HomeMy WebLinkAbout310087_Plan of Action_20180926q 2--�`le �-01 `Gbl 6 7�j PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-87 Facility Name: BW Barwick Farm Certified Operator Name: Leticia Berber County: Duplin Operator Number: AWA992970 1. Current liquid level(s) in inches as measured from the current-Iiquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 0 2. Check all applicable items —Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Benny Barwick Phone: Facility Owner/Manager (print) Date: Facili Owner/Man*r (signature) C -. &-r`r1 1E c,,C uJ 910-293-3434 9/17/2018 It II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagooril1 line m = 2659.5 lb PAN 2. Structure ID: line m = IbPAN .I 3. Structure 10: line m = ID PAN 4. Structure ID: line m = Ib PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = . ID PAN In. lines 1 + 2 + 3 + 4 + 5 + 6 = 2659.5 ID PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPUEn nuRINr; THIS in nAV PFRInn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s U. application window' Field 1 Bermuda 4.60 48.40 222.6 Field 2 Bermuda 7.70 105.11 809.3 Field 3 Bermuda 5.70 39.41 224.6 Field 4 Bermuda 5.90 85.56 504.8 I Field 5 Bermuda 4.20 40.25 169.1 Field 5 Bermuda 3.30 22.85 75.4 Field 7 Bermuda 9.10 82.13 747.4 Field 8 Bermuda 7.80 102.76 801.5 1 Field 91 Bermuda 4.60 20.99 96.6 Field 10 Bermuda 7.50 108.21 811.6 Field 11 I Bermuda 7.00 27,81 194.7 Field 12 Bermuda 14.60 89.41 1305.4 Field 131 Bermuda 6.10 90.15 549.9 Field 14 Bermuda 7.50 115.86 869.0 Field 15 Bermuda 7.50 123.20 924.0 I i l 'I date current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 8305.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2659.5 lb. PAN _ PoA (30 Day) 2/21/00 x. Crop's remaining,PAN balance (line v from section III) = 8305.8 lb. PAN y. Overall PAN balance (w - x) _ -5646 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance'table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and:field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2121 /00 t PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): La oon 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker Dinches b_ designed 25 yr./24 hr. storm & structural freeboard I 20.4 inches c. line b - line a (inches in red zone) = 20.4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 229680 1ft2 e. line c/12 x line d x 7.48 gallons/ft3 2920611 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 359520 1ft3 h. current herd # F---3-8-0-01 certified herd # 4650 actual waste produced = current herd # x line g = 293801 ft° certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/25/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 oft3 133980 ft3 533301 gallons 0.77 Ibs/1000 gal. 2669.5 lbs. PAN Sep 22 18 10:02a Barwick Farms 9102934400 p.1 �7Ir6 Ll e6d On thurs sept 39 hurricane Florenc wept in our freeboard was at 27 inches how ever do to the amount of rain fall we met our max by Sunday afternoon .we decided our best plan of action was to open up risers and disc all the fields so they would absorb the extra water m. Monday I called the DWQ inspector and told him what we were doing and why .plan to pump as soon as possible .we released water by riser sun ,mon, and tues to keep the lagoon intact .have also taken water samples to correct any change in lagoon levels risers were open 8 hrs. every day. On wed sept 19 we were at 12 inches freeboard started pumping with 2 reels until can get to 20 inch Ievels.Dwq told me to keep record of everything we do and did not need to report it to any other office letting him know was enough B.W. Barwick farms 09/17/18