Loading...
HomeMy WebLinkAbout20120142 Ver 5_401 Application_20190718Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* Version* 5 20120142 Is this project a public transportation project?* r Yes r No Is this a DOT r Yes r No project?* Reviewer List:* April Norton:eads\arnorton Select Reviewing Office:* Central Office - (919) 707-9000 Submittal Type:* Modifications Does this project require a request for payment to be sent?* r Yes c: No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Kristi Lynn Carpenter for Jason Dilday Who is subrritting the information? Email Address: jldilday@ncdot.gov Project Information Project Name: US 74 Ellerbee Bypass (R-3421A B) Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown TIP#: WBS#: R-3421 A B 34542.1.FR4 (Applies to DOT projects only) County (ies) Richmond Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent R-3421A_B Individual Modification Richmond July 18 40.44MB 2019.pdf Only pdf or lore files are accepted. Describe the attachments: Original submitted via email. rJ By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: C1{� /z7 �7rd C }� t�YrtrRt Submittal Date: Is filled in autorratically. vim. STATE `ts +nu.am• Qe�.nm°va STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR July 18, 2019 US Army Corps of Engineers Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 ATTN: Mr. Andy Williams NCDOT Coordinator Dear Sir: JAMES H. TROGmN, III SECRETARY Subject: Request for Modification to Individual Section 404 and Section 401 Water Quality Certification for widening and new lane construction from US 74 Rockingham/Hamlet Bypass to US 220 Ellerbe Bypass in Richmond County. Federal Aid Project No. NHF-0220(4), State Project No. 8.1580802, Division 8, TIP Nos. R-3421A and B. References: Section 404 Individual Permit issued August 7, 2012(SAW-1996- 03023) Section 401 Water Quality Certification issued May 10, 2012 (3916) Modification of Section 404 Individual Permit issued October 17, 2012 Modification of Section 401 Water Quality Certification issued August 28, 2012 The purpose of this letter is to submit final drawings for modification of the Clean Water Act (CWA) Section 404 Individual Permit (IP) and Section 401 Water Quality Certification for R-3421A and B. Preliminary drawings for these sections were submitted with the original phased permit application. Included in this application package are the following: (1) this cover letter, (2) Division of Mitigation Services (DMS) confirmation letter, (3) Hydraulic Design and Permit Drawing Review Meetings (CP 4B & 4C) minutes for Sections A and B, (4) Stormwater Management Plan, (5) permit drawings, (6) utility permit drawings for Section B. Since issuance of the original Individual Permit for R-3421, Sections A and B were re -delineated in December 2014. A field verification with Sarah Hair (USACE) was conducted in January 2015, with a Preliminary Jurisdictional Determination issued on February 27, 2015. Information in the following tables present impact comparisons between the preliminary drawings presented in the original permit application and the current design for the project. Site numbers have remained the same between preliminary and final design, however some sites have been broken into sub - sites. These sites are denoted in bold in the tables under the Permit Site No. column. This project is scheduled to Let on October 15, 2019, with a review date of July 30,2019. Mailing Address: Telephone: (919) 707-6000 Location: NC DEPARTMENT OF TRANSPORTATION 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH NC 27610 1598 MAIL SERVICE CENTER Website: www.ncdot.gov RALEIGH NC 27699-1598 Jurisdictional Impacts Table 1. R-3421A Riparian Wetland Impacts Final Permit Site Wetland ID JD package Preliminary No. in FONSI ID Impacts (ac) Permanent Im act (ac) 2 NA WG 0.76 0.48 6 3 WC 0.25 <0.01 7 1 WI 0.15 0.17 (7S) 8 NA WA 0.09 0.02 Section A Total 1.25 0.68* *Total impacts due to rounding. Table 2. R-3421B Riparian Wetland Impacts Permit Site No. Wetland ID in FONSI JD package ID Preliminary Impacts (ac) Final Permanent Impact (ac) 1 4,5 WD,WE,WJ 0.25 0.24 3 NA WAA 0.03 0.03 4 NA WBB 0.09 0.07 5 NA Site Removed 0.02 0.00 6 5A WK 0.58 0.09 8 5B Site Removed 0.20 0.00 9 10 WM,WL 0.42 0.12 10 7,9 WCC,WEE,WFF 1.11 0.87 11 8 Site Removed <0.01 0.00 12 11 WN 1.92 2.38 Section B Total 4.62* 3.80 *Total impacts due to rounding. Table 3. R-3421A Streams Impacted Stream JD Preliminary Final Stream Permit IDS Package Stream Name Intermittent/ Stream Impacts (ft) Site No. I FONSI ID Perennial Impacts (ft) Perm/Temp Perm/Temp 1 2 SG UT to PeeDee perennial 364 / 0 411/10 River 2 34 SH UT to PeeDee Perennial 1 097 / 0 1011150 ' River ' 3 (3A/3B) 5,6 SH UT to PeeDee perennial 676 / 0 617/116 River 4 10 SO UT to PeeDee Intermittent 51110 205/12 River 5 8,9 SI,SM UT to PeeDee Intermittent(SI) 435 / 0 445/35 (5/5A) River Perennial SM 7 7 SH SK UT to PeeDee Perennial (SH) 1 247 / 100 1 130/32 7/7S/7N River Intermittent SK ' 8A) 11 SA UT to PeeDee Intermittent 187 / 0 147/0 (g Section A Total 4,517 / 100 3,966/255 Table 4. R-3421B Streams Impacted Stream JD Preliminary Final Stream Permit ID in Package Stream Name Intermittent/ Stream Impacts (ft) Site No. FONSI ID Perennial Impacts (ft) Perm/Temp Perm/Temp 1 No # SQ UT to Seaburn Intermittent 24 / 15 33/10 Branch 2 13 SAA Seaburn Branch Perennial 28 / 40 201/20 2A* No # SAA/SCC Seaburn Branch perennial 0/0 0/36 and UT 3 13 SAA UT to Seaburn perennial 759 / 37 578/21 Branch 4 No # SW UT to Seaburn perennial 352 / 26 397/22 Branch 5 14 SR UT to Cartledge perennial 645 / 20 669/23 Creek 7 15 ST UT to Cartledge Intermittent 610 / 20 610/34 Creek 8 16 SU UT to Cartledge perennial 832 / 90 703/161 Creek 10** 19,21 SV UT to Cartledge perennial 0/0 339/11 Creek 11 No # SDD UT to Cartledge Intermittent 47 / 10 81/21 Creek Section B Total 3,297 / 258 3,611/359 *Impacts for this site were originally attributed to Site 2. **Previously identified as linear wetland Explanation of Impact Changes Impacts changed for most sites from the preliminary development to final design. In many cases impact numbers were reduced from their preliminary projection, while other sites increased slightly. These minor changes can be attributed to the refinement of the impacts once the design of the roadway was finalized. The re -delineation of the project in December 2014 resulted in the following changes: Section A: Removal of a significant portion of Site 2 due from being a previously inundated area due to beaver activity. The beavers had been removed by the time of the 2014 re -delineation. Section B: • Removal of Sites 5, 8 and 11, due to previously identified wetlands not exhibiting wetland function during re -delineation. • A linear wetland at Site 10 was changed to a jurisdictional stream during the 2014 re - delineation. • The wetland at Site 12 increased in size during the re -delineation increasing impacts. Other notable change resulting in an increase: Section B: 0 Site 2- In the final impact drawings, Site 2 was split, adding a Site 2A. Also, it appears that preliminary calculations of impacts along the -Y- line were incorrect and did not fully account for the true impact. Utilities Section A: There will be no impacts to jurisdictional resources due to relocation of utilities. Section B: Relocation of overhead aerial lines along the intersections with -Y- lines will result in 0.48 ac. of hand clearing in wetlands. Protected Species As of April 2019, Schweinitz's sunflower has been added to the list of federally protected species for Richmond County. Surveys for the species have not been completed, due to the survey window not opening until late August. Once the survey window opens, the surveys will be completed. A review of the NCNHP database shows two known occurrences of the species in the county, both in the same general area, approximately nine miles from the project. Surveys for red -cockaded woodpecker, Michaux's sumac and rough -leaved loosestrife were updated on May 16, 2019. The biological conclusions for these species remain No Effect. Regulatory Approvals Section 404: We are hereby requesting the modification of the USACE Individual 404 Permit signed August 7, 2012 (SAW 1992-03237) and modified on October 17, 2012, for the above -described activities. NCDOT also requests that the current permit for the project to be extended for a period of five (5) years. Section 401: We are hereby requesting a modification to the 401 Water Quality Certification from the NCDWR issued May 10, 2012 (DWQ No. 20120240) and modified on August 28, 2012. In compliance with Section 143-215.3D(e) of the NCAC, we will provide $570.00 to act as payment for processing the Section 401 permit modification. A copy of this permit modification request will be posted on the NCDOT Website at littps://xfei•.services.ncdot.gov/pdea/PermApps/ Thank you for your assistance with this project. If you have any questions or need additional information, please contact Jason Dilday at 919-707-6111 or jldilday@ncdot.gov. Sincerely, Philip S. Harris III, P.E., C.P.M. Environmental Analysis Unit Head cc: NCDOT Permit Application Standard Distribution List Minutes for Hydraulic Design Review Meeting R-23421A State Project 34542.1.1 US 220 BYPASS FROM US 74 BYPASS WEST OF ROCKINGHAM AT SR 1109 (ZION CHURCH ROAD) INTERCHANGE TO 0.3 MILES SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY), RICHMOND COUNTY, DIVISION 8 A Hydraulic Design Review Meeting was held on Wednesday, March 16, 2005 in the Location and Surveys conference room at the NCDOT Century Center Complex, Raleigh. Team Members: Andrew Nottingham-NCDOT Hydraulics (Present) Richard Spencer-USACOE (Present) Brian Wrenn- NCDWQ (Present) Travis Wilson-NCWRC (Absent, will provide comments) Gary Jordan-USFWS (Absent) Chris Militscher-EPA (Present) Cathy Houser- NCDOT Roadway Design (Absent) Elizabeth Lusk-PDEA (Present) Rob Ayers-FHWA (Absent) John Olinger -Division 8 (Present) Participants: Stephen Morgan-NCDOT Hydraulics Virginia Mabry-NCDOT Roadway Design Michael Penney-PDEA Carla Dagnino-PDEA Lonnie Brooks -Structure Design Karen Gulledge -Hydraulics The meeting began at 9:15 a.m. with NCDOT Hydraulics giving a brief description and history of the project. The team then reviewed the plans sheet by sheet. The following items of importance were discussed. Sheet Nos. 6, 7 and 8 • Division 8 noted that the existing roadway cut slopes along US 74 from +/- sta. 60+00 to +/- sta. 80+00 are experiencing problems with ground water seepage. Rip rap has been used to stabilize the slopes but this continues to be a maintenance problem. Division 8 noted that this problem needs to be addressed since the proposed project will be increasing the cut slopes in these areas. USACOE noted that they wanted to make a site visit to review this area. Sheet No. 8 • The stream right of sta. 87+00 I-73 will be piped to the culvert located on sheet no. 8 under loop B. Sheet No. 9 Due to the proposed new interchange the culvert under the existing US 74 ramp will be extended up and downstream and connected on the downstream extension to the existing culvert under existing US 74. The total length of the new culvert created by the extensions and connections will be +/- 1350 feet. Low flow sills will be used at the entrance of the culvert to divert flow into the middle barrel. Baffles are proposed on the new extension portions of the culvert to help retain the bed material in the culvert. DWQ asked if some of the culvert under the existing US 74 ramp could be removed. NCDOT noted that some of the culvert could possibly be remove but that it would leave only a small portion of the channel open (+/- 100 feet) and it was felt that it would be less disturbance to the stream to leave it in place. NCDOT noted that the rip rap at the outlet of the culvert under loop C is needed for erosion control and it is shown on the stream banks only and not in the channel. Low flow sills and baffles will be used on the culvert under loop C. Sheet No. 11 Low flow sills and baffles will be used on the culvert under ramp C. USACOE noted they require new stream channels to vegetate through one growing season prior to diverting flow into the channel. If temporary stream diversions required to construct the stream relocation and culvert fall outside the roadway footprint their impacts will need to be accounted for in the plans and permit. NCDOT will investigate connecting the tributary that enters the stream relocation from the east at a better angle. Sheet 12 • The culvert under existing US 74 will be extended up and downstream and low flow sill will be used. USACOE noted that they would like to review the pond site upstream of the culvert that is proposed to be drained. Sheet 16 • NCDOT will show channel relocation on right side from sta. +/- 134+00 to sta. +/- 135+50 due to proposed fill slope filling in the existing channel. Sheet 10 NCDOT will investigate shifting the junction box or possibly eliminating it on the 48" cross pipe. NCDOT noted that the rip rap at the outlet of the 60" cross pipes under ramp D is needed for erosion control and it is shown on the stream banks only and not in the channel. Draft Minutes for 4C Permit Drawing Review Meeting R3421A State Project 34542.1.1 US 220 Bypass From US 74 Bypass West of Rockingham at SR 1109 (Zion Church Road) Interchange to 0.3 miles South of SR 1140 (Old Charlotte Highway), Richmond County, Div. 8 Purpose: The purpose of this meeting was to review the 4C Permit Drawings and resulting environmental impacts. The Drawings were reviewed, addressing each impact site sequentially. These minutes represent a summary of the items discussed during the meeting. 