Subject: Crum Pond Improvements - NCWRC comments
Hi David and Kevin,
I reviewed the permit application for the Crum Pond Improvement project, which describes the installation of
a new coldwater release outflow structure on a pond that impounds an unnamed tributary to Mulberry Creek
and the placement of riprap on an unknown length of the same stream adjacent to the outflow and existing
culverts. It is our understanding that much of the work has already been completed.
Please note that there are Rainbow Trout in Mulberry Creek, and that any additional work should be
completed outside of the January 1 to April 15 moratorium. Flow must be maintained in the stream at all
times; while the pond is refilled, 50% of the flow should be maintained in the downstream channel.
Thank you for the opportunity to comment on this project.
Andrea
Andrea Leslie
Mountain Habitat Conservation Coordinator
NC Wildlife Resources Commission
645 Fish Hatchery Rd., Building B
Marion, NC 28752
828-803-6054 (office)
828-400-4223 (cell)
www.ncwildlife.org
Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.