Loading...
HomeMy WebLinkAbout310851_Plan of Action_20180924�C�I �6 2-D �i0 �`��✓�� PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Tina Batts 31-851 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard F 2—T-01 inches c. line b - line a (inches in red zone) = 12.0 inches d. top of dike surface area according to design 31200 ffz e. line c/12 x line d x 7.48 gallons/ft3 233376 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 18770 ft' h. current herd # 2600 ` certified herd # 2600 actual. waste produced' = current herd # x line g = 18770 ft' certified herd # i. volume of wash water according to structural design 12513 ft' j. excess rainfall over evaporation according to design 18200 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 61689 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/7/2018 0.85 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 250.8 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown .below) Structure 1 Tina Batts (PoA30day) 9-16-2018 Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Tina Batts (31-851) line m = 250.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = n. = 1 +2 +3+4+5+6 250.8 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window Batts 1 Bermuda Pasture 2.03 130.00 263.9 3/1 - 9/30 Batts 2 Bermuda Pasture 0.45 130.00 58.5 3/1 - 9/30 Batts 3 Bermuda Pasture 1.08 130.00 140.4 3/1 - 9/30 Batts 4 Bermuda Pasture 2.03 130.00 263.9 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 726.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 250.8 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 726.7 lb. PAN y. Overall PAN balance (w - x) = -476 lb. PAN SUMMARY Tina Batts (PoA30day) 9-16-2018 Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level,'add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: J i SUMMARY Tina Batts (PoA30day) 9-16-2018 Page 2 of 2 _