HomeMy WebLinkAboutNCS000061_Email_20190515Garcia, Lauren V
From: Darrell Wilson <darrell@lenoirmirror.com>
Sent: Wednesday, May 15, 2019 3:02 PM
To: Garcia, Lauren V
Subject: Re: [External] Re: Fwd: NCS000061 Permit Renewal
Attachments: LMC Storm Water Testing.xls
• External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
qPRPPRfam@nc.gov
Hi Lauren,
Attached is the information you requested. The information from the first half of 2015 cannot be found. The person
who was our environmental manager passed away in April of 2015, and either the test did not get done or he filed it
somewhere we can't find it. The rest of the data is based on the reporting results done by the firm we use for
testing. Let me know if you need any other data not provided. Thank you for your help in this matter.
Darrell
Darrell Wilson
President/CEO
Lenoir Mirror Company
www.LenoirMirror.com
Phone 828-728-3271
Fax 828-728-5010
On 5/9/2019 10:35 AM, Garcia, Lauren V wrote:
Hi Darrell,
Next week is perfectly fine!
Thanks,
Lauren
From: Darrell Wilson <darrell@lenoirmirror.com>
Sent: Thursday, May 09, 2019 10:19 AM
To: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Subject: Re: [External] Re: Fwd: NCS000061 Permit Renewal
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
[rttachment to report.spam@nc.gov
Good morning Lauren,
We have begun compiling the spreadsheet and will have that information to you early next week if that
is OK.
1
As far as operational changes, there is nothing different from 2009.
Have a good day,
darrell
Darrell Wilson
President/CEO
Lenoir Mirror Company
www.LenoirMirror.com
Phone 828-728-3271
Fax 828-728-5010
On 5/8/2019 2:17 PM, Garcia, Lauren V wrote:
Hi Darrell,
Thank you for working on this for me. The spreadsheet summarizes the monitoring
parameters in your permit: Total Suspended Solids, Biochemical Oxygen Demand,
Chemical Oxygen Demand, Lead, Silver, and pH. I have attached an example of a
spreadsheet another facility provided. I have had facilities in the past that have
preferred to send copies of the monitoring data if they could not create a spreadsheet,
so that is also an option.
Operational changes would include examples like changes in waste production, changes
in waste storage, using new/different chemicals, storing new chemicals outside and not
under a cover, vehicle maintenance on the site, etc. If the facility is still producing the
same products, using the same materials, and following the same procedures as in 2009,
there would be nothing to be reported.
Let me know if you have any more questions!
Thanks,
Lauren
From: Darrell Wilson <darrell@lenoirmirror.com>
Sent: Wednesday, May 08, 2019 2:00 PM
To: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Cc: Tim Brown <tim@lenoirmirror.com>; Drew Mayberry <drew@lenoirmirror.com>
Subject: [External] Re: Fwd: NCS000061 Permit Renewal
External email. Do not click links or open attachments unless you verify. Send all
suspicious email as an attachment to i ci i I � i i i
Good afternoon,
We are working on getting the information you requested below, and I have a couple
questions so we can make sure we get everything you need.
First, what data needs to be on the spreadsheet? We have the monitoring data needed,
I just wasn't sure what the columns in the spreadsheet need to contain. We will be glad
to compile it into a spreadsheet.
Second, what type of operational changes do you need to know about? We will be glad
to give you any information on such changes.
Thank you for your help on this.
Darrell
Darrell G. Wilson
President/CEO
Lenoir Mirror Company
www.LenoirMirror.com
Phone 828-728-3271
Fax 828-728-5010
On 5/8/2019 6:20 AM, Tim Brown wrote:
-------- Forwarded Message--------
Subject:NCS000061 Permit Renewal
Date:Tue, 7 May 2019 17:52:34 +0000
From:Garcia, Lauren V <lauren.garcia@ncdenr.gov>
To:tim@lenoirmirror.com <tim@lenoirmirror.com>
Hi Tim,
Thank you for calling me back earlier. I have looked through our paper
file and checked our database. The NCS000061 permit is categorized as
"In Review," which means that we do not have it officially recorded that
a finalized permit has been issued to you. The most recent permit we
have on file is from 2009. Isaiah Reed has also confirmed that he did not
issue a permit. I think you must be looking at an inspection report. I can
see in our database that an inspection took place on April 22, 2018.
I am working on issuing you a renewed permit, as the facility's permit
expired in 2014. Jack DeBeve submitted a renewal application in 2014.
For reference, I have attached the stormwater permit the facility should
be operating under.
There is some information I am required to ask you for to (1.) confirm
that the information I have is correct and (2.) make sure the permit
adequality serves the needs of the facility.
What I need from you:
A spreadsheet summarizing all of the monitoring data that
has been collected since the effective date of the current
permit;
A verification that the information in the renewal
application is still is still complete and correct; and
An explanation of any operational changes since the
renewal application was submitted.
The following link will take you to an online search box where you will
be able to enter your permit number and review the facilities
information to make sure it is correct:
https://reports.ncdenr.org/BOE/OpenDocument/1703191515/CrystalRe
ports/viewrpt.cwr?id=25212&apsuser=BIMS U&apspassword=blOMs c
r%28ddnri59%29&apsauthtype=secEnterprise&cmd=EXPORT&EXPORT
FMT=U2FPDF%3AO.
Information can be updated using the links provided below, where
applicable:
Owner Update: https://edocs.deg.nc.gov/Forms/SW-Name-Change
Owner Affiliation (i.e., someone with the company who is designated to
represent the company per signatory requirements in the permit (e.g.,
CEO) or another authorized representative):
https://edocs.deg.nc.gov/Forms/SW-Owner-AffiIiation
Company of Facility Name: https://edocs.deg.nc.gov/Forms/SW-Name-
Change
What happens next:
• Once I have the above listed information, I will verify the "draft"
permit information is correct;
You will receive the draft for a 30-day comment period. During
this time we will be able to address any comments or concerns
you have about your permit draft.
During the same 30-day period, the draft will be sent to an
Asheville Regional Office staff member for review and the
permit draft will be sent for Public Notice.
Once all comments and concerns are addressed, you will be
issued the final permit.
Feel free to contact me with any questions as well.
Thanks,
Lauren
Lauren Garcia
Environmental Specialist II
Stormwater Program
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
919-707-3648 (0)
lauren.garcia@ncdenr.gov
DEMLR Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
This email has been checked for viruses by AVG antivirus software.
www.avg.com