1. Stephen Morgan began the meeting by reviewing a timeline of the project — different sections of the project (A, B, C), project documents, Merger history, field investigation verifications, and permitting. A summary of preliminary impacts (2005) vs current impacts was also reviewed. 2. General — note areas of proposed utility activity near any JS or wetland, even if no impacts occur. Include cross sections (and details) at inlet/outlet of culverts, relocated stream. 3. Permits — a Phased Individual Permit was issued in 2012 and expires December 2017. 4. Site 1 • Note existing rip rap at outlet of 36" pipe. • Show Temporary Impacts at outlet of 36" pipe. 5. Site 2 • Show stream as a total take between proposed culvert and culvert that will have a portion removed. 6. Site 3 • Show Bank Stabilization at outlet of culvert at Loop C. • Show Diversion Channel used for construction of culvert. • Include more Temporary Impacts for Diversion Channel. 7. Site 3A/3B • No Comments 8. Site 4 • Stream has been impacted since preliminary impacts were shown by logging operations. Permanent impacts will be shown as they were in preliminary drawings until further determination. NCDOT will coordinate with DWQ and USACE for mitigation. 9. Site 5/5A • A smaller size Energy Dissipater Basin will be shown, decreasing the Permanent and Temporary impacts to the stream. 10. Site 7 (North & South) • For clarification, label stream location between the culverts. • Show stream cross section and detail. 11. Site 8/8A • Add notation for beginning of JS. • Note that pond has been drained. This concluded review of R3421A permit drawings. Subject: Draft Minutes of the Interagency Permit Drawings Review (4b) Meeting on March 16, 2005 for R-342113, Richmond County Participants: Team Members: Randy Henegar, NCDOT, Hydraulics (present) Richard Spencer, USACE (present) Beth Barnes, NCDWQ (not present) Michael Penney, NCDOT, PD&EA (present) Travis Wilson, NCWRC (not present) Gary Jordan, USFWS (not present) Chris Militscher, USEPA (present) Cathy Houser, NCDOT, Roadway (not present) Rob Ayers, FHWA (not present) Elizabeth Lusk, ONE (present) John Olinger, NCDOT, Division 8 (present) Other Attendees: Carla Dagnino, NCDOT, ONE Virginia Mabry, NCDOT, Roadway Paul Fisher, NCDOT, Hydraulics Joe Dunnehoo, NCDOT, Hydraulics Brian Wrenn, NCDWQ Lonnie Brooks, NCDOT, Structures This meeting commenced at approximately 11:00 A.M. Randy Henegar led the attendees in reviewing the plan sheets (sheet by sheet). Comments were as follows: Plan Sheet 4: No comments. Action taken: N/A Plan Sheet 5: No comments. Action taken: N/A Plan Sheet 6: No comments. Action taken: N/A Plan Sheet 7: No comments. Action taken: N/A Plan Sheet 8: No comments. Action taken: N/A Plan Sheet 9: No comments. Action taken: N/A Plan Sheet 10: No comments. Action taken: N/A Plan Sheet 1 l: USACE will go to the field to look at wetlands @ -L- Sta. 226+00 +/-. Action taken: Carla Dagnino will coordinate field visit with USAGE. Plan Sheet 12: No comments. Action taken: N/A Plan sheet 13: No comments. Action taken: N/A Plan Sheet 14: No comments Action taken: N/A Plan Sheet 15: No comments. Action taken: N/A Plan Sheet 16: Richard Spencer wanted to put diversion ditch (-L- Sta. 304+00 +/-) under roadway fill and work in dry season. Action taken: O.N.E. will include note to this effect in the Permit write-up. Plan Sheet 17: No comments Action taken: N/A Plan Sheet 18: No comments Action taken: N/A Plan Sheet 19: All upland wetlands should be counted as impacted wetlands. Check for 2:1 side slopes in wetland areas. USACE to look in field to see if proposed road cuts off groundwater from crossing roadway. Action taken: Joe Dunnehoo will check plans for 2:1 side slopes. Carla Dagnino will coordinate the site visit with USACE. Plan Sheet 20: No comments Action taken: N/A Plan Sheet 21: USACE was concerned about the amount of stream relocation near —Y4- & -SR 1- intersection. Action taken: Engineering Coordination will look at design changes that could reduce the amount of stream relocation. Plan Sheet 22: No comments Action taken: N/A Plan Sheet 23: Remove rip rap from pipe outlet at —Y5- Sta. 39+00 +/-. Action taken: Done. No further comments were recorded, and the meeting adjourned at approximately 12:30 P.M. 4C Meeting Minutes for R-3421B PROJECT: R-3421B 34542.1.FR3 DESCRIPTION: I-73/74 Bypass from South of SR 1140 (Old Charlotte Hwy) To Southwest of SR 1304 (Harrington Rd) COUNTY: Richmond - Division 8 *NOTE: On 9/1/2015 we were notified this project was removed from the "Bond List" and that work should cease at an appropriate point and to not resume until funding becomes available. The 4C permit will be revised per comments below and then work will cease until notification is sent to the Hydraulics Unit to proceed with Draft and Final permit submittals. Team Members: Andy Williams-USACE (Present, conference call) David Wanucha- NCDWQ (Present, conference call) Travis Wilson-NCWRC (Absent) Gary Jordan-USFWS (Absent) Dr. Cynthia Van Der Wiele-USEPA (Absent) David Harris- REU(Absent) Felix Davila-FHWA (Present) Participants: Galen Cail-NCDOT Hydraulics (Present) Joe Dunnehoo-NCDOT Hydraulics (Present) Chris Rivenbark-NES (Present) Jason Dilday-NES (Present) Lisa Feller-PDEA (Present) John Olinger -Division 8 (Present) Rekha Patel- NCDOT Roadway Design (Present) Chris Adam-NCDOT Roadway Design (Present) Mark Staley -Roadside (Present) Mack Bailey -Structures (Present) Don Proper -Utilities (Present) Kyle Pleasant -Utilities (Present) The 4C Meeting was held on Wednesday, August 19, 2015 in the Hydraulics Unit Conference room at the NCDOT Century Center Complex, Raleigh. Galen Cail reviewed the plan sheets with the attendees. Comments are as follows: General Comments: • Andy Williams noted that Bank Stabilization impacts (permanent) should be separate from the fill in stream impacts (permanent) on the Impacts Summary. This will be reviewed and verified. • Andy Williams and Davis Wanucha requested a copy of the Impact Comparison Table. Will be attached with 4C minutes. Site # 1 (Plan Sheet 5 & 6): • No comments. Site # 2 (Plan Sheet 21): • The 66" pipe and impacts located at sta. 12+90-Y4- will be shown as Site 2A. Site #3 (Plan Sheet 7): • Review alignment of outlet pipes relative to downstream outfall channel. Site #4 (Plan Sheet 8): • Review alignment of outlet pipes relative to downstream outfall channel. Site #5 (Plan Sheet 10): • No comments. Site #6 (Plan Sheet 11): • It was discussed to continue the wetland boundary outside of proposed R/W for clarity. After the 4C meeting it was determined the wetland boundary should close just outside of proposed R/W. Therefore, this wetland will be accounted for as a total take. Site #7 (Plan Sheet 11): • No comments. Site #8 (Plan Sheet 12): • Add inlet and outlet channel detail for the culvert to the plan sheet and permit drawing. Site #9 (Plan Sheets 16 & 22): • No comments. Site #10 (Plan Sheet 16): • It was verified the JS stream does stop in the wetlands at sta. 304+60±-L- (Lt.) • The wetlands at sta. 35+35±-Y5-(Lt.) within the ramp and mainline quadrant will be shown and accounted for as a total take as both mechanized clearing and excavation in wetlands impacts. Site #11 (Plan Sheet 23): • No comments. Site #12 (Plan Sheet 19): • The wetlands between Sta. 351+00+ to sta. 354+75±-L-(Rt.) will not be shown as a total take. Also, portions of this wetland impact were accounted for on the original R-3421 C permit. These impacts will be accounted for/subtracted from the final impacts in the R-3421 B permit. Surface Water Impacts Comparison Table: • Under the "Existing Channel Impacts Permanent (ft.)" for Site No. 2, the quantity is shown as 28. This was determined to be a type-o. The correct number should have been 203 ft. This will be changed on the form. Wetland Impacts Comparison Table: • It was asked why there was a big difference between the Current and Preliminary Impacts at Site #10. The difference was because the wetlands were redelineated and the area was reduced. ROY COOPER Governor HCHAEL S. REGAN Secretary TIM BAUMGARTNER Director Mr. Philip S. Harris,111, P.E. Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: NORTH CAROLINA Environmental Quality July 12, 2019 Subject: Mitigation Acceptance Letter: R-3421A, US 220 Bypass from US 74 Bypass West of Rockingham at SR 1109 (Zion Church Road) Interchange to South of SR 1140 (Old Charlotte Highway), Richmond County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on July 12, 2019, the impacts are located in CU 03040201 of the Yadkin River basin in the Southern Piedmont (SP) Eco-Region, and are as follows: Yadkin Stream Wetlands Buffer (Sq. Ft.) 03040201 Sp Cold Cool Warm Riparian Non- Ri arian Coastal Marsh Zone 1 Zone 2 Impacts (feet/acres) 0 0 3,966.0 0.68 0 0 0 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. DMS commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In -Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420. Sincerely, &/t�ff " James B. Stanfill DMS Asset Management Supervisor cc: Mr. Monte Matthews, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, NCDWR File: R-3421A ez��D A 0 ft --,- NA - E IliV i o cs�r.�nwte�.wh� North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W. Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 I fivhwav North Carolina Department of Transportation ti l[ I I Z iWarr Highway Stormwater Program 11.1,%,1 STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 34542.1.FR4 TIP No.: R-3421A County(ies): Page 1 of 2 General Project Information WBS Element: 34542.1.FR4 ITIP Number: R-3421A Project Type: New Location Date: 3/18/2019 NCDOT Contact: Mr. Stephen R. Morgan, PE Contractor / Designer: Address: 1000 Birch Ridge Drive Raleigh, NC Address: Phone: 919-707-6739 Phone: Email: smorgan@ncdot.gov Email: City/Town: County(ies): Richmond River Basin(s): Yadkin -Pee Dee CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 1.78 Surrounding Land Use: Agricultural, Rural, Residential Proposed Project Existing Site Project Built -Upon Area (ac.) ac. ac. Typical Cross Section Description: 46' Grass median, 2@12' paved inside shoulers, 2@12' lanes each direction, 12' paved outside shoulder, grass roadway ditches. Annual Avg Daily Traffic (veh/hr/day): Design/Future: Year: Existing: Year: 2019 General Project Narrative: (Description of Minimization of Water Quality Impacts) CSR 1 & 2 on Loop B & 173; CSR 3 Loop C; CSR 4 Ramp C; CSR 5 on L2/L2Rev (extension). R-3421A is an interchange and bypass project (US220 Bypass From US74 Bypass West Of Rockingham at SR1109 Interchange) which will include a 46' grass median with 2@12' travel lanes in each direction. The project also includes grass lined roadway ditches. The proposed project includes 4 major drainage structures (3Culverts & extension of 2 culverts) located in the interchange, which will convey Un-named Tribs to the Pee Dee River. The culverts will include sills and utilize Low Flow Benches as well as a stream relocation between 2 culverts to maintain the low flow in one barrel of the culvert. A Rip Rapped Energy Dissipator will be utilized at the outlet of 2 60" pipes to dissipate the energy and prevent erosion to the receiving stream. There are also no direct discharges to any Jurisdictional Stream. There are some minor stream relocations at the inlet and outlet of a few of the culverts. Waterbody Information Surface Water Body (1): Un-named Trib to Pee Dee River NCDWR Stream Index No.: UT to 13 - (34) NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) 1111 l�� ti1 North Carolina Department of Transportation -' �I[ 1rI I I\vi.II; r Highway Stormwater Program STORMWATER MANAGEMENT PLAN - (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: TIP No.: R-3421A County(ies): 0 Page 2 of 2 Preformed Scour Holes and Energy Dissipators Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Energy Dissipator Type Riprap Type Drainage Area (ac) Conveyance Structure Pipe/Structure Dimensions (in) Q10 (cfs) V10 (fps) BMP Associated w/ Buffer Rules? 