HomeMy WebLinkAbout240095_Plan of Action_20180924PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): IJerryJohnson 24-95 - 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 73206 ft2 e. line c/12 x line d x 7.48 gallons/ft3 182527 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste. produced according to structural design 432000 ft3 h. current herd # 3200 certified herd # 3200 actual waste produced =current herd # x line g = 432000 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 6/19/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 0 ft3 44625 ft3 594193 gallons 1.76 Ibs/1000 gal. 1367.0 Ibs. PAN ' L II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 ' HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Jerry Johnson line m = 1367.0 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines1+2+3+4+5+6= 1367.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1745 6a-b Small Grain Overseed 3.23 50.00 161.5 10/1 - 3/31 1745 7a-b Small Grain Overseed 4.35 50.00 217.5 10/1 - 3/31 1745 8a-b Small Grain Overseed 1.91 50.00 95.5 10/1 - 3/31 1745 9a Small Grain Overseed 1.97 50.00 98.5 10/1 - 3/31 1745 9b Small Grain Overseed 2.52 50.00 126.0 10/1 - 3/31 1745 9c Small Grain Overseed 3.20 50.00 160.0 10/1 - 3/31 8503 1 Small Grain Overseed 4.10 50.00 205.0 10/1 - 3/31 85031 1 b Small Grain Overseed 1.10 50.00 55.0 10/1 - 3/31 8503 2 Small Grain Overseed 3.20 50.00 160.0 10/1 - 3/31 8503 2b Small Grain Overseed 0.75 50.00 37.5 10/1 - 3/31 8503 3 Small Grain Overseed 3.20 50.00 160.0 10/1 - 3/31 8503 3b Small Grain Overseed 0.80 50.00 40.0 10/1 - 3/31 8503 4 Small Grain Overseed 3.60 50.00 180.0 10/1 - 3/31 85031 4b Small Grain Overseed 2.50 50.00 125.0 10/1 - 3/31 8503 5b Small Grain Overseed 1.10 50.00 55.0 10/1 - 3/31 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1876.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1367.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1876.5 lb. PAN y. Overall PAN balance (w - x) = -509 lb. PAN PoA (30 Day) 2/21/00 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump &haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another_ permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied agronomically and hydraulically as weather permits. L PoA (30 Day) 2/21/00