Loading...
HomeMy WebLinkAbout20190953 Ver 1_Shoreline Stabilization_20190719PAID, State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form 2 0 1 9 0 9 5 3 Three copies of the application (including attachments) and the application fee should be sent to: Ifsending via US Postal Service Ifsending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street n , Raleigh, NC 27699-1617 Raleigh, NC 27604 ��►(/ A r A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Mailing Address: /' o Nl . _V10 01 Telephone Number: 8a8 b Z -t)4 ft"umber: �1a8- a1'1 -'{Z28 E-mail Address: - 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: htti)://www saw usace army mil/Portals/59/docs/regulatory/readocs/Permits/SAMPLE AGENT AUTHORI ZATION FORM.odf) Name: �ohN�e s Company Affiliation: Mailing Address: RS Telephone Number: $�:8 Fax Number: E-mail Address: wnci-t'oe'.'V2." B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: 0- Nearest Town: t.�QQA Lake/ river/ ocean adjacent to property: L Kazoo Property size (acres): - ark Subdivision name or site address (include phase/lot number): C "{ '1� 9'10 Gac\e ,V�,.J , tSL a860 \ Directions to site - please incVde road names and numbers, landmarks, etc.: Latitude (in decimal degrees) 35.'I b Tg l Longitude (decimal degrees) - 81. 35L4S6 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): 'Rem. cig4o_\ 6. Describe proposed work (include di ssion as to Kw hardening of shoreline has been (1 avoided, or why it is necessary): } �aCe ` vc, � osS �r► l ru�� a T 7. Will work be conducted from land? ❑ From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, ri rap, retaining walls, etc.) in square feet: ri(J�oo t- �W ST �E ('mac✓ Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including k fill, excavation, rip rap, retaining walls, etc.) in square feet: �00S� 4SO-� (_l (����1 Temporary impacts (temporary clearing, construction corridor) in square feet: Al 41 h e 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number M, _77— s ( trees, for instance): ✓oSS� 11. Signature Owner/Agent's Signature*1 A NCAC 02H .0502(f)] ate 'Agent's signature is valid on y if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 FL Norma SI Lake (At Full Pond/ Normal Water Level) Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 ,W catawba county Geospatial Real Estate Search MAKING. urree. errrEr. Information Services now . a y N w -LE 1 in=80ft Parcel: 370417126310, 970 18TH AVE CIR NW HICKORY, 28601 Owners: ZAGAROLI DAVID PETER, ZAGAROLI NANCY K Owner Address- 316 4TH ST NW Values - Building(s): $539,800, Land: $412,800, Total- $952,600 This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2014 Catawba County NC 07/15/2019 �s �rF4''s tia Granite Fails 041Whiss 1*44% FOX RIDGE FAST BURKE FARMS WILT OW OAK Petra Mills Bethlehem 1173 Shiloh IR 20 min 62mi 970 18th Ave Circle NWEkory, North Carolina 28601, United States r Viewmont Hickory Regional' Airport Hickory ,Longview Sweetwater Lv Bing ut Hildebran _ ?: A 1173 Shiloh Church Rd, Hickory, North Ca... Im L—A k FOREST HILLS ;¢�9 i20t9 Llcrosort Gorporarloll�70fe 11BtE'. These directions are subject to the Microsoft® Service Agreement and are for informational purposes only. No guarantee is made regarding their completeness or accuracy. Construction projects, traffic, or other events may cause actual conditions to differ from these results. Map and traffic data 0 2019 HERE'. St Stephens Oxford Pi +. 