HomeMy WebLinkAbout100033_5 day - 30 day POA_20180801I
,;Qa�tll�
�� Ia3o[►g
:PLAN Oif. ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 10-33
Facility Name: Bell Swamp Farm
County: 'Brunswick
Certified Orator Name: Robert Gene Ward Operator Number.
°I. Current liquid level(s) in inches as measured from the current liquid leveHn the lagoon to the
lowest point] on the top of the dam for lagoons without spillways; and from the current -liquid level
in "the lagoon to the bottom, of the spillway for lagoons with spillways.
` Lagoon 1 Lagoon'2 Lagoon & Lagoon 4 Lagoon,5
Lagoon Name/ID: BSF
Spillway(Tc r N): ,N
Level(inches): 10
'2. Check all applicable items
X Liquid level Is,within the designed structural freeboard elevations of one or more structures.
d�ive and 30 day Plans of Action are attached. Hydraulic and -agronomic balances are
rNithin acceptable ranges.
[liquid level is within the 25 year 24 hour storm.elevations for one or more structures:, A
30,day Plan.of-Action is attached. Agronomic balance is within -acceptable range.
aste is to be pumped and hauled to off,site locations.- Volume and PAN content of Waste
be pumped -arid hauled is reflected in section III tables. Included within -this plan -is a Fist
the proposed sites with related facility numbers, numberof-,acres and receiving -crop
ormation. Contact and secure approval from.the bWQ prior•to transfer of waste -to a site.
t covered in the facility s CAWMP.
5eration will be partially or fully depopilated.
ttach a complete schedule with corresponding animal units and dates�fro depopulation
animals -are to be moved to another permitted facility; -provide facility number, I_a_goon
!eb4ard levels,and herd population for the receiving facility,
3. 'Eafliest p�ssible.date to begin land.application of waste: As,weather/field. conditions allow
I,hereby certify that-l-have reviewed the information listed above and included within" the
Attached. Pilo of Actlon, and to the best of my knowlodyb altd ability[, the infomtatioii is-
accurate- anil.correct_
Robert Gene Ward
F 61ity Owner/Manager (print)
cbert Gene Ward
FIbcility Owner/Manager (signature)
Phone: 9107-233-6525
Date: 7131 /2018
01
IL TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID: Bell Swamp Farm 10-33 line 1= 317414 gaflons
2. structure ID:
Ine -
gallons
3.
structure ID:
line I = .
gallons
4.
structure ID:
line I =
gallons
5.
structure ID:
line I =
gallons
6.
structure ID:
line 1=
gallons
n.11ines1+2+3+4+5+6=
o. I line n / 27154 =
317414 gallons
11.69 acre -inches
III. TOTAL I ORES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIO0',2
'While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2
Fields with no remaining PAN -balance, no receiving crop, and/or completely saturated are
Inot considered available to receive waste.
P. tract #
q. field #
r. soil type
s. crop
t. acres
u. remaining
1RR-2 PAN
balance
(lb/acre)
v. maximum
application rate
(in/hr)
w. maximum
application
amount (inches)
PP2
Lynchburg
Soybeans
41.32
53.82
0.5
1
1
1
.
1
I
-
_
1
I
�
1
I
I
x, total acres available during 5 day draw down (sum of column t) = 41.32 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC.LOAD TO BE LAND APPLIED PER ACRE
PoA yy Da line o = 0.28 inches per acre to be applied within-5 days
to y) 2/2'17W
line x
_If unable to land apply hydraulic load listed in lime y, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump.& haul and herd reduction options,
recalculate new hydraulic load based on new information.
Irrigation will begin as field and weather conditions permit.
V-1an .0 !a" -apply nyorauuc ioacn:
1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation
equipment. mar down in field; "trafficabili " across soils; will soils absorb applicationmithout runoff, etc.
Farm has received rainfall about every day since mid -July (,approximately 15 inches in the last two weeks)'
2. Date anq amount of last rainfall event? -
DATE: I ' 0,7131/18 AMOUNT: 3.70 inches
3:.Dates ofilast wastp-nnnlication event per field:
Last irrigaiton event was 7/10118'(Pivot)
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in
Line "n" at appropriate seasonal (i.e. winter) application rates within 5 days?
