HomeMy WebLinkAbout20190964 Ver 1_SWMP_20190722North Carolina Department of Trans portation
.'i 101111�4 iA I Cr Highway Stormwater Program.+
STORM WATE R MANAGEMENT PLAN -- `
(Version 2 1sed Oc[obeF 2016) FOR NCOOT PROJECTS
WBSElement: VJ-5601HP TIP No.: Countylieo: '.'Uake Page 1 of 2
General Project Information
WBSElement:
W-5601HP TIP Number:
Project Type: Realignment Date: 1012912018
NC DOT Contact
Galen Cai I
Contractor 1 Deslg
ner.
Address:
1020 Birch Ridge
Raleigh, NC27610
Address:
Phone:
(919) 707-6711
Phone:
Email:
tail ncdot. ov
Email:
cityrrown:
County{ies):
Wake
River 11a a i n (s 1:
Neuse I
ICAMACounty?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (Iin• miles or feet}:
560fi Surrounding Land Use: IResidential
Proposed Project
Existing Site
Project Built -Upon Area Jac.)
0.3 ac.
0.3 ac.
Typical Cross Section Description:
10.5ft lanes w14ft grassed shoulders
10.5ft lanes w1Z grassed shoulders
Annual Avg Daily Traffic(vehthrlday):
❑esignlFuture: 9500 Year:2013
: 15900 Year: 2040
115at
General Project Narrative:
{Description of Minimization of Water
Impacts}
Project involves realigning ofQptimist Farm Road SR 1300 with Danny Brook Road SR Lake Wheeler Road SR 1375. Project will remove approximately
0.2 acres of existing pavement of existing SR 1390. Grassed shoulders and grassed sditches will be provided. Impacts to buffered pond in SW quadrant.Quality
Total area ofprojectto grassed swales is approx 0.6 acres fsee treatment provided on s"tab.
Waterbody Information
Surface Water Body j1 }:
NCDWR Stream Index No.:
NCDWR Surface Water Classifcationfor Water Body
PrimaryCIassifcation:
Supplemental Classification:
Other Stream Classification:
None
Impairments:
AquaticTBESpecies?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect Neuse
Project Includes Bridge Spanning Water Body?
INo
I Deck Drains Discharge Over Buffer? Yes Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
INo
(If yes, provide justification in the General Project Narrative) (Ifyes, describe in the General Project Narrative. if no,justify in the
General Project Narrative)
(Ifyes, provide justification in the General Project Narrative)
I lighway
Stortnwater
',Version 2.07: Released October
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
WBS Element: W-5601HP TIP No.: CountAies): Wake Page 2 of 2
Swales
Sheet
No.
Station & Coordinates
{Road and Non Road
Projects
Surface
Water
Body
Base
Width
fi
Front
Slope
H:f
Back
Slope
H:f
Drainage
Area
ac
Recommended
Treatm'tLength
fi
Actual
Length
fi
Longitudinal
Slope
Q2
cfs
V2
f
Q10
cis
V70
f
Rock
Checks
Used
BMP
Associated w/
Buffer Rules?
4
35.658611-7871902
0.0
4.0
20
04
40
200
340%
1.1
2.0
14
22
No
Yes
35.658081-78.71821
Actual Length
Input adual linear
length of —ale