Loading...
HomeMy WebLinkAbout20180004 Ver 1_Post Construction Memo FINAL_20190718Staff Review DWR Project #:* 20180004 Version:* 1 Reviewer List* Alan Johnson:eads\adjohnson1 CERTIFICATION SUBMITTED ON 7/18/2019 Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to submit it to the DWR 401 & Buffer Permitting Branch. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Is this a Public Transportation Project? r Yes PF No USACE Permit# SAW -2018-00035 DWR Project #: 18004 Version: 1 County: Union 401 Water Quality Certification Issued Date: 1/16/2019 Applicant: Sanu Odugbesan Project Name: Piedmont Natural Gas Southfork Supplemental Attachments: Click the upload button or drag and drop files here to attach docurrent Southfork Post Construction Memo 3.96MB FINAL.pdf FDF only Who will be submitting the Certification of Completion? r Applicant r Agent r Certified Professional Agent's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. rJ By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of the "Certificate of Completion" form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) 0 1 agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the "Certificate of Completion" form." Printed Name: Jonathan Oravetz Signature ("KL E/NFEL OER Bright People. Right Solutions. MEMORANDUM TO: David L. Shaeffer, U.S. Army Corps of Engineers Charlotte Regulatory Field Office FROM: Jonathan Oravetz DATE March 26, 2019 SUBJECT: Piedmont Natural Gas - Southfork Road Enhancement Project U.S. Army Corps of Engineers Action ID: SAW -2018-00035 On behalf of Piedmont Natural Gas (PNG), Kleinfelder completed a post -construction review of the Southfork Road Enhancement Project area (project area) located in Union County, North Carolina on March 25, 2019. A Nationwide Permit #12 (NWP 12) was authorized for use on this project by the U.S. Army Corps of Engineers (USACE) Charlotte Regulatory Field Office on March 6, 2018. The Southfork Road Enhancement Project included the installation of approximately 0.87 miles of 12 -inch natural gas pipeline to support the increased power demands in the area. Prior to construction, three (3) wetland areas were delineated within the project area. A post - construction inspection was conducted at these three wetland areas to confirm pre -construction topographic gradients were restored at these areas. Pedestrian surveys of the review areas were performed, and photo documentation was collected at each location. Each location showed no significant difference in topographic gradients compared to undisturbed adjacent areas. A site map, photo documentation, and the signed "completion of activity" USACE form is attached with this memorandum. Enc. Figure 1 — Site Map Appendix A — Photo Documentation Appendix B — USACE Completion of Activity Form 20181266.001/JAX19M93200 Page 1 of March 26, 2019 © 2019 Kleinfelder www.kleinfelder.com KLEINFELDER 8933 Western Way, Suite 12, Jacksonville, FL 32256 p 1 904.538.9171 f 1 904.538.9172 r KLE/NFELDER sone xome ayn r sawrorn FIGURE 1 - SITE MAP r KLE/NFELDER sone xome ayn r sawrorn APPENDIX A - PHOTO DOCUMENTATION �I KL E/NFEL DER Bright People. Right Solutions. W-1 - View West W-1 - View East PROJECT NO. 20181266 I SITE PHOTOGRAPHS DRAWN BY: LP CHECKED BY: CK Southfork Road Enhancement Project DATE: 3/26/2019 Piedmont Natural Gas REVISED: Union County, North Carolina PLATE 1 W-2 - View East W-2 - View West PROJECT NO. 20181266 SITE PHOTOGRAPHS PLATE DRAWN BYLP : KLE/NFEL DER CHECKED BY CK Bright People. Right SolutionS. DATE: 3/26/2019 Southfork Road Enhancement Project Piedmont Natural Gas 2 REVISED: Union County, North Carolina W-3 - View East W-3 - View West PROJECT NO. 20181266 SITE PHOTOGRAPHS PLATE DRAWN BYLP : KLE/NFEL DER CHECKED BY CK Bright People. Right SolutionS. DATE: 3/26/2019 Southfork Road Enhancement Project Piedmont Natural Gas 3 REVISED: Union County, North Carolina KL.�lNFELOER APPENDIX B - USACE COMPLETION OF ACTIVITY FORM Action ID Number: SAW -2018-00035 County: Union Permittee: Piedmont Natural Gas, Sanu Odugbesan Project Name: Piedmont Natural Gas - Southfork Date Verification Issued: 03/05/2018 Project Manager: David L. Shaeffer Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David L. Shaeffer Asheville Regulatory Office U.S Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. V C 0'f 20 t � Signature of Permittee Date