Loading...
HomeMy WebLinkAbout20190707 Ver 2_Riparian Buffer Authorization_20190718S I RALEIGH: 1 GLENWOOD AVENUE, SUITE 600, RALEIGH, NC 27603 OFFICE: 919.789.9977 / FAX: 919.789.9591 / WWW.SEPIINC.COM July 11, 2019 NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 RE: Timber Drive Sidewalks Construction, Town of Garner, Wake County, DWR Project #20160707 Neuse River Riparian Buffer Authorization Request Dear Sir/Madam, On behalf of the Town of Garner, SEPI Inc. (SEPI) submits the attached Riparian Buffer Authorization Form for the construction of sidewalks along sections of Timber Drive, in the Town of Garner, Wake County, North Carolina. The proposed project includes the addition of 5-foot sidewalks and ADA compliant ramps on the south side of Timber Drive (SR 2812) between Blanton Street and Stowe Place and between Harth Drive and Benson Road (Timber Crossing Shopping Center). No additional right of way is required for the project, and where temporary construction easements will be needed, the area of ground disturbance will occur entirely within the fill / shoulders of the roadway and will not extend beyond the existing toe of slope. The project area does not extend beyond the existing Timber Road right of way or toe of slope. There are no open stream channels within the project area. However, two streams (UT to Reedy Branch and UT to Lake Benson) pass under Timber Drive through existing culverts. The streams are shown on the USGS topographic map and NRCS Wake County Soil Survey. A Determination for Applicability to the Neuse Buffer Rules was received June 5, 2019 (DWR Project #20190707). Please do not hesitate to contact me at (919) 747-5857 or bleosic@seoiinc.com with any questions or comments regarding the attached application. Sincerely, Robert Lepsic, PWS SEPI Inc. JUL 1 8 2019 DENR - WATER RESOURCES TRANSPOR AT1ON PERMITTING UNIT 0 DWR State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 A. Applicant Riparian Buffer Authorization Form Information 1. Project Information 1a. Name of project: Timber Drive Sidewalks C-5604CA 1b. County: Wake 1c. Nearest municipality: Town of Gamer 1d. Subdivision name: N/A le. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer 1f below. ❑ Yes ®No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)7 El Yes No 2. Owner Information 2a. Name on Recorded Deed: N/A All work will occur within the existing Timber Drive right of way 2b. Deed Book and Page No. N/A 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): N/A 2d. Responsible Party (for Corporations): Rodney Dickerson Town of Gamer 2e. Street address: 900 7' Avenue 2f. City, state, zip: Gamer NC 27529 2g. Telephone no.: 919-773-4420 2h. Fax no.: 21. Email address: Dickerson@gamemc.gov 3. Applicant Information (If different from owner) 3a. Applicant is: ® Agent ❑ Other, specify: 3b. Name: Robert Lepsic 3c. Business name (if applicable): SEPI Inc. 3d. Street address: 1 Glenwood Avenue, Suite 600 3e. City, state, zip: Raleigh NC 27603 3f. Telephone no.: 919.747.5857 3g. Fax no.: 3h. Email address: blepsic@sepiinc.com 4. AgentlConsultant Information (If applicable) 4a. Name: 4b. Business name (if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 49. Email address: FORM: BA 10-2013 Page 1 of S B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A— Existing Timber Drive ROW 1 b. Site coordinates (in decimal degrees): Latitude: 35.685794 Longitude:-78.624219 1 c. Property size: Study area 7.3 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Reedy Branch and UT to Lake Benson 2b. Water Quality Classification of nearest receiving UT to Lake Benson — WS-III; NSW, CA water: UT to Reedy Branch — WS-III; NSW 2c. River basin: Neuse 03020201 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is an existing road right of way. There are areas of grassed roadway shoulder in the study area. Portions of these areas will be paved for the sidewalk installation. 3b. Attach an 8 Y x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/z x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: There are no open stream channels within the study area. The streams pass through the study area within culverts under Timber Drive. 3e. Explain the purpose of the proposed project: The purpose of the project is to improve safety and mobility for pedestrians and improved pedestrian accessibility through the addition of sidewalks. 3f. Describe the overall project in detail, including the type of equipment to be used: The grassed shoulder will be excavated less than 12" deep and the excavation prepared for concrete to be poured within the excavation. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ® Yes ❑ No ❑ Unknown Corps or State been requested or obtained for this property/ Comments: There are no jurisdictional project (including all prior phases) in the past? features within the study area. 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: SEPI, Inc. Name (if known): Robert Lepsic, PWS Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. NCDEQ Buffer Determination 6/5/2019 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 5 C. Proposed Impacts Inventory 1. Buffer Impacts 1 a. Project is in which protected ® Neuse ❑ Tar -Pamlico ❑ Catawba basin? ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ required? (sq ft) (sq ft) or Temporary mitigation) T B1 ® P ❑ T Sidewalk allowable UT to Reedy ❑ Yes ® No 346 240 construction Branch B1 ❑ P ® T sidewalk allowable UT to Reedy ❑ Yes ® No 716 401 construction Branch B2 ® P ❑ T sidewalk allowable UT to Lake ❑ Yes ® No 364 232 construction Benson B2 ❑ P ® T Sidewalk allowable UT to Lake ❑ Yes ® No 718 429 construction Benson Total buffer impacts 2,144 1,302 1 c. Comments: The sidewalks will be constructed on the grassed shoulder within the Timber Drive existing right of way. There are no open stream channels within the construction area. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All work will occur within the grassed shoulder of the existing Timber Drive ROW. The sidewalk was designed to avoid all mature trees within the buffer area. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All state and local sediment and erosion control measures will be followed. FORM: BA 10-2013 Page 3 of 5 C. Impact Justification and Mitigation, continued 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of Impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for Impact Total Impact (square feet(square Multiplier Required mitigation feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: E. Diffuse Flow Plan Sidewalk construction will not result in new concentrated flow Into surface waters. Sidewalk runoff will be directed to Timber Drive and the existing stormwater system. All buffer Impacts and high ground impacts require diffuse flow or other form of ® DHFuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be El Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader Is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form. FORM: SSGP3080 8-13 Page 4 of 5 F. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use ® Yes ❑ No of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ® Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ® Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: A draft CE was prepared for the project and submitted to NCDOT in May 2019. Final approval has not yet been received. 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Ro»rJe Applicant/Agent's Printed Name Applicant/Agent's Signature D" ate (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NG 27699 -1617 For all other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR —401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699 - 1617 For government transportation: projects sent by delivery service (UPS, FedEx, etc): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivef y service (UPS, FedEx, etc.): OR Karen Higgins NCDWR —401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10-2013 Page 5 of 5 9 i BEGIN PROJECT/ END SIDEWALK SIDEWALK IMPROVEMENTS IMPACT AREA #1 IMPROVEMENTS K ------- INSET -A 7 0\ ---- -------- MB ER DRIVE Q: -- --------- VA VARIABLE -R. 2812) 1 . ;' )j� I , 1, - i " " Fl: 0 L YvIWTH PU 11 .-" ___­_1'___1'l 01 ' rn BLIC ---- q 0 ------ ---------- HT-OF_WAy ------------ 6 ---------- < ------------- �� --- p, ---------- -n- Z Permanent Temporary Impact Area Perpendicular (YES/NO) Zone I I Impact (SF) Zone 2 I Impact (SF) 1 Stream Impact (LF) I Wetland Impact (SF) IZone 2 Impact (SF) , Zone 2 Impact (SF) Stream Impact (LF) I YES 346 240 0 0 716 401 0- .2 YES 364 232 0 0 718 429 0 TOTAL 710 �47 2 0 0 1,434 830 0 1 TIMBER DRIVE . SIDEWALKS STREAM BUFFER IMPACT MAP OVERALL q......... .. 0 �80 01 �4 'Q WESTERN SECTION EASTERN SECTION INSET AREA IMPACT AREA SCALE 0 75 150 SCALE: 1"=150' END PROJECT/ SIDEWALK IMPROVEMENTS SHEET 1 OF 3 RALEIGH, NORTH CAROLINA 919.789.9977 CHARLOTTE, NORTH CAROLINA 704.714.4880 WILMINGTON, NORTH CAROLINA 910.523.5715 sepiengineefing.com DRAWN BY: CHECKED BY: DATE JOB NUMBER LSMITH I J. BEARD 1 2019-07-10 1 SE18.187.00 r ' NMI C&G ` ' Nc-� f TIMBER DRIVE (S.R. 2812) VARIABLE WIDTH PUBLIC r z v ' RIGHT-OF-WAY'cov 1 ASPHALT ` i _. _— • IMPACT AREA #1 �• ZONE 1- 346 SF (PERM) ZONE 1- 716 SF (TEMP) ZONE 2 - 240 SF (PERM) ZONE 2 - 401 SF (TEMP) {Ir C&G- - - -sd.- -sd- -sd- -sd - — - 5 - n • — �`� L LLLLL LLLLLL `LLLL LLLL LLLLL LLLL4 LLI..LL LLLL 1..LLL% LLLL 5' SIDEWALK gp/ �--�� - — - W — —�M� - — - - a� 1L. LL LL L.LLL`L LLLLLLL L`L LLLLLLLLLLI-L LL `LLLL L \-1-LL tSLLL L �LL LL L LLL L". — - -/ - F - LLL "L L' l-t'.� �L�.� LL LL F L L L L-L L LLVLLVIJLLI `L LLL \ - F- - - - -� p(��� RM \— - - — TCE - TCE TCE - TCE TCE X TCE TCE E TCE CRAPE MYRTL V 10 CRAPE MYRTLE `4�L�LL LLLL LLLLLVL-L�LLLLL L LLLL LLLLL -yTCE -TCE _ I ! •x 1 . 