with on -site audible and visual high water alarms,
telemetry, and a portable generator connection with manual transfer to serve the pool complex with 200
gpd of allocation currently tributary to PS #1.
July 24, 2014
MODIFICATION
Version 1.1
(VOIDED)
December 1, 2011
ORIGINAL ISSUANCE
Version 1.0
(VOIDED)
Total allocation for the proiect is 41,773 gallons per day,
This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified
conditions and limitations contained therein.
Permit Number: WQ0035658
Issued Today: July 25, 2019
DocuSigned by:
E
t0 5-�7 6,4
E3ABA14AC7DC434_
Morella Sanchez -King, Regional Supervisor
Wilmington Regional Office
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
By Authority of the Director and The Environmental Management Commission
Permit No. WQ0035658 July 25, 2019 Page 4 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
SUPPLEMENT TO PERMIT COVER SHEET
TOWN OF BEAUFORT is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension. The
sewage and wastewater collected by this system shall be treated in the Beaufort Wastewater Treatment
Facility in accordance with Permit Number NC0021831.
Permitting of this project does not constitute an acceptance of any part of the project that does not meet
15A NCAC 2T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned
herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed
Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -
constructed project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below.
I. SPECIAL CONDITIONS
Pursuant to the variance request received July 161h, 2014 from the Town of Beaufort, an alternative
design is granted for the operation of approximately 1,631 linear feet of 10-inch gravity sewer as
indicated on the provided plans and specifications with the following requirements: [15A NCAC 02T
.0105(n)]
The section of gravity sewer shall be designated as "high -priority sewer" in accordance with 15A
NCAC 02T .0402.
High -priority sewers shall be inspected by the permittee or its representative at least once every
six -months in accordance with the Permittee's individual system -wide collection system permits
(WQCS00102). Documentation of such inspections shall be maintained for a minimum of three
years.
2. Each pump station shall be clearly and conspicuously posted using a weatherproof sign with the
address, a pump station identifying name/number, 24-Hour Emergency telephone number, and name
of the owner/operator of the sewer system/pump station and instructions to call the number in the
event of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a
single-family residence may have a placard or sticker without the address placed on the control panel
in lieu of a sign. [15A NCAC 02T .0305(h)(2)]
II. STANDARD CONDITIONS
This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)]
Permit No. WQ0035658 July 25, 2019 Page 5 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or surface
water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365
days per year). Pump stations that are connected to a telemetry system shall be inspected at
least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are
documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three
years with exception of the map, which shall be maintained for the life of the system.
Permit No. WQ0035658 July 25, 2019 Page 6 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
5. Noncompliance Notification:
The Permittee shall report by telephone to a water resources staff member at the Wilmington
Regional Office, telephone number (910) 796-7215, as soon as possible, but in no case more than 24
hours or on the next working day, following the occurrence or first knowledge of the occurrence of
either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the initial
verbal report. Overflows and spills occurring outside normal business hours may also be reported to
the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Persons reporting any of the above occurrences shall file a spill report by completing and submitting
Part I of Form CS-SSO (or the most current Division approved form) within five days following first
knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to
ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved
form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form with checklist attached to this permit shall be submitted with the
required supporting documents to the address provided on the form. A complete certification is one
where the form is fully executed and the supporting documents are provided as applicable. Any
wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Engineer's Certification shall be considered a violation of the permit and shall subject the
Permittee to appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles
of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately
filed with the applicable County's Register of Deeds office shall be submitted with the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines & force
mains) of the wastewater collection system extension. Final record drawings should be clear on
the plans or in accepted electronic format and are defined as the design drawings that are marked
up or annotated with after construction information and show required buffers, separation
distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity,
pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge
protection, detention time in the wet well, and force main, ability to flush low points in force
mains with a pump cycle, and downstream sewer capacity analysis.
