Loading...
HomeMy WebLinkAbout310102_Inspection_20190521` Division of Water Resources Facility Number j' j � O Division of Soil and Water, Conservation- � 0 Other,Agency (Type of Visit: (N Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance I Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: JI I LI I I"i I Arrival Time: Departure Time: County: �L�� l (i� Region: U V Farm Name: Owner Email: T— Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Mn(,ko&( fJbr1(}5 Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Other _ Other Latitude: Phone: Certification Number: Certification Number: Design Current 'Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Canacitv Pon. Layers Non -Layers Pullets Turkeys ITurkey Poults Other Longitude: Design Current; Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow ,Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes VNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes' ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facili Number: - Date of inspection: Waste Collection & Treatment VNo 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 1 l cci Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 66No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes XNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes t`}-' No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �f No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [f No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No 0 NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. � Yes ❑ NA ❑ NE Waste Application Weekly Freeboard Waste Analysis Soil Analysis ❑ Pp ❑ Y ❑ Y ❑ Y Waste Trahsfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfal Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No 9 ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facile Number: - Date of inspection: c 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check VYes ❑ No ❑ NA ❑ NE the appropriate box(es) below. 1 Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels Non -compliant sludge levels m an lagoon r s yZt�S�� PDA- 0 RQYz(S' List structure(s) and date of first survey indicating non-compliance: r 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 4 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No *A *�& Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 1No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes EYNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes IgNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes N6 No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). 4k n H /' A �ov�r Get u i eM - eN I W VVA3 C nj b + � 1 _cS b l( Q/1na sl S- a 1 J g 1 n p S dv\ _6im Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 c C/w erg �UOYJ3 were re& �V1 �W � a00ii-2 � -IY A tie l�-erae�, r. Z Phone: Date: - Z 21412015