Loading...
HomeMy WebLinkAbout710012_Plan of Action_20180208PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 11-12 County: Pender Facility Name: Crooked Run Farm Certified Operator Name: Joe Szaloky Operator Number: 999328 1.- Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest -point on the top of the dam for lagoons, without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 - N 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X � Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: - 2/10/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Bandit 3, LLC Matt Butler Phone: Facility,Owner/Manager (print) Date: Facility Owner/Manager (signature) 910-990-0062 2/8/2018 I II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24, HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 48.3 lb PAN " 1 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure -ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 48.3lbPAN = III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. 2 PAN balance .: _ 'BALANCE FOR 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4230.0 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be -land applied (line n from section II) = 48.3 Ib. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 4230.0 lb. PAN y. Overall PAN balance (w - x) _ -4182 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled,to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will begin as weather and field conditions permit. Last waste sample has not been released from NCDA. The prior sample was .13 lbs/ nitrogen so I doubled that for calculation purposes. No hogs have been on this site for months nor any planned in the near future. Q PoA (30 Day) 2/21/00 D PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d: top of dike surface area according to design (area at below structural freeboard elevation) i e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.0 inches 195570 ftz 121905 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 252548 ft3 h. current herd # 0 certified herd # 4200 actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x , 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/31/2017 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 51333 ft3 63995 gallons 0.26 Ibs/1000 gal. 48.3 lbs. PAN PoA (30 Day) 2/21/00 'Sheetl c'i1)(i myk-r __..9-I;u-Pu r? PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 71.12 I I County: Pander Facility Name. Crooked Ron Farm I I Certified Operator Name; Joe s2afo* (Operator Number. 999328 1. Current liquid level(s) in Inches as measured from the current liquid level In the lagoon to the lowest point on the top of the dam for lagoons vnthout spillways; and from the current liquid level In the lagoon to the bottom of the spillway for lagoons with splways. Lagoon t Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 LagoonNameAD 1 I I I I I Spillway(Y or N)- N Levei(mches): 18 2. Check all applicable items L_ J Liquid level Is within the designed structural freeboard elevations of one or more structures. "and 30 day Plane of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. x I Liquid level Is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action 15 attached Agronomic bamnce Is wMn acceptable range. L J Waste Is to be pumped and haled to off site locations. Volume and PAN content of waste to be pumped and hauled Is reflected In section III tables. Included within this plan Is a list of the proposed stes with related facility numbers, number of acres and receiving crop Information. Contact and secure approval from the DM prior to transfer of waste to a site not covered in the faclitys CAWMP. Operation will be partlelly or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation d animals are to be moved to another permitted facility. provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2110118 I I I hereby certify that I have reviewed the Information listed above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the Inrormalion Is accurate and correct Bandit 3, L C lPhad Merl Phone. 810J3200*2 t Y . ,Erily owneriUanager (pnn 1 �' r a 20181 Faddy OwnerlM ger(signature) �31-wln-qiG 41 I �1liLC! C(--:, (