16 C r_--- OM9"ME B 970 18th Ave Circle NW, Hickory, North C... Millersville U 4earn Rd, Hickory United Stst>. IR 20 min 62mi 970 18th Ave Circle NWEkory, North Carolina 28601, United States r Viewmont Hickory Regional' Airport Hickory ,Longview Sweetwater Lv Bing ut Hildebran _ ?: A 1173 Shiloh Church Rd, Hickory, North Ca... Im L—A k FOREST HILLS ;¢�9 i20t9 Llcrosort Gorporarloll�70fe 11BtE'. These directions are subject to the Microsoft® Service Agreement and are for informational purposes only. No guarantee is made regarding their completeness or accuracy. Construction projects, traffic, or other events may cause actual conditions to differ from these results. Map and traffic data 0 2019 HERE'. St Stephens Oxford Pi +. 16 C r_--- OM9"ME B 970 18th Ave Circle NW, Hickory, North C... bing maps A 1173 Shiloh Church Rd, Hickory, North Carolina 28601, United States B 970 18th Ave Circle NW, Hickory, North Carolina 28601, United States A 1173 Shiloh Church Rd, Hickory, North Carolina 28601, United States 20 min, 6.2 mi Moderate traffic (6 min delay) Via NC -127 Local roads '(' 1 Depart Shiloh Church Rd toward Lynwood Ln 0.2 mi ()Turn 2 right onto NC -127 Pass Exxon/Circle K in 3.9 mi 4.6 mi r> 3 Turn right onto 20th Ave NW 0.5 mi 4. Turn right onto 2nd St NW 0.2 mi 5 Bear left onto 20th Ave Dr NW 0.2 mi 6 Bear left onto 18th Ave Dr NW 0.4 mi 0' 7 Turn right onto 18th Ave Circle NW 0.2 mi 8• Arrive at 18th Ave Circle NW on the right The last intersection is 18th Ave Dr NW B 97018th Ave Circle NW, Hickory, North Carolina 28601, United States CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: °1qO �$i� (�fe • C��e. County: Owner: Print Contractor/agent: _ Signatu Print N Signa The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, �\ C 3ZO \ hereby state that I have been informed of the Catawba Riparian Buffer Rule. Ar4work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. 11 Signature (owner): Date: 30 �� ♦r r rrr .1 NpRMa t�s^A�;/I���!�.N I -i�� .. li � r�� r•!�`' �/:.th ,�E��• •.arh !Ml M rNM Al N06wA � fry/''{,,y i , .�•• w r • • • 1 ( ) � fIR / - 11 � • rat �M�/+y� IaM•} tM+ +�•,4,1W wM ( '4% ♦ � ; � 1 « �' /�` b^r `• ,.�• «Ar ISi a lMr � l II • u i' :Irl e h 1'K • .1 r A•11:'1 rtl Alr i rl e'R I.IRf r ' �• • ° r Ir 01 ti+1,1� \ r1 'n •r•- h r'u Nr ♦ s _ .,, it ;'1 !{ J 1 `} r C! .. r Ny rr ��►y rt h/•AKt r � 1� _ - /r ,1111 � O dl ,) i � �, •:. h 19� w !a• � ' I � II � t, �J r 1 � . .a- r I /�\• Ir i fir! � � Q 1 / •♦ �' / �i. 1 1 N•MI f. �Y " it 1 e11: �i�„ i" 1 r P (••M7 M• r e ' • y Nrr 11 Mni,/'fxlr IIIA r.i1N I.NM •/ 1Yr Alt? 14 R l M/ r. R•r.• Ir MJ 1 '•• 11'1'1+i• f i 1 l•1rwAW 1/A4 W♦•.h•t.rl.,. «•1l i�'!_T 1','I •' M ry'�'•,� ��1 ` ILLS INlhr rr,wen rl NNR RAN/Mel Mp Alb 151 lhr .( ♦ �/ r'!•17♦n,A' E1 { l♦ (•fl) s✓� rl hipl..«l.w. l.rr.l 1.► ' 19,39' at / It n A .a o• 09 AL♦p4 ''9 5R♦+ \'S �'/. °e•/ M1�0 d•.ti✓}'\ ssas ra. J\Sr. ,U 1 1 I �%�_ _ it s pay' ��•� �♦ M1\'� .►°• /� � ... r. �s4c. ���4. !• Y�r ►/ a ♦,� \o / "J> Vz -? . \ �` P\ •'++r, e ArflO Aw OW I7.M••./a/nwA 1B0 P.P. ' Y� `\ti\ / Y!i i ♦• // i yr `� ti \ .,' 9` .`@w JO lbw M wtfv tI/frrl•(M• ASD• S\0�\\ / ^ Ao �' F So - Iwo fi w ry «NMrrNI A/ AI. PANwMI All' y4 I NN' ,t. - DIIAR rRWRM "1{I AS>i 0 A4 \ \ "al ♦ ^ / \ \ `y o. C1,,Q rAli l• _ n • 9 - / \'r•► L41 �+tn+� ♦ yt i '\ \ 1J a�/ • L •IR /cox. es z1 � N�, � ,yV ra.� • 4'i. / E \\ 10.01• t 44 G coa . u s \ / ♦,' �1f' �y, / o s�° -L•� 111?N\ . �.'--• g A'+ W 1 +c • +c '' .; � e� '+• ' '! wr.lr»w' w,. �/ r~ / s3l�r z e T l {{ \1• fJ0. •a �'rye`tr/ hr 9 { PAIIO� h, l'afNtl C*odt— .1 M. I.A...hr • e• i w 4, i (fin) / � q0' E s s -ss f Ja.• . � of �� I> °'40 A r'rM i/T / \� 04J•I6 60" M1�,y�`JO a• : \\ r \ CNMAtrAM ArIN/ CMNry AN r.A/ r'.mna.bn �. r , / (/•• e J ' l5 ey ,! \ ) '!)_ FNr Ar»••,.I AM rAr M/ .( M. ew.naAM } !►' ,1' i, L7. / R° ► a A. ez e� �A, +u .