Loading...
HomeMy WebLinkAbout20190700_SAW-2019-00924_W-5706 C_NWP 14 Verification_20190626U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-00924 County: Bladen County U.S.G.S. Quad: Dublin GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Mr. Jim Rerko North Carolina Department of Transportation, Division 6 Address: Project Development and Environmental Analysis Engineer 500 Transportation Drive Fayetteville NC, 28301 Telephone Number: 910-364-0834 Size (acres) —15 acre Nearest Town Dublin Nearest Waterway Bear Ford Swamp River Basin Lower Pee Dee USGS HUC 03040203 Coordinates Latitude: 34.643427 Longitude:-78.735949 Location description: The project site is located at the existing intersection of NC 41 and NC 410, which is a traditional 4-wav road crossing with a 4-way stop sign configuration. The site is located approximately 1.2 miles south of the town of Dublin, in Bladen County. Description of projects area and activity: This verification authorizes activities associated with an NC DOT roadway improvement project at the intersection of NC Highway 410 and NC Highway 41. Permanent impacts total 0.02 acre wetland filled and 0.03 acre wetland excavation associated with the construction of a roundabout. Additionally, 0.03 acre of wetland will be hand cleared as a part of the project. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number: NWP 14 SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated May 31, 2019 and June 25, 2019. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Sarah Hair at (910) 251-4049 or Sarah.E.HairAusace.armv.mil. Corps Regulatory Official: YI Date: June 25, 2019 Expiration Date of Verification: March 18, 2022 A. Determination of Jurisdiction: 1. ® There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are waters, including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW- B. Basis For Jurisdictional Determination: N/A. An Approved JD has not been completed. C. Remarks: D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by N/A. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: arah Hair Date of JD: June 25, 2019 Expiration Date of JD: N/A The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at hqp:Hcop2smapu.usace.army.mil/cm apex/Pp=136:4:0. E-Copy furnished: Ms. Joanne Steenhuis, NC DWR Mr. Greg Price, NC DOT Division 6, DEO Action ID Number: SAW-2019-00924 County: Bladen County Permittee: Jim Rerko North Carolina Department of Transportation Project Name: W-5706C - Roundabout NC 41 and NC 410 Date Verification Issued: June 25, 2019 Project Manager: Sarah Hair Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Sarah Hair 69 Darlington Avenue Wilmington, North Carolina 28403 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Jim Rerko, North Carolina Department of File Number: SAW-2019-00924 Date: June 25, 2019 Transportation Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at hqp://www.usace.gM.mil/Missions/CivilWorks/Re ug latoiyProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section H of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION H - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Administrative Appeal Review Officer Attn: Sarah Hair CESAD-PDO 69 Darlington Avenue U.S. Army Corps of Engineers, South Atlantic Division Wilmington, North Carolina 28403 60 Forsyth Street, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Sarah Hair, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: June 25, 2019 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: James Rerko, PO Box 1150, Fayetteville, NC 28302 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, W-5706 C, NC 410/NC 41 Roundabout SAW-2019-00924 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Bladen City: Dublin Center coordinates of site (lat/long in degree decimal format): Lat.: 34.643355 Long.:-78.736007 Universal Transverse Mercator: 17 Name of nearest waterbody: Bear Ford Swamp E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑X Office (Desk) Determination. Date: June 25, 2019 ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resource in review area (acreage and linear feet, if applicable) Type of aquatic resource (i.e., wetland vs. non -wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) WA 34.642711 -78.736020 0.08 acre Wetland Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be"waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ❑■ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map:Vicinity Map, Topographic Map, Jurisdictional Features Map, LIDAR Map 0 Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. FW U.S. Geological Survey map(s). Cite scale & quad name: 1:24,000 1987 Dublin, NC 0 Natural Resources Conservation Service Soil Survey. Citation: 1990 Bladen County Soil Survey ❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: 100-year Floodplain Elevation is: Photographs: ❑ Aerial (Name & Date): or ❑ Other (Name & Date): .(National Geodetic Vertical Datum of 1929) ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessaril been verified by the Corps and should not be relied upon for later Wrisdict`lonal determinations. AdatR6/25/2019 �%Jc May 30, 2019 Sig ure and date of PEQUIREe, egulatory staff member completing PJD ss obtaining e signature is impracticable)' I Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. ex of See IA For See Sheet iB For Cobnvenrrono�tmbols STATE OF NORTH[ CARO1LINA USee Sheets RW02C- 1 & RW02C-2 For Survey Control Sheets N.C. W_5706C 1 DUBLIN DIVISION OF HIGHWAYS H WAYS mn-- 1_-- Osip, -t TOWN LIMIT 44852.1.3 HSIP-0041710 PE' 44852.2.3 HSIP-0041110 ROW A 44852.3.3 HSIP-0041110 CONST a ` BLADED COUNTY � O 5aa�oNPo, PP°`t LOCATION: ROUNDABOUT O NDABOT AT INTERSECTION OF NC 41 O NC 410 Wetland Permit Drawings TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, Sheet 1 of 4 PROJECTS oP AND PAVEMENT MARKING OQSIT N.� ¢ BEGIN CONSTRUCTION � 4 -Yl- STA- 1+00.00 � 10 ?� END TIP PROJECT W-5706C VICINITY MAP -I- STA 22+00.00 T� DENOTES OFF -SITE DETOUR i TO LUG MBERTON BEGIN TIP PROJECT W-5706C - h -L- (NC HWY 41) \\ I � - TO EUZAEETHTOWN -L- STA 12 +00.00 i %� I ao � 0a z 0 a�r .END CONSTRUCTION 3r 0 0 NCDOT CONTACT: JASON HATFIELD - DIVISION PROJECT ENGINEER DOCUMENT NOT CONSIDEEED FINAL UNLEEE ALL SIONATUNES COMPLETED V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared far r Nl r Corolla Deportment or 7ransp Nmn m r orrice or: gypgA S ENGINEER 50 5 0 50 100 ADT 2V = PARSONS SUNGAIEOEGIGNGAOIF PA � `UI P 91_ N 50 M = 50 MPH SEAL %ta/ia15 anon OF 3Bt8 STANDARD SPSCIF ONS PLANS DHV = 10% LENGTH OF ROADWAY TIP PROJECT W-5706C = 0.189 MILES .