Loading...
HomeMy WebLinkAbout310192_Plan of Action_20180924J 2-61862.5q0 q-Zq-E(6 31 _jqL PLAN OF ACTION, (PoA)-FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Mike Wallace MKM 31-192 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 4.5 inches d. top of dike surface area according to design 93666 ft2 e, line c/12 x line d x 7.48 gallons/ft3 262733 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116329 ft3 h. current herd # F--3-5-2-0-1 certified herd #1 3520 actual waste produced = current herd # x line g = 116329 ft' certified herd # i. volume of wash water according to structural design vJft3 j. excess rainfall over evaporation according to design 54639 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 213139 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/31/2018 1.34 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 637.7 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Mike Wallace MKM (PoA30day) 9-16-2018 Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Mike Wallace MKM 31-192 line m = 637.7 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb -PAN 6. Structure ID: line m = n. = 1 +2 +3+4+5+6 637.7 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIFI nS TC1 WHICH PAN rANIAIf1T RG eool ICn nl ioikir%- -rule -in nwv ol=clnn 1 � - - ,;.- .2 PAN .. . •- . . ��C- •_ � 111 :I • 1 e OWLU Uwieni UUp enamg appucauon aaie or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1803.1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE - w. Total PAN to be land applied (line n from section II) = 637.7 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1803.1 lb. PAN Y. Overall PAN balance (w - x) _ - -1165 Ib. PAN SUMMARY Mike Wallace MKM (PoA30day) 9-16-2018 Page 1 of 2 c J Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump '& haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon'freeboard levels at the receiving facility. i ►J SUMMARY Mike Wallace MKM (PoA30day) 9-16-2018 Page 2 of 2