10 -RPD- 10+32.66 73.4' LT (1)Un-named Trib to Pee Riprap Energy Dissipator Basin Class 1 2 - 60" RCP and 1 - 36" RCP N/A 34.9524103,-79.8468202 Additional Comments * Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. 0_ 03 ED N 0 LF) 0 N I I u I _a N L Q N n- co U) C a L 0 / 0 L aD L 0 L c Lw Lw / �D Qa L CD -Do oe >- 0=0 N/L o3FrL ti h U O U See Sheet 9 -A For Index of Sheets See Sheet I -B For Conventional Symbols End Project R-3421A ZION CHURCH RD / Begin Pro ect R-3421� I VICINITY MAP EX, ZION CHURCH RD INTERSECTION To N THIS IS A CONTROLLED —ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES 61 %1 E wV W _11, NORTH CAROLINA I u L A L 011M, " Ise I 1 7 111 110 � W� LOCATION: I-73174 FROM US 74 BYPASS WEST OF ROCKINGHAM AT SR 1109 (ZION INTERCHANGE TO 0.3 MILES SOUTH (OLD CHARLOTTE HWY.) TYPE OF WORD: GRADING, DRAINAGE, PAVING, SIGNING, STRUCTURES, CULVERT, & RETAINING CHURCH RD.) OF SR 1140 WALLS WETLAND AND SURFACE WATER IMPACTS PERMIT -1-73- / US 220 BYPASS STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. R-3421A I STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION 34542.1.FR4 HPPF-0220(75) P.E. 34542.2.4 HPPF-0220 30 R/W, UTIL. 34542.3.FS4 HPPF-0220(30) P.E. -US 74- POT 147+38,68 END CONSTRUCTION 6 1-73 ROC 133+89,42 END CONSTRUCTION GRAPHIC SCALES 50 25 0 50 100 DESIGN DATA 2016 — 9 330-12800900 ( ) ADT (2036) = 19,900-23,800 ° K = 10% D = 60% T = 26% V = 70 mph FUNC. CLASS. = INTERSTATE (TTST 9% + DUAL 17%) PROJECT LENGTH LENGTH ROADWAY TIP PROJECT R-3421A = 1.707 miles LENGTH STRUCTURES TIP PROJECT R-3421A = 0.073 miles TOTAL LENGTH OF TIP PROJECT R-3421A = 1.782 miles (SB LANES WERE USED FOR LENGTH OF PROJECT) Prepared in the Office of: RIDGEFIELD DRIVE, SUITE 350 RUM , N KRTH C & KAHLLINA 27ADT R#C%KLLP RALEIGH, NORTH CAROLINA 27609 NC LICENSE NO. F-0112 FOR NORTH CAROLINA DEPARTMENT OF TRANSPORTATION HYDRAULICS ENGINEER P.E. SIGNATURE: , � o� OF HIGHWAYS STATE OF NORTH CAROLINA 2012 STANDARD SPECIFICATIONS MICHAEL T. MERRITT, PE PLANS 50 25 0 50 100 RIGHT OF WAY DATE: JUNE 20 2008 PROJECT ENGINEER RK&K, LLP SCOTT BLEVINS P.E. ROADWAYS DESIGN ENGINEER P.E.DIVISION SIGNATURE: LETTING DATE: OCTOBER, 2019 PROFILE (HORIZONTAL) 10 5 0 10 20 PROJECT DESIGN ENGINEER RKf�K, LLP NCDOT CONTACT: GREGORY S. DAVIS, P.E. DIVISION 8 PROJECT ENGINEER PROFILE (VERTICAL) to Z O w ce T, 03 PERMIT DRAWING SHEET 2 OF 37 -US 74 EBL- FCC 8+ BEGIN MILLING Js� &REBUKE' LNG 4 - SC 78 +40.4 �� ✓S�5 RSA �j PROJECT REFERENCE NO. R -342/A RNV SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 8 HYDRAULICS ENGINEER INCOMPLETE IE PLANS DO NOT USE 1F0R % W ACQUISI`Il"ION PR ELIMIL � R Y NS PLANS 00 NOT US F0 CONSTRUCTION ✓s��R is —�� RIPRAP tip G 00, RETAIN 2GI DIr�l // O tPA _ - - --- -- -- - --------_- - - - - - SEE DETAIL F � � o - � --------- -� TOE PROTECTION O �� W/185 TONS CL B RIP RAP � L------ / Z \��� STA 411 S82 + 600TEX86 E 30 R US74DRAINAGE BL LT -RE-M VE �° — _ �' /j � __ 2GI FS SEE �� F — _� / // O _ DETAIL E — — — RIPRAP�EMO 85 — QI I I I / O W RIP 8O / RA REMOVE _ _ — _ _ �OL�CR -AND--EXTEND — — — — _ — — �I I I I z // - O CONIC � RIP RAP REMOVE � I I � // / O 7/� 15" CONII RETAIN 2GI 5 -us �EIvTOVE EXI - B III -US 74 EBL- 85 RETAIN_36_' ___----- --- D TB JB — - —--------------- 36° coNC __--- O O I= AN -N36 ---------- CS Sta.2_8+58.75 o E7-4 l 73 FOC 87+9/34 (35 LT) ' ' BEGIN SB APPROACH SLAB _ _ 00 2 ' 4 „ UG DET w• - — — — 1-73 POC 86 +83 t -(3 ' RT) Q cAT _� 15" CONIT _ R BEGIN NB AFFRO H SLA$ �- i= R _ CAT-11-73 FOC 88 +15.00 (35' LT) 2GICV) --- -- =_ -- — - - T"85 — _ EGIN SB BRIDGE - — — RETVrBVE--- _ INC HW� 1-73 FOC 8835.8% R o„ bo,. IS„ . LU �R� r� -- -� p FL�POC 27+16.54 _/Pg — - RCP_ a — _ I I 111 I 2GI P� 5 Q RIPRAP E RIP RAP - moo, A E — — - o° IFS rV E � � RIP Rq� � -RPC- SC 4+47.1 � C _ � GI FS SEE — DETAIL D - + _ FALSE SUMP ( Not to Scale) oo Outside Ditch Traffic Flow W p 21 71 GI 1-73 30- RCP_III S = Ditch Slope Proposed Ditch 20 2GI-A FS SEE 36" RCP -III DETAIL D FS SEE DETAIL D 2GI-A 42" RCP-111 �TI- FS SEE DETAIL D 42" 611 2GI-D �M,-2GI I '® JB w/MH L m _ _F, y— Z 0- U ' ti GREu TL 3 GAF (V 2GI 00 FS SEEFS SEE -C DETAIL D DETAIL D co Q 2GI -RFC- FOC STA.10+57.25 R - DETAIL X FALSE SUMP ( Not to Scale) Median Ditch 9. �2 (See Chart Below) ►i< 20' R GI S = Ditch Sloe q Proposed Ditch Ditch Grade L Ditch Grade L 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' Over 2.0% To 4.0% 30' Over 6.0% 50' 2GI 2GI �Q; 2GI -73 FOC 87 +07.00 (35' RT) 3EG/N NB BRIDGE S CAT-1 B-77 END I -RPC - POC ST A.12 +16.80 END APPROACH SLAB �C �� +40.00 —RFC— �� 113.50 �4' BASE DITCH \� EST. 30 TONS CL. I RIP P EST.40 SY GEOTEXTILE __--- -RFC- FOC STA. 11 +SEE DETAIL ZZ �\ ,,--------- END BRIDGE W — DETAIL ZZ DETAIL D = a NN o ---- STANDARD BASE DITCH R FALSE SUMP in \�N / ( Not to Scale) (Not to Scale) C r Natural Natural 733 Ground Out ide Ditch CD) _ _ _ _ ____- FENCE d TD Tra is Flow ��•� 20:1 0 —_ OP WW Min. D = 5 Ft. N PRGeotextile g E —�� is Max. d=1.5 Ft. � S— O _ - / B = 4 Ft. O C--------------- __ _— / v Type of Liner=l�jS 'I' Rip-Ra S=Ditch Slope > STA. FLY,24+6 RT. ✓SCR' 1= W BEGIN APPROACH SLAB -RPC - FOC STA.10+8/.00 BEGIN BRIDGE -RPC - FOC 11 +47.77 = -FLY- FOC 24+61.99 GI �z etc. Proposed Ditch � 1 °G � +70.00 —FLY— w 275.001 1 2G 50' 0' 50' 100, 150' C I� DENOTES TEMPORARY DENOTES IMPACTS IN 12 _0 ° $DATE$ IMPACTS IN SURFACE WATER SURFACE WATER GRAPHIC SCALE oN= o $(USERNAME)$ con $FILEL$ -DETAIL - I -73z-ROC 89+27.00 (351 Lj:;R TB 2GI Tf� 1-73 FOC 89 +50.68 (35' LTA END SB APPROACH SLAB o 0 -73 FOC 88 +69.90 (35' RT) ND NB APPROACH SLAB N o DOC 88+46.00 (35' RT) �Q ✓B BRIDGE M �S v g� . I. ONI O Z 4j z T, 03 co Q PERMIT DRAWING SHEET 3 OF 37 I\` N 366 M 363/ / 366 364- (V 3E Ol 3 O L 0 0 3 — —325— W /322— 3 W CL a� $DATE$ �= o $(USERNAME)$ con $FILEL$ 29289 -9LZ SLZ O 215 — —273 272 Z 264 2E L 26 266 W 62 1 W W _ O 265— 9 LLQ �`2 1� 6g2 M sLz aLz W 8z z z 8` ►1 z Z6Z 2 6 6B2 V 6- bZ 62 Lo£ �190-68C 62� PROJECT REFERENCE NO. SHEET NO. 26� 26,2 R —5421 A 8 2 �59 —�24 252s35V 5 5 a 255 24824 R/W SHEET NO. 242 2p q y 2qy 26 2g 250 246147 4 G6 239 24 243 2qq N 45 244 ROADWAY DESIGN HYDRAULICS \\23� 234 23g — 4 243 241 3 4 ENGINEER ENGINEER --232 \233 235 2p.L 240 2 23 \31 Z a 2 233 231 23 232 23 232 J` INCOMPI[ E E PLANS NS S£2 226 23q EbZ zza ' 9j z� aq zn /22m DO NOT TT9F, FOR // W ACQUISITION T7�� 26p/ 25�" 2sY SEZ rbz f2 3 ZZ£Z iZZ bZZ —r v 2 m �p• 26 SZ 862 LbZ 96Z bbZ lE2 S£2 6ZZ 2 / — � ZZ —z _ 6 g5z baz sZ 2 0E2 Z DO NOT USE FOR, CONSTRUCTION sz zsz zbz bz 9£z b£z / 22 zsz STV_% VIVA 265 SZ� ESZ bSZ S6Z 6£2 £� 2 ZZ / / sz esz £ ti 9Z L92 9Z r8 b Z bbZ _ 6£ � 9Z ZZ CZ / bEZ � V Fy 2 2 Z9Z E9Z Z9Z £9Z Z _ - - a 2 b y2Z E - D —6 S9Z ssz sz _ - - - Lsz 601, W 60 SEZ / mppm pop • -' • t. ..11 - VMS • "[ •OEM- -- �r _ AMP - i � -- — � 1 I I - ° 'L�' � :e i � � � Imo'• I --Ea"-�i i����� GI Ditch i LID . . efan_ ch .. �,.... �313 �312 DENOTES TEMPORARY DENOTES IMPACTS IN IMPACTS IN SURFACE WATER SURFACE WATER E 5 0' 0' 5 0' 100, 15 0' GRAPHIC SCALE -A 4' E EST SEE L LE PROJECT REFERENCE NO to Z _O _N Lu ce T, 03 C O1 CD LC� N SITE 1 ENLARGEMENT R-3421A SHEET NO. 8 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLETE PLANS DO NOT USE FOP, % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 4 OF 37 $DATE$ $(USERNAME)$ $FILEL$ DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER PROJECT REFERENCE NO T, 03 V) Z _O _N Lu $DATE$ $(USERNAME)$ $FILEL$ SITE 1 ENLARGEMENT R-342/A SHEET NO. 8 RiW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INC®MPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 5 OF 37 DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER T, 03 PROJECT REFERENCE NO. R -342/A R/W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 9 HYDRAULICS ENGINEER to Z _O _N Lu ce $DATE$ $(USERNAME)$ $FILEL$ l � 77 SITE 2 ,pb k pp p0 ��3 5� P' - — VANE , M10 INCOMPLETE PLANS DO NOT USE FOP, % W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION ti 7 s ,ONN- �O I+/395 P mac, x so 0O NOTES DENOTES WATERTS IN DENIMPACTS IN SUORARY RFACE WATER F F DE L IN WETLAND T, 03 PROJECT REFERENCE NO R -3421A SHEET NO. 9 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER V) Z _O _N Lu SITE 2 INC®lylIP LE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION r DRAWING r 7 OF 37 •• • •• •• •• GRAPHIC Q o, o $DATE$ N? o $(USERNAME)$ L $FILEL$ con- NOTES DENOTES WATERTS IN DENIMPACTS IN SUORARY RFACE WATER DE L IN WETLAND 03 PROJECT REFERENCE NO R —3421 A SHEET NO. 9 I R/W SHEET NO. I ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER to Z _O _N Lu ce N �1 N L N ,p (� A 0- w 0 E L i ro (V Q �GREU N ' TL-3 't /G m / / 5 TOI 1 F W/ C r RAP FOR DR41(NAGE 0 4+35 LT/ E L 0 c w � (,o i w QL $DATE$ N=o $(USERNAME)$ $FILEL$ n� WW / CONC i i i / i IL D 2G1-A / DET E D 2 INCOMP LE IE PLANS DO NOT USE FOP, / W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 8 OF 37 SITE 2 ENLARGjl,,EM.ENT 5 0' 0' 5 0' GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER /y/ F DENOTES FILL IN WETLAND T, 03 SHEET NO. 9 V) Z _O _N Lu 0- ED co Q E L L f6 (V L Q co Ol L $DATE$ $(USERNAME)$ $FILEL$ PROJECT REFERENCE NO. R -3421 A RM/ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 9 OF 37 SITE 2 ENLARGEMENT GRAPHIC 1 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND L PROJECT REFERENCE NO. SHEET NO. r R -342/A ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER -0 $DATE$ $(USERNAME)$ L $FILEL$ -173- Station 98 + 63. 3@8' 7' RCBC With ills G.P. E EV. = 24 8.36 KE DEGREES 2:1 Normbi 220 REMOV PORTI N OF EXISTIN CUL ERT OR USE VA IABLE LOPE 500 r WSEL 03.0' 20Q Match Ceiling _ _ 100 r WSEL 200.2' OUTLEr INV. �/ 50yr SEL 199 9 187.97 —,� ELOCA ED STR AMBED Existing Invert 88.94' Pop CL 180 E ev =18 .92 Proposed Invert 187. ' S = .0105 ftAt. INVERT 187.4 ' Ef 1100 I 1200 1300 INC®MP LE lE PLANS DO NOT USE FOR % W ACQUISITION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 10 OF 37 L PROJECT REFERENCE NO. SHEET NO. r R ,7r%l ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER W W W O Q ro i c9-0 N 7F 0 0= cv/ [I m m � m m m -LPB- 8 + 68. 3@8' 7' RCB with Sills G.P. ELEV. = 232.32 SKEW = 74 Dig. 220 INC®Iy]IPLE ]E PLANS DO NOT USE FOR / W ACQUISITION PRELIMINARY ]TANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 11 OF 37 -U 74 BYP 200 100 YR WS 1 " RC P 50 YR WS ELEV-1 2.9 INV. 184.0 - `180� Exist. 3@8'x6' RCBC '' o '---�J' ' \ -- --- --J ' Existing Proposed Invert 180. 7' Invert 1 1.70 Invert 180.70' Elev. S = . =183.01 127 FT T. -o $DATE$ 0 $(USERNAME)$ i $FILEL$ SHEET NO. 9 to Z _O _N Lu ce T, 03 C �l CV N OJ �1 L C N co Q 1 E L i L i f6 (V L Q co �1 C 3 O L 0 O C N E L 0 L W W / i 10 TONS C L B RIP RAP\\\\ 28 SY GEOTEXTI LE FOR DRAINAGE \ \ —L2 RT FOC 4 -�00.0, — —L2 L2CONN—FOC 24-�010.(Y � 4.0 RT \ PROJECT REFERENCE NO. R —5421 A R/W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, / W ACQUISITION PR EI[eIMIN R Y PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 12 OF 37 50/ o/ 50/ GRAPHC SCALE $DATE$ $(USERNAME)$ $FILEL$ DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER PROJECT REFERENCE NO R -3421A T, 03 V) Z _O _N Lu $DATE$ $(USERNAME)$ $FILEL$ 50/ SHEET NO. 9 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INC®lylIP LE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 13 OF 37 50/ DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER L PROJECT REFERENCE NO 342111, ROADWAY DESIGN ENGINEER SHEET NO. HYDRAULICS ENGINEER 20 10 —Lop C— Station 1 + 11.6 3@ x7 Reiriforced C..oncretek Box C Ivert wi h Sills Ske =100° 100yr WSEL 297.42 INC®Iy]IPLE ]E PLANS DO NOT USE FOR % W ACQUISITION PRELIMINARY ]TANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 14 OF 37 Secti n Through Culvert Natur I Ground ------ --- -- --------------- Natural Groun -- ----------- -- --- --- ' �enterl'ib-e�200 --- ---- ------ -- ---- I ---------- el. -20% PROPO ED STR AM RELOC TION RADE Stream Grade ------ I.97 `_ I 1 90 Stream Grade rel 03 PROJECT REFERENCE NO R -342/A SHEET NO. /0 I RM/ SHEET NO. I ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER V) Z _O _N LU ce �1 C 3 O L 0 10 Q� E L 0 L W W T) Q 10 L O-0r CV= CV/ ssZ 2/ V173- $DATE$ $(USERNAME)$ $FILEL$ DETAIL IT SPECIAL CUT DITCH ( Not to Scale? Front Desch Natural t4 Slope Ground Min. D =2.0 Ft. `AGE SEE DETAIL B STA 7+DITC 00 H 19+36 W SITME - -mp SEE SIYEE NST �l 8 0p• 00 DETAIL X FALSE SUMP ( Not to Scale) Median Ditch y" 2• (S- Chart Below) —�r� 20' —y'I !GI .