Loading...
HomeMy WebLinkAbout310418_Plan of Action_20180924s V 018(a5e) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Je 3141 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Tom Whitfield 31-418 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 7.5 inches d. top of dike surface area according to design 49178 Jft2 e. line c/12 x line d x 7.48 gallons/ft3 229907 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 59342.2 ft3 h. current herd # 1800 certified herd #1 1800 actual waste produced = current herd # x line g = certified herd # i. volume, of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/5/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 59342 ft3 0 ft3 29295.3 ft3 110501 gallons 1.42 Ibs/1000 gal. 483.4_ Ibs. PAN Structure 1 Tom Whitfield Farm (PoA30day) 9-16-2018 Page 1 of 1 i II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 ti HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: -Tom Whitfield (31-418) line m = 483.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = n. = 1 +2 +3+4+5+6 483.4 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR t. TOTAL PAN u. application window' 2 PAN balance BALANCE FOR (lb/acre) FIELD (lbs.) column r x s 5663 CP1 Rye 16.45 125.00 2056.3 9/1 - 3/31 VIC LV I.UI I GI IL IA%Jp GI IUII HJ. QLJV11%..QIIVI I UGLG VI IIUAL %AUiJ QLJV11%,QLIVII IJUUJJ II Ill IU UQIG IVI QV011cuiIO receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2056.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 483.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2056.3 lb. PAN y. Overall PAN balance (w - x) = -1573 lb. PAN SUMMARY Tom Whitfield Farm (PoA30day) 9-16-2018 Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. SUMMARY Tom Whitfield Farm (PoA30day) 9-16-2018 Page 2 of 2