HomeMy WebLinkAbout20051711 Ver 2_USACE Permit_20190712U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2019-01282 County: Alamance U.S.G.S. Quad: NC -Burlington
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Burlington Alamance Airport
Attn: Dan Danieley
Address: 3441 North Aviation Drive
Burlington, NC 27244
Size (acres) _3 Nearest Town Burlington
Nearest Waterway Gum Creek River Basin Cape Fear
USGS HUC 03030002 Coordinates 36.051045, -79.471074
Location description: The project area is located at the Burlington -Alamance Regional Airport, just up- and down -stream of a
twin arch culvert installed in a section of Gum Creek during a runway extension project in 1994, in Burlington, Alamance
County, North Carolina.
Description of projects area and activity: This verification authorizes the temporary discharge of fill material into 50 linear feet
of stream channel for the removal of accumulated sediment necessary to maintain an existing twin arch culvert at the
Burlington -Alamance Regional Airport.
Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 3. Maintenance
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed 6/17/2019, received 6/19/2019, and the enclosed plans, Exhibits 1-4. Any violation of
the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration
order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact David E. Bailey at (919) 554-4884, Ext. 30or David.E.Bailey2(a)usace.army.mil.
g Date: 2019.07.12 12:44:56
Corps Regulatory Official: -04'00' Date: 7/12/2019
Expiration Date of Verification: 03/18/2022
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Copy furnished:
Troy Beasley, WithersRavenel, 219 Station Road, Suite 101, Wilmington, NC 28405
Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd., Suite 300, Winston Salem NC 27105
0
C?
L�
Airport Property Line
LEGEND
_.
'i-111111
.�
Al � t�..; � � Burlington -Alamance Regional Airport
"C' )Z\ \ ✓ i
eui oirvc i �//
�\ �,_`•��, S« \ \ `CJ �
___� 'N-�%moi//jos'-2
r 'f//!i r/i/j%moi:=:%ir'
__
✓r� ��i\�r)11���`,11� '�
W
LINE
r- REGULATORY
FLOODWAYZONEAE
�,;G'
ZONE AE SPECIAL
-- FLOOD HAZARD AREA
/f,tlr
,.x0�m
/
650
OVERALL AIRPORT LAYOUT -
Exhibit 1 -TWIN ARCH CULVERT REHABILITATION PROJECT AREA
IV�,
LEGEND
_.
'i-111111
.�
PROJECT AREA
AIRPORT PROPERTY
✓r� ��i\�r)11���`,11� '�
W
LINE
r- REGULATORY
FLOODWAYZONEAE
ZONE AE SPECIAL
-- FLOOD HAZARD AREA
,.x0�m
650 325
650
E llllllllllllllllllll�
Scale
ZZ
- EXISTING ROAD
_(OLD CONSTRUCTION ACCESS ROAD) /
/ /
BASE FLOW CUL
8 ERT (WET)
FLOW
W CULVERT (DRY)
FIGURE 4 - IMPACT
590 • 1 xzz/
41
LEGEND
r---- REGULATORY
FLOODWAYZONEAE SEE FIGURE 3 - IMPACT AREA 1 ________
__-_________ --_J FLOOD ONE
H SPECIAL
�� 1) LOOD HAZARD AREA
PROJECT A
EAM BANK
ST
� �\ /
NOTE: EXISTING CULVERT CONSISTS CENTERLINE
OF /
DUAL BARREL 18'-0" X 10'-9" HIGH / / I ( ` \ \ \ TOP OF BANK
PLATE STEEL ARCH CULVERTS. I
TEMPORY
INSTALLED ON SPREAD FOUNDATIONS. /// \ I STAGNGA
A EA
PROJECT AREA- N 100 50 0 100
Exhibit 2- TWIN ARCH CULVERT REHABILITATION OVERALL IMPACT W ��
5 Scale
p/ / 560
p�G /
SANDBAG DIVERSION FOR
SEDIMENT REMOVAL
Xx
/ O
90 C-\ _
IMPACT AREA 1
SEDIMENT REMOVAL ADJACENT TO STREAM
AT CULVERT OUTLET
X -STREAM IMPACTS - 20 LF, 250 SF,
APPROX. 25 CY OF SEDIMENT REMOVED
EXISTING RIP RAP
(TYPICAL)
tIN/ TEMPORARY
/
BRIDGEMAT
/ C
/ a
/ SEDIMENT REMOVAL
/ ADJACENT TO STREAM �o
/
/ \ EXISTING RIP RAP\ -
(TYPICAL)
PROJECT AREA -
EXHIBIT 3 -TWIN ARCH CULVERT REHABILITATION OUTLET IMPACTS (IMPACT AREA 1)
s \ \
�NUF so \
F�
LEGEND
LOD PROJECT AREA
STREAM BANK
CENTERLINE
TOP OF BANK
STREAM BUFFER
\ ZONES
STREAMIMPACTS
SANDBAG DIVERSION
SEDIMENT REMOVAL
IN CULVERT- NO
STREAMIMPACTS
N 30 15 0 30
W E
5 Scale
IMPACT 2 \
63 INLET END TEMPORARY ACCESS ROAD
/ZONE 1 BUFFER STREAM IMPACTS - 823 SF
ZONE 2 BUFFER STREAM IMPACTS - 585 SF
STREAM IMPACTS - 30 LF, 208 SF
MPORAR ELEVATED RIDGE GO h6
FOR NSTRUC I ACCESS. 560 p�SANDBAG DIVERSION
NSTRUCTED AT LOC ON ��� Pp` FOR SEDIMENT REMOVAL./
PREVIOU REAM
CROSQp O BUFFER-
/
SING ALIGNED WIT \�C� ONE2STREAM /
M IMPACTSEXISTIALLOWED. O� �'� 20'FROMZONE
NO
O�
(100
�O
�
�OFK o
h�
BASE FLp
i W CULVE
OF6 r0 � �- RT (WET)
�O� CpP �OP OF BANK
HIGH FLOW ULV C
/ ER7 (DRY)
L D
/ZONE 1 STREAM BUFFER
30' FROM TOP OF BANK
-\ ° REMOVE RIP RAP AND /
GRADE BANK FOR LEGEND
ACCESS/
CCESS ROAD / RESTORE TEMPORARY 0 EXISTING LOD PROJECT AREA
4O TEMPO CONDITIONS AT / STREAM CENTERLINE
K
PROJECT COMPLETION. TOP OF BANK
STREAM BUFFER
0 ZONES
S AGING AREA
2 TEMPORARY STREAM BUFFER
- STAGING AREA / ZONE 2IMPACTS
STREAM BUFFER
ZONETS
/ / STREAMMIMPAIMPACTS
� SANDBAG DIVERSION
PROJECT AREA- N 30 15 0 30
EXHIBIT 4- TWIN ARCH CULVERT REHABILITATION INLET IMPACTS (IMPACT AREA 2) W E
5 Scale
Action ID Number: SAW -2019-01282 County: Alamance
Permittee: Burlington Alamance Airport (Attn: Dan Danieley)
Project Name: Burlington -Alamance Regional Airport / culvert sediment removal / Burlington /
Alamance County / municipal
Date Verification Issued: 7/12/2019
Project Manager: David E. Bailey
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: David E. Bailey
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
David.E.Bailey2@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date