-S—c. S=Ditch Slope (j Proposed Ditch o� DETAIL DETAIL E FALSE SUMP � (Nato Scoio) FALSE SUMP N c� (Not to Scale) Outside Ditch Outside Ditch �2 0, Traffic Flow 1p Tiro is F o�w ,Q.1 20:1 '� -, 2 �« GI Edch S=Ditch Slope C Proposed Ditch S=Ditch Slope Poposed 0 0 E�s����i �i— PUE ---- P� DETAIL B DETAIL A / BERM V' DITCH BERM V' DITCH WiLINER / (Not to Scale) (Not to Scale) DETAIL S DETAILIT DITCH BLOCK STANDARD DITCH s. xor m soae cxor to soma Natural Natural � - Grauna Li D A Ground :i D V�+3S90 pb*oh ro / RDWY d RDWY a W dad 20y _ d D at Mln. D = 2.0 Ft. Mln. D = 2.0 Ft. Max. d =1.0' _ _ — Flir.r FaEri Max. d b = 5.0 Ft. b = 5.0 Ft. Propoeea m+pn Type of Llner = CL I RIP RAP Type of Liner = CL B RIP RAP S = orrpn Slope f OUTLET OF 36" RCP LEFT OF -RP D- STATION 10+00 EST. 36 TONS CLASS 'I' RIP RAP EST. 40 S.Y. GEOTEXTILE FOR DRAINAGE \ PUF OUTLET OF 2-60" RCPs LEFT OF -RP D- STATION 10+45 EST. 40 TONS CLASS 'I' RIP RAP EST. 45 S.Y. GEOTEXTILE FOR DRAINAGE / NC GRID NAD 83 / 18 DENOTES MECHANIZED CLEARING INCOMPLETE PLANS DO NOT USE FOP, % W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 15 OF 37 DENOTES IMPACTS IN 100' 0' 100' 200' 300' SURFACE WATER GRAPHIC SCALE DENOTES TEMPORARY IMPACTS IN SURFACE WATER T, 03 PROJECT REFERENCE NO R -342/A SHEET NO. /0 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER V) Z _O _N LLI Ol L 3 O L 0 O L N E L O L L W (0 W W T) Q 10 L CV= CV/ Di n r $DATE$ $(USERNAME)$ $FILEL$ DETAIL IT SPECIAL CUT DITCH ( Not to Scale? Front Desch Natural t4 Slope Ground Min. D =2.0 Ft. DETAIL X FALSE SUMP ( Not to Scale) Median Ditch 9" 12, (S- Chart Below) —�r� 20' —y'I !GI .-S—c. S=Ditch Slope (j Proposed Difch DETAIL DETAIL E FALSE SUMP � (Nato Scoio) FALSE SUMP N c� (Not to Scale) Outside Ditch Outside Ditch �2 0, Traffic Flow 1p Tiro 20:1TT7 Jl GI 5=Ditch Slope r} Proposed Difch S=Ditch Slope Proposed Ditch DETAIL B DETAIL A BERM V' DITCH BERM V' DITCH WiLINER / (Not to Scale) (Not to Scale) DETAIL S DETAILIT DITCH BLOCK s. STANDARD DITCH xor m soae cxor to soma Natural Natural Grauna Li D cround :i DV�+3S90 pb*oh ro / RDWY �-d RDWYGeotextlleMin. D = 2.0 Ft. Mln. D = 2.0 Ft. _ _ — Flir.r FaErt Max. tl b = 5.0 Ft. b = 5.0 Ft. Propoeea m+pn Type of Llner = CL I RIP RAP Type of Liner = CL B RIP RAP S = orrpn Slope / INC®lylIP LE IE PLANS DO NOT TT91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 16 OF 37 ".v0 DENOTES IMPACTS IN 100' 0' 100' 200' 300' SURFACE WATER GRAPHIC SCALE DENOTES TEMPORARY IMPACTS IN SURFACE WATER T, 03 V) Z _O _N Lu $DATE$ $(USERNAME)$ $FILEL$ DENOTES IMPACTS IN SURFACE WATER PROJECT REFERENCE NO R -342/A SHEET NO. /0 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 18 OF 37 ftftftftNC GRID - mm=ftft-- NAD 83 SITE 4 ENLARGEMENT 50/ 0 / 50/ DENOTES TEMPORARY IMPACTS IN SURFACE WATER 03 PROJECT REFERENCE NO. R —342/A R(W SHEET NO. V) Z 0 V) w ce CD CD n CD (V i ISM ro L a) CD co 0 1 E L ro N L Q 3 L 0 / ro E L 0 L 0 W 7 W / $DATE$ o L L $(USERNAME)$ (= o $FILEL$ L OOP L . - t iJ if Cy COMMON ENDWALL SEE STD DETAIL 838.28 SEE DETAIL HM--� SPECIAL LATERAL BASE DITCH / � STA 9+50 — 10+25 —RPD— LT; 7z-- BED ww �S FENCE END WW FENCE +15a00 —RFD UJoVV NAD 83 _�50000 7.30 / / L ROADWAY DESIGN ENGINEER SHEET NO. /0 HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, % W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 19 OF 37 FS iARGEMENT 50' o' 50' GRAPHC SCALE S DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER T IMPACTS IN SURFACE WATER T, 03 PROJECT REFERENCE NO. R -342/A RW SHEET NO. to Z O N 1 Lu w L O1 L O O CD CD n CD 1V LSD N N Ol L ro L N CD co Q E L ro L Q �1 L 3 L 0 / r L L E L , O L L L� H ^W LL / $ DATE $ a ro $(USERNAME)$ L � N= o $FILEL$ L OOP L iv NAD 83 S DENOTES IMPACTS IN SURFACE WATER ROADWAY DESIGN ENGINEER SHEET NO. /0 HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT TTS1F, FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE FO CONSTRUCTION PERMIT DRAWING SHEET 20 OF 37 50/ o/ 50/ GRAPHE SC/�LE // T/ S/ T DENOTES TEMPORARY IMPACTS IN SURFACE WATER SHEET NO. to Z O Lu c T, T ILB-�.�\ 03 o J 7-Ground ^/ D Z� Min. D = 2.0 Ft. b = 5.0 Ft. SE ETAIL F TO ROTECTION W/57 TONS CL B RAP 130 SY GEOTEXTILE OR D STA 27+00-28+25 L2REV LT U ED I IU i co Q E L L fo (V L Q / co cyl (6 L 0 / ro E L 0 w 7- G' w w / Q L N= 0 $DATE$ N/ O $(USERNAME)$ oon $FILEL$ I OO. X cb �A �O 4 , �O �4 Nx 0, V s �O . -0 T! X 00 • 00 GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER PERMIT DRAWING SHEET 21 OF 37 PROJECT REFERENCE NO. R -342/A R/W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPILE IE PLANS DO NOT USE 1F®R / W ACQUISI`Il"ION PRELIMIN RY PLANS Do NOT USE Fo CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES EXCAVATION DENOTES MECHANIZED /yF/ F DENOTES FILL IN IN WETLAND CLEARING WETLAND • _ � y .. UMA Fill Ell Min. 0 Ft, b = 5.0 Clio F -'a - - �i�rYl�di►�il►:�av�� • • II ope r is OO. X C I CoD Nz Ike �C LT V,�APPROX INA E 711 ROX. U) 1 G CAL REV- FCH 4+ 0 �ZZ N 5 6° 48' 43.3 �,� zZ _ _ _ 6ZZ £Z— _-- -I--- - ezz _ 226 — — — Z — — bZZ 230— _R C DIT� 229 -� �- � � DETAI> _ 226 227 225 22� 7 22 3 I� 22 217 22 219 / 216 81Z / 226 2�" 217_ 229 223 22 218 j / / / 5 215— 216 / 217 _ 21 / 22 227 2l5 / 216 215 214 — 213 212 1 C /226 22 ya stz O 2n 2-10 212 207 E -2 213 I c Q E I L Q- I (V I 3 (6 L 0 E L O >I W W CL Q L N=0 $DATE$ N/ O $(USERNAME)$ 0on $FILEL$ 2 TON CL B M AP REV— C 29 *88.47 lz emti ym 0�2 06 ti mZ zm / / / �lZ gl so 29�zz —mZZ Z/ 0£Z t / Z£Z �li<l z U' O 59z - r-0 m- 0 o- °o 21 210 / / —�—�7st Z —L2— I \\\ EV — ILF- fECT<I�t �IS CL OTE) 00 2GI D RA PERMIT DRAWING SHEET 22 OF 37 — — — — — — B 2G1 Ditch T Z —281— SEE I TOE /86 K8]� RAINAGE PROJECT REFERENCE NO. SHEET NO. R —3421 A 11 RNV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOlylIP LE IE PLANS DO NOT U91E FOR / W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION DOCUMENT NOT QONSIDERED FINAL \SS�RI P-RAP �!?/_/IK �s�s! �i r� a 5 0' 0' 5 0' 10 0' 150 �f67 bz- GRAPHIC SCALE DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER DENOTES EXCAVATION DENOTES MECHANIZED F F DENOTES FILL IN IN WETLAND CLEARING WETLAND PROJECT REFERENCE NO SHEET NO. T, 03 to Z 0 V) W ce $DATE$ $(USERNAME)$ $FILEL$ �ETAI L F ROTECTION TONS CL B � SY GEOTEXTILE 27+00-28+25 SITE 3J9 E1LARGEMEIVT SEE DETAIL F o TOE P OTECTI O B W/34TONS C RIP RAP 78 SY GEOTEXTILE FOR DRAINAGE STA 28 + 25 — 29 + 00 , 17 D C\/ IT Z / SEE DETAIL G SPECIAL CUT STA 29+50 - -L2 REV— LT DENOTES IMPACTS IN SURFACE WATER DITCH - 34+50 GI 50/ R -542/A I R/W SHEET NO. I ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 23 OF 37 0 / SCALE 50/ DENOTES TEMPORARY IMPACTS IN SURFACE WATER SHEET NO. T, 03 to Z _O _N Lu ce $DATE$ $(USERNAME)$ $FILEL$ SITE 3JU E3iLARGEMEIVT DENOTES IMPACTS IN SURFACE WATER 50/ PROJECT REFERENCE NO R -542/A R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLETE PLANS DO NOT USE FOP, / W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 24 OF 37 0 / SCALE 50/ DENOTES TEMPORARY IMPACTS IN SURFACE WATER to Z 0 V) W ce 03 �Iu z C , II/ I�- II II II --ter---- II II I� CLASS I RIP —RAP I� SEE DETAIL P I� II I� I IS J (V CO L(� ED i Co Q E 10 (V (V I Co `,o 7- W Q� $DATE$ CD o $(USERNAME)$ r'_ 0 CVO $FILEL$ COS L PROJECT REFERENCE NO. R -5421A RNV SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, / W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 25 OF 37 o� v Y 1 %� -'� = ---- _ - � — � 4' BST 75° ' I E F . BASE D ITC — --_, ____ -- _ I � --------------- SEE ETAIL Q ___ --- — __------ I _-- — — I I � III _ J — _ I I U II 00I I Z _ nII 00 - S— d �COLLAR CP- 15►► RCP-N wo f_ ,TB 2 G 00 �GQ� TB 2G1 GI CLASS I RIP —RAP 000 -------------- 2G1—D � 0 0 0 0 0000 2 TON L RI °8 Sy GEOTEX ILE 0 P ELBOW � DRAINAGE FS SEE ' DETAIL E - — 156A •o SEE DETAIL L SEE DETAIL B BERM DITCH STA 18 + 00 — 32 + 00 —RPC— RT SEE DETAIL F CL I RIP RAP ' TOE PROTECTION SLOPE PROTECTION W/63 TONS CL B RIP RAP ,ELBOW 144 SY GEOTEXTILE FOR DRAINAGE 156 STA 33 + 00 — 34 + 00 —RPC— RT BDO / / C / v / \+10o00 —CPC — 4' Base Ditch 3 Depth See Detail 'Y' Use Class I Rip Rap Begin Ditch Elev.-215.4 IDR0WW F E End Ditch Elev.— itc Slope-2.5% i r /E DENOTES IMPACTS IN DENOTES EXCAVATION 50/ O DENOTES FILL IN SURFACE WATER IN WETLAND F F WETLAND DENOTES TEMPORARY DENOTES MECHANIZED GRAPHIC SCALE IMPACTS IN SURFACE WATER � �� � " � CLEARING 9' CONC W� 50/ L PROJECT REFERENCE NO 2 -242/A ROADWAY DESIGN ENGINEER SHEET NO. HYDRAULICS ENGINEER INC®MP LE lE PLANS DO NOT USE FOR % W ACQUISITION PRELIMINARY PLANS DO NOT USE FO CONSTRUCTION PERMIT DRAWING SHEET 27 OF 37 -Ramp C- 32 75.27 2@10' 8' Reinforced Concrete 3ox Culvert with Sills 24 Skew=45 11 From Normal ct Centerline NVIt: LAGt 2.5" ORTHE FiIG N MOT SILLS (c0 INL FLO I AND BARRE VUILt Vr 1' SILL •? (HIGH ) .PLACE ' 2 10 INLET AND O TLET WITH 6 APPLES SPACE @ 4 012 a 7�� �o ��' I IDE THEN M T L W FL W BARRE '� ACKFIL WITH ATIVE MATERIAL. SEE ACKFIL NOTE UNDER A DITIO AL INF RMATI N. � c_j 0 40,E o� 5 Oyr WS L 221.5 �o 0 4 F1 00yr WS L 219. ' �`�? \ 50y WSEL 19.0'1 220 - 21 Stream Bank rhve rt 2 06.79' C nterlin A 208.7 — -----_ _-------------�\ Invert 2111.32' Proaoseld Stream I Grade occ-- q I 03 PROJECT REFERENCE NO. R -3421 A RM/ SHEET NO. SHEET NO. /2 to Z 0 W ce w w i 0 Q� oc�o� 0 $DATE$ $(USERNAME)$ N� $FILEL$ 0on- L ELBO\ T __ r Z rn i n i F W co O O O O un rn rn Ir Z O J SITE 7 (1�ORrill) / L—J — — DETAIL X FALSE SUMP ( Not to Scale) Median Ditch . 9 —� 2 �- (See Chart Below) ► < 20' ]GI S = Ditch Slope CL Proposed Ditch Ditch Grade L Ditch Grade L 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' Over 2.0% To 4.0% 30' Over 6.0% 50' DENOTES IMPACTS IN SURFACE WATER ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, / W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION MTL7--- 4r---r---T- I I RETAIN 2G1 & I I 15", 24", 30" W/N C TO W/NEW C2 END RESURFACING 50/ 0/ 50/ 100/ 150/ DENOTES TEMPORARY IMPACTS IN SURFACE WATER GRAPHIC SCALE 03 PROJECT REFERENCE NO R -3421 A SHEET NO. /2 V) Z _0 _N Lu C 01 C O O N L� (V Q E ro (V L Q N 01 C 3 ro L 0 ro C N E L O L C W Co $DATE$ $(USERNAME)$ $FILEL$ Armqw 4wPwl" 42romw BW 01, R/W SHEET NO. ROADWAY DESIGN I HYDRAULICS 50, 0' 5 0' I 0 0' 15 0' DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER GRAPHIC SCALE to Z 0 W ce 03 -�60000 L2 REV P1 IF — ------ 20 � PUE�: -�20000 L2 REV 189Z7 X 6 JR1 P RAP EXTI LE .I AGE r TEcT�ON O TO — CD T ELBOW co W L. CL o N X� �IQ Lo I r-- ro (V CT"ON REMOVE DAM PR 2-6' X 6' RCBC X— X ` X SEE DETAIL F TOE PROTECTION W/130 TONS CL B RIP RAP 300 SY GEOIERTICE- FdR YRAl-NAG STA 40 + 50 - 42 + 50 -L2 REV- LT ,r_r� _-- --------z-------- T-------z--- �1 3 O 0 / ro *>-- PUE E TOE PRIL TION X--W/-34 TONS CL B RIP RAP 75 SY GEOTEXTILE FOR DRAINAGE \ STA 43 + 00 — 44 + 50 J �R REV— LT US 74 W BL 24' BST E O / GREU FS SEE L A. DETAIL X TL-3 W-------------------------- W / $DATE$ Q0 $(USERNAME)$ 2�o $FILEL$ CV/ OL COS L MTL -L2 REV oo +45.00 L2 REV 220.00' *35a00 —L2 REV — 200000' A� F -�55000 —L2 164.62' A' 01 ffl I Use N I A k 0. Ali F �OOo00 , k L_ 85000' DENOTES IMPACTS IN SURFACE WATER PROJECT REFERENCE NO. R -5421 A R/W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 12 HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, % W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 30 OF 37 50/ o/ 50/ GRAPHC SCALE DENOTES TEMPORARY IMPACTS IN SURFACE WATER PROJECT REFERENCE NO R -5421 A SHEET NO. /2 V) Z _O _N Lu T, 03 Ol C 3 O L 0 / ro E L 0 CL W / O Q(o L (Dc�o, CV/ 50/ RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INC®MPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 31 OF 37 0 / so / $DATE$ $(USERNAME)$ DENOTES IMPACTS IN DENOTES TEMPORARY $FILEL$ SURFACE WATER IMPACTS IN SURFACE WATER L PROJECT REFERENCE NO. SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER L 00 CD n CV i Q x N N x O Q (V CC Q CV CC C 3 i O C N E C O i E W CJ� 70 50 -1-2- 41 + 47.2 Extend 2@6'x6' RCBC S kew =12 0° -1-2 Rev 42 + 1 .5 Extend 2@6'x6 RCBC Skew= 20° & 42° 30' Q. INC®Iy]IPLE ]E PLANS DO NOT USE FOR % W ACQUISITION PRELIMINARY ]TANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 32 OF 37 END LIE @ �5' .LONG �• MAI TAIN AME GRADE. r • R EVA VA 230 Natura Groun along --- _-- --- C-djInrt Cnnt riumm ---- --- Invert 220.6 220 -- _— — o Existing tream Profile I vert 21 .8' --- ---- — 1 SiII in r� --- left barrel $DATE$ 0 $(USERNAME)$ L $FILEL$ 210 03 PROJECT REFERENCE NO. SHEET NO. R -3421 A 16 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER V) Z O V) w L L O O 6' N ED n N CO co Q E L L f6 N L Q N co cl L 3 ro L 0 ro +' L N E L O L L w Co Ln r- O Z W W cn w w V) $DATE$ $(USERNAME)$ $FILEL$ Ur -\AI- rM- Jl ALr DENOTES IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING Cr 03 PROJECT REFERENCE NO R242/A SHEET NO. R R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER to Z _O _N Lu ce C �l C O O (V CD L(� co N 4' co N O1 L C N C9 co Q E L L f6 (V L Q 3 O L 0 ro E L 0 W W / DENOTES IMPACTS IN F SURFACE WATER DO NOT USE 10 CONSTRUCTION PERMIT DRAWING SHEET 36 OF 37 50, o/ 50/ GRAPHIC SCALE DENOTES FILL IN WETLAN D $DATE$ $(USERNAME)$ $FILEL$ DENOTES MECHANIZED CLEARING WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 24+53 / 26+88 -FLY- PROP PIPE SYSTEM 0.03 < 0.01 411 10 2 94+76 / 98+53 -1-73- TRIPLE BARREL 0.48 0.25 0.02 1011 50 CULVERT EXTENSIONS 3 12+62 / 14+03 -LPC- PROP 3-BARREL CULVERTS 0.09 0.02 475 106 3A 