Loading...
HomeMy WebLinkAbout20170951 Ver 1_Dewatering Plan_20180718 Carpenter,Kristi From: Herndon, T. Mason Sent: Wednesday, July 18, 2018 9:54 AM To: Steenhuis, Joanne Subject: FW: DC00206 Dewatering Plan Attachments: Dewatering Plan Rhodestown Rd.pdf Anneliese on vacation this week, but she forwarded this to me this morning. Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Westphal,Anneliese Sent:Wednesday,July 18, 2018 8:09 AM To: Herndon,T. Mason <tmherndon@ncdot.gov> Subject: Fw: DC00206 Dewatering Plan Mason, Please see below. Sunland has started the pipe installation on Rhodestown Rd. If you would like to let Joanne know, she may want to take a look. It is only a tributary so it probably depends on what else she has going on. I can always visit the site later with or without her. Thanks. From: Meyer, Benjamin C Sent: Monday,July 16, 2018 3:27:50 PM To:Westphal,Anneliese Subject: DC00206 Dewatering Plan Anneliese, Attached is the dewatering plan that Sunland sent to us for DC00206 Rhodestown Curve. My reply is below,with additional comments. They plan on starting the installation tomorrow. Let me know if Joanne or yourself have any other comments and plan on checking the site during installation. I will keep you updated with progress. Thanks for the help. Cheers, Ben Meyer Assistant Resident Engineer Division 3-Jacksonville Construction Office NCDOT (910) 497-0520 office (910) 617-1902 cell bcmeyerl@ncdot.gov bmeyer@rkk.com 295B Wilmington Hwy. Jacksonville,NC 28540 m From: Meyer, Benjamin C Sent: Monday,July 16, 2018 3:22 PM To: 'Chip Williford' <willifordc08@gmail.com> Cc: Carroll,Trevor K<tkcarroll@ncdot.gov>;Zepeda,Zachary P<zpzepeda@ncdot.gov>; bvaldez@gfnet.com Subject: RE: [External] Dewatering Plan Chip, This is acceptable with the following comments: - Both pumps will need a backup available should they break down during a pumping operation. - The pump around discharge will need to be dissipated. This will keep the discharge from creating scour/erosion issues as the water is returned downstream. - The silt bag for the dewatering pump will need to be installed on top of either pallets or#57 Stone (incidental to the silt bag). Let me know if you have any questions. Cheers, Ben Meyer Assistant Resident Engineer Division 3-Jacksonville Construction Office NCDOT (910) 497-0520 office (910) 617-1902 cell bcmeyerl@ncdot.gov bmeyer@rkk.com 295B Wilmington Hwy. Jacksonville,NC 28540 2 From: Chip Williford [mailto:willifordc08@gmail.com] Sent: Monday,July 16, 2018 12:09 PM To: Meyer, Benjamin C<bcmeyerl@ncdot.gov> Subject: [External] Dewatering Plan CAUTION: External email. Do not click links or open attachments unless verified.Send all suspicious email as an attachment to Good Afternoon, Was this what you meant for the dewatering plan? Respectfully, Chip Williford Sunland Builders Inc. C: 252-725-3600 PH: 252-764-2828 FAX: 252-393-7070 Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 3