�' X19 eq 3z e + zs Pt.. R A ale/ 9UD Irlrlun 4", aN. d'' Ua) N:i f1�j1 / e•a1 AN IL�Ze°i---. -'-♦ave y\ "''4 �,ye d J?Jss coA. •,� 1 �ns wM.P nJar do6roper /Iuc. r�ol, ,' A' 7y RC• / Yli' + •>. RF 11 f' 1,1 \Aff Rr, r f 0• a / 4. A. t rb�r N 11.07 Ac. f Y\ea Jd 1 K IK�� Ck ,llN d{ • „�.rr`r+ .. 1.!• Od C�� n. • ss!�o •; �trJ. Io. �, Sf7eA6N_ l 6\0 . • ) 1 •� . I • . sr _— -- yJ'1 91N 01' O. Oit�0.15 'Ir N tl N/ A. X ..tt •1 \ rA./ br KrMla.Aw ./�D.'D�/o/ry �1• nl.,.., 1 '�� 6\•-- SS' � `y✓ �S . s.(. � ylr, •°• 4+rr• A, son• ILa3N---'-^� ♦° �+p � x . Mr Al. (IA Ov N..lalluly .. 1787 - iI 1 it ...fr• 97H 4rY '/• DN.oJ A.'� 'OE Cll sao• .!' •Y ' d 7 f' .( e 4 e N10.16 + y W Mrw/N h PM a..R PNM 9S ' e • / e♦ AC. N N ]-R7-47 W " Y ; • •, 't r t : )A I ► D J ,''!y. 66.0•s I w� _/ `,.T: •i 6E ew 176a�•_�.._•-�i5�...-�N..11 �EC .1 4' ,' AIA eJli 11.17' C110.'53. E / �0 ttl ry . n%'r4 ck /0 N OJ0.ao f MIO -s ,. 70.0 CII LL, 10 , Ip ,��' \' CH 1140' A 110.6°' GIG 10. I7 16 fi.r N•°►h .r n../. 1(,' " I \C, b X415 , 17 0 et 1 r g ; IIIA. '���s: �,� ,/ b• w a• , a ,- -, C.� -. �,r1 `,, }} GIL LEits •�,9A C• / O /YYqq LSA / RIFIDP 2 u N / ~' ___ -sem M ►-N-10 W p y01ye N Nr A N Y r wAr.M f.rn/y ,A, p•Y �y / O w j O / h 3 / P6.67J a F. 10' AM SEI9ACN ^'r 16 A6• } f. �•`Yl �A) • .16 r Kalay Von Orssael r 'a •�I ♦a ) zoao' Ldoul`' / . ,c O is Acs. F. "1 yly r 6 AC /Ar /•r11rrA• 04.1 _,OAF d'. . w`r / • it SPA Mr/rr /'IaiA d L•pfa ADa CNwI(a A(C _ _ zJlwo• RAW - . - _ - / u' M / a s r wNMrAb 11 r` Ic/ .-- ' f 1 1-606 111.IS' ''^,I•' _ 2 NEMC OR' - Z54.40' 14 •1�. SW6E � NAIO' �-'_- !//.1/__'-•i4.y ♦-tti[.fx lAfl _ ,. 11y .r0 wl CLJi'/ -ID' eA 166.'0 F 711.♦0' .- 1111.11 M /,- SHUFORO MLLLs INC, PAUL HOLAHAN JAMES HOLLAR / 0Ixip•/ f 1 17110' , ._^'�S 16-00• ,IIV1 i t'l..R. / s 1_ss rrr/l.J, 10 ♦yw/A, oyro.we Ay -s7ao f A—q/wd rwl y 1-1,ANrA•a i A-REORMK ALL > H-4Pas. -— [ /Ar 0—ow•A,• n./ `/' 4, / '3 EN / qr„ `« ANNE MaALLIS JFR r..grJ w• rA..• .. AnJ ry M.r'Aw d A,— a/wm..tbn (oma ' ,7:.-�t,': °1• \,.: l f { A O..4 ,'•rI• Mo( Ari /'b( r., M w•J h .c.w/rrc.• r l ul .Aw a r u ra r. 7 ,1/ J w/M.,, m/ o.NqAd,bnA.r, A./a oAl.r �. r• 2i �� �'•%. i C 5 t• Mw•r..AIJ rn/ AAM if "nor b t_.'c.f4tk:�. _ AA_ /9. L _. _ t= / Q / NOM: /�ti•• / • •4' �d •.j ON CONNED L014 trlf. 5M YARD AIII/l1000 ew �rw/, �` •••' •''•• • .A"'• V ,••9f 'fib / som, srurcr SIMI.I. 111 NO IJ NS MAN 110% I N./464404 #—A.r /.�11=.. �•�':) : Cf1V • Q to Ir AMM 1'r.Iq .,. y.'/11•./N r/w/y UWIINI N .Illll 11.r.Ay C.,Arr /0 M.I 11 ..I UTA7a, w/ ! I r!1' / d MN jrrwN wI vhh Ar. rrm frill/ M.r am- rW •I hw..•rwrnh Mr. sell Arl.11d NI Alb r lHA/1WAr�16�MMrjA/l w►j�r,�7Awy�y 0qMM.aIr l~.11NX.1weARu►raJ rANrwI.r rVIN�nr1.vh«!l' rr.r1rAlr...AtyN•rrrr•S, . r.r «•/Nr.Awr.•l.M.I AwnrcwrN•.rA:rhaANn. lbA.-lQ.wwwlrrNhw o/wryoAbMlAwIMRwtllyx��Y1�.jINIW.rAlr}rIYoAN AI•. 1. •11•fa' .r1.410 1-. 11 T/Jjr4all 1!1 N1L My/wWrf%2K. Ia .lulllMN ►) or IIIA•M'A. Irreel jdA/y/ JURanNN ♦l,•�,�f i� 1111 ArrtR I owHal catawba county Geospatial Real Estate Search LIVING. ,,,,E,. Information Services Mill ,,.„,„ o � � Qo DR NW Cal C oRti 5 9LFOR NW C� _� C 17 .s y� C:5 C'5 ” gQ O �o yrs o � " 1 in=600ft w +E S Parcel- 370417126310, 970 18TH AVE CIR NW HICKORY, 28601 Owners: ZAGAROLI DAVID PETER, ZAGAROLI NANCY K Owner Address: Values - Building(s): $539,800, Land: $412,800, Total: $952,600 This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disdaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2014 Catawba County NC 05/30/2019 0catawba county Geospatial Real Estate Search �' MAKING. LIVING. K[n,K. Information services I!- N WN 1 in= 100ft Parcel: 370417126310, 970 18TH AVE CIR NW HICKORY, 28601 Owners: ZAGAROLI DAVID PETER, ZAGAROLI NANCY K Owner Address: Values - Building(s): $539,800, Land: $412,800, Total: $952,600 _ 53►,35��5G 35.