12+90 / 13+44 -LPC-RT 60" RCP EXTENSION < 0.01 81 PROP 3-BARREL CULVERTS 3B 28+02 / 28+38-L2REV- PROP 66" RCP < 0.01 < 0.01 61 10 4 108+56 / 109+94 -1-73- PROP 48" RCP 0.01 < 0.01 205 12 5 10+00 / 11+96 -RPD- PROP 60" RCP 0.02 < 0.01 327 25 5A 10+34 / 10+71 -RPD- PROP 60" RCP < 0.01 < 0.01 118 10 6 126+44 / 126+91 -1-73- CLEARING FOR ROADWAY FILL < 0.01 7A 35+17 / 35+87 -RPC- PROP CULVERTS < 0.01 < 0.01 127 10 7 SOUTH 31+62 / 38+32 -RPC- PROP CULVERTS, 18"RCP, 0.15 0.02 0.11 < 0.01 828 10 STREAM REALIGN 7 NORTH 42+60 / 43+90 CULVERTS EXTENSIONS, 0.03 < 0.01 175 12 -L2REV- PROP CULVERT & 8 134+60 / 135+70 -US 74- 60" RCP EXTENSION 0.01 147 8A 133+06 / 133+86 -US 74-1 ROADWAY FILL < 0.01 0.02 TOTALS*: 0.48 0.15 0.05 0.58 0.05 3966 255 0 -KOunaea totals are sum of actual impacts NOTES: 1024 North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 34542.1.FR3 TIP No.: R-3421B County(ies): Richmond Page 1 of 2 General Project Information WBS Element: 34542.1.FR3 ITIP Number: R-3421B Project Type: New Location Date: 6/14/2319 NCDOT Contact: Mr. Galen Call, PE Contractor / Desi ner: Address: 1000 Birch Ridge Drive Raleigh, NC Address: Phone: 919-707-6711 Phone: Email: cail ncdot. ov Email: City/Town: Count ies : Richmond River Basins : Yadkin -Pee Dee CAMA Count ? I No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 4.30 Surrounding Land Use: JAgricultural, Rural, Residential Proposed Project Existing Site Project Built -Upon Area ac. 52.1 ac. N/A ac. Typical Cross Section Description: 46' Grass median, 2@12' paved inside shoulers, 2@12' lanes each direction, 12' paved outside shoulder, grass roadway ditches. N/A Annual Avg Daily Traffic (veh/hr/day): Design/Future: 19,980 Year: 2036 Existing: N/A Year: N/A General Project Narrative: (Description of Minimization of Water Quality Impacts) R-3421 B is an interchange and bypass project (US220 Bypass, 1-73/1-74) which will include a 46' grass median with 2@12' travel lanes in each direction. The project also includes grass lined roadway ditches. The proposed project includes 1 major drainage structure (3 barrel RCBC), which will convey an unnamed tributary to Cartledge Creek. The culvert will include sills and utilize Low Flow Benches to maintain low flow in two barrels. Rip Rapped Energy Dissipators will be utilized at the outlets of a 30" pipe and a 36" pipe to prevent erosion at the outlets. Waterbody Information Surface Water Body (1): Un-named Trib to Cartledge Creek NCDWR Stream Index No.: UT to 13 - 35 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I I II�;�iWc'1 ■ North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: TIP No.: R-3421B County(ies): Richmond Page 2 of 2 Preformed Scour Holes and Energy Dissipators Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Energy Dissipator Type Riprap Type Drainage Area ac Conveyance Structure Pipe/Structure Dimensions (in) Q10 cfs V10 (fps) BMP Associated w/ Buffer Rules? 17 -L- 322+50 RT (1)Un-named Trib to Riprap Energy Dissipator Basin Class 1 9.7 Pipe 30" RCP 27.5 1.1 N/A 34.9854605,-79.7994557 19 -L- 347+26 LT (1)Un-named Trib to Riprap Energy Dissipator Basin Class 1 13.2 Pipe 36" RCP 32.4 1.2 N/A 34.9897885,-79.7930204 Additional Comments - FCeter to the NUUU I tSest Management Practices 1001boX (ZU14), NGUU I Standards, the reoeral HlghWay AomInistrahOn (FHWA) Hydraulic Engineering Uircular No. 14 (HEU-14), I hlro Etlltlon, Hydraulic Uesign of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. 0- \ 03 ED 0 ED C T) N 0 m 0 0 N I UD I N _m N U) 0 L / F C O L o� w U) w / QL w o� o W Uj J J N / O Qa =L o o L 6969 LL 1-7 rr E00ft� '*402) T4 PM h V O U See Sheet 1-A For Index of Sheets See Sheet 1-13 For Conventional Symbols E D ROJECT 1005 22a 1303 1302 1142 1336 loos \ \ 1301 / 1005 220 1141 NEST ROCKINGHAM 1005 (UNINC ) 1140 30 " 100 1335 ]4 • 6G5 11164 220 1124 4 1239 I eUs 184 3 ]4 BEG PRO T B05 RO KI HA ]4 1 ` • ]4 \ \ E \ ]4 1. VICINITY MAP SITE 2A SITE 2-,, , �� SITE I -Y3- POC 23 + 16.67 ± r, BEGIN BRIDGE �MUIL-I<E)r ENGINEERS 8• CONSULTANTS PO Box 331 27 RALEIGHN.C. 27836 (91 91 851-1 91 2 19191 851-1918 (FAX) WWW.MULKEYINC.COM RICHMOND COUNTY LOCATION: 1-73/74 FROM 0.3 MILES SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY) TO 0.2 MILES SOUTHWEST OF SR 1304 (HARRINGTON ROAD) TYPE OF WORK: GRADING, PAVING, DRAINAGE, CULVERTS, STRUCTURES, MSE RETAINING WALLS, AND SIGNING WETLAND AND SURFACE WATER IMPACTS PERMIT SITE 6 STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. R-3421 B I WBS NO. F. A. PROD. NO. DESCRIPTION 34542.1.FR3 NHF-0220 76 P.E. 34542.2.3 NHF-022 0 43 R /W & UTI L. PERMIT DRAWING SHEET 1 OF 71 END TIP PROJECT R-3421B END BRIDGE 7-0 ELIERgE NOTE: THIS PROJECT IS A CONTROLLED ACCESS PROJECT WITH ACCESS LIMITED TO THE INTERCHANGE. GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of. Mulkey Engineers & Consultants HYDRA ULICS ENGINEER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 2 5' 0 50' PLANS 25' 0 50' PROFILE (HORIZONTAL) 5' 0 10, ADT 2016 =101400 ADT 2036=19,980 o K = 10% D = 60% T = 2 6% * V = 70 mph * (Duals = 9%+TTST=17%) LENGTH ROADWAY TIP PROJECT R-3421 B = 4.270 MILES LENGTH STRUCTURES TIP PROJECT R-3421B= 0.029 MILES FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.E. SIGNATURE: o �� Q ��p Q� 4Rp0Qo 2012 STANDARD SPECIFICATIONS JOHNNY BANKS RIGHT OF WAY DATE: SEPTEMBER 23, 2009 MULKEY E & C PROJECT MANAGER STEVE BROWDE, PE ROADWAY DESIGN ENGINEER TOTAL LENGTH TIP PROJECT R-3421B = 4.299 MILES LETTING DATE: FEB 16 2016 (PRODUCTION) PROJECT DESIGN ENGINEER PROFILE (VERTICAL) Functional Class.: Interstate statewide ties —L— LINE USED FOR PROJECT LENGTH P.E. SIGNATURE: PE NCDOT CONTACT. REKHA PATEL, PE ROADWAY DESIGN - PROJECT ENGINEER STATE HIGHWAY DESIGN ENGINEER to Z _O _N LU ce T, 03 F Natural L10 Ground b{ � I d d = 1.5 Ft. b= 3.0 Ft. Geotextile Type of Liner= CLASS "B" Rip -Rap FROM STA. 149 + 00 —L— TO STA. 151 + 35 —L— RT. (Est.Qty. 70 Tons; 161 SY GEOTEXTILE) FROM STA. 22 + 71 —SRI— TO STA. 23 + 05 —SRI— LT. (Est.Qty. 41 Tons; 24 SY GEOTEXTILE) DETAIL C PIPE OUTLET CHANNEL ( Not to Scale) Natural Natural Ground sl/ OPGround "� agNk D E��S��aG d _ I, 0 ------ CHANNEL BED (Variable) Length = - D = 1.5- ___-_ Est = ___7___ Tons of Class _B_ RipRop STA. 150+95.58 -L- (LT) DETAILAL X FALSE SUMP ( Not to Scale) o - Outside Ditch Traffic Flow 2,0 GI S— etc. S = Ditch Slope Proposed Ditch STA. 156+50 -L- (RT) STA. 160+00 -L- (RT) STA, 32+00 -SRI- (RT) DETAILAM FALSE SUMP ( Not t $Cale) Median Ditch 9' --{ z' se Chart Below)+T� 20'__� L--%] Proposed Ditch STA, 156+50 -L- (CL) STA. 160+00 -L- (CL) DETAILAN C o FALSE SUMP ( Not to Scale) u Outside Ditch Traffic Flow 2� 2 cl �- S — etc. S=Ditch Slope Proposed Ditch STA. 32+00 -SRI- (LT) DENOTES IMPACTS IN SURFACE WATER JO. SHEET NO. 6 NO. HYDRAULICS ENGINEER E IE PLANS g % W ACQUISI`Il"ION RY PLANS rO CONSTRUCTION re DENOTES FILL IN WETLAND N $DATE$ $(USERNAME)$ $FILEL$ DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES MECHANIZED CLEARING V) Z _O _N Lu T, 03 L L O LO N m ED ED (V (D ED L Q N 3 F L Q 71 S m (V m �1 L 3 L 0 L N L L O L L W (0 m w a- / (Est.Qty. 41 Tons; 24 SY GEOTEXTILE) y(Varlable)V STA. 156+50 -L- (RT) D I H. IJOTJU -L- «,u Length = jo-_____ D = 1.5- _____ STA. 160+00 -L- (RT) STA. 160+00 -L- (CL) STA. 32+00 -SRI- (LT) Est = _-_--- Tons of Class _B- RipRap STA. 32+00 -SRI- (RT) STA. 150+95.58 -L- (LT) DENOTES IMPACTS IN SURFACE WATER F JO. SHEET NO. 6 NO. HYDRAULICS ENGINEER E,rE PLANS 8 % W ACQUISITION I Y PLAINS rO CONSTRUCTION ff �J I DENOTES FILL IN WETLAND N $DATE$ DENOTES TEMPORARY DENOTES MECHANIZED $(USERNAME)$ IMPACTS IN SURFACE WATER CLEARING $FILEL$ 4i/, OTECTjON mc TOE pR 'L „RA,► SEE SETA \ L " OTECTION TOE PR "RA SEE VETA"" Z �i ti0 oLu � p� LB -- I �7 N L Q �I3 E� L Q .t Q� �nm c� Q� o $DATE$ $(USERNAME)$ $FILEL$ 2G1 F 2G1 RCPAV > i Lo 2G1 15" RCP —IV 2G1 I EST 5 SY GEOTEXTILE �TS CL B RIPRAP R SEE DETAIL "C" 0 15" RCP —IV 0 Ln OTECTION -� OE PR ►► SEE -L- i PROJECT REFERENCE NO. R -3421 B RW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 6 HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, / W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 6 OF 71 SITE I E3 L All R GE2klmE3 T 50' 0' GRAPHC SCALE 50' DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAN D DENOTES MECHANIZED CLEARING V) Z _O _N Lu T, 03 Q L -0-� Lc-)_0 $DATE$ ram/ o $(USERNAME)$ $FILEL$ PROJECT REFERENCE NO R -3421 B SHEET NO. 6 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLE IE PLANS DO NOT AT91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 7 OF 71 SITE 1 E1LARGEMEIyT 50' 0' GRAPHC SCALE 50' DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAN D DENOTES MECHANIZED CLEARING 03 H LL W / U < Q Q L� LUWVf N w Q Ln O p � LL — . L e» F» W L 4 0 4 0 400 380 3650 3,10 3 0 300 030 2650 2,10 2 0 200 0 10 PROJ. REFERENCE NO. SHEET NO. / 0 / 0 PERMIT DRAWINU SHEET 8 OF 71 8.0 22Sf //.0 0�50 //00 8.0370 � N 0.020 0.020 — o 340 WE SI LAN 1) E 1 �80 Sao // 2/ +690/ 0 0 7 //00 8.0 370 -- -- __— --- —0.020 _ O n01 0.020 S.S.3540 8 ---- - -__ 4 0 410 400 3 0 3 0 3 0 3 0 3 0 050 2 0 2,10 2 0 2 0 / 0 / 0 \ N co yr � W Q L W LU J �- O W N W J N W oo = o?LL �/O 69 d4 b4 o o L I` W L l 0 / 0 / 0 8 6 4 0 0 4 6 8 / 0 10 PROJ. REFERENCE NO. SHEET NO. � —342/B X —25 0 / 0 / 0 PERMIT DRAWING SHEET 9 OF 71 24.0 c c ,370 a030 cc CC 370 0.030 o Q l l V 0.00 WETLAND srrE 1 Sal 091 0030 0.030 Q -L 2i � o 0000 l48 + l 0 / 0 / 0 80 60 40 20 0 40 60 8 / 0 140 / 0 91 7 S�EET NINE 10 j6+00 00 MAY 4 ST AT � -Y4- PT 16+66.58 6\ o r o� -Y4- PC 18 +73.99 F Ln TS i. l H h�l ` CLASS I RIP RAP SEE DETAIL "D" SITE TOE PROTECTION C SEE DETAIL "RA" A / / / / / / / / / N � Z / o ' N c ---- ____ c S _ ------ _ LU 2GI FS CAT-1 WN 0 O z �- J� z - Q I C- T) Q I +> 0 3 I F L Q I z I m (V i m_ 3 L 0 10 a� a= 0 0 L > C W I U) m W i (n 0 :5 D Q� L o, o $DATE$ $ USERNAME $ �= 0 L $FILEL$ i�m L 0 0 2GI GREU FS TL-3 24 RCP -IV TYPE'A' 2GI / C NA -L- F DETAIL D PIPE OUTLET CHANNEL ( Not to Scale) Natural Natural Ground Ground "c a,NK--- CHANNEL BED (Variable) 20 2 Length = _____ D = Est = __6___ Tons of Class _ I _ RipRap STA, 167+43 -L- (LT) DETAIL F LATERAL BASE DITCH ( Not to Scale) b Fill Natural Slope Ground 1"/Ft. d Min. D = 1.0 Ft. B Max. d = 1.0 Ft. GEOTEXTILE When B is < 6.0' B = 5.0 Ft. b = 10 Ft, Type of Liner = CLASS "B" RIP RAP STA. 169 + 00 to 169 + 50 -L- (RT) (EST 23 TONS; 50 SY GEOTEXTILE; 98 CY DDE) CABLE GUIDERAIL BEG. SHOULDER BERM GUTTER STA. 164 + 00 -L- RT DETAIL E LATERAL BASE DITC ( Not to Scale)o b NaturaGround 2, \ Slope / D 2• I"/F . Min. D = 0.5 Ft. Lo I I B = 5.0 Ft. b = 10 Ft. STA.1 68 + 46.97 to 169+00 -L- (RT); 54 CY DDE 2GI FS JB w/Slal See Specia Sheet 2l CAT-1 • FROF. SI UFRIGA -L- POC 168+78.62 = o -Y4- POC 20 +78.66 C� GQ -Y4- PT 21 +94.00 B w/MH RCP -IV LATERAL BASE DITCH --- (SEE DETAIL "E")TS -Y4 - PC 24 +08.65 PERMIT DRAWING I SHEET 10 OF 71 STA. 163+00 -L- (RT) STA, 174+50 -L- (RT) DETAILAM FALSE SUMP p ( Not to Scale) Median Ditch I`-- 9 -�I2 I ee Chart Below20'GI S etc. S=Dltch Slope Proposed Ditch I / / Ditch Grade L DTtch Grade L 0.07 To 2.0% 20' Over 4.0% To 6.0% 40' IOver 2.0% To 4.0% 30' Over 6.0% 50' I I/ STA. 163+00 _L_ (CL) STA. 172+00 _L_ (CL) STA, 167+00 L (CL) STA. 174+50 L (CL) I STA. 169+50 -L- (C L) -Y4- STA/7+4 5 I PROJECT REFERENCE NO. SHEET NO. R -3421 B 7 W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPILs]E IE PLANS DO NOT USE FOR / W ACOUISI`Il"ION PR MIN RCONSTRUCTIONPLANS ®L® ® 700,00 � O O Qc� MTL \ \ STA, 164,+25 -L- (LT) FROM STA. 165+90 -L- TO STA. 167+40 -L- LT. \ \ STA. 170,150 -L- (LT) (Est.Qty. 40 Tons; 115 SY GEOTEXTILE) \ FROM STA. 169 + 90 -L- TO STA. 171 + 00 -L- RT. \ (Est.Qty. 30 Tons; 75 SY GEOTEXTILE) II I +63.64 -L- -L- / 175.00 75.00 (LT) .oG 221.00 (LT)� ' F I I �` +08.00 -L - 'w�- \ R 175,00 (LT) \ ry --_�\ \ 0+�0 \� F \ 2 /--------F-------- -_ --_ L__ SOIL TL-3----- \ 2GI \ \ / I \ �� C23 Q) \ O GREU 8:1 1'. I TL-3 2GIS / I C -Y4- P1 StG 15+78.17 P/ StG 20+34.72 P/ StG 24+34.78 0 = 12°43"32.4" (LT) A = 13°20102.5" (RT) A = 1*34104.5" (LT) D= 7*10100.0" D= 4*10100.0" D= 3°00100.0" L = 177.57 L = 320.02 L = 52.26 T = 89.15 T = 160.73 T = 26.15 R = 799.48 R = 1,375.10 R = 11909.86 SE = NA SE = NA SE = NA D.S. = NA D.S. = NA D.S. = NA C" tI C C / i i I / I Ln \ \CD \ 2GI FS \ 2GI. FS / SOIL \ v J > -V O RCP 0 2GI 2GI CAT-1 _- - t, FS i� J F���\ �_------� 2GI\ �% m / / / / / TOE PROTECTION SEE DETAIL "RA" GRADE TO DRAIN 5' WIDE W/CLASS B RIP RAP EST 10 TONS ATTERAL BASE DITCH (SEE-D�TAIL "F") -Y4- STA. 23+88.98 -Y4- PT 24+60.91 -Y4- POT 25 +65.88 c END SHOULDER \ BERM GUTTER \ ( r STA. 172 + 00 -L- SOIL \ P/ StG 180+84.12 L = 104°0/152.6" (RT) D = 0'45100.0" L = 13,870.84 T = 9,783.54 R = 7,639.44 SE = 0.03 D.S. = 70 mph DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER F DENOTES FILL IN WETLAND 5 0' 0' 5 0' 100, 15 0' Ct7:lT1[9Z.