Permit No. WQ0035658 July 25, 2019 Page 7 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump
stations' storage capacities and the rotation schedule of the portable power source or pump,
include travel timeframes, shall be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in
non-compliance with this permit (including pipe length changes of 10% or greater by type & size,
increased flow, pump station design capacity design increases of 5% or greater, and increases in the
number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications
or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its
own merit. Please note that variances to the Minimum Design Criteria should be requested and
approved during the permitting process prior to construction. After -construction requests are
discouraged by the Division and may not be approved, thus requiring replacement or repair prior to
certification & activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greaterthan ten percent below the minimum required slope perthe Division's
Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until
corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting
the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of
the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's
Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials may subject the Permittee to an enforcement action by
the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C,
construction of additional or replacement wastewater collection facilities, and/or referral of the North
Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T
.0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement facilities.
[15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local
government agencies which have jurisdiction or obtaining other permits which may be required by
the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)]
Permit No. WQ0035658 July 25, 2019 Page 8 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
13. If the Permittee/Applicant holds a system -side collection system operation, maintenance and
management permit (WQCS-prefix) from the Division, then the following applies: For all newly
constructed, modified and rehabilitated pump stations, all equipment and components shall be sealed
within a corrosion -resistant coating or encasement to the extent practicable and equivalent to the
minimum design criteria unless the permittee can demonstrate it is not practicable or another form
of corrosion resistance is employed. [15A NCAC 02T .0108 (b)]
Permit No. WQ0035658 July 25, 2019 Page 9 of 11
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE:
Town of Beaufort
PERMIT #:
WQ0035658
PROJECT:
Front Street Village — Phase 2
ISSUE DATE:
July 25, 2019
COUNTY:
Carteret
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until
the Division has received this Certification and all required supporting documentation. Consequently, it should be
submitted in a manner that documents the Division's receipt. Send the required documentation to the Wilmington
Regional Supervisor, Water Quality Section at the address at the bottom.
The Permittee is responsible for tracking all partial certifications up until a final certification is received. Partial
Certifications shall include Phase/Section covered. line size & leneths installed. and listine of lots/connections to be served
and pump station design, if applicable. A Final Certification shall be a complete set of record drawings and design
calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable
standards & requirements, the Professional Engineer below has provided applicable design/construction information to
the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein
or portions thereof.
Printed Name, Title Signature Date
ENGINEERS CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North Carolina, having been
authorized to (❑ periodically, ❑ weekly, ❑ full time) observe the construction of the project name and location as
referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used
in the observation of the following construction:
station (#3) with duplex pumps. on -site audible and visual hiah water alarms, telemetrv. and an on -site permanent
generator with automatic transfer switch or an on -site automatically activated stand-by bypass pump as well as
approximately 1,390 linear feet of 4-inch force main; 189 linear feet of 8-inch gravity sewer tributary to a 54—gallon per
minute pump station 02) with duplex pumps, on -site audible and visual high water alarms, telemetry, and connected
to a permanent aenerator with automatic transfer switch as well as aoproximately 33 linear feet of 2-inch and 185
linear feet of 2.5-inch force main
such that the construction was observed to be built in compliance of this permit; 15A NCAC 2T; the Division of Water
Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials.
.............................................................
North Carolina Professional Engineer's Seal w/signature & date
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
NC DWR — Water Quality Regional Operations Section 127 Cardinal Drive Extension Wilmington, NC 28405
Wilmington Regional Office Phone: 910-796-7215 FAX: 910-350-2004
DocuSign Envelope ID: 3684CBD1-5306-4997-AF18-293648EF179F
SEWER ENGINEERING CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116.
Certifying Engineer:
Certification Review Date:
Project Name:
W Q00
Project County:
1) Has permittee information changed since the permit was issued (or last modified): change of mailing address,
change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No
• If yes, please provide either a change of ownership form or new contact information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ❑ Yes ❑ No
3) Final Engineering certification? ❑ Yes ❑ No
• If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase, what was previously certified (if applicable), and what is left to be certified.
4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines.
• Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches).
5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A
• Ensure power reliability option was selected per 15A NCAC 02T.0305(h).
6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers (latest version), and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other
pertinent information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable, specific language regarding the variance
will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines (15A NCAC 02T .0402(2))? ❑ Yes ❑ No
• If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with
the appropriate language.
8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe
length difference of 10% or greater, change in flow, pump station design capacity design change of 5% or greater, and
change in the number/type of connections)? ❑ Yes ❑ No
• If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.