HomeMy WebLinkAbout310488_Plan of Action_20180924-dl�o2ssz 3�-� PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/24/2018 1. Structure Name/Identifier (ID): WD Thi en Juantia 31-488 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to. marker 5.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 14.0 inches d. top,of dike surface area according to design (area at below structural freeboard elevation) F 53820 ftZ e, line c/12 x line d x 7.48 gallons/ft3 469669 gallons 3. Projected volume of waste liquid produced during draw down period P1-3 f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 167400 ft3 h. current herd # 1240 certified herd #1 1240 t actual waste produced = current herd # x line g = 167400 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/1/2018 m. ((lines e + k)/1000) x line I REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Oft3 31112 ft3 247478 gallons 1.04 Ibs/1000 gal. 745.8 Ibs. PAN PoA (30 Day) 2/21 /00 9/24/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: WD Thigpen (Juantia)31-488 line m = 745.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 745.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIFI DS TO WHICH PAN CANNOT RF APPI IFn nl IRINr. THIS sn nev PFRIOn 2 PAN balance .. BALANCE FOR • column rxs 'State current crop ending application, date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1047.6 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 745.8 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1047.6 lb. PAN y. Overall PAN balance (w - x) _ -302 lb. PAN PoA (30 Day) 2/21/00 9/24/2018 :N Line y must show as a deficit. If line y does not show as a deficit, -list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. PoA (30 Day) 2/21 /00 9/24/2018