`1WRAIIIIIIIIIIII 91 N Z 0 > w i �.1 2 J h m Wo M $R 2 I oz O m (_ _ m mm �� . Z m c9 Q - c� N m m ED -C C Q T fV 3 m gym. M E Q x � A z I m s �9e ee F 069 9f £ N ir e e. `tee s Ae 0•g SE, W eA � N ural Gr nd F"r�S G P N M G (n - � � m d 3 N EL ( r b ) Lengt =_ _ Es (0 +) mm. lmbm° LATERAL BASE DITCH ( Not to Scale) b Uj Natural Ground �/ D 2� V/Ft. Fill Slope d Min. D = 1.0 Ft, 12� WCL B GEOTEXTILE Max. d = 1,0 Ft, When B is < 6.0' B = 5,0 Ft. b = 10 Ft, Type of Liner = CLASS "B" RIP RAP Q STA. 169 + 00 to 169 + 50 -L- (RT) $DATE$ (EST 23 TONS; 50 SY GEOTEXTILE; 98 CY DDE) ,,o -) $(USERNAME)$ o — L $FILEL$ e. v es, 9 ; C m ,m P mm� °�•�� 1 T C ,! b b. Mi NO iFfi , HLIof 1'� >I +00 ,C TION r P C %yW1 111=1m ig!. ---LATERAL SE 19 = SEE -ETAI- "E") N� Pl Sto 15+78.17 Pl Sta 20+34.72 P/ Sto 2\4 = 12°43132.4" (LT) z� _ 13°20102.5" (RT) z�, = 1 °34' D= 7*10100.0" D= 4*10100.0" D= 3*00100. L = 177.57 L = 320.02 L = 52.26 T = 89.15 T = 160.73 T = 26.13 R = 799.48 R = 1,375.10 R = 1'909.86 SE = NA SE = NA SE = NA D.S. = NA D.S. = NA D.S. = NA C/ z PERMIT DRAWING I SHEET 11 OF 71 STA 163+00 -L- (RT) STA, 174+50 -L- (RT) rI I I� STA. 163+00 (CL) STA. 172+00 (CL) I _L_ _L_ STA, 167+00 L (CL) STA. 174+50 L (CL) 1 STA. 169+50 -L- (CL) \ DETAILAN o \ FALSE SUMP ( Not to Scale) � = Natural � \ Outside Ditch and Traffic Flow ZOJ 2�v 2' m m S=Ditch Slope r a� a ( M A. I w TA C\ PROJECT REFERENCE NO. SHEET NO. R —3421 B 7 WW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE IE PLANS DO NOT TT91E FOR / W ACQUISITION PR ® I RCONSTRUCTIONPLANS ® ® DETAIL RA TOE PROTECTION ( Not to Scale) b d Geotextile �C "B- Rip -Rap - TA. 167 + 40 -L- LT. OTEXTILE) +00 -L- RT. Q) O / e \ / n I O w e. -------F 0'£ £ Eu w SOIL TL- 'e m 2GI \ \ \ m > \ , 0 e � i r 0, B 2GI ;, FS G e I 7 's s e ws •e F \ •B a / •e — I am \ R e E R T C 10 m e see E D T L RA' \ D 'IN 5' 1 ZIP RA \ 364.e ET1 1J o s e 0/L i e w e .a POT 25 +65.88 P/ Sta 180+84.12 z� = 104°0/152"6" (RT ) D = 0°45100.0" L = 13,870.84 T = 9,783.54 R = 7,639.44 SE = 0.03 D.S. = 70 mph F e SO \ �O m`ELE I� J S`�• FS � J 2G� C :a 3g2e •e e pare DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER F DENOTES FILL IN WETLAND 50' 0' 50' 100' 150' Ctl:",.I[M�wim I PROJECT REFERENCE NO 0-7iir,)lCD to Z _O _N Lu ce 03 SHEET NO. 7 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLETE PLANS DO NOT USE FOP, / W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 12 OF 71 SITE 3 EIVLARGEAIEIVT 50' 0' GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER F DENOTES FILL IN WETLAND 50' DENOTES TEMPORARY IMPACTS IN SURFACE WATER Q L 00 / N $DATE$ $(USERNAME)$ $FILEL$ PROJECT REFERENCE NO 0-7/ 1D/D T, 03 V) Z _O _N Lu $DATE$ $(USERNAME)$ $FILEL$ SHEET NO. 7 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLE IE PLANS DO NOT T791E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 13 OF 71 SITE 3 EIVLARGEAIENT 50' 0' GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER k\F\�K DENOTES FILL IN WETLAND 50' DENOTES TEMPORARY IMPACTS IN SURFACE WATER \ N co H LL W / U < Q G L Q ^ -0 0 F LU OSW QjJ N/ O e» va v3 4 0 4 0 400 380 3650 3,10 3 0 300 030 2650 2,10 2 0 2 0 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -63 Jo Jo PERMIT DRAWING SHEET 14 OF 71 �on Q0 70 LLJ z z WLB sll!,--� 3/0 -- — 4 0 4 0 4 0 3 0 3 0 3 0 3 0 3 0 2 0 2 0 2 0 2 0 2 0 / 0 / 0 03 cr N LID ED N m Q X E L Cl- T, z, m Er LD N / 3 L O 0 C a) 0 L L w Ln '380l 0 / 0 / 0 8 6 4 0 0 4 6 8 / 0 10 PROJ. REFERENCE NO. SHEET NO. R —3421 B X —62 0 / 0 / 0 ,380 ,370 24.0 24.0 370 DRAWING SHEET 15 OF 71 FPERMIT 'Yo °°° 80/ o9a� °.°°° — '360 ,�,150 L:::::: �,50 QQ I 168 -� 0.00 �I Z (� 24.0 N 24.0 � 0 Sal 09� 0.050 U Q Q 2340 201 W SITE 3 __ _ _ ___ ___ 3/0 '300 _ '300 29 062 12,90 168+ 0.00 l 0 140 / 0 8p 6p 4 0 0 4p 6p 8 / 0 / 0 / 0 \ N co l 0 / 0 200 2 0 2,10 2650 250 300 3 0 3,10 3630 3 0 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -64 400 4,110 440 ,70 PERMIT DRAWING SHEET 16 OF 71 'Yo ,�,50 CL- —300 370 Q 350 340 QZ cl l 0 / 0 2 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 3 0 4 0 4 0 4140 T, 03 PROJECT REFERENCE NO. R -3421 B RW SHEET NO. SHEET NO. 8 V) Z _O _N LU m $ DATE $ $(USERNAME)$ $FILEL$ DETAILAL C� o FALSE SUMP 1 :2 ( Not to Scale) v o — Outside Ditch Traffic Flow ,J2,p_ GI S — etc. S = Ditch Slope Proposed Ditch STA. 176+50 -L- (RT) STA, 190+00 -L- (RT) STA. 183+50 -L- (RT) STA. 187+00 -L- (RT) DETAIL _G PIPE OUTLET CHANNEL ( Not to Scale) Natural Fx/ �,� Natural Ground STj 0P Ground h'C ggNk D E��SS\aG i CHANNEL BED -- (Variable) Length = 12 D = 2.0'_--_ Est = --it--- Tons of Class I RipRap STA, 178+71.06 -L- (LT) STA, 179+59 -L- (RT) -(25' long) DETAILAM FALSE SUMP ( Not t Scale) Median Ditch 9. —�II 2' f — ee Chart Below)�_ 20' -- GI S etc . Proposed Ditch STA, 176+50 -L- (CL) STA, 183+50 -L- (CL) STA, 179+00 -L- (CL) STA, 187+00 -L- (CL) STA. 181+00 -L- (CL) STA. 190+00 -L- (CL) DETAILAN o FALSE SUMP ( Not to Scale) " o - Outside Ditch Traffic Flow 20.E 20y 2' �- GI _ S — etc. S=Ditch Slope (i Proposed Ditch STA. 176+50 -L- (LT) STA. 190+00 -L- (LT) STA, 183+50 -L- (LT) STA. 187+00 -L- (LT) DETAIL RA TOE PROTECTION ( Not to Scale) o,�e< F� Natural 1 0� S\0 Ground b F�\ d = 1.5 Ft. b= 3.0 Ft. Geotextile Type of Liner= CLASS "B" Rip -Rap C) FROM STA. 178 + 00 -L- TO STA. 180 + 00 -L- LT. Q) (Est.Qty. 70 Tons; 147 SY GEOTEXTILE) + FROM STA. 178+25 -L- TO STA. 179+45 -L- RT. iC) (Est.Qty. 30 Tons; 84 SY GEOTEXTILE) CC) 0 Or DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE IE PLANS DO NOT TT91E FOR % W ACQUISITION PR ®LIMIN NOT USE ®R CONSTRUCTION PERMIT DRAWING SHEET 18 OF 71 5 0' 0' 5 0' 100, 15 0' DENOTESWETLAND IMPACTS IN DENOTES TEMPORARY IM\ PACTS IN SURFACE WATER \,GRAPHIC SCALE re SHEET NO. 8 to Z _O _N Lu ce T, 03 $DATE$ $(USERNAME)$ $FILEL$ wPRAP 50' PROJECT REFERENCE NO. R -3421 B R/W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE ]CLANS DO NOT USE FOP, / W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 19 OF 71 0' GRAPHC SCALE DENOTES IMPACTS IN SURFACE WATER 50' DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES MECHANIZED CLEARING F DENOTES FILL IN WETLAND N SHEET NO. 8 V) Z _O _N Lu T, 03 L O1 L O O LC� LID (V N N O1 L r L N co ED F Q m w CL / 0 APO 50' PROJECT REFERENCE NO. R -3421 B RM/ SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 20 OF 71 0' GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER 50' DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES MECHANIZED CLEARING N $DATE$ $(USERNAME)$ $FILEL$ DENOTES FILL IN WETLAND \ N co 4 0 4 0 400 380 3650 3,10 3 0 300 030 2650 2,10 2 0 2 0 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -73 Jo / 0 PERMIT DRAWING SHEET 21 OF 71 WL SIT 4 o cc 3,30 � ,370 W Z 0 z Cl- ,370 ciz O cl- 40 40 40 30 30 30 30 30 20 20 20_ '�20 20 /0 /0 03 L CP m w CL i W Q� L� WSJ ��° aN=o cl-5 LL N� L in in w CC L l 0 / 0 / 0 8 6 4 0 0 4 6 8 / 0 10 PROJ. REFERENCE NO. SHEET NO. R —3421 B X —72 0 / 0 / 0 PERMIT DRAWING SHEET 22 OF 71 ,�Bo VVLB �Bo SITE 4 °030 QC 0°030 �4 e71 i 178 -� 0.00 Z 8al °90l— -- --- --- -- — 0030/Ilk 0°030 35 °54 / i 340 l77 0.00 361088 -- 6°/ — 1030 0°030 -- _— i l 0 140 / 0 8 6 4 0 0 0 4 6 8 / 0 / 0 / 0 V) Z _O _N LU T, 03 W CL (n O DETAILAL C X FALSE SUMP ( Not to Scale) o — Outside Ditch Traffic Flow GI DETAILAN o FALSE SUMP ( Not to Scale) o - Outside Ditch Traffic Flow 2 DETAIL RA TOE PROTECTION ( Not to Scale) p,�ec Natural 0� S�0Qe Ground F b PROJECT REFERENCE NO. R -342/B R/W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. /0 HYDRAULICS ENGINEER $DATE$ $(USERNAME)$ $FILEL$ 5 0' 0' 5 0' 100, 15 0' DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER GRAPHIC SCALE 03 � Lu Q t�qZ4�q LU K J QNw j LL 69 fR EA 4 0 4 0 400 380 3650 3,10 3 0 300 030 2650 2,10 2 0 2 0 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -128 I I / 0 PERMIT DRAWING SHEET 27 OF 71 0 �00 z SIT 5 70 pen So = 4.2% 4 0 4 0 4 0 3 0 3 0 3 0 3 0 3 0 -- ------2 ----- ------ Zu 0 2 72" 0 RCP / 0 / 0 \ N 00 01 l 0 / 0 / 0 8 6 4 0 0 4 6 8 / 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -127 0 / 0 / 0 PERMIT DRAWING SHEET 28 OF 71 z 24.0 24.0 � Q:) Ah 7750 U Q —�00 �00 Q 2a� � S11TE 5 1p 0 Pen 24 1.13 72" RCP l 0 00 / 0 8 6 4 So= 4.2% 0 0 4 60 8 / 0 140 / 0 \ N 00 01 l 0 / 0 200 2 0 2,10 2650 250 300 3 0 3,10 3630 3 0 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -129 400 4,110 440 PERMIT DRAWING SHEET 29 OF 71 Q 0 Sl E 5 24a- 72" RCP �- So = 4.2% l 0 / 0 200 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 3 0 4 0 4 0 4,40 to Z _O _N LU ce 03 (V CD n ED (V C_ In Q +' N 3 F L Q 71 S m (V W m DETAILAM FALSE SUMP ( Not to Scale) Median Ditch 7� I - 9 2' f kZ)ee Chart Below)-'— 20'—�I Ld �- S — S=Ditch Slope Proposed Ditch Ditch Grade L Ditch Grade L 0.0/ To 2.07 20' Over 4.07 To 6.0% 40' Over 2.07 To 4.07 30' Over 6.0% so,— STA. 220+00 -L- (CL) STA. 224+00 -L- (CL) STA. 227+50 -L- (CL) STA�.2 00 -L- (CL) ) $DATE$ $(USERNAME)$ $FILEL$ DETAIL -K PIPE OUTLET CHANNEL ( Not to Scale) Natural �,� Natural Ground STjya 0P Ground CHANNEL BED (Variable) Length = 22 D = 2.0_____ Est = _ 39--- Tons of Class -L RipRap STA. 229+81.52 -L- (LT) SITE 6 II II II II II DETAIL RA TOE PROTECTION ( Not to Scale) Natural .)1S\°fie Ground b �d 1= 1.5 Ft. )= 3.0 Ft. Geotextile Type of Liner= CLASS "B" Rip -Rap DETAIL L LATERAL BASE DITCH ( Not to Scale) b Fill Natural Slope Ground 2/ D 2� 1"/Ft. d GEO- Min. D = 1.5 Ft. B TEXTILE Max. d = 1.5 Ft. When B is < 6.0' B = 4.0 Ft. b = 5.0 Ft. Type of Liner = CLASS T' STA.224+50 TO 226+20-L-(RT) (EST 94 TONS; EST 200 SY GEOTEXTILE) 060 Z Z ri� DENOTES IMPACTS IN DENOTES FILL IN F SURFACE WATER WETLAND DENOTES TEMPORARY DENOTES MECHANIZED �Ivllfilrll IMPACTS IN SURFACE WATER CLEARING DETAIL Al TOE PROTECTION ( Not to Scale) o,�et F Natural Ground b d d= 1.5 Ft. b— 3.0 Ft. Geotextile Type of Liner= CLASS "I" Rip —Rap FROM STA. 223+00 -L- TO STA. 224+45 -L- RT (Est.Qty. 50 Tons; 83 SY GEOTEXTILE) 00 ■ ■ ■ ■ ■ kj�P' PROJECT REFERENCE NO R -342/B SHEET NO. RM/ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPIL E IE PLANS NS DO NOT USE FOP, / W ACQUISITION PRELIMINARY ® NOT USE QCONSTRUCTIONPLANS PERMIT DRAWING SHEET 30 OF 71 �,O N V) Z O V) LU T, 03 DETAILAM FALSE SUMP ( Not to Scale) Median Ditch 9 I - 2' f kZ)ee Chart Below)-'— 20'—� GI S=Ditch Slope q Proposed Ditch Ditch Grade L Ditch Grade L 0.0% To 2.07 20' Over 4. % T)Js 6 S40' Over 2.07 To 4.07 1 30' 1 1 1 0 e % 5 STA. 220+00 —L— ( L STA.224+00 7L I( L STA. w — ( L Ui C\j —L] 1 I J M� Q l J ICD LS J ED (V I 1� T 3 I F L 9- T I m (V m / m �1 C 3 O L 0 (0 n� W I- i_ 0 L LLI I ('0 W CL / Q L o $DATE$ $(USERNAME)$ Ni $FILEL$ �m L DETAIL —K PIPE OUTLET CHANNEL ( Not to Scale) Natural �,� Natural Ground STjy� 0P Ground CHANNEL BED (Variable) Length = 22 D = 2,0_____ Est = _ 39--- Tons of Class -L RipRap . 229+81.52 —L— (LT) / N our vo- / G oun m b m o / m m " d 1. F. yp ofm i er=mL� I / m �0'ssz a a'ZSZ R M " �1 �L N F O Ss A. 2 8 s, (E t. ty. 9 on I I N / 258�0 1 RIP N ES TOP I I E 1 SY a es 23+7 m / —L— S /+7/. m �O Ss2 � % gyti // \ I I /tee•,._ 1.