-.m *Lc� �'' sD 25 50 100 D = 65% DAVID L. WILVER. PE T - 4% * * TTST= 1% DUAL= 3% TOTAL LENGTH OF TIP PROJECT W-5706C = 0.189 MILES RIGXT OF WAY DATE: MARCH 30, 2018 A oP Q (HORIZONTAL) PRO�`T ROADWAY DESIGN ENGINEER OPROFILE l0 5 Q 70 20 FUNC CLASS = LET77NG DATE: J. MATTHEW PICKENS, PE P" �`" D&s1t'"' E"D"'Ps" 5EAL ry28/2019 TtLwt' V RURAL MINOR COLLECTOR _ r a + e x APRIL 17, 2019 PROFILE (VERTICAL) (Y ) STATEWIDE TIER - E0 Wetland Permit Drawings Sheet 2 of 4 DENOTES FILL IN WETLAND DENOTES EXCAVATION IN WETLAND ® DENOTES HAND CLEARING O SIEC. CUT � DITCH III DETAIL I G ELA IS EST a 11 G, f RUE - RUE O -rr- PDT Sla, r2fooLoo I Or 6 . r BECOSTRUCT N III`F / RY SPIC IT Cn s . DETILI Q O SO I'll E RI A 1 z_ z SEE DETAIL i rr PT rc r I45°CP Sim 1 . Drtc Sro.l5+5020 M1 , sEE °ETA L ICI PER. _TDI ESTIO Rfa^O [ADI ,I 1 I SPEC .51 8E DETA - a - 2 N ' I S G EST 3 F C my D M aD2�svE PDT Va. pfOpaD SPEC. L, sEE DETAL < cEAT R.s EST R SY Gf 5 RIP I HS OE.Aa , u L(-rl- PC SI fd 50HGM OF NC. PBIs PG ISMSNLE. OL BRISIDII �9�5_ARTHPETROLEUV 55 BDRIP MP IY.IILC-rl- PRC slo. l8+i620 i sEEDETAIL I �sT IEDITCHsPEc fs, , :.cf°K8RRu5 YP6B156PG'DETAIL 1 D AIL I � -rtcH \ M��. D u H. M D Ta A , , Site 1 / i °IA _ 1 10 " o°M 5.. °.DD1. TO gzz. -n- IT RGR R OETNL 5 RCN \\ `FROM 57 TO Ai DETAIL 3T DETAIL4 DETAIL M PRC Sla 19f82A5 sPEc e, a s o.I ITCH qMu AI Sert SPEC I Yayl ITcn ALA PROM TO 1 IS TO so n RiT FROM rrA. ie. aD To STA. n . oo - M STAR I _IS =„= LT REn,O�E , • . \srA sPEc Du�iExTi 6rtcH T z.<I.I iwm �=smTH AIR nl 11 �� SEECDETAt] ITCN , ° ,wn.D on fnom STA,tT-5D MI^17 -7-11 � R T° S;A,, o 40TEH o°M 1AI IS o ST '; n SEE SHEET 5 FOR •L• PROFLE -rr- PDC sra22++aw \ SEE SHEET 5 FOR -YI- PROFLE E D STRUCT SEE SHEET 6 FOR -RAB- PROFLE g Wetland Permit Drawings +EOM EFEEE— FUUM ..oNs -Y/- PC Sheet 3 of 4 O $ft 12#6307� G,�57 SUNGATE DESIGN GROUP, P.A. a -YI- PT Sla 13+3679 -Y/- POT s/0./2f0plb DENOTES FILL IN ©i`�', WETLANDSPI BEGINCO STRUCT / �`' / �/� orrniLvx DITCH N DOWMENT NOT UNLESS ALL SIGN DENOTES EXCAVATION IN WETLAND r/ 1. O Q � °� ® DENOTES HAND �X Z CLEARING us5 P P. n /set / Ill CO, I DITCH RETAIL O Lsr.1 sr III DETAIL i c Es, T s. cE - - PT Sro III LT sPEc.*. oE°ui e - TII —ES I RIP RAP SEE SEE.— I f - PUL. PU - -L- PC SIG 17 s. si PUE—rPUE E DUE DUE •/ - Pr - f i 1 Br�pfl- B)!fl - B�/. I. < _♦ 119 I! _ 1ifS y9 LJw L- Eri-- - --------- ---------- IT ♦rvwteFs -�- : - 1-__-u._..;- - �: - - __. rwa �i 'y ( -_.,s --• 1 i F Ins 'A H, ssv dH„ aatrwn MoYGw .. - ��I SPEC .I v DUL I -'r Y rq r I !"✓ yS EST— Y Rs I - - SJs. sEE DLFAL x � } L - - EI sr cIn S x- M eo�EaE K sPEC UT. xsx/SOETNIe SA AR FAP > br rA 4K O. SEEAPIN(x \_ _ jlk H EST 7 sY'GF- - I+ii NC¢ ku / CIE DE>DITCH LLi YR GNWv im SO--1!5i NC. LLC PB A5EEc' O C EusTI I'll xa TZ 2 1y '/ - •- MnNLEv 8 rpNUl 31:ISSOMI E5, ] - // f _ H PE iPOLEUM -YI- PAC Slo. l8+ 20 + ' is ID-1CUr 1 ITCH ss oEn nAr }III un c.Ipv. �I f •_ rv. SIEC UT D DITCH sl - - Esi T sv GI e - $; • r5ygy5 Y o ` PEI.EIS6 PG SEE �� DETAIL 1 DETAIL I ° EIMc '1 1 =� SPECIALRCEI r 14!— I- �� .v pOu sr O si"IM.' L 9ri1?' AH ' , '�,' /' '/ / /;4• � S�C.E iu vS rtCX 41111 5 L F0.0M sin —SO TO M. 22 t00 YI IT Nfl R O T L DETAIL 3T I 4 DETAIL 5 rtc m. PAC S/o.19f82A5 sPEc uT aPu-I D,cn/ sPEc nL ICE,IED,cN SPECuTEn,L rD P �.1o.�rysp!�R� ��ea I.L� �"�.. / /%• M sT . s 2 'REDISTSATA112— TO STA ITfAOM ST STA. I • 00 • / / \EPECUDETAli6l rtCH Si DDpgo y'7 H ..� _ AIR SPED uT DITG„ ID, 5TA„-90 AT TD . ,, ,o -rl_ LT NpTE� 0 To TA- YI GC PSra22++IDLID \ `"�'" - ' '° n" - AT SEE SHEET 5 FOR -L• PROFLE E o STRAT SEE SHEET 5 FOR -vl- PROFLE _; SEE SHEET 6 FOR -RAB- PROFLE WETLAND AND SURACE WATER IMPACTS SUMMARY VVE=D IMPACTS SMFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 near -Y1- STA. 18+46.20 Roadway Fill/Spec. Lat. V Ditch 0.02 0.03 0.03 TOTALS`: 0.02 0.03 0.03 0 0 0 *Rounded totals are sum of actual impacts NOTES: 2018 Feb