%b99k This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2014 Catawba County NC M1011110*1 W catawba county Geospatial Real Estate Search N•► MAKING. LIVING. W,E,. Information Services N W+E 1 in=80ft Vs Parcel: 370417126310, 970 18TH AVE CIR NW HICKORY, 28601 Owners: ZAGAROLI DAVID PETER, ZAGAROLI NANCY K Owner Address: 316 4TH ST NW Values - Building(s): $539,800, Land: $412,800, Total: $952,600 This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2014 Catawba County NC 07/15/2019 ebb -e a r �a l _.�"f� ' R ''" � T , r - fit'• T^k.pl. �', y. •_�._®�"f.4�a J.. . •..fib ��. ��., •-, �� ��..., — � '�,.� _. - _ y _ _+y • AeAr t DUKE ENERGY INTERNAL USE ONLY Construction 6%, DUKE Date Received App Fee Amt Application -r ENERGY. version 19a Duke Energy Lake Services Site ID HEP Fee Mail Code EC12Q 526 S. Church St. Charlotte, NC 28202 I. APPLICANT INFORMATION (applicant mailing address and contact information) Name* ---C)W-(4 o- Primary Phone* Address* n r`o t g1j- Secondary Phone City*LA �eko—a4 State* Zip Code Email ll. PROPERTY I OT permit) gas (.. �z- coo I.-, gav Z+'l-'1222? Is there an existing dock or other facilities ❑ Yes If yes, include Dock Tag #. If tag along the shoreline property or over the Lake? ❑ No cannot be located, note that here. * Address*�fe �l� c . Ghia¢_, .L ] . County* City* ;&e-,,o,,State*E '� Zip Code* Lake* � p Subdivision Lot(s) F -s31 Latitude and longitude of the property. Please use a service/software to acquire the location information. Values should be provided in Decimal Degrees format (35.1245). Latitude (e.g. 35.12345)* Example service: http://getlatlong.net/ Longitude (e.g. -80.12345)* III. PROPOSED ACTIVITY (check all that apply) ❑ New/Modification of Existing Structure ❑ Maintenance of Existing Structure ❑ New/Modification of Existing Shoreline Stabilization ® Maintenance of Existing Shoreline Stabilization ❑Transfer of Ownership (check box if you want a copy ❑ Other (Describe below. If the activity involves an irrigation of permitting history ❑ ) withdrawal, include the pump capacity.) Structure size (square feet) Is dock covered?❑ Yes ❑ No Number of slips ❑ Is structure a common use dock? ❑Yes* ❑ No Number of jetports ❑ *If yes, see special note in Section vil Shoreline Stabilization Length of stabilization (feet) L Distance from shoreline (feet) Materials Brief Description of the Activity Describe briefly the existing structures over land and water (include sq ft) IV. Additional Requirements (Include with application; limit document sizes to 11"x 1T' or smaller) You must include the following items with your application (unless specifically excluded for your application type). Survey stamped/signed by a professional licensed surveyor ❑ showing the location of the existing or proposed structure and/or survey of the existing or proposed stabilization (not required for transfer) ❑ Photos along property shoreline and photos of existing structures and/or stabilization in or near the water ❑ Application fee (check only, payable to Duke Energy) ❑ Signed Applicant's User Agreement Letter V. Application Processing Plan and profile drawing showing all measurements, ❑ elevations, and irrigation line routing (not required for transfer UNLESS tag number can't be located; sketch can be used in such cases, not required for shoreline stabilization) Local and state permits (building permits or exemption letter required for all structure applications at Catawba- ❑ Wateree lakes in NC; Tega Cay, SC; Kershaw County, SC; NCDWR approval required for shoreline stabilization in NC; not required for other applications) Habitat Enhancement Program payment (required onlyfor ❑ New/Modified structures at Catawba-Wateree and Keowee- Toxaway