15" CR PE MYRTLE / . — 960. b`b� ' �c,A'. ���, EXISTING RIGHT-OF-WAY l I N > EXISTING �b�. HEADWALL \ 10 0. co m. �. o'INN N I RAM�kY, MARLA OLSVIG IN ES, ALLAN K. �� / D.B. 17�224, P.G. 1 158 D.B. 169&'31P G. 613 ,- N JESl ALLjAN'K:. 1 . `�. �; �. 61�3 I B.O.M. 198, P.G. 594 50 RIPARIAN B.O.M. 1974, P.G. 247 D�B: 1�6983, P.. �— i V. \ PIN# 1710` 46539 ''� PIN# 171014462� O,M.- 19.14P:G.: 247 f J I. ! I BUFFER --, . •RIN#.17AC11ddS7d( I \. SCALE 0 10 20 LLLLLLLLLLLL LLLLLLLLLLLL ZONE 1 IMPACT (TEMP) ZONE 1 IMPACT (PERM) LLLLLLLLLLLL LLLLLLLLLLLL LLLLLLLLLLLL SCALE:1"=20' SHEET 2 OF 3 TIMBER DRIVE RALEIG NORTH CAROLINA (TEMP) (PERM) ZONE 2 IMPACT TEMP ZONE 2 IMPACT PERM — 919.789.9977 CHARLOTTE, NORTH CAROLINA SIDEWALKS — WILMINGTON, NORTH CAROLINA GTON, NORTH CA 910.523.5715 STREAM BUFFER IMPACT MAP sepiengineedng.cwm 1 1 N S ET A : IMPACT AREA TRANSPORTATION-TRAFFIC-SURVEYING-ENVIRONMENTAL-SRFJCML-INSPECNONS-CONSMUMN MANAGEMENT JOB NUMBER �� r DRAWN BY: CHECKED BY: DATE I 1 LSMITH J. BEARD 2019-07-10 SE18.187.00 I, r C&G TIMBER DRIVE (S.R. 2812) <v , VARIABLE WIDTH PUBLIC Z v 27A'. RIGHT-OF-WAY ; o co,.. 1 � / ASPHALT 1 . . . . . . . . . . . . �. . . . .. . , . ....\ . IMPACT AREA #2 � . . . . . . . . . . . . . . .' . . . I _ _ . . . . ZONE 1- 364 SF (PERM) \, ---- — -�--- 7 ZONE 1- 718 SF (TEMP) — . .� ,. . . . . . . . . . . . .'i . ZONE 2 - 232 SF (PERM) — -- — -- -- - — ZONE 2 - 429 SF (TEMP) .� :' _ C&G . . . . . .. . . . . / . :_..� . . ` . . . . . . . . . . . . . . . . -_ -� - - -- --- --- -- --- _--- _ LL LL LL LL LL LLLLLULL LLLL LL'LLLLLLLLL'LLLLLLL'LLLLL L �+ `-- . . . . . . . . . . .. 5' SIDEW L \ --5' SIDEWALK -- — — ' ,, . , LLLLLL LLLLLLLL LLLLLLLL,�LLLLLLLL LLLLLLL L LLLLLLL L � a.�t+y�L Lt GLCCCLLC LCL==LLLLLZLZ(,LLCLL` ` L��''LL�����,L�''�ji'a`k - \ ^ ^ LLLLL •LLLLL y \ _ y ,,jLLELLLLLLLLUVLLLLL F — - - — - -T LL LLL i - F� - - F - - F - - F'- - F= F - --- - - - F - — - F - — - - R/W— RT 270— �1L1��1��`�L1,.yL,,L L'LLLLLLLLLL�LLLLLLLLLLLLLLLULLLLLLLLILLLLLL4LLLLLLLLLLLL�LLLLLL�QLy. L'LLLLLLLLLLLL — — - RI — RM-- __� � . . ,`. .' . . . . __.- �/ — �. .............. . . __M1 zooWOODS ... / ./. . . . . . . . . . . . . . . . . . . . . . . . . . . .............. . zs8- 1 _ - -- `� EXISTING RIGHT-OF-WAY .../ . ,. — . j EXISTING I /.j. 7 . ........ HEADWALL I. . . . . . . . . . �. . . r1 ... .. ...... .. . . . . .I. . . . . . . .. -'. .� �. .�. ���... . . . . . . . . .'.. . . . . . . a ID. .' I ' �. 2 50' RIPARIAN „_.. . �- .'. . ... ... . .. . . . .'. .. . .. . �� �a ' ' BUFFER _�zsB ' ./: ..�/..�.:.....:............. . THOMPSON INVESTMENT .��.--� ........ . .p . ..�...�. . �........................ COMPANY ... ........... ......� . . � .....? . 1. .. .'. .. D-R. 312, P.0 . 