HomeMy WebLinkAbout100033_5 day - 30 day POA_20180801I ,;Qa�tll� �� Ia3o[►g :PLAN Oif. ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 10-33 Facility Name: Bell Swamp Farm County: 'Brunswick Certified Orator Name: Robert Gene Ward Operator Number. °I. Current liquid level(s) in inches as measured from the current liquid leveHn the lagoon to the lowest point] on the top of the dam for lagoons without spillways; and from the current -liquid level in "the lagoon to the bottom, of the spillway for lagoons with spillways. ` Lagoon 1 Lagoon'2 Lagoon & Lagoon 4 Lagoon,5 Lagoon Name/ID: BSF Spillway(Tc r N): ,N Level(inches): 10 '2. Check all applicable items X Liquid level Is,within the designed structural freeboard elevations of one or more structures. d�ive and 30 day Plans of Action are attached. Hydraulic and -agronomic balances are rNithin acceptable ranges. [liquid level is within the 25 year 24 hour storm.elevations for one or more structures:, A 30,day Plan.of-Action is attached. Agronomic balance is within -acceptable range. aste is to be pumped and hauled to off,site locations.- Volume and PAN content of Waste be pumped -arid hauled is reflected in section III tables. Included within -this plan -is a Fist the proposed sites with related facility numbers, numberof-,acres and receiving -crop ormation. Contact and secure approval from.the bWQ prior•to transfer of waste -to a site. t covered in the facility s CAWMP. 5eration will be partially or fully depopilated. ttach a complete schedule with corresponding animal units and dates�fro depopulation animals -are to be moved to another permitted facility; -provide facility number, I_a_goon !eb4ard levels,and herd population for the receiving facility, 3. 'Eafliest p�ssible.date to begin land.application of waste: As,weather/field. conditions allow I,hereby certify that-l-have reviewed the information listed above and included within" the Attached. Pilo of Actlon, and to the best of my knowlodyb altd ability[, the infomtatioii is- accurate- anil.correct_ Robert Gene Ward F 61ity Owner/Manager (print) cbert Gene Ward FIbcility Owner/Manager (signature) Phone: 9107-233-6525 Date: 7131 /2018 01 IL TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Bell Swamp Farm 10-33 line 1= 317414 gaflons 2. structure ID: Ine - gallons 3. structure ID: line I = . gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line 1= gallons n.11ines1+2+3+4+5+6= o. I line n / 27154 = 317414 gallons 11.69 acre -inches III. TOTAL I ORES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIO0',2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2 Fields with no remaining PAN -balance, no receiving crop, and/or completely saturated are Inot considered available to receive waste. P. tract # q. field # r. soil type s. crop t. acres u. remaining 1RR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) PP2 Lynchburg Soybeans 41.32 53.82 0.5 1 1 1 . 1 I - _ 1 I � 1 I I x, total acres available during 5 day draw down (sum of column t) = 41.32 acres IV. FACILITY'S PoA OVERALL HYDRAULIC.LOAD TO BE LAND APPLIED PER ACRE PoA yy Da line o = 0.28 inches per acre to be applied within-5 days to y) 2/2'17W line x _If unable to land apply hydraulic load listed in lime y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump.& haul and herd reduction options, recalculate new hydraulic load based on new information. Irrigation will begin as field and weather conditions permit. V-1an .0 !a" -apply nyorauuc ioacn: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment. mar down in field; "trafficabili " across soils; will soils absorb applicationmithout runoff, etc. Farm has received rainfall about every day since mid -July (,approximately 15 inches in the last two weeks)' 2. Date anq amount of last rainfall event? - DATE: I ' 0,7131/18 AMOUNT: 3.70 inches 3:.Dates ofilast wastp-nnnlication event per field: Last irrigaiton event was 7/10118'(Pivot) 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in Line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Will lmgate,I s weather and field.conditons permit (Pivot) 5. lrrigationlschedufe for,ne, 5 days -include daily schedule; proposed pplication,rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed; etc. to meet proposed changes.in application rates and amounts; and any other information for consideration Will irrigate � is weather and field conditions permit. (Pivot) PoA '(5 Day) �J21 /00 R PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD 1. TOTAL j OLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Bell Swamp Farm 10-33 i 2.i Current liquid volume in structural freeboard i a. current liquid level according to marker 10.0 inches b. designed structural freeboard zone (Normally 12 inches or greater) 12.0 inches c. line b - line a (inches within structural freeboard) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 200000 ftZ i e. line c/12 x line d x 7.48 gallonsfft' 249333 gallons 3. Projected volume of waste liquid produced during draw down period i f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 210994. ft3 I h. current herd# 64001 certified herd #1 64_06 actual waste produced = current herd # x line g = 210994 ft' certified herd # i" volume of wash water according to structural design �_ I ft3 i j. excess rainfall over evaporation according to design 116666:7 ft3 k. (lines h + i + j) x 7.48 x 5 days/line f = 68081 gallons 4. Total volume of waste to -be land applied during 5 day draw down i 1. total volume to be land applied line e + line k = 317414 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 I i x. Crop's remaining PAN balance (line v from section III)._ y,. Overall PAN balance (w - x) I 5571.2 lb. PAN 6458.4 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and. haul, depopulation, herd reduction, etc. For pump & haul,and herd reduction options, recalculate new PAN based on new information. *If new fields are to be included as an option for lowering lagoon level, add these. fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the I i PoA (30 Day) 2121/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE I. Structure Name/Identifier (ID): Bell Swam Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I 10,0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = i 9.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) F 200,000 ft2 I e. line c/12 x line d x 7.48 allons/ft3 g 1122000 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 210994 ft3 i h. current herd # 6400 certified herd #1 6400 I actual waste produced = current herd # x line g = 210994 ft3 certified herd # i. volume of wash water according to structural design i ft3 j. excess rainfall over evaporation according to design E 116666 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 408483 gallons 4. Total PAN to be land applied during draw down period I I. current waste analysis dated 6/9/2018 7.86 Ibs/1000 gal. - m_ ((lines e + k)/1000) x line 1= i �120029.6 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) I i PoA (30 Day) 2/21/00 i If. TOTAL POUNDS OF PAN STORED WITHIN S;TRUCTURAL.FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURt& FOR FACILITY 1. 'Structure ID:, Bell Swamp Farm i line m = 12029.6 lb PAN 2_ Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. ,Structure ID: line m = !b PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 +,4 + 5 + 6 = 12029.6 Ib'PAN -111. TOTAL PAN BALANCE` REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW- DOWN PERIOD_ DO 'NOT t IST rim ns TA tkruif-tj nA.f ^A\f Lt' 1T r..- o. tract # ; i p. field # - -- - - - -- - q. crop ...-.... f -- r.• acres A►-rf_fCLJ vOJr[U1il9 s. remaining IRR 2 PAN balance (lb/acre) I,111,0 Su t TOTAL PAN BALANCE FOR FIELD (Ibs) column rxs- IJAT MMUL]. u. application window' PP2 So beans 4'1.32 53.82 2223.8 4I01-9/15 i F4 So beans 24.98 134.00 3347.3, 4/01-9/15 -------------- i - _ - G_ _" -1 _ .f p ,, ..,V.. -a v- - IWA f %A uN d11.1L111C7d11U" oeginning aale tor- available. 'receiving crops during 30 day,draw down period. v. Total PAN available for all fields (sum of column t) = 557112 Ib; PAN iV, FACILITY'S PoA OVERALL PAN BALANCE w. i Total PAN to be land applied (line n' from section I = � 12029.E ItD. PAN PoA (30 Day) 2121/00