Loading...
HomeMy WebLinkAbout20190964 Ver 1_SWMP_20190722North Carolina Department of Trans portation .'i 101111�4 iA I Cr Highway Stormwater Program.+ STORM WATE R MANAGEMENT PLAN -- ` (Version 2 1sed Oc[obeF 2016) FOR NCOOT PROJECTS WBSElement: VJ-5601HP TIP No.: Countylieo: '.'Uake Page 1 of 2 General Project Information WBSElement: W-5601HP TIP Number: Project Type: Realignment Date: 1012912018 NC DOT Contact Galen Cai I Contractor 1 Deslg ner. Address: 1020 Birch Ridge Raleigh, NC27610 Address: Phone: (919) 707-6711 Phone: Email: tail ncdot. ov Email: cityrrown: County{ies): Wake River 11a a i n (s 1: Neuse I ICAMACounty? No Wetlands within Project Limits? Yes Project Description Project Length (Iin• miles or feet}: 560fi Surrounding Land Use: IResidential Proposed Project Existing Site Project Built -Upon Area Jac.) 0.3 ac. 0.3 ac. Typical Cross Section Description: 10.5ft lanes w14ft grassed shoulders 10.5ft lanes w1Z grassed shoulders Annual Avg Daily Traffic(vehthrlday): ❑esignlFuture: 9500 Year:2013 : 15900 Year: 2040 115at General Project Narrative: {Description of Minimization of Water Impacts} Project involves realigning ofQptimist Farm Road SR 1300 with Danny Brook Road SR Lake Wheeler Road SR 1375. Project will remove approximately 0.2 acres of existing pavement of existing SR 1390. Grassed shoulders and grassed sditches will be provided. Impacts to buffered pond in SW quadrant.Quality Total area ofprojectto grassed swales is approx 0.6 acres fsee treatment provided on s"tab. Waterbody Information Surface Water Body j1 }: NCDWR Stream Index No.: NCDWR Surface Water Classifcationfor Water Body PrimaryCIassifcation: Supplemental Classification: Other Stream Classification: None Impairments: AquaticTBESpecies? No Comments: NRTR Stream ID: Buffer Rules in Effect Neuse Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? Yes Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) (Ifyes, describe in the General Project Narrative. if no,justify in the General Project Narrative) (Ifyes, provide justification in the General Project Narrative) I lighway Stortnwater ',Version 2.07: Released October North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS WBS Element: W-5601HP TIP No.: CountAies): Wake Page 2 of 2 Swales Sheet No. Station & Coordinates {Road and Non Road Projects Surface Water Body Base Width fi Front Slope H:f Back Slope H:f Drainage Area ac Recommended Treatm'tLength fi Actual Length fi Longitudinal Slope Q2 cfs V2 f Q10 cis V70 f Rock Checks Used BMP Associated w/ Buffer Rules? 4 35.658611-7871902 0.0 4.0 20 04 40 200 340% 1.1 2.0 14 22 No Yes 35.658081-78.71821 Actual Length Input adual linear length of —ale