4hO SCALE 0 10 20 ' LLLLLLLLLLLL LLLLLLLLLLLL ZONE 1 IMPACT (TEMP) LLLLLLLLLLLL LLLLLLLLLLLL LLLLLLLLLLLL ZONE 1 IMPACT (PERM) SCALE: V--20' SHEET 3 OF 3 TIMBERDRIVE RALEIGH, NORTH CAROLINA SIDEWALKS ZONE 2 IMPACT (TEMP) _ ZONE 2 IMPACT (PERM) 919.789.9977 CHARLOTTE, NORTH CAROLINA 70O — WILMINGTON, NORTH CAROLINA ,NORT CA 910.523.5715 STREAM BUFFER IMPACT MAP seplenglneedng.mm INSET' B' I M PACT AREA TRANSPORTATION-TRAFFIC-SURVEYING-ENVIRONMENTAL-SnWML-INSPECTIONS-CONSTRUCTION MANAGEMENT -------f DRAWN BY: CHECKED BY: DATE JOB NUMBER LSMITH J. BEARD 2019-07-10 SE18.187.00 ROY COOPER Govan. MICHAEL S. REGAN S—dary LINDA CULPEPPER Director To: Robert Lepsic, SEPI, Inc. NORTH CAROLINA EnWonmenta/ Quality June 5,2019 From: Rob Ridings, NC Division of Water Resources, Transportation Permitting Branch Subject: Town of Garner Project: TIP No. C-5604CA, Drainage Features under SR 2812, Wake County. DWR Project#20190707 Determination for Applicability to the Neuse Buffer Rules (15A NCAC 2B.0233) Dear Mr. Lepsic; On June 3, 2019, NC Division of Water Resource received your request to confirm your on -site determinations of two drainage features at the above -referenced project for applicability to the Neuse Buffer Rules. The drainage features are approximated on referenced package received by DWR. NCDWR has confirmed that the drainage features labeled below are as follows: Lal 35.6858, Long-78.6243: Perennial. Subject to Buffer Rules. Lat 35.6863, Long-78.6101: Perennial. Subject to Buffer Rules. No other stream or buffer sites were identified in this request. Also, this letter only addresses applicability to the Neuse Buffer Rules at the sites specifically marked on the referenced reaps and does not apply to reaches of the channels further downstream from the project area, or to any other drainage features in the vicinity. This letter only addresses the applicability to the buffer rules and does not approve any activity within the buffer, Waters of the United States, or Waters of the State. Any impacts to wetlands, streams and buffers must comply with the Neuse Buffer Rules, 404/401 regulations, water supply regulations (15A NCAC 2B .0216), and any other required federal, state and local regulations. Please be aware that even if no direct impacts are proposed to the protected buffers, sheet flow of all new stormwater runoff as per 15A NCAC 2B.0233 is required. The owner (or future owners) or pemlittee should notify NCDWR (and other relevant agencies) of this determination in any future correspondences concerning this property and/or project. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by NCDWR or Delegated Local Authority that a surface water exists and that it is subject to the mitigation rules may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Amy Chapman, NCDWR Transportation Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617. Individuals that dispute a determination by NCDWR or Delegated Local Authority that "exempts" a surface water from the mitigation rules may ask for an adjudicatory hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice and the date the affected party (including downstream and adjacent landowners) is notified of this decision. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between D_ - North Caralm DepartmentEnvironmental ofQuality I Division of Water Resources 512 North Sa[Wmry Street 11617 Mail Service Center I Raleigh. North Carolina 27699.1617 +a�+r� /'� 919.707.9000 the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed -provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center This determination is final and binding unless you ask for a hearing within 60 days. If you have any additional questions or require additional information please call Rob Ridings at 919-707-3873. ••rM�. 