lakes and shoreline stabilization at Keowee- Toxaway) Application is reviewed and determined if complete. Fields with an asterisk are required. If application is not complete or does not include all items and information listed in the checklist, the application will be returned as incomplete. • A Duke Energy representative will visit the site to conduct a visual inspection. • Applicant will be notified of approval or denial, typically via email. VI. Directions by Road Directions by Road* �Y\� V l�( `l, 12'1 . �. V rv�:. � `rwl.v� ®oh�0 i?A-t1. �(C . � IS Mi . � Vv�. — \ u.�1.r• ®� c 2-11.2r..�.— ov.�o \ 8 ��' A•s-e, . R • rs vJ th; _. �wCar� NZV�}A \ ?3 k't- Aft . UatL- �[ O - VII. Application Submission Please complete, print and sign this application. Then enclose all items required per Section IV above and submit to the address below. Duke Energy Lake Services Mail Code EC12Q 526 S. Church St. Charlotte, NC 28202 I agree the information contained within is accurate: nt signature * Common Use Dock Co -Owner Signature(s) and Information (all owners of common use docks must submit a signed Applicant's User Agreement and application fee) Name Address Name Address Signature Signature Attach additional sheets if there are more co-owners DUKE ENERGY PRIVATE FACHAT ES "APPLICANT'S USER AGREEMENT" (Fill in blanks with required information. Please Print) Date j lq TO: Duke Energy c/o Lake Services - EC12Q 526 S. Church Street Charlotte, NC 28202 RE: (Lake Name)(LakeAddress) (Applicant's full name) L-aagtay\ hereby agrees to comply with all requirements and co tions set forth by Duke Energy's Lake Services (Duke Energy) office, and any federal, state or local agencies pertaining to our application to construct and/or maintain a ZZ�,o (LSA D on Lake In addition; Mwe have read and agree to comply with Duke Energy's Shoreline Manage e t Guidelines (SMG) and understand that written authorization must be obtained from Duke Energy prior to beginning any activity/construction within the Federal Energy Regulatory Commission (FERC) Project boundary. The construction will be completed as described in the approved application and within twelve (12) months following the date of approval by Duke Energy. An extension will be considered for legitimate extenuating circumstances (as determined by the sole discretion of Duke Energy) provided a specific timefiame in which to complete the construction, not to exceed an additional 12 months, is provided in writing to Duke Energy by the applicant. Failure to complete construction within the 12 -month build -out period or any Duke Energy approved extension will require the applicant to file a new application that complies with the then -current SMG. The new application filing will include any applicable fees and security deposits. Uwe attest to be the owner or lease -holder of the tract of land immediately adjoining the Project boundary where the proposed private facility is to be constructed. I/we agree to comply with all FERC orders (as modified or interpreted by FERC), with all other applicable FERC Rules and Regulations implemented by Duke Energy; and with all rules or regulations imposed on Duke Energy by any governmental agency. Page 1 of 5 Rev 1MOM Uwe understand the physical location of my/our lot in relation to the common property line with Duke Energy, if any, the FERC Project boundary, and any deeded flood easements or required building setbacks. Uwe understand that this lake was constructed as a working hydropower reservoir for the primary purpose of producing cost-effective electric energy and that this remains as the lake's primary purpose. I/we understand the lake and its associated hydroelectric facilities