HomeMy WebLinkAbout310226_Plan of Action_20180924r �
�L0 (ADZ s�3 -Z�FVr
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 1—
Facility Number: 31-226 County: Duplin
r
Facility Name: Bud Rivenbark
Certified Operator Name: Bud Rivenbark Operator #:
lagoon to the lowest point on the top of the dam for lagoons without spillways; and from
the current liquid level- in the lagoon to the bottom of the spillway for lagoons with
spillways.
Structure 1 Structure 2 Structure 3 Structure 4
Lagoon Name (ID): 1 2
Spillway (Yes or,No): No No
Level (inches): 13 14
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan. .
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal ,units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/20/2018
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Bud Rivenbark Phone:
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Cover Page Bud Rivenbark (PoA30day) 9-16-2018
Date: 9/16/2018
Page 1 of 1
t
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I Bud Rivenbark #1 31-226
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 13.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 6.5 inches
d. top of dike surface area according to design
69696 ft'
e. line c/12 x line d x 7.48 gallons/ft' 282385 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 105497.3 ft3
h. current herd #. F 3200 certified herd # 3200
actual waste produced = current herd # x line g = 105497 ft'
certified herd #
i. volume of wash water according to structural design Oft3
J. excess rainfall over evaporation according to design 42525 ft3
k. (lines h + i +j) x 7.48 x , 30 days/line f= 184534 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/24/2018 1.25 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1= 583.6 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 1 Bud Rivenbark (PoA30day) 9-16-2018 Page 1 of 1
0
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Bud Rivenbark #2 31-226
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 14.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 5.5 inches
d. top of dike surface area according to design
108836 ft2
e, line c/12 x line d x 7.48 gallons/ft3 373126 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days_
g. volume of waste produced according to structural design 131871 ft3
h. current herd # F-4--00-0-1 certified herd # 4000
actual waste produced = current herd # x line g = 131871 ft',
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/24/2018
11
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
65829 ft3
246466 gallons
1.47 1 Ibs/1000 gal.
910.8 Ibs. PAN
Structure 2 Bud Rivenbark (PoA30day) 9-16-2018
Page 1 of 1
i
II. TOTAL
POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Bud Rivenbark #1 (31-226)
line m = 583.6
lb PAN
2.
Structure ID: Bud Rivenbark #2 (31-226)
line m = 910.8
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
n. = 1 +2 +3+4+5+6 1494.4
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres,
s. remaining IRR
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
4307
pla
Bermuda Grazed
3.15
80.00
252.0
mar - oct
4307
p1b
Bermuda Grazed
0.32
255.00
81.6
mar - oct
4307
p2a
Bermuda Grazed
3.71
110.00
408.1
mar - oct
4307
p2b
Bermuda Grazed
0.64
200.00
128.0
mar - oct
4307
p3a
Bermuda Grazed
0.67
161.00
107.9
mar - oct
4307
p3b
Bermuda Grazed
0.71
167.00
118.6
mar - oct
4307
p4a
Bermuda Grazed
2.87
75.00
215.3
mar - oct
4307
p4b
Bermuda Grazed
0.74
255.00
188.7
mar - oct
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1500.1 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1494.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1500.1 lb. PAN
y. Overall PAN balance (w - x) _ -6 lb. PAN
SUMMARY Bud Rivenbark (PoA30day) 9-16-2018 Page 1 of 2
A
Line y must show as a deficit. If line y-does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
SUMMARY Bud Rivenbark (PoA30day) 9-16-2018 Page 2 of 2