HomeMy WebLinkAbout310209_Plan of Action_20180924PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I I Murphy Piglets 31-209 1 "
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 12.0 inches
b. designed 25 yr./24 'hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 7.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 22425 ft2
e. line c/12 x line d x 7.48 gallons/ft3 97848 gallons
3. Projected volume of waste liquid produced during draw down period
p1-3 90
180 days
g. volume of waste produced according to structural, design 23444 ,ft3
h. current herd # 3200 certified herd # 3200
actual,waste produced = current herd # x line g = 23444 ft3
certified herd #
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 14000 ft3
k. (lines h + i +j) x 7.48 x 30 days/line f= 46680 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/3/2018 2.12 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1 = 306.4 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE,ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00 9/24/2018
y
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Big Lagoon I Murphy Piglets 31-209 2
'2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 12.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. lineā¢b - line a (inches in red zone) = 7.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 25600 ft2
e. line c/12 x line d x 7.48 gallons/ft'' 111701 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 23444 ft3
h. current herd # F 3-2-0-01 certified herd #1 3200
actual waste produced = current herd # x line g = 23444 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 14000 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 46680 gallons
4. Total PAN*to be land applied during draw down period
I. current waste analysis dated 7/3/2018 1.70 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 269.2 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Murphy Piglets (31-209) 1
line m =
306.4 lb PAN
2.
Structure ID: Murphy Piglets (31-209) 2
line m =
269.2 Ib PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 575.6 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS M nAY PFRInn_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
72412
P1
Wheat
3.90
125:00
487.5
9/1 - 4/31
724121
P3
Wheat
6.70
125.00
837.5
9/1 - 4/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1325.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 575.6 lb. PAN
x.-Crop's remaining PAN balance (line v from section III) = 1325.0 lb. PAN
y. Overall PAN balance (w - x) _ -749 lb. PAN
PoA (30 Day) 2/21/00 9/24/2018
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding,the herd population and lagoon freeboard levels at the
receiving facility.
PoA (30 Day) 2/21/00 9/24/2018