are operated by Duke Energy under the terms of a license issued by the FERC and there will be no change in hydro project operations as a result of the construction and/or use of any facilities that Uwe may be allowed to place within the FERC Project boundary or on any Duke Energy -owned property. Uwe understand during drought conditions Duke Energy may request reduced usage or discontinued usage of any water withdrawal or related systems, until such drought conditions improve. Failure to do so may cause possible removal of the system and/or any other permitted facilities that Uwe may have, and any costs associated with removal of the facilities will be assessed to the lot owner. Uwe understand lake levels will rise and fall over time in response to weather events and hydro project operations and Duke Energy does not guarantee an approved facility will always have sufficient water depth to be accessible by boat or for other water depth related recreation activities. Ave acknowledge Duke Energy provides no guarantee of any specific quantities (except those identified in the FERC license) or quality of water in the lake. Uwe understand the facilities to be installed and/or maintained are my/our property and Uwe therefore agree to be fully responsible for the permitted reservoir use including maintaining facilities in good repair. If the private facility is deemed unsafe by Duke Energy, I/we agree to repair or remove the private facility at my/our own expense and within the specified timeframe set by Duke Energy. I/we understand Duke Energy approval of the requested reservoir use in no way constitutes assignment of any interest in real property Duke Energy may have (i.e. land rights). The approval is granted and maintained solely at Duke Energy's discretion. Uwe also understand the permitted use may be revoked at any time by Duke Energy or its successors for any reason whatsoever. If the approval is revoked, Uwe agree to remove the facility at my/our own expense within the specified timeframe set by Duke Energy. Uwe understand ownership/interest in a Common Use Facility or residential marina eliminates the option of having a separate private facility on any other owned or leased lot within the affected subdivision. Uwe understand this lake is open for use by the general public and that maintaining safe and lawful public use is one of the primary lake management objectives of Duke Energy. Page 2 of 5 Rev 11IM016 Uwe understand the use for which we are applying is a private use and it should not interfere with the general public's safe and lawful use of the lake. Ifwe understand lake use permit holders have the authority to prevent others from trespassing on the facilities Uwe have built. Uwe also understand Uwe, however, do not have any authority to impede anyone from pursuit of the lawful public recreation enjoyment of FERC Project lands and waters. Except as specified otherwise in the SMG, other Duke Energy documents (e.g. Public Safety Plans), or a separate lease agreement, anyone may fish around/under facilities built by others, may walk/wade/fish within the FERC Project boundary, boat in the lake's waters, etc. without having to get anyone's permission to do so. Uwe agree to fully disclose all information regarding the approved private facility to any prospective buyer/leaseholder of the property and any new owner/leaseholder. Uwe agree to notify Duke Energy immediately of any sale/transfer of the property, including the name and address of the new owner and to transfer the permit and/or Duke Energy lease to the new owner. Uwe agree the adjacent Duke Energy Project property, if any, shall be used exclusively for non- commercial recreational purposes