HomeMy WebLinkAboutNCC190976_ESC Approval Submitted_20190716 Wake County Environmental Services Department
Water Quality Division,Watershed Management Section
336 Fayetteville St. • P.O. Box 550• Raleigh, NC 27602
WAKE
COUNTY
E TEL 919 856-7400• FAX 919 743-4772
NoiCr ii(A KO I.hv
WMCPA-WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
Panther Creek
Project Name Subdivision Watershed Middle Creek Jurisdiction Wake County
Date Processing Disturbed
Date Received 6/26/19 Initiated 7/2/19 Acreage 3.82
S&E
S&E Permit Number SEC-018186-2019 Plan Review Fee $955.00 Paid S&E Permit Fee $955.00 Pending
SW
SW Permit Number SWF-018188-2019 Plan Review Fee $955.00 Paid SW Permit Fee $955.00 Pending
Applicant: Engineer:
Gray Wolf Development, LLC/
Name Wade Corbett Name: McGill Associates/Matthew Lassiter, PE
104 Airport Industrial Drive 211 Tyler Drive
Address: Clayton, NC 27520 Address: Smithfield, NC 27577
Phone: 919-934-7788 Phone: 919209-9955
Email: w.corbett@graywolfhomes.com Email: matthew.lassiter@mcgillengineers.com
Plan Date/Revision Date: 6/25/19
The above-referenced erosion control and stormwater management plans have been reviewed and
conditionally approved.
Approval Date: 1. Specify erosion control blanket on exterior slope of dry detention pond at end of Street'A'on C-108.
2. Add a detail for erosion control blanket on slopes to detail sheets.
7/3/19
Panther Creek Subdivision is approved for the creation of 11 full lots and 13 partial lots. Plans approved limiting
the maximum impervious surface of 133,652 SF(3.07 acres)that has been dispersed over 11 full lots, 13 partial
lots and roads.The project shall provide stormwater control (nutrients,volume control and peak attenuation)
with one(1)storm water control measures(dry detention pond)in Wake County.See approved site data below.
Approved Site Data:
Permitted Imp Road ISA(SF)= Lots ISA(SF)= Other ISA
(SF)= 133,652 36,949 96,703 (SF)= 0
Nitrogen Post
Nitrogen Pre Nitrogen Post BMP Nitrogen
(lb/ac/yr)= 1.13 (lb/ac/yr)= 1.68 (lb/ac/yr)= 0.24 Offset(lb)= 0
Nitrogen Post
Phosphorus Phosphorus BMP Phosphorus
Pre(lb/ac/yr)= N/A Post(lb/ac/yr)= N/A (lb/ac/yr)= 0.05 Offset(Ib)= N/A
Conditions of Approval
Items marked with an "X"were noted as conditions of the Stormwater and Sediment and Erosion Control Plan approval.Unless
otherwise noted,all references shown in brackets are for the Wake County Unified Development Ordinance(UDO),adopted
04/17/06.
1
APPROVAL_WatershedManagement-V.2_W M
Wake County Environmental Services Department
Water Quality Division,Watershed Management Section
336 Fayetteville St. • P.O. Box 550• Raleigh, NC 27602
WAKE
COUNTY
E TEL 919 856-7400• FAX 919 743-4772
NoiCr ii(A KO I.hv
WMCPA-WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
A mandatory preconstruction meeting is required between the owner,contractor,and Wake County prior to
issuance of the Stormwater and Land Disturbance Permits. Please call to schedule this meeting at your convenience.
1. The Stormwater and Land Disturbance permit fees are due at that time. Once conditional item Nos.1 and 2 are
completed,please contact Alan Alcock at 919-868-2560 to schedule the preconstruction meeting and provide five
(5)full size plan sets at the meeting.
® 2' Grading,other than for installation of soil erosion and sedimentation control measures,is prohibited prior to the
issuance of a Certificate of Compliance.[10-30-7(D)]
® 3' Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field modifications
to erosion and sediment control devices. No devices shall be removed without prior approval from Wake County.
Wake County's sedimentation pollution control program is performance oriented, requiring protection of the natural
resources and adjoining properties. If at any time during the project it is determined that the Erosion and
® 4. Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation Control
Ordinance of Wake County,this office may require revisions in the plan and its implementation to ensure compliance
with the Ordinance.
Effective April 1,2019, prior to the preconstruction meeting with the county,the applicant must obtain from
NCDEQ-DEMLR the NCG-010000 NPDES Construction Stormwater General Permit coverage by completing an
® electronic Notice of Intent(NOI). The online NOI submittal must include the completed and notarized Financial
5 Responsibility/Ownership Form and this approval letter. See NCDEQ web site at:
https:Hdeg.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permits/stormwater-
permits/construction-sw.
® 6' SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre
(including non-contiguous lots).
Stormwater COAs-All conditions of approval must be completed and approved by Wake County prior to final plat approval or
signoff of the Certificate of Occupancy(C.O.)for future building permits. Items required prior to final plat or building permit
approval are checked and listed below.
