HomeMy WebLinkAbout20170951 Ver 1_Dewatering Plan_20180718 Carpenter,Kristi
From: Herndon, T. Mason
Sent: Wednesday, July 18, 2018 9:54 AM
To: Steenhuis, Joanne
Subject: FW: DC00206 Dewatering Plan
Attachments: Dewatering Plan Rhodestown Rd.pdf
Anneliese on vacation this week, but she forwarded this to me this morning.
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From:Westphal,Anneliese
Sent:Wednesday,July 18, 2018 8:09 AM
To: Herndon,T. Mason <tmherndon@ncdot.gov>
Subject: Fw: DC00206 Dewatering Plan
Mason,
Please see below. Sunland has started the pipe installation on Rhodestown Rd. If you would like to let Joanne
know, she may want to take a look. It is only a tributary so it probably depends on what else she has going
on. I can always visit the site later with or without her. Thanks.
From: Meyer, Benjamin C
Sent: Monday,July 16, 2018 3:27:50 PM
To:Westphal,Anneliese
Subject: DC00206 Dewatering Plan
Anneliese,
Attached is the dewatering plan that Sunland sent to us for DC00206 Rhodestown Curve. My reply is below,with
additional comments. They plan on starting the installation tomorrow. Let me know if Joanne or yourself have any other
comments and plan on checking the site during installation. I will keep you updated with progress. Thanks for the help.
Cheers,
Ben Meyer
Assistant Resident Engineer
Division 3-Jacksonville Construction Office
NCDOT
(910) 497-0520 office
(910) 617-1902 cell
bcmeyerl@ncdot.gov
bmeyer@rkk.com
295B Wilmington Hwy.
Jacksonville,NC 28540
m
From: Meyer, Benjamin C
Sent: Monday,July 16, 2018 3:22 PM
To: 'Chip Williford' <willifordc08@gmail.com>
Cc: Carroll,Trevor K<tkcarroll@ncdot.gov>;Zepeda,Zachary P<zpzepeda@ncdot.gov>; bvaldez@gfnet.com
Subject: RE: [External] Dewatering Plan
Chip,
This is acceptable with the following comments:
- Both pumps will need a backup available should they break down during a pumping operation.
- The pump around discharge will need to be dissipated. This will keep the discharge from creating scour/erosion
issues as the water is returned downstream.
- The silt bag for the dewatering pump will need to be installed on top of either pallets or#57 Stone (incidental to
the silt bag).
Let me know if you have any questions.
Cheers,
Ben Meyer
Assistant Resident Engineer
Division 3-Jacksonville Construction Office
NCDOT
(910) 497-0520 office
(910) 617-1902 cell
bcmeyerl@ncdot.gov
bmeyer@rkk.com
295B Wilmington Hwy.
Jacksonville,NC 28540
2
From: Chip Williford [mailto:willifordc08@gmail.com]
Sent: Monday,July 16, 2018 12:09 PM
To: Meyer, Benjamin C<bcmeyerl@ncdot.gov>
Subject: [External] Dewatering Plan
CAUTION: External email. Do not click links or open attachments unless verified.Send all suspicious email as an attachment to
Good Afternoon,
Was this what you meant for the dewatering plan?
Respectfully,
Chip Williford
Sunland Builders Inc.
C: 252-725-3600
PH: 252-764-2828
FAX: 252-393-7070
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
3