and that I/we shall not rent or otherwise allow third parties (except for temporary use by guests, family members, and leaseholders of the residential property) to use any facilities permitted to me/us by Duke Energy. Uwe agree not to allow any use of the adjacent property, and will exercise due care and diligence to prevent all other persons that are affiliated with my/our property (including invitees, family members, guests, etc.), to violate an applicable federal, state or local law or regulation. Examples include, but are not limited to nudity, illegal discharge of firearms or fireworks, controlled substance abuse, public drunkenness, public urination or defecation, or other activities determined to be a nuisance by law enforcement officials. Uwe agree to exercise all care and due diligence to preserve and maintain the character of the Duke Energy's adjacent property, if any. Uwe agree to comply with the Duke Energy vegetation management requirements as stated in the SMG_ Ifwe agree further to not allow sewage, including discharge from septic tanks (or similar facilities) or boat holding tanks, garbage, trash, or other waste material to be discharged or dumped into the reservoir, tributaries or adjacent property. Uwe understand that as an adjoining property owner Uwe can make no change in land form of land within the FERC Project boundary or land owned by Duke Energy, if any, such as grading, excavation or filling without prior written approval by Duke Energy. Uwe agree for myselffourselves, members of my/our family, guests and invitees that Uwe assume all risks of personal injury or property damage incident to my/our occupancy and use of the FERC Project boundary or land owned by Duke Energy, if any; including, but not limited to, any personal injury or property damage which may be sustained as a result of flood waters or in connection with the rise and fall of water in the reservoir as a result of floods or of the operation of Duke Energy's hydroelectric facilities. Uwe as the adjoining property owner(s) further agree Uwe will indemnify, protect, defend, and save harmless Duke Energy from any and all loss, cost, Page 3 of 5 Rev 11MM16 claims damages, expenses, judgments and causes of action for all injuries and damages sustained by the members of my/our family, guests, and invitees arising or claimed to have arisen in connection with their occupancy or use of the Duke Energy permitted facility(s). 1/we agree if any action is taken by Duke Energy to enforce any provision, covenant or agreement contained in this user agreement or Duke Energy SMG or if Duke Energy is required to retain an attorney to enforce any provision, covenant or agreement contained in this user agreement or SMG (including, without limitation, the payment of fees due hereunder or the removal of an encroachment constructed in violation of this user agreement or SMG), then Duke Energy shall be entitled to recover all of its reasonable costs associated with such an action, including but not limited to, attorneys' fees and court costs incurred in such action and/or enforcement. I/we understand certain activities specified in the SMG are prohibited because of environmental concerns, boating capacity limitations, safety considerations and other reasons. Uwe specifically waive any claim against Duke Energy for consequential damages arising out of or relating to this application, Duke Energy's approval or denial of it, or subsequent revocation of approval, and 1/we specifically understand and acknowledge that, because Duke Energy can revoke the permitted use at any time, Ihve am/are not entitled to reliance damages. Ifwe understand the proposed facility will be used only for