Loading...
HomeMy WebLinkAbout310037_Plan of Action_20180924f o2i 3 1 q z4Ib {� PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 31--3 % 30 DAY DRAW DOWN PERIOD 9/16/2018 I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): W&K and McKay Farm 31,37(1) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design 81985 ft2 e. line c/12 x line d x 7.48 gallons/ft3 357728 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 202253.76 ft3 h. current herd # 6120 certified herd #1 6120 actual waste produced = current herd # x line g-= 202254 ft' certified herd # i. volume of wash water according to structural design Oft, j. excess rainfall over evaporation according to design 58712 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 325337 gallons 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 5/24/2018 2.56 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 1748.6 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. i (Click on the next Structure tab shown below) Structure 1 Shelia McKay 31-37 (PoA30day) 9-16-2018 Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 9/16/2018 I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): W&K and McKay Farm 31-37 (2 2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 7.5 inches d. top of dike surface area according to design 97500 ft2 e. line c/12 x line d x 7.48 gallons/ft3 455813 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 161410 ft3 h. current herd # 4-8-9-61 certified herd # 4896 actual waste produced = current herd # x line g = 161410 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 5/24/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 58712.5 ft3 274419 gallons 2.82 Ibs/1000 gal. 2059.3 Ibs. PAN 4 Structure 2 Shelia McKay 31-37 (PoA30day) 9-16-2018 Page 1 of 1 II� TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: W&K and McKay Farm 31-37 (1) line m = 1748.6 lb PAN 2. Structure ID: W&K and McKay Farm 31-37 (2) line m = 2059.3 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = n. 3807.9 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN' PERIOD DO NOT LIST FIELDS TO WHICH PAN -CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 4714 Pivot 1 Bermuda Pasture 8.83 120.00 1059.6 3/1 - 9/31 4714 Pivot 2 B Millet Pasture 15.19 75.00 1139.3 3/1 - 9/31 4714 Pivot 1 Small Grain 8.83 50.00 441.5 10/1 - 3/31 4714 Pivot 2 B R e rass Pasture 15.19 130.00 1974.7 9/1 - 9/31 4714 Pivot 3 Wheat 10.88 106.00 1153.3 9/1 - 4/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 5768.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section ll) 3807.9 lb. PAN, x. Crop's remaining PAN balance (line v from section III) = 5768.3 lb. PAN y. Overall PAN balance (w - x) _ -1960 lb. PAN SUMMARY Shelia McKay 31-37 (PoA30day) '9-16-2018 Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. SUMMARY Shelia McKay 31-37 (PoA30day) 9-16-2018 Page 2 of 2