HomeMy WebLinkAbout240095_Plan of Action_20180924PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018
1. Structure Name/Identifier (ID): IJerryJohnson 24-95 -
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 15.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 4.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 73206 ft2
e. line c/12 x line d x 7.48 gallons/ft3 182527 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste. produced according to structural design 432000 ft3
h. current herd # 3200 certified herd # 3200
actual waste produced =current herd # x line g = 432000 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/19/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
0 ft3
44625 ft3
594193 gallons
1.76 Ibs/1000 gal.
1367.0 Ibs. PAN '
L
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 '
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Jerry Johnson line m = 1367.0 lb PAN
2. Structure ID: line m = lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN
n.lines1+2+3+4+5+6= 1367.0lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIED DURING THIS 30 DAY PERIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
1745
6a-b
Small Grain Overseed
3.23
50.00
161.5
10/1 - 3/31
1745
7a-b
Small Grain Overseed
4.35
50.00
217.5
10/1 - 3/31
1745
8a-b
Small Grain Overseed
1.91
50.00
95.5
10/1 - 3/31
1745
9a
Small Grain Overseed
1.97
50.00
98.5
10/1 - 3/31
1745
9b
Small Grain Overseed
2.52
50.00
126.0
10/1 - 3/31
1745
9c
Small Grain Overseed
3.20
50.00
160.0
10/1 - 3/31
8503
1
Small Grain Overseed
4.10
50.00
205.0
10/1 - 3/31
85031
1 b
Small Grain Overseed
1.10
50.00
55.0
10/1 - 3/31
8503
2
Small Grain Overseed
3.20
50.00
160.0
10/1 - 3/31
8503
2b
Small Grain Overseed
0.75
50.00
37.5
10/1 - 3/31
8503
3
Small Grain Overseed
3.20
50.00
160.0
10/1 - 3/31
8503
3b
Small Grain Overseed
0.80
50.00
40.0
10/1 - 3/31
8503
4
Small Grain Overseed
3.60
50.00
180.0
10/1 - 3/31
85031
4b
Small Grain Overseed
2.50
50.00
125.0
10/1 - 3/31
8503
5b
Small Grain Overseed
1.10
50.00
55.0
10/1 - 3/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1876.5 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1367.0 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1876.5 lb. PAN
y. Overall PAN balance (w - x) = -509 lb. PAN
PoA (30 Day) 2/21/00
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump &haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another_ permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Waste will be applied agronomically and hydraulically as weather permits.
L
PoA (30 Day) 2/21/00