HomeMy WebLinkAbout310016_Inspection_20190626D vision of Water Resources
'i
%h
aciis ° , -Number ,� - � Q Division of Soil.and Water. Conservation
'O Other Agency
r/ �V
Type of Visit: ACompliance Inspection O Operation Review O Structure Evaluation O Technical Assistance I
Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: Departure Time:
County: (` Region: �� (��
Farm Name: ,(,� &G' 1 ,5� l L dl K Owner Email:
Owner Name:
Mailing Address:
Phone:
Physical Address: 1
Facility Contact: lam( V'C6 Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Design _ Current
Swine Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
F—TO—ther
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design
Current
Wet Poultry
Capacity
Pop.
Layer
Non -Layer
-.Design
Current
Dry Poultry
Canacitv
. Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Design = Current
Cattle Capacity- Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes [—]No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
Page 1 of 3 21412015 Continued
Facility Ndbaber: d I - Date of Inspection: G
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard?
Structure 1 Structure 2 Structure 3 Structure 4
Identifier: ( -I 2
Spillway?: _
Designed Freeboard (in): _
Observed Freeboard (in): 3 _
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes
Structure 5
0 No ❑ NA ❑ NE
❑No ❑NA ❑NE
Structure 6
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stalks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement? 7TT"
Waste A��lication
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute InspectionEr ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
ElYes No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes No
❑ NA
❑ NE
Page 2 of 3 t
21412015 Continued
Fa.rility-Number: - ju Date of Inspection:
Did the facili fail to calibrate waste a lication a ui ment as re uired b the ermit? Yes I No NA NE
h' PP q P q Y P #I-
24. [� ❑ ❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check �fyest& ❑ NA ❑ NE
the appropriate box(es) below.
❑ ailure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance: �'— I e o k w (Re-
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes
WNo
NA
❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
❑ No
KNA
❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
No
❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes ❑ No ❑ NA XNE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes \KNo ❑ NA ❑ NE
n
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes I
No ❑ NA ❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
h4�. Mau l�e(,a,tvfS -FG�i�
��n�ckca3t Le n
J)-vol* INA WULJ.
�bYaj's U�\) Dve Ck 2-S
Y-dk utq
cal, 2A i z
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
W,
1&4_1 AkkQ -6 a,
tvi
I INf'�_(O'r\ +
re v alrld
s�dc ,ej
2��s , J
Phone
Date:
Page 3 of 3 \ ) 21412015