HomeMy WebLinkAbout20190383 Ver 2_Request for Modification from NWP 14 to NWP 39_20190710Carpenter, Kristi
From:
Sent:
To:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
Thanks,
April
Norton, April R
Monday, July 15, 2019 10:03 AM
Carpenter,Kristi
FW: [External] US 15-501 Improvements (Northwood High School Rd Improvements)
- DWR Proj #20190383 - Request for Modification from NWP 14 to NWP 39
NWSH Rd Improvements & NWHS Access Rd-USACE NWP 39_2019-07-09.pdf; US
15-501 Phase II Improvements - NCDWR 401 WQC_2019-04-03.pdf; Northwood HS
Access Rd_NCDWR 401 Permit_06.28.18.pdf
Follow up
Flagged
From: Beasley, Troy <TBeasley@withersravenel.com>
Sent: Wednesday, July 10, 2019 12:03 PM
To: Norton, April R <april.norton@ncdenr.gov>
Subject: [External] US 15-501 Improvements (Northwood High School Rd Improvements) - DWR Proj #20190383 -
Request for Modification from NWP 14 to NWP 39
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
April,
Good talking to you today. As I mentioned on the phone, the USACE changed our request for a NWP 14 for the US 15-
501 Improvements - Ph 11 (Northwood High School Road Improvements) to a NWP 39 since the purpose of the impacts
are for school traffic. I've attached the USACE NWP 39 to this email. So the 401 WQC (Prof #20190383) that you issued
on 4/3/19 needs to be revised to a NWP 39. Also, we modified the design to reduce the impacts, so the impacts are less
than what was previously approved.
Also, the USACE has previously notified the Chatham County Board of Education that the Northwood High School Access
Road (DWR Proj #20180682), was non -compliant with the NWP 39 issued for that project, as one of the rip -rap
dissipaters was 12 If longer than permitted. So in order to bring the Access Road project into compliance, we included
the revised impacts for the Access Road project into the NWP 39 for the 15-501 Improvements project. So now the
USACE NWP 39 covers both the 15-501 Improvements project AND the Northwood High School Access Road project.
I'm assuming that NCDWR will mimic the USACE and issue a revised 401 WQC for both projects as well. I will be
submitting the request for a NWP 39 to your office via FedEx, along with a new application fee.
To make it as easy as possible on you, below is a breakdown of the revised impacts to be reflected in the new 401 WQC:
Northwood High School Access Road (DWR Proj #20180682) - Revised Impacts from previous permitting
• Impact 4-45 If (revised from the previously authorized 32 to bring project into compliance)
US 15-501 Improvements — Ph II (Northwood High School Road Improvements) (DWR Proj #20190383) — Revised
Impacts from previous permitting
• Impact 1A-95 If (reduced from previously authorized 111 If)
• Impact 113 — 52 If (same a previously authorized)
• Impact 1C — 20 If (reduced from previously authorized 24 If)
Once you've received the revised NWP 39 application, please let me know if you have any questions. Thanks for your
help with this project!
Troy Beasley
0
0 ��u � . .o�....
219 Station Road, Suite 101 1 Wilmington, NC 28405
Office:910.256.9277 1 Direct:910.509.6512
Mobile: 910.622.0122
tbeasley@withersravenel.com
CONFIDENTIALITY AND NONDISCLOSURE