Will lmgate,I s weather and field.conditons permit (Pivot)
5. lrrigationlschedufe for,ne, 5 days -include daily schedule; proposed pplication,rates and amounts
per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed; etc. to
meet proposed changes.in application rates and amounts; and any other information for consideration
Will irrigate � is weather and field conditions permit. (Pivot)
PoA '(5 Day) �J21 /00
R
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
1. TOTAL j OLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Bell Swamp Farm 10-33
i
2.i Current liquid volume in structural freeboard
i
a. current liquid level according to marker 10.0 inches
b. designed structural freeboard zone
(Normally 12 inches or greater)
12.0 inches
c. line b - line a (inches within structural freeboard) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 200000 ftZ
i e. line c/12 x line d x 7.48 gallonsfft' 249333 gallons
3. Projected volume of waste liquid produced during draw down period
i
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 210994. ft3
I
h. current herd# 64001 certified herd #1 64_06
actual waste produced = current herd # x line g = 210994 ft'
certified herd #
i" volume of wash water according to structural design �_ I ft3
i
j. excess rainfall over evaporation according to design 116666:7 ft3
k. (lines h + i + j) x 7.48 x 5 days/line f = 68081 gallons
4. Total volume of waste to -be land applied during 5 day draw down
i
1. total volume to be land applied line e + line k = 317414 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21/00
I
i
x. Crop's remaining PAN balance (line v from section III)._
y,. Overall PAN balance (w - x)
I
5571.2 lb. PAN
6458.4 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and.
haul, depopulation, herd reduction, etc. For pump & haul,and herd reduction options, recalculate new PAN
based on new information. *If new fields are to be included as an option for lowering lagoon level, add these.
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
I
i
PoA (30 Day) 2121/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
I. Structure Name/Identifier (ID): Bell Swam Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker I 10,0 inches
b. designed 25 yr./24 hr. storm & structural freeboard
19.0 inches
c. line b - line a (inches in red zone) =
i
9.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
F 200,000 ft2
I e. line c/12 x line d x 7.48 allons/ft3
g
1122000 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
1 210994 ft3
i
h. current herd # 6400 certified herd #1 6400
I
actual waste produced = current herd # x line g =
210994 ft3
certified herd #
i. volume of wash water according to structural design
i
ft3
j. excess rainfall over evaporation according to design
E 116666 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f=
408483 gallons
4. Total PAN to be land applied during draw down period
I
I. current waste analysis dated 6/9/2018
7.86 Ibs/1000 gal.
- m_ ((lines e + k)/1000) x line 1=
i
�120029.6 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
I
i
PoA (30 Day) 2/21/00
i
If. TOTAL POUNDS OF PAN STORED WITHIN S;TRUCTURAL.FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURt& FOR FACILITY
1. 'Structure ID:, Bell Swamp Farm
i
line m =
12029.6 lb PAN
2_ Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. ,Structure ID:
line m =
!b PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n. lines 1 + 2 + 3 +,4 + 5 + 6 = 12029.6 Ib'PAN
-111. TOTAL PAN BALANCE` REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW- DOWN
PERIOD_ DO 'NOT t IST rim ns TA tkruif-tj nA.f ^A\f Lt' 1T r..-
o. tract # ;
i
p. field #
- -- - - - -- -
q. crop
...-.... f --
r.• acres
A►-rf_fCLJ vOJr[U1il9
s. remaining IRR
2 PAN balance
(lb/acre)
I,111,0 Su
t TOTAL PAN
BALANCE FOR
FIELD (Ibs)
column rxs-
IJAT MMUL].
u. application window'
PP2
So beans
4'1.32
53.82
2223.8
4I01-9/15
i
F4
So beans
24.98
134.00
3347.3,
4/01-9/15
--------------
i
-
_ - G_ _" -1 _ .f p ,, ..,V.. -a v- - IWA f %A uN d11.1L111C7d11U" oeginning aale tor- available.
'receiving crops during 30 day,draw down period.
v. Total PAN available for all fields (sum of column t) = 557112 Ib; PAN
iV, FACILITY'S PoA OVERALL PAN BALANCE
w. i Total PAN to be land applied (line n' from section I =
� 12029.E ItD. PAN
PoA (30 Day) 2121/00