�� BE�IN� SH BE GU' GU' ST.24+ SEE' DETAIL "V O'910 �.a \et6 26r O'sb p O'bl� H DIT e'sb (N tT ca 0 96I e`6 , Notur 0 0(z NO q;", Slope :s ri, = 1.5 - 4. Ft. 3S 66t O'10Z � EST Ln 2Gkm PROJECT REFERENCE NO. SHEET NO. er6r R —3421 B RNd SHEET NO. O'0bL ROADWAY DESIGN HYDRAULICS mZb ENGINEER ENGINEER DE PROTECTI0 /\ O•bbt = 3.0 Ft we, � of Liner= +, (Est-Qty. 50 m N 0`" T + 45 -Lg� - RT �l�l �®���1Le 1Le PLANS DO NOT AT91E FOR // W ACQUISITION PRELIMINARY PLAINS DO NOT USE FOR, CONSTRUCTION PERMIT DRAWING SHEET 31 OF 71 TS 9 0 a N q0m� C S I IP b S E EAIL J� m " mm i I i 0 m n 0N W m m 2,2 m mn � ee ti e ti'" m 9F2 /0 DENOTES IMPACTS IN DENOTES FILL IN SURFACE WATER F WETLAND " 5 0' 0' 5 0' 100, 15 0' DENOTES TEMPORARY DENOTES MECHANIZED Im IMPACTS IN SURFACE WATER CLEARING GRAPHIC SCALE All/ " 2GI \ N co H LL W / U LU </ Q Q L� uo LU � yry HWw = AN a. N/ L tnF»u4 W L 4 0 4 0 400 380 3650 3,10 3 0 300 030 2650 2,10 2110 2 0 Ou 10 ■ . ■TT PROD. REFERENCE NO. SHEET NO. R-342/B X-140 Jo Jo PERMIT DRAWING SHEET 32 OF 71 3/0 ,�oo P,gn W z ,3/0 0 ,�oo Z 80 VVLB SITE 6 P,5n 440 4 0 4 0 380 J650 3,10 3 0 3 0 050 2650 2,10 2 0 1 2 0 1 /110 1 / 0 03 l 0 / 0 / 0 8 6 4 0 0 4 6 8 / 0 10 PROJ. REFERENCE NO. SHEET NO. R —3421 B X —139 0 / 0 / 0 ,�po PERMIT DRAWING SHEET 33 OF 71 24.0 ,, 2400 0030 Sal 0901 2� _ — P60 .2en //-75 T.41 Ltj— 0 24.0 24.0 0030 0.030 U 00 300 W B _— ,970 1260 SITE 6 / _- --- ---- _ tsn / _ 2/9+ 0.00 l 0 140 / 0 8p 6p 4p 40 0 4p 6p 8 / 0 140 / 0 V) Z _O _N W T, 03 L O O LC� I co Ol L ro L Q I 3 1- L Q 71 S m (V m co Ol C 3 O L 0 O C F L O W I 0 2GI ' ; F 0.10Z --- � N//z N , N (((//K/�\ N CL VN � m ti m � PROJECT REFERENCE NO. Q � -342/B 11 R/W SHEET NO. �(1 ROADWAY DESIGN M ENGINEER VQ ZQ Z 50' 0' GRAHHC SCALE SHEET NO. HYDRAULICS ENGINEER INCO yIIPL E IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 35 OF 71 50' DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER \ N 00 W X E L 0 1 T I m N m W CO N m rr 1-1 Ol C 3 L 0 C N E E O L C W rr W W O w Q lbqZl6q W J QN W J j LL 64 !R EA 4 0 4 0 400 380 3650 3,10 3 0 300 030 2650 2,10 2 0 200 Ou 10 ■ . ■TT PROD. REFERENCE NO. SHEET NO. R-342/B X-173 / 0 / 0 PERMIT DRAWINww SHEET 36 OF 71 SIT 7 I PPO 2" RCP O --- -------- ------------------------------ So = 3.3% U pff) 4 0 4 0 4 0 380 J650 3,10 3 0 3 0 030 2650 2,10 2 0 2 0 / 0 / 0 03 Q X E L Cl- T, 4-1 / m / 3 L O C N E C O L C W Cn W Q lb�Zto!) LU W J Q N W ❑ j LL fR b4 ER l0 /0 /0 80 60 40 120 0 40 60 8 /0 Ou 10 ■ . ■TT PROD. REFERENCE NO. SHEET NO. R-342/B X-172 /0 /0 PERMIT DRAWING SHEET 37 OF 71 P80el 24.0 CC 24.0 .020 O°020 Sl'TE 7 w 7 .00 So = 2" RC 3.3% _ v Q.020 � 280 24e0 8:� 8:� 24.0 280 O°020 IP-30 1p,30 0 PIPO 229f 0,00 l0 /0 /0 0 4 /0 /0 /0 \ N 00 W X E L 0 1 T I m N m W CO N m Ol C 3 L 0 C N E E O L C W W W O w Q �Z� LU W J Q N w J j LL ER E!T LL l 0 / 0 200 2 0 2,10 2650 250 3 0 3 0 3,10 3630 380 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -174 4 0 4,110 440 PERMIT DRAWING SHEET 38 OF 71 P80 S I'TE 7 --- --- 72" RCP ------ ------ -- So = 3.3% U 280 ppo l 0 / 0 2 0 2 0 2 0 2 0 2 0 3 0 3 0 3 0 3 0 3 0 4 0 4 0 4 0 V) Z O w J etb i— t 0'Zb 1 \ \ O � 0 I� ^ , �V 1\\VI � N titi� m� O � titi Jm 0522/ c: 2�/\ m� � � J c o Q �- I 11 etf O'ss2 I (V _c nT W 3 r ti F L I S I m (V l J I eS / 2 m �9 3 m asz� �6 _o.bsz 0 Z ro I_ 0 E L 0 LL I w i yes« Q 0L o $DATE$ N=� $(USERNAME)$ $FILEL$ —� �m L 9 BNeg 92 NeN N9 N 'e 2gee 1 \ 21Se t6� 214.0 m 0°Z m I CLASS II RIP RAP 9S0 SEE INLET/OUTLET CHANNEL DETAIL PDE— TIDE o v 9�0 R m m W N�TTES: I T S V• LZ BA IL O'LLZ J�0'L9Z 2 ;210.0 0 —_ _ SILLS 3 " I -^------------ 'Z, _ ��_ TERAL_BAS 96�ITC SEE DETAIL "L" JB S 7�n m� BAFFL " RaPAV 15" KCP4 TYPE 'A' ZZ moKaffa3' Lt'lt'i'S'�t'a® 15" RCP -IV a. _ y 2GI m m im to mti D T II AT A AS DI H t t cal .c� III ti at r lode Gr u d r/ D /Ft. d Min = .5 t. B GEO- T TILEI. ax• = 1.5 t• 2 e B s 6.0' B= OF Z`Z = 5 Ft. 0 0•£1Z p�0.gl f it 6r = 2 CLA "I" 34 6 TO �1 7 + a3!9-L-( �(ESrt TO 33 S m�EOT ILE• 2 C D 236 + TO + 75.mti� -(RTr tititi ONS 6 Sy °OTEX ILE; 9,2 CY [� N e. el e.� 2100 N N BN O'L61 ,N e�z e BAFFLES 6 0°SEZ m ` N e2 ILL 2090 -- 9, AN bz\ a — — — — — — — — — — — — — — — — — — Se N 2e cn e � 'N LATERAL BASE DITCH! zese arN SEE DETAIL "L" w NB v 202.0 m PDE +45.00 - 0a ze 300.00 R aesz Obb262 a 2 CLASS II RIP RAP Lu 02.52 SEE INLET/OUTLET 0 250RT O'861 CHANNEL DETAIL 9 BN 6 0N B? — 0y TDB 0., O'8SZ 6e 6. O'Lbl O'bSZ - 2° s 66r 0°79Z e, SN ' Oy N S 9. ee T O'S61 m'bb� SNN N 9e 0002 i 6. S 0 0SZ — 9N ete2\ee? AM u- .. 23 +( . 2 0+S A. 44 ( "'s T s- 40 SY GEOTE TILE) SEE DETAIL "Al" \ 240.0 . z 241.0 N �w N m 2GI L ti n 2500 25�'0 .0 PROJECT REFERENCE NO. SHEET NO. R -3421 B 12 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOyIIPLE IE PLANS DO NOT TT9F, FOR / W ACQUISITION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 40 OF 71 0 l 2se e 50' 0' 50' 100, 150' GRAPHIC SCALE DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER L PROJECT REFERENCE NO. SHEET NO. R -5421 B ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER c m CV i co Q X E i Q 7F m (V ro CC m CV CC C 3 i W C N E C O i E W CJ� 200+00 270 260 250 240 wl Klmle-Lo SATE 18 0f00 00f00 1 200fOO PRO . 3 9'x9' RCBC w 220 210 100 YR WSEL 2()0.50 TB, LT 50 YT WSEL 19.68 T B. RT, 200 TB, RT, -------------- 193.0 NVS ELEV. = 189.47 SILL 80 SILL So = 0 8895% 4 $DATE$ o $(USERNAME)$ L $FILEL$ INC®MP LE lE PLANS DO NOT USE FOR % W ACQUISITION PRELIMINARY PLANS DO NOT USE FO CONSTRUCTION PERMIT DRAWING SHEET 41 OF 71 S 03 PROJECT REFERENCE NO R -342/B SHEET NO. /6 RNV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER to Z _O _N Lu ce (V m CD LC� ED 1V co (n Q +' 0 3 I F L Q I T z I N / m !n 0I 3 L 0 10 C 0 E L 0 L w ('0 w w / Q(0 L CV= CV/ S4.35+33 -YS- (97' LT) DDE = 140, C4-- STA. 35+58 - 5— DDE = 150 CY f vER RAMP C CS 7+13.32 Puf Put O R DETAIL X STANDARD BASE DITCH Puf f Not to Scale) \ %1 PUE Cr n D .S\ GrounO \ =t. I Min. D = I.0 Ft. P(�f \ =t. B 8 = .0 Ft. put DETAIL 0 SPECIAL LATERAL BASE DITCH j_so� DETAIL P $3EGI �&L BASE DITCH DETAIL 0 SPECIAL CUT BASE DITCH DETAIL R TOE PROTECTION ( Not to Scale) ( Nat- tam le)\ 1 Not to Scale) F,dFront q /0R ( Not to Scale) A+\D;t Fill \ BY Slope Ground roun 3,. D\� �`F�v°2nt / t e\ Dlicti / t Ditch roun 3 D F\o {er Slope t Slope D d / U 4.=.! Min. D = 1.5 Ft. GEOTEXTILE B Min. D =1.5 Ft. �G Q ElQ1� B Min. D = 1.5 Ft. d = 1.5 Ft. B = 2.0 Ft. Max. d = 1.5 Ft. B = 2.0 Ft. Max. d = 1.5 Ft. 8�2.0 Ft. ®-.ef-Lte��lfi So. YD. P RiN .. ROM STA. 3+56-YSRPB- TO STA. 14+66 -RPB- LT Type 0t Liner = CLASS B RIP RAP Type Of Liner = 201 SQ. YD.PS cone cre ne�tn _vs_ rn cre x nn _vs_ $ DATE $ $(USERNAME)$ $FILEL$ STA. 35+00-YS-(LT) STA.35+50 -YS- (RT) � FENCE Puf R \ put \ Puf SITE 9 MATC,yUNE -TOYSS N23�AT/0�2 MATCHLINE TO SHEET 23 -YS- STATION 38+00 SITE 10 INCOMPLETE PLANS DO NOT USE 1F®R % W ACQUISI`Il"ION PRELIMINARY PLANS D® NOT USE 1F® CONSTRUCTION STA. 10+38.18 -RAMP 'A'- (LT) STA. 8+00 -RAMP 'Cl- (RT) STA. 4+14 TO 5+79 -RPD- (LT) STA. 9+25 -L- TO STA. 11+35 -RAMP A- RT. (EST 50 TONS; EST 130 SY GEOTEXTILE; 119 CY DDE) (Est.Qty. 55 Tons; 138 SY GEOTE)MLE) STA. 11+15 -L- TO STA. 12+75 -RAMP D- LT. (Est.Qty. 45 Tons; 165 SY GEOTEXTILE) LATERAL 3' BASE DITCH SEE DETAIL AF cp ac- to 100' 0' 100' 200' 300' GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING E �E] DENOTES EXCAVATION IN WETLAND N T, 03 PROJECT REFERENCE NO R -342/B SHEET NO. /6 RNV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER V) Z _O _N Lu C O1 C O O (D N m CD LC� ED (V CO F Q +' N 3 F L Q 71 S N m $DATE$ $(USERNAME)$ $FILEL$ I°_ SITE 9 SITE 10 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND INCOMPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION DENOTES MECHANIZED CLEARING �E� �Ej DENOTES EXCAVATION IN WETLAND I to Z _O _N Lu ce T, 03 C O1 C O O LC� N N O1 L C N CD c- Q N 3 F L Q 71 S (V m Ol C 3 O L 0 ro N E L O L W 7- W / Q $DATE$ o� o $(USERNAME)$ _ 0 $FILEL$ f�� L 25' PROJECT REFERENCE NO. R -3421 B R/W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. /6 HYDRAULICS ENGINEER INCOMPLETE ]CLANS DO NOT USE FOP, / W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 45 OF 71 0' 25' GRAPHC SCALE F DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING \ N 00 W tqz WWLU QN W o j u> er3 LL l 0 / 0 / 0 6 4 0 0 / 0 10 PROJ. REFERENCE NO. SHEET NO. R -342/B X -422 0 / 0 / 0 PERMIT DRAWING SHEET 46 OF 71 1200 ° 12.0 v J SP O 33 Ci- -- -- --- --- --- --- Oo00 --- --- ___ _ -- --- 23 + 1200 12.0 Mn 40 OB40 ct- -- --- --- --- 33 .84 23 + Oo00 JUNO— ITE 9 � C\l /200 12.0 Oo040 0o04 — --- --- 33 .87 22 + O°00 l 0 140 / 0 6 4 0 do 4 6 / 0 140 / y 0 5 to Z _O _N Lu 0e 91 C3 C CV ISM ED 1V ED N co 0 �1 L ro C I c0 F Q I +> 0 3 I F L Q I z I N m_ / co cyl L 0 / ro C C 0 L 0 w I (,n w / SEE CROSS SECTIONS ,NT kSIN (IONS RD BASE DITCH 150 CY AIL "W" — SPECIAL CUT DITCH SEE DETAIL "T" CL I RIP R, EST 26 TO EST 56 Sy GFn CL B RIPRAP EST 2 TONS — EST 7 SY GEOTEXTILE Q) BEG. SHOULDER BERM GUTTER STA. 300 + 71 —L— LT I � c c(; �� TOE PROTECTION CFF nr-TAll "RA" TOE PROTECTION SEE DETAIL "RA" PROP• WW FENCE O C EST 00 w 2 00 �m . 15" RC i i i i i i i E qh PROJECT REFERENCE NO. R -342/B RM/ SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. /6 HYDRAULICS ENGINEER INCOMPLETE ]CLANS DO NOT USE FOP, % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 47 OF 71 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND 0' 00' $ DATE$ $(USERNAME)$ $FILEL$ N GRAPHC SCALE V) Z _O _N Lu T, 03 PROJECT REFERENCE NO. SHEET NO. R -342/B 16 RM/ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLE IE PLANS DO NOT T791E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 48 OF 71 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY LIS111AI IMPACTS IN SURFACE WATER DENOTES FILL IN \�\\"'K WETLAND DENOTES MECHANIZED CLEARING E E DENOTES EXCAVATION IN WETLAND 00' $DATE$ $(USERNAME)$ $FILEL$ N GRAPHC SCALE \ N co l 0 / 0 200 2 0 2,10 2650 250 300 3 0 3,10 3650 380 0 10 PROJ. REFERENCE NO. SHEET NO. R -342/B X -305 4 0 4,110 440 PERMIT DRAWING SHEET 49 OF 71 ,�60 ______________ ________________ ------------------- ------- l f o°oo 4°0 /5°8 c6 - ° -------------- W � U Q ,3 0 vyt C. 1 LAN I c ,3,30 %J pz��p Lm I %J ------------------------- ----------- l 4.1 5°00 / ° 6-1 N_ So=0.99% l 0 / 0 2 0 2 0 210 2 0 2 0 3 0 3 0 310 3 0 3 0 4 0 4 0 440 \ N 00 4 0 4 0 400 380 3650 3,10 3 0 300 280 2630 2,10 2 0 200 0 10 PROJ. REFERENCE NO. SHEET NO. R —3421 B X —316 / 0 / 0 PERMIT DRAWING SHEET 50 OF 71 ,�60 �F�AI�P 2.0 N 4,0 -- -- ------� 3 0 20 Oo 0 Ln — - ----------------------- Z O Z v cc 2.0 AYP06 400 S 10TE 10 ----------- ------------- ---- 6 01 Oo020 OLEO 26 340 --------------------- ---------------------- --- -------- ------- - ------ -------- -------------------- ------------------------ 60" RCP So = 1.5% 4 0 4 0 4 0 3 0 3 0 310 3 0 40 2 0 2 0 2,10 2 0 2 0 / 0 / 0 \ N 00 0 10 PROJ. REFERENCE NO. SHEET NO. R -3421 B X -3/5 / 0 / 0 / 0 w / W Q� L LU LU 0 N O 24.0 I °� 050 / E5./ 24.0 PERMIT DRAWING SHEET 51 OF 71 -v -- 60" RCP So = 1.5% .304+ 0.00 l0 /0 /0 80 6p 4 0 0 4p 6p 8 /0 /0 /0 03 l 0 / 0 200 2 0 2,10 2650 250 300 3 0 3,10 3650 380 0 10 PROJ. REFERENCE NO. SHEET NO. R -342/B X -3/7 4 0 4,110 440 PERMIT DRAWING SHEET 52 OF 71 'Yo L �.5n 340 R OR 0°040 � U Q WLB simrE 10 ROIOP - 6.040 ------ 4°0 / O " 0°0 °0 40 ° _-_ --- ° 60" RCP l 0 / 0 2 0 40 210 2 0 40 3 0 3 0 310 3 0 3 0 4 0 4 0 440 m \ N 00 0 10 PROJ. REFERENCE NO. SHEET NO. -342/B X -427 MENEMR l0 /0 /0 6 0 0 k� 4 /0 /0 /0 co W 7J 52 32.0 210 2 .0 J F Ln h-� PERMIT DRAWINC 4 SHEET 53 OF 71 ° _ _ _ _ ° ° 317,68 _ _ cl- 0 0 36+ 0.00 co W N WL WLB 27.E .0 2 .0 11 -- — --� W VA J --- — — — — ------- — —318 _—_ 30 �— -- -- a O 36+ 0.00 O Li i _ SITE 10 SITE 10 c� .0 210 0.029 rl- 0° 20 -- --- -- --- -- — — — — -- — — 79.37 --- 6 0' RCP 35 +550.00 CL 6011 RCP So= 0.6% W 5°2. 2 °0 20.0 ° 0. 20 0.020 N °02 -- --- — -- — — ------ 32102 35 + 0.00 o --- LQ N � # v) - - - - - - - - - - ^_ 0° 20 0° 20 _--- — --- 32 094 -- 0 34+ 0.0 0 ° — \ W W N # Ltj Ltd C\l LLJ 210 20.0 0° ry- 20 0. 20 —_ --- _— -- 32 099 _ O � 34+ 0 y 5 l0 /0 /0 69 4 0 0 4 6 /0 /0 /0 to Z _O _N LU ce Ib DETAIL AB BERM BASE DITCH ( Not to Scale) b I Natural �\ roun 2,y D d RDWY B GEOTEXTILE�% Min. D = 1.0 Ft. B = 3.0 Ft. Max. d = 1.0 Ft. b = 10 Ft. Type of Liner = CLASS "B" RIP RAP DETAILAL = X FALSE SUMP ( Not to Scale) o - Outside Ditch Traffic Flow 20:) �2.0i _ Zoe :—S-:— j` 7etc. S = Ditch Slope Propos STA. 346+50 -L- (RT) STA. 349+50 -L- (RT) DETAIL Al TOE PROTECTION I Not to Scale) °,�e� Natural tiN SN°Qe Ground b-{ d d = 1.5 Ft. b= 3.0 Ft. Geotextile Type of Liner= CLASS "I" Rip -Rap Q �h so STA. 344 + 25 to 346 + 50 -L- (RT.) , �JQ IPZT 77 Tn►.Ic. 170 cv �GGG nTVTII G. onn ry mmm FROM STA. 350+68 -L- TO STA. 354+65 -L- RT.(Est.Qty. 130 Tons; 267 SY GEOTEXTILE) $DATE$ $(USERNAME)$ $FILEL$ PROJECT REFERENCE NO. R -5421 B RM/ SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. /9 HYDRAULICS ENGINEER INCOMP LE IE PLANS DO NOT USE FOP, % W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION BASIN # LOCATION (AT OUTLET) CULVERT / 1 322+50 -L- RT WO — / NATURAL / 2 347+26 -L- LT — _ GROUND z„ D �' 50' 0' 50' 150' 200' AGEOCTEXTILECTION E GRAPHIC SCALE S STA. 347+26 -L- RT (EST 15 TONS CLASS I RIP RAP; 27 SY GEOTEXTILE; 23 CY DDE) 7/08 DENOTES FILL IN \F\\'� WETLAND DENOTES MECHANIZED CLEARING N SHEET NO. /9 T, 03 V) Z _O _N LU DETAIL AB BERM BASE DITCH ( Not to Scale) fiural T oun � 2,y 1 D GEOTEXTILE�% net — n — i n r+ RDWY DETAILAL = X FALSE SUMP ( Not to Scale) o — Outside Ditch Traffic Flow Zoe 2oa j` ci S DETAIL Al TOE PROTECTION ( Not to Scale) °,�e� Natural ti1N S\°Qe Ground b PROJECT REFERENCE NO. R -342/B R/W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMP1LE lE PLANS $DATE$ STA. 347+26 —L— RT DENOTES FILL IN DENOTES MECHANIZED $DAERNAME)$ (EST 15 TONS CLASS I RIP RAP; 27 SY GEOTEXTILE; 23 CY DDE) WETLAND CLEARING $FILEL$ \ N co W Q „l� z LU ag: J Q V) W J LL 4 0 4 0 400 380 3650 3,10 3 0 300 280 2630 2,10 2 0 200 OlO u ■ . ■TT PROD. REFERENCE NO. SHEET NO. R-342/B X-377 / 0 / 0 PERMIT DRAWING SHEET 56 OF 71 400 QQ ,370 Z 0 o -- v 400 WL.B 3-90 1 SITE '380 12 370 -360 ---------- ---- --------------- 4 0 4 0 4 0 3 0 3 0 3 0 3 0 3 0 2 0 2 0 2 0 2 0 2 0 140 / 0 \ N 00 H w w / LU a� a L O W W=w DELL L esr va ' q l0 /0 /0 80 60 40 120 120 40 60 8 /0 OlO u ■ . ■TT PROD. REFERENCE NO. SHEET NO. R-342/B X-376 /0 /0 PERMIT DRAWING SHEET 57 OF 71 24.0 N del 8:1—j�� `\l 24.0 400 °Ol9 0.020 '77 .1 _____ 35 L97 v Q Y&B -ZT7-- C\l _ CC C� L-Au oeoii 0.020 SITE 12 - ------ --------- --------- ----- ---- --------- l0 /0 /0 8p 6p 4 0 4p 6p 8 /0 /0 /0 N z O LU 91 03 0 �� �xo�0 DETAIL AF LATERAL BASE DITCH ( Not to Scale) Natural Fill Ground ?'7 D I"/Ft. Slope d GEOTEXTILE B Min. D=2.0 Ft. Max. d = 1.7 Ft. *When B