HomeMy WebLinkAbout310087_Plan of Action_20180926q 2--�`le
�-01 `Gbl 6 7�j
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-87
Facility Name: BW Barwick Farm
Certified Operator Name:
Leticia Berber
County: Duplin
Operator Number:
AWA992970
1. Current liquid level(s) in inches as measured from the current-Iiquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
0
2. Check all applicable items
—Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Benny Barwick Phone:
Facility Owner/Manager (print)
Date:
Facili Owner/Man*r (signature)
C -. &-r`r1 1E c,,C uJ
910-293-3434
9/17/2018
It
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagooril1
line m =
2659.5 lb PAN
2. Structure ID:
line m =
IbPAN
.I
3. Structure 10:
line m =
ID PAN
4. Structure ID:
line m =
Ib PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m = .
ID PAN
In. lines 1 + 2 + 3 + 4 + 5 + 6 =
2659.5 ID PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30
DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPUEn nuRINr; THIS in nAV PFRInn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
U. application window'
Field 1
Bermuda
4.60
48.40
222.6
Field 2
Bermuda
7.70
105.11
809.3
Field 3
Bermuda
5.70
39.41
224.6
Field 4
Bermuda
5.90
85.56
504.8
I
Field 5
Bermuda
4.20
40.25
169.1
Field 5
Bermuda
3.30
22.85
75.4
Field 7
Bermuda
9.10
82.13
747.4
Field 8
Bermuda
7.80
102.76
801.5
1
Field 91
Bermuda
4.60
20.99
96.6
Field 10
Bermuda
7.50
108.21
811.6
Field 11
I Bermuda
7.00
27,81
194.7
Field 12
Bermuda
14.60
89.41
1305.4
Field 131
Bermuda
6.10
90.15
549.9
Field 14
Bermuda
7.50
115.86
869.0
Field 15
Bermuda
7.50
123.20
924.0
I
i
l
'I
date current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 8305.8 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 2659.5 lb. PAN _
PoA (30 Day) 2/21/00
x. Crop's remaining,PAN balance (line v from section III) = 8305.8 lb. PAN
y. Overall PAN balance (w - x) _ -5646 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance'table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and:field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2121 /00
t
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): La oon 1
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker Dinches
b_ designed 25 yr./24 hr. storm & structural freeboard I 20.4 inches
c. line b - line a (inches in red zone) = 20.4 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 229680 1ft2
e. line c/12 x line d x 7.48 gallons/ft3 2920611 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 359520 1ft3
h. current herd # F---3-8-0-01 certified herd # 4650
actual waste produced = current herd # x line g = 293801 ft°
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 9/25/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
oft3
133980 ft3
533301 gallons
0.77 Ibs/1000 gal.
2669.5 lbs. PAN
Sep 22 18 10:02a Barwick Farms 9102934400 p.1
�7Ir6 Ll e6d
On thurs sept 39 hurricane Florenc wept in our freeboard was at 27 inches how ever do to the amount
of rain fall we met our max by Sunday afternoon .we decided our best plan of action was to open up
risers and disc all the fields so they would absorb the extra water m. Monday I called the DWQ inspector
and told him what we were doing and why .plan to pump as soon as possible .we released water by riser
sun ,mon, and tues to keep the lagoon intact .have also taken water samples to correct any change in
lagoon levels risers were open 8 hrs. every day. On wed sept 19 we were at 12 inches freeboard started
pumping with 2 reels until can get to 20 inch Ievels.Dwq told me to keep record of everything we do and
did not need to report it to any other office letting him know was enough
B.W. Barwick farms 09/17/18