1 � ti.i�1 Owl • a f 0 " q,y Project Vicinity y*Garn« a ,c a s da Ease RxIga Goe Club l� Ra dRd T� Or D Legend a Study Area € a` m A.oyl. cN a - S p �n (T 0ac CI>ymol. Dr 2 b � dw CI t; u E o t= 4m➢°r DI a 0t>- v � 4 b 3 n s a u ty4 tbofn. pr N 0 625 1,250 Figure 1 Project Vicinity Timber Drive Sidewalk NCDOT Project C-5604CA Town of Garner, Wake County May 2019 "rY ry> Cf SOYDunb, Ci 3 0 Dl u>ta � ,am➢y u C1 4Yy,. a.y mor. Or O� � pa *Wilton M.>➢°� y a" o LL o n L:.. fn-'% °2,5^0 s� Atdu,. St _ u o` y� 3� 4� Q. 5,000 iiiiillillllslil Feet nis Exhied Is for penning oumoees only end shown herein does not meet NC O30 Requiremems and Intend. is not for daelge. Y.mdrucdon. or re emmg or transfer or tied. The E",W was mmpied om eseeNtr tmm�uon°nemed mdm me seYrme limed hell. 1 inch = 400 feet GRAPHIC SCALE Figure 2. Aerial Photography Timber Drive Sidewalk nsd• 4S\$OY2B5: ��e�� S E P I NCOOT, NC OneMae. ESHI 0 200 400 800 NCDOT Project C-5604RA Mey 2019 Feet Town of Garner, Wake County r;, •^••°' C 1 RD 2 r � was, r� r t 12 rfr/ 1 J EATH R ' _ �� J SO%THER" Legend IV J � o Study Area Iiiiiiiiiiiiiiiii,strearris — Streets m ' c r 3 ° ° LavMORE-Ok— — � ' WILTON M - OV `r r. W j of 12 yo TIMB - i 1 1 / ` CLELLA r A J WHITHORNE D Y `' AfiCHISON ST v w '# � ( •1, INS LC �r J \\`l B T - 9 CIR ZINNIA PalJae EaabX to rw plemmnn, porch c only and Mown or Epee f ti meet NC O-g0 Reeuoemente eno glemiele is not br design, coneeucean, w recording or Irenalar IX iXb. TM1a Eanrall was compilao Irom avallade Inlormagon oMaIN beE "in • sources listed! w baaa. 1 inch = 400 feet GRAPHIC SCALE Figure 3. USGS Topographic Map Timber Drive Sidewalk °Y I `• S E P $OWpM: NCDOT, NC OroMap. ESftl 0 200 400 800 NCDOT Project C-5604RA j Ae t3 e Wy1019 Feet Town of Garner, Wake County •tee +/+' This Eahbn b for planning purpowe only add eEtwn herein does not meet NC 4730 Ream amenu and 0arefore la not for de®gn, conaeuceon, or reodeding ar tarsier of tale, The ENidi ww compied f. avelleda Inlamallon ohleMad from me sources listed blow. Souroes 1 inch = 400 feet GRAPHIC SCALE Figure 4. NRCS Soils Map Timber Drive Sidewalk ..> tea° wo (a' I _ NCDOT. NC OnaMep, ESRI, Wake Count' Soil Surnyl9)0 W'Z°" o zoo aoo eoo NCDOT Project C-5604RA � ''^roe°'' FEEL Town of Garner, Wake County HEATHERWOOD DR n U o SOUTHERBY DR 0 a it w 3 N �� r i o Legend Study Area r�FM g�GKtHpRN Streams qhIr 7�,-,fCLAYMORE cr W° z 0 m wJa0L) DR 9j- Ro Z = c~i RN pR o WILTON MEADOW DR �O�EtP BUCKI HAMRD yORKC Ix w o h a4 o �0n O O U_ TIMBER OR z Q =� o U 2' � 1m Z MCLELLAN DR r O O BOO WHITHORNE DR O O� 2 ti U I- ATCHISON ST `G m PSSE�GON Tn U >� O x 9 O y w U w NOVEMBER T r SUMMERS WALK CIR ZINNIA LN M..Falb. Is for aamenB ,arar.o.any and .bawn bangolar ndma.l. IIbft .. urncormenu. ay"Wa o1.f rwi Inr C.mpn, cfrom thean, ar r11sted nB n tran.P.r d MM. TNe E+blbp we. mmpYaC Iron ay"We bbrahaE from Ua aauroe nxee below. e 1 inch =400 feet GRAPHIC SCALE Figure 5. LiDAR Map Timber Drive Sidewalk z I Soamas: NCOOT. NC OrwMa0.E5R1 0 2()() 4()0 800 NCDOT Project C-5604RA WyM9 Feet Town of Garner, Wake County