HomeMy WebLinkAbout_External_ U-4900 Start of Study Notification
Carpenter,Kristi
From:Robby Bessette <robby.bessette@threeoaksengineering.com>
Sent:Thursday, September 27, 2018 12:17 PM
To:Freeman, Craig A; Karen Taylor
Cc:Craig Young; Rekha Patel
Subject:\[External\] U-4900 Start of Study Notification
Attachments:U-4900_Start_of_Study_Packet.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
Report Spam.
On behalf of NCDOT Division 6 Project Engineer Craig Freeman, I am sending you the Start of Study packet for STIP
project U-4900, which involves widening NC 210 (Murchison Road) from I-295 (Fayetteville Outer Loop) to south of US
401 Bypass in Fayetteville, Cumberland County, North Carolina. This project is being reinitiated after a hold was placed
on project planning in 2007 and 2014-15.
Please refer to the attachment for the Start of Study letter, Project Vicinity Map, Project Study Area Map, and Project
Topo Map. If you have any issues opening the attachments, please let me know!
Regards,
Robby Bessette
Transportation Planner
Three Oaks Engineering
American Tobacco Campus
324 Blackwell Street, Suite 1200
Durham, NC 27701
336.970.7791
robby.bessette@threeoaksengineering.com
1