Loading...
HomeMy WebLinkAbout100033_5 day - 30 day POA_20180801 (2)qbl0 l I 3s fep 64,j n hof l8 PLAN Facility Facility ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 10-33 Bell (tamp Farm County: -Brunswick Certified Operator Name: Robert Gene Ward Operator Number. 1. Current liquid level(s) in inches as measured from the current liquid-level'in the lagoon to the lowest pointl on the top of the dam -for lagoons without spillways; and from the current -liquid level in -the lagoofi to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID:_ BSF, Spillway(Y'or N): N Level(inche f ); 10 '2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of -one or more structures. ive and 30 day Plans of Action are attached. Hydraulic and -agronomic balances are within acceptable ranges: Liquid level is within the 25: year 24 hour storm elevations for one or more structures;, A 30'day Plan of -Action is attached. Agronomic balance is within -acceptable range. aste is to be pumped and hauled to off site locations.. Volume.and PAN conten t of waste to be pumped and hauled is reflected in section III tables. Included within this plan_is a list .�f the proposed -sites -with related facility numbers, number of acres and receiving'crbp -information. Contact and secure approval from thee-DWQ prior to transfer of waste to"a site rot covered in the facility s.CAWMP. ieratibri'Wll be partially or fully depopulated. ttach a complete'.schedule with corresponding animal units -and dates -fro -depopulation - animals are to be moved to another permitted facility; provide facility number, lagoon eboard level§.and herd population for the receiving facility 3. 'Earliest p�ssible=date to begin land:application ofwaste: As.weather/field conditions allow 1 hereby certify that] have reviewed the information listed above and included within the attached -Plan of Action, and to the best of my'knouiied9e and°abilityi,`the infolTriatioti is accurate anld :to rrect. Gene Gene Ward Owner/Manager (sig Phone: 91 U-233-6525 Date: 7131/2018 1. , If. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Bell Swamp Farm 10-33 line 1= 317414 gallons i I 2..structure ID: - line I = � gallons 3. structure ID: line I = . gallons 4. structure ID: line I = gallons j 5. structure ID: line I = gallons 6. structure ID: line I = gallons i I n. j lines 1 + 2 3 + 4 + , + g = ® gallons i o. line n 127164. = 11.69 acre4nches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PEMO01,2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. Fields -with no'remaining PAN balance, no receiving crop, and/or completely saturated are ,not considered available to receive waste. p. tract # q. field # r. soil type s. crop t, acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) PP2 Lynchburg Soybeans 41.32 53.82 _ 0.5 1, 1 _ 1 1 - 1 � 1 1 - ; 1 I I i X. total acres available during 5 day draw down (sum of column t) = 41.32 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA ( Da 2/ line o — 0.28 inches per acre to be applied within 6 days y) 1700 i V . I line x If unable to land apply hydraulic load listed in line .y, list course of action here including pump m and haul, depopulation, herd reduction, etc. For pup.4 haul and herd reduction options, recalculate new hydraulic -load based on new information. Irrigation will begin as field and lweather conditions permit. Plan to tan apply hydraulic load: 1. Describe "moisture conditions of fields? (e.g. Is there Water standing in field; does irrigation eauinmenf rnar rinwn in fialri. "trmfrif nk lihP­ ­Ac Farm has received _10- v a U'auV11 VVIU Iuut l ul lull, Ulu. rainfall about every day since mid -July (-approximately 15 inches in the last two weeks): 2. Date and amount of last rainfall event? - DATE: 3:.Dates 0,7131/18 AMOUNT: F 3-7-01 inches of last waste ---application event per field: Last irrigait n event was 7/1.0/18 "(Pivot) 4. -Given optimum soil and -weather conditions, is irrigation equipment capable of applying the volume in p line "n" at appropriate seasonal i.e. winter application rates within 5 days? Will irrigate, s weather.and field_conditons permit.