As-Built Plans—Upon completion of required improvements,an as-built plan of required stormwater improvements
® 7. must be submitted (must indicate that stormwater improvements were constructed in accordance with the
approved plan).[9-31-2]
® 8. Maintenance Plan
® The developer must record and reference on the record plat,a maintenance plan providing instruction about
a. annual maintenance tasks and associated costs for at least a 20-year period.[9-32-3(A)]
® It will be the responsibility of the property owners association or lot owner to update the maintenance plan at
b. least every 10 years. [9-32-3(8)]
® 9. Maintenance Agreement
The developer must record and reference on the record plat,a maintenance agreement or restrictive covenant
® a. that sets for the property owners association's or lot owner's continuing responsibilities for maintenance,
including how cost will be apportioned among lot owners served.[9-32-4(A)]
® b The maintenance agreement must provide that the association and its individual members are jointly and
severable liable for maintenance. [9-32-4(8)]
All maintenance documents required must be submitted prior to record plat approval and must be referenced on the
® 10. record plat. For developments not requiring record plats,documentation must be submitted prior to building permit
issuance. [9-32-6]
Performance Guarantee—The county may not approve a record plat or issue a building permit until stormwater
® 11. improvements required of the developer have been completed or a performance guarantee has been provided.
[9-31-1]
Applicable Regulations
2
APPROVAL_WatershedManagement-V.2_W M
Wake County Environmental Services Department
�� Water Quality Division,Watershed Management Section
WAKE 336 Fayetteville St. • P.O. Box 550• Raleigh, NC 27602
COUNTY TEL 919 856-7400• FAX 919 743-4772
. LI II uYpl.iw%
WMCPA-WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
® 12. 9-32-2 Parties Responsible for Maintenance of Improvements
The developer must maintain stormwater improvements until accepted by a property owners association or lot
® a. owner.The developer must disclose which party will be responsible for continued maintenance on the record
plat.
Before improvements are accepted for maintenance by the property owners association or lot owner,the
® b. developer must certify to the property owners association or lot owner and the county that improvements are
complete and functioning as designed.
® 13. Part 5—Enforcement and Penalties
® a. Failure to complete required improvements or failure to maintain improvements as required by the approved
plan are violations and subject to a fine of up to$1,000 per day.[9-50]
Inspection of Stormwater Improvements—Wake County agents have the right to inspect sites to determine
® b. whether stormwater improvements are being installed and maintained in compliance with the ordinance. [9-
51]
10-30-6 Validity of Plan,Lapse of Approval-An approved erosion and sedimentation control plan is valid for 2
® 14. calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year
period,the erosion and sedimentation control plan approval becomes null and void.
® 15. 10-30-8Actions Required Prior to Land Disturbance
S&EC plan approval and land disturbance permit issued must be prominently displayed until all construction is
® a. complete,all permanent sedimentation and erosion control measures are installed and the site has been
stabilized.A copy of the approved plan must be kept on file at the job site.
® b No person shall initiate a land-disturbing activity until notifying Wake County of the date that the land-
disturbing activity will begin.
® 16. 10-31-1 Authority
County officials may enter any property,public or private,at reasonable times for the purpose of investigating
and inspecting the sites of any land-disturbing activity. No person shall refuse entry or access to any authorized
® a. representative or agent for the County who requests entry for purposes of inspections,and presents
appropriate credentials, nor shall any person obstruct, hamper,or interfere with any such representatives
while in the process of carrying out their official duties.
Agents and officials of the County will periodically inspect land-disturbing activities to ensure compliance with
® b' the North Carolina Sedimentation Pollution Control Act,this article,or rules or orders adopted or issued
pursuant to this article,and to determine whether the measures required in the erosion and sedimentation
control plan are effective in controlling erosion and sedimentation resulting from land-disturbing activity.
Any land-disturbing activity will be the responsibility of the person(s)conducting the land disturbing activity,
® c. including the property owners. Failure to prevent off site sedimentation will be deemed a violation of the
erosion and sedimentation control regulations of this article.
3
APPROVAL_WatershedManagement-V.2_W M
Wake County Environmental Services Department
Water Quality Division,Watershed Management Section
336 Fayetteville St. • P.O. Box 550• Raleigh, NC 27602
WAKE
COUNTY
E TEL 919 856-7400• FAX 919 743-4772
NV1Cf 11(A KO I.I-v
WMCPA-WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
15A NCAC28.0233- Due to the location of this project, it should be noted that a rule to protect and maintain
existing buffers along watercourses in all of Wake County became effective in 2006.The Neuse River Riparian
Area Protection and Maintenance Rule applies to all perennial and intermittent streams, lakes, ponds and
estuaries in Wake County with forest vegetation on the adjacent land or"riparian area". In riparian areas with
existing forest vegetation in the first 30 feet directly adjacent to the stream,the rule prohibits land disturbance,
® 17. new development and fertilizer use within the first 50 feet of land next to the water. In riparian areas with
forest vegetation that is less than 30 feet wide,the rule prohibits land disturbance, new development and
fertilizer use within the area that contains forest vegetation (but not the entire 50 foot riparian area). For more
information about this riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at
919-807-6300.Wake County enforces the Neuse Buffer Rules in both the Cape Fear River Basin and the Neuse
River Basin except when superseded by the Jordan Buffer Rules[15A NCAC 02B.0265].
Wake County Watershed Management Section is not responsible for subject approvals of other Local,State or Federal Agencies.The
subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water
Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401
(Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit
requirements. The approval issued in this letter cannot supersede any other required permit or approval.
Environmental Alan Alcock REHS Contact Info: alan.alcock@wakegov.com
Consultant: 919-868-2560
Wake County PE: � Contact Info:
barney.blackburn@wakegov.com
919-418-3791
Barney Blackburn, PE
4
APPROVAL_WatershedManagement-V.2_W M