is < 6.0' 13=3.0 Ft. Type of Liner= Class "B" Rip —Rap b-5.0 Ft. STA. 40 + 50 TO 43 + 70.78-SRI- (LT) (EST 162 TONS; 360 SY GEOTEXTILE; 3,750 CY DDE) DETAIL AG PIPE OUTLET CHANNEL ( Not to Scale) Natural ` N� ��0 Natural Ground sT'Nc agNk Tif d ��\SS Len th = 18 Ft. CHANNEL BED g (Variable) d = 2.0 Ft. Est. = 24 Tons of Class 1 Rip -Rap STA. 42 + 60.29 -SRI- (LT) DETAIL AK SPECIAL CUT DITCH (Not to Scale) Front Ditch Natural J�0 1 \ Ground 4d� % D �p �`� Slope J 2G1 1 1 Geotextile Min. D=1.0 Ft. Type of Liner= Class B Rip —Rap Max. d=1.0 Ft. , 1 FS II STA. 11 + 00 TO 10 + 32.14 -Y4- (LT) TYPE 'A' I (EST 22 TONS; EST 49 SY GEOTEXTILE) 2G1 11 I I FS II I I \ I � I I � I C 4'C � 2G1 \� \� TYPE 'A' FS C DO w i 0 Q 7 (6 o-OL $DATE$ _� $(USERNAME)$ Ni o $FILEL$ �m L —SR 1— PC 39 +36.02 -�cA/ GAF ao 30 R DETAIL AH STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground T �•� Ground d Geotextile B Min. D=1.0 Ft. Max. d =1.0 Ft. *When B is < 6.0' B = 4.0 Ft. Type of Liner= Class "B" Rip —Rap STA. 12 + 58.46 -Y4- (RT) DDE=12 CY (EST CLASS B 12 TONS; EST 9 SY GEOTEXTILE) DETAIL AL a FALSE SUMP ( Not to Scale) or Outside Ditch �2 0'� Traffic Flow 101 201 GI $ — etc. S = Ditch Slope Proposed Ditch STA. 35+50 -SRI- (RT) STA. 38 + 00 -SRI- (RT) STA.40+12.29 -SRI- (RT) —SR I— POC 43 +25000 —Y4— POT 9 +75.26 LATERIAL BASE DITCH (SEE DETAIL "AF") TYPE 'A' 4W mF� 2GI FS 5'xl0'----------- CLASS 'B' RIP RAP PAD EST. 6 TONS GEOTEXTILE EST. 6 SY SITE —Y4— PT 13+95.71 —Y4— POT 14+00,00 END CONSTRUCTION CD O, CD T FPILLS RD /SRII41 BLEB g/ z ST O CD Z STANDARD BASE DITCH SEE DETAIL "AH" 'A U —Y4— PC 14+89.01 :Rr TS SI TS / TS " 3 / i /C / / / C CUT DITCH (SEE DETAIL "AJ") TOE PROTECTION (SEE DETAIL "Al-) DETAIL Al TOE PROTECTION ( Not to Scale) F�Oet Natural ,L �0`\S�oQe Ground b d = 1.5 Ft. b= 3.0 Ft. Geotextile Type of Liner= CLASS "I" Rip -Rap FROM STA. 11 + 50 -L- TO STA. 13 + 22 -Y4- LT. (Est.Qty. 50 Tons; EST 53 SY GEOTEXTILE) DETAIL AN "` FALSE SUMP ono ( Not to Scale) o� Outside Ditch Traffic Flow -- GI S — etc. S=Ditch Slope Proposed Ditch STA. 35 + 50 -SRI- (LT) STA. 40+12.29 -SRI- (LT) DETAIL AJ ( Not to Scale) Front of Ditch Natural N �e< Slope Ground ?.•y D Min. D=1.0 Ft. STA. 44 + 00 TO 48 + 00 -SRI- (RT) STA. 12 + 00 TO 12 + 50 -Y4- (LT) z F\ /F (F 2 is " , 1 1 5 CL I d"P P SEE. TAIL SC S SPECIAL CUT DITCH (SEE DETAIL "AK") —Y4— FCC 11 +43.23 / / / / / / / / —Y4— PC 10+0500/ - CUT DITCH (SEE DETAIL "AJ") /0 PROJECT REFERENCE NO. R -342/B RM/ SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 2/ HYDRAULICS ENGINEER INCOMPILs]E IE PLANS NS DO NOT USE FOP, / W ACQUISITION � PRELIMINARY L I� IN PR® RCONSTRUCTIONifPLANS NOT USE ® PERMIT DRAWING SHEET 58 OF 71 —SR I— POT 49+00.00 50' 0' S0' 150' 200' GRAPHIC SCALE DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER 91 03 e. w CL / Q (6 $DATE$ =� $(USERNAME)$ N/ o $FILEL$ ae DETAIL AF LATERAL BASE DITCH ( Not to Scale) ral Fill Groun ?'7 D �'� 1'%Ft. Slope OTEXTIL g Min. D=2.0 Ft. Max. d = 1.7 Ft. * B is < B = 3.0 Ft. lass "B" Rip -Rap b-5.0 Ft. 50 TO 43 + 70.78-SRI- (LT) 60 SY GEOTEXTILE; 3,750 CY DDE) \ 31,0 18 0 317 0 314. 313,E 310.0 1` 312.0 `C 305.0 Ie 02�e e'Je Beef ee eele6\\\e e \\ m l � a•ze��alez � F A LS RD L ITT I SR 1141 B 20'gs / DETAIL AG PIPE OUTLET CHANNEL ( Not to Scale) Natural \ N� ��0 Natural noun fr, �N�. to / _Ground sTjNG agNk Tif �� ry, P d S Len th = 18 Ft. CHANNEL BED g (Variable) d = 2.0 Ft. Est. = 24 Tons of Class 1 Rip -Rap STA. 42 + 6 0.2 9 -SRI- (LT) DETAIL AK SPECIAL CUT DITCH (Not to Scale) 1 Front Ditch Natural 4" 1 p Ground 4d�� % D \p Slope Geotextile Min. D=1.0 Ft. Type of Liner= Class B Rip —Rap Max. d=1.0 Ft. — STA. 11 + 00 TO 10 + 32.14 -Y4- (LT) BEST 22 TONS; EST 49 SY GEOTEXTILE) 301.0 DETAIL AH STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground TD �A Ground d Geotextile g Min. D=1.0 Ft. Max. d =1.0 Ft. *When B is < 6.0' B = 4.0 Ft. Type of Liner= Class "B" Rip —Rap STA. 12 + 58.46 -Y4- (RT) DDE=12 CY (EST CLASS B 12 TONS; EST 9 SY GEOTEXTILE) DETAIL AL a FALSE SUMP ( Not to Scale) O Outside Ditch �2 0' Traffic Flow 101 20:1 GI $ — etc. S = Ditch Slope Proposed Ditch S STA. 35+50 -SRI- (RT) STA. 38 + 00 -SRI- (RT) STA.40+12.29 -SRI- (RT) eta m/ TOE PROTECTION (SEE DETAIL -Al-) N CUT DITCH (SEE DETAIL "AJ") DETAIL Al TOE PROTECTION ( Not to Scale) FNo�et Natural ,L �0`\S\oQe Ground b d = 1.5 Ft. b= 3.0 Ft. Geotextile Type of Liner= CLASS "I" Rip -Rap ROM STA. 11 + 50 -L- TO STA. 13 + 22 -Y4- LT. (Est.Qty. 50 Tons; EST 53 SY GEOTEXTILE) DETAIL AN Outside Ditch / Traffic Flow --5— S=Ditch Slope etc. Proposed Ditch STA. 35 + 50 -SRI- (LT) STA. 40 + 12.29 -S tia DETAIL AJ ....... ...... Front of Ditch Natural p 1 �e< Slope Ground ?.•y D Min. D =1.0 Ft. STA. 44 + 00 TO 48 + 00 -SRI- (RT) STA. 12 + 00 TO 12 + 50 -Y4- (LT) .g �0'LSZ �g2 0 / .0' 0 / myL 0 2 / DEL 3T DITCH EE DETAIL "AK") —Y4 — FCC // +43.23 —Y4 — FC /0 +05.0/ �F - CUT DITCH (SEE DETAIL "AJ") /0 C —SR l — FT 46 +96.79 PROJECT REFERENCE NO. R —3421 B R/W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 2/ HYDRAULICS ENGINEER INCOMPI[ E E PLANS DO NOT TT9F, FOR // W ACQUISITION PRELIMINARY ]�][sI®NS ® NOT USE O S� PERMIT DRAWING SHEET 59 OF 71 50' 0' 50' 150' 200' GRAPHIC SCALE DENOTES IMPACTS IN DENOTES TEMPORARY SURFACE WATER IMPACTS IN SURFACE WATER SHEET NO. to Z O Lu ce 03 SITE EIVLAI? GE2kI.E3 T 940O 29300 2c)2 27 271°O 0, 25' PROJECT REFERENCE NO. R —3421 B R/W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOP, % W ACQUISI`Il"ION PRELIMINARY PLANS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 61 OF 71 0' �va� GRAPHC SCALE 9� S 25' $DATE$ DENOTES IMPACTS IN DENOTES TEMPORARY $(USERNAME)$4$FILEL$ SURFACE WATER IMPACTS IN SURFACE WATER N o' N a� X n� LL U) 3 co L 0 E 0 L w (n w DL 0 10 PROJ. REFERENCE NO. SHEET NO. "EILUILIR 342/B X 399 0 / 0 / 0 l 0 / 0 / 0 6 4 0 0 4 6 / PERMIT DRAWING SHEET 62 OF 71 51T 2 P,90 P90 /507 ll00 8.0 4/. ciz .0 P80 '' 27.5 008 W o. ao P70 P600 '- — o ��RCP ---- ------- -------- � 8„ RC 25 ,81 �`__ ------- __ --- 0 ------ So = 2.3% /507 //.0 8.0 32.8 \\\\ l3 IJ (07 0o080 2� L LL P70 P70 ------- ------- -------- o Ln 26 .09 '------ ---�� 42f00.00 ' --- ZOO /5.7 8.0 /0.9 //o .0 cc Oo080 0.020 o 980 e \ _----- -------- -----L ---- cq 4/ 0.00 S� l 0 / 0 / 0 80 69 40 20 120 40 60 8 / 0 / 0 / 0 PROJECT REFERENCE NO SHEET NO. V) Z _O _N Lu T, 03 $DATE$ $(USERNAME)$ $FILEL$ SITE 2A EIVL AlAR GE2VIAE]VT 25' RiW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOMPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLAINS DO NOT USE 1FO CONSTRUCTION PERMIT DRAWING SHEET 64 OF 71 III GRAPHIC SCALE DENOTES IMPACTS 9v s 25' TEMPORARY IN SURFACE WATER N 00 00 M N I N N +' I Q X E L 0 1 T I m N m m N m rr 3 L 0 i a� 0 L w W ul�z WW� Q N W �! LL. 0 10 PROJ. REFERENCE NO. SHEET NO. R —342/B X —408 0 / 0 NO l 0 / 0 / 0 / PERMIT DRAWING SHEET 65 OF 71 .300 .300 PRO PRO 27 .99 1070 14+ 0.00 P.90 cc W j W PR 19gn -- ---- ------- -- O270 — --- — Li _�270 l4+ 0.00 5 Pgo o _J _ — 27 ,84 � _� 270 13 +f 0.00 TE 2* , —Y4 — ST o /3 +OOo0 — _ ND CONSTRUCTION _-- /0.0 _— PRO �_— 'PROe O.080 0.120 / — ----_— / 27C 043 lo7nO �� \ �/970 / __ _— So = 2.6% ------------- Y4 l l 0 / 0 0 / 0 / 0 / 0 V) Z O N w 03 0 U (V m CD ED (V (V F (n Q I 3 F L Q I I m (V m (n 3 0 Q� 1= L 0 L W W CL Q 7 CDu o $DATE$ �_-0 $(USERNAME)$ Ni ° $FILEL$ O O �e \ CAI 305.0 - 316.0 311.0 310.0 _ / v \31g0 313.0 �31Z0 3120 311.e 310.0 3l0.0 30`1.0 308.0 301.0 '06.1 DENOTES IMPACTS IN SURFACE WATER MULKEY ENGINEERS & CONSULTANTS PO BOX 331 27 RALEIGH, N.C. 27636 (919) 851-1912 (919) 651-191a (FAX) WWW.MULKEYINC.COM 1005 CARTLEDGEA 302.0 PROJECT REFERENCE NO. SHEET NO. R —3421 B 23 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER INCOlyllPLE IE PLANS DO NOT U91E FOR % W ACQUISITION PRELIMINARY PLANS NS DO NOT USE 1FO CONSTRUCTION 5 0' 0' 5 0' 15 0' 2 0 0' DENOTES TEMPORARY IMPACTS IN SURFACE WATER GRAPHIC SCALE \ N 00 O 10 PROJ. REFERENCE NO. SHEET NO. R —342/B X —429 l0 /0 /0 80 69 49 20 20 4 /0 /0 /0 PERMIT DRAWING SHEET 70 OF 71 L Ltd VZ4 --- --- -- — — .020 0.020 0.0206-1 -- --- -- _ — — 315 66 � W W / .0 /4.0 6c /4.0 20 0.020_ _ _ _0.020 6°I 315,49 cl O 1-1 ° o l2. 14.8 /4°8 — --- -- -- — 0.0 0 .020 0.02 — ,30 315 28 _— O 40 + 0.00 W ME AN ITE cc 0 12° 15.6 /5.6 W -- -- --- --- --- — 0.02 .020 Ln -- —° 2/ 6 I 6cl- --°� ` — —0_.02 315 08 — 60" RCP 40+ 0.00 ------- -------- ------- -------- -------- So = 0.3% 12.0 /6.5 /6.5 -- --- --- --- -- — o_ 0.020 2.020 0o02_ 0 CL- — -- — o� N 60� — N �/ — — — 314 95 --- -- -- --- -- 39+ 0.00 y 5 l0 /0 /0 8p 6 4p 10 10 4p 6 /0 /0 /0 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 147+09 / 150+26 -L- PROP 30" RCP 0.23 0.01 < 0.01 < 0.01 33 10 2 42+28 / 43+89 -SR1- PROP 78" RCP 0.03 < 0.01 201 20 2A 12+29 / 13+29 -Y4- PROP 66" RCP < 0.01 36 3 165+85 / 167+99 -L- PROP PIPE SYSTEM 0.03 0.05 < 0.01 578 21 4 177+50 / 179+71 -L- PROP 48" RCP 0.06 < 0.01 0.05 < 0.01 397 22 5 215+90 / 217+35 -L- PROP 72" RCP 0.08 < 0.01 669 23 6 218+57 / 219+34 -L- ROADWAY FILL 0.09 < 0.01 7 228+51 / 231+25 -L- PROP 72" RCP 0.07 < 0.01 610 34 8 233+83 / 238+88 -L- PROP 3@9'X9' RCBC 0.22 0.05 703 161 9 22+48 / 23+27 -Y5- PROP 42" RCP 0.10 0.02 10 299+77 / 310+33 -L- PROP PIPE SYSTEM 0.75 0.03 0.09 0.02 < 0.01 339 11 11 39+08 / 39+23 -Y5- PROP 60" RCP < 0.01 < 0.01 81 21 12 350+69 / 355+83 -L- ROADWAY FILL 1 2.24 1 1 1 0.14 TOTALS: 1 3.50 1 1 0.03 1 0.27 1 1 0.53 1 0.07 1 3611 1 359 0 *Rounded totals are sum of actual impacts NOTES: 2018 Feb c E L T a T N V K N c C .3 O 0 0 0 a E m m m Z U) 0 CD C N E 0 c w i w i 0 0 ,/ GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2019 = 11,850 ADT 2040 = 21,900 K = 10 % D = 60 % T = 26 % V = 70 MPH * 17% TTST + 9% DUAL FUNC CLASS= INTERSTATE STATEWIDE TIER STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS RICHMOND COUNTY LOCATION. I-73174 FROM 0.3 MILES SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY) TO 0.2 MILES SOUTHWEST OF SR 1304 (HARRINGTON ROAD) 3'rATR STAIR PROlRCT RRPBRRNCB NQ BIdRS N0. �YYrAI.T8 31@9 R-3421 B 1 5 RA4 N0. F.A. DROI. NQ DRSCRDTION 34542.1.FR3 NHF-0220 76 P.E. 34542.2.3 NHF-0220 43 R /W & UTIL. 34542.3.7 NHF-0220 43 CONST. TYPE OF WORK: GRADING, PAVING, DRAINAGE, CULVERTS & STRUCTURES SU .CE PROJECT LENGTH LENGTH ROADWAY TIP PROJECT R-3421B = 4.270 MILES LENGTH STRUCTURES TIP PROJECT R-3421B = 0.029 MILES TOTAL LENGTH TIP PROJECT R-3421B = 4.299 MILES Prepared in the Office of. 4 CALYX FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 2018 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: JOHNNY BANKS SEPTEMBER 23, 2009 PROJECT MANAGER LETTING DATE: STEPHEN C. BROWDE, PE OCTOBER 2019 PROJECT DESIGN ENGINEER NCDOT CONTACT: GREGORY S. DAVIS, PE HYDRAULICS ENGINEER P.E. ROADWAY DESIGN ENGINEER P.E. SIGNATURE: �+sue: �■■Ir�i ��.�\ TOTO E� NOTE: THIS PROJECT IS A CONTROLLED ACCESS PROJECT WITH ACCESS LIMITED TO THE INTERCHANGE. D' PROJECT REFERENCE NO. SHEET NO. D, R-342/B 16 ro RW SHEET NO. WETLAND AND SURFACE WATER UTILITY IMPACTS ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SHEET 2 OF 5 � �seao r - MAYS-US7N 23 Pf SA22 -SR 6- A 2; I / I PC SAx n. � rrt 'WAIL -- OETARAL II ltu oET.2..r12 2 S e _ as RE Sit d (j ti HEM AlL o M4a � � ,in.a.M � sreuu uT s ux[ orten RuE- R�s RAMP A *m. i, ,\ / R. av u r,N, ie: :..,ora,iw R se'i`oeiul"o "'s` a ,.. o...^ • •• • � � / v � ro sT.Ic.rs /a& — — L, `ri `� , `C �� - ST JtlMIJf RAMP B SC EN60 A 340 s sFrnws I see m.R : \ AYP B Sr B+PATE a �e.o Il _ QQYy RAMP ST.'N — RAMP B BC n A TS /NOBD o Eo, ea, . sr eeomn� / RMIP B PW Z40M DETAILM DETAIL% DM m DETAIL ETAILP DETAIL DETAIL 61 MIT Al ITG I—L 11 wpm 11 dv aw wmm[ � Yn \x` e.s� sou. n..s.sa-ware-ro sra i..ee -a°- >w rll•P ✓ DETAroIT DETAIL TAG DETAIL u � T IL q E 0 an C sr..lzl2 ro D.Ax -Raw .- sr..»w ro sr..wzssu. c cn _If ww .. a.: i xwm J9 w <r au°'.L w sr..2s.00 x­ su ss.so -xs- mD w o_ i 0 -o $DATE$ DENOTES HAND $(USERNAME)$ _ $FILEL$ CLEARING , I � / B For N-ma%�/�/ f RAMP BTS SRss r T _ I 1 _ RAMP D SC AH099 / �/ `y `r `C�V C REE� E II M—Y5VNST ro ET 23 10 SEE PSH 23 FOR CONTINUATION OF SITE 10 I DETAIL AE DETAIL AD DETAILAL o s PIPE OUTLET CHANNEL SPECIAL CUT DITCH FALSE SUMP ( Not to Scale) ( Not to Scala) (Nor +0 5<al.) Front+��a Han N x�enr Man �LO '�cad'f n ,fit. Natural A\ {{0'� Slope a or 2� 20;1 Oa d _5crcuna D �� c� NC - - .+<. N,4 p GR/p Min. D = 1.0 Ft. s = ol+on sac. f rr.00.sa olr=n 8`�9S Length = _ -4�__ � D = 2•�� _ Sta. 10+00 to 73+50 -V5- STA. 13+56.65 -YS- (LT) Est 4 __ �__ Tons off Class A_ RlpRap STA. 22+77.50 -YS- (RT) WETLAND AND SURFACE WATER UTILITY IMPACTS \ \ SHEET 3 OF 5 J11W v DENOTES HAND CLEARING PROJECT REFERENCE NO. SHEET NO. R-3421B 22 R1W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS E WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 9 22+48/22+79 -Y5- 0.04 10 299+40/301+03 -L- 0.44 TOTALS: 0.48 0 0 T 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb