HomeMy WebLinkAbout20190748 Ver 1_DCM Permit_20190722Strickland, Bev
From: Bodnar, Gregg
Sent: Monday, July 22, 2019 1:35 PM
To: Hair, Sarah E CIV CESAW CESAD (US); DCR - Environmental -Review; Cox, Heidi;
Staples, Shane; Harris, David B; Jenkins, Shannon; Gupton, Sharon; Walton, Tim;
Moser, Mike; Mairs, Robb L; Hall, Christine; Dunn, Maria T.; Butler, Rodney A;
Sandi.Watkins@moreheadcitync.org; Sullivan, Shelton
Cc: Day, Susan
Subject: CAMA permit for Edward and Rachel Cozart
Attachments: Cozart 60-19.pdf
Afternoon all,
Please see above attachment for the subject CAMA permit.
Thanks,
G regg
GreggBodnar
Assistant Major Permits Coordinator
D, E Division of Coastal Manazernent
Department of Environmental Quality
252 808 2808 ext 215 (Office)
GrCggJ3odnar@ncdenr.gmr
Email correspondence to and from this address is subjectto the
e a: r • e e r r r• o *r
Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
e r m1r t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113 -229
Issued to Edward and Rachel Cozart, 205 Lands End Road, Morehead City, NC 28557
Permit Number
60-19
Authorizing development in Carteret County at adj. to Bogue Sound, at 205 Lands End Rd.,
in Morehead City , as requested in the permittee's application dated 5/6/19,
including attached workplan drawings (2), Sheets 1 and 2 of 2 dated "Revised 6/26/19".
This permit, issued on July 15, 2019 is subj ect to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
1) This permit authorizes only the docks, piers, boat lifts, and other structures and uses located in or
over the water that are expressly and specifically set forth in the permit application. No other
structure, whether floating or stationary, shall become a permanent part of this docking facility
without permit modification. No non -water dependent uses of structures shall be conducted on, in or
over Public Trust waters without permit modification.
2) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not
exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as
measured from the bottom of the decking.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
PA4
Wivi.ivi
Braxto ' .Davis, Director
'�
sion of Coastal Management t
This permit and its conditions are hereby accepted.
Signature of Permittee
Edward and Rachel Cozart Permit No. 60-19
Page 2 of 3
ADDITIONAL CONDITIONS
3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
4) This permit authorizes a maximum of 5 formalized boat slips.
5) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's areas of riparian access.
6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to
the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat
does not result from the construction and/or operation of the authorized facilities.
USACE Condition
8) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must
implement the U.S. Fish & Wildlife Service's Guidelines, and strictly adhere to all requirements therein.
The guidelines can be found at lett ://Nvxvw.fws. gov/nc-es/mammal/mecuiatee guidelines. df..
General
9) If a court of competent jurisdiction determines that a party other than the permittee has legal title to any
part of the area approved for development under this permit, this permit shall be null and void as to the
area the court determines is not owned by the permittee. This condition shall take effect on the date such
court judgment becomes final. In such event, the permittee shall consult DCM prior to initiating or
continuing any further development under this permit.
10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
11 TheP ermittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
12) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 197800056 (Action ID SAW -2019-01080).
Edward and Rachel Cozart Permit No. 60-19
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 2019-0748.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808-2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: An application processing fee of $250 was received by DCM for this project.