HomeMy WebLinkAbout310194_Plan of Action_20180924PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018
1. Structure Name/Identifier (ID): JRalph Lanier 31-194 FN: 31-194
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker ,
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft''
14.0 inches
19.0 inches
5.0 inches
96654 ft2
301238 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 116047.1 ft3
h. current herd # 3520 certified herd #1 3520
actual waste produced = current herd # x line g = 116047 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation- according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/7/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
r
PoA (30 Day) 2/21/00
0 ft3
58595.8 ft3
217721 gallons
1.26 Ibs/1000 gal.
653.9 Ibs. PAN
9/24/2018
IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Ralph Lanier(31-194)
line m =
653.9 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line rn—
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 653.9 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT gE APPLIED DURING THIS 30 DAY PERIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
6575
1
Bermuda Hay
4.36
100.00
436.0
3/1 - 9/31
65751
2
Bermuda Hay
4.16
100.00
416.0
3/1 - 9/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 852.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _ -653.9 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 852.0 lb. PAN
y. Overall PAN balance (w - x) _ ' -198 lb. PAN
PoA (30 Day) 2/21/00 9/24/2018
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
PoA (30 Day) 2/21/00 9/24/2018