HomeMy WebLinkAbout310134_Plan of Action_20180924PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Richard Lanier 31-134 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 9.5 inches d. top of dike surface area according to design 97795 ftZ e. line c/12 x line d x 7.48 gallons/ft3 579109 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058.2 ft3 h. current herd # 3672 certified herd #1 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # i. volume of wash water according to structural design 01ft3 j. excess rainfall over evaporation according to design 59262 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 224799 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/7/2018 1.02 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 820.0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Richard Lanier (PoA30day) 9-16-2018 Page 1 of 1 It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 26 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE -STRUCTURES FOR FACILITY 1. Structure ID: Richard Lanier (31-134) 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: line m = 820.0 lb PAN, line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = n. = 1 +2 +3+4+6+6 820.0 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining'IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 6788 3 Bermuda Hay 1.06 200.00 212.0 3/1 - 9/31 6788 4a Bermuda Hay 1.21 200.00 242.0 3/1 - 9/31 6788 5a Bermuda Hay 2.92 200.00 584.0 3/1 - 9/31 6788 6 Bermuda Hay 3.21 200.00 642.0 3/1 - 9/31 6788 7a Bermuda Hay 2.62 200.00 524.0 3/1 - 9/31 6788 8a Bermuda Hay 2.75 200.00 550.0 3/1 - 9/31 r 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2754.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n,from section II) = 820.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2754.0 lb. PAN y. Overall PAN balance (w - x) _ -1934 lb. PAN SUMMARY Richard Lanier (PoA30day) 9-16-2018 Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: I SUMMARY Richard Lanier (PoA30day) 9-16-2018 Page 2 of 2