Loading...
HomeMy WebLinkAbout710029_Plan of Action_20180223u FLAN OF, ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-29 County: Pender Facility Name: Barnhill Farms Certified Operator Name: Kenny Barnhill Operator Number: 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 2 N 10 2. Check all applicable items XXX Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving, facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Kenny Barnhill Phone: Facility Owner/Manager (print) Kenny Barnhill Date: Facility Owner/Manager (signature) 2/23/2018 l m PLAN.OF, ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #2 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 10.0 inches 12.0 inches 2.0 inches 60450 ftz 75361 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 80750 ft3 h. current herd # 500 certified herd #1 2448 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h+ i +j) x 7.48 x 5 days/line f= 4. Total volume of waste to be land applied during 5 day draw down 16493 ft3 0 ft3 36750 ft3 11063 gallons I. total volume to be land applied line e + line k = 1 86424 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) • II.' TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 71-29 line I = 86424 gallons 2. structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons ' 6. structure ID: line I = gallons n. lines1 +2+3'+4+5+6= o. linen/ 27154 = 86424 gallons 3.18 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) W. maximu m applicat ion amount (inches 743 1 Small Grain Overse 2.10 48.55 0.5 1 743 3 Small Grain Overse 1.60 46.92 0.5 1 743 5 Small Grain Overse 2.00 48.77 0.5 1 743 7 Small Grain OverSE 2.10 48.46 0.5 1 743 8 Small Grain OverSE 2.10 48.3 0.5 1 743 11 Small Grain OverSE 3.80 47.34 0.5 1 743 12 Small Grain OverSE 2.80 47.52 0.5 1 743 (13 Small Grain Overse 4.90 47.55 0.5 1 743 14 Small Grain Overse 3.10 47.6 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 24.50 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE v I ,A Y. line o = 0.13 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recaicuiate new nvaraunc ioaa nasea on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation =quipment mar down in field; "trafficability" across soils; will soils absorb application without run Fields are very wet. 2. Date and amount of last rainfall event? DATE: AMOUNT: inches 3. Dates of last waste application event per field: 1/24/18 ff, etc.) 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in ine "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Yes it is capable 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to IIICCL F./1 UPUJCU uldllg'CJ III clyyI IL.d LIUII ICILCJ d11U dIIIUUIILb, dllU dlly UL11U1 IIIIUI IIId LIUII IUI L,UIIJIUuh Shorter pumping times and lower applications will be used. Mr. Barnhills daughter Kendi called 2/22/17 to ask me to do a 5 day POA. This POA was created on 2/23/18 by Sam Edwards Environmental Specalist/Division of Soil and Water Conservation. 3tion.