Loading...
HomeMy WebLinkAbout20081658 Ver 1_Triage Comments_20090901Use this form instead of writing inside the folder ?y Triage Comment Sheet DwQ# ?? f • 2 Triaged By: ` g o Reviewer 1 Date: Reviewer 2 Date: S /G j Reviewer 3 Date: Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) Issue with conditions (Reviewer 1) r Issue with conditions (Reviewer 2) ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage FormsUriage Issue Sheet.doc PLEASE PRINT CLEARLY 08-1658v2 Rogers Residence Variance Request AML comments September 1, 2009 Please provide a completed Infiltration Basin Supplement Form (including both worksheets, Design Summary and Required Items Checklist), as well as all of the required items. The BMP Supplement Forms are available on the DWQ web site at: http:/ih2o.enr.state.nc.us!?sLi/bmp_for ns.htm. The form that was provided pertained to Infiltration Trenches. 2. Please show the area of rooftop that will be conveyed to the infiltration basin. This area must be equivalent to or greater than the amount of impervious surface that is proposed within the riparian buffer. The design of the infiltration basin must reflect the actual amount of water that is being conveyed from the rooftop. 3. Please provide plans for the hydraulic device that will be used to convey stormwater from the grit chamber to the infiltration basin. 4. Please remove the vegetated area that is proposed upslope of the infiltration basin. Importing clays and topsoil to this area will increase the risk of clogging in the infiltration basin. In addition, the infiltration basin should be sited in the highest area possible to maximize the separation between the basin and the Seasonal High Water Table. 5. It is permissible to plant grass on the surface of the infiltration basin.