(Pivot) 5. Irrigationischedule for,next 5 days - include daily schedule; proposed application'rates and amounts per irrigation -proposed event; changes made in gun sizes, nozzles, flop, rings, operating time, travel speed, etc. to meet Will irrigate changes in application rates and amounts- and any other information for consideration. as weather -and field conditions permit. (Pivot) PoA (5 Day) 2121/00 i I I 6 I PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD 1. TOTAL VOLUME 70 BE LAND APPLIED PER WASTE STRUCTURE 1.� Structure Name/Identifier (ID): Bell Swamp Farm 10-33 2. Current liquid volume in structural freeboard I a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) d. top of dike surface area according to design (area at below structural freeboard elevation) j e. line c/12 x line d x 7.48 gallons/ft' i 3.1 Projected volume of waste liquid produced during draw down period I f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 1 64001 certified herd # 640'0, actual waste produced = current herd # x line g = certified herd # i_ volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = i 4. Total volume of waste to be land applied during 5 day draw down _:�T0701 inches 12.0 inches 2.0 inches 2000 10 ft2 249333 gallons 180 days 210994 ft' 210994 ft' ---_ J ft3 116666.7 ft' 68081 .gallons 1. total volume to be land applied line a +.line k = 317414 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2121 /00 f ' X. Crop`s remaining PAN balance_ (line v from section III = y. Overall PAN balance (w _ x) = ) 5571.2 lb. PAN 6458.4 lb. PAN Line y musty show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depot u' lation, herd reduction, etc. For pump & haul,and herd reduction options, recalculate new PAN based on new information. 'If new fields are to be included as an option for lowering lagoon level, add these. fields to the, PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the ►'arcivinn ��ni01,. New waste' ample has been submitted to NCDA (thru Brunswick County Cooperative Ext. Office). Irrigation will begin as weather and field conditons permit. I i PoA 00 Day)' 2121100 1 t PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Bell Swamp Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = i 9.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 200,000 fig e. line c/12 x line d x 7.48 gallons/ft3 i 11220001gallons � 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g_ volume of waste produced according to structural design 210994 ft3 h. current herd # 6400 certified herd # 6400 j actual waste produced = current herd # x line g = 210994 ft3 certified herd # 1. volume of wash water according to structural design ®ft3 j. excess rainfall over evaporation according to -design -1 i6666 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 408483 gallons 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 6/1/2018 m_ ((lines e + k)/1000) x line I = REPEAT SECTION i FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 7.86 Ibs/1000 gal. 12029.6 lbs. PAN II. TOTAL POUNDS OF PAN STORED wITHiN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM,STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Bell Swamp FaRn line m = 12029.6 lb_ PAN 2. Structure ID: line m = lb PAN 3. ;Structure ID: line rn = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID line rn = lb PAN n, lines 1 + 2 + 3 ¢•4 + 5 + 6 = 12020.6 lb'PAN III. TOTAL PAN BALANOI� REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOn_ nn NnT 1 ICT 9z11=1 nc TA tia.u19-1_2 MAKI ^A►...-- 0. tract # t - � p. ,field # - - — - . • . • ••� g, crop ••• ••••.... ...� r.• acres .zr r �.�ar uvr[uv_V s. remaining IRR 2 PAN balance (lb/acre) 1,M0 su t TOTAL PAN BALANCE FOR FIELD (Ibs.) column rxs UAT t 1:111UL). u.•application window' PP2 Soybeans 41.32 53.82 2223.8 4/01-9115 i F4 Soybeans 24.98 134.00 3347.3 4/01-9/15 i - -- _ -. -�-.._...� 11 uc z► 11 uN aNNnc duVn oeginning awe Tor available receiving cro s during 30 day draw down period. V. Total PAN available for all Melds (svm of column t) = 5571:2 Ib: PAN IV, FACILITY'S PoA OVERALL PAN BALANCE w-a Total PAN to. -be land applied .(line n from section 11) = 12029.6 lb'. PAN PoA (30 Day) 2/21/00