HomeMy WebLinkAboutNCC191003_NOI Application_20190718 Action History (UTC-05:00) Eastern Time(US&Canada)
Submit by Anonymous User 7/18/2019 2:48:51 PM(NCG01 NOI Submission)
Approve by McCoy, Suzanne 7/18/2019 3:23:15 PM(Review-Construction NOI 13643)
• The task was assigned to McCoy, Suzanne by round robin distribution 7/18/2019 2:49 PM
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:July 22,2019 5:00 PM
7/18/2019 2:49 PM
Submit by McCoy, Suzanne 7/18/2019 3:25:00 PM(Payment Verification-NCG01-2019-1003)
• The task was assigned to McCoy, Suzanne.The due date is:July 19,2019 5:00 PM
7/18/2019 3:23 PM
1 sees �' � ••. -• i •• i i• i
IY sell
NORTH CAROLINA
Environmental QUII
A. Project Information
Part A.
Project Location and Waterbody Information
1. Project Name* West Brunswick WRF-Reclaimed Water High-Rate Infitratiion
2. County* Brunswick
3. Highway or Street By-Pass Way
Address* Street narre only is acceptable if no address nurrber assigned yet
4. City or Township* Bolivia
5. State* INC
6.Zip Code* 28422
7. Latitude* Enter the latitude in decirral degrees
34.0590
8. Longitude* Enter the longitude in decirral degrees(MIST be negative)
-78.2500
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 07/22/2019
Estimated Construction Project Start Date
10. Date to End* 01/22/2020
Estimated Construction Project End Date
11. SIC(Primary)* Other(0000)
Standard Industrial aassification for Developrrent
12.Acres to be 16.90
disturbed* (including off-site borrow and waste areas)
13.Total site area 18.00
(acres)*
14. Post- 0.09
construction (Estimated)
impervious area
(acres)*
NCC Project NCC-BRUNS-2019-West Brunswick WRF-Reclaimed Water High-
Tracking ID Rate Infitratiion
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a.Receiving Beaverdam Swamp
Waterbody* Nbrre of waterbody into which stormuater runoff will discharge
15b.Waterbody 15-25-1-12-3
Index No.* NCWaterY ybod IndexNarrber
Stormwater No
discharges will flow Yes
to additional
wate rs*
16a.Is this project r Yes
subject to the NC f No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information-Legally Responsible Entity and Individual
.....................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV,
Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part
IV,Section B, Item(6)of that permit.
1.Organization Brunswick County
Name*
2. First Name* John
ff Corporation,enter Registered Agent First l\brre
3. Last Name* Nichols
ff Corporation,enter Registered Agent Last Barre
3b.Title Utilities Administrator
4. Permitee E-mail john.nichols@brunswickcountync.gov
Address*
5. Permittee 910 253 2657
Telephone No.*
6. Permittee Mailing Street Address
Address* P O Box249
Address Line 2
City State/Province/Region
Bolivia North Carolina
Pbstal/Zip Code Country
28422 United States
Check box if the r Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 250 Grey Water Road
Address Line 2
City State/Province/Region
Supply NC
Rastal/Zip Code Country
28462 US
C. Site Contact Information
Part C.
Roject Site Contact Information
...............................................................................................
1.Type of Government-County
Ownership*
2. Primary Site Robert
Contact-First
Name*
3.Primary Site Tweedy
Contact-Last
Name*
4.Title Senior Utilities Manager
5.Site Contact E- bob.tweedy@brunsWckcountync.gov
mail Address*
6.Site Contact 910 253 2680
Telephone No.*
7.Organization Brunswick County
Name
8.Site Contact Street Address
Mailing Address* P O Box249
Address Line 2
City State/Rovince/Region
Bolivia North Carolina
Fbstal/Zip Code Country
28422 United States
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Ran Approval Information
....................................................................................................................................................................................................................................... .............................................................................................
1. Date E&SC Plan 04/17/2019
Approved*
2. E&SC Plan Project BRUNS-2019-073
Number/ID* Assigned by agency or local program
3. E&SC Plan f•State DEQ Office
Approved by r Local Program
4.State DEQ Office* Wilmington(WiRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application.
5. E&SC Plan E&S Approval Letter.pdf 127.92KB
Approval Mist be PCFfornat
letter/documentation
6. NOI Certification NOI Certificatiion Form.pdf 45.85KB
Form Mist be RDFfornat
This is an Express f•No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other
documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project,for
satisfying the requirements of this permit,and for any civil or criminal penalties
incurred due to violations of this permit.
* rJ The information submitted in this NOI is,to the best of my knowledge and belief,
true,accurate, and complete based on my inquiry of the person or persons who
manage the system,or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s)and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important:The person who signs this Certification above and signs the NOI Certification Form should be the same
person(or authorized responsible person within the same organization)as listed in Section B(Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV,
Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part
IV,Section B, Item(6)of that permit.
Signature
01� rl�t
Type Name* John Nichols
Title Utilities Administrator
Organization Brunswick County
Date* 07/18/2019
F. Tracking and COC Info
NOI Tracking No. 13643
NC Reference No. NCG01-2019-1003
Uses'count number variable(incremented by SP)
Certificate of NCC191003
Coverage (COC) Uses'count_nunber'variable(increrrented bySP)
No.*
Count Number 1003
Sequential nunber for subrrittal that is incremented by Stored Procedure
COC Year 2019
Year of date reviewed(used to assign YY digits after"NGC'in OOCno.)