Loading...
HomeMy WebLinkAbout_External_ U-4900 Start of Study Notification Carpenter,Kristi From:Robby Bessette <robby.bessette@threeoaksengineering.com> Sent:Thursday, September 27, 2018 12:17 PM To:Freeman, Craig A; Karen Taylor Cc:Craig Young; Rekha Patel Subject:\[External\] U-4900 Start of Study Notification Attachments:U-4900_Start_of_Study_Packet.pdf CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam. On behalf of NCDOT Division 6 Project Engineer Craig Freeman, I am sending you the Start of Study packet for STIP project U-4900, which involves widening NC 210 (Murchison Road) from I-295 (Fayetteville Outer Loop) to south of US 401 Bypass in Fayetteville, Cumberland County, North Carolina. This project is being reinitiated after a hold was placed on project planning in 2007 and 2014-15. Please refer to the attachment for the Start of Study letter, Project Vicinity Map, Project Study Area Map, and Project Topo Map. If you have any issues opening the attachments, please let me know! Regards, Robby Bessette Transportation Planner Three Oaks Engineering American Tobacco Campus 324 Blackwell Street, Suite 1200 Durham, NC 27701 336.970.7791 robby.bessette@threeoaksengineering.com 1