HomeMy WebLinkAbout310189_Plan of Action_20180803Irf—C fkc� 'i ( 3 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-189 County: Duplin Facility Name: Eugene Whaley Farm Certified Operator Name: Eugene Whaley Operator Number: 17331 1. Current liquid level(s) in inches as measured from the current liquid level'in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 N N 16 16 2. Check all applicable items Liquid level'is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances -are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation , *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Eugene Whaley Phone: 910-290-1005 Facility Owner/Manager (print) . Date: 8/3/2018 a ity Owner/snag ignature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID- Lagoon 1 line m = 350.3 lb PAN 2. Structure ID- Lagoon 2 line m = 121.0 lb PAN 3. Structure ID. Lagoon 3 line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 471.4lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPI IFn nuRMr, T14IS an nay PFRinn o. tract # p. field # q. crop r acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window" P1 Bermuda 23.00 180.00 4140.0 March - Sept State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4140.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line in from section II) = 471.4 lb. PAN PoA (30 Day) 2/21100 1 x. Crop's remaining PAN balance (line v from section III) = 4140.0 lb. PAN y. Overall PAN balance (w - x) _ -3669 lb. PAN Line'y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information.. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. This is a renewal of the 30 POA prepared for Mr Whaley on December 9, 2009. Due to wet and cold weather, Mr. Whaley has been able to pump only about 100,000 gallons onto his winter crops. Therefore, we are renewing his 30-Day POA for this facility. Mr. Whaley will continue to land apply as weather, crops and fields permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I.. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE r 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 3.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 92125 ftz e. line c/12 x line d x 7.48 gallons/W 200986 gallons 3. Projected volume of waste liquid produced during draw down period , f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116329 ft3 h. current herd # 2900 certified herd # 4896 actual waste produced = current herd # x line g = 68904 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/8/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100 Oft3 53739.E ft3 152896 gallons. 0.99 Ibs/1000 gal. 350.3 lbs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD i. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID). I Lagoon 2 2. Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 31250 ft2 e. line c/12 x line d x 7.48 gallons/ft' 58438 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 29011.8 ft3 h. current herd # 1000 certified herd # 880 actual waste produced = current herd # x line g = 32968 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7 48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/8/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 f�ft3 LL 18��229.2 ft' 63826 gallons 0.99 Ibs/1000 gal. 121.0 Ibs. PAN