Loading...
HomeMy WebLinkAbout20170951 Ver 1_Dewatering Plan Rhodestown Rd_20180718Development and Construction Dewatering Plan To: Whom it Concerns Contract #: DC00206 7/13/18 Ftwy 24 East • Post Office Box 1505 Cape Carteret, NC 28584 Here is the dewatering plan for-L-21+55, CL, 104 LF R.C.P. Class IV. -L- C +n i .. 42" RCP -AV J CL 8 RIP RAP 15 TONS 37 SY GEOTEXTILE Plan 1. 4" Godwin Double Diaphragm Diesel Pump 100-750 GPM pumping capacity. This pump will be on the upstream side of the ditch on the non -construction side of the sheet steel with the discharge side being on the downstream side of the second sheet of sheet steel. As per NCDENR coversation there will not need to be a silt bag on this pump because it will be pumping undisturbed water from construction. The pump will be running only when needed and will be checked out and setup before start of construction. 2. For dewatering purposes of open excavation, we will use a small electric or gas - powered pump with the intake encased stone and the discharged side going into a silt bag per detail 1630.06 to dewater as necessary for the installation of the 42" RCP 3. For blocking off the stream flow of the jurisdiction stream we will use sheet steel on both the upstream and downstream side to minimize disturbance and contain silt. 4. After the pipe is installed and backfilled and compacted we will install Rip Rap at the end of the pipe then removed the sheet steel to open back up the jurisdictional stream.