the purposes described in the information submitted to Duke Energy and other appropriate governing bodies for approval. I/we understand every reasonable effort must be made to minimize adverse impacts on fish, wildlife, and other natural resources. I/we understand trees and vegetation growing within the Project boundary play an important role in the overall environmental condition of the lake. The ecological benefit the vegetation has on the fish and wildlife habitat supports a sound and healthy lake environment. IAve also understand unauthorized removal of shoreline vegetation and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests and require me/us to re-establish the vegetation, if the disturbance is found to be in violation of the state or county watershed buffer regulations or Duke Energy's vegetation management requirements as stated in the SMG. I/we agree to maintain any prescribed mitigation activities that are required in order to gain approval for facility construction, as long as the facility exists. Ihve recognize Ilwe have the continuing responsibility to ensure that the constructed facilities are maintained in good repair, including, but not limited to maintenance of the facilities, and proper erosion control within the permit area and along the shoreline, and agree to take all reasonable steps necessary to meet this responsibility. Ifwe agree to maintain all facilities within the Project boundary and on Duke Energy -owned property, if any, in a sound condition and in a neat appearance and pay all costs for said maintenance. Page 4 of 5 Rev 1119=6 Uwe understand Duke Energy representatives may issue Stop Work Directives for any violation(s) of the SMG or engagement in prohibited acts or activities on Duke Energy property, if any, as specifically identified in the SMG. Uwe understand persons found to be in violation will be subject to Duke Energy sanctions which can include, but are not necessarily limited to: 1) restoration of the impacted area at the person's expense; 2) loss of consideration of any future lake use permitting activities for up to five years for improper vegetation removal or until vegetation is satisfactorily, re-established (even if there is a change in property ownership); 3) revocation of a previously issued permit and loss of consideration of any future lake use permitting activities and/or reinstatement of the revoked permit; 4) increase in fees; 5) modification or removal of non -complying facilities; and/or 6) further legal action being taken. by Duke Energy. Uwe agree that if any historic or archaeological resources are discovered during construction of an approved activity the applicant must stop work immediately and contact Duke Energy. Uwe understand that in the event that anyone discovers a potential site of archaeological or historic significance including any gravesite within the Project, the individual must immediately notify Duke Energy. Uwe acknowledge Duke Energy has the right to charge reasonable user's fees for private. use of its property, if any, and the Project and failure to pay any applicable user's fees in a timely manner can result in the suspension or cancellation of any previously approved lake use permit. Uwe agree to notify Duke Energy when construction is completed and during the construction period, Uwe will post the Duke Energy approval (to be provided by Duke Energy) at the job site visible from the water's edge. Ap Ip�licant Name r Lake Street Address l� . Q' - City/State/Zip Code sag (Oka- oo(,g Preferred contact Phone Number Email Ad Page 5 of 5 �J Applicant 4ignature Home Mailing Address / City/State/Zip Cod F;L9 AtI--1 a.z8 Home Phone Number b I3ol lq Date Rev 1119/1016